BQ - Chiller - AC

44
PEKERJAAN INSTALASI TATA UDARA L0KASI RSUD KEBUMEN 1 NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material ( Rp ) ( Rp ) ( Rp ) PEKERJAAN TATA UDARA - A BANGUNAN A - 1 Lantai 1 UGD - Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row - Kap 10.000 CFM, 423.600 BTU/h - 4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang - dng Filter Dryer, Penel on/of dan Control Termostat - Pemipaan tembaga dan isolasi condensat, dan pipa Drain - lengkap terpasang set 2 4,500,000 - 2 Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM - Lengkapdng Hosing, Volume damper Fress air, dan Elec - tronic Air cleaner, terpasang di Retern Dac set 4 - 3 Pengadaan Pemasangann Ducting AC terpasang lengkap - Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - Duc tape …………..dan bantu lainnya - a BJLS 100 suplay - 54" X 26" 26 171,600 1,500,000 4,461,600 40" X 24" 28 171,600 1,350,000 4,804,800 36" X 20" 4 171,600 1,250,000 686,400 36" X 18" 28 171,600 1,150,000 4,804,800 34" X 20" 7 171,600 1,025,000 1,201,200 30" X 20" 6 171,600 975,000 1,029,600 b BJLS 80 suplay - 28" X 20" 11 141,900 1,350,000 1,560,900 26" X 14" 9 141,900 1,250,000 1,277,100 24" X 18" 5 141,900 1,150,000 709,500 24" X 16" 9 141,900 1,025,000 1,277,100 22" X 12" 7 141,900 975,000 993,300 c BJLS 60 suplay - 16" X 12" 17 107,800 1,250,000 1,832,600 18" X 14" 6 107,800 1,125,000 646,800 Jumlah 25,285,700.00

Transcript of BQ - Chiller - AC

PEKERJAAN INSTALASI TATA UDARA L0KASI RSUD KEBUMEN

1

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

PEKERJAAN TATA UDARA - 0.00A BANGUNAN A - 0.001 Lantai 1 UGD - 0.00

Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row - 0.00 Kap 10.000 CFM, 423.600 BTU/h - 0.00 4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang - 0.00 dng Filter Dryer, Penel on/of dan Control Termostat - 0.00

Pemipaan tembaga dan isolasi condensat, dan pipa Drain - 0.00 lengkap terpasang set 2 4,500,000 - 9,000,000.00

2 Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM - 0.00 Lengkapdng Hosing, Volume damper Fress air, dan Elec - 0.00 tronic Air cleaner, terpasang di Retern Dac set 4 - 0.00

3 Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

a BJLS 100 suplay - 0.00 54" X 26" m² 26 171,600 1,500,000 4,461,600 39,000,000.00 40" X 24" m² 28 171,600 1,350,000 4,804,800 37,800,000.00 36" X 20" m² 4 171,600 1,250,000 686,400 5,000,000.00 36" X 18" m² 28 171,600 1,150,000 4,804,800 32,200,000.00 34" X 20" m² 7 171,600 1,025,000 1,201,200 7,175,000.00 30" X 20" m² 6 171,600 975,000 1,029,600 5,850,000.00

b BJLS 80 suplay - 0.00 28" X 20" m² 11 141,900 1,350,000 1,560,900 14,850,000.00 26" X 14" m² 9 141,900 1,250,000 1,277,100 11,250,000.00 24" X 18" m² 5 141,900 1,150,000 709,500 5,750,000.00 24" X 16" m² 9 141,900 1,025,000 1,277,100 9,225,000.00 22" X 12" m² 7 141,900 975,000 993,300 6,825,000.00

c BJLS 60 suplay - 0.00 16" X 12" m² 17 107,800 1,250,000 1,832,600 21,250,000.00 18" X 14" m² 6 107,800 1,125,000 646,800 6,750,000.00

Jumlah 25,285,700.00 211,925,000.00

2

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

d BJLS 40 suplay - 0.00 12" X 10" m² 20 70,400 1,150,000 1,408,000 23,000,000.00 10" X 10" m² 3 70,400 1,025,000 211,200 3,075,000.00 10" X 6" m² 3 70,400 975,000 211,200 2,925,000.00 8" X 8" m² 44 70,400 850,000 3,097,600 37,400,000.00 8" X 6" m² 65 70,400 750,000 4,576,000 48,750,000.00

4 Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

a BJLS 100 Retern - 0.00BJLS 100 Retern - 0.00 56" X 26" m² 32 171,600 1,650,000 5,491,200 52,800,000.00 40" X 24" m² 31 171,600 1,500,000 5,319,600 46,500,000.00 34" X 16" m² 7 171,600 1,350,000 1,201,200 9,450,000.00 36" X 24" m² 13 171,600 1,250,000 2,230,800 16,250,000.00 36" X 16" m² 10 171,600 1,150,000 1,716,000 11,500,000.00 32" X 16" m² 26 171,600 975,000 4,461,600 25,350,000.00

b BJLS 80 Retern - 0.00 16" X 8" m² 14 141,900 1,350,000 1,986,600 18,900,000.00 12" X 8" m² 27 141,900 1,250,000 3,831,300 33,750,000.00 24" X 16" m² 36 141,900 1,150,000 5,108,400 41,400,000.00

c Plenum Reternt + Isolation In and out set 1 - 0.00d Plenum Suplay + Isilation In and out set 1 - 0.00e Reternt Air Grille Alimminium dobleduflexen - 0.00

24" X 16" set 10 5,750 57,500 0.00 16" X 8" set 5 5,000 25,000 0.00 12" X 8" set 6 5,000 30,000 0.00

f Diffuser 12" X 12" Aluminium + Volume Damper Justable set 63 270,000 17,010,000 0.00g Diffuser 2 slot 10 cm X 90 cm Aluminium - 0.00

and Damper justable set 8 - 0.00h Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 6" mtr 31 29,000 899,000 0.00i Door air Grille and Volume damper oudoor Type - 0.00

14" X 14" ( Fress Air ) set 1 - 0.00j Ducting Non Isolation 14" X 14" BJLS 60 m² 7 107,800 754,600 0.00

k Panel + Power kabel set 1 - 0.00

Jumlah 59,626,800.00 371,050,000.00

3

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

5 EXHAUST - 0.00a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m² - 0.00 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m² - 0.00 Door grille 8" X 8" set 1 - 0.00b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial - 0.00 Dacting Non isolation 8' x 8" = 3 m² - 0.00 6 x 4" = 2 m² m2 2 - 0.00 4 x 4" = 2 m² m2 2 - 0.00 Glelle 4" X 4" = 2 set set 2 - 0.00 Glelle 6" X 6" = 1 set set 1 - 0.00 Door Grille = 1 set 9" X 9" set 1 - 0.00

- 0.00B BANGUNAN A - 0.001 Lantai 2 ICU & ICCU - 0.00

Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row - 0.00 Kap 10.000 CFM, 423.600 BTU/h - 0.00 4 x YICA 100-CS 217 Dsshfc 12 a 4 DX Coil, lengkap terpasang - 0.00 dng Filter Dryer, Penel on/of dan Control Termostat - 0.00

Pemipaan tembaga dan isolasi condensat, dan pipa Drain - 0.00 lengkap terpasang set 2 - 0.00

2 Pengadaan Pre, medium, hepa Filter Cap 5.000 CFM - 0.00 Lengkapdng Hosing, Volume damper Fress air, dan Elec - 0.00 tronic Air cleaner, terpasang di Retern Dac set 4 - 0.00

3 Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

a BJLS 100 suplay - 0.00 54" X 26" m² 26 171,600 1,500,000 4,461,600 39,000,000.00 40" X 24" m² 28 171,600 1,350,000 4,804,800 37,800,000.00 36" X 20" m² 4 171,600 1,250,000 686,400 5,000,000.00 36" X 18" m² 28 171,600 1,150,000 4,804,800 32,200,000.00 34" X 20" m² 7 171,600 1,025,000 1,201,200 7,175,000.00 30" X 20" m² 6 171,600 975,000 1,029,600 5,850,000.00

b BJLS 80 suplay - 0.00 28" X 20" m² 11 141,900 1,350,000 1,560,900 14,850,000.00 26" X 14" m² 9 141,900 1,250,000 1,277,100 11,250,000.00 24" X 18" m² 5 141,900 1,150,000 709,500 5,750,000.00 24" X 16" m² 9 141,900 1,025,000 1,277,100 9,225,000.00 22" X 12" m² 8 141,900 975,000 1,135,200 7,800,000.00

- 0.00

Jumlah 22,948,200.00 175,900,000.00

4

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

c BJLS 60 suplay - 0.00 16" X 12" m² 17 107,800 1,250,000 1,832,600 21,250,000.00 18" X 14" m² 6 107,800 1,125,000 646,800 6,750,000.00

d BJLS 40 suplay - 0.00 12" X 10" m² * 70,400 1,150,000 #VALUE! #VALUE! 10" X 10" m² 3 70,400 1,025,000 211,200 3,075,000.00 10" X 6" m² 3 70,400 975,000 211,200 2,925,000.00 8" X 8" m² 44 70,400 850,000 3,097,600 37,400,000.00 8" X 6" m² 65 70,400 750,000 4,576,000 48,750,000.00

4 Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

a BJLS 100 Retern - 0.00BJLS 100 Retern - 0.00 56" X 26" m² 32 171,600 1,650,000 5,491,200 52,800,000.00 40" X 24" m² 31 171,600 1,500,000 5,319,600 46,500,000.00 34" X 16" m² 7 171,600 1,350,000 1,201,200 9,450,000.00 36" X 24" m² 13 171,600 1,250,000 2,230,800 16,250,000.00 36" X 16" m² 10 171,600 1,150,000 1,716,000 11,500,000.00 32" X 16" m² 26 171,600 975,000 4,461,600 25,350,000.00

b BJLS 80 Retern - 0.00 16" X 8" m² 14 141,900 1,350,000 1,986,600 18,900,000.00 12" X 8" m² 27 141,900 1,250,000 3,831,300 33,750,000.00 24" X 16" m² 36 141,900 1,150,000 5,108,400 41,400,000.00

c Plenum Reternt + Isolation In and out set 1 - 0.00d Plenum Suplay + Isilation In and out set 1 - 0.00e Reternt Air Grille Alimminium dobleduflexen - 0.00

24" X 16" set 10 5,750 57,500 0.00 16" X 8" set 5 5,000 25,000 0.00 12" X 8" set 6 5,000 30,000 0.00

- 0.00Supplying Complete Chiller installment - 0.00Placed on the foundation - 0.00Type : Air Cooled Liquid YAEP 77UC9C - 0.00cap : 150 TR, - 0.00Compressors. : semi-Hermetic reciprocating - 0.00Ambient air entering condenser 35 ºC - 0.00Fouling Factor : 0.044m² ºC/KW - 0.00Cooling Capacity : 537 KW ( 153 Ton ) - 0.00Water Temperature 12 ºC to 7 ºC ( Range 5ºC ) - 0.00Weter Flow Rate 25.7 L/S ( 410 GPM ) - 0.00Compressors Power 173 KW unit 2 1,330,000,000 2,660,000,000 0.00

Jumlah #VALUE! #VALUE!

5

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

f Diffuser 12" X 12" Aluminium + Volume Damper Justable set 63 270,000 17,010,000 0.00g Diffuser 2 slot 10 cm X 90 cm Aluminium - 0.00

and Damper justable set 8 - 0.00h Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 6" mtr 31 29,000 899,000 0.00i Door air Grille and Volume damper oudoor Type - 0.00

14" X 14" ( Fress Air ) set 1 - 0.00j Ducting Non Isolation 14" X 14" BJLS 60 m² 7 107,800 754,600 0.00

k Panel + Power kabel set 1 - 0.005 EXHAUST - 0.00

a, Axhaust 1- 1 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m² - 0.00 Ceiling Fan 120 CFM + Ducting 4 x 6 = 3 m² - 0.00 Door grille 8" X 8" set 1 - 0.00b, Wall Exh 1 - 2, 600 CFM, St pres 0,8, Industrial - 0.00 Dacting Non isolation 8' x 8" = 3 m² - 0.00 6 x 4" = 2 m² m2 2 - 0.00 4 x 4" = 2 m² m2 2 - 0.00 Glelle 4" X 4" = 2 set set 2 - 0.00 Glelle 6" X 6" = 1 set set 1 - 0.00 Door Grille = 1 set 9" X 9" set 1 - 0.00

6 BANGUNAN A - 0.00Lantai 3 Perkantoran - 0.00

1 Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 10 3,000,000 750,000 30,000,000 7,500,000.00 Kap : 1 PK 8,000 Btu/h set 12 3,500,000 750,000 42,000,000 9,000,000.00 Kap : 2 PK 18,000 Btu/h set 12 6,900,000 1,500,000 82,800,000 18,000,000.00

2 Exhaust Ceiling a cap 100 Cfm set 5 518,100 2,590,500 0.003 Exhaust Ceiling b cap 130 Cfm set 5 518,100 2,590,500 0.004 Glelle 4" X 4" = 13 set set 13 - 0.005 Glelle 6" X 6" = 4 set set 4 - 0.006 Ducting 6 x 4" m² 10 - 0.00

4 x 4" m² 18 - 0.00 - 0.00 - 0.00

Jumlah 178,644,600.00 34,500,000.00

6

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

B BANGUNAN B - 0.001 Lantai 1, Area publik, Poliklinik, Apotik, Lab - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 2 3,000,000 750,000 6,000,000 1,500,000.00 Kap : 1 PK 8,000 Btu/h set 12 3,500,000 750,000 42,000,000 9,000,000.00 Kap : 1,5 PK 12,000 Btu/h set 1 5,500,000 1,500,000 5,500,000 1,500,000.00 Kap : 2 PK 18,000 Btu/h set 12 6,900,000 1,500,000 82,800,000 18,000,000.00

b Exhaust Ceiling a cap 100 Cfm set 5 - 0.00c Exhaust Ceiling b cap 130 Cfm set 5 - 0.00d Glelle 4" X 4" = 13 set set 13 - 0.00e Glelle 6" X 6" = 4 set set 4 - 0.00f Ducting 6 x 4" m² 27 - 0.00

4 x 4" m² 26 - 0.00 - 0.00

2 BANGUNAN B - 0.00Lantai 2, Poliklinik, Medical chek Up, Medical Record, Lab dan - 0.00Farmasi - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 2 3,000,000 750,000 6,000,000 1,500,000.00 Kap : 1 PK 8,000 Btu/h set 9 3,500,000 750,000 31,500,000 6,750,000.00 Kap : 1,5 PK 12,000 Btu/h set 2 5,500,000 1,500,000 11,000,000 3,000,000.00 Kap : 2 PK 18,000 Btu/h set 16 6,900,000 1,500,000 110,400,000 24,000,000.00

b Exhaust Ceiling a cap 100 Cfm set 6 518,100 3,108,600 0.00c Exhaust Ceiling b cap 130 Cfm set 8 518,100 4,144,800 0.00d Glelle 4" X 4" = 13 set set 20 - 0.00e Glelle 6" X 6" = 4 set set 5 - 0.00f Ducting 6 x 4" m² 32 - 0.00

4 x 4" m² 29 - 0.00 - 0.00

Jumlah 302,453,400.00 65,250,000.00

7

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

C BANGUNAN C - 0.001 Lantai 1, Radiologi, VK, - 0.00

a YIDX 300, 3XYICA100, 10.900 CFM - 0.00Ducting Suply - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya set 5 - 0.00

b SPLIT DUC 1-1 - 0.00Ducting Suply - 0.00BJLS 100 suplay - 0.00 42" X 22" m² 21 171,600 3,603,600 0.00 26" X 18" m² 94 171,600 16,130,400 0.00 32" X 22" m² 26 171,600 4,461,600 0.00 30" X 20" m² 119 171,600 20,420,400 0.00BJLS 80 suplay - 0.00 20" X 16" m² 34 141,900 4,824,600 0.00 20" X 14" m² 102 141,900 14,473,800 0.00BJLS 60 suplay - 0.00 18" X 14" m² 149 107,800 16,062,200 0.00 16" X 10" m² 68 107,800 7,330,400 0.00BJLS 40 suplay - 0.00 12" X 10" m² 74 70,400 5,209,600 0.00 10" X 8" m² 238 70,400 16,755,200 0.00 8" X 6" m² 281 70,400 19,782,400 0.00

c Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00BJLS 100 Retern - 0.00BJLS 100 Retern - 0.00 56" X 26" m² 157 171,600 26,941,200 0.00 40" X 24" m² 102 171,600 17,503,200 0.00 34" X 16" m² 57 171,600 9,781,200 0.00 36" X 24" m² 64 171,600 10,982,400 0.00

Jumlah 194,262,200.00 -

8

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

36" X 16" m² 65 171,600 11,154,000 0.00 32" X 16" m² 138 171,600 23,680,800 0.00BJLS 80 Retern - 0.00 16" X 8" m² 68 141,900 9,649,200 0.00 12" X 8" m² 119 141,900 16,886,100 0.00 24" X 16" m² 144 141,900 20,433,600 0.00

d Plenum Reternt + Isolation In and out set 4 - 0.00e Plenum Suplay + Isilation In and out set 4 - 0.00f Reternt Air Grille Alimminium dobleduflexen - 0.00

24" X 16" set 20 5,750 115,000 0.00 16" X 8" set 27 5,000 135,000 0.00 12" X 8" set 36 5,000 180,000 0.00

g Diffuser 9" X 9" Aluminium + Volume Damper Justable set 204 260,000 53,040,000 0.00h Diffuser 2 slot 10 cm X 90 cm Aluminium - 0.00

and Damper justable set 40 - 0.00i Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 6" mtr 155 29,000 4,495,000 0.00j Door air Grille and Volume damper oudoor Type - 0.00

14" X 14" ( Fress Air ) set 4 - 0.00k Ducting Non Isolation 14" X 14" BJLS 60 m² 36 107,800 3,880,800 0.00l Panel + Power kabel set 4 - 0.00

m Exhaust Ceiling a cap 100 Cfm set 7 518,100 3,626,700 0.00n Exhaust Ceiling b cap 130 Cfm set 6 518,100 3,108,600 0.00o Glelle 4" X 4" = 13 set set 40 - 0.00p Glelle 6" X 6" = 4 set set 29 - 0.00q Ducting 6 x 4" m² 32 - 0.00

4 x 4" m² 29 - 0.00 10 X 14 m² 37 - 0.00

2 Bangunan C - 0.00Lantai 2, IBS, Haemodialisa, CSSD - 0.00

a Pengadaan pemasangan AC dng st Press 3,4 in wg, 4 row - 0.00 Kap 7.000 CFM, 285.100 BTU/h - 0.00 2 x YICA 125-CS 156 Dsshfc 12 a 4 DX Coil, lengkap terpasang - 0.00 dng Filter Dryer, Penel on/of dan Control Termostat - 0.00 Pemipaan tembaga dan isolasi condensat, dan pipa Drain - 0.00 lengkap terpasang set 5 - 0.00

- 0.00 - 0.00 - 0.00

Jumlah 150,384,800.00 -

9

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

BJLS 100 suplay - 0.00 40" X 20" m² 272 171,600 46,675,200 0.00BJLS 60 suplay - 0.00 20" X 16" m² 69 107,800 7,438,200 0.00 18" X 14" m² 140 107,800 15,092,000 0.00 18" X 12" m² 35 107,800 3,773,000 0.00 16" X 12" m² 38 107,800 4,096,400 0.00BJLS 40 suplay - 0.00 14" X 14" m² 60 70,400 4,224,000 0.00 14" X 10" m² 27 70,400 1,900,800 0.00 12" X 10" m² 51 70,400 3,590,400 0.00 9" X 9" m² 272 70,400 19,148,800 0.00Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

b BJLS 100 Retern - 0.00 48" X 24" m² 272 171,600 46,675,200 0.00 38" X 24" m² 103 171,600 17,674,800 0.00BJLS 80 Reternt - 0.00 24" X 16" m² 78 141,900 11,068,200 0.00BJLS 60 Reternt - 0.00 20" X 16" m² 77 107,800 8,300,600 0.00 16" X 16" m² 94 107,800 10,133,200 0.00BJLS 40 Reternt - 0.00 12" X 8" m² 21 70,400 1,478,400 0.00

c Plenum Reternt + Isolation In side and out side set 5 - 0.00d Plenum Suplay + Isilation Inside and out set 5 - 0.00e Reternt Air Grille Alimminium dobleduflexen - 0.00

60 cm X 30 cm set 21 5,000 105,000 0.00 24" X 16" set 12 5,750 69,000 0.00 16" X 8" set 16 5,000 80,000 0.00 16" X 16" set 16 5000 80,000 0.00 16" X 16" set 16 5000 80,000 0.00 12" X 12" set 21 5000 105,000 0.00 12" X 8" set 11 5,000 55,000 0.00

Jumlah 201,843,200.00 -

10

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

f Diffuser 9" X 9" Aluminium + Volume Damper Justable set 70 260,000 18,200,000 0.00Diffuser 3 slot 16" X 48" Aluminium - 0.00 and Damper justable set 47 - 0.00

g Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 8" mtr 217 34,500 7,486,500 0.00h Door air Grille and Volume damper oudoor Type - 0.00

14" X 14" ( Fress Air ) set 4 - 0.00i Ducting Non Isolation 14" X 14" BJLS 60 m² 21 107,800 2,263,800 0.00j Panel + Power kabel set 4 - 0.00

k Diffuser 2 slot 15 cm X 120 cm Aluminium - 0.00 and Damper justable set 102 - 0.00

l Door air Grille and Volume damper oudoor Type - 0.00 18" X 18" ( Fress Air ) set 4 - 0.00

m Ducting Non Isolation 18" X 18" BJLS 60 m² 27 107,800 2,910,600 0.00n Electronic Air Cleaner Cap 2000 CFM set 5 5,576,500 27,882,500 0.00o Filter and hosing, hanger include, Pre Filter, medium - 0.00

filter, hepa Filter Capasity 4.000 CFM set 10 - 0.00p Panel + Power kabel set 4 - 0.00q Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 6" mtr 204 29,000 5,916,000 0.00r Exhaust Ceiling a cap 100 Cfm set 8 518,100 4,144,800 0.00s Exhaust Ceiling b cap 130 Cfm set 7 518,100 3,626,700 0.00t Glelle 4" X 4" = 13 set set 40 - 0.00u Glelle 6" X 6" = 4 set set 29 - 0.00v Ducting 6 x 4" m² 32 - 0.00

4 x 4" m² 29 - 0.00 10 X 14 m² 37 - 0.00

3 EXHAUST DUCT & FAN - 0.00c, Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 12" x 10" = 14 m² - 0.00 6 x 6" = 12 m² m2 12 - 0.00 6" x 4" = 8 m² m2 8 - 0.00 4 x 4" = 4 m² m2 4 - 0.00 Glelle 4" X 4" = 4 set set 4 - 0.00 Glelle 6" X 6" = 1 set set 8 - 0.00d, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial - 0.00 Dacting Non isolation 12" x 12" = 16 m² - 0.00 12" x 10" = 16 m² m2 16 - 0.00 6" x 4" = 8 m² m2 8 - 0.00 4" x 4" = 4 m² m2 4 - 0.00 Glelle 4" X 4" = 4 set set 8 - 0.00

Jumlah 72,430,900 -

11

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

D BANGUNAB D - 0.001 Lantai 1, Fhisio Traphy, - 0.00

a Split Duc 1 - 5 - 0.00YIDX150,2XYICA075, 5.000 CFM - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya set 1 - 0.00

b Ducting Suply - 0.00BJLS 100 suplay - 0.00 36" X 18" m² 8 171,600 1,372,800 0.00BJLS 80 suplay - 0.00 24" X 16" m² 4 141,900 567,600 0.00 22" X 14" m² 10 141,900 1,419,000 0.00BJLS 60 suplay - 0.00 20" X 14" m² 12 107,800 1,293,600 0.00 18" X 14" m² 14 107,800 1,509,200 0.00BJLS 40 suplay - 0.00 12" X 10" m² 5 70,400 352,000 0.00 10" X 10" m² 20 70,400 1,408,000 0.00 9" X 8" m² 44 70,400 3,097,600 0.00

c Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

d BJLS 80 Retern - 0.00 24" X 24" m² 52 141,900 7,378,800 0.00BJLS 60 Reternt - 0.00 16" X 16" m² 53 107,800 5,713,400 0.00

e Plenum Reternt + Isolation In side and out side set 1 - 0.00f Plenum Suplay + Isilation Inside and out set 1 - 0.00g Reternt Air Grille Alimminium dobleduflexen - 0.00

60 cm X 30 cm set 2 5,000 10,000 0.00 12" X 12" set 2 5,000 10,000 0.00 16" X 16" set 5 5,000 25,000 0.00

h Diffuser 8" X 8" Aluminium + Volume Damper Justable set 22 255,000 5,610,000 0.00

Jumlah 29,767,000.00 -

B552
Author:

12

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

i Diffuser 9" X 9" Aluminium + Volume Damper Justable 9 260,000 2,340,000 0.00j Diffuser 2 slot 10 cm X 90 cm Aluminium - 0.00

and Damper justable set 3 - 0.00k Door air Grille and Volume damper oudoor Type - 0.00

14" X 14" ( Fress Air ) set 1 - 0.00l Ducting Non Isolation 14" X 14" BJLS 60 m² 14 107,800 1,509,200 0.00

m Panel + Power kabel set 1 - 0.002 Lantai 2, Fhisio Traphy, - 0.00

a YIDX250,2XYICA125, 8.500 CFM - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00

b Ducting Suply - 0.00BJLS 100 suplay - 0.00 42" X 16" m² 8 171,600 1,372,800 0.00BJLS 80 suplay - 0.00 28" X 14" m² 10 141,900 1,419,000 0.00 26" X 14" m² 24 141,900 3,405,600 0.00 24" X 14" m² 7 141,900 993,300 0.00 22" X 12" m² 9 141,900 1,277,100 0.00BJLS 60 suplay - 0.00 20" X 12" m² 12 107,800 1,293,600 0.00 18" X 12" m² 12 107,800 1,293,600 0.00BJLS 40 suplay - 0.00 12" X 10" m² 5 70,400 352,000 0.00 10" X 10" m² 5 70,400 352,000 0.00 10" X 8" m² 23 70,400 1,619,200 0.00

c Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00BJLS 40 Reternt - 0.00 14" X 12" m² 9 70,400 633,600 0.00 14" X 8" m² 15 70,400 1,056,000 0.00

- 0.00

Jumlah 18,917,000.00 -

13

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

d EXHAUST DUCT & FAN - 0.00Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 12" x 10" = 14 m² - 0.00 6 x 6" = 12 m² m2 12 - 0.00 6" x 4" = 8 m² m2 8 - 0.00 4 x 4" = 4 m² m2 4 - 0.00 Glelle 4" X 4" = 4 set set 4 - 0.00 Glelle 6" X 6" = 1 set set 3 - 0.00

e Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 3 3,000,000 750,000 9,000,000 2,250,000.00 Kap : 1 PK 8,000 Btu/h set 3 3,500,000 750,000 10,500,000 2,250,000.00 Kap : 1,5 PK 12,000 Btu/h set 2 5,500,000 1,500,000 11,000,000 3,000,000.00 Kap : 2 PK 18,000 Btu/h set 4 6,900,000 27,600,000 0.00

f Exhaust Ceiling a cap 100 Cfm set 4 518,100 2,072,400 0.00g Exhaust Ceiling b cap 130 Cfm set 4 518,100 2,072,400 0.00

- 0.00E BANGUNAN E - 0.00

1 a Rawat Inap Bang A, Lantai 1 - 0.00Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 1 3,000,000 750,000 3,000,000 750,000.00 Kap : 1 PK 8,000 Btu/h set 21 3,500,000 750,000 73,500,000 15,750,000.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 138,744,800.00 24,000,000.00

14

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 4 m² m2 4 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 7 m² m2 7 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 9 m² m2 9 - 0.00 Grelle 4" X 4" = 11 set set 11 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.002 Rawat Inap Bang A, Lantai 2 - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 16 3,000,000 48,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 7 3,500,000 24,500,000 0.00

6 Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 3 m² m2 3 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 4 m² m2 4 - 0.00 10" x 8" = 4 m² m2 4 - 0.00 12" x 8" = 7 m² m2 7 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 9 m² m2 9 - 0.00 Grelle 4" X 4" = 12 set set - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 72,500,000.00 -

15

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

F BANGUNAN F - 0.001 Rawat Inap Bang B, Lantai 1 - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 8 3,000,000 24,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 7 3,500,000 24,500,000 0.00

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.002 Rawat Inap Bang B, Lantai 2 - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 9 3,000,000 27,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 7 3,500,000 24,500,000 0.00

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00

- 0.00

Jumlah 100,000,000.00 -

16

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.00G BANGUNAN G - 0.001 Rawat Inap Bang C, Lantai 1 - 0.00

a Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 7 3,000,000 21,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 3 3,500,000 10,500,000 0.00

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

2 Rawat Inap Bang C, Lantai 2 - 0.00a Pengadaan pemasangan AC Split dinding, lengkap - 0.00

terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 7 3,000,000 21,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 2 3,500,000 7,000,000 0.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 59,500,000.00 -

17

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

b Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.00H BANGUNAN H - 0.00

a Rawat Inap Bang D, Lantai 1 - 0.00Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 7 3,000,000 21,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 3 3,500,000 10,500,000 0.00 Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 31,500,000.00 -

18

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

b Rawat Inap Bang D, Lantai 2 - 0.00Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 7 3,000,000 21,000,000 0.00 Kap : 1 PK 8,000 Btu/h set 3 3,500,000 10,500,000 0.00 Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 2 m² m2 2 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 8 m² m2 8 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 12 m² m2 12 - 0.00 Grelle 4" X 4" = 12 set set 12 - 0.00 Door Grille 18" X 18" = 1 set set 2 - 0.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 31,500,000.00 -

19

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

I BANGUNAN I - 0.00Dapur, Loundry, Rg Jenasah, & Workshop - 0.00a, Centrifugal Exhaust 2A - 5, 1.050 Cfm st 2 In Wg Industrial - 0.00 Dacting Non isolation 18" x 12" = 26 m² m2 26 - 0.00 14" x 12" = 19 m² m2 19 - 0.00 8" x 8" = 24 m² m2 24 - 0.00 Grelle 8" X 8" = 7 set set 7 - 0.00

- 0.00b, Centrifugal Exhaust 2A - 6, 400 Cfm st 1,2 In Wg Industrial - 0.00 Dacting Non isolation 18" x 12" = 26 m² m2 26 - 0.00 10" x 10" = 26 m² m2 26 - 0.00 Grelle 6" X 6" = 2 set set 2 - 0.00

- 0.00c, Wall Exh 2A - 7, 200 CFM, St pres 0,8, Industrial set 1 - 0.00

- 0.00d, Centrifugal Exhaust 1C - 1, 350 Cfm st 1,2 In Wg Industrial - 0.00 Dacting Non isolation 12" x 12" = 26 m² m2 26 - 0.00 8" x 6" = 7 m² m2 7 - 0.00 6" x 4" = 3 m² m2 3 - 0.00 Grelle 6" X 6" = 6 set set 6 - 0.00

- 0.00e, Exhaust Fan Kitchen Cap 11.000 CFM Axial St Pres 1 In WG - 0.00 Set Hood and Ducting ( 2 ) set 2 - 0.00

- 0.00f, Axial Exhaust 2C- 1, 1.000 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 4" x 4" = 16 m² m2 16 - 0.00 6" x 4" = 2 m² m2 2 - 0.00 8" x 4" = 3 m² m2 3 - 0.00 10" x 4" = 4 m² m2 4 - 0.00 10" x 8" = 3 m² m2 3 - 0.00 12" x 8" = 7 m² m2 7 - 0.00 14" x 10" = 4 m² m2 4 - 0.00 16" x 10" = 9 m² m2 9 - 0.00 Grelle 4" X 4" = 10 set set 19 - 0.00 Door Grille 18" X 18" = 1 set set 1 - 0.00

- 0.00 - 0.00 - 0.00

Jumlah - -

20

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

J BANGUNAN K, ASRAMA LT 1 - 0.00a a, Wall Exhaust 1- 4, 600 Cfm st 1,2 In Wg Industrial - 0.00

Dacting Non isolation 12" x 12" = 16 m² m2 16 - 0.00 12" x 10" = 16 m² m2 16 - 0.00 6" x 4" = 8 m² m2 8 - 0.00 4" x 4" = 4 m² m2 4 - 0.00 Glelle 4" X 4" = 4 set set 4 - 0.00

- 0.00b, Exhaust Ceiling a cap 100 Cfm set 4 518,000 2,072,000 0.00c, Exhaust Ceiling b cap 150 Cfm set 4 518,000 2,072,000 0.00

- 0.00 - 0.00 - 0.00

d, Cintrifugal Exhaust 1- 3, 600 Cfm st 1 In Wg Industrial - 0.00 Dacting Non isolation 12" x 10" = 14 m² m2 14 - 0.00 6 x 6" = 12 m² m2 12 - 0.00 6" x 4" = 8 m² m2 8 - 0.00 4 x 4" = 4 m² m2 4 - 0.00 Glelle 4" X 4" = 4 set set 4 - 0.00 Glelle 6" X 6" = 1 set set 1 - 0.00e, Pengadaan pemasangan AC Split dinding, lengkap - 0.00 terpasang dengan hanger Indor unit, pondasi outdoor - 0.00 termasuk pemipaan refigeran, drain, kabel power ke P - 0.00 AC, kabel control, Thermosstat, lengkap terpasang - 0.00 Type : Dinding Wireless, Produc Nasional, Daikin - 0.00 Kap : 0,75 PK 6,000 Btu/h set 0 - 0.00 Kap : 1 PK 8,000 Btu/h set 16 3,500,000 56,000,000 0.00

- 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

Jumlah 60,144,000.00 -

21

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

b BANGUNAN K, Rg Serbaguna LT 2 - 0.00YIDX 300, 3XYICA100, 10.900 CFM - 0.00Ducting Suply - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 24 kg/m³-1", Allumunium Foil AB Foil AB-631D/S - 0.00atau 2 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya set 1 - 0.00SPLIT DUC 1-1 - 0.00Ducting Suply - 0.00BJLS 100 suplay - 0.00 42" X 22" m² 4 171,600 686,400 0.00 26" X 18" m² 4 171,600 686,400 0.00 32" X 22" m² 4 171,600 686,400 0.00 30" X 20" m² 31 171,600 5,319,600 0.00BJLS 80 suplay - 0.00 20" X 16" m² 7 141,900 993,300 0.00 20" X 14" m² 20 141,900 2,838,000 0.00BJLS 60 suplay - 0.00 18" X 14" m² 26 107,800 2,802,800 0.00 16" X 10" m² 14 107,800 1,509,200 0.00BJLS 40 suplay - 0.00 12" X 10" m² 10 70,400 704,000 0.00 10" X 8" m² 51 70,400 3,590,400 0.00 8" X 6" m² 36 70,400 2,534,400 0.00Ducting Retern - 0.00Pengadaan Pemasangann Ducting AC terpasang lengkap - 0.00Dengan Gantungan, Bobokan, Hanger, Solasi glaswol - 0.00Density 16 kg/m³-1", Allumunium Foil AB Foil AB-S/S - 0.00atau 1 sisi Fire Resistant, cill Flinkut, dan matrial, isolasi - 0.00Duc tape …………..dan bantu lainnya - 0.00BJLS 100 Retern - 0.00BJLS 100 Retern - 0.00 56" X 26" m² 23 171,600 3,946,800 0.00 40" X 24" m² 20 171,600 3,432,000 0.00 34" X 16" m² 13 171,600 2,230,800 0.00 36" X 24" m² 14 171,600 2,402,400 0.00

- 0.00

Jumlah 34,362,900.00 -

22

NO URAIAN PEKERJAAN Vol Sat Harga Material Upah Kerja Total Material Total Upah

( Rp ) ( Rp ) ( Rp ) ( Rp )

36" X 16" m² 11 171,600 1,887,600 0.00 32" X 16" m² 36 171,600 6,177,600 0.00BJLS 80 Retern - 0.00 16" X 8" m² 10 141,900 1,419,000 0.00 12" X 8" m² 18 141,900 2,554,200 0.00 24" X 16" m² 36 141,900 5,108,400 0.00Plenum Reternt + Isolation In and out set 1 - 0.00Plenum Suplay + Isilation In and out set 1 - 0.00Reternt Air Grille Alimminium dobleduflexen - 0.00 24" X 16" set 3 5,750 17,250 0.00 16" X 8" set 4 5,000 20,000 0.00 12" X 8" set 2 5,000 10,000 0.00Diffuser 9" X 9" Aluminium + Volume Damper Justable set 27 260,000 7,020,000 0.00Diffuser 2 slot 10 cm X 90 cm Aluminium - 0.00 and Damper justable set 20 - 0.00Flexible Duc Isolation, Glass Wool, Al Foil FR Ø 6" mtr 36 29,000 1,044,000 0.00Door air Grille and Volume damper oudoor Type - 0.00 14" X 14" ( Fress Air ) set 1 - 0.00Ducting Non Isolation 14" X 14" BJLS 60 m² 10 107,800 1,078,000 0.00Panel + Power kabel set 1 - 0.00 Exhaust Ceiling a cap 100 Cfm set 1 518,100 518,100 0.00 Exhaust Ceiling b cap 130 Cfm set 1 518,100 518,100 0.00

- 0.00

Jumlah 27,372,250.00 -

TOTAL PEKERJAAN AC 2,694,812,750.00