apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi...

40

Transcript of apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi...

Page 1: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside
Page 2: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Page 1 of 2

HEAD OFFICE & FACTORY : Jl. Raya Kedamean No. 168, Desa Mojotengah, Kecamatan Menganti Gresik 61174, INDONESIA Phone : +62 31 7913777 (Hunting) Facsimile : +62 31 7912047 Email : [email protected] Homepage : http://www.weltes.co.id

Gresik, 17 Januari 2017 No: 016/W-PP/I-17-1 Kepada Yth. PT. PP (Persero) Tbk. DVP – EPC Jl. Letjend. TB Simatupang No. 57 Pasar Rebo, Jakarta 13760 Up. : Bpk. Fuad Prabowo C.c. : -. Bpk. Satrio Agung Wijonarko

Hal : Final Negosiasi Penawaran Harga Main Equipment, Mechanical, Intrument and Electrical Erector, Gresik Gas CoGeneration Plant – Gresik.

Dengan hormat, Sesuai hasil final negosiasi pekerjaan “Erector Main Equipment, Mechanical, Instrument & Electrical”

pada tanggal 17 Januari 2017, Gresik Gas CoGeneration Plant – Gresik, berikut kami sampaikan penawaran harga, sbb. :

Main Equipment, Mechanical, Intrument and Electrical Erector Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir

Total Harga pekerjaan : Rp. 19.600.000.000,- Terbilang : Sembilan Belas Milyar Enam Ratus Juta Rupiah. Keterangan :

Harga belum termasuk PPn 10%.

Harga sudah termasuk PPh 3%.

Harga adalah at site PKG- Gresik.

Spesifikasi dan teknikal data sesuai terlampir.

Tidak termasuk material fabrikasi equipment.

Tidak termasuk painting.

Page 3: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Page 2 of 2

Sudah termasuk penyediaan crane maximum 150 ton.

Sudah termasuk pekerjaan pemasangan di site.

Sudah termasuk Hydrotest kecuali pengadaan air.

Waktu penyelesaian : 7 (Tujuh) bulan setelah terima PO dan uang muka diterima dan supply material on schedule as proposed. Syarat Pembayaran : Full SKBDN 90 days with : 5% DP. 90% monthly progress. 5% Retensi 12 bulan, counter warranty bond

Demikian kami sampaikan, atas perhatian dan kerjasamanya kami ucapkan terima kasih. Hormat kami, Hendratama A. Direktur

Page 4: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

ATTACHMENT 1

SCOPE OF SUPPLY & PRICE BREAKDOWN Mechanical Construction Work -

Project : GGCP

Contractor : PT. PP

UNIT PRICE TOTAL PRICE

(Rp) (Rp)

I PREPARATION WORKS

A Temporary Office, Storage & Warehouse 1.00 Ls 100,000,000 100,000,000

B Fabrication Workshop 1.00 Ls -

C Equipment Mobilization 1.00 Ls 75,000,000 75,000,000 Attachment 3 : Equipment List exclude 550 ton crane

D Tools Mobilization 1.00 Ls 50,000,000 50,000,000 Attachment 4 : Tools + Scaffolding (Attachment 6 : Common

Works)

E HSE Procedure Praparation & Tools Mobilization 1.00 Ls 200,000,000 200,000,000 Attachment 2 : HSE

F Lifting & Rigging Plan 1.00 Ls 250,000,000 250,000,000

SUBTOTAL PREPARATION WORKS 675,000,000

II DIRECT WORKS

A MAIN EQUIPMENT

1 GAS TURBINE GENERATOR UNIT 1.00 Set - 3,605,118,000 GTG General Arrangement, PID, SLD and IsometricAll Installation & Testing shall follow GE

Manual Procedure

a. Mechanical, Electrical & Instrument Installation

- Gas Turbine & Generator Skid Positioning

□ Gas Turbine SkidPositioning on Foundation 1.00 Set Included 1,146,801,000 T028 (GGCP-01-C2-L0-001-PP Gas Turbine Generator

Machinery Foundation GA Rev.1)Sliding Method

T106 (GGCP-01-C2-L0-001-PP Turbogenerator GA Rev.2)

T104 (GGCP-01-M0-GA-003-PP GA Mechanical Connection

Rev.2)

T115 (GGCP-01-C2-DW-001-PP GT Auxilliary Foundation

Drawing Rev.1)

□ Generator & Gearbox Skid Positioning on Foundation 1.00 Set Included Included T063 (GGCP-01-M0-DS-002-PP GT Weights and COG Rev.0)Heavy Lifting Required from Truck to

Foundation

□ Gas Turbine, Gearbox & Generator Allignment 1.00 Lot Included 150,000,000 T030 (GGCP-01-E0-ED-002-PP Generator Main Terminal

Boxes Outline Rev.0)

T034 (GGCP-01-E0-GA-001-PP Generator GA Drawing Rev.0)

- Fuel Gas Meter for GTG 1.00 Lot Included 100,000,000 T095 (GGCP-01-M11-ED-001-PP Fuel Gas Flow Meter

Outline Rev.2 )

T113 (GGCP-01-I2-EL-001-PP Fuel Gas System Field

Instrument List Rev.2)

- Enclosure Installation 1.00 Lot Included 100,000,000 Refer to T106 (GGCP-01-C2-L0-001-PP Turbogenerator GA

Rev.2)

- Ventilation System 1.00 Lot Included 100,000,000 Refer to T106 (GGCP-01-C2-L0-001-PP Turbogenerator GA

Rev.2)

- Air Intake System 1.00 Lot Included 125,000,000 T081 (GGCP-01-M11-ED-003-PP Pulse Jet Filter House

Outline Drawing Rev.5)

- Exhaust System 1.00 Lot Included 125,000,000 Refer to T106 (GGCP-01-C2-L0-001-PP Turbogenerator GA

Rev.2)

- Fire Fighting System 1.00 Lot Included 50,000,000 T056 (GGCP-01-M11-ED-004-PP CO2 Fire Extinguishing

Bottle Skid Outline Drawing Rev.1)

- Installation of Piping & Tubing inside GTG Battery Limit 1.00 Lot Included 36,250,000 T102 (GGCP-01-L0-GA-001-PP Interconnecting Piping Layout

Rev.2 )

- Electrical Installation & Cabling 1.00 Lot Included 480,000,000 T033 (GGCP-01-E5-LP-001-PP Battery Layout & Connection

Diagram Rev.0)

T053 (GGCP-01-M9-GA-001-PP Starting Motor GA &

Terminal Box Outline Drawing Rev.1)

T077 (GGCP-01-E0-LP-001-PP Generator Wiring Diagram

Rev.0 )

REFERENCE DOCUMENT REMARKSNO DESCRIPTION QTY UNIT

Page 5: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

T080 (GGCP-01-E5-LP-002-PP DC Panel Outline Drawing

Rev.2 )

T092 (GGCP-01-E5-HK-001-PP Field Electrical Hook Up &

Wiring Diagram Rev.2 )

T105 (GGCP-01-E0-ED-002-PP Generator Excitation Panel

Outline Drawing Rev.2)

T109 (GGCP-01-E0-SL-001-PP General Single Line Diagram

Rev.3)

T114 (GGCP-01-E0-LP-002-PP Generator Control &

Protection Panel Wiring Diagram Rev.2)

T116 (GGCP-01-E0-ED-004-PP Generator Control &

Protection Panel Outline Drawing Rev.1)

- Steel Structure and Platform 1.00 Lot Included 81,067,000 T032 (Inlet Duct Structure Outine Drawing)

- Turbine Control System (Mark Vie) Installation 1.00 Lot Included 55,000,000 T045 (GGCP-01-M0-GA-002-PP UCP Layout & Main

Instrument List Rev.1)

T089 (GGCP-01-I7-LP-002-PP Unit Control System

Interconnecting Wiring Diagram Rev.0)

T098 (GGCP-01-M0-LP-001-PP Control System Schematic

Rev.3 )

T111 (GGCP-01-I7-IX-001-PP Unit Control System Hardware

I/O List Rev.4 )

T103 (GGCP-01-I7-DW-001-PP Unit Control System

Construction Drawing & Component List Rev.1)

T110 (GGCP-01-I7-LP-001-PP Unit Control System Wiring

Diagram Rev.2)

T107 (GGCP-01-E2-CL-001-PP Suggested Interconnecting

Control Cable List Rev.1)

- Field Instrument Installation & Tag Labelling 1.00 Lot Included 50,000,000 All GTG System PID

- Lubrication Oil Filling 1.00 Lot Included 25,000,000 T084 (GGCP-01-M0-ES-001-PP Utility Consumption List

Rev.1)

- Installation Completion 1.00 Ls Included 906,000,000 Refer to T106 (GGCP-01-C2-L0-001-PP Turbogenerator GA

Rev.2)

- Painting Works 1.00 Lot Included 75,000,000 T082 (GGCP-01-M0-ED-003-PP Painting Specification Rev.1) Man Power Only

b. Individual Testing

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test 1.00 Lot included included

- Leak Test for Pipe 1.00 Lot included included

- Pipe Cleaning 1.00 Lot included included

- Lube Oil Flushing 1.00 Lot included included Excluded supply Oil

- Megger & Continuity check 1.00 Lot included included

- Equipment Function Test 1.00 Lot included includedT097 (GGCP-01-I7-PD-001-PP Unit Control System Test

Procedure Rev.1)

- Turbine Control System Loop Test 1.00 Lot included included

- Cold Start 1.00 Lot included included Man Power Only

2 HEAT RECOVERY STEAM GENERATOR 5,590,263,983

a. Mechanical, Electrical & Instrument Installation

- Bypass Stack (Tee Box) Unit 1.00 Unit included 780,000,000 Refer to 1168-M-011 HRSG General Arrangement Rev.1

Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Diverter Damper erection 1.00 Lot included included 1168-C-389 -Diverter data sheet rev 1

□ Lower transition onto top of diverter 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ GT Expansion Joint, transition duct, and extension duct 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Support Structure over diverter 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Silencer & Upper transition duct onto support structure 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Bypass expansion joint belt between silencer and lower transition 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Stack section 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Access ladder & platforms 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ HRSG expansion joint and transition duct 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

Page 6: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

□ Auxiliary equipment (HPU, Fan, Control panel) 1.00 Lot included included Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

- Heat Recovery Steam Generator (HRSG) Unit 1.00 Unit included 2,105,763,983 1168-S-001 Steam Water P&I Diagram Rev.2

1168-S-002 HRSG steam and water P&ID Rev.2

1168-M- 020 HRSG - Foundations Map Rev 3

1168-M-019 HRSG - Battery Limits Assembly and Data rev

01

1168-M-011 HRSG General Arrangement Rev.1

1168-M-900 Shipping Drawing Prefabricated Components

Rev.0

1168-M-165 HRSG Pressure Part Assembly Rev.1

□ Erection HRSG Modules 3.00 Set Excluded Excluded1168-C-766 HRSG Modules Handling And Installation

Procedure rev.0

Heavy Lifting for HRSG modules will be

done by PP

1168-M-168 Final Superheater Assembly & Detail Rev.0

1168-M-172 Primary Superheater Assembly & Detail Rev.0

1168-M-174 HP Evaporator Assembly & Detail Rev.0

1168-M-177 Economizer Assembly & Detail Rev.0

1168-M-184 LP Evaporator Assembly & Detail Rev.0

□ Installation steam drums/deaerator + Blowdown 1.00 Lot included 300,000,000 1168-S-002 Steam Drum and Drains P&I Diagram Rev.2

1168-M-150 HRSG - HP Steam Drum Assembly And Details

Rev.0

1168-M-152 HRSG - LP Steam Drum Assembly And Details

Rev.0

1168-M-234 Deaerating Tower Assembly Drawing Rev.0

□ Erection of staircase, platform, and ladders 1.00 Lot included 65,000,000 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

□ Intermediate ducting & interconnecting piping 1.00 Lot included 100,000,000 refer to 1168-M-011 HRSG General Arrangement Rev.1

□ Erection Inlet Duct 1.00 Lot included 100,000,000 refer to 1168-M-011 HRSG General Arrangement Rev.1

□ Erection Fuel System 1.00 Lot included 100,000,000 1168-S-006 Fuel System P&I Diagram Rev.2

□ Erection Burner Unit 1.00 Lot included 100,000,000 1168-S-007 Burner System P&I Diagram Rev.2

1168-C-305 Burner Data Sheet Rev.0

□ Erection of stack including platforms, damper, silencer and ladders 1.00 Lot included 90,000,000 1168-S-003 Air Flue Gas P&I Diagram Rev.2

1168-M026 Templates for Stack Foundation Rev.1

□ Piping (incl. valves, PSV, supports, hangers, silencer, etc) inside HRSG Battery Limit 1.00 Lot included 104,500,000 1168-S-170 Motor Operated Valve Data Sheet Rev.0

1168-S-167 Self Operated Pressure Valve Data Sheet Rev.1

1168-S-168 Sealing Air Damper Valves Data Sheet Rev.0

1168-C-040 Piping Terminal Point List Rev.1

1168-M-812 Piping Jurisdictional Limit Rev.0

□ Expansion joints (Ducting & Piping) 1.00 Lot included 75,000,000 refer to 1168-M-011 HRSG General Arrangement Rev.1

- Installation of Boiler Feed Pump 2.00 Set included 30,000,000 1168-S-005 BFW System P&I Diagram Rev.2

1168-M-225 -Steam Turbine Drawing rev 0

1168-C-385 - FW Pumps DataSheet REV 1

1168-C-327 Steam Turbine Data Sheet Rev.1

- Auxiliary equipment (Pumps, Chemical dosing, etc) 1.00 Lot included 125,000,000 1168-S-025 Utilities P&I Diagram Rev.2

1168-S-018 Lube Oil System P&I Diagram Rev.1

1168-S-016 Blow Down System P&I Diagram Rev.2

1168-S-012 Chemical Dosing System P&I Diagram Rev.2

- Controls, Electrical & Instrumentation include Tubing Installation 1.00 Lot included 1,440,000,000 ELECTRICAL

1168-S-008 Duct Burner Local Panel P&I Diagram Rev.2

1168-S-533 Burner Local Panel Layout & Schematic Diagram

Rev.0

1168-S-303 J.Box Wiring Diagram Rev1

1168-S-106 M.V. Motor Data Sheet rev 1

1168-S-880 MV Motor Drawings rev 0

INSTRUMENT

1168-S-165 Control Valves Data Sheet Rev.1

1168-S-113 Orifice Plates and Flanges Data Sheet Rev.0

1168-S-166 Pneumatic Shut Off Valves Data Sheet Rev.0

1168-S-111 Flow Transm. (Differential Press. Type) Data

Sheet Rev1

Page 7: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

1168-S-125 Level Transmitters (Differential Pressure Type)

Data Sheet Rev 1

1168-S-133 Pressure Transmitters Data Sheet Rev1

1168-S-141 Temperature Transmitters Data Sheet Rev 0

1168-S-142 Temp. Transmitters With Thermoelement Data

Sheet Rev1

1168-S-131 HRSG - Level Indicators Data Sheet Rev 0

1168-S-090 - HRSG System Architecture Diagram Rev.2

1168-C-315 - Safety Valves Data Sheet Rev.3

1168-S-147 Skin Point Thermoelement with Transmitter DS

Rev.0

1168-S-171 Solenoid Valve Data Sheet Rev.0

- BMS / BCS Installation 1.00 Lot included included 1168-S-082 - BCS Control Loop Diagram Rev 0

1168-S-084 HRSG BMS Logic Diagram Rev.0

- Insulation (Wall, Ducting, Pipe & Vessel) 1.00 Lot included 75,000,000 refer to 1168-M-011 HRSG General Arrangement Rev.1

Refer to 1168-M-700 HRSG - Steel Structures and Platforms GA Rev 0

- Touch-up and Final Painting 1.00 Lot N/A N/A 1168-Q-150 Painting Specification Rev.1 Will be done by : Painting Vendor

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included 1168-Q-101 NDE Work Instructions Rev.1

1168-Q-105 HP/LP Steam Drum Shell NDE Procedure

- PWHT (Post Weld Heat Treatment) 1.00 Lot included included 1168-Q-120 PWHT Work Instructions Rev.1

- X-Ray / Radiography Test 1.00 Lot included included

- Hydrotest 1.00 Lot included included 1168-Q-110 Hydrostatic Test Procedure Rev.1

- Chemical Cleaning 1.00 Lot included included

- Megger & Continuity Test 1.00 Lot included included

- Function Test 1.00 Lot included included Disnaker Certification by : PP

- BMS / BCS Loop Test 1.00 Lot included included

- Steam Blow 1.00 Lot included included

3 PACKAGED BOILER 1.00 Unit - 2,475,500,000

a. Mechanical, Electrical & Instrument Installation

- Boiler Big Block (Pressure Part) 1.00 Set Excluded Excluded1167-S-000 Interconnecting Piping and Instrum. Diagram

Rev2

Heavy Lifting for Boiler big block will be

done by PP

1167-S-001 Steam Water Piping and Instrument Diagram

Rev2

1167-S-002 Steam Drum and Drains Piping and Instrument

Diagram Rev2

1167-M-020 Foundation Assembly Rev. 3

1167-M-021 Foundation Details Rev. 3

1167-M-024 Equipments Foundations And Loads Rev.1

1167-C-766 Boiler Big Block Installation Procedure rev.0

1167-M-900 DWG For Shipping Of Oversize Shop

Prefabricated Component

1167-C-310 Boiler Data Sheet Rev.2

1167-M-100 Boiler Pressure Part GA Rev.2

1167-M-234 Boiler Deaerator GA Rev.1

1167-M-700 Boiler Package Plan View & Section GA Rev.0

1167-M-130 Boiler Superheater Pressure Parts Assembly

And Details Rev.2

1167-M-140 Economizer Pressure Parts General

Arrangement Rev.2

1167-M-150 Boiler Steam Drum Assembly & Detail Rev.1

1167-M-151 Boiler Water Drum Assembly & Detail Rev.1

- Erection Fuel Gas Systems 1.00 Lot included 100,000,000 1167-S-006 Fuel Gas System Piping and Instrument Diagram

Rev2

- Erection Burner Unit 1.00 Lot included 100,000,000 1167-S-021 Burner 1 Piping and Instrument Diagram Rev2

1167-S-022 Burner 2 Piping and Instrument Diagram Rev2

1167-C-305 - Burner Data Sheet Rev.1

Page 8: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

1167-B-200 Burner Details Rev.0

- Installation of Ducting (Inlet, intermediate and stack) 1.00 Lot included 275,000,000 1167-S-003 Air Flue Gas Piping and Instrument Diagram

Rev2

1167-M-400 - Flue Gas Ducts And Stacks GA Rev.0

1167-M-026 Foundation Templates for Main Stack Rev.0

- Erection of staircase, platform, and ladders 1.00 Lot included 150,000,000 Refer to 1167-M-700 Boiler Package Plan View & Section GA

Rev.0

- Piping (incl. valves, PSV, supports, hangers, silencer, etc) inside Packaged Boiler Battery Limit 1.00 Lot included 363,000,000 1167-M-812 Piping Jurisdictional Rev. 1

1167-S-170 Motor Operated Valve Data Sheet Rev.0

1167-M-019 Piping Battery Limits Assembly And Data Rev.0

1167-S-113 Orifice Plates And Flanges Data Sheet Rev.0

- Expansion joints (Ducting & Piping) 1.00 Lot included 275,000,000

- Installation of Deaerator, Vessel & Blowdown Unit 1.00 Lot included 277,500,000 1167-S-016 Blowdown System Piping and Instrument

Diagram Rev2

1167-M-234 Boiler Deaerator GA Rev.1

- Installation of Boiler Feed Pump 1.00 Lot included 25,000,000 1167-S-005 BFW System Piping and Instrument Diagram

Rev2

1167-M-225 - Steam Turbine Drawing rev 0

1167-C-385 - FW Pumps Datasheet REV 1

1167-C-327 Steam Turbine Data Sheet Rev.1

- Erection of stack including platforms, damper, silencer and ladders 1.00 Lot included 230,000,000 1167-M-026 Foundations Template For Main Stack Rev 1

- Auxiliary equipment (Pumps, Chemical dosing, etc) 1.00 Lot included 125,000,000 1167-S-012 Chemical Dosing System Piping and Instrument

Diagram Rev2

1167-S-018 Lube Oil System Piping and Instrument Diagram

Rev1

1167-S-019 FD Fan and Electric Motor Piping and

Instrument Diagram Rev2

1167-S-025 Utilities Piping and Instrument Diagram Rev2

1167-M-211 Forced Draft Fan General Arrangement rev 0

1167-C-321 FD Fan Data Sheet rev 01

1167- M- 024 FD Fan Foundation Detail & Load Rev.0

- Controls, Electrical & Instrumentation include Tubing Installation 1.00 Lot included 480,000,000 ELECTRICAL

1167-S-303 J.Box Wiring Diagram Rev1

1167-S-106 M.V. Motor Data Sheet rev 1

1167-S-880 MV Motor Drawings rev 0

1167-S-533 Aux.Boiler Burner Local Panel Layout &

Schematic Rev.0

INSTRUMENT

1167-S-090 - System Architecture Diagram Rev.2

1167-S-111 Flow Transm. (Differential Press. Type) Data

Sheet_Rev1

1167-S-125 Level Transmitters (Differential Pressure Type)

Data Sheet_Rev1

1167-S-133 Pressure Transmitters Data Sheet_Rev1

1167-S-141 Temperature Transmitters Data Sheet_Rev0

1167-S-142 Temp. Transmitters With Thermoelement Data

Sheet_Rev1

1167-S-151 O2 Analyzer Data Sheet_Rev1

1167-S-131 HRSG - Level Indicators Data Sheet Rev 0

1167-S-181 Pneumatic Actuator Data Sheet Rev0

1167-C-315 - Safety Valves Data Sheet Rev.3

1167-S-147 - Skin Point Thermoelement & TT Data Sheet

Rev.0

1167-S-171 Solenoid Valve Data Sheet Rev.0

1167-S-165 Control Valve Data Sheet Rev.1

1167-S-166 Pneumatic Shut-Off Valve Data Sheet Rev.0

1167-S-167 Self Operated Pressure Valve Data Sheet Rev.1

1167-S-100 Instrument & IO List Data Rev.1

1167-S-090 System Block Architecture Diagram Rev.1

- BMS / BCS Installation 1.00 Lot included included 1167-S-082 BCS Control Loop Diagram rev 0

Page 9: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

1167-S-084 BMS Logic Diagram Rev.0

1167-S-031 Description of BMS Operation Rev.0

- Insulation (Wall, Ducting, Pipe & Vessel) 1.00 Lot included 75,000,000 1167-M-600 External Insulation G A rev0

- Touch-up and Final Painting 1.00 Lot N/A N/A 1167-Q-150 Painting Specification Rev.1 Will be done by : Painting Vendor

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included 1167-Q-102 - NDE Work Instruction (MR) Rev.1

1167-Q-101 NDE Work Instruction Rev.0

- PWHT (Post Weld Heat Treatment) 1.00 Lot included included 1167-Q-121 - PWHT Work Instruction (Macchi Rom) Rev.1

1167-Q-120 PWHT work instructions Rev.1

- X-Ray / Radiography Test 1.00 Lot included included

- Hydrotest 1.00 Lot included included 1167-Q-110 Hydrostatic test procedure Rev.1 Water by PP

- Chemical Cleaning 1.00 Lot included included Chemical Waste to PP's WTP

- Megger & Continuity Test 1.00 Lot included included 1167-C-154 Performance Test Procedure rev 0

- Function Test 1.00 Lot included included 1167-Q-112 Pneumatic Work Instruction Rev.0 Disnaker Certification by : PP

- BMS / BCS Loop Test 1.00 Lot included included 1167-C-154 Performance Test Procedure rev 0

- Steam Blow 1.00 Lot included included Provide temporary facility except steam

B MECHANICAL BALANCE OF PLANT

1 NATURAL GAS FEED SYSTEM No Data Attached

a. Mechanical, Electrical & Instrument Installation GA & PID GAS Feed System

- Main Shut Off Valve Installation 1.00 Set included included

- Gas Metering & Filter Skid Positioning on Foundation 2.00 Set included included

- GTG Inlet Control Valve Skid Positioning on Foundation 1.00 Set included included

- HRSG Shut Off Valve Skid Positioning on Foundation 1.00 Set included included

- Packaged Boiler Shut Off Valve Skid Positioning on Foundation 1.00 Set included included

- Condensate Tank Installation 1.00 Lot included included

- Piping Installation include Valve, PSV and Vent 1.00 Lot included included

- Field Instrument, Junction Box, Cable and Control include Tubing Installation 1.00 Lot included included

b. Individual Testing

- Visual Inspection & Bolt Tightening Check

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test (100%) 1.00 Lot included included

- Leak Test 1.00 Lot included included

- Megger & Continuity Test 1.00 Lot included included

- Function Test 1.00 Lot included included

2 COOLING TOWER & COOLING WATER SYSTEM 200,000,000

a. Mechanical, Electrical & Instrument Installation GGCP-00-M8-EO-005-PP-R3 Operating Philosophy Cooling Tower & CIS (A)

- Cooling Tower Package Installation 2.00 Set included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

GGCP-04-P0-PI-007-PP PID Cooling Tower System Rev.3

□ FRP Structure 1.00 Lot included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

□ FRP Wall & Roof 1.00 Lot included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

□ Installation of Cooling Distribution Pipe & Sprayer 1.00 Lot included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

□ FRP Fan Stack Installation 2.00 Set included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

□ Fan Installation 2.00 Set included included GGCP-00-M8-DS-003-PP-R3 Fan Details (A)

□ Motor, Gearbox and Shaft 1.00 Lot included included GGCP-00-M8-DS-004-PP-R1 Motor Details (A)

GGCP-00-M8-DS-005-PP-R2 Gearbox Details (A)

GGCP-00-M8-DS-006-PP-R2 Drive Shaft Details (A)

□ Platform and Ladders 1.00 Lot included included GGCP-00-M8-GA-001-PP-R4 Cooling Tower GA

□ Electrical Works & Field Instruments Works 1.00 Lot included included GGCP-00-M8-SD-001-PP-R3 JB Layout Drawing (A)

GGCP-00-M8-SL-001-PP-R2 Motor Wiring Diagram(A)

- Chemical Injection Package Installation included included GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

GGCP-00-M8-PF-001-PP-R2 PFD (AC)

□ Anti Scalant Tank included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Non Oxidizing Biocide Tank included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Oxidizing Biocide Tank included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Softener Tank included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ NaCl Tank included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Piping, Valve & Accessories included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

GGCP-00-W3-DS-003-PP-R2 Valve List & Data Sheet of CIS

Page 10: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

□ pH Analyzer included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Conductivity Analyzer included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ ORP Analyzer included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

□ Anti Scalant Pump included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

GGCP-00-W3-DS-002-PP-R2 Pump Dosing Detail of CIS

□ Non Oxidizing Biocide Pump included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

GGCP-00-W3-DS-002-PP-R2 Pump Dosing Detail of CIS

□ Oxidizing Biocide Pump included included Refer to GGCP-00-M8-PI-001-PP-R2 P&ID (AC)

GGCP-00-W3-DS-002-PP-R2 Pump Dosing Detail of CIS

□ Electrical Works & Field Instruments Works included included GGCP-00-W3-SL-002-PP-R3 LCP Wiring Diagram CIS (AC)

- Make up cooling water pump 1.00 Lot included included GGCP-04-M4-DS-106-PP Motor datasheet for make up CWP Rev.0

GGCP-04-M4-DW-116-PP Motor outline drawing for makeup CWP Rev.0

GGCP-04-M4-GA-101-PP GA drawing for make up CWP Rev.1

GGCP-04-M4-DS-101-PP Pump datasheet for makeup CWP Rev.2

- Circulating cooling water pump 1.00 Lot included included GGCP-04-M4-DS-107-PP Motor datasheet for CCWP Rev.0

GGCP-04-M4-DW-117-PP Motor outline drawing for CCWP Rev.0

GGCP-04-M4-GA-102-PP GA drawing for CCWP Rev.1

GGCP-04-M4-DS-102 Pump datasheet for CCWP Rev.2

- Installation of Pipe, Support include Valves and Nozzle up to Pump Header 1.00 Lot included included GGCP-04-L8-GA-004-PP_1 OF 3-R1-GA Around Cooling Tower and IA PA

- Field Instrument, Junction Box, Cable and Control include Tubing Installation 1.00 Lot included included GGCP-04-P0-PI-007-PP PID Cooling Tower System Rev.3

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test (20%) 1.00 Lot included included

- Hydrotest 1.00 Lot included included

- Megger & Continuity Test 1.00 Lot included included

- Function Test 1.00 Lot included included

- PLC Loop Test for chemical injection system 1.00 Lot included included

3 PLANT WATER SUPPLY & DISTRIBUTION SYSTEM excluded excluded

a. Mechanical, Electrical & Instrument Installation

- Water Treatment Plant Installation 320PRJ1601001-01-001-R2 PID

320PRJ1601001-01-002-R2 PFD

320PRJ1601001-01-101_R2 GA

□ Filter Feed Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Multimedia Filter 2.00 Set 320PRJ1601001-04-302_Process Datasheet For DMF Media Will be done by : WTP Vendor

□ Filter Water Tank 1.00 Set 320PRJ1601001-02-065 Will be done by : WTP Vendor

□ Filter Backwash Tank (DMF Backwash Tank) 1.00 Set 320PRJ1601001-02-064 Will be done by : WTP Vendor

□ Filter Backwash Pump (DMF Backwash Pump) 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Filter UF Air Blower 2.00 Set 320PRJ1601001-04-301_Process Datasheet For Air Blower_Rev 2Will be done by : WTP Vendor

□ UF Feed Pump 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Coagulant Dosing Tank 1.00 Set 320PRJ1601001-02-063 Will be done by : WTP Vendor

□ Coagulant Dosing Pump 2.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ Strainer for UF 2.00 Set 320PRJ1601001-07-001-R0-FRP-Basket-Strainer Will be done by : WTP Vendor

□ UF skids 2.00 Set 320PRJ1601001-06-102 Will be done by : WTP Vendor

□ UF Backwash Pump(UF MC pump) 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Hypo Dosing Tank CEB 1.00 Set 320PRJ1601001-02-062-R1 Will be done by : WTP Vendor

□ Hypo Dosing Pump CEB 2.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ Acid (H2SO4) Dosing Tank CEB 1.00 Set 320PRJ1601001-02-060 Will be done by : WTP Vendor

□ Acid (H2SO4) Dosing Pump CEB 2.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ Caustic Dosing Tank CEB 1.00 Set 320PRJ1601001-02-061-R0 Will be done by : WTP Vendor

□ Caustic Dosing Pump CEB 2.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ UF Permeate Storage Tank 1.00 Set 320PRJ1601001-02-066 Will be done by : WTP Vendor

□ RO Feed Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ RO Micron Cartrdige Filter 2.00 Set 320PRJ1601001-04-306_Process Datasheet For Cartridge FilterWill be done by : WTP Vendor

□ RO HP Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

Page 11: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ RO Skid 2.00 Set 320PRJ1601001-06-101-R0-BWRO Skid GA Drawing Will be done by : WTP Vendor

□ Coagulant Dosing Tanks 1.00 Set 320PRJ1601001-02-063-R1 Will be done by : WTP Vendor

□ CIP Tank 1.00 Set 320PRJ1601001-02-053-R0 Will be done by : WTP Vendor

□ CIP Tank Agitator 1.00 Set Will be done by : WTP Vendor

□ CIP Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps

1.00 Set 320PRJ1601001-04-303_Process Datasheet For Centrifugal pumpsWill be done by : WTP Vendor

□ CIP Cartridge Filter 1.00 Set 320PRJ1601001-04-306 Will be done by : WTP Vendor

□ Antiscalant Dosing Tank 2.00 Set 320PRJ1601001-02-059-R1 Will be done by : WTP Vendor

□ Antiscalant Dosing Pump 1.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ SMBS Dosing Tank 2.00 Set 320PRJ1601001-02-058-R1 Will be done by : WTP Vendor

□ SMBS Dosing Pump 1.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ Degasser Tower 2.00 Set 320PRJ1601001-03-007,foundation Will be done by : WTP Vendor

□ Degasser Blower 1.00 Set 320PRJ1601001-04-301_Process Datasheet For Air Blower_Rev 2Will be done by : WTP Vendor

□ Degassed Water Tank 2.00 Set 320PRJ1601001-02-067 Will be done by : WTP Vendor

□ MB Feed Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumpsWill be done by : WTP Vendor

□ Mixed Bed Exchanger 2.00 Set 320PRJ1601001-02-052 Will be done by : WTP Vendor

□ MB Regeneration Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumpsWill be done by : WTP Vendor

□ Air Blower for MB & N-pit 2.00 Set 320PRJ1601001-04-301_Process Datasheet For Air Blower_Rev 2Will be done by : WTP Vendor

□ Acid Storage Tank 1.00 Set 320PRJ1601001-02-054-R3 Will be done by : WTP Vendor

□ Acid Dosing Tank for MB & N-Pit 2.00 Set 320PRJ1601001-02-057 Will be done by : WTP Vendor

□ Acid Dosing Pump for MB & N-Pit 2.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ NaOH/Caustic Unloading Pump 1.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ NaOH/Caustic Storage Tank 2.00 Set 320PRJ1601001-02-055-R1 Will be done by : WTP Vendor

□ Acid Unloading Pump 1.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Alkali Storage Tank 1.00 Set 320PRJ1601001-02-055-R1 Will be done by : WTP Vendor

□ Alkali Dosing Tank for MB 2.00 Set 320PRJ1601001-02-056-R0 Will be done by : WTP Vendor

□ Alkali Dosing Pump for MB 1.00 Set 320PRJ1601001-04-304_Process Datasheet For Dosing Pumps_ Rev 1Will be done by : WTP Vendor

□ Air Blower for MB & Neutralization Pit 2.00 Set 320PRJ1601001-04-301_Process Datasheet For Air Blower_Rev 2Will be done by : WTP Vendor

□ Neutralised Waste Transfer Pump 1.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumps

□ Safety Shower and Eye Wash 1.00 Lot 320PRJ1601001-04-312 Will be done by : WTP Vendor

□ Piping and valves within battery limit 1.00 Lot 320PRJ1601001-06-001-Piping GA Will be done by : WTP Vendor

□ Field instruments, junction box 1.00 Lot Will be done by : WTP Vendor

□ Common MCC-PLC, Instrument cables &cable trays within battery limit 1.00 Set Will be done by : WTP Vendor

□ UV system 2.00 Set Will be done by : WTP Vendor

□ Service Water Pump 2.00 Set 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

320PRJ1601001-04-303_Process Datasheet For Centrifugal pumpsWill be done by : WTP Vendor

- □ UF MC Pump 320PRJ1601001-10-305_Vendor_Data_Sheet_Ebara_Pumps Will be done by : WTP Vendor

Water Distribution Pump 2.00 Unit

□ Demin feed boiler water pump 2.00 Unit GGCP-04-M4-DS-104-PP Pump datasheet for demin feed boiler water pump Rev.2Will be done by : WTP Vendor

GGCP-04-M4-DS-109-PP Motor datasheet for demin feed boiler water pump Rev.0Will be done by : WTP Vendor

GGCP-04-M4-DW-119-PP Motor outline drawing for demin feed boiler water pump Rev.0Will be done by : WTP Vendor

GGCP-04-M4-GA-104-PP GA drawing demin feed boiler water pump Rev.1Will be done by : WTP Vendor

□ Demin feed HRSG water pump 1.00 Unit GGCP-04-M4-DS-105-PP Pump datasheet for demin feed hrsg water pump Rev.2Will be done by : WTP Vendor

GGCP-04-M4-DS-110-PP Motor datasheet for demin feed hrsg water pump Rev.0Will be done by : WTP Vendor

GGCP-04-M4-DW-120-PP Motor outline drawing for demin feed hrsg water pump Rev.0Will be done by : WTP Vendor

GGCP-04-M4-GA-105- PP GA drawing for demin feed hrsg water pump Rev.1Will be done by : WTP Vendor

□ Demin feed boiler pump Control Panel 1.00 Unit HOLD DATA Will be done by : WTP Vendor

□ Demin water HRSG pump Control Panel HOLD DATA Will be done by : WTP Vendor

- Installation of Pipe, Support include Valves and Nozzle up to Pump Header 1.00 Lot GGCP-04-M4-GA-104-PP GA drawing demin feed boiler water pump Rev.1Will be done by : WTP Vendor

- Field Instrument, Junction Box, Cable and Control include Tubing Installation HOLD DATA Will be done by : WTP Vendor

b. Individual Testing Will be done by : WTP Vendor

- Allignment & Verticality Check 1.00 Lot join testing with WTP Vendor

- Visual Inspection & Bolt Tightening Check 1.00 Lot join testing with WTP Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot join testing with WTP Vendor

- X-Ray / Radiography Test 1.00 Lot join testing with WTP Vendor

- Hydrotest 1.00 Lot join testing with WTP Vendor

Page 12: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Megger & Continuity Test 1.00 Lot join testing with WTP Vendor

- Function Test 1.00 Lot join testing with WTP Vendor

- PLC Loop Test 1.00 Lot join testing with WTP Vendor

4 FILTERED WATER TANK (3,500 M3) excluded excluded

a. Mechanical, Electrical & Instrument Installation GGCP-04-M3-GA-102-PP-R8 - Filtered Water Tank - General Arrangement (A)Will be done by : Tank Vendor

- Shell Plate 1.00 Lot GGCP-04-M3-DW-111-PP-R10- Filtered Water Tank (Shell Plate Development) (A)Will be done by : Tank Vendor

- Bottom Plate 1.00 Lot GGCP-04-M3-DW-112-PP-R1 - Filtered (Bottom Plate Development) (A)Will be done by : Tank Vendor

- Roof Plate GGCP-04-M3-DW-113-PP - Filtered Water Tank (Roof Plate Development) (A)Will be done by : Tank Vendor

- Roof Structure GGCP-04-M3-DW-114-PP-R4 - Filtered Water Tank - Roof Structure Development (A)Will be done by : Tank Vendor

- Center Coloumn GGCP-04-M3-DW-115-R5 - Filtered Water Tank (Center Column Detail) (A)Will be done by : Tank Vendor

- Shell Manhole GGCP-04-M3-DW-116-PP-R1 - Filtered Water Tank (Shell Manhole Detail) (A)Will be done by : Tank Vendor

- Roof Manhole GGCP-04-M3-DW-117-PP-R1 - Filtered Water Tank (Roof Manhole Detail) (A)Will be done by : Tank Vendor

- Stairway & Roof Handrail GGCP-04-M3-DW-118-PP - Filtered Water Tank (Stairway & RoofHandraill) (A)Will be done by : Tank Vendor

- Shell Nozzle GGCP-04-M3-DW-119-PP-R1 - Filtered Water Tank (Shell Nozzle Detail) (A)Will be done by : Tank Vendor

- Roof Noozle 1.00 Lot GGCP-04-M3-DW-120-PP-R2 - Filtered Water Tank (Roof Nozzle Detail) (A)Will be done by : Tank Vendor

- Clip Support 1.00 Lot GGCP-04-M3-DW-121-PP-R3- Filtered Water Tank (Detail Clip Support) (A)Will be done by : Tank Vendor

- Field Instrument 1.00 Lot HOLD DATA Will be done by : Tank Vendor

- Painting (Sand Blast, Prime Coat, Intermediate and Finish Coat) 1.00 Lot Will be done by : Tank Vendor

b. Individual Testing

- Visual Inspection 1.00 Lot Will be done by : Tank Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot Will be done by : Tank Vendor

- X-Ray / Radiography Test 1.00 Lot Will be done by : Tank Vendor

- Hydrotest 1.00 Lot Will be done by : Tank Vendor

- Calibration Test Will be done by : Tank Vendor

5 CONDENSATE WATER TANK (2,000 M3) excluded excluded

a. Mechanical, Electrical & Instrument Installation GGCP-04-M3-GA-101-PP-R4 - Condensate Water Tank (General Arrangement) (A) Will be done by : Tank Vendor

- Shell Plate 1.00 Lot GGCP-04-M3-DW-101-PP-R8- Condensate Water Tank (Shell Plate Development) (A)Will be done by : Tank Vendor

- Bottom Plate 1.00 Lot GGCP-04-M3-DW-102-PP-R1 - Condensate Water Tank (Bottom Plate Development) (A)Will be done by : Tank Vendor

- Roof Plate 1.00 Lot GGCP-04-M3-DW-103-PP-R2 - Condensate Water Tank (Roof Plate Development) (A)Will be done by : Tank Vendor

- Roof Structure 1.00 Lot GGCP-04-M3-DW-104-PP-R2 - Condensate Water Tank (Roof Structure Development) (A)Will be done by : Tank Vendor

- Center Coloumn 1.00 Lot GGCP-04-M3-DW-105-PP-R3 - Condensate Water Tank - Center Column Detail (A)Will be done by : Tank Vendor

- Shell Manhole 1.00 Lot GGCP-04-M3-DW-106-PP-R1 - Condensate Water Tank (Shell Manhole Detail) (A) Will be done by : Tank Vendor

- Roof Manhole 1.00 Lot GGCP-04-M3-DW-107-PP-R1 - Condensate Water Tank (Roof Manhole Detail) (A) Will be done by : Tank Vendor

- Stairway & Roof Handrail 1.00 Lot GGCP-04-M3-DW-108-PP-R2 - Condensate Water Tank (Stairway&RoofHandraill) (A)Will be done by : Tank Vendor

- Shell Nozzle 1.00 Lot GGCP-04-M3-DW-109-PP-R2 - Condensate Water Tank (Shell Nozzle Detail) (A) Will be done by : Tank Vendor

- Roof Noozle 1.00 Lot GGCP-04-M3-DW-110-PP-R2 - Condensate Water Tank (Roof Nozzle Detail) (A) Will be done by : Tank Vendor

- Clip Support 1.00 Lot GGCP-04-M3-DW-122-PP-R2- Condensate Water Tank (Detail Clip Support) (A) Will be done by : Tank Vendor

- Field Instrument 1.00 Lot HOLD DATA

- Painting (Sand Blast, Prime Coat, Intermediate and Finish Coat) 1.00 Lot

b. Individual Testing

- Visual Inspection 1.00 Lot Will be done by : Tank Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot Will be done by : Tank Vendor

- X-Ray / Radiography Test 1.00 Lot Will be done by : Tank Vendor

- Hydrotest 1.00 Lot Will be done by : Tank Vendor

- Calibration Test Will be done by : Tank Vendor

6 WASTE WATER TREATMENT PLANT excluded excluded

a. Mechanical, Electrical & Instrument Installation 320PRJ1601002-01-101-GA drawing

320PRJ1601002-01-001-PI&D

320PRJ1601002-01-002 PFD

- Waste Water Treatment Plant Installation

□ Oil Separator 1.00 Set 320PRJ1601002-07-004-fabrication drawing Will be done by : WTP Vendor

□ Oily Sludge Tank 1.00 Set 320PRJ1601002‐03‐001 ‐civil outline Will be done by : WTP Vendor

□ Waste Water Storage Pond 1.00 Set 320PRJ1601002‐03‐001 ‐civil outline Will be done by : WTP Vendor

□ Air Blower for Mixing 2.00 Set 320PRJ1601002-04-301_Process Datasheet For Air Blower_Rev 0Will be done by : WTP Vendor

□ Air Diffuser for Mixing 2.00 Set 320PRJ1601002-04-308 Will be done by : WTP Vendor

□ Waste Water Transfer Pump 2.00 Set 320PRJ1601002-04-303_Process Datasheet For Centrifugal pumps_ Rev 0 Will be done by : WTP Vendor

□ Tank for pH Reaction + Coagulation 1.00 Set Will be done by : WTP Vendor

Page 13: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

□ Tank Agitator for pH Reaction + Coagulation 1.00 Set 320PRJ1601002-04-306_Process Datasheet For Agitator_Rev 1Will be done by : WTP Vendor

□ Flocculation Tank 1.00 Set Will be done by : WTP Vendor

□ Tank Agitator for Flocculation Tank 1.00 Set 320PRJ1601002-04-306_Process Datasheet For Agitator_Rev 1Will be done by : WTP Vendor

□ Clarifier Tank 1.00 Set Will be done by : WTP Vendor

□ Tube Settler for Clarifier 1.00 Lot 320PRJ1601002-04-307_Process Datasheet For Tube Settler Media_Rev 0Will be done by : WTP Vendor

□ Monitoring & Purified Waste Water Pit 1.00 Set Will be done by : WTP Vendor

□ Purified Water Transfer Pump 2.00 Set Will be done by : WTP Vendor

□ Clarifiier Sludge Transfer Pump 2.00 Set 320PRJ1601002-04-305_Process Datasheet for Progressive Cavity PumpsWill be done by : WTP Vendor

□ Thickener Tank 1.00 Set Will be done by : WTP Vendor

□ Thickener Sludge Transfer Pump 2.00 Set 320PRJ1601002-04-305_Process Datasheet for Progressive Cavity PumpsWill be done by : WTP Vendor

□ Belt Filter Press (Sludge Dehydrator) 1.00 Set 320PRJ1601002-04-309_Process Data sheet For Belt Filter Press_Rev 0 Will be done by : WTP Vendor

□ Acid Tank (HCl 33%) 1.00 Set Will be done by : WTP Vendor

□ Acid Gas Seal Pot (HCl 33%) 1.00 Set Will be done by : WTP Vendor

□ Acid Dosing Pump (HCl 33%) 2.00 Set 320PRJ1601002-04-304_Process Datasheet For Dosing Pumps_ Rev 1 Will be done by : WTP Vendor

□ Caustic Tank (NaOH 45%) 1.00 Set Will be done by : WTP Vendor

□ Caustic Dosing Pump (NaOH 45%) 2.00 Set 320PRJ1601002-04-304_Process Datasheet For Dosing Pumps_ Rev 1 Will be done by : WTP Vendor

□ Coagulant Tank 1.00 Set Will be done by : WTP Vendor

□ Agitator for Coagulant Tank 1.00 Set 320PRJ1601002-04-306_Process Datasheet For Agitator_Rev 1Will be done by : WTP Vendor

□ Coagulant Dosing Pump 2.00 Set 320PRJ1601002-04-304_Process Datasheet For Dosing Pumps_ Rev 1 Will be done by : WTP Vendor

□ A-Polymer Tank 1.00 Set Will be done by : WTP Vendor

□ Agitator for A-Polymer Tank 1.00 Set 320PRJ1601002-04-306_Process Datasheet For Agitator_Rev 1Will be done by : WTP Vendor

□ A-Polymer Dosing Pump 2.00 Set 320PRJ1601002-04-304_Process Datasheet For Dosing Pumps_ Rev 1 Will be done by : WTP Vendor

□ C-Polymer Tank 1.00 Set Will be done by : WTP Vendor

□ Agitator for C-Polymer Tank 1.00 Set 320PRJ1601002-04-306_Process Datasheet For Agitator_Rev 1Will be done by : WTP Vendor

□ C-Polymer Dosing Pump 2.00 Set 320PRJ1601002-04-304_Process Datasheet For Dosing Pumps_ Rev 1 Will be done by : WTP Vendor

□ Piping and valves within battery limit 1.00 Lot Will be done by : WTP Vendor

□ Field instruments, junction box 1.00 Lot Will be done by : WTP Vendor

□ Common MCC-PLC, Instrument cables &cable trays within battery limit 1.00 Lot Will be done by : WTP Vendor

□ Safety Shower & Eye Wash Station 1.00 Set 320PRJ1601002-04-310_Process Datasheet-Safety Shower Will be done by : WTP Vendor

- Waste Water Distribution Pump

□ Treated water pump 2.00 Unit GGCP-04-M4-DS-103-PP Pump datasheet for treated water pump Rev.2

GGCP-04-M4-DS-108-PP Motor datasheet for treated water pump Rev.0

GGCP-04-M4-DW-118-PP Motor outline drawing for treated water pump Rev.0

GGCP-04-M4-GA-103-PP GA drawing for treated water pump Rev.1

□ Transformer Area Collecting Pit (CP-3) Transfer Pump 2.00 Unit

□ Main Equipment Area Collecting Pit (CP-1) Transfer Pump 2.00 Unit

□ BOP Area Collecting Pit (CP-2) Transfer Pump 2.00 Unit

□ Treated water pump Control Panel 1.00 Unit

□ Transformer Area Collecting Pit (CP-3) Transfer Pump Control Panel 1.00 Unit

□ Main Equipment Area Collecting Pit (CP-1) Transfer Pump Control Panel 1.00 Unit

□ BOP Area Collecting Pit (CP-2) Transfer Pump Control Panel 1.00 Unit

- Installation of Pipe, Support include Valves and Nozzle up to Pump Header 1.00 Lot

- Field Instrument, Junction Box, Cable and Control include Tubing Installation 1.00 Lot

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot Join testing with WWTP Vendor

- Visual Inspection & Bolt Tightening Check 1.00 Lot Join testing with WWTP Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot Join testing with WWTP Vendor

- X-Ray / Radiography Test 1.00 Lot Join testing with WWTP Vendor

- Hydrotest 1.00 Lot Join testing with WWTP Vendor

- Megger & Continuity Test 1.00 Lot Join testing with WWTP Vendor

- Function Test 1.00 Lot Join testing with WWTP Vendor

- PLC Loop Test 1.00 Lot Join testing with WWTP Vendor

7 FIRE FIGHTING SYSTEM excluded excluded

a. Mechanical, Electrical & Instrument Installation

- Main Component

□ Main Electric Fire Pump & Electric Controller 1.00 Unit Will be done by : Fire Fighting Vendor

□ Main Diesel Fire Pump & Diesel Controller 1.00 Unit Will be done by : Fire Fighting Vendor

□ Jockey Fire Pump 1.00 Unit Will be done by : Fire Fighting Vendor

□ Pump Suction and Discharge Header Assembly (c/w valve and instrument) 1.00 Lot Will be done by : Fire Fighting Vendor

□ MCP Fire Alarm System 1.00 Set Will be done by : Fire Fighting Vendor

ERECTION AND INSTALLATION BY

VENDOR FIRE FIGHTING & ALARM

SYSTEM

Page 14: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Installation at IA/PA Area

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at WTP/WWTP Control Room

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ FM200 Fire Suppression System (c/w piping, sprinkler, valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at CCR Building

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ FM200 Fire Suppression System (c/w piping, sprinkler, valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Sprinkler System (c/w piping, sprinkler, valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Workshop Building

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Sprinkler System (c/w piping, sprinkler, valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Security Post

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Substation Building

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ FM200 Fire Suppression System (c/w piping, sprinkler, valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Interbus Transformer

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Water Spray Nozzle System (c/w piping, sprinkler, deluge valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Auxilliary Transformer

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Water Spray Nozzle System (c/w piping, sprinkler, deluge valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Gas Turbine Generator

□ CO2 Skid Fire Suppression (c/w Instrument, CO2 cylinder, Hose and Alarm) 1.00 Lot

- Installation at Heat Recovery Steam Generator (HRSG)

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Water Spray Nozzle System (c/w piping, sprinkler, deluge valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Packaged Boiler (PB)

□ Fire Alarm Fixtures (Detector, Alarm Bell & IO Module) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Water Spray Nozzle System (c/w piping, sprinkler, deluge valve and accessories) 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Gas Metering Skid

□ Gas Detector 1.00 Lot Will be done by : Fire Fighting Vendor

- Installation at Outdoor Yard

□ Outdoor Hydrant Unit 1.00 Lot Will be done by : Fire Fighting Vendor

□ Siamese Connection 1.00 Lot Will be done by : Fire Fighting Vendor

□ Hydrant Box (c/w nozzle and flexible hose) 1.00 Lot Will be done by : Fire Fighting Vendor

□ Hydrant Line (Piping, Valve and Support) 1.00 Lot Will be done by : Fire Fighting Vendor

- Fire Extinguisher 1.00 Lot Will be done by : Fire Fighting Vendor

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot Will be done by : Fire Fighting Vendor

- Visual Inspection & Bolt Tightening Check 1.00 Lot Will be done by : Fire Fighting Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot Will be done by : Fire Fighting Vendor

- X-Ray / Radiography Test 1.00 Lot Will be done by : Fire Fighting Vendor

- Hydrotest 1.00 Lot Will be done by : Fire Fighting Vendor

- Megger & Continuity Test 1.00 Lot Will be done by : Fire Fighting Vendor

- Function Test 1.00 Lot Will be done by : Fire Fighting Vendor

- Fire Alarm Control Loop Test 1.00 Lot Will be done by : Fire Fighting Vendor

- Fire Fighting System Performance Test 1.00 Lot Will be done by : Fire Fighting Vendor

8 IA / PA (COMPRESSED AIR SYSTEM) 125,000,000

a. Mechanical, Electrical & Instrument Installation

- Air Compressor Unit 3.00 Unit included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

- Heatless Adsorbtion Dryer 2.00 Unit included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

- Instrument Air Receiver 1.00 Unit included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

- Plant Air Receiver 1.00 Unit included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

- Piping, Valve, Safety Valve and Field Instrument inside IA/PA Battery Limit 1.00 Lot included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

- Electrical, Instrument, Control, Cable, etc inside IA/PA Battery Limit 1.00 Lot included included GGCP-04-M6-IM-001-PP General Arrangement of Compressed Air System

b. Individual Testing

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test 1.00 Lot included included GGCP-04-W2-PR-003-PP Radiography Examination Procedure (A)Tentative for pipe

ERECTION AND INSTALLATION BY

VENDOR FIRE FIGHTING & ALARM

SYSTEM

Page 15: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Hydrotest 1.00 Lot included included GGCP-04-W2-PR-002-PP Hydrostatic & Pneumatic Procedure (A)

- Megger & Continuity Test 1.00 Lot included included

- Function Test 1.00 Lot included included

9 PIPE RACK & STEEL STRUCTURE excluded excluded

a. Mechanical, Electrical & Instrument Installation

- Pipe Rack #1 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Pipe Rack #2 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Pipe Rack #3 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Pipe Rack #4 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Pipe Rack #5 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- WTP Shelter 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- WWTP Shelter 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- IA/PA Shelter 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Fire Pump House Shelter 1.00 Lot

- Distribution Pump House Shelter 1.00 Lot

- Transformer House Shelter 1.00 Lot

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- Visual Inspection & Bolt Tightening Check 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

- X-Ray / Radiography Test 1.00 Lot Will be done by : Pipe Rack & Structure Vendor

10 HVAC SYSTEM excluded excluded

a. Mechanical, Electrical & Instrument Installation

- Substation Building

□ Air Cooled DX - AHU System, Refrigerant with R-407C 2.00 Unit Will be done by : HVAC Vendor

□ Fresh Air Filter Unit 1.00 Lot Will be done by : HVAC Vendor

□ Supply Fan for Pressurize System 2.00 Set Will be done by : HVAC Vendor

□ Exhaust Fan for Battery Room 2.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Smoke Removal 1.00 Lot Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Ducting Installation Work 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Office & CCR Building (1st Floor)

□ Air Cooled DX - AHU System, Refrigerant with R-407C 1.00 Unit Will be done by : HVAC Vendor

□ Fresh Air Filter Unit 1.00 Lot Will be done by : HVAC Vendor

□ Exhaust Fan for Pantry 1.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Toilet 1, 2 and Urinoir 3.00 Lot Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Ducting Installation Work 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Office & CCR Building (2nd Floor)

□ Air Cooled DX - AHU System, Refrigerant with R-407C (Panel and Control Room) 2.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - AHU System, Refrigerant with R-407C (Dinning Room) 1.00 Unit Will be done by : HVAC Vendor

□ Fresh Air Filter Unit (Panel & Control Room) 1.00 Lot Will be done by : HVAC Vendor

□ Fresh Air Filter Unit (Dinning Room) 1.00 Lot Will be done by : HVAC Vendor

□ Supply Fan for Pressurize System 2.00 Lot Will be done by : HVAC Vendor

□ Exhaust Fan for Smoke Removal Control Room 2.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Toilet 1 & 2 2.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Ducting Installation Work 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Warehouse & Workshop

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 1.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 1.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 1.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 3.00 Unit Will be done by : HVAC Vendor

□ Turbine Ventilator for Chemical Storage Room 10.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Toilet 1 & 2 2.00 Set Will be done by : HVAC Vendor

□ Exhaust Fan for Mushola 1.00 Set Will be done by : HVAC Vendor

ERECTION AND INSTALLATION BY

VENDOR HVAC SYSTEM

Page 16: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

□ Exhaust Fan for Ablution 1.00 Set Will be done by : HVAC Vendor

□ Exhaust Fan for Storage 1.00 Set Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Pos Security 1

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 1.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 1.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Toilet 1.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Pos Security 2

□ Air Cooled DX - Wall Mounted, Refrigerant with Non CFC 1.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan for Pantry 8.00 Unit Will be done by : HVAC Vendor

□ Exhaust Fan Toilet 1.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- CEMS & SWAS Building

□ Air Cooled DX - Wall Mounted, Refrigerant with Non CFC 1.00 Unit Will be done by : HVAC Vendor

□ Air Cooled DX - Wall Mounted, Refrigerant with Non CFC 3.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Electrical Room WTP

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 4.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

- Substation UBB

□ Air Cooled DX - Wall Mounted, Refrigerant with R410A 6.00 Unit Will be done by : HVAC Vendor

□ Piping Installation c/w insulation & jacketing, include hanger, support, etc 1.00 Lot Will be done by : HVAC Vendor

□ Electrical / Automatic Control & Instrumentation For HVAC System 1.00 Lot Will be done by : HVAC Vendor

b. Individual Testing

- Visual Inspection 1.00 Lot Will be done by : HVAC Vendor

- Leak Test 1.00 Lot Will be done by : HVAC Vendor

- Function Test 1.00 Lot Will be done by : HVAC Vendor

11 HOISTING MACHINE 50,000,000

a. Mechanical, Electrical & Instrument Installation

- Workshop Overhead Crane included includedGGCP-04-M10-EL-010-PP Equipment List OHT Single Girder

Crane Cap. 10 T (A)

GGCP-04-M10-DW-001-PP Detail Drawing OH Crane

Workshop Rev.0 (A)

GGCP-04-M10-DS-010-PP Data Sheet OHT Cap. 10 T

Workshop Rev.0

GGCP-04-M10-GA-001-PP Rev.2 Layout Drawing Crane 10T

Warehouse

□ Install Square Bar Runway Railway 1.00 Set included includedGGCP-04-M10-DW-001-PP Detail Drawing OH Crane

Workshop Rev.0 (A)

□ Install Single Girder 1.00 Set included includedGGCP-04-M10-DW-001-PP Detail Drawing OH Crane

Workshop Rev.0 (A)

□ Install Hoist Machine + Electric Wire Rope 1.00 Set included includedGGCP-04-M10-DW-001-PP Detail Drawing OH Crane

Workshop Rev.0 (A)

□ Electrical and Control Installation 1.00 Lot included includedGGCP-04-M10-DW-001-PP Detail Drawing OH Crane

Workshop Rev.0 (A)

- Manual Chain Hoist for HRSG Boiler Feed PumpGGCP-04-M10-EL-011-PP Equipment List Manual Cap 3 T

BFW Pump HRSG (A)

□ Install Structure Free Standing Runway Beam Monorail HOLD DATA

□ Install Railway 1.00 Set included included HOLD DATA

□ Install Manual Hoist & Trolley 1.00 Set included included HOLD DATA

- Manual Chain Hoist for PB Boiler Feed Pump GGCP-04-M10-EL-012-PP Equipment List Manual Cap 3 T BFW Pump Boiler (A)

□ Install Structure Free Standing Runway Beam Monorail HOLD DATA

□ Install Railway 1.00 Set included included HOLD DATA

□ Install Manual Hoist & Trolley 1.00 Set included included HOLD DATA

ERECTION AND INSTALLATION BY

VENDOR HVAC SYSTEM

Page 17: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Manual Chain Hoist for Screen Inlet Cooling TowerGGCP-04-M10-EL-013-PP Equipment List Manual Crane Cap

2 T Cooling Tower (A)

GGCP-04-M10-DS-013-PP Data Sheet Manual OHT Crane

Cap. 2 T Cooling Tower Rev.0

GGCP-04-M10-GA-004-PP Rev.3 Layout Drawing Manual

Crane Cooling Tower

GGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

□ Install Structure Free Standing Runway Beam Monorail 1.00 Set included includedGGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

□ Install Girder 1.00 Set included includedGGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

□ Install End Carriage 1.00 Set included includedGGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

□ Install Runway Rail 1.00 Set included includedGGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

□ Install Manual Hoist & Trolley 1.00 Set included includedGGCP-04-M10-DW-004-PP Detail Drawing Manual Crane

Cooling Tower Rev.0 (A)

- Painting Works for Overhead & Manual Crane excluded excluded GGCP-04-M10-GS-001-PP SPEC PAINTING Rev.2 (A)

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test (if required) 1.00 Lot included included

- Function Test 1.00 Lot included includedLoad Test shall provided by Erector,

Depnaker Certificate by : PP

C PIPING WORKS 2,719,456,667

1 PIPING INSIDE COGEN PLANT

a. Piping Installation Refer to : PID, Pipe Route and Isometric Drawing

GGCP-00-L8-SD-002 PIPE SUPPORT STANDARD DRAWING

GGCP-00-L8-PR-007-PPSPECIFICATION FOR PIPING FABRICATION

INSTALLATION

- Natural Gas Feed Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-008-PP, ISOMETRIC MTO NATURAL GAS

- Filtered Water & Cooling Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-001-PP; GGCP-00-L8-BQ-006-PP ISOMETRIC MTO FILTERED AND COOLING

- Demin Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-004-PP, ISOMETRIC MTO DEMIN WATER SYSTEM

- IA/PA Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-002-PP, ISOMETRIC MTO COMPRESS AIR SYSTEM

- Boiler Feed Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-005-PP, ISOMETRIC MTO BFW

- Steam Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-005-PP, ISOMETRIC MTO STEAM SYSTEM

- Treated Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included includedDrawing No : …….. And MTO Valve. Control Valve +

Instrument

- Service Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included GGCP-00-L8-BQ-007-PP, ISOMETRIC PLANT WATER SYSTEM

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test 1.00 Lot included included

- Hydrotest 1.00 Lot included included

- Pipe Chemical Cleaning 1.00 Lot included included

- Preservation 1.00 Lot included included

2 TIE IN PIPING TO AMUREA II AND PABRIK 3 PETROKIMIA GRESIK

a. Piping Installation

- Tie-In TP 01 MP Steam Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included

GGCP-00-L8-GA-002-PP; GGCP-00-L8-IM-1303-PP (14-MPS-

3A-003-H-135); GGCP-00-L8-IM-1305-PP (10-MPS-3A-005-H-

125 )

GA and isometric

- Tie-In TP 01 Condensate Return Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included includedGGCP-00-L8-GA-003-PP; GGCP-00-L8-IM-1101-PP (6-C-1A-

001)GA and isometric

- Tie-In TP 02 Nitrogen Gas Supply Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included N/A Nitrogen not available in amurea

- Tie-In TP 02 Condensate Return Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included includedGGCP-00-L8-GA-003-PP; GGCP-00-L8-IM-1101-PP (6-C-1A-

001)GA and isometric

Page 18: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Tie-In TP 03 Filter Water Supply Piping, Support, Valve, Control Valve and Instrument 1.00 Lot excluded excludedGGCP-05-L8-GA-006-PP; GGCP-00-L8-IM-6001-PP_10-RW-

1A-001

Will be done by : Filtered Water & Natural

Gas Outside Piping Vendor

- Tie-In TP 04 Natural Gas Supply Piping, Support, Valve, Control Valve and Instrument 1.00 Lot excluded excludedGGCP-00-L8-GA-005-PP; GGCP-00-L8-IM-7001-PP (8-FG-2A-

001)

Will be done by : Filtered Water & Natural

Gas Outside Piping Vendor

- Tie-In TP 06 Treated Water Piping, Support, Valve, Control Valve and Instrument 1.00 Lot included included

GGCP-04-L8-GA-002-PP; GGCP-00-L8-IM-1801-PP (8-TW-1A-

001);GGCP-00-L8-IM-1802-PP (8-TW-1A-002); GGCP-00-L8-

IM-1804-PP (6-TW-1A-004); GGCP-00-L8-IM-1806-PP (6-TW-

1A-006)

GA and isometric

b. Individual Testing

- Allignment & Verticality Check 1.00 Lot included included

- Visual Inspection & Bolt Tightening Check 1.00 Lot included included

- NDT (Magnetic Particle / Liquid Penetrant Test) 1.00 Lot included included

- X-Ray / Radiography Test 1.00 Lot included included

- Hydrotest 1.00 Lot included included

- Pipe Chemical Cleaning 1.00 Lot included included

- Preservation 1.00 Lot included included

3 DE- HEATER & DE-PRESSURE

a. Mechanical & Instrument Installation

- Install & erection water injection line for MP Steam 1.00 Lot included included

- Install erection steam line for MP Steam 1.00 Lot included included

- Install Control Valve skid for MP Steam 1.00 Lot included included

- Install & erection condensate Trap Line for MP Steam 1.00 Lot included included

- Install & erection flow meter for MP Steam 1.00 Lot included included

- Install & erection pipe spooling 1.00 Lot included included

- Install & erection water injection line for LP Steam 1.00 Lot included included

- Install erection steam De-Heater line for LP Steam 1.00 Lot included included

- Install Control Valve skid for LP Steam 1.00 Lot included included

- Install & erection condensate Trap Line for LP Steam 1.00 Lot included included

- Install & erection flow meter for LP Steam 1.00 Lot included included

- Install & erection pipe spooling 1.00 Lot included included

b. Individual Testing

- Visual Inspection & Bolt Tightening Check included included

- NDT (Magnetic Particle / Liquid Penetrant Test) included included

- X-Ray / Radiography Test (100%) included included

- Leak Test included included

- Megger & Continuity Test included included

- Function Test included included

4 PAINT / COATING WORK FOR PIPING excluded excluded GGCP-00-L8-GS-007-PP; GGCP-00-L8-GS-004-PP

a. Paint / Coating Material Procurement & Site Application Specification for Painting; wraping material

- Sand Blast & Prime Coat 1.00 LotGGCP-00-L8-GS-007-PP GENERAL PROCEDURE FOR

PAINTINGWill be done by : Sand Blast & Prime Coat Vendor

- Secondary Coat 1.00 Lot Will be done by : Painting Vendor

- Top / Finish Coat 1.00 Lot Will be done by : Painting Vendor

b. Individual Testing

- Visual Inspection 1.00 Lot Will be done by : Painting Vendor

- Coat Thickness Check 1.00 Lot Will be done by : Painting Vendor

5 INSULATION WORK FOR PIPING included included GGCP-00-L8-GS-006-PP SPECIFICATION FOR INSULATION Specification for Insulation

a. Insulation Material Procurement & Site Application 1.00 LotGGCP-00-L8-GS-004-PP SPECIFICATION FOR WRAPPING

TAPE MATERIALsteam and bfw (MPS, LPS, BFW)

b. Individual Testing

- Visual Inspection 1.00 Lot

- Thickness Check 1.00 Lot

D ELECTRICAL BALANCE OF PLANT 2,900,191,250

Page 19: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

1 GENERATOR TRANSFORMER GGCP-04-E1-GA-150-PP

a. DISTRIBUTION TRANSFORMER 30 MVa c/w Cable Box , w/o Conservator & Radiator 1.00 Unit included included Will be handled by erector

- Installation

- Lifting to foundation Done By PP

- Allignment

- Installation (radiator, Conservator, Oil, etc)

- Oil Sampling Test

- Purifier Oil of Interbus Transformer (if Any)

- Finishing Touch-up (Painting, Cleaning, etc)

- Testing Will be handled by erector

- Insulation resistance of core and windings

- Dielectric strength of oil samples

- Ratio and no load current at low voltage on all tappings

- Phase relation check

- Calibration check of temperature instruments, including secondary current injection and

proving contact settings

- Air injecion tests of /oil-flow actuated relays

- Setting check of oil-level, oil-flow and water flow device

- Complete functional tests of cooling equipment and tap changing equipment, including

manual/automatic sequence, indications, alarms and interlocks.

- Operational tests of "freeze-drier" type breathers, insulation resistance of all secondary circuits

- Final checks before energizing :

Venting, position and locking of valves, earthing of star position, state of breathers and of

pressure relief devices, oil levels, oil dielectric absence of oil leakage, operation of cabinet

heaters, tap changer counter readings, resetting of maximum temperature indicators, final

proving of alarms and trips

- Test when energized : off load tap changer operation throughout range (subject to not

exceeding 1.1 p.u volts on any winding

- Test on load : 1. Temperature instrument readings, 2. Measurements of winding

temperature indicating (WTI) CT Secondary currents.

All test shall be reports

b. Neutral Grounding Resistor 1.00 Unit included included Still Waiting revision document from vendor'NGR 800 A, (20 / √3) kV, 50 Hz, 30 sec, (3 ±

10%) Ohm

□ Installation Will be handled by erector

2 UNIT AUXILLIARY (DISTRIBUTION) TRANSFORMER GGCP-04-E1-GA-160-PP

a Unit Auxiliary Transformer Type Oil Immersed With Conservator 3.5 MVA 1.00 Unit included included Oil Immersed, OCTC Capacity 3.5MVA

- Installation Will be handled by erector

- Lifting to foundation Done By PP

- Allignment

- Installation

- Finishing Touch-up (Painting, Cleaning, etc)

- Testing Will be handled by erector

- Insulation resistance of core and windings

- Dielectric strength of oil samples

- Ratio and no load current at low voltage on all tappings

- Phase relation check

- Calibration check of temperature instruments, including secondary current injection and

proving contact settings

- Air injecion tests of /oil-flow actuated relays

- Setting check of oil-level, oil-flow and water flow device

- Complete functional tests of cooling equipment and tap changing equipment, including

manual/automatic sequence, indications, alarms and interlocks.

- Operational tests of "freeze-drier" type breathers, insulation resistance of all secondary circuits

- Final checks before energizing :

Venting, position and locking of valves, earthing of star position, state of breathers and of

pressure relief devices, oil levels, oil dielectric absence of oil leakage, operation of cabinet

heaters, tap changer counter readings, resetting of maximum temperature indicators, final

proving of alarms and trips

- Test when energized : off load tap changer operation throughout range (subject to not

exceeding 1.1 p.u volts on any winding

- Test on load : 1. Temperature instrument readings, 2. Measurements of winding

temperature indicating (WTI) CT Secondary currents.

Page 20: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

All test shall be reports

a1 Neutral Grounding Resistor 1.00 Unit included included GGCP-04-E1-GA-208-PP'NGR 800 A, (20 / √3) kV, 50 Hz, 30 sec, (3 ±

10%) Ohm

□ Installation Will be handled by erector

b LV Transformer-1 1.25 MVA 1.00 Unit included included GGCP-04-E1-GA-160-PP Oil Immersed, OCTC Capacity 1.25MVA

- Installation Will be handled by erector

- Lifting to foundation Done By PP

- Allignment

- Installation

- Finishing Touch-up (Painting, Cleaning, etc)

- Testing

- Insulation resistance of core and windings

- Dielectric strength of oil samples

- Ratio and no load current at low voltage on all tappings

- Phase relation check

- Calibration check of temperature instruments, including secondary current injection and

proving contact settings

- Air injecion tests of /oil-flow actuated relays

- Setting check of oil-level, oil-flow and water flow device

- Complete functional tests of cooling equipment and tap changing equipment, including

manual/automatic sequence, indications, alarms and interlocks.

- Operational tests of "freeze-drier" type breathers, insulation resistance of all secondary circuits

- Final checks before energizing :

Venting, position and locking of valves, earthing of star position, state of breathers and of

pressure relief devices, oil levels, oil dielectric absence of oil leakage, operation of cabinet

heaters, tap changer counter readings, resetting of maximum temperature indicators, final

proving of alarms and trips

- Test when energized : off load tap changer operation throughout range (subject to not

exceeding 1.1 p.u volts on any winding

- Test on load : 1. Temperature instrument readings, 2. Measurements of winding

temperature indicating (WTI) CT Secondary currents.

All test shall be reports

c LV Transformer-2 1.25 MVA 1.00 Unit included included GGCP-04-E1-GA-160-PP Oil Immersed, OCTC Capacity 1.25MVA

- Installation Will be handled by erector

- Lifting to foundation Done By PP

- Allignment

- Installation

- Finishing Touch-up (Painting, Cleaning, etc)

- Testing Will be handled by erector

- Insulation resistance of core and windings

- Dielectric strength of oil samples

- Ratio and no load current at low voltage on all tappings

- Phase relation check

- Calibration check of temperature instruments, including secondary current injection and

proving contact settings

- Air injecion tests of /oil-flow actuated relays

- Setting check of oil-level, oil-flow and water flow device

- Complete functional tests of cooling equipment and tap changing equipment, including

manual/automatic sequence, indications, alarms and interlocks.

- Operational tests of "freeze-drier" type breathers, insulation resistance of all secondary circuits

- Final checks before energizing :

Venting, position and locking of valves, earthing of star position, state of breathers and of

pressure relief devices, oil levels, oil dielectric absence of oil leakage, operation of cabinet

heaters, tap changer counter readings, resetting of maximum temperature indicators, final

proving of alarms and trips

- Test when energized : off load tap changer operation throughout range (subject to not

exceeding 1.1 p.u volts on any winding

- Test on load : 1. Temperature instrument readings, 2. Measurements of winding

temperature indicating (WTI) CT Secondary currents.

All test shall be reports

Page 21: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

d Emergency Transformer 1.00 Unit included included GGCP-04-E1-GA-160-PP Oil Immersed, OCTC Capacity 1.25MVA

- Installation Will be handled by erector

- Lifting to foundation

- Allignment

- Installation

- Finishing Touch-up (Painting, Cleaning, etc)

- Testing Will be handled by erector

- Insulation resistance of core and windings

- Dielectric strength of oil samples

- Ratio and no load current at low voltage on all tappings

- Phase relation check

- Calibration check of temperature instruments, including secondary current injection and

proving contact settings

- Air injecion tests of /oil-flow actuated relays

- Setting check of oil-level, oil-flow and water flow device

- Complete functional tests of cooling equipment and tap changing equipment, including

manual/automatic sequence, indications, alarms and interlocks.

- Operational tests of "freeze-drier" type breathers, insulation resistance of all secondary circuits

- Final checks before energizing :

Venting, position and locking of valves, earthing of star position, state of breathers and of

pressure relief devices, oil levels, oil dielectric absence of oil leakage, operation of cabinet

heaters, tap changer counter readings, resetting of maximum temperature indicators, final

proving of alarms and trips

- Test when energized : off load tap changer operation throughout range (subject to not

exceeding 1.1 p.u volts on any winding

- Test on load : 1. Temperature instrument readings, 2. Measurements of winding

temperature indicating (WTI) CT Secondary currents.

All test shall be reports

3 BUSDUCT

a. MV Busduct (Cast Resin Type) P04803-GA001 Will be handled by erector

- From Terminal Generator to 11kV Switchgear

□ Straight 1.00 Lot included included

□ Elbow 90 degress (Horizontal/Vertical Bend) 1.00 Lot included included

□ Terminal Element 1.00 Lot included included

□ Flexible Copper Connection 1.00 Lot included included

□ Connection Box 1.00 Lot included included

□ Wall Flange 1.00 Lot included included

□ Thermostat 1.00 Lot included included

□ Jointing c/w acessories material 1.00 Lot included included

□ Support and fittings accessories 1.00 Lot included included

Installation

- Supporting material and installation

- Jointing and termination

Site Aceptance Test / Commisioning

- resistance test

- Insulation Test

- Hi Pot Test (if Any)

- Continuity Test

- Energize load test

- From 11kV Switchgear to Interbus Transformer Cast Resin Type

□ Straight 1.00 Lot included included Will be handled by erector

□ Elbow 90 degress (Horizontal/Vertical Bend) 1.00 Lot included included

□ Terminal Element 1.00 Lot included included

□ Flexible Copper Connection 1.00 Lot included included

□ Connection Box 1.00 Lot included included

□ Wall Flange 1.00 Lot included included

□ Thermostat 1.00 Lot included included

□ Jointing c/w acessories material 1.00 Lot included included

□ Support and fittings accessories 1.00 Lot included included

Installation

- Supporting material and installation

Page 22: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Jointing and termination

Site Aceptance Test / Commisioning

- resistance test

- Insulation Test

- Hi Pot Test (if Any)

- Continuity Test

- Energize load test

b. Cast Resin Busduct Low Voltage 0.4 KV P04825GA001 Will be handled by erector

- From Emergency Transformer to LV Switchgear

□ Straight 1.00 lot included included

□ Elbow 90 degress (Horizontal/Vertical Bend) 2.00 pcs included included

□ Terminal Element 2.00 pcs included included

□ Flexible Copper Connection 2.00 set included included

□ Connection Box - Un - Pained 2.00 set included included

□ Supports & fittings accessories 1.00 lot included included

□ Flat membrance 1.00 pcs included included

□ Rubber bellow 1.00 pcs included included

□ Wall penetration (S120) 1.00 pcs included included

Installation

- Supporting material and installation

- Jointing and termination

- From LV Transformer 1 to LV Switchgear 'Cast Resin Type

□ Straight 1.00 lot included included Will be handled by erector

□ Elbow 90 degress (Horizontal/Vertical Bend) 2.00 pcs included included

□ Terminal Element 2.00 pcs included included

□ Flexible Copper Connection 2.00 set included included

□ Connection Box - Un - Pained 2.00 set included included

□ Supports & fittings accessories 1.00 lot included included

□ Flat membrance 1.00 pcs included included

□ Rubber bellow 1.00 pcs included included

□ Wall penetration (S120) 1.00 pcs included included

Installation Will be handled by erector

- Supporting material and installation

- Jointing and termination

- From LV Transformer 2 to LV Switchgear Will be handled by erector

□ Straight 1.00 lot included included

□ Elbow 90 degress (Horizontal/Vertical Bend) 2.00 pcs included included

□ Terminal Element 2.00 pcs included included

□ Flexible Copper Connection 2.00 set included included

□ Connection Box - Un - Pained 2.00 set included included

□ Supports & fittings accessories 1.00 lot included included

□ Flat membrance 1.00 pcs included included

□ Rubber bellow 1.00 pcs included included

□ Wall penetration (S120) 1.00 pcs included included

Installation Will be handled by erector

- Supporting material and installation

- Jointing and termination

Site Aceptance Test / Commisioning Will be handled by erector

- resistance test

- Insulation Test

- Energize load test

4 MV SwitchgearIncluded in Switchgear Scope of Supply

Alreadya. 20kV MV Switchgear included included GGCP-04-E1-SL-112-PP, GGCP-05-E1-DW-001-PP Will be handled by erector

Incoming Breaker

VCB 1250 A, 20 KV, 50 Hz, 31.5 KA C/W CT, VT, Syn Check, Protection + Metering (from Inter.TR) Withdrawble type, Motorized

Installation

- Positioning to foundation

Page 23: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Allignment

- Bolting and Tightening

Outgoing Breaker included included

VCB 1250 A, 20 KV, 50 Hz, 31.5 KA C/W CT, VT, Syn Check, Protection + Metering (for S/S UBB) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

VCB 630 A, 20 KV, 50 Hz, 31.5 KA C/W CT, VT, Protection + Metering (for AMM.II) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

VCB 630 A, 20 KV, 50 Hz, 31.5 KA C/W CT, VT, Protection + Metering (for EMG.TR) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

VCB 630 A, 20 KV, 50 Hz, 31.5 KA C/W CT, VT, Protection + Metering (for Spare) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Bus VT Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Site Aceptance Test / Commisioning Will be handled by erector

- Primary injection tests on current transformer to prove ratio and polarity

- Secondary injection tests to prove relay and meter calibration

- High voltage tests on buses, including metal enclosed bus and switchgear

- Mechanical Test

- Point - to - point writing continuity checks on all low voltage circuits to confirm the final

connections agree with the panel wiring diagrams.

- Meggering at the appropriate voltage of all high voltage circuits

- Energizing of all low voltage circuits

- Check operation of all meters, relays, instruments, alarms, and trips

- Adjustments of all relays in line with the settings to be agreed with the owner

- Functional testing of all equipment

b. 11kV MV Switchgear included included GGCP-04-E1-SL-111-PP, GGCP-05-E1-DW-001-PP Will be handled by erector

Incoming Breaker

- VCB 1600 A, 11 KV, 50 Hz, 31.5 KA C/W CT, VT, Syn Check, Protection + Metering (from GTG) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Outgoing Breaker

- VCB 1600 A, 11 KV, 50 Hz, 31.5 KA C/W CT, VT, Syn Check, Protection + Metering (for Inter.TR) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- VCB 630 A, 11 KV, 50 Hz, 31.5 KA C/W CT, VT, Protection + Metering (for Aux.TR) Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Bus VT Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

Page 24: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Bolting and Tightening

Site Aceptance Test / Commisioning Will be handled by erector

- Primary injection tests on current transformer to prove ratio and polarity

- Secondary injection tests to prove relay and meter calibration

- High voltage tests on buses, including metal enclosed bus and switchgear

- Mechanical Test

- Point - to - point writing continuity checks on all low voltage circuits to confirm the final

connections agree with the panel wiring diagrams.

- Meggering at the appropriate voltage of all high voltage circuits

- Energizing of all low voltage circuits

- Check operation of all meters, relays, instruments, alarms, and trips

- Adjustments of all relays in line with the settings to be agreed with the owner

- Functional testing of all equipment

5 6 kV SWITCHGEARS 1 Lot included included GGCP-04-E1-SL-110-PP, GGCP-05-E1-DW-001-PP Will be handled by erector

a. Incoming Breaker

- VCB 630 A, 6.3 KV, 50 Hz, 25 KA C/W CT, VT, Protection + Metering 1 Set included included Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

b Outgoing Breaker

- VCB 630 A, 6.3 KV, 50 Hz, 25 KA C/W CT, VT, Protection + Metering (for TR) 3 Set included included Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

VCB 630 A, 6.3 KV, 50 Hz, 25 KA C/W CT, VT, Protection + Metering (for Motor) 4 Set included included Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

RVSS 630 A, 6.3 KV, 50 Hz, 25 KA C/W CT, VT, Protection + Metering (for Motor) 4 Set included included Withdrawble type, Motorized

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Bus VT 1 Set included included

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Site Aceptance Test / Commisioning Will be handled by erector

- Visual Inspection

- Primary injection tests on current transformer to prove ratio and polarity

- Secondary injection tests to prove relay and meter calibration

- High voltage tests on buses, including metal enclosed bus and switchgear

- Mechanical Test

- Point - to - point writing continuity checks on all low voltage circuits to confirm the final

connections agree with the panel wiring diagrams.

- Meggering at the appropriate voltage of all high voltage circuits

- Energizing of all low voltage circuits

- Check operation of all meters, relays, instruments, alarms, and trips

- Adjustments of all relays in line with the settings to be agreed with the owner

- Functional testing of all equipment

6 0.4 kV LV SWITCHGEARS Will be handled by erector

a. Erection and Installation

- Emergency Switchgear + ATS at Substation Building 5.00 Panel included included GGCP-04-E1-GA-101-PP, GGCP-05-E1-DW-001-PP

Installation

- Positioning to foundation

Page 25: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Allignment

- Bolting and Tightening

- LV Switchgear 1 (GTG Auxilliary MCC) at Substation Building 4.00 Panel included included GGCP-04-E1-GA-101-PP, GGCP-05-E1-DW-001-PP

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- LV Switchgear 2 at Substation Building 4.00 Panel included included GGCP-04-E1-GA-102-PP, GGCP-05-E1-DW-001-PP

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Power Distribution Board 1.00 Panel included included

InstallationInstallation

- lifting to foundation- Positioning to foundation

- Allignment- Allignment

- Tightening- Bolting and Tightening

- Workshop DB 1.00 Panel included included

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

b Site Aceptance Test / Commisioning included included Will be handled by erector

- Mechanical Test

- Point to Point wiring continuity checks on all circuit to confirm the final connections agree

with the panel wiring diagram

- Energizing of all circuits

- Check operation of all relays, instrument, alarms, and trips

- Adjusment of all relays in line with the settings to be agreed with the owner

- Functional testing of all equipment

- Confirmation of fuse size

7 0.4 kV LV MCC Will be handled by erector

a. Erection and Installation

- 230 GTG Aux MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-103-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Utility MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-104-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- HRSG & PB MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-105-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation- Positioning to foundation- Allignment- Bolting and Tightening

- LVB for HRSG MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-108-PP, GGCP-05-E1-DW-001-PP Inteligent typeInstallation

- Positioning to foundation- Allignment- Bolting and Tightening

- LVB for Package Boiler MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-109-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Fire Fighting MCC at Substation Building 1.00 Panel included included GGCP-04-E1-GA-107-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation

- Positioning to foundation

Page 26: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Allignment

- Bolting and Tightening

- Cooling Tower MCC at Substation Building 2.00 Panel included included GGCP-04-E1-GA-106-PP, GGCP-05-E1-DW-001-PP Inteligent type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

b Site Aceptance Test / Commisioning Will be handled by erector

- Mechanical Test 1.00 Lot included included

- Point to Point wiring continuity checks on all circuit to confirm the final connections agree with

the panel wiring diagram1.00 Lot included included

- Energizing of all circuits 1.00 Lot included included

- Check operation of all relays, instrument, alarms, and trips 1.00 Lot included included

- Adjusment of all relays in line with the settings to be agreed with the owner 1.00 Lot included included

- Functional testing of all equipment 1.00 Lot included included

- Confirmation of fuse size 1.00 Lot included included

8 Batteries and UPS System Will be handled by erector

UPS System (110 VAC) Redundant system

UPS Panel System 1 Set included included GGCP-00-E1-GA-001-PP

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Battery and Battery Rack 2 Set included included GGCP-00-E1-GA-002-PP VLRA

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Battery charging (one time)

AC Distribution Board 1 Set included included GGCP-00-E1-GA-001-PP Standing Floor Type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

DC System System Redundant system

SDC Panel System 1 Set included included GGCP-00-E1-GA-003-PP

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

Battery and Battery Rack 2 Set included included GGCP-00-E1-GA-004-PP VLRA

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

- Battery charging (one time)

DC Distribution Board 1 Set included included GGCP-00-E1-GA-003-PP Standing Floor Type

Installation

- Positioning to foundation

- Allignment

- Bolting and Tightening

9 CABLES, CABLE TRAYS & BULK MATERIALS included included GGCP-00-E2-BM-001-PP Will be handled by erector

Electrical Cables

Installation

- Cutting cables GGCP-00-E2-DW-002-PP

- Pulling Cable

- Termination

- Jointing

- special joint at 20 KV from GGCP to SS UBB

Page 27: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Mob-Demob

Site Aceptance Test / Commisioning

- Resistance Test

- Insulation Test

- Continuity test

Cable Ladder & Accessories included included GGCP-00-E2-BM-001-PP Will be handled by erector

Installation Will be handled by erector

- Installtion of cable ladder/tray

- Bolting and Tightening

- Support and accessories installation

- outdoor cable tray support material purchasing

10 GROUNDING SYSTEM & LIGHTNING PROTECTION excluded excluded Handled the other Subcont

a. Grounding System

- Grounding Electrode, Copper Clad Steel Driven type

□ 3/4" x 3000 mm L 1.00 Lot

- Grounding Well, Reinforced Concrete c/w Steel Plate 4mm cover,

Grounding Electrode Marker Plate

□ 450mm (W) x 450mm (L) x 400 (D) 1.00 Lot

- Grounding Wire Connector, "C" Sleeve Compression Type, Copper

□ 120mm2 + 35mm2 1.00 Lot

□ 120mm2 + 16mm2 1.00 Lot

- Grounding Electrode & Wire Clamp, Copper c/w 3/4" dia. M8 U-Bolt

2ea Nuts, 2ea Flat & Spring Washer Conductor Size

□ 120mm2 1.00 Lot

□ 70mm2 1.00 Lot

□ 50mm2 1.00 Lot

□ 35mm2 1.00 Lot

□ 16mm2 1.00 Lot

- Exothermic Welding Kit

□ 120mm2 - 120mm2 - 120mm2 - 120mm2 1.00 Lot

□ 120mm2 - 120mm2 - 120mm2 1.00 Lot

- Exothermic Welding Powder, 1 Pack = 10 Tube

□ 120mm2 - 120mm2 - 120mm2 - 120mm2 1.00 Lot

□ 120mm2 - 120mm2 - 120mm2 1.00 Lot

- Grounding Lug, Steel, Hot Dipped Galvanized

□ 50mm (W) x 100mm (L) x 6mm (T) 1.00 Lot

- Grounding Bar, Cooper Bar c/w Accessories (Roll Isolator, Insulator, Bolt and Nuts)

□ 50mm (W) x 300mm (L) x 5mm (T) 1.00 Lot

- Air terminal, Conventional, c/w Base, 600 mmL 1.00 Lot

- Air terminal, Early Streamer Earthing c/w Lightining Counter , FRP Masts 1.00 Lot

- Conductor Clamp c/w Bolt and Nut 1.00 Lot

- Testing Joint Box, PVC, Terminal, Copper accessories

□ 120mm (W) x 400mm (L) x 100mm (D) 1.00 Lot

- T Joint Terminal Copper Conductor Size 70mm

□ 30mm (W) x 90mm (L) 1.00 Lot

- Flexible Braids (Length Min 400mm) for bonding grounding cable tray

□ Std. Dia 0,25mm Length Min=300mm 1.00 Lot

- Lightning Protection Cable Copper Tinned,

PVC Insulated 0,6/1kV Green with Yellow Stripe

□ 1C - 50mm2 1.00 Lot

- Grounding Cable, Bare Copper Conductor

□ 1C - 16mm2 1.00 Lot

□ 1C - 35mm2 1.00 Lot

□ 1C - 120mm2 1.00 Lot

- Copper Tinned, PVC Insulated 0,6/1kV Green with Yellow Stripe

□ 1C - 120mm2 1.00 Lot

b. Lightning Protection

- Grounding and Lightning Protectiorn for SS New UBB

□ Grounding Cable, Bare Copper Conductor

Page 28: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

1C - 120mm2 1.00 Lot

□ Groun ROD 3/4" (Dia) x 3000mmL 1.00 Lot

□ Grounding Well, Reinforced Concrete c/w Steel Plate 4mm Cover 1.00 Lot

Grounding Electrode Marker Plate

□ Air Terminal, Stainless Steel 1.00 Lot

□ Testing Joint Box ,PVC, Terminal Copper Accessories 1.00 Lot

□ Lightning Protection Cable 1 x 50 sqmm 1.00 Lot

11 PLANT LIGHTING excluded excluded Handled the other Subcont

1. INDOOR LIGHTING

a. Substation Building

- Equipment

□ Main Lighting Panel 1.00 Set

NYY 4 x 10 sqmm + BC 10 sqmm for Power cable Lighting Panel 1.00 Lot

□ Emergency Main Lighting Panel 1.00 Set

NYY 4 x 10 sqmm + BC 10 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighitng Panel Sub Building C/W Installation (I-MA-23858-C) 1.00 Set

NYY 4 x 10 sqmm + BC 10 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture 33.00 pcs

Lamp c/w lighting fixture 2.00 pcs

□ Switch On/Off Lighting 6.00 Lot

□ Power Outlets 3.00 pcs

- Installation

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Lighting 35.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Power Outlets 3.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Switch on/off 6.00 Ttk

b. Office, CCR Building, and Security Post 1

- Equipment

□ Lighting Panel C/W Installation (1-MA-23858G, 1-MA-23056F) 2.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Local Emergency Panel C/W Installation (1-MA-2385H, 1-MA23056J) 2.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ MCB Box (security Pos) C/W Installation 1.00 Set

NYY 4 x 4 sqmm + BC 1.5 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture 101.00 pcs

Lamp c/w lighting fixture 3.00 pcs

Lamp c/w lighting fixture 6.00 pcs

□ Switch On/Off Lighting 35.00 pcs

□ Power Outlets 26.00 pcs

- Installation

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Lighting 110.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Power Outlets 26.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Switch on/off 35.00 Ttk

c. Workshop and Warehouse Building

- Equipment

□ LP Workshop Building C/W Installation (1-MA-23858L) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Local Emergency Panel Workshop Building (1-MA-23858M) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture 31.00 pcs

Lamp c/w lighting fixture 3.00 pcs

Lamp c/w lighting fixture 18.00 pcs

Lamp c/w lighting fixture 2.00 pcs

Lamp c/w lighting fixture 12.00 pcs

□ Switch On/Off Lighting 15.00 pcs

□ Switch On/Off Lighting 6.00 pcs

□ Power Outlets 12.00 pcs

Page 29: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Installation

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Lighting 66.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Power Outlets 12.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Switch on/off 21.00 Ttk

d. CEMS and SWAS Building and security pos 2

- Equipment

□ MCB Box CEMS and SWAS Building C/W Installation 1.00 Set

NYY 4 x 6 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ MCB Box Security Pos 2 C/W Installation 1.00 Set

NYY 4 x 6 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture 19.00 pcs

□ Switch On/Off Lighting 8.00 pcs

□ Power Outlets 5.00 pcs

- Installation

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Lighting 19.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Power Outlets 8.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Switch on/off 5.00 Ttk

2. OUTDOOR LIGHTING excluded excluded Handled the other Subcont

a. Street Lighting

- Equipment

□ LP Street Lighting C/W Installation (01-MA-23858-A) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Local Emergency Panel Street Lighting (01-MA-23858-B) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture c/w 15.00 pcs

Street Lighting Pole 15.00 pcs

Terminal Box Each Lighting Pole c/w bolt and Nut 15.00 pcs

Circuit Breaker each Pole 15.00 pcs

Base Plate 15.00 pcs

- Installation

□ Power Cables 3 x 10 sqmm C/W Conduit and Fitting for Lighting 19.00 Ttk

□ Lighting Poles and foundation 8.00 Ttk

b. GTG and Transformer Area

- Equipment

□ Lighting Fixtures

Flood Lighting 15.00 pcs

Lighting Pole 4.00 pcs

Circuit Breaker each Pole 4.00 pcs

- Installation

□ NYY 3 x 10 sqmm C/W Steel Conduit and Fitting for Lighting 15.00 Ttk

□ Lighting Poles and foundation 4.00 Ttk

c. HRSG Area

- Equipment

□ LP HRSG C/W Installation (01-MA-23858-Q) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Flood Lighting 2.00 pcs

Lamp c/w lighting fixture 12.00 pcs

Lighting Pole for Flood Lighting type 2.00 pcs

Circuit Breaker each Pole c/s terminal box 4.00 pcs

Lighting Pole for Fluorescent type 12.00 pcs

- Installation

□ NYY 3 x 4 sqmm C/W Steel Conduit and Fitting for Lighting 14.00 Ttk

□ Lifting Lighting Poles 14.00 Ttk

d. Package Boiler Area

Page 30: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Equipment

□ LP Boiler C/W Installation (01-MA-23858-P) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Flood Lighting 9.00 pcs

Lamp c/w lighting fixture 16.00 pcs

Lighting Pole for Flood Lighting type 9.00 pcs

Circuit Breaker each Pole c/s terminal box 12.00 pcs

Lighting Pole for Fluorescent type 16.00 pcs

- Installation

□ NYY 3 x 4 sqmm C/W Steel Conduit and Fitting for Lighting 25.00 Ttk

□ Lifting Lighting Poles 25.00 Ttk

e. Condensate and Filtered Water Tank Area

- Equipment

□ Lighting Fixtures

Flood Lighting 5.00 pcs

Lamp c/w lighting fixture 9.00 pcs

Lighting Pole for Flood Lighting type 5.00 pcs

Circuit Breaker each Pole c/s terminal box 7.00 pcs

Lighting Pole for Fluorescent type 9.00 pcs

- Installation

□ NYY 3 x 4 sqmm C/W Steel Conduit and Fitting for Lighting 14.00 Ttk

□ Lifting Lighting Poles 5.00 Ttk

f. IA & PA, WTP and WWTP Area

- Equipment

□ Lighting Panel C/W Installation (1-MA-23858N) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Local Emergency Panel C/W Installation (1-MA-238580) 1.00 Set

NYY 4 x 10 sqmm + BC 4 sqmm for Power cable Lighting Panel 1.00 Lot

□ Lighting Fixtures

Lamp c/w lighting fixture 43.00 pcs

□ Switch On/Off Lighting 3.00 pcs

□ Power Outlets 10.00 pcs

- Installation

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Lighting 43.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Power Outlets 3.00 Ttk

□ NYM 3 x 2.5 sqmm C/W Conduit and Fitting for Switch on/off 10.00 Ttk

g. Cooling Tower Area

- Equipment

□ Lighting Fixtures

Flood Lighting 4.00 pcs

Lighting Pole 4.00 pcs

Circuit Breaker each Pole 4.00 pcs

- Installation

NYY 3 x 10 sqmm C/W Steel Conduit and Fitting for Lighting 4.00 Ttk

Lighting Poles and foundation 4.00 Ttk

12 COMMUNICATION SYSTEM excluded excluded Handled the other Subcont

Clock System 1 lotGGCP-00-E5-DW-010-PP, GGCP-00-E1-SD-005-PP, GGCP-00-

E1-BM-006-PP

Installation

Positioning Material refer to Clock system Layout

Bolting and Tightening

Support material purchasing and installation

Test

Function Test

LAN system 1 lotGGCP-00-E1-SD-005-PP, GGCP-00-E5-DW-008-PP, GGCP-00-

E1-BM-006-PP

Positioning Material refer to Clock system Layout

Page 31: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Bolting and Tightening

Support material purchasing and installation

Test

Function Test

Telephone and paging system 1 lotGGCP-00-E1-SD-004-PP, GGCP-00-E5-DW-002-PP, GGCP-00-

E1-BM-006-PP

Positioning Material refer to Clock system Layout

Bolting and Tightening

Support material purchasing and installation

Test

Function Test

CCTVGGCP-00-E1-SD-005-PP, GGCP-00-E5-DW-006-PP, GGCP-00-

E1-BM-006-PP

Positioning Material refer to Clock system Layout

Bolting and Tightening

Support material purchasing and installation

Test

Function Test

13 20 kV SWITCHGEAR SS UBB 1 Set included included GGCP-04-E1-SL-112-PP

a. Erection and Installation

- Install 20 kV Switchgear at Substation Building

- Install extension of 20 kV Switchgear at SS UBB Building

- Allignment

- Connecting new panel with existing panel ss UBB (Busbar to Busbar)

b. Individual Testing

- Primary injection tests on current transformer to prove ratio and polarity

- Secondary injection tests to prove relay and meter calibration

- High voltage tests on buses, including metal enclosed bus and switchgear

- Mechanical Test

- Point - to - point writing continuity checks on all low voltage circuits to confirm the final

connections agree with the panel wiring diagrams.

- Meggering at the appropriate voltage of all high voltage circuits

- Energizing of all low voltage circuits

- Check operation of all meters, relays, instruments, alarms, and trips

- Adjustments of all relays in line with the settings to be agreed with the owner

- Functional testing of all equipment

14 TIE - IN TP 05 INTERNET CONNECTION Handled the other Subcont

a. Erection and Installation

- Pulling Cable and Termination Internet Data Cable 1.00 Lot excluded excluded

- Internet Setting 1.00 Lot excluded excluded

b. Individual Testing

- Continuity Check 1.00 Lot excluded excluded

- Loop Test 1.00 Lot excluded excluded

E INSTRUMENTATION BALANCE OF PLANT 1,259,470,100

1 CEMS & SWAS

a. CEMS included included GGCP-00-I0-TE-002-PP: TBE CEMS.

- CEMS Cabinet for Package Boiler Stack GGCP-00-I3-PI-002-PP: P&ID CEMS.

- Pre-Sampling Conditioning system GGCP-00-I3-GA-002-PP: General Arrangement Drawing

CEMS

Sample Probe (Heated Gas sampling probe) 1.00 Set included included

Heated Tube sample line (Heated 3/8" OD Teflon Sample Line) 1.00 Lot included included Still awaiting for isometric tube from Piping

- Sampling Conditioning system inside cabinet

Freestanding cabinet, Size: H2000*W800*D800 (mm), Material of construction, EG, 100 x 50 C-

channel plinth, including :1.00 Set included included

2 x 3/2 way solenoid valve for stream switching

1 x Buehler pump with bypass flow regulating valve

1 x JCT Cooler (dual stage)

Page 32: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

2 x KNF pump with bypass flow regulating valve

1 x PAS separator

2 x 3/2way solenoid valve for Auto calibration controllered by IR 400

2 x Brooks flowmeter (glasstube rotameter)

JCT Moisture detector with controller, 1 x membrane filter

NO/NOx Converter

Teflon membrane filter

Tubing and Fitting

Infra Red Analyzer

O2 Analyzer

- Opacity Analyzer (Installation at Insitu / Stack) 1.00 Set included included

Opacity & Total Particulate Monitor

Dynoptic systems control unit

Blower

- Flow & Temperature Measurement (Installation at Insitu / Stack) 1.00 Set included included

- Individual Testing

Visual Check 1.00 Set included included

Continuity Check 1.00 Set included included

Loop Check 1.00 Set included included

Function Test 1.00 Set included included

- CEMS Cabinet for HRSG Stack

- Pre-Sampling Conditioning system GGCP-00-I3-PI-002-PP: P&ID CEMS.

Sample Probe (Heated Gas sampling probe) 1.00 Set included includedGGCP-00-I3-GA-002-PP: General Arrangement Drawing

CEMS

Heated Tube sample line (Heated 3/8" OD Teflon Sample Line) 1.00 Lot included included Still awaiting for isometric tube from Piping

- Sampling Conditioning system inside cabinet

Freestanding cabinet, Size: H2000*W800*D800 (mm), Material of construction, EG, 100 x 50 C-

channel plinth, including :1.00 Set included included

2 x 3/2 way solenoid valve for stream switching

1 x Buehler pump with bypass flow regulating valve

1 x JCT Cooler (dual stage)

2 x KNF pump with bypass flow regulating valve

1 x PAS separator

2 x 3/2way solenoid valve for Auto calibration controllered by IR 400

2 x Brooks flowmeter (glasstube rotameter)

JCT Moisture detector with controller, 1 x membrane filter

NO/NOx Converter

Teflon membrane filter

Tubing and Fitting

Infra Red Analyzer

O2 Analyzer

- Opacity Analyzer (Installation at Insitu / Stack) 1.00 Set included included

Opacity & Total Particulate Monitor

Dynoptic systems control unit

Blower

- Flow & Temperature Measurement (Installation at Insitu / Stack) 1.00 Set included included

- Data Acquisition System (DAS), Yokogawa DX2000 Recorder (Positioning at CEMS Building) 1.00 Set included included

Single Stage 22" LED Monitor

Optical Mouse

Alphanumeric Keyboard

Annunciator Keyboard

CPU Model : Manufacturing Standard Industrial Type

Console

Page 33: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Gas Cylinder (Positioning at CEMS Building) 3 Set included included

Span Gas SO2,NO,CO,O2 and Mix Gas N2, Alumunium, SS, Regulator Single Stage Type,Capacity 47

Liter

- Individual Testing

Visual Check 1.00 Set included included

Continuity Check 1.00 Set included included

Loop Test 1.00 Set included included

Function Test 1.00 Set included included

b. SWASGGCP-00-I3-GA-001-PP: General Arrangement Drawing

SWAS.

- Wet Panel (Positioning at SWAS Building) 1.00 Set included included GGCP-00-I3-PI-001-PP: P&ID SWAS

Freestanding cabinet, Size: H2100*W3000*D600 (mm), Material of construction, SS Rectangular

Tube of 40x60x2mm, Sheet Metal Fabrications SS, Tundish Material SS 304, including :

High temperature Sample Isolation valves

Primary Sample coolers with SS 316 Coil material.

Cooling Water Isolation Valves

Cooling Water Flow Indicator

Pressure Reducers (Rod-In Tube type design)

Pressure Regulator Cleaning Arrangement.

Sample Pressure Relief Valve

Cooling Water Header (Inlet & Outlet) with Isolation valve, Flow Switch.

Blow-down Headers

Waste Drain Headers

Pressure Gauges

Temperature Gauges

Thermal shut-off valve for High Temperature Protection

Sample flow indicator (Rota-meter)

Back Pressure Regulators with Stainless Steel Diaphragm,

Dual Cation Column – color changing resins

Manual Grab Sample Facility

- Dry Panel (Positioning at SWAS Building) 1.00 Set included includedGGCP-00-I3-GA-001-PP: General Arrangement Drawing

SWAS.

Freestanding cabinet, Size: H2100*W1800*D600 (mm), Material of construction, SS Rectangular

Tube of 40x60x2mm, Front Access Door,Sheet Metal Fabrications SS, Tundish Material SS 304,

including :

GGCP-00-I3-PI-001-PP: P&ID SWAS

Analyzer Converter

Conductivity Sensor

PH Sensor

Dissolved Oxygen Sensor

PH Fitting

Conductivity Fitting

Dissolved Oxygen Fitting

PH Cable

Conductivity Cable

Dissolved Oxygen Cable

Accessories

Other Analyzer

- Termination and Wiring inter-panel between Dry and Wet Panel 1.00 Lot included included Attach for Vendor Wiring Diagram Dwg

- Individual Testing

Visual Check 1.00 Set included included

Continuity Check 1.00 Set included included

Function Test 1.00 Set included included

2 Distributed Control System & Emergency Shutdown System

a. DCS (Positioning at CCR Building) GGCP-00-I0-DW-005-PP: Instrument Layout Control Room.

Page 34: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

- Engineering Workstation/Historian/SPMS 1.00 Lot included included GGCP-04-I1-SO-001-PP: DCS Cabinet Layout

Single Stage 22" LED Monitor GGCP-04-I1-LD-001-PP: DCS - Termination Database

Optical Mouse GGCP-04-I1-SD-001-PP: System Architecture

Alphanumeric Keyboard

Annunciator Keyboard

CPU Model : Intel xeon or i7 w / 3.2 GHz, 8GB RAM, 1TB internal SATA HDD, Floppy Drive, DVD-RW,

PCIe dual digital video Interface

Console

- Operator Workstation DCS 1.00 Lot included included

Dual Stage 22" LED Monitor

Optical Mouse

Alphanumeric Keyboard

Annunciator Keyboard

CPU Model : Intel xeon or i7 w / 3.2 GHz, 8GB RAM, 1TB internal SATA HDD, Floppy Drive, DVD-RW,

PCIe dual digital video Interface

Console

- Overall Plant Overview minimum 85" LED Monitor c/w accessories 1.00 Set included included

- DCS System Cabinet-1 1.00 Lot included included

System Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

FCP280 Redundant-FCP280-Control Processor, baseplate mounted. Control network and fieldbus

network connections are 100 Mbps fiber optic. Includes required cables.

Hardwired HART Channel Isolated Analog Input - FBM214 - On a per card basis, supports up to 8

HART input signals, suitable to be mounted on a baseplate. System power is provided for transmitter

powering. Includes a 1 meter cable and termination assembly per card.

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- DCS System Cabinet-2 1.00 Lot included included

System Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

FCP280 Redundant-FCP280-Control Processor, baseplate mounted. Control network and fieldbus

network connections are 100 Mbps fiber optic. Includes required cables.

Hardwired HART Channel Isolated Analog Input - FBM214 - On a per card basis, supports up to 8

HART input signals, suitable to be mounted on a baseplate. System power is provided for transmitter

powering. Includes a 1 meter cable and termination assembly per card.

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- DCS Marshalling Cabinet-1 1.00 Lot included included

Marshalling Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

FCP280 Redundant-FCP280-Control Processor, baseplate mounted. Control network and fieldbus

network connections are 100 Mbps fiber optic. Includes required cables.

Hardwired HART Channel Isolated Analog Input - FBM214 - On a per card basis, supports up to 8

HART input signals, suitable to be mounted on a baseplate. System power is provided for transmitter

powering. Includes a 1 meter cable and termination assembly per card.

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- DCS Marshalling Cabinet-2 1.00 Lot included included

Marshalling Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

FCP280 Redundant-FCP280-Control Processor, baseplate mounted. Control network and fieldbus

network connections are 100 Mbps fiber optic. Includes required cables.

Page 35: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Hardwired HART Channel Isolated Analog Input - FBM214 - On a per card basis, supports up to 8

HART input signals, suitable to be mounted on a baseplate. System power is provided for transmitter

powering. Includes a 1 meter cable and termination assembly per card.

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- Individual Testing

Functional Test 1.00 Set included included

I/O Loop Checking 1.00 Set included included

Continuity Check 1.00 Set included included

Visual Check 1.00 Set included included

Partial Stroke Device Testing 1.00 Set included included

Diagnostic Test 1.00 Set included included

b. ESD (Positioning at CCR Building) GGCP-00-I0-DW-005-PP: Instrument Layout Control Room.

- ESD/SOE Engineering Workstation 1.00 Lot included included GGCP-04-I1-SO-002-PP: ESD Cabinet Layout

Single Stage 22" LED Monitor GGCP-04-I1-LD-002-PP: ESD - Termination Database

Optical Mouse GGCP-04-I1-SD-001-PP: System Architecture

Alphanumeric Keyboard

Annunciator Keyboard

CPU Model : Intel xeon or i7 w / 3.2 GHz, 8GB RAM, 1TB internal SATA HDD, Floppy Drive, DVD-RW,

PCIe dual digital video Interface

Console

- ESD System Cabinet 1.00 Lot included included

System Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

System Cabinet - Standard cabinet that can contain up to twenty tripaks, ETA and Field Power

Supplies G80 - Trident System Enclosure, Front & Rear Access - Standard Termination cabinet.

5354 - Hardwired HART Analog Input - Analog Input, HART TriPak, 32 pt, commoned, 4-20 mA, 5301 -

Trident Hardwired Digital Input - Digital Input TriPak, 32 pt, commoned, 24VDC, 5411H - Trident

Hardwired Digital Output - Supervised Digital Output TriPak High Current, 16

Pt, Commoned, 24 Vdc

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- ESD Marshalling Cabinet 1.00 Lot included included

Marshalling Cabinet, Size: H2100*W800*D800 (mm), IP43 NEMA12, Front & Rear access, PS-100-

240VAC/24VDC/20 (24Vdc 20A) for field power supply c/w Wiring & Accessories

5354 - Hardwired HART Analog Input - Analog Input, HART TriPak, 32 pt, commoned, 4-20 mA, 5301 -

Trident Hardwired Digital Input - Digital Input TriPak, 32 pt, commoned, 24VDC, 5411H - Trident

Hardwired Digital Output - Supervised Digital Output TriPak High Current, 16

Pt, Commoned, 24 Vdc

Hub Switch Industrial Type, Ethernet and Firewall, Model : Max. 12ch 10/100, 1000Base-T MGBIC

Module w/ RJ45 - MGBIC, 1000Base-SX, MMF, LC, Use w/ C/N Series Switches

Panel Accessories: Terminal Block, Terminal Fuse, Interposing Relay Blocks TRS 24VDC 1CO

- Raw Console for Other Workstation 6.00 Set included included

- GPS Master Clock System antenna (Installation at CCR Building Roof) 1.00 Set included included

- Auxiliary Console for Emergency Shutdown System (Positioning at CCR Building) 1.00 Set included included

- Report Printer, Laser Color Graphics Printer A3 paper size, c/w console, cable, and accessories 1.00 Set included included

- Alarm Printer, Dot matrix type, per A4 paper size second, c/w cable, console, and accessories. 1.00 Set included included

- Individual Testing

Visual Check 1.00 Set included included

Functional Test 1.00 Set included included

I/O Loop Test 1.00 Set included included

Continuity Check 1.00 Set included included

Partial Stroke Device Testing 1.00 Set included included

Page 36: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Diagnostic Test 1.00 Set included included

3 FIELD INSTRUMENTP&ID, Material Take Off for Field Instrument GGCP-00-I0-BM-

010-PP

1. Erection and Installation GGCP-00-I0-DW-002-PP Instrument Layout Plan.

□ Level Switch P&ID No : GGCP-04-P0-PI-002-PP & GGCP-04-P0-PI-009-PP

- Displacer type (316 SS) 2.00 Set included included GGCP-00-I0-DW-006-PP: Instrument Hook Up Diagram

- Guided Radar Level (Carbon Steel) 3.00 Set included included

□ Temperature Gauge (Heavy Duty Bimetalic 316 SS), with Thermowell (Solid Drilled from Bar Stock 316 SS) 13.00 Set included includedP&ID No : GGCP-04-P0-PI-007-PP, GGCP-04-P0-PI-008-PP,

GGCP-04-P0-PI-010-PP

□ Temperature Transmitter (HART, Smart Transmiter), with Thermowell (Solid Drilled from Bar Stock 316 SS) included included P&ID No : GGCP-04-P0-PI-007-PP & GGCP-04-P0-PI-010-PP

- 3-WIRE RTD (316 SS) 2.00 Set included included

- Thermocouple Type K (316 SS) 3.00 Set included included

□ Pressure Gauge ( Bourdon Type 316 SS) 26.00 Set included included

P&ID No : GGCP-04-P0-PI-002-PP, GGCP-04-P0-PI-003-PP,

GGCP-04-P0-PI-006-PP, GGCP-04-P0-PI-007-PP, GGCP-04-P0-

PI-008-PP, GGCP-04-P0-PI-010-PP

□ Pressure Transmitter (Diaphragm, HART, Smart Transmitter) 6.00 Set included includedP&ID No : GGCP-04-P0-PI-001-PP, GGCP-04-P0-PI-006-PP

GGCP-04-P0-PI-007-PP, GGCP-04-P0-PI-010-PP

□ Pressure Switch (Bourdon Type) 4.00 Set included includedP&ID No : GGCP-04-P0-PI-003-PP, GGCP-04-P0-PI-007-PP

GGCP-04-P0-PI-006-PP

□ Flow Transmitter (Diaphragm, HART, Smart Transmitter) 2.00 Set included includedP&ID No : GGCP-04-P0-PI-002-PP, GGCP-04-P0-PI-007-PP

GGCP-04-P0-PI-006-PP

□ Flow Transmitter (Diaphragm, HART, Smart Transmitter) w/ Flow Element (Orifice Plate, Concentric 316 SS C/W Flange, 1/2" 150 # RF)1.00 included included GGCP-04-P0-PI-007-PP

□ Flow Indicator (Turbine/ Rotary Flow Meter, 2'' 150#RF), w/ Flow Element (Concentric 316 SS C/W Flange, 1/2" 150 # RF)1.00 Set included included P&ID No : GGCP-04-P0-PI-006-PP

2. Individual TestGGCP-00-I0-PR-001-PP: Instrument Inspection Plan and

Testing Procedure

Visual Inspection 1.00 Set included included

Wiring Check 1.00 Set included included

Labelling

4 CONTROL VALVE, ON-OFF VALVE AND PRESSURE SAFETY VALVETBE Control Valve: GGCP-00-I0-TE-009-PP, MTO Control

Valve: GGCP-00-I0-BM-011-PP

a. Control Valve

- Equipment

Globe Valve, diaphragm actuator w/ IP Positioner and position transmitter

□ 6'' 150#RF 1.00 Set included included P&ID No: GGCP-04-P0-PI-010-PP Steam Distribution System

□ 6'' 600#RF 1.00 Set included included P&ID No: GGCP-04-P0-PI-010-PP Steam Distribution System

□ 2'' 600#RF 1.00 Set included included P&ID No: GGCP-04-P0-PI-010-PP Steam Distribution System

- Installation 1.00 Lot included included

- Individual Testing

Visual Check 1.00 Lot included included

Functional Check 1.00 Lot included included

b. Pressure Safety Valve

- Equipment

Pilot Valve

□ 3/4''x1'' 150#RF 4.00 Set included includedP&ID No: GGCP-04-P0-PI-014-PP Sheet 1 of 2:

Interconnecting Type

□ 4''x6'' 600#RF 1.00 Set included included P&ID No: GGCP-04-P0-PI-010-PP: Steam Distribution System

- Installation 1.00 Lot included included

- Individual Testing

Page 37: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Visual Check 1.00 Lot included included

Functional Check 1.00 Lot included included

c. On-Off Valve

- Equipment

Gate Valve, c/w spring return actuator

□ 1'' 150#RF 1.00 Set included included GGCP-04-P0-PI-009-PP: Plant Water Supply & Distribution

□ 1 1/2'' 150#RF 2.00 Set included included GGCP-04-P0-PI-009-PP: Plant Water Supply & Distribution

□ 6'' 150#RF 3.00 Set included includedGGCP-04-P0-PI-002-PP Sheet 2 of 2: Waste Water

Treatment System

□ 10'' 150#RF 1.00 Set included includedGGCP-04-P0-PI-003-PP Sheet 1 of 13: Water Treatment

System

- Installation 1.00 Lot included included

- Individual Testing

Visual Check 1.00 Lot included included

Functional Check 1.00 Lot included included

5 INSTRUMENT CABLE & WIRING ACCESSORIES

a. Instrument CableGGCP-00-I0-EL-003-PP Instrument Cable Schedule for

Balance of Plant

- MTO: GGCP-00-I0-BM-003

Cutting Cable GGCP-00-I0-DW-004-PP: Instrument Main Cable Way

Laying Cable 1.00 Lot included included GGCP-00-I0-DW-014-PP: Instrument Main Cable Way & JB

Pulling Cable 1.00 Lot included included GGCP-00-I0-DW-005: Instrument Layout Control Room

Termination 1.00 Lot included included

Labeling 1.00 Lot included included

- Individual Test for Cable

Visual Check 1.00 Lot included included

Megger Test 1.00 Lot included included

Continuity Test 1.00 Lot included included

b Instrument Wiring Accessories

-

Sealing

Insulating 1 Lot included included

Bolting 1 Lot included included

Screwing 1 Lot included included

Tightening 1 Lot included included

Marking and Labeling 1 Lot included included

- Individual Test for Wiring Accessories

Visual Check 1 Set included included

6 INSTRUMENT CABLE TRAY & LADDER 567,624,460

a. InstallationGGCP-00-I0-GS-007-PP General Specification for Cable

Ladder & Tray.

- Installation of Cable Ladder/Tray 1.00 Lot included includedGGCP-00-I0-EM-003-PP Material Take Off for Cable Ladder,

Tray & Fabrication.

- Bolting & Tightening 1.00 Lot included included GGCP-00-I0-DW-004-PP: Instrument Main Cable Way

- Support and Accessories installation 1.00 Lot included included GGCP-00-I0-DW-014-PP: Instrument Main Cable Way & JB

- Outdoor cable tray support material purchasin 1.00 Lot included included GGCP-00-I0-DW-005: Instrument Layout Control Room

e. Individual Test

Visual Check 1.00 Lot included included

7 INSTRUMENT BULK MATERIAL

a. Installation GGCP-00-I0-DW-006-PP Instrument Hook Up Diagram

Laying 1.00 Lot included included MTO for Instrument Bulk Material: GGCP-00-I0-BM-005-PP

Bolting 1.00 Lot included included

Installation shall be done in this following area (DCS, PB, GTG, HRSG, ESD), furhter information will be

Installation shall be done in this following area (DCS, PB, GTG, HRSG, ESD), further information will be

Page 38: apps.pp-epc.comapps.pp-epc.com/eproc/upload_file/selection_project/6551FA2DA558AB... · Spesifikasi pekerjaan dan Rincian Harga : Sesuai Penawaran Terlampir ... silencer, etc) inside

Tightening 1.00 Lot included included

Labeling 1.00 Lot included included

b. Individual Test 1 Lot included included

Visual Inspection

8 INSTRUMENT JUNCTION BOX

a. Item

- Junction Box for Cable 1P, 2P (1,5mm2) 2 Set included included GGCP-00-I0-BM-005-PP MTO Junction Box

Fiber Glass reinforce (FRP with 2mm thickness GGCP-00-I0-DW-014-PP: Instrument Main Cable Way & JB

Dimension: 500H x 400W x 275D (mm) GGCP-00-I0-DW-006-PP: Instrument Hook Up Diagram

Construction : Rectangular shape, softer finished rounded edges, strong robust construction

with superior silicone sponge gasket c/w document pocketGGCP-00-I0-DW-004-PP: Instrument Main Cable Way

Terminal : Klippon type (Weidmuller WDU or SAK series) with both side identified marking.

For intrinsic safety, blue color terminal shall be used.

Terminal are installed vertically

- Junction Box for Cable 1P, 10P, 20P (1.5mm2) 1 Set included included

Fiber Glass reinforce (FRP with 2mm thickness

Dimension: 600H x 500W x 275D (mm)

Construction : Rectangular shape, softer finished rounded edges, strong robust construction with

superior silicone sponge gasket c/w document pocket

Terminal : Klippon type (Weidmuller WDU or SAK series) with both side identified marking.

For intrinsic safety, blue color terminal shall be used.

Terminal are installed vertically

- Junction Box for Cable 2C, 4C, 40C (16 AWG) 5 Set included included

Fiber Glass reinforce (FRP with 2mm thickness

Dimension: 500H x 400W x 275D (mm)

Construction : Rectangular shape, softer finished rounded edges, strong robust construction with

superior silicone sponge gasket c/w document pocket

Terminal : Klippon type (Weidmuller WDU or SAK series) with both side identified marking. For

intrinsic safety, blue color terminal shall be used.

Terminal are installed vertically

b. Individual Test

- Visual Check 1 Lot included included

19,600,000,000

Terbilang "Sembilan Belas Milyar Enam Ratus Juta Rupiah.

Total Price