Hari 1
Kerja kotor = 06.00 – 17.00 = 11 jam
Istirahat = 50 menit (mesin menyala)
Setting up = 25 menit (mesin mati)
Kerja bersih = 9 jam 45 menit = 585 menit
Maka harga bensin :
Kerja 585 menit (6liter/jam) = 58.5 liter
Istirahat 50 menit (2 liter/jam) = 5/3 liter
Maka : 585.5 liter + 5/3 liter = 361/6 liter x Rp.6.900,00/liter = Rp. 415.150,00
Total pengeluaran hari ke-1
Bahan bakar = Rp. 415.150,00
Operator = Rp. 90.000,00
Uang makan = Rp. 20.000,00
Total = Rp. 525.150,00
Mencari jarak :
Kerja kotor = 06.00 – 17.00 = 11 jam
Istirahat = 50 menit (mesin menyala)
Setting up = 25 menit (mesin mati)
Kerja bersih = 9 jam 45 menit = 585 menit
t = 35100 sekon
v = 7.2 km/jam
v = 7200/3600 = 2 m/s
v = s/t
2 m/s = s / 31500 s
s = 71.200 m
s = 71.2 km