File : document.xls # REKAPITULASI PERKIRAAN HARGA PEKERJAAN Proyek / Bagpro : No. Paket Kontra : Nama Paket : Prop / Kab / Kod : No. Divisi Uraian 1 Umum 2 Drainase 3 Pekerjaan Tanah 4 Pelebaran Perkerasan dan Bahu Jalan 5 Pekerasan Non Aspal 6 Perkerasan Aspal 7 Struktur 8 Pengembalian Kondisi dan Pekerjaan Minor 9 Pekerjaan Harian 10 Pekerjaan Pemeliharaan Rutin (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) Terbilang …………………………………………………………………………………….................................... …………………………………………………………………………………….................................... ........., Menyetujui / Mengesahkan Panit k / Bagpro ................. Pinpro / Pinbagpro, ............................. .......... (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

Transcript of AHSASBUTON

Page 1: AHSASBUTON

File : document.xls

###

REKAPITULASIPERKIRAAN HARGA PEKERJAAN

Proyek / Bagpro :

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

Jumlah HargaNo. Divisi Uraian Pekerjaan

(Rupiah)

1 Umum 1,353,030,000

2 Drainase 19,955,090

3 Pekerjaan Tanah 2,710,435

4 Pelebaran Perkerasan dan Bahu Jalan 1,819,314

5 Pekerasan Non Aspal 2,157,200

6 Perkerasan Aspal 25,587,897

7 Struktur 307,331,598

8 Pengembalian Kondisi dan Pekerjaan Minor 41,240,320

9 Pekerjaan Harian 4,725,532

10 Pekerjaan Pemeliharaan Rutin 220,135,354

1,978,692,740

(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 197,869,274

(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 2,176,562,014

Terbilang : ……………………………………………………………………………………....................................

……………………………………………………………………………………....................................

..............., ................. 20...

Menyetujui / Mengesahkan Panitia PelelanganProyek / Bagpro ...................... Ketua,

Pinpro / Pinbagpro,

( ............................. ) ( ............................. )

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

Page 2: AHSASBUTON

File : document.xls

-2

Page 3: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 1. - MOBILISASI

1.2 Mobilisasi Lump sum 1.0 1,353,030,000

DIVISI 2. DRAINASE

2.1 Pekerjaan Galian untuk Selokan Drainase dan Saluran Air 1.0 23,461.52

2.2 Pekerjaan Pasangan Batu dengan Mortar 1.0 443,404.27

2.3 (1) Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam < 45 cm 1.0 385,792.15

2.3 (2) Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam 45-75 cm 1.0 472,133.77

2.3 (3) Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam 75-120 cm 1.0 767,253.83

2.3 (4) Gorong-Gorong Pipa Baja Bergelombang Ton 1.0 1,301,436.48

2.3 (5) Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 20 Cm 1.0 -

2.3 (6) Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 25 Cm 1.0 16,103,892.05

2.3 (7) Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 30 Cm 1.0 111,755.28

2.4 (1) Timbunan Porus atau Bahan Penyaring 1.0 261,266.68

2.4 (2) Anyaman Filter Plastik 1.0 24,157.82

2.4 (3) Pipa Berlubang Banyak Untuk Pek. Drainase di Bawah Permukaan 1.0 60,536.11

DIVISI 3. PEKERJAAN TANAH

3.1 (1) Galian Biasa 1.0 46,120.37

3.1 (2) Galian Batu 1.0 213,570.75

3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter 1.0 68,956.42

3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter 1.0 551,654.08

3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter 1.0 508,798.54

3.1 (6) Coferdam, Penyokong, Pengaku dan Pekerjaan yang berkaitan LS 1.0 -

3.1 (7) Galian Perkerasan Beraspal dengan Cold Milling Machine 1.0 117,683.03

3.1 (8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 1.0 558,050.70

3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km 1.0 7,420.85

3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan 1.0 136,385.34

3.2 (2) Timbunan Pilihan 1.0 117,693.96

3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) 1.0 101,127.08

3.2.(4) Timbunan Batu dengan Manual 1.0 78,445.33

3.2.(5) Timbunan Batu dengan Derek 1.0 144,780.86

3.2.(6) Timbunan Batu dengan Derek Ton 1.0 59,024.19

3.3 Penyiapan Badan Jalan 1.0 723.79

3.4 Pengupasan Permukaan Aspal Lama dan Pencampuran Kembali (tebal 15 cm) 1.0 -

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

M3

M1

M1

M1

M1

M1

M1

M3

M2

M1

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

M3

M3

M3

M3

M3

M3

M3/Km

M3

M3

M3

M3

M3

M2

M3

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Page 4: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 4 - PERBAIKAN TEPI PERKERASAN DAN BAHU JALAN

4.2 (1) Lapis Pondasi Agregat Kelas A 1.0 480,247.78

4.2 (2) Lapis Pondasi Agregat Kelas B 1.0 441,288.15

4.2 (3) Lapis Pondasi Semen Tanah 1.0 741,183.91

4.2 (4) Semen Untuk Lapis Pondasi Semen Tanah Ton 1.0 137,008.27

4.2 (5) Agregat Penutup BURTU 1.0 6,353.99

4.2 (6) Bahan Aspal Untuk Pekerjaan Pelaburan Liter 1.0 7,788.94

4.2 (7) Lapis Resap Pengikat Liter 1.0 5,442.57

DIVISI 5. PERKERASAN BERBUTIR

5.1 (1) Lapis Pondasi Agregat Kelas A 1.0 475,028.53

5.1 (2) Lapis Pondasi Agregat Kelas B 1.0 425,653.25

5.2 (1) Lapis Pondasi Agregat Kelas C 1.0 409,451.12

5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0 741,183.91

5.4 (2) Lapis Pondasi Tanah Semen 1.0 105,883.02

5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) 1.0 -

5.6 (1) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) 1.0 -

M3

M3

M3

M2

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

M3

M3

M3

M3

M3

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Page 5: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 6. PERKERASAN ASPAL

6.1 (1) Lapis Resap Pengikat Liter 1.0 5,550.36

6.1 (2) Lapis Perekat Liter 1.0 6,446.25

6.2 (1) Agregat Penutup BURTU 1.0 4,561.93

6.2 (2) Agregat Penutup BURDA 1.0 7,225.18

6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.0 7,342.13

6.3 (1) Latasir Kelas A (SS-A) 1.0 36,624.34

6.3 (2) Latasir Kelas B (SS-B) 1.0 44,302.17

6.3 (3) Lataston Lapis Aus (HRS-WC) 1.0 62,337.38

6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton 1.0 927,499.83

6.3(4) Lataston Lapis Pondasi (HRS-Base) 1.0 1,852,462.15

6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton 1.0 806,256.62

SKh. 6.3.a (1a) Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) (Asbuton Pra Campur)( t=4cm) 1.0 63,228.11

SKh. 6.3.a (1b) Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) Leveling (Asbuton Pra Campur) (t=3cm) Ton 1.0 691,555.56

SKh. 6.3.a (2a) Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) (Asbuton Pra Campur) (t=5cm) 1.0 1,537,465.82

SKh. 6.3.a (2b) Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) Leveling (Asbuton Pra Campur) Ton 1.0 678,337.92

SKh. 6.3.a (3a) Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) (Asbuton Pra Campur) (t=6cm) 1.0 1,499,485.53

SKh. 6.3.a (3b) Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) Leveling (Asbuton Pra Campur) (t=4c Ton 1.0 519,047.63

SKh. 6.3.b (1a) Camp. Hangat Asbuton Lap. Aus (AC-WC AsbH) T 20/25 (t=4 cm) 1.0 55,354.29

SKh. 6.3.b (1b) Camp. Hangat Asbuton Lap. Aus (AC-WC AsbH) Leveling T 20/25 (t=3 cm) Ton 1.0 647,377.88

SKh. 6.3.b (2a) Camp. Hangat Asbuton Lap. Permuk. Antara (AC-BC AsbH) T 20/25 (t=4 cm) 1.0 1,458,059.42

SKh. 6.3.b (2b) Camp. Hangat Asbuton Lap. Permuk. Antara (AC-BC AsbH) Leveling T 20/25 (t=3 cm) Ton 1.0 639,626.30

SKh. 6.3.b (3a) Camp. Hangat Asbuton Lap. Pondasi (AC-Base AsbH) T 20/25 (t=4 cm) 1.0 1,431,316.47

SKh. 6.3.b (3b) Camp. Hangat Asbuton Lap. Pondasi (AC-Base AsbH) Leveling T 20/25 (t=4 cm) Ton 1.0 627,309.94

6.4 (1) Lasbutag 1.0 10,507.47

6.4 (2) Latasbusir Kelas A 1.0 4,993.98

6.4 (3) Latasbusir Kelas B 1.0 6,877.19

6.4 (4) Bitumen Asbuton Ton 1.0 1,832,187.50

6.4 (5) Bitumen Bahan Peremaja Ton 1.0 6,226,189.55

6.4 (6) Bahan Anti Pengelupasan (anti stripping agent) Liter 1.0 24,000.00

6.5 Campuran Aspal Dingin untuk Pelapisan 1.0 1,318,763.76

6.6.1 Lapis Permukaan Penetrasi Macadam 1.0 1,235,218.47

6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam 1.0 1,320,386.06

M2

M2

M2

M2

M2

M3

M2

M3

M3

M2

M3

M3

M2

M2

M2

M3

M3

M3

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Page 6: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Page 7: AHSASBUTON

File : document.xls

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 7. STRUKTUR

7.1 (1) Beton K500 1.0 1,517,333.42

7.1 (2) Beton K400 1.0 1,446,890.01

7.1 (3) Beton K350 1.0 1,420,870.38

7.1 (4) Beton K300 1.0 1,131,031.99

7.1 (5) Beton K250 1.0 1,097,901.27

7.1 (6) Beton K175 1.0 770,716.20

7.1 (7) Beton Siklop K175 1.0 646,568.14

7.1 (8) Beton K125 1.0 688,063.61

7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah 1.0 23,844,677.44

7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m Buah 1.0 26,165,722.54

7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m Buah 1.0 27,055,251.32

7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m Buah 1.0 28,045,251.32

7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m Buah 1.0 29,035,251.32

7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m Buah 1.0 29,695,251.32

7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m Buah 1.0 31,237,526.12

7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m Buah 1.0 31,345,251.32

7.2 (9) Baja Prategang Kg 1.0 263,120.55

7.2 (10) Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah 1.0 35,568,643.43

7.2 (11) Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension) 1.0 1,205,208.85

7.3 (1) Baja Tulangan U24 Polos Kg 1.0 11,330.10

7.3 (2) Baja Tulangan U32 Polos Kg 1.0 11,324.60

7.3 (3) Baja Tulangan U32 Ulir Kg 1.0 12,050.60

7.3 (4) Baja Tulangan U39 Ulir Kg 1.0 10,920.35

7.3 (5) Baja Tulangan U48 Ulir Kg 1.0 12,050.60

7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 1.0 40,171.68

7.4 (1) Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,722.03

7.4 (2) Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,722.03

7.4 (3) Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,722.03

7.5 (1) Pemasangan Jembatan Rangka Baja Kg 1.0 642.34

7.5 (2) Pengangkutan Bahan Jembatan Kg 1.0 509.15

7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan 1.0 34,211.81

7.6 (2) Dinding Turap Kayu Tanpa Pengawetan 1.0 -

7.6 (3) Dinding Turap Kayu Dengan Pengawetan 1.0 37,991.40

7.6 (4) Dinding Turap Baja 1.0 20,957.98

7.6 (5) Dinding Turap Beton 1.0 -

7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan 1.0 40,115.74

7.6 (7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan 1.0 33,814.44

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

M3

M3

M3

M3

M3

M3

M3

M3

M3

M1

M2

M2

M2

M2

M3

M3

DIVISI 7 berlanjut ke halaman berikut.

Page 8: AHSASBUTON

File : document.xls

PembayaranUraian Satuan

Kuantitas Satuan

(Rupiah)

a b c d e

7.6 (8) Penyediaan Tiang Pancang Baja Kg 1.0 85,736.42

7.6 (9) Penyediaan Tiang Pancang Beton Bertulang Pracetak 1.0 4,459,986.74

7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak 1.0 1,071,397.58

7.6 (11) Pemancangan Tiang Pancang Kayu 1.0 152,229.71

7.6 (12) Pemancangan Tiang Pancang Pipa Baja : Diameter 400 mm 1.0 50,743.24

7.6 (13) Pemancangan Tiang Pancang Pipa Baja : Diameter 500 mm 1.0 50,743.24

7.6 (14) Pemancangan Tiang Pancang Pipa Baja : Diameter 600 mm 1.0 50,743.24

7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diameter 300 mm 1.0 52,244.91

7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau diameter 400 mm 1.0 52,244.91

7.6 (17) Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau diameter 500 mm 1.0 52,244.91

7.6 (18) Tiang Bor Beton, dia. 600 mm 1.0 -

7.6 (19) Tiang Bor Beton, dia. 800 mm 1.0 975,400.50

7.6 (20) Tiang Bor Beton, dia. 1000 mm 1.0 -

7.6 (21) Tiang Bor Beton, dia. 1200 mm 1.0 -

7.6 (22) Tiang Bor Beton, dia. 1500 mm 1.0 -

7.6 (23) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(11) s/d 1.0 -

7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair -

7.6 (24) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d 1.0 -

7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair -

7.6 (25) Pengujian Pembebanan pada Tiang dengan diameter sampai 600 mm Buah 1.0 -

7.6 (26) Pengujian Pembebanan pada Tiang dengan diameter diatas 600 mm Buah 1.0 -

7.7 (1) Penyediaan Dinding Sumuran Silinder, Diameter 250 cm 1.0 4,519,945.18

7.7 (2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm 1.0 5,467,457.78

7.7 (3) Penyediaan Dinding Sumuran Silinder, Diameter 350 cm 1.0 6,434,893.75

7.7 (4) Penyediaan Dinding Sumuran Silinder, Diameter 400 cm 1.0 8,087,493.63

7.7 (5) Penurunan Dinding Sumuran Silinder, Diameter 250 cm 1.0 252,070.12

7.7 (6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm 1.0 332,208.09

7.7 (7) Penurunan Dinding Sumuran Silinder, Diameter 350 cm 1.0 356,936.67

7.7 (8) Penurunan Dinding Sumuran Silinder, Diameter 400 cm 1.0 570,219.43

7.9 Pasangan Batu 1.0 541,896.47

7.10 (1) Pasangan Batu Kosong yang diisi Adukan 1.0 580,587.15

7.10 (2) Pasangan Batu Kosong 1.0 284,242.92

7.10 (3) Bronjong 1.0 350,603.85

7.11 (1) Expansion Joint Tipe Asphaltic Plug 1.0 38,419.32

7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21-41 mm) 1.0 -

7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32-62 mm) 1.0 -

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

M3

M3

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M3

M3

M3

M3

M1

M1

M1

DIVISI 7 berlanjut ke halaman berikut.

Page 9: AHSASBUTON

File : document.xls

7.11 (4) Expansion Joint Tipe Rubber 3 (celah 42-82 mm) 1.0 -

7.11 (5) Joint Filler untuk Sambungan Konstruksi 1.0 -

7.11 (6) Expansion Joint Tipe Baja Bersudut 1.0 -

7.12 (1) Perletakan Logam Buah 1.0 -

7.12 (2) Perletakan Elastomerik Jenis 1 (300 x 350 x 36) Buah 1.0 -

7.12 (3) Perletakan Elastomerik Jenis 2 (350 x 400 x 39) Buah 1.0 -

7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 1.0 -

7.12 (5) Perletakan Strip 1.0 -

7.13 1.0 14,253.41

7.14 Papan Nama Jembatan Buah 1.0 124,901.04

7.15.(1) Penmbongkaran Pasangan Batu 1.0 -

7.15.(2) Pembongkaran Beton 1.0 303,447.35

7.15.(3) Pembongkaran Beton Pratekan 1.0 -

7.15.(4) Pembongkaran Bangunan Gedung 1.0 -

7.15.(5) Pembongkaran Rangka Baja 1.0 374,787.95

7.15.(6) Pembongkaran Balok Baja (Steel Stringers) 1.0 212,009.34

7.15.(7) Pembongkaran Lantai Jembatan Kayu 1.0 -

7.15.(8) Pembongkaran Jembatan Kayu 1.0 -

7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 / Km 1.0 -

7.16 (1) Perkerasan Jalan Beton 1.0 3,518,911.56

7.17 (1) Wet Lean Concrete 1.0 -

7.17 (2) Sand Bedding (t = 4 cm) 1.0 -

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor 1.0 402,188.52

M1

M1

M1

M1

Sandaran (Railing) M1

M3

M3

M3

M2

M2

M1

M2

M2

M3

M2

M2

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

M3

Page 10: AHSASBUTON

File : document.xls

8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor 1.0 381,586.99

8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor 1.0 353,104.61

8.1 (4) Waterbound Macadam untuk Pekerjaan Minor 1.0 324,783.19

8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor 1.0 1,900,000.49

8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor 1.0 -

8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor 1.0 1,231,234.66

8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor 1.0 1,206,717.56

8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter 1.0 7,354.30

8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya 1.0 61,577.56

8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) 1.0 37,619.35

8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah 1.0 112,037.64

8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah 1.0 173,259.68

8.2(5) Pemotongan Pohon diameter > 75 cm Buah 1.0 360,877.85

8.3.(1) Stabilisasi dengan Tanaman 1.0 7,100.38

8.3.(2) Semak / Perdu 1.0 6,879.96

8.3.(3) Pohon Buah 1.0 6,494.96

8.4.(1) Marka Jalan Termoplastik 1.0 124,321.19

8.4.(2) Marka Jalan Bukan Termoplastik 1.0 113,596.19

8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 1.0 431,152.35

8.4.(3) .(b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 1.0 625,524.45

8.4.(4) .(a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 1.0 475,702.35

8.4.(4) .(b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 1.0 713,852.35

8.4.(5) Patok Pengarah Buah 1.0 108,594.41

8.4.(6) .(a) Patok Kilometer Buah 1.0 340,753.02

8.4.(6) .(b) Patok Hektometer Buah 1.0 163,628.35

8.4.(7) Rel Pengaman 1.0 643,322.83

8.4.(8) Paku Jalan Buah 1.0 70,676.95

8.4.(9) Mata Kucing Buah 1.0 147,126.95

8.4.(10) Kerb Pracetak 1.0 120,963.90

8.4.(11) Kerb yang digunakan kembali 1.0 31,895.13

8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median 1.0 10,530.08

8.5(1) Pengembalian Kondisi Lantai Jembatan Beton 1.0 66,803.50

8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu 1.0 29,618.08

8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur 1.0 15,796.31

8.6(1) Kerb Pracetak Pemisah Jalan (Concrete Barrier) 1.0 619,316.24

8.7(1) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt Buah 1.0 22,916,291.54

8.7(2) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt Buah 1.0 1,225,072.55

8.7(3) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 1.0 1,202,448.63

8.7(4) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 1.0 1,225,072.55

8.7(5) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 1.0 1,202,448.63

8.7(6) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 1.0 1,225,072.55

8.8(1) Pagar Pemisah Pedestrian Carbon Steel 1.0 314,825.01

8.8(2) Pagar Pemisah Pedestrian Galvanized 1.0 503,096.50

DAFTAR KUANTITAS DAN HARGA

No. Paket Kontrak :

Nama Paket :

Prop / Kab / Kodya :

M3

M3 (vol. gembur)

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

M2

M1

M1

M1

M2

M2

M2

M2

M1

M1

M1

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Page 11: AHSASBUTON

File : document.xls

No. MataUraian Satuan

Perkiraan Harga

Pembayaran Kuantitas Satuan

(Rupiah)

a b c d e

DIVISI 9. PEKERJAAN HARIAN

9.1 Mandor Jam 1.0 7,871.91

9.2 Pekerja Biasa Jam 1.0 4,985.55

9.3 Tukang Kayu, Tukang Batu, dsb Jam 1.0 6,559.93

9.4 Dump Truck, kapasitas 3-4 m³ Jam 1.0 307,965.42

9.5 Truk Bak Datar 3 - 4 ton Jam 1.0 363,962.58

9.6 Truk Tangki 3000 - 4500 Liter Jam 1.0 177,181.40

9.7 Bulldozer 100 - 150 PK Jam 1.0 457,453.82

9.8 Motor Grader min 100 PK Jam 1.0 378,173.40

9.9 Jam 1.0 293,475.18

9.10 Loader Roda Berantai 75 - 100 PK Jam 1.0 251,000.14

9.11 Alat Penggali (Excavator) 80 - 140 PK Jam 1.0 421,577.21

9.12 Crane 10 - 15 Ton Jam 1.0 598,100.70

9.13 Penggilas Roda Besi 6 - 9 Ton Jam 1.0 441,483.33

9.14 Penggilas Bervibrasi 5 - 8 Ton Jam 1.0 367,997.01

9.15 Pemadat Bervibrasi 1.5 - 3.0 PK Jam 1.0 26,644.52

9.16 Penggilas Roda Karet 8 - 10 Ton Jam 1.0 389,070.60

9.17 Kompresor 4000 - 6500 Ltr/mnt Jam 1.0 122,154.32

9.18 Jam 1.0 73,649.15

9.19 Pompa Air 70 - 100 mm Jam 1.0 18,528.02

9.20 Jack Hammer Jam 1.0 17,698.30

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

10.1 (1) Pemeliharaan Rutin Perkerasan LS 1.0 65,220,585.21

10.1 (2) Pemeliharaan Rutin Bahu Jalan LS 1.0 32,116,761.74

10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan LS 1.0 48,225,702.09

10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS 1.0 12,014,307.42

10.1 (5) Pemeliharaan Rutin Jembatan LS 1.0 62,557,997.32

Loader Roda Karet 1.0 - 1.6 M3

Beton Pengaduk (Molen) 0.3 - 0.6 M3

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Page 12: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

1,353,030,000

1,353,030,000

23,462

443,404

385,792

472,134

767,254

1,301,436

0

16,103,892

111,755

261,267

24,158

60,536

19,955,090

46,120

213,571

68,956

551,654

508,799

0

117,683

558,051

7,421

136,385

117,694

101,127

78,445

144,781

59,024

724

0

2,710,435

Page 13: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

480,248

441,288

741,184

137,008

6,354

7,789

5,443

1,819,314

475,029

425,653

409,451

741,184

105,883

0

0

2,157,200

Page 14: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

5,550

6,446

4,562

7,225

7,342

36,624

44,302

62,337

927,500

1,852,462

806,257

63,228

691,556

1,537,466

678,338

1,499,486

519,048

55,354

647,378

1,458,059

639,626

1,431,316

627,310

10,507

4,994

6,877

1,832,188

6,226,190

24,000

1,318,764

1,235,218

1,320,386

25,587,897

Page 15: AHSASBUTON

File : document.xls

DAFTAR KUANTITAS DAN HARGA

Page 16: AHSASBUTON

File : document.xls

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

1,517,333

1,446,890

1,420,870

1,131,032

1,097,901

770,716

646,568

688,064

23,844,677

26,165,723

27,055,251

28,045,251

29,035,251

29,695,251

31,237,526

31,345,251

263,121

35,568,643

1,205,209

11,330

11,325

12,051

10,920

12,051

40,172

12,722

12,722

12,722

642

509

34,212

0

37,991

20,958

0

40,116

33,814

DAFTAR KUANTITAS DAN HARGA

Jumlah

DIVISI 7 berlanjut ke halaman berikut.

Page 17: AHSASBUTON

File : document.xls

Harga-Harga

(Rupiah)

f = (d x e)

85,736

4,459,987

1,071,398

152,230

50,743

50,743

50,743

52,245

52,245

975,400

0

0

0

0

0

0

0

5,467,458

6,434,894

8,087,494

252,070

332,208

356,937

570,219

541,896

580,587

284,243

350,604

38,419

0

0

DAFTAR KUANTITAS DAN HARGA

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

DIVISI 7 berlanjut ke halaman berikut.

Page 18: AHSASBUTON

File : document.xls

0

0

0

0

0

0

0

0

14,253

124,901

0

303,447

0

0

374,788

212,009

0

0

0

3,518,912

0

0

307,331,598

DAFTAR KUANTITAS DAN HARGA

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

402,189

Page 19: AHSASBUTON

File : document.xls

381,587

353,105

324,783

1,900,000

0

1,231,235

1,206,718

7,354

61,578

37,619

112,038

173,260

360,878

7,100

6,880

6,495

124,321

113,596

431,152

625,524

475,702

713,852

108,594

340,753

163,628

643,323

70,677

147,127

120,964

31,895

10,530

66,804

29,618

15,796

619,316

22,916,292

1,225,073

1,202,449

1,225,073

1,202,449

1,225,073

314,825

503,097

41,240,320

DAFTAR KUANTITAS DAN HARGA

Page 20: AHSASBUTON

File : document.xls

Jumlah

Harga-Harga

(Rupiah)

f = (d x e)

7,872

4,986

6,560

307,965

363,963

177,181

457,454

378,173

293,475

251,000

421,577

598,101

441,483

367,997

26,645

389,071

122,154

73,649

18,528

17,698

4,725,532

65,220,585

32,116,762

48,225,702

12,014,307

62,557,997

220,135,354

Page 21: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (1a) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) (Asbuton Pra Campur)( t=4cm)SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-WC) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 64.0 % CA 60.10 % Gradasi harus -

- Fine Agregat 36.0 % FA 33.90 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi- Asphalt Nominal 6.0 % As 6.00 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0338 M31.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.0191 M31.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x tM3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 5.6304 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

2. ALAT2.a. WHEEL LOADER (E15)

Kapasitas bucket V 1.50 M3Faktor bucket Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Waktu Siklus Ts1- Muat T1 1.50 menit- Lain lain T2 0.50 menit

Ts1 2.00 menit

Berlanjut ke hal. berikut.

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 22: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (1a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) (Asbuton Pra Campur)( t=4cm)SATUAN PEMBAYARAN M2 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod. / jam = D2 x V x Fb x Fa x 60 Q1 657.68 M3D1 x t x Ts1

Koefisien Alat/M2 = 1 : Q1 (E15) 0.0015 Jam

2.b. ASPHALT MIXING PLANT (AMP) (E01)Kapasitas produksi V 50.0 ton / JamFaktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q2 451.09 M2D1 x t

Koefisien Alat/M2 = 1 : Q2 (E01) 0.0022 Jam

2.c. GENERATORSET ( GENSET ) (E12)Kap.Prod. / Jam = SAMA DENGAN AMP Q3 451.09 M2Koefisien Alat/M2 = 1 : Q3 (E12) 0.0022 Jam

2.d. DUMP TRUCK (DT) (E08)Kapasitas bak V 8.00 TonFaktor Efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 KM / JamKecepatan rata-rata kosong v2 50.00 KM / JamKapasitas AMP / batch Q2b 0.50 tonWaktu menyiapkan 1 batch AC-BC Tb 1.00 menitWaktu Siklus Ts2- Mengisi Bak = (V : Q2b) x Tb T1 16.00 menit- Angkut = (L : v1) x 60 menit T2 13.09 menit- Tunggu + dump + Putar T3 15.00 menit- Kembali = (L : v2) x 60 menit T4 10.47 menit

Ts2 54.56 menit

Kap.Prod. / jam = V x Fa x 60 Q4 79.37 M2D1 x Ts2 x t

Koefisien Alat/M2 = 1 : Q4 (E09) 0.0126 Jam

2.e. ASPHALT FINISHER (E02)Kapasitas produksi V 40.00 ton / jamFaktor efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q5 360.87 M2D1 x t

Koefisien Alat/M2 = 1 : Q5 (E02) 0.0028 Jam

2.f. TANDEM ROLLER (E17) Kecepatan rata-rata alat v 2.50 Km / Jam

Lebar efektif pemadatan b 1.20 MJumlah lintasan n 8.00 lintasan 4 Awal & 4 Akhir

Faktor Efisiensi alat Fa 0.83 -

Berlanjut ke hal. berikut.

Page 23: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (1a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) (Asbuton Pra Campur)( t=4cm)SATUAN PEMBAYARAN M2 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod. / jam = (v x 1000) x b x t x Fa Q6 311.25 M2n x t

Koefisien Alat/M2 = 1 : Q6 (E17) 0.0032 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)Kecepatan rata-rata v 3.50 KM / jamLebar efektif pemadatan b 1.20 MJumlah lintasan n 8.00 lintasanFaktor Efisiensi alat Fa 0.83 -

Kap.Prod./jam = (v x 1000) x b x t x Fa Q7 435.75 M2n x t

Koefisien Alat/M2 = 1 : Q7 (E18) 0.0023 Jam

2.h. ASPHALT LIQUID MIXERKoefesien yang digunakan sama dengan Q2Kap.Prod./jam = Q8 451.09 M2

Koefisien Alat/M2 = 1 : Q8 (E18) 0.0022 Jam

2.i. ALAT BANTU- Rambu = 2 buah Lump Sum- Kereta dorong = 2 buah- Sekop = 3 buah- Garpu = 2 buah- Tongkat Kontrol ketebalan hanparan

3. TENAGAProduksi menentukan : Asphalt Mixing Plant (AMP) Q2 451.09 M2 / JamProduksi AC-WC / hari = Tk x Q2 Qt 3,157.61 M2Kebutuhan tenaga :

- Pekerja P 10.00 orang- Mandor M 1.00 orang

Koefisien Tenaga / M2 :- Pekerja = (Tk x P) / Qt (L01) 0.0222 Jam- Mandor = (Tk x M) / Qt (L03) 0.0022 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 63,228.11 / M2

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 1.00 M2

Page 24: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (2a) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) (Asbuton Pra Campur) (t=5cm)SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-BC) padat t 0.05 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 66.0 % CA 62.18 % Gradasi harus -

- Fine Agregat 34.0 % FA 32.02 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi- Asphalt Nominal 5.8 % As 5.80 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.8740 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.4500 M31.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x 1M3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 136.0680 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

2. ALAT2.a. WHEEL LOADER (E15)

Kapasitas bucket V 1.50 M3Faktor bucket Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Waktu Siklus Ts1- Muat T1 1.50 menit- Lain lain T2 0.50 menit

Ts1 2.00 menit

Berlanjut ke hal. berikut.

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 25: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (2a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) (Asbuton Pra Campur) (t=5cm)SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = D2 x V x Fb x Fa x 60 Q1 26.31 M3 D1 x Ts1

Koefisien Alat / M3 = 1 : Q1 (E15) 0.0380 Jam

2.b. ASPHALT MIXING PLANT (AMP) (E01)Kapasitas produksi V 50.00 ton / JamFaktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q2 18.04 M3D1

Koefisien Alat / M3 = 1 : Q2 (E01) 0.0554 Jam

2.c. GENERATORSET ( GENSET ) (E12)Kap.Prod. / Jam = SAMA DENGAN AMP Q3 18.04 M2Koefisien Alat / M3 = 1 : Q3 (E12) 0.0554 Jam

2.d. DUMP TRUCK (DT) (E08)Kapasitas bak V 8.00 tonFaktor Efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 Km / JamKecepatan rata-rata kosong v2 50.00 Km / JamKapasitas AMP / batch Q2b 0.50 tonWaktu menyiapkan 1 batch AC-BC Tb 1.00 menitWaktu Siklus Ts2- Mengisi Bak = (V : Q2b) x Tb T1 16.00 menit- Angkut = (L : v1) x 60 menit T2 13.09 menit- Tunggu + dump + Putar T3 15.00 menit- Kembali = (L : v2) x 60 menit T4 10.47 menit

Ts2 54.56 menit

Kap.Prod. / jam = V x Fa x 60 Q4 3.17 M3D1 x Ts2

Koefisien Alat / M3 = 1 : Q4 (E09) 0.3150 Jam

2.e. ASPHALT FINISHER (E02)Kapasitas produksi V 40.00 ton / JamFaktor efisiensi alat Fa 0.75 -

Kap.Prod. / jam = V x Fa Q5 13.04 M3D1

Koefisien Alat / M3 = 1 : Q5 (E02) 0.0767 Jam

2.f. TANDEM ROLLER (E17) Kecepatan rata-rata alat v 3.50 Km / Jam

Lebar efektif pemadatan b 1.20 MJumlah lintasan n 8.00 lintasan 4 Awal & 4 Akhir

Faktor Efisiensi alat Fa 0.83 -

Berlanjut ke hal. berikut.

Page 26: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (2a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) (Asbuton Pra Campur) (t=5cm)SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = (v x 1000) x b x t x Fa Q6 21.79 M3n

Koefisien Alat / M3 = 1 : Q6 (E17) 0.0459 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)Kecepatan rata-rata v 5.00 KM / JamLebar efektif pemadatan b 1.50 MJumlah lintasan n 8.00 lintasanFaktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = (v x 1000) x b x t x Fa Q7 38.91 M3n

Koefisien Alat / M3 = 1 : Q7 (E18) 0.0257 Jam

2.h. ASPHALT LIQUID MIXERKoefesien yang digunakan sama dengan Q2Kap.Prod./jam = Q8 18.04 M2

Koefisien Alat/M2 = 1 : Q8 (E18) 0.0554 Jam

2.i. ALAT BANTUdiperlukan : Lump Sum- Kereta dorong = 2 buah- Sekop = 3 buah- Garpu = 2 buah- Tongkat Kontrol ketebalan hanparan

3. TENAGAProduksi menentukan : Asphalt Mixing Plant (AMP) Q2 18.04 M3/JamProduksi AC-BC / hari = Tk x Q2 Qt 126.30 M3Kebutuhan tenaga :

- Pekerja P 7.00 orang- Mandor M 1.00 orang

Koefisien Tenaga / M3 :- Pekerja = (Tk x P) / Qt (L01) 0.3880 Jam- Mandor = (Tk x M) / Qt (L03) 0.0554 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 1,537,465.82 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 1.00 M3

Page 27: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (3a) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) (Asbuton Pra Campur) (t=6cm)SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-Base) padat t 0.06 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 68.0 % CA 64.37 % Gradasi harus -

- Fine Agregat 32.0 % FA 30.13 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi- Asphalt Nominal 5.5 % As 5.50 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.9047 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.4235 M31.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x 1M3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 129.0300 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

2. ALAT2.a. WHEEL LOADER (E15)

Kapasitas bucket V 1.50 M3Faktor bucket Fb 0.90 -Faktor efisiensi alat Fa 0.83 -Waktu Siklus Ts1- Muat T1 1.50 menit- Lain lain T2 0.50 menit

Ts1 2.00 menit

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 28: AHSASBUTON

Berlanjut ke hal. berikut.

Page 29: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (3a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) (Asbuton Pra Campur) (t=6cm)SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = D2 x V x Fb x Fa x 60 Q1 26.31 M3 D1 x Ts1

Koefisien Alat / M3 = 1 : Q1 (E15) 0.0380 Jam

2.b. ASPHALT MIXING PLANT (AMP) (E01)Kapasitas produksi V 50.00 ton / JamFaktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q2 18.04 M3D1

Koefisien Alat / M3 = 1 : Q2 (E01) 0.0554 Jam

2.c. GENERATORSET ( GENSET ) (E12)Kap.Prod. / Jam = SAMA DENGAN AMP Q3 18.04 M2Koefisien Alat / M3 = 1 : Q3 (E12) 0.0554 Jam

2.d. DUMP TRUCK (DT) (E08)Kapasitas bak V 8.00 tonFaktor Efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 Km / JamKecepatan rata-rata kosong v2 50.00 Km / JamKapasitas AMP / batch Q2b 0.50 tonWaktu menyiapkan 1 batch AC-BC Tb 1.00 menitWaktu Siklus Ts2- Mengisi Bak = (V : Q2b) x Tb T1 16.00 menit- Angkut = (L : v1) x 60 menit T2 13.09 menit- Tunggu + dump + Putar T3 15.00 menit- Kembali = (L : v2) x 60 menit T4 10.47 menit

Ts2 54.56 menit

Kap.Prod. / jam = V x Fa x 60 Q4 3.17 M3D1 x Ts2

Koefisien Alat / M3 = 1 : Q4 (E09) 0.3150 Jam

2.e. ASPHALT FINISHER (E02)Kapasitas produksi V 40.00 ton / JamFaktor efisiensi alat Fa 0.75 -

Kap.Prod. / jam = V x Fa Q5 13.04 M3D1

Koefisien Alat / M3 = 1 : Q5 (E02) 0.0767 Jam

2.f. TANDEM ROLLER (E17) Kecepatan rata-rata alat v 3.50 Km / Jam

Lebar efektif pemadatan b 1.20 MJumlah lintasan n 8.00 lintasan 4 Awal & 4 Akhir

Faktor Efisiensi alat Fa 0.83 -

Berlanjut ke hal. berikut.

Page 30: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (3a) Analisa EI-635JENIS PEKERJAAN Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) (Asbuton Pra Campur) (t=6cm)SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN

Lanjutan

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = (v x 1000) x b x t x Fa Q6 26.15 M3n

Koefisien Alat / M3 = 1 : Q6 (E17) 0.0382 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)Kecepatan rata-rata v 5.00 KM / JamLebar efektif pemadatan b 1.50 MJumlah lintasan n 8.00 lintasan 4 Awal & 4 Akhir

Faktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = (v x 1000) x b x t x Fa Q7 46.69 M3n

Koefisien Alat / M3 = 1 : Q7 (E18) 0.0214 Jam

2.h. ASPHALT LIQUID MIXERKoefesien yang digunakan sama dengan Q2Kap.Prod./jam = Q8 18.04 M2

Koefisien Alat/M2 = 1 : Q8 (E18) 0.0554 Jam

2.i. ALAT BANTUdiperlukan : Lump Sum- Kereta dorong = 2 buah- Sekop = 3 buah- Garpu = 2 buah- Tongkat Kontrol ketebalan hanparan

3. TENAGAProduksi menentukan : Asphalt Mixing Plant (AMP) Q2 18.04 M3/JamProduksi AC-BC / hari = Tk x Q2 Qt 126.30 M3Kebutuhan tenaga :

- Pekerja P 7.00 orang- Mandor M 1.00 orang

Koefisien Tenaga / M3 :- Pekerja = (Tk x P) / Qt (L01) 0.3880 Jam- Mandor = (Tk x M) / Qt (L03) 0.0554 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALATLihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAANLihat perhitungan dalam FORMULIR STANDAR UNTUKPEREKEMAN ANALISA MASING-MASING HARGASATUAN.Didapat Harga Satuan Pekerjaan :

Rp. 1,499,485.53 / M3.

6. WAKTU PELAKSANAAN YANG DIPERLUKANMasa Pelaksanaan : . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKANVolume pekerjaan : 1.00 M3

Page 31: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (1b) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Aus (AC-WC AsbP) Leveling (Asbuton Pra Campur) (t=3cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-WC) padat t 0.03 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 48.0 % CA 44.90 % Gradasi harus -

- Fine Agregat 52.0 % FA 49.00 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Asphalt Nominal 6.1 % As 6.10 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.6312 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.6887 M3

1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x 1M3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 143.1060 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 32: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (2b) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Permuk. Antara (AC-BC AsbP) Leveling (Asbuton Pra Campur) (t=3cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-BC) padat t 0.03 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 50.0 % CA 46.99 % Gradasi harus -

- Fine Agregat 50.0 % FA 47.11 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Asphalt Nominal 5.9 % As 5.90 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.6605 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.6622 M3

1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x 1M3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 138.4140 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 33: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.a (3b) Analisa EI-635JENIS PEKERJAAN : Camp. Panas Asbuton Lap. Pondasi (AC-Base AsbP) Leveling (Asbuton Pra Campur) (t=4cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-Base) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 53.0 % CA 50.02 % Gradasi harus -

- Fine Agregat 47.0 % FA 44.28 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Asphalt Nominal 5.7 % As 5.70 %

- Bit. Asb Kode Asb = 6 0.00 % 1 = T 5/20 5 2 = T 15/20 7 3 = T 15/25 8.5 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0281 M31.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.0249 M3

1.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 0.0000 Kg1.d. As Pen 60 = (AS x (D1 x tM3) x Fh2) x 1000 (M62) 0.0000 Kg

1.e. Asbuton Murni (M63) 0.0000 Kg

1.f. Asb. Pra PraCampur (M64) 133.7220 Kg

1.g. Asb. Butir (M65) 0.0000 Kg

AsASB

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

= (ASASB x (D1 x tM3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = Asmin Pen 60 5 = Asbuton Murni 6 = Asbuton Pra Campur
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
Page 34: AHSASBUTON

File : document.xls

DAFTARHARGA DASAR SATUAN BAHAN

Lanjutan

HARGANo. U R A I A N KODE SATUAN SATUAN KETERANGAN

( Rp.)

1 As Pen 60 M62 Kg 4,250.00 Base Camp

2 Asbuton Murni M63 Kg 4,400.00 Base Camp

3 Asb. Pra PraCampur M64 Kg 4,400.00 Base Camp

T 5/20 Kg 950 Base CampT 15/20 Kg 950 Base CampT 15/25 Kg 950 Base CampT 20/25 Kg 1000 Base CampT 30/25 Kg 1000 Base Camp

4 Asb. Butir AC WC (P) M65 Kg 0 Base CampAsb. Butir AC BC (P) M65 Kg 0 Base CampAsb. Butir AC Base (P) M65 Kg 0 Base CampAsb. Butir AC WC L (P) M65 Kg 0 Base CampAsb. Butir AC BC L (P) M65 Kg 0 Base CampAsb. Butir AC Base L (P) M65 Kg 0 Base CampAsb. Butir AC WC (H) M65 Kg 1000 Base CampAsb. Butir AC BC (H) M65 Kg 1000 Base CampAsb. Butir AC Base (H) M65 Kg 1000 Base CampAsb. Butir AC WC L (H) M65 Kg 1000 Base CampAsb. Butir AC BC L (H) M65 Kg 1000 Base CampAsb. Butir AC Base L (H) M65 Kg 1000 Base Camp

Catatan :5 Peremaja Hangat M66 Kg 3,600.00 Base Camp

Page 35: AHSASBUTON

File : document.xls

M65 digunakan untuk semua type (contoh T5/20 dst)

Page 36: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (1a) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Aus (AC-WC AsbH) T 20/25 (t=4 cm)SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-WC) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 64.0 % CA 71.29 % Gradasi harus -

- Fine Agregat 36.0 % FA 22.71 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 6.0 % 2.25 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.0401 M31.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.0128 M31.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 2.1114 Kg

1.e. Asb. Butir (M65) 14.0760 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran
Page 37: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (2a) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Permuk. Antara (AC-BC AsbH) T 20/25 (t=4 cm)SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-BC) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 66.0 % CA 73.37 % Gradasi harus -

- Fine Agregat 34.0 % FA 20.83 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 5.8 % 2.05 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 1.0313 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.2927 M31.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 48.0930 Kg

1.e. Asb. Butir (M65) 351.9000 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran
Page 38: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (3a) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Pondasi (AC-Base AsbH) T 20/25 (t=4 cm)SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-Base) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 68.0 % CA 75.56 % Gradasi harus -

- Fine Agregat 32.0 % FA 18.94 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 5.5 % 1.75 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Asb. Butir D5 1.40 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 1.0621 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.2662 M31.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 41.0550 Kg

1.e. Asb. Butir (M65) 351.9000 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran
Page 39: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (1b) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Aus (AC-WC AsbH) Leveling T 20/25 (t=3 cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-WC) padat t 0.03 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 48.0 % CA 56.09 % Gradasi harus -

- Fine Agregat 52.0 % FA 37.81 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 6.1 % 2.35 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Bit. Asb. B-25 D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.7884 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.5314 M3

1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 55.131 Kg

1.e. Asb. Butir (M65) 351.900 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran
Page 40: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (2b) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Permuk. Antara (AC-BC AsbH) Leveling T 20/25 (t=3 cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-BC) padat t 0.03 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 50.0 % CA 58.18 % Gradasi harus -

- Fine Agregat 50.0 % FA 35.92 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 5.9 % 2.15 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Bit. Asb. B-25 D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.8178 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.5049 M3

1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 50.439 Kg

1.e. Asb. Butir (M65) 351.900 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran
Page 41: AHSASBUTON

ITEM PEMBAYARAN NO. : SKh. 6.3.b (3b) Analisa EI-635JENIS PEKERJAAN : Camp. Hangat Asbuton Lap. Pondasi (AC-Base AsbH) Leveling T 20/25 (t=4 cm)SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEF. SATUAN KETERANGAN

I. ASUMSI 1 Menggunakan alat berat (cara mekanik) 2 Lokasi pekerjaan : sepanjang jalan 3 Kondisi existing jalan : sedang 4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM 5 Tebal Lapis (AC-Base) padat t 0.04 M 6 Jam kerja efektif per-hari Tk 7.00 Jam 7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 - - Aspal Fh2 1.02 - 8 Komposisi campuran AC-WC :

- Coarse Agregat 53.0 % CA 61.21 % Gradasi harus -

- Fine Agregat 47.0 % FA 33.09 % memenuhi -

- Fraksi Filler semen 0.0 % FF 0.00 % Spesifikasi

- Bit Asbuton + Peremaja Nominal 5.7 % 1.95 %

- Bit. Asb Kode Asb = 4 3.75 % 1 = T 5/20 7 2 = T 15/20 10 3 = T 15/25 12.5 4 = T 20/25 15 5 = T 30/25 16.5

9 Berat jenis bahan :- AC-WC D1 2.30 ton / M3- Coarse Agregat & Fine Agregat D2 1.80 ton / M3- Fraksi Filler D3 2.00 ton / M3- Asphalt D4 1.03 ton / M3- Bit. Asb. B-25 D5 1.40 ton / M3- Bit. Asb. Pra cpr D6 1.06 ton / M3

II. URUTAN KERJA

1 Wheel Loader memuat Agregat dan Ashal ke dalam Cold Bin AMP. 2 Agregat dan aspal dicampur dan dipanaskan dengan

AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. 3 Campuran panas AC dihampar dengan Finisher dan

dipadatkan dengan Tandem & Pneumatic Tire Roller. 4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.8603 M31.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.4651 M3

1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.0000 Kg

1.d. Peremaja Hangat (M66) 45.75 Kg

1.e. Asb. Butir (M65) 351.90 Kg

Asp

AsASB

= (ASP x (D1 x 1M3) x Fh2) x 1000

= (ASASB x (D1 x 1M3) x Fh2) x 1000

E23
1 = T 5/20 2 = T 15/20 3 = T 15/25 4 = T 20/25 5 = T 30/25
E24
Persentase Asbuton terhadap total campuran
E25
Persentase Asbuton terhadap total campuran
E26
Persentase Asbuton terhadap total campuran
E27
Persentase Asbuton terhadap total campuran
E28
Persentase Asbuton terhadap total campuran