PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
DOKUMENTASI PEKERJAANBULAN JULI 2015
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYATDIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PEMBANGUNAN BENDUNGAN
PT. VIRAMA KARYA (Persero) – PT. TATA GUNA PATRIA KSO PT. PP (Persero) Tbk.
![Page 2: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/2.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
VISUALISASI PEKERJAAN LAPANGAN
![Page 3: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/3.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PENGHAMPARAN ATB
ATB LAYER II (TOT. 10 CM) ATB LAYER II (TOT. 10 CM)
ATB LAYER II (TOT. 10 CM)
![Page 4: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/4.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PEMADATAN DENGAN TANDEM ROLLER
ATB LAYER II (TOT. 10 CM) ATB LAYER II (TOT. 10 CM)
ATB LAYER II (TOT. 10 CM)
![Page 5: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/5.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PEMADATAN DENGAN TIRE ROLLER
ATB LAYER II (TOT. 10 CM) ATB LAYER II (TOT. 10 CM)
ATB LAYER II (TOT. 10 CM)
![Page 6: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/6.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN ASPAL
Pekerjaan Lurus
![Page 7: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/7.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN ASPAL
Warna Seragam
![Page 8: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/8.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN ASPAL
Pekerjaan Rapi
![Page 9: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/9.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN ASPAL
![Page 10: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/10.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN ASPAL
![Page 11: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/11.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN GALIAN RETAINNING WALL
![Page 12: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/12.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PEMBESIAN RETAINNING WALL
![Page 13: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/13.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PEMASANGAN BEKISTING RETAINNING WALL
![Page 14: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/14.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PENGECORAN RETAINNING WALL
![Page 15: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/15.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN RETAINNING WALL
![Page 16: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/16.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN PEMASANGAN U DITCH
![Page 17: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/17.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PEKERJAAN TIMBUNAN & PEMADATAN U DITCH
![Page 18: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/18.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
HASIL PEKERJAAN U DITCH
STA 7+975
STA 7+825
![Page 19: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/19.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
KEGIATAN QUALITY
![Page 20: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/20.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
PENGAMBILAN SAMPLE DENGAN METODE CORE DRILL
![Page 21: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/21.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
MARSHAL TEST DI LABORATORIUM
![Page 22: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/22.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
EXTRAKSI TEST DI LABORATORIUM
![Page 23: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/23.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
VISUAL MATERIAL YANG DI PRODUKSI DI LAPANGAN
Warna seragamLurus dan rapi Surface permukaan sama
Warna seragamLurus dan rapi Surface permukaan sama
![Page 24: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/24.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
VISUAL MATERIAL YANG DI PRODUKSI DI LAPANGAN
Warna seragamLurus dan rapi Surface permukaan sama
Warna seragamLurus dan rapi Surface permukaan sama
![Page 25: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/25.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
VISUAL MATERIAL YANG DI PRODUKSI DI LAPANGAN
Warna seragamLurus dan rapi Surface permukaan sama
Warna seragamLurus dan rapi Surface permukaan sama
![Page 26: 7. Visualisasi Juli 15 Pidekso](https://reader035.fdokumen.com/reader035/viewer/2022081419/5695d04d1a28ab9b0291e1fa/html5/thumbnails/26.jpg)
PEMBANGUNAN WADUK PIDEKSO DI KABUPATEN WONOGIRI
Terimakasih