4-Rsud M_teweh Bor Log Bt-1 & Bt-2
-
Upload
andon-setyo-wibowo -
Category
Documents
-
view
219 -
download
0
description
Transcript of 4-Rsud M_teweh Bor Log Bt-1 & Bt-2
![Page 1: 4-Rsud M_teweh Bor Log Bt-1 & Bt-2](https://reader035.fdokumen.com/reader035/viewer/2022081809/563db915550346aa9a99d9ef/html5/thumbnails/1.jpg)
Pekerjaan : Feasibility Study Pembangunan RSUD Muara Teweh Tanggal : 05 Mei 2015 No. Boring
Kabupaten Barito Utara Kedalaman : 400 cm Tangan
Lokasi : Jln. Yetko Sinseng No.2 Muara Teweh - Kab. Barito Utara
Metode : Mata Bor Ulir ( Spiral ) Elevasi : Existing
Log Ketebalan (cm) Keterangan
0,00
Lempung Kepasiran (Berhumus)
0,40 Warna Abu-abu Kehitaman Kondisi dinding :
0,80 Lempung Kepasiran 280
Warna Kuning Kecoklatan o Stabil
1,20 o Agak Stabil
o Kurang Stabil
1,60
2,00 Catatan :
2,40
UDS-12,80
Kedalaman
3,20 Muka Air Tanah
- meter
3,60 Lempung Liat 85
Warna Coklat Kemerahan
4,00 Sampel Tanah :
Bor Dangkal Selesai - UDS-1 (2,0 Mtr)
- UDS-2 (4,0 Mtr)
UDS-2
BOR LOG
BT.01
Kedalaman (cm) U r a i a n
35
![Page 2: 4-Rsud M_teweh Bor Log Bt-1 & Bt-2](https://reader035.fdokumen.com/reader035/viewer/2022081809/563db915550346aa9a99d9ef/html5/thumbnails/2.jpg)
Pekerjaan : Feasibility Study Pembangunan RSUD Muara Teweh Tanggal : 05 Mei 2015 No. Boring
Kabupaten Barito Utara Kedalaman : 400 cm Tangan
Lokasi : Jln. Yetko Sinseng No.2 Muara Teweh - Kab. Barito Utara
Metode : Mata Bor Ulir ( Spiral ) Elevasi : Existing
Log Ketebalan (cm) Keterangan
0,00
Lempung Kepasiran (Berhumus)
0,40 Warna Abu-abu Kehitaman Kondisi dinding :
0,80 Lempung Kepasiran 200
Warna Kuning Kecoklatan o Stabil
1,20 o Agak Stabil
o Kurang Stabil
1,60
2,00 Catatan :
2,40
UDS-12,80 Lempung Liat 160
Warna Coklat Kemerahan Kedalaman
3,20 Muka Air Tanah
- meter
3,60
4,00 Sampel Tanah :
Bor Dangkal Selesai - UDS-1 (2,0 Mtr)
- UDS-2 (4,0 Mtr)
UDS-2
BOR LOG
BT.02
Kedalaman (cm) U r a i a n
40