    LESSON LEARNED POST- DISASTER

    JOGJA S EARTHQUAKE 2006

    JOGJAKARTA, 13th July 2010

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    2/31

    AGENDA

    JOGJA EXPERIENCE IN 2006 EARTHQUAKE

    Disaster Impact

    Action Plan for Rehabilitation and

    Reconstruction Implementation of Recovery and

    Evaluation

    POLICY OF POST-DISASTER RECOVERY IN

    INDONESIA

    CLOSING

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    3/31

    Tectonic earthquakeon 27 May 2006 at05:53:57 am, 5,9Richter scale, epicentre8.00 S 110.31 E (37.2km south of

    Yogyakarta city, at 33km depth) .

    Affected area :

    District / Municipility ofYogyakarta and part ofCentral Java.

    Most affected area in south part of Yogyakarta andsurroundings, intensity in Semarang dan Surabaya, II MMIscale, Bantul and Klaten VII MMI scale (source : BMG).

    Earthquake of Yogyakarta and Central

    Java, 27 May 2006

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    4/31

    File:agus sdy

    DISASTER IMPACT

    In Yogyakarta :

    District of Bantul, Sleman, Kulon

    Progo, Gunung Kidul, Yogyakarta city.

    In Central Java :

    Klaten, Sukoharjo, Boyolali, Purworejo,

    Magelang, Wonogiri, Temanggung,

    Karangayar and Kebumen.

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    5/31

    Source (OCHA field situation report 30 May 2006)

    Numbers of Victims

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    6/31

    Summary of Damage and Losses

    -

    2.000

    4.000

    6.000

    8.000

    10.000

    12.000

    14.000

    16.000

    HousingProductive

    Sosial

    InfrastructureCross Sectors

    Housing Productive Sosial Infrastructure Cross Sectors

    (Rp Billion) Losses 1.382 4.676 77 154 110

    (Rp Billion) Damages 13.915 4.348 3.906 398 185

    TOTAL 15.297 9.024 3.983 552 295

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    7/31

    Damage and Losses in Housing Sector

    Located

    (unit) (Rp Billion)

    Totally

    DestroyedDamaged Total Damage Losses Total

    Yogyakarta Province 88.249 98.343 186.592 7.420,7 732,9 8.153,6Bantul 46.753 33.137 79.890 3.419,3 332,6 3.751,9

    Sleman 14.801 34.231 49.032 1.723,5 175,0 1.898,5

    Gunung Kidul 15.071 17.967 33.038 1.299,0 128,6 1.427,6

    Yogyakarta City 4.831 3.591 8.422 357,8 34,9 392,7

    Kulonprogo 6.793 9.417 16.210 621,1 61,8 682,9

    Central Java 68.415 103.689 172.104 6.494,0 648,7 7.142,7

    Klaten 65.849 100.817 166.666 6.277,9 627,4 6.905,3

    Sukoharjo 1.185 488 1.673 77,2 7,4 84,6

    Magelang 499 729 1.228 46,6 4,6 51,2Purworejo 144 760 904 28,3 3,0 31,3

    Boyolali 715 825 1.540 60,9 6,0 66,9

    Wonogiri 23 70 93 3,1 0,3 3,4

    Total 156.664 202.032 358.696 13.914,7 1.381,6 15.296,3

    % of total damage and losses 61,2 21,6 52,5

    Total damage and losses 22.751,0 6.398,0 29.149,0

    13.914,7

    61,21.381,6 21,6

    15.296,3

    52,5

    Total % of total damage and losses

    (Rp Billion) Damage

    (Rp Billion) Losses

    (Rp Billion) Total

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    8/31

    397,51,7153,9 2,4

    551,4

    1,9

    Total % of total damage and losses

    Infrastructure

    Effect (Rp Billion) Damages

    Effect (Rp Billion) Losses

    Effect (Rp Billion) Total

    3906

    17,277 1,2

    3.983

    14

    Total % of total damage and

    losses

    Social Sector

    Effect (Rp Billion) Damages

    Effect (Rp Billion) LossesEffect (Rp Billion) Total4.348,3

    19,14.676,4

    73,1

    9.024,7

    31,0

    Total % of total damage and

    losses

    Productive Sector

    Effect (Rp Billion) Damages

    Effect (Rp Billion) Losses

    Effect (Rp Billion) Total

    185,0

    0,8

    109,6

    1,7

    294,6

    1,0

    Total % of total damage and losses

    Cross-Cutting Sector

    Effect (Rp Billion) Damages

    Effect (Rp Billion) Losses

    Effect (Rp Billion) Total

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    9/31

    EMERGENCY MANAGEMENT

    PERIOD IN YOGYAKARATA

    1. Panic Period :

    - Evacuation of casualaties

    (died and injured).

    - Medical/health services

    - Food / kitchen

    Evacuation ProcessEvacuation Process

    In Yogyakarta :

    District of Bantul, Sleman, Kulon

    Progo, Gunung Kidul, Yogyakarta city.

    In Central Java :

    Klaten, Sukoharjo, Boyolali,

    Purworejo, Magelang, Wonogiri,

    Temanggung, Karangayar and

    Kebumen.

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    10/31

    File:agus sdy

    IDPs :

    - People/IDPs temporarily lived at

    other houses and tents (family,

    schools, mosque, etc) so they could

    not afford themselves for theirliving.

    - IDPs were not concentrated at one

    place, they spread lived at places

    close to their damaged houses.

    - Total amount of IDPs :

    Yogyakarta : 1.352.076people

    Central Java : 759.796

    people

    Total : 2.111.872

    people

    (Souce : Satkorlak/Satlak PB)

    Result of Verification : 1.649.575

    people

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    11/31

    Compensation for the died :

    Rp.2.000.000,-/victim

    Free of charge at hospitals

    Rice 10 kg/month/person.

    Living cost Rp. 90.000,-

    /month/person.

    Emergency response phase

    shortenedfrom 3 months to 1 month.

    Continued with Rehabilitation and

    Reconstruction phase, starting

    from July 2006.

    2. Controlled-Emergency Period : The resources and supplies

    Mobilized include the following:

    Continuing services on medicaland curement/recovery,

    Eighteen field hospitals set up

    by Ministry of Health;

    Essential supplies of :

    1. Food/non-food (monthly):logistic distribution

    2. Security at affected area

    3. Temporarily rehabilitation

    4. Temporary shelter (tents) and

    other building/houses,sanitation

    5. Normalization of fuel,

    electricity, transportation

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    12/31

    Presidential Decree No. 9 Year 2006

    on Coordination Team for

    Rehabilitation and Reconstruction in

    Yogyakarta and Central Java.

    Dut ies :

    To coordinate policy and strategy

    formulation for rehabilitation and

    reconstruction.

    To coordinate planning, implementation

    and evaluation.

    To stipulate strategic actions to cope-

    with obstacles/problems in

    implementation.

    3. Period of Peparation for Rehabilitation

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    13/31

    Estimation ofDamage &

    Losses(5 sectors)

    Estimation ofRecovery Needs

    Each of5 sectors &

    areas

    Action Plan ofRehab &Recons

    Policy onPrioritizedactivities

    Strategy onRehab-Recons

    Source ofData fromMinistry /

    Institutions

    Source ofData fromLocal Gov.

    To be groupedInto 3 focussesof Rehab-Recons- Housing- Public Infrastructure- Local Economy

    Damage & LossesAssesment (DaLA)

    Post-DisasterNeeds Assessment

    (PDNA)

    Formulation ofAction Plan

    PROCESS OF JOGJA RECOVERY PLAN

    Source ofData fromLocal Gov.

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    14/31

    Plan In Rebuilding YogyakartaShort-term

    Policies 1. Presidential Decree 9 of 2006, about coordination team for the

    rehabilitation and reconstruction Yogyakarta post-eartquake.

    2. DIY Government regulation number 23 of 2006, about opera-

    tional guidelines for the rehabilitation and reconstructionYogyakarta post-earthquake.

    Programe 1. Rehabilitation plan

    2a.Preparation of the Regional Action Plan for Disaster

    Risk Reduction,

    b. Regional Action Plan for Disaster Risk Reduction in the

    level of province and regency/city

    Activities Rehabilitation period, usually done by:process of rapid evacuation of disaster victims withoutdiscrimination and provision of temporary shelter

    THE SHORT, MIDDLE, AND LONG-TERM PLAN IN

    REBUILDING YOGYAKARTA

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    15/31

    Middle-Term

    Policies * Presidential rule number 7 of 2005, about NationalMedium-term Development Plant 2004-2009.

    * Yogyakarta Mayor regulation number 17 of 2007, about

    Medium-term Development Plan for the Regional City of

    Yogyakarta in year 2007-2011.

    Programe * Regulation and development in all areas aimed at

    improving the welfare of society,

    * Improving Disaster Mitigation Effort

    Activities

    Recovery of Housing and SettlementsRestoration of Public InfrastructureRegional Economic and Community Recovery

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    16/31

    Long-Term

    Policies * Act number 17 of 2007, about National Long-termDevelopment Plan for years 2005-2025,

    * Law number 24 of 2007, about Management Disaster.

    Programe * Risk reduction and disaster impacts

    * Mitigation Disaster

    Activities * The process of disaster mitigation in accordance withthe geology Yogyakarta and Reconstruction Process

    with sustainable development in all fields to prepare

    the city of Yogyakarta as a City of Quality Education,

    Culture and Tourism-based Center for an

    environmentally sound Services .

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    17/31

    The Implementation of The Plan

    Mechanism

    Institutional

    Funding

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    18/31

    Mechanism

    Financing by /

    private /company

    Financing by public /private with

    assistance

    government

    Financing by

    government, self-

    help community

    Financing entirely

    from Government

    Housing and

    SettlementPhysical Rehabilitation

    Physical Rehabilitation

    roads, bridges,

    irrigation

    Infrastructure Physical Rehabilitation,electricity, clean

    water,telecommunication

    Physical Rehabilitationmarket

    Physical Rehabilitation

    building government

    and public facilities

    Social Sector,

    Economic

    Sector

    Physical Rehabilitation

    National / Cultural

    Heritage, health, education

    ProductiveStimulation financing

    and policy in the field

    economy

    Stimulation of financing,

    and policies in SME sector

    Source: The Coordinating Ministry for Economic Affairs, June 2006

    Scope of Recovery Policy

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    19/31

    Institutional

    Coordinating Team for the

    Rehabilitation and

    ReconstructionPresidential Decree

    Number : 9/2006

    Steering Team Executive Team

    National Technical

    Team

    Executive Team in

    the Province of

    DI Yogyakarta

    Executive Team in

    the Province of

    Central Java

    DI Yogyakarta

    Governor Decree

    Number: 20/TIM/2006

    Central Java

    Governor Decree

    Number: 606.2.05/13/2006

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    20/31

    Funding

    Sources

    Government Non Government

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    21/31

    Funding Scheme for

    Rehabilitation and Reconstruction Implementation

    Recovery Program Financing by private,public and donors

    Financing by

    community, state,

    donors with

    government

    assistance

    Financing by

    government self-help support

    community

    Financing entirelyfrom government

    Housing and

    settlement

    Physical Rehabilitation

    home

    Physical Rehabilitation

    home

    Physical Rehabilitation

    housing and

    settlement

    InfrastructurePhysical Rehabilitation

    electricity network,

    water net, telecom and

    Rehabilitation of

    roads, bridges and

    irrigation network

    Social SectorRehabilitation of schools,

    hospital, health centers,

    where

    Physical Rehabilitation

    building government

    and public

    infrastructure

    Productive

    Economic Sector

    Recovery KUKM (Physical

    and non-physical) for

    small industrial, fisheries

    and agriculture

    Recovery KUKM (Physical

    and non-physical) for

    small industrial, fisheries

    and agriculture

    Recovery KUKM

    (Physical and non-

    physical) for small

    industrial, fisheries and

    agriculture

    Recovery KUKM

    (Physical and non-

    physical) for small

    industrial, fisheries

    and agriculture

    Source: The Coordinating Ministry for Economic Affairs, June 2007

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    22/31

    Earthquake in the Province of Yogyakarta &

    Central Java, which prioritized initiatives

    and role of community(Community Based

    Development) and made- use-of socialcapital(community empowerment aspect).

    REHABILITATION & RECONSTRUCTION OF

    HOUSING

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    23/31

    BUILDING BACK BETTERTHROUGH

    COMMUNITY BASED DEVELOPMENTYOGYAKARTA - CENTRAL JAVA

    Disaster

    27 May 2006

    Assessment result

    Provincial Program:

    Spreading resource

    Discussion with community

    Community based

    development

    Factor:

    Efficiency and Affectivity

    Require:

    Wisdom

    Community and stakeholder fully

    attention

    Require:

    Teamwork

    Trust

    Willingness

    Assessment

    5 June 2006

    LESSON LEARNED

    23

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    24/31

    REHABILITATION & RECONSTRUCKTION ON PEOPLES HOUSES

    IMPLEMENTATION

    FUNCTIONPOLICY

    FUNCTION

    CONTROLLING

    FUNCTIONNOTES

    DIRECTION

    TEAM

    TECHNICAL

    TEAM

    TECHNICAL

    TEAM

    1. Basic House

    2. Time Frame:

    July to - September2006

    1. Complete House

    2. Time frame:

    October - .

    3 TECHNICALREPORT

    TECHNICALGUIDANCE

    CONTROLLING

    GUIDANCE

    1

    4GUIDANCE &DIRECTIVES

    ON COMPLETION

    GOVERNOR

    2

    Regent/

    MAYOR

    CAMAT

    HEAD OF VILLAGE

    COM.GROUP

    Work unit

    PUBLIC WORKS

    PROV LEVEL

    PELAKSATKER

    PUBLIC WORKS

    DISTRICT/MUNICIPILITY

    IMPLEMENTATION TEAM

    BUTGET

    MATERIALS

    Basic house

    IDEM

    COMPLETE HOUSE

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    25/31

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    26/31

    - Period

    Preparation for Houses/Building Rehabilitation

    Presidential Decree No. 9 Year 2006 on Coordination

    Team for Rehabilitation and Reconstruction post-disaster

    in Yogyakarta and Central Java.

    Duties :

    . To coordinate policy and strategy formulation for

    rehabilitation and reconstruction.

    . To coordinate planning, implementation and

    evaluation.

    . To stipulate strategic actions to cope-with

    obstacles in implementation .

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    27/31

    Steps on Rehabilitation & Reconstruction on

    Houses

    Policy :1. The implementation based on one-step po l icy from

    emergency response directly to rehabilitation and

    reconstruction.

    2. Self-help, fair and transparent

    Problems

    1. Rainy season prediction : early October 2006.

    2. Butget (first phase) enough only for 20 25% of total

    need.

    3. Urgent needs for houses.

    4. During rehabilitation & reconstruction (July September) living cost still needed.

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    28/31

    Solution:

    1. Rehabilitation & reconstruction carried-out at the sametime, starting from July and ended at the end of Septem-

    ber to rebuild the whole houses.

    2. Basic house comprises:

    * Foundation

    * Pile

    * Roof

    * Wall ( 1 room )

    3. Technical counseling needed for technical standard and

    ant i-earthquakehouse.

    4. Recruitment on technical counseling personnel trhough

    active pattern.

    5. Making-use-of local gov. apparatus at any level (Prov,

    District, Sub-district, Village).

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    29/31

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    30/31

    Obstacles in Reconstructing

    The Building and Facilities

    1. Many houses / buildings are not equipped with adocument of Building Permit (IMB)

    2. Location is not in accordance with spatial plans

    3. Quality of houses built is not eligible healthy home, safeand earthquake resistant

    Housing

  • 8/9/2019 3.Pengalaman Jogya-JaTeng 2006

    31/31

    Financial

    Funding cuts occur at the level of POKMAS as a

    result of the lack of operational funds made by the

    government.

    1. Material price increases

    2. Shortage of construction material

    3. Labor shortage1

    Material & Labour