JUDUL PEKERJAAN : CALIFORNIA BEARING RATIO
LOKASI PEKERJAAN : E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
SUMBER MATERIAL : SP 1
DIUJI OLEH : KELOMPOK 12 ROMBEL 2
DATA CBR
10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan
Tinggi Mold, t mold (cm) 17.5 17.5 17.5 17.5 17.5 17.5
Diamater Mold, D mold (cm) 15.5 15.5 15.5 15.5 15.5 15.5
Volume Mold (cm3) 3300.43 3300.43 3300.43 3300.43 3300.43 3300.43
Berat Mold, W mold (gr) 3876 4311 5665 4383.5 4443 5664.5
SEBELUM PENGUJIAN
10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan
Berat Mold+Tanah Basah (gr) 8443.5 9505 11250.5 9388 10008.5 11345.5
Berat Tanah Basah (gr) 4567.5 5194 5585.5 5004.5 5565.5 5681
Berat isi, ɣ (gr/cm3) 1.38 1.57 1.69 1.52 1.69 1.72
METODE PEMADATANUNSOAKED SOAKED