JUDUL PEKERJAAN : CALIFORNIA BEARING RATIO LOKASI PEKERJAAN : E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL SUMBER MATERIAL : SP 1 DIUJI OLEH : KELOMPOK 12 ROMBEL 2 DATA CBR 10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan Tinggi Mold, t mold (cm) 17.5 17.5 17.5 17.5 17.5 17.5 Diamater Mold, D mold (cm) 15.5 15.5 15.5 15.5 15.5 15.5 Volume Mold (cm 3 ) 3300.43 3300.43 3300.43 3300.43 3300.43 3300.43 Berat Mold, W mold (gr) 3876 4311 5665 4383.5 4443 5664.5 SEBELUM PENGUJIAN 10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan Berat Mold+Tanah Basah (gr) 8443.5 9505 11250.5 9388 10008.5 11345.5 Berat Tanah Basah (gr) 4567.5 5194 5585.5 5004.5 5565.5 5681 Berat isi, ɣ (gr/cm 3 ) 1.38 1.57 1.69 1.52 1.69 1.72 METODE PEMADATAN UNSOAKED SOAKED METODE PEMADATAN UNSOAKED SOAKED

description

cbr

Transcript of 1

Page 1: 1

JUDUL PEKERJAAN : CALIFORNIA BEARING RATIO

LOKASI PEKERJAAN : E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL

SUMBER MATERIAL : SP 1

DIUJI OLEH : KELOMPOK 12 ROMBEL 2

DATA CBR

10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan

Tinggi Mold, t mold (cm) 17.5 17.5 17.5 17.5 17.5 17.5

Diamater Mold, D mold (cm) 15.5 15.5 15.5 15.5 15.5 15.5

Volume Mold (cm3) 3300.43 3300.43 3300.43 3300.43 3300.43 3300.43

Berat Mold, W mold (gr) 3876 4311 5665 4383.5 4443 5664.5

SEBELUM PENGUJIAN

10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan

Berat Mold+Tanah Basah (gr) 8443.5 9505 11250.5 9388 10008.5 11345.5

Berat Tanah Basah (gr) 4567.5 5194 5585.5 5004.5 5565.5 5681

Berat isi, ɣ (gr/cm3) 1.38 1.57 1.69 1.52 1.69 1.72

METODE PEMADATANUNSOAKED SOAKED

METODE PEMADATANUNSOAKED SOAKED