1 MANAJEMEN PROYEK BAMBANG L. HAKIM, ST, M.KOM Jurusan Teknik Elektro UIN SUSKA Riau.
-
Upload
claire-cruz -
Category
Documents
-
view
249 -
download
8
Transcript of 1 MANAJEMEN PROYEK BAMBANG L. HAKIM, ST, M.KOM Jurusan Teknik Elektro UIN SUSKA Riau.
1
MANAJEMEN PROYEKMANAJEMEN PROYEKMANAJEMEN PROYEKMANAJEMEN PROYEK
BAMBANG L. HAKIM, ST, M.KOMBAMBANG L. HAKIM, ST, M.KOM
Jurusan Teknik Jurusan Teknik Elektro Elektro
UIN SUSKA RiauUIN SUSKA Riau
2
Tujuan Perkuliahan• Mahasiswa memahami prinsip-
prinsip dasar dan teknik-teknik dalam mengelola proyek mulai dari tahap perumusan, perencanaan, eksekusi sampai pada tahap delivery dan penutupan proyek.
3
Materi
Intro
Organization
Leadership Teams
Partnering
MonitoringProgress
Audit &Closure
Define Project
Project Networks
ReducingProject Time
SchedulingResources
ManagingRisks
4
The Technological and SocioculturalDimensions of the Project Management
Process
SocioculturalLeadershipProblem solvingTeamworkNegotiationPoliticsCustomer expectations
TechnicalScopeWBSSchedulesResource allocationBaseline budgetsStatus reports
5
Evaluasi
No. Keterangan
Bobot
1. Tugas 30%
2. UTS 35%
3. UAS 35%
TOTAL 100%
6
Bahan Pustaka• “Project Management, the Managerial Process”,
Gray & Larson, Mc Graw Hill, 2003.• Project Management, A System Approach to
Planning, Scheduling & Controlling, Kerzner, John Wiley, 2003.
• “Project Management, Techniques in Planning and Controlling Construction Projects”, Ahuja dkk, Wiley, 2000.
• “Project Management for Engineering & Construction”, Oberlender, Mc Graw Hill, 2000.
7
FIRST THINGS FIRST : WHAT IS A PROJECT ???
• The characteristics of projects :– Complex and numerous activities– Unique --- a one time set of events– Limited resources and budget– Many people involved, usually across several
functional areas in the organizations– Sequenced activities– Goal oriented– End product or service must result
8
Variasi Produk vs Volume
Volume
Var
iasi
Pro
du
k
Rendah Tinggi
Rendah
Tinggi PROJECT
JOBBING
BATCH
LINE
CONTINUOUS PROCESS
9
Project Management
The art and science of coordinating people, equipment, materials, money and schedules to complete a specified project on time and within approved cost.
10
Everyone is a project manager,
but…not everyone knows how to
plan and manage the project
11
Manajemen Proyek vs Kegiatan Operasional
KEGIATAN PROYEK KEGIATAN OPERASIONAL
a. Bercorak dinamis, non rutinb. Siklus proyek relatif pendekc. Intensitas kegiatan didalam
periode siklus proyek berfluktuasi
d. Kegiatan harus diselesaikan berdasarkan anggaran dan jadwal yang telah ditentukan
e. Terdiri dari bermacam-macam kegiatan yang memerlukan berbagai disiplin ilmu
f. Keperluan sumber daya berubah, baik macam maupun volumenya
a. Berulang-ulang (rutin)b. Berlangsung dalam jangka
panjangc. Intensitas kegiatan relatif
sama.d. Batasan anggaran dan
jadwal tidak setajam dalam proyek.
e. Macam-macam kegiatan tidak terlalu banyak dan terkadang terdiri dari disiplin ilmu tunggal.
f. Macam dan volume keperluan sumber daya relatif konstan.
12
PROJECT SYSTEMSQuality
Estimating
Safety
Equipment Control
Sub ContractAdminControl
Cost Control General Accounting
Material Control
ProgressControl
Small control
tool
Payroll &Personnel
ProjectPerformance
Analysis
Document control
PROJECT
13
Project Constraints/Trade-Offs
SCOPE
BUDGET SCHEDULE
QualityQuality
Quality
14
Project Life CycleDefinition Planning Execution Delivery
Lev
el o
f ef
fort
1. Goals2. Specifications3. Tasks4. Responsibilities5. Teams
1. Schedules2. Budgets3. Resources4. Risks5. Staffing
1. Status reports2. Changes3. Quality4. Forecasts
1. Train customer2. Transfer documents3. Release resources4. Reassign staff5. Lessons learned
15
5 PHASEPROJECT MANAGEMENT
CLOSE
Obtain clientacceptance
Installdeliverables
Document theproject
Issue the finalreport
Conduct postimplementationaudit
DEFINE
State theproblem
Identify projectgoals
List theobjectives
Determinepreliminaryresources
Identifyassumptionsand risks
PLAN
Identify projectactivities
Estimate time &cost
Sequenceproject activities
Identify criticalactivities
Write projectproposal
ORGANIZE
Determinepersonnel needs
Recruit projectmanager
Recruit projectteam
Organize projectteam
Assign workpackages
CONTROL
Definemanagementstyle
Establish controltools
Prepare statusreports
Review projectschedule
Issue changeorders
PLANNING IMPLEMENTATION
1 2 543
DELIVERABLES
16
PLAN
Identify project activities
Estimate time & cost
Sequence project activities
Identify critical activities
Write project proposal
• WBS
• Project Network
• Critical Path
• Project Proposal
17
ORGANIZE
• Recruitment Criteria• Work Package Description• Work Package Assignments
18
CONTROL
• Variance Reports• Status Reports• Staff Allocations Reports
CLOSE
• Final Reports• Audit Reports
19
Start of project
Before project During project
Project Planning
Project Scheduling
Project Controlling
Project Planning, Scheduling & Controlling
20
Perencanaan
• Penetapan tujuan• Mendefinisikan proyek• Mengkaitkan kebutuhan dengan
aktivitas proyek• Mengorganisasikan team
21
Tools Perencanaan Proyek
• Estimasi waktu dan biaya• Anggaran• Cash flow• Ketersediaan bahan• Data personel• Gambar-gambar teknik
22
Penjadwalan Proyek
• Mengkaitkan sumber daya (TK, uang, bahan) dengan aktivitas-aktivitas tertentu.
• Mengkaitkan satu aktivitas dengan aktivitas yang lain.
• Meng-update dan merevisi jadwal secara berkala.
23
Tools Penjadwalan Proyek
• Gantt charts• CPM dan PERT• Milestone chart• Cash flow schedules
24
Pengendalian Proyek
• Memonitor sumber daya, biaya, kualitas dan budgets.
• Merevisi dan merubah rencana.• Menggeser-geser sumber daya
untuk memenuhi permintaan terhadap waktu, biaya dan kualitas.
25
Tools Pengendalian Proyek
• Report-report yang menggambarkan :– Anggaran untuk setiap departemen– Aktivitas-aktivitas yang tertunda– Slack activities– Kualitas pekerjaan yang telah
diselesaikan.
26
ProjectSystems
ProjectPlan & Schedule
Revisions & Updates
ProductionDept.
PurchasingDept.
PersonnelDept.
EngineeringDept.
Subcontractors
Quality ControlDept.
Supplies
Resources
TopManagement
ProjectTeam
Ruang LingkupPekerjaan Manajer Proyek
Performance ReportsFeedback loop
Information regarding times, costs, problem, delays
27
Key areas of project management and project
managers• Planning• Scheduling• Budgeting• Managing resources• Tracking & reporting progress
28
Integrated Management of Projects
Customer
Environmental analysisExternal Internal
Firmmission,
goals, strategies
Priorities
ProjectsEnvironmentand Culture
System
Project Implementation
Scope
Work Breakdown
Networks
Resources
Cost
Organization
Leadership
Teams
Partners
29