Transcript of 1. Kolom
REKAPITULASI PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 04 sd LT. ATAP
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Lantai
Kolom
K1 Uk. K 2 Uk. K 3 Uk. K 4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi
1 Lantai 4 8.00 70 x 70 1.00 60 x 30 18.00 70 x 70 1.00 70 x 70 - - 40.84 258.40 408.82
2 Lantai 5 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65
3 Lantai 6 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65
4 Lantai 7 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 8,506.96
5 Lantai 8 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19
6 Lantai 9 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19
7 Lantai 10 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 5,956.36
8 Lantai Atap 8.00 30 x 30 2.00 30 x 30 17.00 30 x 30 - 30 x 30 17.00 2.00 10.53 140.40 3,313.62
Jumlah 64.00 9.00 143.00 7.00 17.00 2.00 252.25 1,860.40 56,083.45
Panjang
112.00
112.00
112.00
112.00
112.00
112.00
112.00
117.00
901.00
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. ATAP
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No.Dimensi Kolom (M)
Pembesian
Break DownPanjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K1 0.30 0.30 6.00 8 Main 22 8 6.88 55.04 2.98 164.23 4.32 57.60
8.00 Ring 10 100 200 100 16.00 16.00 16.00 1.14 54.72 0.62 33.73
8.00 Extra Hor - - - - - - - - 0.36 - - -
8.00 Extra Ver - - - - - - - - 0.36 - - -
2 K2 0.30 0.30 3.00 2 Main 22 8 3.88 31.04 2.98 92.62 0.54 7.20
2.00 Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98
2.00 Extra Hor - - - - - - - - 0.36 - - -
2.00 Extra Ver - - - - - - - - 0.36 - - -
5 K11 0.30 0.30 3.00 17 Main 16 8 3.64 29.12 1.58 45.96 4.59 61.20
17.00 Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98
17.00 Extra Hor - - - - - - - - 0.36 - - -
17.00 Extra Ver - - - - - - - - 0.36 - - -
6 K12 0.30 0.30 6.00 2 Main 16 16 6.64 106.24 1.58 167.67 1.08 14.40
2.00 Ring 10 100 200 100 16.00 16.00 16.00 1.14 54.72 0.62 33.73
2.00 Extra Hor - - - - - - - - 0.36 - - -
2.00 Extra Ver - - - - - - - - 0.36 - - -
T O T A L 10.53 140.40
Type Kolom
Jumlah Kolom
(Bh)
Rata2Dimensi Kolom
(KG) 70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 30 x 30 60 x 60 25 22 19 16 13 10
1,583.73 366.60 48.00 - - - - - - 8.00 - - 1,313.85 - - - -
- - - - - 269.88
- - - - - -
- - - - - -
223.19 413.31 6.00 - - - - - - 2.00 - - 185.24 - - - -
- - - - - 37.95
- - - - - -
- - - - - -
1,103.88 240.50 51.00 - - - - - - 17.00 - - - - 781.29 - -
- - - - - 322.59
- - - - - -
- - - - - -
402.81 372.98 12.00 - - - - - - 2.00 - - - - 335.34 - -
- - - - - 67.47
- - - - - -
- - - - - -
3,313.62 314.68 117.00 - - - - - - 29.00 - - 1,499.09 - 1,116.64 - 697.89
Besi Beton Panjang
Kolom
Diameter Berat Besi ( Kg )
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 10
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Type KolomDimensi Kolom (M)
Pembesian
Break DownPanjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K1 0.50 0.50 4.00 8 Main 22 12 4.88 58.56 2.98 174.73 8.00 64.00
8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
8.00 Extra Hor - - - - - - - - 0.56 - - -
8.00 Extra Ver - - - - - - - - 0.56 - - -
2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 145.61 0.48 5.60
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.34 44.22 0.62 27.26
1.00 Extra Hor - - - - - - - - 0.46 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.50 0.50 4.00 18 Main 22 12 4.88 58.56 2.98 174.73 18.00 144.00
18.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
18.00 Extra Hor - - - - - - - - 0.56 - - -
18.00 Extra Ver - - - - - - - - 0.56 - - -
4 K4 0.50 0.50 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 1.00 8.00
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.56 - - -
T O T A L 27.48 221.60
Jumlah Kolom
(Bh)
Rata2
(KG)
1,713.63 214.20
172.87 360.15
3,855.66 214.20
214.20 214.20
5,956.36 216.75
Besi Beton
Dimensi Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10
32.00 - - - 8.00 - - - - 1,397.88 - - - -
- - - - - 315.75
- - - - - -
- - - - - -
4.00 - - - - - - - - 145.61 - - - -
- - - - - 27.26
- - - - - -
- - - - - -
72.00 - - - 18.00 - - - - 3,145.23 - - - -
- - - - - 710.43
- - - - - -
- - - - - -
4.00 - - - 1.00 - - - - 174.73 - - - -
- - - - - 39.47
- - - - - -
- - - - - - - - -
112.00 - - - 27.00 - - - - 4,863.45 - - - 1,092.91 ###OK
Panjang Kolom
Diameter Berat Besi ( Kg )
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 08 dan LT. 09
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Type KolomDimensi Kolom (M)
Pembesian
Break DownPanjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K1 0.50 0.50 4.00 8 Main 22 16 4.88 78.08 2.98 232.98 8.00 64.00
8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
8.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
8.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 145.61 0.48 5.60
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.34 44.22 0.62 27.26
1.00 Extra Hor - - - - - - - - 0.46 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.50 0.50 4.00 18 Main 22 16 4.88 78.08 2.98 232.98 18.00 144.00
18.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
18.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
18.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
4 K4 0.50 0.50 4.00 1 Main 22 16 4.88 78.08 2.98 232.98 1.00 8.00
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47
1.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
1.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39
T O T A L 27.48 221.60
* Catatan : Total di kalikan 2 untuk dua lantai
Jumlah Kolom
(Bh)
Rata2
(KG)
2,361.87 295.23
172.87 360.15
5,314.21 295.23
295.23 295.23
8,144.19 296.37
Besi Beton
Dimensi Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10
32.00 - - - 8.00 - - - - 1,863.84 - - - -
- - - - - 315.75
- - - - - 91.14
- - - - - 91.14
4.00 - - - - - - - - 145.61 - - - -
- - - - - 27.26
- - - - - -
- - - - - -
72.00 - - - 18.00 - - - - 4,193.64 - - - -
- - - - - 710.43
- - - - - 205.07
- - - - - 205.07
4.00 - - - 1.00 - - - - 232.98 - - - -
- - - - - 39.47
- - - - - 11.39
- - - - - - - - 11.39
112.00 - - - 27.00 - - - - 6,436.07 - - - 1,708.12
Panjang Kolom
Diameter Berat Besi ( Kg )
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 07
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No.Dimensi Kolom (M)
Pembesian
Break DownPanjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K1 0.60 0.60 4.00 8 Main 22 16 4.88 78.08 2.98 232.98 11.52 76.80
8.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
8.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
8.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 0.60 6.40
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.54 50.82 0.62 31.33
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.60 0.60 4.00 18 Main 22 16 4.88 78.08 2.98 232.98 25.92 172.80
18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
18.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
18.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
4 K4 0.60 0.60 4.00 1 Main 22 16 4.88 78.08 2.98 232.98 1.44 9.60
1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
1.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
1.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43
T O T A L 39.48 265.60
Type Kolom
Jumlah Kolom
(Bh)
Rata2
(KG)
2,459.53 213.50
206.07 343.44
5,533.93 213.50
307.44 213.50
8,506.96 215.48
Besi Beton
Dimensi Kolom
70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10
32.00 - 8.00 - - - - - - 1,863.84 - - - -
- - - - - 380.85
- - - - - 107.42
- - - - - 107.42
4.00 - - - - 1.00 1.00 1.00 - 174.73 - - - -
- - - - - 31.33
- - - - - -
- - - - - -
72.00 - 18.00 - - - - - - 4,193.64 - - - -
- - - - - 856.91
- - - - - 241.69
- - - - - 241.69
4.00 - 1.00 - - - - - - 232.98 - - - -
- - - - - 47.61
- - - - - 13.43
1.00 1.00 1.00 - - - - - 13.43
112.00 - 27.00 - - 1.00 1.00 1.00 - 6,465.19 - - - 2,041.77 ###ERROR
Panjang Kolom
Diameter Berat Besi ( Kg )
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 05 dan LT. 06
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Type KolomDimensi Kolom (M)
Pembesian
BREAK DOWNPanjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K1 0.60 0.60 4.00 8 Main 22 20 4.88 97.60 2.98 291.22 11.52 76.80
8.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
8.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
8.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 0.60 6.40
1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.54 50.82 0.62 31.33
1.00 Extra Hor - - - - - - - - 0.56 - - -
1.00 Extra Ver - - - - - - - - 0.36 - - -
3 K3 0.60 0.60 4.00 18 Main 22 20 4.88 97.60 2.98 291.22 25.92 172.80
18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
18.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
18.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
4 K4 0.60 0.60 4.00 1 Main 22 20 4.88 97.60 2.98 291.22 1.44 9.60
1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61
1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85
T O T A L 39.48 265.60
* Catatan : Total di kalikan 2 untuk dua lantai
Jumlah Kolom
(Bh)
Rata2
(KG)
3,140.32 272.60
206.07 343.44
7,065.73 272.60
392.54 272.60
10,804.65 273.67
Besi Beton
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 04
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Type KolomDimensi Kolom (M)
PembesianBreak Down
Panjang (M) Berat (KG) Beton Begisting
Lokasi DiameterPosisi Besi Jumlah
Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)
1 K 1 0.30 0.30 4.00 8 Main 22 20 4.88 97.60 2.98 291.22 2.88 38.40 8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 0.62 23.19 8.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65 8.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65
2 K 2 0.60 0.30 4.00 1 Main 22 14 4.88 68.32 2.98 203.86 0.72 7.20 1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.74 57.42 0.62 35.40 1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85 1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65
3 K 3 0.70 0.70 4.00 18 Main 22 20 4.88 97.60 2.98 291.22 35.28 201.60 18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74 18.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92 18.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
4 K 4 0.70 0.70 4.00 1 Main 22 20 4.88 97.60 2.98 291.22 1.96 11.20 1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74 1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92 1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92
T O T A L 40.84 258.40
Jumlah Kolom
(Bh)
Rata2
( Kg )
2,749.71 954.76
280.76 389.94
7,358.69 208.58
408.82 208.58
10,797.97 264.40
Besi Beton
PERHITUNGAN VOLUME
PEKERJAAN KOLOM LT. 1 TOILET TAMBAHAN
PROYEK : BANGUNAN SAYAP KWK JAKSEL
No. Type KolomDimensi Kolom (M)
PembesianBreak Down
Panjang (M)Lokasi Diameter
Posisi Besi JumlahHor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total
1 KT 1 0.30 0.30 4.00 4 Main 10 4 4.40 17.60 4.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 4.00 Extra Hor - - - - - - - - 0.36 - 4.00 Extra Ver - - - - - - - - 0.36 -
T O T A L
Jumlah Kolom
(Bh)
Berat (KG)
Unit Total
0.62 10.85 0.62 23.19 - - - -
T O T A L
Beton BegistingRata2
Dimensi Kolom
(M3) (M2) ( Kg ) 70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19
1.44 19.20 136.17 94.56 16.00 - - - - - - - - - - - - - - - - - - -
1.44 19.20 136.17 94.56 16.00 - - - - - - - - - -
Besi Beton Panjang
Kolom
Diameter Berat Besi ( Kg )
16 13 10
- - 43.40 - - 92.77 - - - - - -
- - 136.17 ###OK
Diameter Berat Besi ( Kg )