REKAPITULASI PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 04 sd LT. ATAP PROYEK : BANGUNAN SAYAP KWK JAKSEL No. Lantai Kolom K1 Uk. K 2 Uk. K 3 Uk. K 4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi 1 Lantai 4 8.00 70 x 70 1.00 60 x 30 18.00 70 x 70 1.00 70 x 70 - - 40.84 258.40 408.82 2 Lantai 5 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 3 Lantai 6 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 4 Lantai 7 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 8,506.96 5 Lantai 8 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 6 Lantai 9 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 7 Lantai 10 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 5,956.36 8 Lantai Atap 8.00 30 x 3 2.00 30 x 3 17.00 30 x 3 - 30 x 3 ### 2.00 10.53 140.40 3,313.62 Jumlah 64.00 9.00 143.00 7.00 ### 2.00 252.25 1,860.40 56,083.45

Transcript of 1. Kolom

Page 1: 1. Kolom

REKAPITULASI PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 04 sd LT. ATAP

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Lantai

Kolom

K1 Uk. K 2 Uk. K 3 Uk. K 4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi

1 Lantai 4 8.00 70 x 70 1.00 60 x 30 18.00 70 x 70 1.00 70 x 70 - - 40.84 258.40 408.82

2 Lantai 5 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65

3 Lantai 6 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65

4 Lantai 7 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 8,506.96

5 Lantai 8 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19

6 Lantai 9 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19

7 Lantai 10 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 5,956.36

8 Lantai Atap 8.00 30 x 30 2.00 30 x 30 17.00 30 x 30 - 30 x 30 17.00 2.00 10.53 140.40 3,313.62

Jumlah 64.00 9.00 143.00 7.00 17.00 2.00 252.25 1,860.40 56,083.45

Page 2: 1. Kolom

Panjang

112.00

112.00

112.00

112.00

112.00

112.00

112.00

117.00

901.00

Page 3: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. ATAP

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No.Dimensi Kolom (M)

Pembesian

Break DownPanjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K1 0.30 0.30 6.00 8 Main 22 8 6.88 55.04 2.98 164.23 4.32 57.60

8.00 Ring 10 100 200 100 16.00 16.00 16.00 1.14 54.72 0.62 33.73

8.00 Extra Hor - - - - - - - - 0.36 - - -

8.00 Extra Ver - - - - - - - - 0.36 - - -

2 K2 0.30 0.30 3.00 2 Main 22 8 3.88 31.04 2.98 92.62 0.54 7.20

2.00 Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98

2.00 Extra Hor - - - - - - - - 0.36 - - -

2.00 Extra Ver - - - - - - - - 0.36 - - -

5 K11 0.30 0.30 3.00 17 Main 16 8 3.64 29.12 1.58 45.96 4.59 61.20

17.00 Ring 10 100 200 100 9.00 9.00 9.00 1.14 30.78 0.62 18.98

17.00 Extra Hor - - - - - - - - 0.36 - - -

17.00 Extra Ver - - - - - - - - 0.36 - - -

6 K12 0.30 0.30 6.00 2 Main 16 16 6.64 106.24 1.58 167.67 1.08 14.40

2.00 Ring 10 100 200 100 16.00 16.00 16.00 1.14 54.72 0.62 33.73

2.00 Extra Hor - - - - - - - - 0.36 - - -

2.00 Extra Ver - - - - - - - - 0.36 - - -

T O T A L 10.53 140.40

Type Kolom

Jumlah Kolom

(Bh)

Page 4: 1. Kolom

Rata2Dimensi Kolom

(KG) 70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 30 x 30 60 x 60 25 22 19 16 13 10

1,583.73 366.60 48.00 - - - - - - 8.00 - - 1,313.85 - - - -

- - - - - 269.88

- - - - - -

- - - - - -

223.19 413.31 6.00 - - - - - - 2.00 - - 185.24 - - - -

- - - - - 37.95

- - - - - -

- - - - - -

1,103.88 240.50 51.00 - - - - - - 17.00 - - - - 781.29 - -

- - - - - 322.59

- - - - - -

- - - - - -

402.81 372.98 12.00 - - - - - - 2.00 - - - - 335.34 - -

- - - - - 67.47

- - - - - -

- - - - - -

3,313.62 314.68 117.00 - - - - - - 29.00 - - 1,499.09 - 1,116.64 - 697.89

Besi Beton Panjang

Kolom

Diameter Berat Besi ( Kg )

Page 5: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 10

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Type KolomDimensi Kolom (M)

Pembesian

Break DownPanjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K1 0.50 0.50 4.00 8 Main 22 12 4.88 58.56 2.98 174.73 8.00 64.00

8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

8.00 Extra Hor - - - - - - - - 0.56 - - -

8.00 Extra Ver - - - - - - - - 0.56 - - -

2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 145.61 0.48 5.60

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.34 44.22 0.62 27.26

1.00 Extra Hor - - - - - - - - 0.46 - - -

1.00 Extra Ver - - - - - - - - 0.36 - - -

3 K3 0.50 0.50 4.00 18 Main 22 12 4.88 58.56 2.98 174.73 18.00 144.00

18.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

18.00 Extra Hor - - - - - - - - 0.56 - - -

18.00 Extra Ver - - - - - - - - 0.56 - - -

4 K4 0.50 0.50 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 1.00 8.00

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

1.00 Extra Hor - - - - - - - - 0.56 - - -

1.00 Extra Ver - - - - - - - - 0.56 - - -

T O T A L 27.48 221.60

Jumlah Kolom

(Bh)

Page 6: 1. Kolom

Rata2

(KG)

1,713.63 214.20

172.87 360.15

3,855.66 214.20

214.20 214.20

5,956.36 216.75

Besi Beton

Page 7: 1. Kolom

Dimensi Kolom

70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - - - 8.00 - - - - 1,397.88 - - - -

- - - - - 315.75

- - - - - -

- - - - - -

4.00 - - - - - - - - 145.61 - - - -

- - - - - 27.26

- - - - - -

- - - - - -

72.00 - - - 18.00 - - - - 3,145.23 - - - -

- - - - - 710.43

- - - - - -

- - - - - -

4.00 - - - 1.00 - - - - 174.73 - - - -

- - - - - 39.47

- - - - - -

- - - - - - - - -

112.00 - - - 27.00 - - - - 4,863.45 - - - 1,092.91 ###OK

Panjang Kolom

Diameter Berat Besi ( Kg )

Page 8: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 08 dan LT. 09

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Type KolomDimensi Kolom (M)

Pembesian

Break DownPanjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K1 0.50 0.50 4.00 8 Main 22 16 4.88 78.08 2.98 232.98 8.00 64.00

8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

8.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

8.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

2 K2 0.40 0.30 4.00 1 Main 22 10 4.88 48.80 2.98 145.61 0.48 5.60

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.34 44.22 0.62 27.26

1.00 Extra Hor - - - - - - - - 0.46 - - -

1.00 Extra Ver - - - - - - - - 0.36 - - -

3 K3 0.50 0.50 4.00 18 Main 22 16 4.88 78.08 2.98 232.98 18.00 144.00

18.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

18.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

18.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

4 K4 0.50 0.50 4.00 1 Main 22 16 4.88 78.08 2.98 232.98 1.00 8.00

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.94 64.02 0.62 39.47

1.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

1.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.56 18.48 0.62 11.39

T O T A L 27.48 221.60

* Catatan : Total di kalikan 2 untuk dua lantai

Jumlah Kolom

(Bh)

Page 9: 1. Kolom

Rata2

(KG)

2,361.87 295.23

172.87 360.15

5,314.21 295.23

295.23 295.23

8,144.19 296.37

Besi Beton

Page 10: 1. Kolom

Dimensi Kolom

70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - - - 8.00 - - - - 1,863.84 - - - -

- - - - - 315.75

- - - - - 91.14

- - - - - 91.14

4.00 - - - - - - - - 145.61 - - - -

- - - - - 27.26

- - - - - -

- - - - - -

72.00 - - - 18.00 - - - - 4,193.64 - - - -

- - - - - 710.43

- - - - - 205.07

- - - - - 205.07

4.00 - - - 1.00 - - - - 232.98 - - - -

- - - - - 39.47

- - - - - 11.39

- - - - - - - - 11.39

112.00 - - - 27.00 - - - - 6,436.07 - - - 1,708.12

Panjang Kolom

Diameter Berat Besi ( Kg )

Page 11: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 07

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No.Dimensi Kolom (M)

Pembesian

Break DownPanjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K1 0.60 0.60 4.00 8 Main 22 16 4.88 78.08 2.98 232.98 11.52 76.80

8.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

8.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

8.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 0.60 6.40

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.54 50.82 0.62 31.33

1.00 Extra Hor - - - - - - - - 0.56 - - -

1.00 Extra Ver - - - - - - - - 0.36 - - -

3 K3 0.60 0.60 4.00 18 Main 22 16 4.88 78.08 2.98 232.98 25.92 172.80

18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

18.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

18.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

4 K4 0.60 0.60 4.00 1 Main 22 16 4.88 78.08 2.98 232.98 1.44 9.60

1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

1.00 Extra Hor 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

1.00 Extra Ver 10 100 200 100 1 11.00 11.00 11.00 0.66 21.78 0.62 13.43

T O T A L 39.48 265.60

Type Kolom

Jumlah Kolom

(Bh)

Page 12: 1. Kolom

Rata2

(KG)

2,459.53 213.50

206.07 343.44

5,533.93 213.50

307.44 213.50

8,506.96 215.48

Besi Beton

Page 13: 1. Kolom

Dimensi Kolom

70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19 16 13 10

32.00 - 8.00 - - - - - - 1,863.84 - - - -

- - - - - 380.85

- - - - - 107.42

- - - - - 107.42

4.00 - - - - 1.00 1.00 1.00 - 174.73 - - - -

- - - - - 31.33

- - - - - -

- - - - - -

72.00 - 18.00 - - - - - - 4,193.64 - - - -

- - - - - 856.91

- - - - - 241.69

- - - - - 241.69

4.00 - 1.00 - - - - - - 232.98 - - - -

- - - - - 47.61

- - - - - 13.43

1.00 1.00 1.00 - - - - - 13.43

112.00 - 27.00 - - 1.00 1.00 1.00 - 6,465.19 - - - 2,041.77 ###ERROR

Panjang Kolom

Diameter Berat Besi ( Kg )

Page 14: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 05 dan LT. 06

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Type KolomDimensi Kolom (M)

Pembesian

BREAK DOWNPanjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K1 0.60 0.60 4.00 8 Main 22 20 4.88 97.60 2.98 291.22 11.52 76.80

8.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

8.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

8.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

2 K2 0.50 0.30 4.00 1 Main 22 12 4.88 58.56 2.98 174.73 0.60 6.40

1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.54 50.82 0.62 31.33

1.00 Extra Hor - - - - - - - - 0.56 - - -

1.00 Extra Ver - - - - - - - - 0.36 - - -

3 K3 0.60 0.60 4.00 18 Main 22 20 4.88 97.60 2.98 291.22 25.92 172.80

18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

18.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

18.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

4 K4 0.60 0.60 4.00 1 Main 22 20 4.88 97.60 2.98 291.22 1.44 9.60

1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.34 77.22 0.62 47.61

1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85

T O T A L 39.48 265.60

* Catatan : Total di kalikan 2 untuk dua lantai

Jumlah Kolom

(Bh)

Page 15: 1. Kolom

Rata2

(KG)

3,140.32 272.60

206.07 343.44

7,065.73 272.60

392.54 272.60

10,804.65 273.67

Besi Beton

Page 16: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 04

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Type KolomDimensi Kolom (M)

PembesianBreak Down

Panjang (M) Berat (KG) Beton Begisting

Lokasi DiameterPosisi Besi Jumlah

Hor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total Unit Total (M3) (M2)

1 K 1 0.30 0.30 4.00 8 Main 22 20 4.88 97.60 2.98 291.22 2.88 38.40 8.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 0.62 23.19 8.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65 8.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65

2 K 2 0.60 0.30 4.00 1 Main 22 14 4.88 68.32 2.98 203.86 0.72 7.20 1.00 Ring 10 100 200 100 11.00 11.00 11.00 1.74 57.42 0.62 35.40 1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.66 43.56 0.62 26.85 1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.36 23.76 0.62 14.65

3 K 3 0.70 0.70 4.00 18 Main 22 20 4.88 97.60 2.98 291.22 35.28 201.60 18.00 Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74 18.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92 18.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92

4 K 4 0.70 0.70 4.00 1 Main 22 20 4.88 97.60 2.98 291.22 1.96 11.20 1.00 Ring 10 100 200 100 11.00 11.00 11.00 2.74 90.42 0.62 55.74 1.00 Extra Hor 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92 1.00 Extra Ver 10 100 200 100 2 11.00 11.00 11.00 0.76 50.16 0.62 30.92

T O T A L 40.84 258.40

Jumlah Kolom

(Bh)

Page 17: 1. Kolom

Rata2

( Kg )

2,749.71 954.76

280.76 389.94

7,358.69 208.58

408.82 208.58

10,797.97 264.40

Besi Beton

Page 18: 1. Kolom

PERHITUNGAN VOLUME

PEKERJAAN KOLOM LT. 1 TOILET TAMBAHAN

PROYEK : BANGUNAN SAYAP KWK JAKSEL

No. Type KolomDimensi Kolom (M)

PembesianBreak Down

Panjang (M)Lokasi Diameter

Posisi Besi JumlahHor Ver Panjang Tump. Lap. Tump. (Bh) Unit/Pjg Total

1 KT 1 0.30 0.30 4.00 4 Main 10 4 4.40 17.60 4.00 Ring 10 100 200 100 11.00 11.00 11.00 1.14 37.62 4.00 Extra Hor - - - - - - - - 0.36 - 4.00 Extra Ver - - - - - - - - 0.36 -

T O T A L

Jumlah Kolom

(Bh)

Page 19: 1. Kolom

Berat (KG)

Unit Total

0.62 10.85 0.62 23.19 - - - -

T O T A L

Page 20: 1. Kolom

Beton BegistingRata2

Dimensi Kolom

(M3) (M2) ( Kg ) 70 x 70 60 x 60 60 x 30 50 x 50 50 x 30 60 x 60 60 x 60 25 22 19

1.44 19.20 136.17 94.56 16.00 - - - - - - - - - - - - - - - - - - -

1.44 19.20 136.17 94.56 16.00 - - - - - - - - - -

Besi Beton Panjang

Kolom

Diameter Berat Besi ( Kg )

Page 21: 1. Kolom

16 13 10

- - 43.40 - - 92.77 - - - - - -

- - 136.17 ###OK

Diameter Berat Besi ( Kg )