PEKERJAAN : Pelapisan Landasan Pacu Existing (30 x 700 M'), Taxiway Existing (23 x 187m) Apron Existing (80 x 107 M'), Pemenuhan Standart Runway Strip 24.000 M2 dan Perluasan Turning (650 M2) dan Marking LOKASI : KABUPATEN BENER MERIAH No. U R A I A N KODE SATUAN HARGA HARGA KET SATUAN SATUAN ( Rp. / Jam) ( Rp. / Hari ) 1 Pekerja L01 Jam 10,000.00 70,000.00 2 Tukang L02 Jam 17,142.86 120,000.00 3 Mandor L03 Jam 17,857.14 125,000.00 4 Operator L04 Jam 24,285.71 170,000.00 5 Pembantu Operator (Semi Terampil) L05 Jam 12,857.14 90,000.00 6 Sopir/Driver L06 Jam 12,857.14 90,000.00 7 Pembantu Sopir/Driver L07 Jam 7,142.86 50,000.00 8 Mekanik L08 Jam 12,857.14 90,000.00 9 Pembantu Mekanik L09 Jam 10,714.29 75,000.00 Banda Aceh, 25 April 2014 PT. FLAMBOYANT HUMA ARTA Ir. Alwin Abdullah Direktur Utama DAFTAR HARGA SATUAN UPAH

Transcript of 05. Harga Upah, Bahan, dan Peralatan.pdf

  • #REF!

    PEKERJAAN : Pelapisan Landasan Pacu Existing (30 x 700 M'), Taxiway Existing (23 x 187m)

    Apron Existing (80 x 107 M'), Pemenuhan Standart Runway Strip 24.000 M2 dan

    Perluasan Turning (650 M2) dan Marking

    LOKASI : KABUPATEN BENER MERIAH

    No. U R A I A N KODE SATUAN HARGA HARGA KET

    SATUAN SATUAN

    ( Rp. / Jam) ( Rp. / Hari )

    1 Pekerja L01 Jam 10,000.00 70,000.00

    2 Tukang L02 Jam 17,142.86 120,000.00

    3 Mandor L03 Jam 17,857.14 125,000.00

    4 Operator L04 Jam 24,285.71 170,000.00

    5 Pembantu Operator (Semi Terampil) L05 Jam 12,857.14 90,000.00

    6 Sopir/Driver L06 Jam 12,857.14 90,000.00

    7 Pembantu Sopir/Driver L07 Jam 7,142.86 50,000.00

    8 Mekanik L08 Jam 12,857.14 90,000.00

    9 Pembantu Mekanik L09 Jam 10,714.29 75,000.00

    Banda Aceh, 25 April 2014

    PT. FLAMBOYANT HUMA ARTA

    Ir. Alwin Abdullah

    Direktur Utama

    DAFTAR HARGA SATUAN UPAH

  • DAFTAR HARGA SATUAN BAHANPEKERJAAN : Pelapisan Landasan Pacu Existing (30 x 700 M'), Taxiway Existing (23 x 187m)

    Apron Existing (80 x 107 M'), Pemenuhan Standart Runway Strip 24.000 M2 dan

    Perluasan Turning (650 M2) dan Marking

    LOKASI : KABUPATEN BENER MERIAH

    No. U R A I A N KODE SATUAN HARGA LOKASI BAHAN

    SATUAN

    (Rp.)

    1 Pasir untuk Pasangan & Beton K-175 M01 M3 77,500.00 Quarry Jamur Ujung

    2 Pasir Beton > K - 175 M01.a M3 209,500.00 Quarry Teupin Mane

    3 Batu Kali M02 M3 90,300.00 Quarry Jamur Ujung

    4 Aggregat Kasar untuk Beton K-175 M03 M3 163,725.90 Proses Stone Cruser

    5 Aggregat Kasar untuk Beton > K-175, M03.a M3 392,078.38 Proses Stone Cruser

    Base Klas A & B

    6 Aggregat Halus untuk Beton K-175 M04 M3 156,112.92 Proses Stone Cruser

    7 Aggregat Halus untuk Beton > K-175, M04.a M3 374,832.34 Proses Stone Cruser

    Base Klas A & B

    8 Filler M05 Kg 900.00

    9 Batu Belah M06 M3 99,600.00

    10 Gravel untuk Beton K - 175 M07 M3 99,106.83 Quarry Jamur Ujung

    11 Gravel untuk Beton > K - 175 M07.a M3 306,700.00 Proses Stone Cruser

    12 Material Tanah Timbunan M08 M3 10,000.00 Borrow Pit

    13 Material Pilihan M09 M3 54,413.23 Borrow Pit

    14 Aspalt M10 Kg 16,300.00 Redelong

    15 Kerosen/Minyak Tanah M11 Liter 6,600.00 Pertamina

    16 Semen M12 Kg 1,500.00 Redelong

    17 Besi Beton Polos M13 Kg 12,700.00 Redelong

    18 Besi Frofil M13 Kg 17,100.00 Redelong

    19 Kawat Beton M14 Kg 10,000.00 Redelong

    20 Sirtu M16 M3 83,200.00 Jamur Ujung

    21 Sirtu M16.a M3 294,300.00 Quarry Kanis

    22 Cat Meini Kg 20,000.00

    23 Cat Marka Landasan M17 Kg 80,000.00

    24 Blass Bit M17a Kg 60,000.00

    25 Thinner M17b Kg 15,000.00

    26 Paku M18 Kg 8,500.00

    27 Kayu Perancah M19 M3 1,500,000.00

    28 Triplek T = 12 mm M19 M2 34,000.00

    29 Bensin M20 Liter 12,300.00 Pertamina

    30 Solar M21 Liter 12,300.00 Pertamina

    31 Minyak Pelumas/Oli M22 Liter 20,000.00

    32 Pasir Urug M44 M3 64,000.00

    33 Tanah Humus M08a M3 18,000.00

    34 Rumput Gajah BOQ M2 12,000.00

    Banda Aceh, 25 April 2014

    PT. FLAMBOYANT HUMA ARTA

    Ir. Alwin Abdullah

    Direktur Utama

  • HARGA SATUAN PERALATAN

    PEKERJAAN : Pelapisan Landasan Pacu Existing (30 x 700 M'), Taxiway Existing (23 x 187m)

    Apron Existing (80 x 107 M'), Pemenuhan Standart Runway Strip 24.000 M2 dan

    Perluasan Turning (650 M2) dan Marking

    LOKASI : KABUPATEN BENER MERIAH

    HARGA

    No. U R A I A N KODE SATUAN SATUAN KET.

    ( Rp. )

    1 ASPALT MIXING PLANT E01 Jam 3,666,071.12

    2 ASPALT FINISHER E02 Jam 277,859.43

    3 ASPALT SPRAYER E03 Jam 78,183.32

    4 BULLDOZER 100-150 HP E04 Jam 483,665.18

    5 COMPRESOR 4000-6500 L/M E05 Jam 54,252.42

    6 CONCRETE MIXER 0,3-0,6 M3 E06 Jam 70,325.26

    7 DUMP TRUCK 3-4 TON E08 Jam 153,151.00

    8 DUMP TRUCK 6 - 8 TON E09 Jam 238,372.00

    9 EXCAVATOR 80-140 HP E10 Jam 371,371.01

    10 FLAT BED TRUCK 3-4 M3 E11 Jam 242,988.49

    11 GENERATOR SET E12 Jam 365,812.01

    12 MOTOR GREDER > 100 HP E13 Jam 382,712.88

    13 TRACK LOADER 75-100 HP E14 Jam 332,598.92

    14 WHELL LOADER 1,0-1,6 M3 E15 Jam 337,264.33

    15 THREE WHEEL ROLLER E16 Jam 186,198.07

    16 TANDEM ROLLER 6-8 TON E17 Jam 177,510.57

    17 PENEMATIC TYRE ROLLER E18 Jam 224,603.75

    18 VIBRATORY ROLLER 5-8 TON E19 Jam 292,053.66

    19 CONCRETE VIBRATOR E20 Jam 60,213.78

    20 STONE CRUSHER E21 Jam 624,823.78

    21 WATER PUMP 70-100 MM E22 Jam 50,253.20

    22 WATER TANKER 3000-4500 LT E23 Jam 253,687.03

    23 PEDESTRIAN ROLLER E24 Jam 76,428.42

    24 TAMPER E25 Jam 68,614.05

    Catatan

    - Satuan agar digunakan jam kerja untuk tenaga dan alat, volume atau berat untuk bahan

    - Harga satuan dasar untu alat sudah termasuk bahan bakar, barang habis dipakai dan operator

    - Harga satuan dasar sudah termasuk semua pajak-pajak dan retribusi yang berhubungan

    dengannya tetapi tidak termasuk PPN.

    - Penawar diharuskan untuk melengkapi komponen pada uraian dan satuan pada bentuk ini

    sesuai dengan Spesifikasi gambar, dan methode pelaksanaan.

    Banda Aceh, 25 April 2014

    PT. FLAMBOYANT HUMA ARTA

    Ir. Alwin Abdullah

    Direktur Utama