02 II 1_7 Panduan Arsi Ged Spo

28
NO URAIAN JENIS PEKERJAAN VOLUME SAT II PEKERJAAN GEDUNG SPO II.3 PEKERJAAN LISTRIK II.3.1 PANEL SDP II.3.1.1 PANEL SDP GEDUNG SPO PERTAGAS ● Incoming MCCB 250A 1.00 unit ● Outgoing MCCB 3p 63A x 4 ● Outgoing MCCB 3p 40A x 2 ● Outgoing MCCB 3p 80A ● Outgoing MCCB 3p 32A ● SPD ,CT ,CU Busbar 400A ,Pilot Lamp,Digital Power Meter, II.3.3 Kabel Distribusi Tegangan Rendah DARI SDP Ke : 1 PP-POMPA AIR BERSIH NYFGBY 4 x 10mm² + NYA 6 mm² 85.00 m 2 PP-AC LT.DASAR Kabel NYY 4 x 25 mm² + NYA 1 x 16 mm² 8.00 m 3 PP-LP LT.DASAR NYY 4 x 25 mm² + NYA 16 mm² 8.00 m 4 PP-AC LT.SATU Kabel NYY 4 x 25 mm² + NYA 1 x 16 mm² 20.00 m 5 PP-AC LT.SATU NYY 4 x 25 mm² + NYA 16 mm² 8.00 m 6 SDP POWER ROOM / EMSB PP-SUMPIT AIR BUANGAN NYFGBY 4 X 4 mm² 150.00 m II.3.4 Pekerjaan Panel Elektrikal 1 PP-POMPA AIR BERSIH 1.00 Unit 2 PP-AC LT.DASAR 1.00 Unit 3 PP-LP LT.DASAR 1.00 Unit 4 PP-AC LT.SATU 1.00 Unit 5 PP-LP LT.SATU 1.00 Unit 7 SDP POWER ROOM 1.00 Unit 8 PP-Pompa Sumpit Air Buangan 1.00 Unit II.3.5 GROUNDING SYSTEM COPPER ROOD STANDART ,KEDALAMAN 12 S/D 18 MTR MENGUNAKAN INSTALASI PIPA GIP 1 Grounding SDP Panel Gedung SPO Pertagas,BC 95mm 2.00 ttk c/w Accessories & Earth Testing 2 Grounding PP-Security & P.Luar 1.00 ttk c/w Accessories & Earth Testing 3 Grounding SDP Power Room ( EMSB ) 1.00 ttk c/w Accessories & Earth Testing Penambahan untuk Grounding Data Center dan Power Room ( Untuk 3 Titik Grounding + Plate Tembaga 5mm ) Semua Grounding Grounding Panel c/w Bak Control 400 x 400 x 300 mm c/w Cover Plate 3mm II.3.7 PEKERJAAN CABLE LADDER TRAY II.3.7.1 LANTAI DASAR 1 Cable Tray ukuran 300 x 100 mm 37.00 m 2 c/w Fitting & Accessories Equipment Tray ladder 1.00 lot 3 Pemasangan dan Perapihan c/w Support Hanger & Equipment 1.00 lot II.3.7.2 LANTAI SATU 1 Cable Tray ukuran 300 x 100 mm 39.00 m 2 Cable Tray ukuran 200 x 100 mm 8.00 m 3 c/w Fitting & Accessories Equipment Tray ladder 1.00 lot 4 Pemasangan dan Perapihan c/w Support Hanger & Equipment 1.00 lot II.3.8 PEKERJAAN INSTALASI LISTRIK Pengadaan dan Pemasangan Lampu, Stop Kontak,Saklar, Instalasi kabel dan perlengkapan lainnya c/w Testing Commisioning II.3.8.1 LANTAI DASAR

description

Panduan Arsitek Gedung

Transcript of 02 II 1_7 Panduan Arsi Ged Spo

Page 1: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN JENIS PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

II PEKERJAAN GEDUNG SPO

II.3 PEKERJAAN LISTRIK II.3.1 PANEL SDP

II.3.1.1 PANEL SDP GEDUNG SPO PERTAGAS ● Incoming MCCB 250A 1.00 unit MERLIN GERLIN ,SHEIDDER

● Outgoing MCCB 3p 63A x 4 Box Panel Standart PLN dan SNI

● Outgoing MCCB 3p 40A x 2 dengan warna cat Powder coating dan anti karat

● Outgoing MCCB 3p 80A ● Outgoing MCCB 3p 32A ● SPD ,CT ,CU Busbar 400A ,Pilot Lamp,Digital Power Meter,

II.3.3 Kabel Distribusi Tegangan Rendah

DARI SDP Ke : 1 PP-POMPA AIR BERSIH SUPREME

NYFGBY 4 x 10mm² + NYA 6 mm² 85.00 m KABLEINDO 2 PP-AC LT.DASAR

Kabel NYY 4 x 25 mm² + NYA 1 x 16 mm² 8.00 m 3 PP-LP LT.DASAR

NYY 4 x 25 mm² + NYA 16 mm² 8.00 m KABLEINDO 4 PP-AC LT.SATU TRANKA

Kabel NYY 4 x 25 mm² + NYA 1 x 16 mm² 20.00 m DAN MERK SETARA LAINNYA 5 PP-AC LT.SATU

NYY 4 x 25 mm² + NYA 16 mm² 8.00 m 6 SDP POWER ROOM / EMSB

PP-SUMPIT AIR BUANGAN NYFGBY 4 X 4 mm² 150.00 m

II.3.4 Pekerjaan Panel Elektrikal 1 PP-POMPA AIR BERSIH 1.00 Unit BOX PANEL DARI BAHAN PLAT DENGAN 2 PP-AC LT.DASAR 1.00 Unit 3 PP-LP LT.DASAR 1.00 Unit FINISHING CAT POWDER COATING 4 PP-AC LT.SATU 1.00 Unit STANDART SNI DAN PLN 5 PP-LP LT.SATU 1.00 Unit 7 SDP POWER ROOM 1.00 Unit 8 PP-Pompa Sumpit Air Buangan 1.00 Unit

II.3.5 GROUNDING SYSTEM

COPPER ROOD STANDART ,KEDALAMAN 12 S/D 18 MTR MENGUNAKAN INSTALASI PIPA GIP PEMBUATAN DAN PEMASANGAN

1 Grounding SDP Panel Gedung SPO Pertagas,BC 95mm 2.00 ttk GROUNDING MENGUNAKAN COPPER ROOD

c/w Accessories & Earth Testing 2 Grounding PP-Security & P.Luar 1.00 ttk DAN SESUAI DENGAN STANDART

c/w Accessories & Earth Testing EARTH TESTING MAX 1 OHM

3 Grounding SDP Power Room ( EMSB ) 1.00 ttk

c/w Accessories & Earth Testing Penambahan untuk Grounding Data Center dan Power Room ( Untuk 3 Titik Grounding + Plate Tembaga 5mm ) Semua Grounding Grounding Panel c/w Bak Control 400 x 400 x 300 mm c/w Cover Plate 3mm

II.3.7 PEKERJAAN CABLE LADDER TRAY

II.3.7.1 LANTAI DASAR

1 Cable Tray ukuran 300 x 100 mm 37.00 m KABEL TRAY LEADDER BRAND

2 c/w Fitting & Accessories Equipment Tray ladder 1.00 lot TRIAS ,SPECTRA,TRUNKING POWER

3 Pemasangan dan Perapihan c/w Support Hanger & Equipment 1.00 lot DAN YANG SETARA LAINNYA

II.3.7.2 LANTAI SATU

1 Cable Tray ukuran 300 x 100 mm 39.00 m

2 Cable Tray ukuran 200 x 100 mm 8.00 m

3 c/w Fitting & Accessories Equipment Tray ladder 1.00 lot 4 Pemasangan dan Perapihan c/w Support Hanger & Equipment 1.00 lot

II.3.8 PEKERJAAN INSTALASI LISTRIK Pengadaan dan Pemasangan Lampu, Stop Kontak,Saklar, Instalasi kabel dan perlengkapan lainnya c/w Testing Commisioning

II.3.8.1 LANTAI DASAR

Page 2: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN JENIS PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

1 RM TL 2 x 36 W Mirror Reflector ( Kode A ) 55.00 bh

2 Down Light PL 2 x 18 W ( Kode C ) 39.00 bh

3 Halogen 50 W ( Kode E ) 8.00 bh BRAND SPECTRA,LUMENLITE,CENTRAL LITE 4 Lampu EXIT 9 W Double Side ( Kode I ) 1.00 bh LAMPU DAN ISOLATOR ,SERTA TRANSFORMER 5 TL 2 x 36 W Tangga ( Kode J ) 2.00 bh BRAND PHILIP 6 Saklar Tunggal 2.00 bh 7 Saklar Double 6.00 bh CLIPSAL .EGA DAN SETARA LAINYA 8 Saklar Group 6 s/d 8 GS 3.00 bh 9 Stopkontak Tunggal 1P 220 Volt AC 1.00 bh 10 Stopkontak Group 1P 220 VAC 3Gang 6.00 bh 11 Stopkontak Floor Type c/w Data Outlet dan Telepon 1.00 bh

12 7.00 ttk

13 11.00 ttk 14 105.00 ttk

II.3.8.2 LANTAI SATU

1 RM TL 2 x 36 W Mirror Reflector ( Kode A ) 19.00 bh

2 Down Light PL 2 x 18 W ( Kode C ) 29.00 bh

3 Halogen 50 W ( Kode E ) 3.00 bh

4 Lampu EXIT 9 W Double Side ( Kode I ) 1.00 bh LAMPU DAN ISOLATOR ,SERTA TRANSFORMER

5 TL 2 x 36 W Tangga ( Kode J ) 3.00 bh BRAND PHILIP

6 TL 1 x 18 W ( Kode K ) 82.00 bh

7 Saklar Tunggal 2.00 bh FITING DAN ACCESSORIES

8 Saklar Seri 1.00 bh CLIPSAL .EGA DAN SETARA LAINYA

9 Saklar Double 11.00 bh

10 Saklar Group 6 s/d 8 GS 2.00 bh

11 Stopkontak Tunggal 1P 220 Volt AC 14.00 bh

12 Stopkontak Group 1P 220 VAC 3Gang 1.00 bh

13 Stopkontak Floor Type c/w Data Outlet dan Telepon 15.00 bh

14 30.00 ttk

15 16.00 ttk 16 137.00 ttk

II.3.9 Pekerjaan Penangkal Petir

1 Lighting Protection radius 150 M dengan tinggi tiang Min 6 mtr dia 1.00 Unit TYPE ELECTRODA FROD bangunan lengkap dengan obstruction lamp,photo electric switch, BRAND KURN dan termasuk pipa penyangga, dudukan dan perlengkapannya KABEL PENGHANTAR Tiang Tunggal

2 Kabel penghantar NYA diameter 1 x 70 mm² 150.00 m DAN SETARA LAINYA

3 Klem kabel & accs 1.00 lot

4 Pipa PVC diameter 1 1/2 inch kabel schoen, plat dudukan terminal, isolator, dop, sesuai gambar 1.00 lot

5 Bak kontrol uk. 300 x 300 x 300 c/w dari pasangan bata, tutup 1.00 Unit beton , lubang rembesan,klem, Cooper Rod dia 1", tahanan Max. 3 Ohm dan perlengkapan lain sehingga system berfungsi dengan baik

Sub Total Pekerjaan Penangkal Petir

II.3.10 TEST COMMISIONING & TRAINING 1.00 ls

Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dlm Condouit PVC 20mm Instalasi Saklar dgn kabel NYM 2 x 2.5 mm² dlm Condouit PVC 20mm Instalasi lampu penerangan dgn kabel NYM 3 x 2.5 mm² dlm Condouit PVC 20mm

Instalasi stop kontak dengan kabel NYM 3 x 2.5 mm² dlm Condouit PVC 20mm 20mm Instalasi lampu penerangan dgn kabel NYM 3 x 2.5 mm² dlm Condouit PVC 20mm

Page 3: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

II PEKERJAAN GEDUNG SPO

II.4 PEKERJAAN PLUMBING DAN HYDRANT

II.4.1 PEKERJAAN PLUMBING

Pekerjaan Instl. Pipa Air Bersih

Peralatan Utama

● Tangki air atas Uk 2 x 2 x 1 mtr = 4 m3 Fiber Glass Cubical S 1.00 unit AQUATECH , BIO FIBER GLASS,KENCANA FIBERc/w Pondasi Dudukan dan Perapihan DAN SETARA LAINYA

II.4.2 Valve-valve & Assesories

1 Pompa Transfer

● Gate Valve dia. 65mm 4.00 bh BRAND KITZ ,EGANO , ONDA ● Check Valve dia. 65mm 2.00 bh DAN SETARA LAINNYA ● Flexible Joint dia. 65mm 2.00 bh

● Gate Valve dia 80 mm 1.00 bh GIP YANG DIGUNAKAN BAKRIE PIPE,SMI ● consentric reducer 4.00 bh DAN SETARA LAINNYA ● Strainer dia. 65mm 2.00 bh

● Pipa header dia 100mm 1.00 bh

2 Roof Tank BRAND KITZ ,EGANO , ONDA ● Pipa header dia 100mm 10.00 mtr DAN SETARA LAINNYA ● Gate Valve dia 50 mm 8 bh ● Gate Valve dia. 40mm 5 bh ● Gate Valve dia 20 mm 1 bh ● Check Valve dia. 40mm 2 bh ● Flexible Joint dia. 40mm 4 bh ● consentric reducer 4 bh ● Strainer dia. 40mm 2 bh ● Floating Valve dia. 50mm 2 bh ● Pressure Gauge 2 bh ● Pressure Switch 2 bh Material Bantu 1 ls

Booster Pump 2 bh ● Type centrifugal dan suction

● Kap.x 300lt/menit

● Head : 15 meter

● Motor 1,5 KW/3 phase/220V/50 Hz

Putaran : 2900 Rpm

C/W panel, kontrol & kabel, WLC,

pressure tank, asesoris

II.4.3 Pekerjaan Pemipaan Air Bersih

II.4.3.1 Instl. Pipa Distribusi.utama dan riser

Lengkap dengan fitting dan perapian.

● Pipa GIP 65 mm 57.00 m'

● Pipa GIP 50 mm 74.00 m' GIP YANG DIGUNAKAN BAKRIE PIPE,SMI ● accesories 1.00 ls DAN SETARA LAINNYA

II.4.3.2 LANTAI DASAR

Pengadaan dan pemasangan semua semua instalasi

lengkap dengan fitting dan perapian.

Toilet Office & Pantries

● Pipa GIP 65 mm 15.00 m' BRAND KITZ ,EGANO , ONDA ● Pipa GIP 32 mm 13.00 m' DAN SETARA LAINNYA ● Pipa GIP 20 mm 25.00 m'

● Pipa GIP 15 mm 8.00 m' GIP YANG DIGUNAKAN BAKRIE PIPE,SMI ● Gate Valve dia. 32 mm 3.00 bh DAN SETARA LAINNYA ● Gate Valve dia. 65 mm 2.00 bh

● accesories 1.00 ls

II.4.3.3 LANTAI SATU

Pengadaan dan pemasangan semua semua instalasi

lengkap dengan fitting dan perapian.

Toilet Office & Pantries

● Pipa GIP 65 mm 15.00 m' BRAND KITZ ,EGANO , ONDA ● Pipa GIP 32 mm 13.00 m' DAN SETARA LAINNYA ● Pipa GIP 20 mm 25.00 m'

Page 4: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

● Pipa GIP 15 mm 8.00 m' GIP YANG DIGUNAKAN BAKRIE PIPE,SMI ● Gate Valve dia. 32 mm 3.00 bh DAN SETARA LAINNYA ● Gate Valve dia. 65 mm 2.00 bh

● accesories 1.00 ls

II.4.3.4 TEST COMMISIONING PLUMBING 1.00 ls BADAN PENELITIAN YANG BERWENANG DAN PERIJINAN SERTA PENGETESAN KADAR AIR TENTANG AIR LAYAK PAKAI SESUAI DENGAN KALIBRASI

II.4.4 Pekerjaan Pemipaan air kotor

II.4.4.1 Instalasi Pipa utama dan riser

Lengkap dengan fitting dan perapian.

● Pipa PVC AW dia. 100mm Inlet 28.00 m' PIPA PVC AW BRAND UNILON ,MASPION ● Pipa PVC AW dia. 100mm Outlet 15.00 m' DAN SETARA LAINNYA ● accessories c/w Fitting dan Equipment Support 1.00 ls

II.4.4.2 LANTAI DASAR

● Pipa PVC AW dia. 100mm 24.00 m' PIPA PVC AW BRAND UNILON ,MASPION ● Pipa PVC AW dia. 75mm 18.00 m' DAN SETARA LAINNYA ● Clean Out dia 75 mm 8.00 bh

● Floor drain dia 75 mm 8.00 bh

● Accessories c/w Fitting dan Equipment Suppot 1.00 ls

II.4.4.3 LANTAI SATU PIPA PVC AW BRAND UNILON ,MASPION ● Pipa PVC AW dia. 100mm 29.00 m' DAN SETARA LAINNYA ● Pipa PVC AW dia. 75mm 20.00 m'

● Clean Out dia 75 mm 6.00 bh

● Floor drain dia 75 mm 6.00 bh

● Accessories c/w Fitting dan Equipment Suppot 1.00 ls

II.4.4.4 PENAMPUNGAN AIR BUANGAN DARI GEDUNG SPO

1 Pompa Sumpit Buangan 1 s/d 1.5Kw 1.00 set

2 Instalasi pipa Inlet ke Bak Penampungan Air Buangan dia 75mm 100.00 mtr

3 Instalasi Pipa Outlet dari Bak Penampungan Air Buangan ke Bal 100.00 mtr

II.4.4.5 TEST COMMISIONING PLUMBING 1.00 ls

II.4.5 Pekerjaan Hydrant dan Sprinkler Pemipaan Pemadam

II.4.5.1 LANTAI DASAR

1 Instalasi Pipa Hydrant BSP Sch 40 dalam gedung

● Pipa BSP Sch 40 dia. 150mm 2.00 m'

● Pipa BSP Sch 40 dia. 100mm 15.00 m' PIPA SCH 40 SEAMLESS ● Pipa BSP Sch 40 dia. 65mm 25.00 m' BRAND BAKRIE PIPE ,MSI ● Pipa BSP Sch 40 dia. 32mm 18.00 m' DAN SETARA LAINNYA

● Accesories 1.00 ls

Box Hydrant c/w Fire Alarm Device Output

- Fire Hose Cabinet Indoor 2.00 unit

c/w Flexibel Hose Rubber & Nozzle

- Gate Valve dia. 100mm ( Flanged ) 1.00 bh

- Gate Valve dia. 65mm ( Flanged ) 4.00 bh PERALATAN HYDRANT

● Kepala Sprinkler / head sprinkler 14.00 ls BRAND KITZ ● Fire Extinguiser, Kap. 9 kg Dry Powder 6.00 unit

● Branch Gate Valve + TDV 3.00 unit

II.4.5.2 LANTAI SATU

1 Instalasi Pipa Hydrant BSP Sch 40 dalam gedung PIPA SCH 40 SEAMLESS ● Pipa BSP Sch 40 dia. 150mm 2.00 m' BRAND BAKRIE PIPE ,MSI ● Pipa BSP Sch 40 dia. 100mm 6.00 m' DAN SETARA LAINNYA ● Pipa BSP Sch 40 dia. 65mm 10.00 m'

● Pipa BSP Sch 40 dia. 32mm 19.00 m'

● Accesories 1.00 ls

Box Hydrant c/w Fire Alarm Device Output

- Fire Hose Cabinet Indoor 1.00 unit

c/w Flexibel Hose Rubber & Nozzle

- Gate Valve dia. 100mm ( Flanged ) 1.00 bh

- Gate Valve dia. 65mm ( Flanged ) 2.00 bh

● Kepala Sprinkler / head sprinkler 8.00 ls

● Fire Extinguiser, Kap. 9 KG Cleant Agent FE-227E 2.00 unit

Page 5: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

● Branch Gate Valve + TDV 3.00 unit

II.4.5.3 Test Comisioning , Training & perijinan PMK 1.00 ls

Page 6: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SPESIFIKASI BAHAN

II PEKERJAAN GEDUNG SPO II.5 PEKERJAAN ELEKTRONIK

II.5.1 PEKERJAAN INSTALASI FIRE ALARM II.5.1.1 Peralatan Utama

1 1.00 unit BRAND NOTIFIER,PROTECHWELL,NITTAN

BRAND KABEL SUPREME , KABEL METAL ,TRANKA general alarm INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm Remote Annuciator 1.00 unit Display & Networking Controller ● Instalasi untuk peralatan diruang Operation Control Room

2 Instalasi Main Control Fire Alarm 1.00 Lot Twisted Shieldied AWG 18 NYA 2 x 1.5mm NYM 3 x 2.5mm

3 Instalasi Remote Anunciator 1.00 Lot Twisted Shieldied AWG 18 NYA 2 x 1.5mm NYM 3 x 2.5mm Posisi pada Pos Alarm

II.5.1.2 Instalasi pengkabelan

II.5.1.2.1 Instalasi MDF-FA ke JBFA. LT.Satu

1 menggunakan kabel NYA 2(1 x 1.5)mm 50.00 m INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 2 Twisted Shieldied AWG 18 1Pair 50.00 m

Dalam PVC Conduit High Impact 20mm II.5.1.2.2 Instalasi MDF-FA ke JBFA.LT.Dua BRAND NOTIFIER,PROTECHWELL,NITAN 3 menggunakan kabel NYA 2(1 x 1.5)mm 60.00 m BRAND KABEL SUPREME , KABEL METAL ,TRANKA 4 Twisted Shieldied AWG 18 1Pair 60.00 m INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm

Dalam PVC Conduit High Impact 20mm

II.5.1.3 INSTALASI FIRE ALARM

II.5.1.3.1 LANTAI DASAR BRAND NOTIFIER,PROTECHWELL,NITAN

a. Pengadaan dan pemasangan Fixtures Alarm BRAND KABEL SUPREME , KABEL METAL ,TRANKA

1 Addressable Fixed temp. heat detector 12.00 bh INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 2 Addressable Smoke Detector 1.00 bh 3 Alarm bell 2.00 bh 4 Fire Alarm Lamp 2.00 bh 5 Manual Push Button c / w outlet intercom 2.00 bh 4 JBFA : lengkap dgn Terminal blok terminasi 2.00 set 5 FCM - Control Module for Warning Sign 2.00 set 6 FMM - Monitoring Module For Manual Call Poit 2.00 set

b. Pekerjaan instalasi 1 Instalasi Smoke / heat detector menggunakan 13.00 ttk

AGW 18 1Pair dalam condouit PVC 20mm 2 2.00 ttk

Instalasi Module NYA 2 x 1.5mm + AWG 18 1 Pair 2.00 ttk

II.5.1.3.2 LANTAI SATU

a. Pengadaan dan pemasangan Fixtures Alarm 1 Addressable Fixed temp. heat detector 6.00 bh 2 Addressable Smoke Detector 5.00 bh 3 Addressable Fixed temp. heat detector 1.00 bh 4 Alarm bell 1.00 bh 5 Fire Alarm Lamp 1.00 bh 6 Manual Push Button c / w outlet intercom 1.00 bh 7 JBFA : lengkap dgn Terminal blok terminasi 1.00 set 8 FCM - Control Module for Warning Sign 1.00 set 9 FMM - Monitoring Module For Manual Call Poit 1.00 set

b. Pekerjaan instalasi 1 Instalasi Smoke / heat detector menggunakan 12.00 ttk

AGW 18 1Pair dalam condouit PVC 20mm 2 1.00 ttk

Instalasi Module

SAT

Pengadaan dan pemasangan peralatan utama sesuai dengan spesifikasi teknis dan gambar

Main Control Panel Fire Alarm FULL ADDRESABLE SYSTEM 1 LOOP termasuk grounding c/w

● Battery 24 jam standbay / 30 menit kerja dalam

Pekerjaan instalasi pengkabelan sesuai dengan spesifikasi teknis dan gambar

Inst. Fire Alarm Bell ,Indicator lamp dan Manual Push Button NYA 4 x 1 x 1.5 mm2 dalam PVC condouit 20 mm

Inst. Fire Alarm Bell ,Indicator lamp dan Manual Push Button NYA 4 x 1 x 1.5 mm2 dalam PVC condouit 20 mm

Page 7: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SPESIFIKASI BAHAN SAT

3 NYA 2 x 1.5mm + AWG 18 1 Pair 1.00 ttk

II.5.1.4 PEKERJAAN TATA SUARA BRAND TOA , PANASONIC DAN SETARA LAINYA

II.5.1.4.1 PERALATAN SENTRAL KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO

DAN SETARA LAINYA

TATA SUARA INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 1 Rak Kabinet, lengkap dengan accessories 1.00 set ACCESSORIES DAN PEMASANGANNYA 2 Mixer Frame 1.00 Unit BRAND TOA , PANASONIC DAN SETARA LAINYA 3 Program Selector Unit 1.00 Unit KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO 4 Power Amplifier 380 w 4.00 unit DAN SETARA LAINYA 5 Power Amplifier 380 w u/ Parking Area 2.00 unit INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 6 Speaker selector 30 zone 1.00 unit ACCESSORIES DAN PEMASANGANNYA 7 Paging Microphones 8.00 unit 8 Emergency Microphone 1.00 unit BRAND TOA , PANASONIC DAN SETARA LAINYA 9 Main distribution frame tata suara 100'' 1.00 unit KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO 10 Equalizer 1.00 unit DAN SETARA LAINYA 11 Sirine Module 1.00 unit INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 12 Back up battery 30 menit 1.00 unit ACCESSORIES DAN PEMASANGANNYA 13 Instalasi + alat bantu 1.00 ls

II.5.1.5 INSTALASI PENGKABELAN TATA SUARA KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO

1 75.00 m DAN SETARA LAINYA

2 80.00 m ACCESSORIES DAN PEMASANGANNYA

II.5.1.6 INSTALASI TATA SUARA DALAM GEDUNG

II.5.1.6.1 LANTAI DASAR

1 Ceiling speaker 3 w 8.00 bh BRAND TOA , PANASONIC DAN SETARA LAINYA 2 Volume Control 3.00 bh KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO 3 Junction Box Tata Suara ( JBTS-1 ) 1.00 unit DAN SETARA LAINYA

Instalasi dari JBTS ke speaker menggunakan INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 4 NYMHY 2 x 1,5 mm2 dalam condouit PVC 20 mm 12.00 titik ACCESSORIES DAN PEMASANGANNYA

II.5.1.6.2 LANTAI SATU 1 Ceiling speaker 3 w 8.00 bh 2 Volume Control 3.00 bh 3 Junction Box Tata Suara ( JBTS-2 ) 1.00 unit

Instalasi dari JBTS ke speaker & Volume control menggunakan 4 NYMHY 2 x 1,5 mm2 dalam condouit PVC 20 mm 12.00 titik

II.5.1.6.2 Lantai Area Luar 1 Outdoor Speaker 5.00 bh BRAND TOA , PANASONIC DAN SETARA LAINYA 2 Volume Control 2.00 bh KABEL MENGUNAKAN SUPREME ,KABEL METAL,KABELINDO 3 Junction Box Tata Suara ( JBTS-3 ) 1.00 unit DAN SETARA LAINYA

Instalasi dari JBTS ke speaker & Volume control menggunakan INSTALASI MENGUNAKAN PVC CONDUIT HIGH IMPACT 20mm 4 NYMHY 2 x 1,5 mm2 dalam condouit PVC 20 mm 8.00 titik ACCESSORIES DAN PEMASANGANNYA

II.5.1.7 PEKERJAAN TELEPON BRAND PANASONIC SERIES

II.5.1.7.1 Peralatan Utama INSTALASI MENGUNAKAN KABEL ITC DAN MULTICORE SUPREME , KABEL METAL,KABELINDO,TRANKA

1 Operator console 1.00 set 2 Instalasi + alat bantu 1.00 ls 3 Key Phone Controller 1.00 unit

II.5.1.7.2 Instalasi pengkabelan 1 BRAND PANASONIC SERIES

2 Instalasi dari MDF-TP ke IDFT.1 DAN SETARA LAINNYA ● UTP Cat.6 AMP 1.00 ttk Instalasi dari MDF-TP ke IDFT.2

3 ● UTP Cat.6 AMP 1.00 ttk a. LANTAI DASAR SUPREME , KABEL METAL,KABELINDO,TRANKA

1 Kabel dari IDF-T1 ke JB-T1.1 DAN SETARA LAINNYA - UTP Cat.6 AMP 2.00 ttk

Pengadaan dan pemasangan peralatan utama sesuai dengan spesifikasi teknis dan gambar

Instalasi dari MDFTS ke JBTS.1 menggunakan NYMHY 4 x 1,5 mm2

Instalasi dari MDFTS ke JBTS.2 menggunakan NYMHY 4 x 1,5 mm2

Pengadaan dan pemasangan peralatan utama sesuai dengan spesifikasi teknis dan gambar

Pekerjaan instalasi pengkabelan sesuai dengan spesifikasi teknis dan gambar

Page 8: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SPESIFIKASI BAHAN SAT

b. LANTAI SATU 1 Kabel dari IDF-T2 ke JB-T2.1

● UTP Cat.6 AMP 18.00 ttk

II.5.1.7.3 Instalasi Telephon Dalam Gedung BRAND MENGUNAKAN PANASONIX SERI KX a. LANTAI DASAR

1 Outlet telephon 3.00 bh BRAND MENGUNAKAN PANASONIX SERI KX 2 IDFTP Kap 100" 1.00 unit INSTALASI KABEL MENGUNAKAN ITC CABLE 3 JBT-1.1 Kap 50" 1.00 unit DALAM PVC CONDUIT 20mm HIGH IMPACT 4 Instalasi dari masing-masing JBTP ke outlet telephon menggunakan HANDSET TELEPON MENGUNAKAN PANASONIC

ITC 2 x 2 x 0,6 mm dalam condouit PVC 20 mm 3.00 titik DAN YANG SETARA LAINYA b. LANTAI SATU

1 Outlet telephon 17.00 bh 2 IDFTP Kap 100" 1.00 unit 3 JBT-1.1 Kap 50" 1.00 unit 4

ITC 2 x 2 x 0,6 mm dalam condouit PVC 20 mm 17.00 titik BRAND MENGUNAKAN PANASONIX SERI KX Handset Telepon by Onwer

II.5.1.8 SCOPE PEKERJAAN KABEL DATA HANYA PADA INSTALASI MENGIKUTI OUTLET FLOORING POWER STOPKONTAK DATA , DAN TELEPON

II.5.1.8..1 Instalasi Jaringan INSTALASI KABEL DATA

1 Patch Panel Lt.1 38.00 m TYPE YANG DIGUNAKAN CAT.6 2 Patch Panel Lt.2 48.00 m INSTALASI MENGUNAKAN PVC CONDUIT 20mmII.5.1.8..2 LANTAI DASAR 1 Instalasi kabel Cat.6 dari Patch Panel Lt.2 ke Switch-1.1 50.00 m MENGUNAKAN KABEL PANDUIT ,BELDEN DAN SETARA 2 Patch Panel Cat. 6 1.00 unit TYPE YANG DIGUNAKAN CAT.6 3 Switch 24 Port 1.00 unit INSTALASI MENGUNAKAN PVC CONDUIT 20mm 4 Rack 1.00 unit 5 Outlet Data Cat.6 2.00 bh 6 4.00 titik

II.5.1.8..3 LANTAI SATU 1 Instalasi kabel Cat.6 dari Patch Panel Lt.2 ke Switch-2.1 60.00 m INSTALASI KABEL DATA 2 Patch Panel Cat. 6 1.00 unit TYPE YANG DIGUNAKAN CAT.6 3 Switch 24 Port 1.00 unit INSTALASI MENGUNAKAN PVC CONDUIT 20mm 4 Rack 1.00 unit 5 Outlet Data Cat.6 15.00 bh 6 17.00 titik

II.5.1.9 PEKERJAAN CCTV SYSTEM II.5.1.9.1 Peralatan Utama 1 Falco IP Soft Web Video Ent 1.00 lot BRAND AVTECH , SKYNET , IMPACT , DAN SETARA LAINNYA 2 Soft Millstone Integration with Camera IP 1.00 lot INSTALASI MENGUNAKAN PVC CONDUIT 20mm 3 Patch Panel 24 Port 1.00 lot 4 Monitoring LCD 32" 1.00 lot COAXIAL KABEL 5 PC Monitoring Control Hardisk Minimum 2 Ghz , 524 GB , 2GB 1.00 lot

UPS Battery Back Up Pada Monitoring Room

6 Instalation from Patch Panel to Server 1.00 lot

II.5.1.9.2 LANTAI DASAR BRAND AVTECH , SKYNET , IMPACT , DAN SETARA LAINNYA 1 Dome Camera 3.00 unit INSTALASI MENGUNAKAN PVC CONDUIT 20mm 2 Dome Camera Rotation 2.00 unit COAXIAL KABEL 3 Instalasi Kabel UTP Cat.6 5.00 ttk

PVC Conduit 20mm High Impact Conector dan Accessories RJ 45 Data

II.5.1.9.3 LANTAI SATU 1 Dome Camera 1.00 unit 2 Dome Camera Rotation 4.00 unit 3 Instalasi Kabel UTP Cat.6 5.00 ttk BRAND AVTECH , SKYNET , IMPACT , DAN SETARA LAINNYA

PVC Conduit 20mm High Impact INSTALASI MENGUNAKAN PVC CONDUIT 20mm Conector dan Accessories RJ 45 Data COAXIAL KABEL

II.5.1.9.4 Area Luar 1 PTZ Camera 2.00 unit 2 Instalasi Kabel UTP Cat.6 2.00 ttk BRAND AVTECH , SKYNET , IMPACT , DAN SETARA LAINNYA

PVC Conduit 20mm High Impact

Instalasi dari masing-masing JBTP ke outlet telephon menggunakan

Instalasi kabel data Cat.6 dari Ruang Server ke Masing-masing Patch Panel

Pemasangan kabel data dari Switch ke Outlet termasuk Trunking, Conduit dan aksesoris pendukung lainnya

Pemasangan kabel data dari Switch ke Outlet termasuk Trunking, Conduit dan aksesoris pendukung lainnya

Page 9: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SPESIFIKASI BAHAN SAT

II.5.1.9.5 TEST COMMISIONING & TRAINING PEK. ELEKTRONIK 1.00 LS

Page 10: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

II PEKERJAAN GEDUNG SPO II.6 PEK. TATA UDARA ( AIR CONDITIONING ) GEDUNG SPO

II.6.1 PERALATAN UTAMA

II.6.1.1 LANTAI DASAR

a. Unit

● AC Split Wallmounted 1PK 1.00 unit BRAND UNIT AC SPLIT WALLMOUNTED

Type Air Cool ,Indoor Type : Roof c/w support SHARP ,LG ,PANASONIC , DAIKIN

Outdoor Type : Cooling Fan DAN SETARA LAINNYA

● AC Ceilling Cassette 2 PK 5.00 unit

Type Air Cool ,Indoor Type : Roof c/w support BRAND UNIT AC CEILLING CASSETTE

Outdoor Type : Cooling Fan SHARP ,LG ,PANASONIC,DAIKIN

● AC Ceilling Cassette 6 PK VRV System DAN SETARA LAINNYA

Type Air Cool ,Indoor Type : Roof c/w support 1.00 unit

Outdoor Type : Cooling Fan

b. Instalasi Pipa AC

● Instalasi Pipa AC Split Walmounted 1.00 lot INSTALASI MENGUNAKAN PIPA TEMBAGA

Pipa Refigrant 1/4 dan 3/4 STANDART PIPING AC UNIT

c/w Insulation termal condensation

support hanger & Accessories

● Instalasi Pipa AC Ceilling Cassette 5.00 lot DAN INSULATION CONDENSASI

Pipa Refigrant 3/4 dan 5/8

c/w Insulation termal condensation

support Hanger & Accessories

● Instalasi Pipa AC Ceilling Cassette VRV System 1.00 lot

Pipa Refigrant 5/8 dan 11/4

c/w Insulation termal condensation

support Hanger & Accessoriess

c. Instalasi Pipa Drain AC

● Pipa Drain AC 1.5" 65.00 m

● Pipa Drain AC 1" 47.00 m

Instalasi Pipa Drain c/w Insulation Condensasi

II.6.1.2 LANTAI SATU

a. Unit BRAND UNIT AC CASSETTE

● AC Split Wallmounted 1PK 3.00 unit YORK ,AXON ,FUJIAIR,DAIKIN

Type Air Cool ,Indoor Type : Roof c/w support DAN SETARA LAINNYA

Outdoor Type : Cooling Fan

● AC Split Wall Mounted 2 PK Battery Room & Server Room 2.00 unit INSTALASI MENGUNAKAN PIPA TEMBAGA

Type Air Cool ,Indoor Type : Roof c/w support STANDART PIPING AC UNIT

Outdoor Type : Cooling Fan DAN INSULATION CONDENSASI

● AC Split Wall Mounted 1.5 PK Battery Room & Server Roo 2.00 unit

Type Air Cool ,Indoor Type : Roof c/w support

Outdoor Type : Cooling Fan

● AC Ceilling Cassette 2 PK System

Type Air Cool ,Indoor Type : Roof c/w support 2.00 unit

Outdoor Type : Cooling Fan

● AC Ceilling Cassette 6 PK VRV System

Type Air Cool ,Indoor Type : Roof c/w support 1.00 unit

Outdoor Type : Cooling Fan

b. Instalasi Pipa AC

● Instalasi Pipa AC Split Walmounted 7.00 lot

Pipa Refigrant 1/4 dan 3/4

c/w Insulation termal condensation

support hanger & Accessories

● Instalasi Pipa AC Ceilling Cassette 2.00 lot

Pipa Refigrant 3/4 dan 5/8

c/w Insulation termal condensation

support Hanger & Accessories

Page 11: 02 II 1_7 Panduan Arsi Ged Spo

NO URAIAN PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

● Instalasi Pipa AC Ceilling Cassette VRV System 1.00 lot

Pipa Refigrant 5/8 dan 11/4

c/w Insulation termal condensation

support Hanger & Accessoriess

c. Instalasi Pipa Drain AC

● Pipa Drain AC 2.5" 32.00 m

● Pipa Drain AC 1.5" 17.00 m

Instalasi Pipa Drain c/w Insulation Condensasi

d. Exhaust Fan 8.00 bh

Exhaust Fan Cap.100 cfm

Type Ceiling Mounted

● Instalasi Exhaust Fan 4.00 ttk

II.6.1.3 Test Commisioning & Training 1.00 lot

Page 12: 02 II 1_7 Panduan Arsi Ged Spo

NO ITEM PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

II PEKERJAAN GEDUNG SPO

II.7 PEKERJAAN OPERATION ROOM DAN DATA CENTER ROOM

II.7.1 RAISED FLOOR BATTERY & SERVER ROOM

1 Raised Floor Panel 17.00 m BRAND HPL Type Designed for Data Center PANASONIC,GOLBALD,DONN USA FS - 1000 HE Special , Concrete c/w Pedestal & Stringer Equipment Complete Laminated Antistatic HPL to prevent static built - up Applicable for earthing / grounding process Resistant to heavy rolling load for equipment Resistant to eartquake at particular level Sited on precission die-cast alumunium pedestal head Supported by strengthened c/w steel stringer Easy Accessibillity ISO 9001:2000 and 14001 : 2004 Certificate

2 Ramp 1000 x 750 mm 1.00 set Dudukan RamWay terbuat dari besi siku 50 3 Fascia Full dengan system penyambungan las 4 Veribor 1.00 set Alas Ramway terbuat dari bahan vinil karet 5 Grill ( Trade In ) tahan api 2 jam ( Fire Rated 2 hour ) 6 Thermal Insulation armaflex (under raised floor) 7 Thermal Insulation armaflex (above ceiling)

8 Tile Lifter

II.7.2 SUPRESSION SYSTEM BY GASES PROTECTION II.7.2.1 HFC - 125 / FE - 25

SYSTEM MONITORING 1 Panel Control HFC -125 1.00 ea

Battery back up 17 Ah ,Back Up Time 24 Hour ,for Electrical Loses

II.7.1.2 DATA CENTER ROOM a. SYSTEM HARD WARE

1 Gas FE -25 / HFC - 125 18.00 kg BRAND 2 100 lbs ( 44 L) HFC -125 , GCA Container Assy 80mm valve up 1.00 ea FIKE ( DUPPONT ) ,SAFETY HITECH ( BOC )

Container with : Presure Gauge ,Agent Release Module ( ARM ) DAN BRAND SETARA LAINNYA No GCA ,No LLI ,Vitalic Coupling ,with Nipple and Mounting Straps

3 GCA ( Gas Catride Actuator ) c/w Junction Box 1.00 ea 4 Low Presure Switch 20 - 1000 Lbs 1.00 ea 5 Nozzle 1800 , 10mm ( 3/8") 3.00 ea 6 Sign Lamp DNE / Do Not Enter 1.00 ea 7 Sign Lamp Do Not Enter HFC - 125 1.00 ea 8 Sign Lamp " Gas Discharge " Evacuate 1.00 ea 9 Sign System Abort " Push And Hold " 1.00 ea 10 Sign System " RELEASE " , Manual Release System 1.00 ea

b. SYSTEM MONITORING 1 Module Relay ( EM - 1RI ) 1.00 ea 2 Module Releasing ( EM - 1RMI ) 3.00 ea 3 Module Supervised Control ( EM 1SR ) 4.00 ea 4 Module Monitor ( EM - 1SM ) 1.00 ea 5 Photo Smoke Sensor 2.00 ea 6 Ion Sensor 2.00 ea 7 Base for Sensor Detection 4.00 ea 8 Alarm Bell Device 1.00 ea 9 Horn Strobe Lamp ,Selectable ,Wallmounted Type 1.00 ea 10 Switch MR/A Manual Release & Abort Dual Actions 2.00 ea 11 Intelegent Pull Station 1.00 ea 12 Junction Box for Module 1.00 ea

c. Instalation & Piping INSTALASI 1 Instalation & Piping use Black Stell SCH 40 c/w Painting ,and Finishi 1.00 lot TWISTED SHIELDIED AWG 18

Cable Instalation Use Twisted Shieldied AWG 18 ,and NYA 2 x 1.5mm STANDART SNI DAN 4 BESAR c/w PVC Conduit High Impact 20mm , and Finishing SUPREME,KABEL METAL,KABELINDO,TRANKA

d. Testing Commisioning 1 Testing Commisioning c/w Actual Real Test Fire use 1.00 lot

Nitrogen Gases

And Simulataion

II.7.3 ACCESS CONTROL WEB BASE POE SYSTEM TCP / IP ACCESS CONTROL POE SYSTEM

Page 13: 02 II 1_7 Panduan Arsi Ged Spo

NO ITEM PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

II.7.3.1 OPERATION ROOM AND DATA CENTER ROOM 1 TCP / IP 2 Door Controller c/w unit PSU 3.0A 1.00 ea BRAND 2 Print and Finger Print c/w LCD Reader 2.00 ea FALCO TCP / IP WEB BASE 3 Magnetic Lock 600 lbs ( Electromacnetic POE ) 2.00 ea GE TCP / IP WEB BASE 4 ZL Bracket 2.00 ea BIO SCRYPT TCP / IP WEB BASE 5 Push Button Switch 2.00 ea 6 Mechanical Overide Switch 2.00 ea 7 Emergency BreakGlass 2.00 ea 8 Door Magnetic Contact 2.00 ea 9 Back Up Battery 12 VAC 7Am 2.00 ea 10 Power Supply POE System 1.00 ea 11 Enclouser Metal Box 2.00 ea 12 Transformer 2.00 ea 13 Swith Hub POE System 1.00 ea

● Soft IP Web ● Soft IP Time Pro ( For 24 Hour Attendance ) ● Soft IP Fire Alarm ( For Integrated with Fire Alarm System And ● Suppression System )

a. Instalation 1 Instalation use UTP Cat.6 and Twisted Shieldied AWG 18 1.00 lot 4 BESAR PRODUSEN KABEL

c/w PVC Conduit High Impact 20mm SUPREME,KABEL METAL,KABELINDO 2 TCP / IP 2 Door Controller c/w unit PSU 1.5A 1.00 ea 3 Print and Finger Print c/w LCD Reader 1.00 ea 4 Magnetic Lock 600 lbs ( Electromacnetic POE ) 1.00 ea 5 ZL Bracket 1.00 ea 6 Push Button Switch 1.00 ea 7 Mechanical Overide Switch 1.00 ea 8 Emergency BreakGlass 1.00 ea 9 Door Magnetic Contact 1.00 ea 10 Back Up Battery 12 VAC 7Am 1.00 ea 11 Power Supply POE System 1.00 ea 12 Enclouser Metal Box 1.00 ea 13 Transformer 1.00 ea 14 Swith Hub POE System 1.00 ea

b. Instalation 1 Instalation use UTP Cat.6 and Twisted Shieldied AWG 18 1.00 lot

c/w PVC Conduit High Impact 20mm

II.7.4 UPS SYSTEM ( UNTERRITEBLE POWER SYSTEM ) II.7.4.1 POWER ROOM DATA CENTER

1 UPS System 1.00 ea NEWAVE , EATON ,POWER WARE Type : Power Scale 20 KVA Single Defent c/w Paralel Kitz and Accessories Equipment Battery Back Up Time 20 mnt ( At Power Down ) 1.00 ea BRAND

2 Instalation And Testing Commisioning 1.00 lot SUPREME,KABELINDO,KABEL METAL,TRANKA

TOTAL PEKERJAAN UPS DAN ITX SYSTEM II.7.5 ELECTRICAL SYSTEM

II.7.5.1 ELECTRICAL PANEL 1 Panel EMSB / MSB Power Room for Data Center 1.00 set PANEL STANDART SNI

and Operation Room Incoming MCCB 100 A ,TPN , 25 KA DENGAN CAT POWDER COATING ATAU YG SETARA LED Lamp RST 2 A Surge Device ( SD ) 100A PERALATAN PANEL / PANEL EQUIPMENT Digital Power Meter ME ,ABB,TELEMECANIC DAN SETARA LAINYA KWH and CT Fuse Outgoing 40A DB-Raw Outgoing 63A ITX and UPS 20KVA Outgoing 63A ITX and UPS 20KVA ( Future )

2 Panel DB-Raw For Lighting Operation And Data Center Room 1.00 set Incoming MCCB 40A TPN Outgoing MCB 10 A x 10

3 Panel PDU ( Distribution Panel For Operation Room & 1.00 set Data Center Room )

Page 14: 02 II 1_7 Panduan Arsi Ged Spo

NO ITEM PEKERJAAN VOLUME SAT SPESIFIKASI BAHAN

Incoming MCCB 40A TPN LED Lamp RST 2A Digital Power Meter Outgoing MCB / 1Ph 16A x 21

4 Panel UMSB 1.00 set Incoming MCCB 63A x 2 LED RST 2A Outgoing MCCB 40A x 2

II.7.5.2 CABLING POWER 1 NYY 4 X 70mm + NYA 1 x 50mm 35.00 m

for EMSB / MSB KABEL STANDART PLN DAN SNI 2 NYY 4 x 16mm + NYA 1 x 10mm 10.00 m 4 BESAR KABEL

for DB-Raw KABEL METAL,KABELINDO,SUPREME ,TRANKA 3 NYY 4 x 25mm + NYA 1 x 16mm 10.00 m

for ITX incoming 4 NYY 4 x 25mm + NYA 1 x 16mm 10.00 m

for UPS Incoming 5 NYY 4 x 25mm + NYA 1 x 16mm 12.00 m

Outgoing UPS 6 NYY 4 x 25mm + NYA 1 x 16mm 12.00 m

Outgoing from UMSB to PDU Panel 7 NYY 3 x 4 mm

form PDU Panel to Outlet Legrand 1P/16 A c/w Legrand 360.00 m Oulet Male & Female x 21 Outlet

II.7.5.3 Armature Lighting 1 RM 2 x 36 W Reflector Mirror 2.00 set PERALATAN ARMATURE 2 RM 2 x 36 W Reflector Mirror c/w Nicad Battery 2.00 set BRAND SPECTRA ,CRYSTAL LITE,LUMENT LITE 3 Outlet Stop kontak 1P/ 4 Gang for Operation 12.00 set

Room & Data Center Room 4 Instalasi Lampu Operation Room & Data Center Room 18.00 set PERALATAN ELECTRICAL 5 Instalasi Stop kontak outlet 12.00 set CLIPSAL , EGA , MK 6 Saklar Double 3.00 set PVC HIGH IMPACT 20 mm 7 Instalasi Saklar 4.00 set II.7.5.4 Cabel Tray System 1 Cable Tray Power 300 x 100 mm 28.00 m KABEL TRAY 2 Cable Tray Power 200 x 100mm 4.00 m BRAND TRIAS ,TRUNKING,SPECTRA 3 Tee / Elbow dan Equipment tambahan 5.00 set 4 Support And Hanger 1.00 lot

Support Tray Power / 1.5mtr 5 Cablefoil Data Tray 200 x 50mm 42.00 m 6 Tee / Elbow dan Equipment tambahan 5.00 set 7 Support And Hanger 1.00 lot

Support Tray Data / 1.5mtr

Page 15: 02 II 1_7 Panduan Arsi Ged Spo

DENGAN CAT POWDER COATING ATAU YG SETARA