01_PPT Lawe Sikap rev04
-
Upload
putri-hidayati -
Category
Documents
-
view
416 -
download
0
Transcript of 01_PPT Lawe Sikap rev04
![Page 1: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/1.jpg)
LOKASI :
Desa Batu Mbulan I, Kecamatan Babussalam, Kabupaten Aceh
Tenggara, Provinsi Aceh
Review Basic Design dan Detailed Engineering Design Pembangkit Listrik Tenaga Mini Hidro (PLTM) LAWE SIKAP 2 x
3.5 kW
PT. BANGUN NUSANTARA ENGINEERING
![Page 2: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/2.jpg)
REVIEW HIDROLOGI
![Page 3: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/3.jpg)
Analisis Hidrologi (Data Hidro
Klimatologi)STASIUN KLIMATOLOGI
(Studi Terdahulu)
1. Sta. Blangkejeren
(Rentang Tahun Tidak ada)
STASIUN KLIMATOLOGI
(Studi Review)
1. Sta. Blangkejeren (1994-2006)
STASIUN CURAH HUJAN
(Studi Terdahulu)
1. Sta. Blangkejeren (1980-1990)
2. Sta. BPP. Badar (1973-2000)
3. Sta. DPTPH (2004-2012)
STASIUN CURAH HUJAN
(Studi Review)
1. Sta. BPP. Badar (2002-2013)
2. Sta. Laeaonum (2002-2013)
3. Sta. Lawe Alas (2002-2013)
Hujan representative tdk ada Analisis Poligon
Theissen
Hujan representative Dilengkapi dg Analisis
Poligon Theissen
![Page 4: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/4.jpg)
Poligon
Theissen
Review
Analisis
Review Studi
Pada Analisis Poligon
Theissen
![Page 5: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/5.jpg)
DAS PLTM LAWE SIKAP
![Page 6: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/6.jpg)
PLTM Lawe Sikap
No Periode Ulang t
DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM
(mm)
( T/ Tahun ) DISTRIBUSI NORMAL DISTRIBUSI GUMBEL TP 1
1 2 0.000 58.53 56.76
2 5 0.842 69.22 71.40
3 10 1.282 74.81 81.09
4 15 1.501 77.59 86.56
5 20 1.645 79.42 90.39
6 25 1.751 80.76 93.34
7 50 2.054 84.61 102.42
8 100 2.326 88.07 111.44
Sumber : Hasil Perhitungan
No Periode Ulang t
DISTRIBUSI CURAH HUJAN HARIAN MAKSIMUM
(mm)
( T/ Tahun ) PEARSON TP III LOG PEARSON TP III
1 2 0.000 58.32 57.95
2 5 0.842 69.15 69.26
3 10 1.282 74.93 75.52
4 15 1.501 77.85 78.71
5 20 1.645 79.77 80.83
6 25 1.751 81.19 82.41
7 50 2.054 85.29 86.96
8 100 2.326 89.00 91.11
Sumber : Hasil Perhitungan
Review Studi &
Design Analisa FS
DISTRIBUSI GUMBEL TIPE I
DISTRIBUSI LOG PEARSON TIPE III
Hujan
Rencana
![Page 7: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/7.jpg)
Hujan Bulanan
![Page 8: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/8.jpg)
Metode
JAN FEB MAR APR MEI JUN JUL AGS SEP OKT NOV DES Jumlah
2002 8% 9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41
2003 17% 9.34 7.28 4.99 5.52 9.48 5.98 4.66 6.22 8.37 7.65 9.28 11.30 90.06
2004 25% 7.09 7.05 4.86 5.51 8.15 4.69 4.43 5.40 4.66 6.91 9.14 8.98 76.88
2005 33% 5.92 6.47 4.75 4.28 7.79 4.00 4.19 5.30 4.41 6.83 8.65 7.47 70.07
2006 42% 5.62 6.04 4.70 4.06 5.50 3.72 3.31 3.95 4.33 5.94 8.36 6.04 61.56
2007 50% 5.48 5.09 4.52 3.54 4.19 3.32 3.07 3.92 4.29 5.88 8.13 6.04 57.48
2008 58% 5.00 5.03 4.46 3.35 3.60 3.23 2.43 3.62 3.77 4.47 7.61 5.42 51.99
2009 67% 4.60 4.47 3.61 3.31 2.85 2.91 1.80 3.10 3.73 4.01 6.90 4.00 45.28
2010 75% 4.57 4.41 3.31 3.25 2.82 1.75 1.48 2.50 3.36 3.76 6.36 3.92 41.46
2011 83% 4.10 4.32 2.71 2.49 2.53 1.63 1.30 2.19 2.68 3.37 5.71 3.32 36.35
2012 92% 2.95 3.31 2.23 2.08 2.26 1.15 0.83 1.82 2.12 1.97 5.36 3.22 29.29
2013 100% 2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90
5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18 57.39
9.71 8.14 5.14 8.09 10.45 9.99 7.57 6.39 9.60 9.25 9.54 11.55 105.41
2.93 3.04 1.90 1.55 1.22 1.03 0.72 1.02 1.60 1.93 3.00 2.96 22.90
4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56 38.39
3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24 30.70
Sumber : Hasil Perhitungan
GENERATING DEBIT DAS LAWE SIKAPPLTM
Tahun
Rata-rata
Max
Min
80%
90%
Prob ( % )
LAWE SIKAP Mock
DEBIT ( m3/dt )
JAN FEB MARET APR MEI JUNI JULI AGS SEPT OKT NOV DES
Debit Rata-rata 5.61 5.39 3.93 3.92 5.07 3.62 2.98 3.79 4.41 5.16 7.34 6.18
Q 80% 4.29 4.36 2.95 2.79 2.65 1.68 1.37 2.31 2.95 3.53 5.97 3.56
Q 90% 3.18 3.51 2.33 2.16 2.31 1.25 0.92 1.89 2.23 2.25 5.43 3.24
Q Desain 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2
0.00
2.00
4.00
6.00
8.00
De
bit
( m
3/d
t )
![Page 9: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/9.jpg)
ANALISA DEBIT ANDAL
(Ketersediaan Air) GENERATING DATA DEBIT
PLTM LAWE SIKAP
Stasiun Metode MOCK Metode NRECA
NOProb. QFDC Ecoflow QDesain QFDC Ecoflow QDesain
( % ) (m3/dt) (m3/dt) (m3/dt) (m3/dt) (m3/dt) (m3/dt)
1 5 9.77 0.48 9.29 9.02 0.49 8.54
2 10 8.61 0.48 8.13 8.14 0.49 7.65
3 15 7.67 0.48 7.19 7.37 0.49 6.88
4 20 6.89 0.48 6.41 6.71 0.49 6.22
5 25 6.26 0.48 5.78 6.16 0.49 5.67
6 30 5.73 0.48 5.26 5.72 0.49 5.23
7 35 5.30 0.48 4.82 5.37 0.49 4.88
8 40 4.93 0.48 4.45 5.09 0.49 4.60
9 45 4.61 0.48 4.13 4.87 0.49 4.38
10 50 4.33 0.48 3.85 4.68 0.49 4.19
11 55 4.07 0.48 3.59 4.51 0.49 4.02
12 60 3.82 0.48 3.35 4.32 0.49 3.83
13 65 3.58 0.48 3.11 4.11 0.49 3.62
14 70 3.33 0.48 2.86 3.84 0.49 3.36
15 75 3.06 0.48 2.58 3.52 0.49 3.03
16 80 2.75 0.48 2.28 3.14 0.49 2.65
17 85 2.39 0.48 1.91 2.68 0.49 2.19
18 90 1.95 0.48 1.48 2.15 0.49 1.66
19 95 1.42 0.48 0.94 1.57 0.49 1.08
20 98 1.04 0.48 0.56 1.21 0.49 0.72
Sumber : Hasil Perhitungan
Analisis Review Studi
& Design
ANALISIS DEBIT ANDAL
(Ketersediaan Air)
![Page 10: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/10.jpg)
ANALISA DEBIT ANDAL
(Ketersediaan Air) Analisa
Terdahulu
ANALISA DEBIT ANDAL
(Ketersediaan Air)
![Page 11: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/11.jpg)
Analisis Terdahulu ( Luas DAS =
65 Km2 )
Debit Banjir
Rencana
Analisis Review Design ( Luas DAS =
79.15 Km2 )RESUME PERHITUNGAN DEBIT BANJIR RENCANA DAS
LAWE SIKAP
PLTM LAWE SIKAP - PROVINSI ACEHNo DEBIT BANJIR UNIT HIDROGRAF SNYDER UNIT HIDROGRAF NAKAYASU
1 Q 2 57.06 62.13
2 Q 5 71.77 78.16
3 Q 10 81.52 88.77
4 Q 25 93.83 102.17
5 Q 50 102.96 112.11
6 Q 100 112.03 121.99
Sumber : Hasil Perhitungan
![Page 12: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/12.jpg)
REVIEW POTENSI DAYA DAN PRODUKSI ENERGI
FESIBILITY STUDY DESIGN• DEBIT DESIGN (Studi terdahulu)
Berdasarkan FS Debit Design adalah 6 m3/det pada Probabilitas 29.77 %.
• HEAD GROSS DAN HEAD NETHead gross berdasarkan FS adalah 131.54 (berdasarkan laporan studi terdahulu) dengan Net Head pada 130.17 jika dan berdasarkan gambar disain gross head adalah 135.67 m.
• KAPASITAS DAYAKapasitas daya berdasarkan FS adalah 7 MW (2x3.5 MW)
Berikut Data Optimasi Daya dan Kelayakan dengan berbagai Debit berdasarkan FS
![Page 13: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/13.jpg)
Grafik Optimasi Daya dan Hasil Studi Terdahulu dengan berbagai Debit
Berdasarkan Studi Terdahulu dengan debit 6 m3/det dan head net131.17 maka kapasitas daya yang dihasilkan adalah 7 MW
Terdapat perbedaan head gross pada gambar desain yang ada dandata laporan hidrologi sebelumnya.
![Page 14: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/14.jpg)
ANALISA REVIEW DESIGN
• DEBIT DESIGNBerdasarkan analisa yang telah dilakukan debit design ditentukan adalahsebesar 6.2 m3/det pada probabilitas 18%Kenaikan debit menjadi 6.2 m3/det dilakukan untuk mengejar kapasitas2x3.5 MW, karena dengan debit berdasarkan FS ( 6 m3/det) dan gross head135.67 (FS) tidak mencukupi kapasitas 7 MW (2x3.5 MW), kapasitas yangdiperoleh hanya 6.76 MW (2x3.38 MW).
• HEAD GROSS DAN HEAD NETAnalisa Head gross yang diperoleh adalah sebesar 136.67 M dengan Headnet 132.37 m
• KAPASITAS DAYA DAN ENERGIKapasitas daya terpasang adalah 7 MW (2x3.5 MW) dengan produksienergi tahunan 34,742.52 MWh
![Page 15: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/15.jpg)
Long section PLTM Lawe Sikap
Dalam hal ini penstock tidak perlu menggunakan surge tank.
![Page 16: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/16.jpg)
Terjadi kenaikan Headpond sebesar 1.36 m, sehingga gross head naik 1.36m dari gross head sebelumnya menjadi 136.67 .
![Page 17: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/17.jpg)
Perhitungan Produksi Energi Tahunan dan Alternatif Kapasitas DayaAlternatif 1 : Debit Design 6.2 m3/det
Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debitminimum turbin. Berdasarkan data hidrologi ini diperkirakan terjadi diantara bulanJuni, Juli dan Agustus dalam 1 Tahun. Dan kondisi ini dapat dimanfaatkan untukmaintenance ataupun perbaikan.
DEBIT DESAIN: : 6.20 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3530 kW
DEBIT DESAIN/UNIT : 3.10 m3/det 2 X 3.53 MW
DEBIT MINIMUM : 1.24 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 61841 MWh
TINGGI JATUHAN : 132.37 m 61.841 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
2 10 8.14 0.49 7.65 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
3 15 7.37 0.49 6.88 6.20 3.10 0.92 0.95 1541.01 3.10 0.92 0.95 1541.01
4 20 6.71 0.49 6.22 6.20 3.10 0.92 0.94 1524.79 3.10 0.89 0.94 1475.07
5 25 6.16 0.49 5.67 5.67 2.84 0.88 0.94 1334.81 2.84 0.86 0.94 1304.47
6 30 5.72 0.49 5.23 5.23 2.62 0.85 0.94 1188.88 2.62 0.83 0.94 1160.90
7 35 5.37 0.49 4.88 4.88 2.44 0.82 0.93 1058.62 2.44 0.81 0.93 1045.71
8 40 5.09 0.49 4.60 4.60 2.30 0.80 0.93 974.28 2.30 0.79 0.93 962.10
9 45 4.87 0.49 4.38 4.38 2.19 0.79 0.93 915.74 2.19 0.78 0.93 904.15
10 50 4.68 0.49 4.19 4.19 2.10 0.77 0.93 854.19 2.10 0.77 0.93 854.19
11 55 4.51 0.49 4.02 4.02 2.01 0.76 0.92 798.92 2.01 0.76 0.92 798.92
12 60 4.32 0.49 3.83 3.83 1.92 0.75 0.92 751.89 1.92 0.74 0.92 741.87
13 65 4.11 0.49 3.62 3.62 1.81 0.73 0.92 690.74 1.81 0.73 0.92 690.74
14 70 3.84 0.49 3.36 3.36 1.68 0.71 0.92 623.27 1.68 0.72 0.92 632.05
15 75 3.52 0.49 3.03 3.03 3.03 0.91 0.94 1476.38 - - - -
16 80 3.14 0.49 2.65 2.65 2.65 0.85 0.94 1202.46 - - - -
17 85 2.68 0.49 2.19 2.19 2.19 0.79 0.93 913.88 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.71 0.92 617.42 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 19,549.31 15,193.21
PRODUKSI ENERGI TAHUNAN 34,742.52 MWh CF : 0.56
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.43 MWh
ENERGI TERJUAL KE PLN 33,957.09 MWh
Turbin 1 Turbin 2NO
%
PROBABILITYQ PROB
Q
RESIDUALQ PROB-Q RES Q OPERASI
![Page 18: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/18.jpg)
Alternatif 2: Debit Design 6 m3/det
Pada probabilitas 95% dan 100 % karena debit yang ada berada dibawah debit minimumturbin.
Berdasarkan Analisa Review data hidrologi ini diperkirakan terjadi pada bulan Juni, Julidan Agustus dalam 1 tahun.
DEBIT DESAIN: : 6.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 3423 kW
DEBIT DESAIN/UNIT : 3.00 m3/det 2 X 3.423 MW
DEBIT MINIMUM : 1.20 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 59964 MWh
TINGGI JATUHAN : 132.63 m 59.964 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
2 10 8.14 0.49 7.65 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
3 15 7.37 0.49 6.88 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
4 20 6.71 0.49 6.22 6.00 3.00 0.92 0.95 1494.23 3.00 0.92 0.95 1494.23
5 25 6.16 0.49 5.67 5.67 2.84 0.90 0.95 1382.38 2.84 0.90 0.95 1382.38
6 30 5.72 0.49 5.23 5.23 2.62 0.86 0.95 1218.05 2.62 0.86 0.95 1218.05
7 35 5.37 0.49 4.88 4.88 2.44 0.84 0.94 1098.26 2.44 0.84 0.94 1098.26
8 40 5.09 0.49 4.60 4.60 2.30 0.82 0.94 1011.36 2.30 0.82 0.94 1011.36
9 45 4.87 0.49 4.38 4.38 2.19 0.80 0.94 939.14 2.19 0.80 0.94 939.14
10 50 4.68 0.49 4.19 4.19 2.10 0.78 0.93 866.99 2.10 0.78 0.93 866.99
11 55 4.51 0.49 4.02 4.02 2.01 0.77 0.93 819.84 2.01 0.77 0.93 819.84
12 60 4.32 0.49 3.83 3.83 1.92 0.76 0.93 771.71 1.92 0.76 0.93 771.71
13 65 4.11 0.49 3.62 3.62 1.81 0.74 0.93 709.20 1.81 0.74 0.93 709.20
14 70 3.84 0.49 3.36 3.36 1.68 0.72 0.92 633.29 1.68 0.72 0.92 633.29
15 75 3.52 0.49 3.03 3.03 1.52 0.70 0.92 556.85 1.52 0.70 0.92 556.85
16 80 3.14 0.49 2.65 2.65 2.65 0.87 0.92 1206.93 - - - -
17 85 2.68 0.49 2.19 2.19 2.19 0.80 0.94 937.24 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.72 0.92 627.35 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 - - - - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 18,755.50 15,983.98
PRODUKSI ENERGI TAHUNAN 34,739.48 MWh CF : 0.58
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 347.39 MWh
ENERGI TERJUAL KE PLN 33,954.09 MWh
Turbin 1 Turbin 2NO
%
PROBABILITYQ PROB
Q
RESIDUALQ PROB-Q RES Q OPERASI
![Page 19: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/19.jpg)
Alternatif 3: Debit Design 5 m3/det
Pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin. terjadi sekitar 2 bulan, yaitu pada bulan Juli dan Agustus dalam 1 Tahun, untuk Downtime.
DEBIT DESAIN: : 5.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2822 kW
DEBIT DESAIN/UNIT : 2.50 m3/det 2 X 2.822 MW
DEBIT MINIMUM : 1.00 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 49443 MWh
TINGGI JATUHAN : 131.23 m 49.443 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
2 10 8.14 0.49 7.65 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
3 15 7.37 0.49 6.88 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
4 20 6.71 0.49 6.22 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
5 25 6.16 0.49 5.67 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
6 30 5.72 0.49 5.23 5.00 2.50 0.92 0.95 1232.05 2.50 0.92 0.95 1232.05
7 35 5.37 0.49 4.88 4.88 2.44 0.91 0.94 1177.22 2.44 0.92 0.95 1202.82
8 40 5.09 0.49 4.60 4.60 2.30 0.88 0.94 1073.90 2.30 0.92 0.95 1134.66
9 45 4.87 0.49 4.38 4.38 2.19 0.86 0.94 998.92 2.19 0.92 0.95 1079.98
10 50 4.68 0.49 4.19 4.19 2.10 0.85 0.93 934.82 2.10 0.92 0.95 1033.57
11 55 4.51 0.49 4.02 4.02 2.01 0.83 0.93 874.39 2.01 0.92 0.95 990.05
12 60 4.32 0.49 3.83 3.83 1.92 0.81 0.93 813.80 1.92 0.90 0.94 913.95
13 65 4.11 0.49 3.62 3.62 1.81 0.80 0.93 758.61 1.81 0.88 0.94 843.45
14 70 3.84 0.49 3.36 3.36 1.68 0.77 0.92 670.12 1.68 0.85 0.93 747.79
15 75 3.52 0.49 3.03 3.03 1.52 0.74 0.92 582.46 1.52 0.81 0.94 651.41
16 80 3.14 0.49 2.65 2.65 1.32 0.71 0.92 487.28 1.32 0.77 0.94 539.95
17 85 2.68 0.49 2.19 2.19 2.19 0.86 0.94 998.27 - - - -
18 90 2.15 0.49 1.66 1.66 1.66 0.77 0.92 663.83 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 0.66 0.92 369.77 - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 17,795.69 16,529.91
PRODUKSI ENERGI TAHUNAN 34,325.59 MWh CF : 0.69
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 343.26 MWh
ENERGI TERJUAL KE PLN 33,544.34 MWh
Turbin 1 Turbin 2NO
%
PROBABILITYQ PROB
Q
RESIDUALQ PROB-Q RES Q OPERASI
![Page 20: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/20.jpg)
Alternatif 4: Debit Design 4 m3/det
Turbin mati pada debit 0.78, probability 95%, debit berada dibawah debit minimum turbin. Kedua unit turbin akan mati selama sekitar 2 bulan, yaitu pada bulan juli dan Agustus.
DEBIT DESAIN: : 4.00 m3/det
JUMLAH TURBIN : 2 unit KAPASITAS DAYA TERPASANG : 2 X 2261 kW
DEBIT DESAIN/UNIT : 2.00 m3/det 2 X 2.261 MW
DEBIT MINIMUM : 0.80 m3/det/unit KAPASITAS PRODUKSI TAHUNAN : 39617 MWh
TINGGI JATUHAN : 131.44 m 39.617 GWh
QT1 nt1 ng1 MWh QT2 nt2 ng2 MWh
1 5 9.02 0.49 8.54 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
2 10 8.14 0.49 7.65 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
3 15 7.37 0.49 6.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
4 20 6.71 0.49 6.22 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
5 25 6.16 0.49 5.67 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
6 30 5.72 0.49 5.23 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
7 35 5.37 0.49 4.88 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
8 40 5.09 0.49 4.60 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
9 45 4.87 0.49 4.38 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
10 50 4.68 0.49 4.19 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
11 55 4.51 0.49 4.02 4.00 2.00 0.92 0.95 987.22 2.00 0.92 0.95 987.22
12 60 4.32 0.49 3.83 3.83 1.92 0.90 0.94 915.41 1.92 0.90 0.94 915.41
13 65 4.11 0.49 3.62 3.62 1.81 0.88 0.94 844.80 1.81 0.88 0.94 844.80
14 70 3.84 0.49 3.36 3.36 1.68 0.85 0.93 748.98 1.68 0.85 0.93 748.98
15 75 3.52 0.49 3.03 3.03 1.52 0.81 0.94 652.46 1.52 0.81 0.94 652.46
16 80 3.14 0.49 2.65 2.65 1.32 0.77 0.94 540.82 1.32 0.77 0.94 540.82
17 85 2.68 0.49 2.19 2.19 1.09 0.72 0.93 413.53 1.09 0.72 0.93 413.53
18 90 2.15 0.49 1.66 1.66 1.66 0.84 0.94 741.10 - - - -
19 95 1.57 0.49 1.08 1.08 1.08 0.71 0.92 398.42 - - - -
20 100 1.21 0.49 0.72 0.72 0.72 - - - - - - -
PRODUKSI ENERGI TAHUNAN 16,114.88 14,975.36
PRODUKSI ENERGI TAHUNAN 31,090.24 MWh CF : 0.78
ASUMSI PEMAKAIAN DAYA SENDIRI = 50 Kw 438.00 MWh
ASUMSI LOSSES TRANSFORMER DAN DOWNTIME (1%) 310.90 MWh
ENERGI TERJUAL KE PLN 30,341.34 MWh
Turbin 1 Turbin 2NO
%
PROBABILITYQ PROB
Q
RESIDUALQ PROB-Q RES Q OPERASI
![Page 21: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/21.jpg)
Kesimpulan
Terjadi perbedaan gross head antara Gambar desain dengan data laporanhidrologi. Ada kenaikan headpond sebesar 1.36 m diakibatkan oleh tailraceterendam banjir 50 Tahun (Q 50) sehingga gross head naik menjadi 136.67.
No. Uraian Simbol Fesibility Studi
Debit 6.2 m3/det Debit 6 m3/det Debit 5 m3/det Debit 4 m3/det
1 Net head Hnet 132.37 m 132.63 m 131.23 m 131.44 m 130.17 m
2 Debit desain Qm 6.2 m3/dtk 6 m3/dtk 5 m3/dtk 4 m3/dtk 6 m3/dtk
3 Debit minimum Qd 1.24 m3/dtk 1.2 m3/dtk 1 m3/dtk 0.8 m3/dtk -
4 Jumlah turbin 2 unit 2 unit 2 unit 2 unit 2 unit
Debit desain setiap unit Qd1 3.1 m3/dtk 3 m3/dtk 2.5 m3/dtk 2 m3/dtk 3 m3/dtk
Efisiensi turbin hT 0.92 0.92 0.92 0.92 -
5Efisiensi generator dan
Efisiensi gear boxhG 0.95 0.95 0.95 0.95 -
6Kapasitas daya listrik
terbangkit Pel1 2 x 3.5 MW 2x 3.4 MW 2x 2.8 MW 2x 2 MW
2x3.5 MW (7
MW)
7 Kapasitas Produksi tahunan KE 61.84 GWh 59.96 GWh 49.44 Gwh 39.61 GWh -
8 Produksi Energi tahunan E 34742.52 MWh 34739.48 MWh 34325.59 MWh 31090.24 MWh -
9 Energi Terjual ke PLN Esold 33957.09 MWh 33954.08 MWh 33544.34 MWh 30341.34 MWh -
10 Capacity Factor CF 0.56 0.58 0.69 0.78 -
Revie Design
![Page 22: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/22.jpg)
review geoteknik
Berdasarkan uji laboratorium hasil kegiatan Soil Investigation diperoleh nilaiEngineering Properties sebagai berikut:
RINGKASAN HASIL PENGUJIAN LABORATORIUM MEKANIKA TANAH
PEKERJAAN REVIEW BASIC DESAIN
pltm lawe sikap
No. Lokasi Posisi Nama Kedalaman Natural Specivic Sample UnitBangunan Titik (m) Water Gravity Description Weight
Content Gs gm F C
(%) (gr/cm3) (gr/cm3) (O) (kg/cm2)
1 kiri bendung BI-1 sandy gravelly boulder
2 apron bendung BI-2 sandy gravelly boulder3 olak bendung BI-3 sandy gravelly boulder4 sandtrap BI-4 sandy gravelly boulder5 waterway HBH-1 1.00 - 1.50 29.35 2.56 gravelly clay 1.61 7.00 0.106 waterway HBH-2 1.00 - 1.50 28.74 2.57 gravelly clay 1.62 8.00 0.117 waterway HBH-3 gravelly fine sand
3.00 - 3.50 38.51 2.58 sandy clay 1.57 6.00 0.116.00 - 6.50 35.92 2.58 silty clay 1.61 7.00 0.129.00 - 9.50 34.86 2.57 silty clay 1.62 9.00 0.12
9 penstock BI-6 clayes sandy gravell
LAWE SIKAP
8
TriaxialUU
headpond BI-5
Dari tabel di atas, dapat disimpulkan bahwa sebagian besar jenis tanah di lokasi rencana proyek adalah clay/ lempung.
![Page 23: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/23.jpg)
Dengan data engineering properties di atas, maka stabilitas lereng galiandapat dihitung dengan menggunakan metoda irisan Bishop dengan hasil:
1 m
5 m
2
1
Slice 1 - Bishop Method
1.8121
5.3043
1.8073
11.084
![Page 24: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/24.jpg)
Sehingga perubahan kemiringan lereng galian terhadap desain semula adalahseperti gambar di bawah ini:
Galian desain semula
Galian review desain
![Page 25: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/25.jpg)
Dimensi bangunan juga turut mengalami perubahan, seperti pada dimensidinding sandtrap spillway:
dimensi desain semula
dimensi review desain
C
![Page 26: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/26.jpg)
review kegempaan
Berdasarkan Peta Zona Gempa Indonesia yang diterbitkan oleh PuslitbangSumber Daya Air, Balitbang Pekerjaan Umum (2004), lokasi rencana proyekmasuk ke dalam zona E :
![Page 27: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/27.jpg)
Besarnya koefisien gempa di lokasi penyelidikan dapat dihitung dengan rumussebagai berikut :
k = ad / g
ad = Z x ac x v
diperoleh: ad = z x ac x v = 239.478393
K = ad / g = 0.244365707
ad = percepatan gempa rencana, cm/dt2
v = faktor koreksi jenis tanah setempat = 1.375
ac = percepatan gempa dasar, (g) = 0.148
K = koefisien gempa
g = persepatan gravitasi, cm/dt2= 980
z = faktor yang bergantung pada faktor geografis= 1.2
Besaran koefisien gempa berpengaruh langsung terhadap stabilitas bangunanBendung, Angkur Blok Pipa Pesat, Power House dan Jembatan Akses.
![Page 28: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/28.jpg)
Hasil review stabilitas bendung terhadap gaya akibat gempa:
dimensi desain semula
dimensi review desain
![Page 29: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/29.jpg)
KESIMPULAN :
• Area Kebutuhan Pembebasan Lahan bertambah Besar Akibat PerubahanKemiringan Lereng Galian
• Volume Galian Tanah Bertambah Besar
• Adanya Perubahan Dimensi Bangunan yang Cenderung Semakin Gemuk
![Page 30: 01_PPT Lawe Sikap rev04](https://reader034.fdokumen.com/reader034/viewer/2022051007/5a6cfe777f8b9abd418b4c43/html5/thumbnails/30.jpg)
Go Green Indonesia !Green Energy, Energy Future
30
Thank you for Your Attention
PT. BANGUN NUSANTARA ENGINEERING