01

1
NO. LEMBAR JUDUL GAMBAR SKALA KODE GAMBAR 01 DAFTAR GAMBAR ARSITEKTUR (A) & STRUKTUR (S) 02 DENAH LANTAI 01 A0 - 01 A1 - 01 03 DENAH LANTAI 02 A1 - 02 04 DENAH LANTAI 03 A1 - 03 05 GAMBAR TAMPAK DEPAN A2 - 01 06 GAMBAR TAMPAK BELAKANG A2 - 02 07 GAMBAR TAMPAK SAMPING KANAN & KIRI A2 - 03 08 POTONGAN MEMBUJUR (POT. A - A) A3 - 01 09 POTONGAN MELINTANG (POT. B - B) A3 - 02 10 KEYPLAN LANTAI 01 S1 - 01 11 KEYPLAN LANTAI 02 S1 - 02 12 KEYPLAN LANTAI 03 S1 - 03 13 KEYPLAN LANTAI DAK S1 - 04 14 KEYPLAN BALOK RING S1 - 05 15 DENAH PONDASI S2 - 01 16 DETAIL PONDASI FOOTPLAT S2 - 02 17 DETAIL PONDASI LAJUR KELILING BANGUNAN S2 - 03 18 DENAH STRUKTUR ATAP S3 - 01 19 DETAIL KUDA-KUDA K1 S3 - 02 20 DETAIL KUDA-KUDA 1/2 K1 & KUDA-KUDA JURAI S3 - 03 SKEMA KUDA-KUDA K1 ; 1/2 K1 ; DAN JURAI DETAIL JOIN A ; B ; C ; DAN D 21 PORTAL BALOK DAN KOLOM PADA AS E S4 - 01 DETAIL PENULANGAN TIPE SLOOF 22 DETAIL PENULANGAN TIPE KOLOM S4 - 02 23 DETAIL PENULANGAN TIPE BALOK RING DAN DAK S4 - 03 24 S4 - 04 DETAIL PENULANGAN TIPE BALOK 25 DETAIL PENULANGAN PLAT T = 12 MM S4 - 05 26 S4 - 06 DETAIL PENULANGAN PLAT T = 10 MM 27 S4 - 07 DETAIL PENULANGAN PLAT T = 15 MM 29 DENAH TANGGA UTAMA S5 - 01 30 POTONGAN 01 DAN DETAIL BALOK BORDES S5 - 02 31 S5 - 03 POTONGAN 02 DAN DETAIL PLAT TANGGA 28 S4 - 08 32 S5 - 04 33 S5 - 05 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 ARS. 1 : 150 STR. 1 : 150 STR. 1 : 150 STR. 1 : 150 STR. 1 : 150 STR. 1 : 150 STR. 1 : 150 STR. 1 : 10 STR. 1 : 20 STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. STR. 1 : 40 N.T.S N.T.S 1 : 100 1 : 20 1 : 20 1 : 20 1 : 20 1 : 40 1 : 40 1 : 40 1 : 150 1 : 40 1 : 40 1 : 40 1 : 10 N.T.S.

description

d

Transcript of 01

  • NO. LEMBAR JUDUL GAMBAR SKALA KODE GAMBAR

    01 DAFTAR GAMBAR ARSITEKTUR (A) & STRUKTUR (S)

    02 DENAH LANTAI 01

    A0 - 01

    A1 - 01

    03 DENAH LANTAI 02A1 - 02

    04 DENAH LANTAI 03A1 - 03

    05 GAMBAR TAMPAK DEPANA2 - 01

    06 GAMBAR TAMPAK BELAKANGA2 - 02

    07 GAMBAR TAMPAK SAMPING KANAN & KIRIA2 - 03

    08 POTONGAN MEMBUJUR (POT. A - A)A3 - 01

    09 POTONGAN MELINTANG (POT. B - B)A3 - 02

    10 KEYPLAN LANTAI 01S1 - 01

    11 KEYPLAN LANTAI 02S1 - 02

    12 KEYPLAN LANTAI 03S1 - 03

    13 KEYPLAN LANTAI DAKS1 - 04

    14 KEYPLAN BALOK RINGS1 - 05

    15 DENAH PONDASIS2 - 01

    16 DETAIL PONDASI FOOTPLATS2 - 02

    17 DETAIL PONDASI LAJUR KELILING BANGUNANS2 - 03

    18

    DENAH STRUKTUR ATAP

    S3 - 01

    19

    DETAIL KUDA-KUDA K1

    S3 - 02

    20

    DETAIL KUDA-KUDA 1/2 K1 & KUDA-KUDA JURAI

    S3 - 03

    SKEMA KUDA-KUDA K1 ; 1/2 K1 ; DAN JURAI

    DETAIL JOIN A ; B ; C ; DAN D

    21 PORTAL BALOK DAN KOLOM PADA AS ES4 - 01

    DETAIL PENULANGAN TIPE SLOOF22

    DETAIL PENULANGAN TIPE KOLOM

    S4 - 02

    23

    DETAIL PENULANGAN TIPE BALOK RING DAN DAK

    S4 - 03

    24 S4 - 04 DETAIL PENULANGAN TIPE BALOK

    25

    DETAIL PENULANGAN PLAT T = 12 MM

    S4 - 05

    26 S4 - 06 DETAIL PENULANGAN PLAT T = 10 MM

    27 S4 - 07

    DETAIL PENULANGAN PLAT T = 15 MM

    29

    DENAH TANGGA UTAMA

    S5 - 01

    30

    POTONGAN 01 DAN DETAIL BALOK BORDES

    S5 - 02

    31 S5 - 03

    POTONGAN 02 DAN DETAIL PLAT TANGGA

    28 S4 - 08

    32 S5 - 04

    33 S5 - 05

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    ARS.1 : 150

    STR.1 : 150

    STR.1 : 150

    STR.1 : 150

    STR.1 : 150

    STR.1 : 150

    STR.1 : 150

    STR.1 : 10

    STR.1 : 20

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    STR.

    1 : 40

    N.T.S

    N.T.S

    1 : 100

    1 : 20

    1 : 20

    1 : 20

    1 : 20

    1 : 40

    1 : 40

    1 : 40

    1 : 150

    1 : 40

    1 : 40

    1 : 40

    1 : 10

    N.T.S.