0. 100 % Peninggian Jalan Keluar KawasanA

download 0. 100 % Peninggian Jalan Keluar KawasanA

of 26

Transcript of 0. 100 % Peninggian Jalan Keluar KawasanA

DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT #REF! #REF! #REF! #REF! #REF! NO. A 1 2 3 4 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 C 1 2 3 4 5 6 7 8 9 10 TENAGA Kepala Tukang Mandor Pekerja Tukang BAHAN Agregat B (Macadam) Agregat Halus Agregat Kasar Agregat Kelas C Air Angkutan Aspal Aspal Emulsi Aspal Sealent Baja Tulangan (Polos) U24 Batu Kali Bekisting Beton Jepit Bekisting Plat Duiker Bekisting Rigit Besi Beton Polos Besi Beton Ulir Beton Readymix BO Slump 12 Beton Readymix K 175 Slump 12 FA Beton Readymix K 225 Slump 12 FA Beton Readymix K 250 Slump 12 FA Beton Readymix K 350 Slump 12 FA Bongkaran Filler Galian Tanah Berbatu Galian Tanah Berbatu + Angkutan Galian Tanah Biasa Galian Tanah Biasa + Angkutan Karung Kaso uk. 5x7x400 cm Kawat Beton Kayu Kruing uk. 5/7 Terentang Palembang Kayu Perancah (Bekisting) Material Timbunan Oli / Gemuk Paku Pasir Beton Pasir Pasang Plastik Semen (PC) Triplek Uk. 4 x 8 Ft Teb. 9 mm Wet Lean Concrete (t = 5 cm) PERALATAN Asphalt Finisher Asphalt Mixing Plant Asphalt Sprayer Compressor Concrete Cutter Concrete Mixer Concrete Vibrator Dump Truck Generator Set Mesin Potong Paving Block # # # # # URAIAN #REF! #REF! #REF! #REF! #REF! SATUAN HARGA SATUAN DASAR (Rp.)

Jam Jam Jam Jam

9,996.72 11,309.37 7,500.00 8,682.90

M M M M Ltr M Kg Kg M' Kg M Panel Panel Panel Kg Kg M M M M M M Kg M M M M Lbr M Kg M Panel M Liter Kg M M M Kg Lbr M

141,600.00 220,500.00 141,600.00 189,000.00 1,000.00 44,888.00 6,400.00 6,400.00 3,500.00 8,750.00 165,000.00 205,101.78 336,518.25 82,895.85 8,750.00 8,800.00 543,000.00 625,000.00 654,000.00 670,000.00 744,000.00 568,492.00 1,500.00 80,771.81 125,659.81 39,996.72 84,884.72 1,000.00 1,750,000.00 12,000.00 2,417,750.00 82,895.85 32,500.00 1,000.00 12,000.00 177,000.00 225,000.00 800.00 1,100.00 120,750.00 567,200.00

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

900,000.00 8,000,000.00 350,000.00 500,000.00 35,000.00 75,000.00 35,000.00 100,000.00 255,000.00 150,000.00

11 12 13 14 15 16 17

Pneumatic Tyre Roller Sewa Truck / Ongkos angkut / bh Stamper Tandem Roller Vibro Roller Water Tank Wheel Loader

Jam Jam Jam Jam Jam Jam Jam

450,000.00 200,000.00 150,000.00 150,000.00 175,000.00 149,500.00 200,000.00

Nomor Lampiran

: 016/PTUK/SPH/X/2011 : 1 (satu) berkas

Jakarta, 18 Oktober 2011

Kepada Yth. Panitia Pengadaan Barang/Jasa UPT. Pengelola Kawasan Pelabuhan Perikanan dan Pangkalan Pendaratan Ikan, Dinas Kelautan dan Pertanian Provinsi DKI Jakarta di Jl. Dermaga No. 1, Muara Angke - Jakarta Utara Perihal : Penawaran Pekerjaan Peninggian Jalan Keluar Pengawasan

#NAME?

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut di atas. Kami akan melaksanakan pekerjaan tersebut dengan jangka waktu pelaksanaan pekerjaan selama 60 (enam puluh) hari kalender.

Penawaran ini berlaku selama 45 (empat puluh lima) hari kalender sejak tanggal surat penawaran ini Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan : Hasil pemindaian (scan)Jaminan Penawaran asli; Dukungan Bank; Pernyataan Tunduk; Pernyataan Sanggup Menyerahkan Jaminan Pelaksanaan; Pernyataan Kebenaran Dokumen; Dokumen penawaran teknis, terdiri dari : a. Pendekatan dan Metodologi Pelaksanaan Pekerjaan; b. Analisa Teknis Pelaksanaan Pekerjaan; c. Bagan Organisasi Pelaksanaan Pekerjaan; d. Jadwal Pelaksanaan (Barchart); e. Rencana Kerja (Net Work Planning); f. Daftar dan Jadwal Penugasan Personil g. Curriculum Vitae/Pengalaman Pekerjaan bagi Pelaksana Proyek/tenaga ahli serta dilengkapi hasil pemindaian (scan) ijazah; h. Surat Pernyataan Kesanggupan dari Tenaga Ahli; i. Daftar dan Jadwal penggunaan peralatan yang dipergunakan dalam pekerjaan, dengan mencantumkan jumlah dan jenis alat, kapasitas alat Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN);

1. 2. 3. 4. 5. 6.

7.

8.

Dokumen usulan biaya/harga : a. Daftar Perincian Biaya (Daftar Kuantitas dan Harga); b. Daftar Harga-harga Satuan Bahan dan Upah; c. Daftar Analisa Harga Satuan Pekerjaan dan Peralatan; d. Rekapitulasi Rencana Anggaran Biaya Dokumen/data kualifikasi : a. Formulir isian kualifikasi; b. Surat pernyataan minat; c. Pakta integritas; d. Data Pengalaman; e. Surat keterangan kinerja baik dan tidak masuk dalam daftar sanksi, atau surat pernyataan kinerja baik; f. Surat keterangan memiliki Kemampuan Dasar (KD) pada bidang pekerjaan yang sesuai dalam kurun waktu 10 (sepuluh) tahun terakhir; g. Pernyataan tidak membuat pernyataan yang tidak benar tentang kompetensi dan kemampuan usaha yang dimilikinya; h. Surat Keterangan Sisa Kemampuan Paket (SKP); i. Neraca perusahaan tahun terakhir (sampai dengan 31 Desember 2010) yang diaudit oleh akuntan publik; j. Scan Surat Ijin Usaha (IUJK) dan SBU yang masih berlaku (Jasa Pelaksana Konstruksi Bidang arsitektur, Sub Bidang bangunan-bangunan non perumahan lainnya, termasuk perawatannya (Kode : 21005), Kualifikasi non Kecil/gred 5; k. Scan NPWP perusahaan, direktur dan tenaga ahli; l. Scan Tanda daftar perusahaan (TDP) yang masih berlaku; m. Fotocopy KTP pengurus perusahaan yang masih berlaku; n. Scan Surat keterangan fiskal perusahaan (SKF) yang diterbitkan tahun 2011; o. Fotocopy surat keterangan tidak pailit dari pengadilan niaga yang diterbitkan tahun 2011; p. Surat Pernyataan Bukan PNS/TNI/Polri;

9.

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan. PT. UBER KARYA

GUSTRIANA SINURAT Direktur

REKAPITULASI BIAYAUrusan Pemerintah Organisasi/SKPD Urusan Program Kegiatan Kode Rekening Tahun Anggaran Lokasi NO. A. B. C. D. E. F. G. H. I. J. K. L. : : : : : : : : 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.008 UPT Pengelola Kaw. Pelabuhan Perikanan dan Pangk. Pendaratan Ikan 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.06 Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternakan 2.05.06.010 Peninggian Jalan Keluar Kawasan 5.2.3.21.08 Belanja Modal Pengadaan Konstruksi Jalan Lingkungan 2011 Provinsi DKI Jakarta URAIAN PEKERJAAN PERSIAPAN PENINGGIAN JALAN KAWASAN - A PENINGGIAN JALAN KAWASAN - B PENINGGIAN JALAN KAWASAN - C PENINGGIAN JALAN KAWASAN - D PENINGGIAN JALAN KAWASAN - E PENINGGIAN JALAN KAWASAN - F PENINGGIAN JALAN KAWASAN - G PENINGGIAN JALAN KAWASAN - H PENINGGIAN JALAN KAWASAN - I PENINGGIAN JALAN KAWASAN - J PENINGGIAN JALAN KAWASAN - K BIAYA (Rp.) 71,873,854.09 180,081,908.26 221,768,543.57 155,625,383.14 184,549,633.79 529,199,512.75 465,014,460.23 144,696,570.09 179,289,367.15 165,058,624.93 182,442,552.45 338,422,880.30

JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN #NAME? #NAME?

2,818,023,290.75 281,802,329.07 3,099,825,619.82 3,099,825,619.00

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

DAFTAR PERINCIAN BIAYAUrusan Pemerintah Organisasi/SKPD Urusan Program Kegiatan Kode Rekening Tahun Anggaran Lokasi : : : : : : : : 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.008 UPT Pengelola Kaw. Pelabuhan Perikanan dan Pangk. Pendaratan Ikan 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.06 Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternakan 2.05.06.010 Peninggian Jalan Keluar Kawasan 5.2.3.21.08 Belanja Modal Pengadaan Konstruksi Jalan Lingkungan 2011 Provinsi DKI Jakarta HARGA SATUAN (Rp.) BIAYA (Rp.)

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

A. 1.1 1.2 1.3 1.4 1.5 1.6

PEKERJAAN PERSIAPAN Papan Nama Proyek Direksi Keet UK. 4x6 =24 m2 atap seng gelombang tebal 0.25 mm kaca nako lengkap 1 set meubel sederhana Foto Proyek 3 Phase (0%, 50%, 100%) Listrik dan Air Kerja Pengukuran Pembersihan Lokasi

1.00 24.00 3.00 1.00 919.19 4,900.26

bh m2 set ls m' m2

716,135.00 470,028.00 232,228.00 1,500,000.00 39,961.00 4,275.00 JUMLAH A

716,135.00 11,280,672.00 696,684.00 1,500,000.00 36,731,751.59 20,948,611.50 71,873,854.09

B. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - A PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

160.58 13.45 269.09 119.45

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

34,173,397.52 7,627,498.22 56,173,866.80 418,075.00 98,392,837.54

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

1.97 52.51

m3 m2

10,630.00 4,601.15 Sub Jumlah II

20,941.10 241,606.38 262,547.48

III. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Beton Jepit 10/60 , K-225 Pas. Saluran Batu Kali, ad 1 PC : 3 PSR Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

106.98 10.70 131.00 106.98 13.13 82.04 30.35 39.38 5.25

m2 m3 unit m2 unit m' m3 bh m3

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 174,186.09 601,518.79 410,400.00 51,450.00 Sub Jumlah III

3,553,982.58 2,769,256.30 5,895,000.00 17,211,637.77 590,850.00 14,290,226.82 18,256,095.27 16,161,552.00 270,112.50 78,998,713.24

IV. 4.1 4.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

26.25 26.25

m3 m3

41,038.00 51,450.00 Sub Jumlah IV JUMLAH A

1,077,247.50 1,350,562.50 2,427,810.00 180,081,908.26

C. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - B PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

259.69 13.45 269.09 119.45

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

55,265,223.59 7,627,498.22 56,173,866.80 418,075.00 119,484,663.61

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

1.97 60.91

m3 m2

10,630.00 4,601.15 Sub Jumlah II

20,941.10 280,256.04 301,197.14

III. 3.1 3.2 3.3 3.4 3.5 3.6 3.7

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

242.84 24.28 328.00 242.84 26.25 78.76 5.78

m2 m3 unit m2 unit bh m3

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 410,400.00 51,450.00 Sub Jumlah III JUMLAH B

8,067,387.64 6,283,882.52 14,760,000.00 39,069,677.66 1,181,250.00 32,323,104.00 297,381.00 101,982,682.82 221,768,543.57

D. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - C PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

30.01 13.45 269.09 119.45

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

6,386,496.82 7,627,498.22 56,173,866.80 418,075.00 70,605,936.84

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

1.97 52.51

m3 m2

10,630.00 4,601.15 Sub Jumlah II

20,941.10 241,606.38 262,547.48

III.

PEKERJAAN KANSTEEN DAN TROTOAR

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN (Rp.)

BIAYA (Rp.)

3.1 3.2 3.3 3.4 3.5 3.6

Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

243.49 24.35 328.00 243.49 39.38 5.25

m2 m3 unit m2 bh m3

33,221.00 258,809.00 45,000.00 160,886.50 410,400.00 51,450.00 Sub Jumlah III JUMLAH C

8,088,981.29 6,301,999.15 14,760,000.00 39,174,253.88 16,161,552.00 270,112.50 84,756,898.82 155,625,383.14

E. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - D PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

141.32 13.62 272.39 120.11

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

30,074,632.82 7,723,905.26 56,862,758.10 420,385.00 95,081,681.18

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

1.97 76.14

m3 m2

10,630.00 4,601.15 Sub Jumlah II

20,941.10 350,331.56 371,272.66

III. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Pas. Saluran Batu Kali, ad 1 PC : 3 PSR Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

111.58 11.16 328.00 111.58 52.51 16.46 78.76 6.73

m2 m3 unit m2 unit m3 bh m3

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 601,518.79 410,400.00 51,450.00 Sub Jumlah III

3,706,799.18 2,888,308.44 14,760,000.00 17,951,715.67 2,362,950.00 9,900,999.28 32,323,104.00 346,258.50 84,240,135.07

IV. 4.1 4.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

52.51 52.51

m3 m3

41,038.00 51,450.00 Sub Jumlah IV JUMLAH D

2,154,905.38 2,701,639.50 4,856,544.88 184,549,633.79

F. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - E PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

584.70 47.48 949.51 354.75

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

124,431,345.96 26,925,919.39 198,214,903.07 1,241,625.00 350,813,793.42

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

4.95 131.88

m3 m2

10,630.00 4,601.15 Sub Jumlah II

52,618.50 606,799.66 659,418.16

III. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Beton Jepit 10/60 , K-225 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

156.60 15.66 824.00 156.60 32.97 329.69 98.91 11.54

m2 m3 unit m2 unit m' bh m3

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 174,186.09 410,400.00 51,450.00 Sub Jumlah III

5,202,408.60 4,052,948.94 37,080,000.00 25,194,825.90 1,483,650.00 57,427,412.01 40,592,664.00 593,733.00 171,627,642.45

IV. 4.1 4.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

65.94 65.94

m3 m3

41,038.00 51,450.00 Sub Jumlah IV JUMLAH E

2,706,045.72 3,392,613.00 6,098,658.72 529,199,512.75

G. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - F PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

354.07 32.51 650.23 286.73

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

75,350,447.52 18,436,428.80 135,738,724.63 1,003,555.00 230,529,155.95

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN (Rp.)

BIAYA (Rp.)

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

9.40 229.07

m3 m2

10,630.00 4,601.15 Sub Jumlah II

99,922.00 1,053,985.43 1,153,907.43

III. 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Beton Jepit 10/60 , K-225 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

336.87 33.69 392.00 336.87 62.67 313.36 188.02 23.72

m2 m3 unit m2 unit m' bh m3

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 174,186.09 410,400.00 51,450.00 Sub Jumlah III

11,191,158.27 8,719,275.21 17,640,000.00 54,197,835.25 2,820,150.00 54,582,953.16 77,163,408.00 1,220,394.00 227,535,173.89

IV. 4.1 4.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

62.67 62.67

m3 m3

41,038.00 51,450.00 Sub Jumlah IV JUMLAH F

2,571,851.46 3,224,371.50 5,796,222.96 465,014,460.23

H. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - G PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

138.53 16.99 339.87 407.84

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

29,480,886.53 9,635,033.07 70,949,541.45 1,427,440.00 111,492,901.05

II. 2.1 2.2

PEKERJAAN BONGKARAN Bongkaran Kansteen Bongkaran Conblok

1.77 68.56

m3 m2

10,630.00 4,601.15 Sub Jumlah II

18,815.10 315,454.84 334,269.94

III. 3.1 3.2 3.3 3.4

PEKERJAAN KANSTEEN DAN TROTOAR Kanstein Type 15.25.40 cm Beton Jepit 10/60 , K-225 Pas. Saluran Batu Kali, ad 1 PC : 3 PSR Angkutan kansteen dan conblok dengan truk kap 5-7 m3 jarak s/d 20 km

296.00 59.11 11.23 6.06

unit m' m3 m3

45,000.00 174,186.09 601,518.79 51,450.00 Sub Jumlah III

13,320,000.00 10,296,139.77 6,755,056.01 311,787.00 30,682,982.78

IV. 4.1 4.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

23.64 23.64

m3 m3

41,038.00 51,450.00 Sub Jumlah IV JUMLAH G

970,138.32 1,216,278.00 2,186,416.32 144,696,570.09

I. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - H PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

77.30 15.90 317.94 110.34

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

16,450,390.01 9,016,893.81 66,371,545.62 386,190.00 92,225,019.44

II. 2.1 2.2 2.3 2.4 2.5 2.6

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm

130.92 13.09 234.00 130.92 37.40 112.21

m2 m3 unit m2 unit bh

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 410,400.00 Sub Jumlah II JUMLAH H

4,349,293.32 3,387,809.81 10,530,000.00 21,063,260.58 1,683,000.00 46,050,984.00 87,064,347.71 179,289,367.15

J. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - I PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

123.22 10.34 206.74 89.43

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

26,222,730.37 5,863,816.48 43,157,996.29 313,005.00 75,557,548.14

II. 2.1 2.2 2.3

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm

134.62 13.46 240.00

m2 m3 unit

33,221.00 258,809.00 45,000.00

4,472,211.02 3,483,569.14 10,800,000.00

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN (Rp.)

BIAYA (Rp.)

2.4 2.5 2.6

Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm

134.62 38.46 115.39

m2 unit bh

160,886.50 45,000.00 410,400.00 Sub Jumlah II JUMLAH I

21,658,540.63 1,730,700.00 47,356,056.00 89,501,076.79 165,058,624.93

K. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - J PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

193.16 13.98 279.62 102.53

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

41,106,821.93 7,928,061.35 58,372,056.32 358,855.00 107,765,794.60

II. 2.1 2.2 2.3 2.4 2.5 2.6 2.7

PEKERJAAN KANSTEEN DAN TROTOAR Urugan sirtu bawah Paving Blok t= 10 cm Urugan pasir pasang bawah paving blok Kanstein Type 15.25.40 cm Paving Blok t=6 cm K. 300 Tali Air Beton K-225 Ukuran 40X35-100 Pas. Saluran Batu Kali, ad 1 PC : 3 PSR Plat Penutup Tali Air uk. 40 x 50 tebal 10 cm

37.28 3.73 233.00 37.28 37.28 13.98 111.85

m2 m3 unit m2 unit m3 bh

33,221.00 258,809.00 45,000.00 160,886.50 45,000.00 601,518.79 410,400.00 Sub Jumlah II JUMLAH J

1,238,478.88 965,357.57 10,485,000.00 5,997,848.72 1,677,600.00 8,409,232.68 45,903,240.00 74,676,757.85 182,442,552.45

L. I. 1.1 1.2 1.3 1.4

PENINGGIAN JALAN KAWASAN - K PEKERJAAN PENINGGIAN JALAN Urugan Sirtu bawah Jalan Lantai Kerja Ready Mix B0 Slump 12 cm Perkerasan Jalan Beton Readymix K-350, t=25 cm Joint Sealent

88.12 53.83 1,076.68 349.62

m3 m3 m2 m'

212,812.29 567,100.24 208,754.94 3,500.00 Sub Jumlah I

18,753,018.99 30,527,005.91 224,762,268.79 1,223,670.00 275,265,963.69

II. 2.1 2.2 2.3

PEKERJAAN KANSTEEN DAN TROTOAR Pas. Saluran Batu Kali, ad 1 PC : 3 PSR Pasangan Bata 1 Bata , Adukan 1 PC 5 PSR Plester 15 mm ad 1 PC : 3 PSR + Acian

80.75 34.32 68.64

m3 m2 m2

601,518.79 168,995.00 40,933.00 Sub Jumlah II

48,572,642.29 5,799,908.40 2,809,641.12 57,182,191.81

III. 3.1 3.2

PEKERJAAN NORMALISASI SALURAN Kuras lumpur saluran terbuka bebas, tenaga orang Angkutan lumpur saluran dengan kap 5-7 m3 jarak s/d 20 km

64.60 64.60

m3 m3

41,038.00 51,450.00 Sub Jumlah III JUMLAH K

2,651,054.80 3,323,670.00 5,974,724.80 338,422,880.30

DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALATUrusan Pemerintah Organisasi/SKPD Urusan Program Kegiatan Kode Rekening Tahun Anggaran Lokasi : : : : : : : : 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.008 UPT Pengelola Kaw. Pelabuhan Perikanan dan Pangk. Pendaratan Ikan 2.05 PERIKANAN, KELAUTAN, DAN PERTERNAKAN 2.05.06 Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternakan 2.05.06.010 Peninggian Jalan Keluar Kawasan 5.2.3.21.08 Belanja Modal Pengadaan Konstruksi Jalan Lingkungan 2011 Provinsi DKI Jakarta

NO. A 1 2 3 4 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 TENAGA Pekerja Tukang Kepala Tukang Mandor

URAIAN

SATUAN

HARGA SATUAN DASAR (Rp.)

Jam Jam Jam Jam

7,500.00 8,682.90 9,996.72 11,309.37

BAHAN Batu Kali Semen (PC) Pasir Pasang Pasir Beton Material Timbunan Agregat Kasar Agregat Halus Agregat B (Macadam) Agregat Kelas C Beton Readymix BO Slump 12 Beton Readymix K 175 Slump 12 FA Beton Readymix K 225 Slump 12 FA Beton Readymix K 250 Slump 12 FA Beton Readymix K 350 Slump 12 FA Bekisting Plat Duiker Bekisting Rigit Kayu Perancah (Bekisting) Bekisting Beton Jepit Kaso uk. 5x7x400 cm Kayu Kruing uk. 5/7 Terentang Palembang Triplek Uk. 4 x 8 Ft Teb. 9 mm Paku Oli / Gemuk Plastik Karung Aspal Sealent Wet Lean Concrete (t = 5 cm) Aspal Emulsi Air Filler

M Kg M M M M M M M M M M M M Panel Panel Panel Panel M M Lbr Kg Liter M Lbr M' M Kg Ltr Kg

165,000.00 1,100.00 225,000.00 177,000.00 32,500.00 141,600.00 220,500.00 141,600.00 189,000.00 543,000.00 625,000.00 654,000.00 670,000.00 744,000.00 336,518.25 82,895.85 82,895.85 205,101.78 1,750,000.00 2,417,750.00 120,750.00 12,000.00 1,000.00 800.00 1,000.00 3,500.00 567,200.00 6,400.00 1,000.00 1,500.00

31 32 33 34 35 36 37 38 39 40 41 C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Aspal Baja Tulangan (Polos) U24 Besi Beton Polos Besi Beton Ulir Kawat Beton Galian Tanah Berbatu Galian Tanah Biasa Galian Tanah Berbatu + Angkutan Galian Tanah Biasa + Angkutan Bongkaran Angkutan PERALATAN Stamper Vibro Roller Water Tank Concrete Mixer Concrete Vibrator Concrete Cutter Asphalt Sprayer Compressor Wheel Loader Asphalt Mixing Plant Generator Set Dump Truck Asphalt Finisher Tandem Roller Pneumatic Tyre Roller Mesin Potong Paving Block Sewa Truck / Ongkos angkut / bh

Kg Kg Kg Kg Kg M M M M M M

6,400.00 8,750.00 8,750.00 8,800.00 12,000.00 80,771.81 39,996.72 125,659.81 84,884.72 568,492.00 44,888.00

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

150,000.00 175,000.00 149,500.00 75,000.00 35,000.00 35,000.00 350,000.00 500,000.00 200,000.00 8,000,000.00 255,000.00 100,000.00 900,000.00 150,000.00 450,000.00 150,000.00 200,000.00

NO.

URAIAN

SATUAN

HARGA SATUAN DASAR (Rp.)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NOMOR MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

2.05.06 Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Pe 2.05.06.0 Peninggian Jalan Keluar Kawasan Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 1.1 Urugan Sirtu bawah Jalan M

NO. (a) A 1 2 B 1

KOMPONEN (b) TENAGA Pekerja Mandor BAHAN Agregat B (Macadam) (L01)

SATUAN (c) Jam

PERKIRAAN KUANTITAS (d) 0.0496

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 11,309.37 372.00 80.29 452.29 169,920.00 169,920.00 100,000.00 150,000.00 41,630.00 810.00 42,440.00 212,812.29 212,812.29

(L03) Jam 0.0071 JUMLAH HARGA TENAGA M 1.2000

141,600.00

JUMLAH HARGA BAHAN C 1 2 PERALATAN Dump Truck Tandem Roller (E08) (E17) Jam Jam 0.4163 0.0054

JUMLAH HARGA PERALATAN D E F JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) OVER HEAD & PROFIT 0% x D HARGA SATUAN PEKERJAAN (D + E)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 5.7.(1) Wet Lean Concrete (t = 5 cm) M

NO. (a) A 1 2 3 B 1

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Beton Readymix BO Slump 12

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 8,682.90 11,309.37 18,750.00 4,341.45 1,008.79 24,100.24 543,000.00 543,000.00 567,100.24 567,100.24

(L01) Jam 2.5000 (L01) Jam 0.5000 (L02) Jam 0.0892 JUMLAH HARGA TENAGA (M12) M 1.0000

543,000.00

JUMLAH HARGA BAHAN C D E JUMLAH HARGA TENAGA, BAHAN (A + B) OVER HEAD & PROFIT 0% x C HARGA SATUAN PEKERJAAN (C + D)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka Plesteran tebal 15 mm ad. 1 : 3 M

NO. (a) A 1 2 3 4 B 1 2

KOMPONEN (b) TENAGA Pekerja Tukang Kepala Tukang Mandor BAHAN Semen (PC) Pasir Pasang

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 52,500.00 60,780.30 69,977.04 79,165.59 14,941.50 7,962.21 916.69 688.74 24,509.14 11,246.40 5,175.00 16,421.40 40,930.54 40,930.54

Oh 0.2846 Oh 0.1310 Oh 0.0131 Oh 0.0087 JUMLAH HARGA TENAGA Kg 10.2240 M 0.0230 JUMLAH HARGA BAHAN

1,100.00 225,000.00

C D E

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B) OVER HEAD & PROFIT 0% x C HARGA SATUAN PEKERJAAN (C + D)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NOMOR MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 2.2 Pasangan Batu dengan Mortar (1 : 3) M

NO. (a) A 1 2 3 B 1 2 3 C 1

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Batu Kali Semen (PC) Pasir Pasang PERALATAN Concrete Mixer

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 8,682.90 11,309.37 36,772.50 27,826.95 4,541.84 69,141.29 178,200.00 222,200.00 101,857.50 502,257.50 30,120.00 30,120.00 601,518.79 601,518.79

(L01) Jam 4.9030 (L02) Jam 3.2048 (L03) Jam 0.4016 JUMLAH HARGA TENAGA (M02) M 1.0800 (M12) Kg 202.0000 (M01) M 0.4527 JUMLAH HARGA BAHAN (E06) Jam 0.4016

165,000.00 1,100.00 225,000.00

75,000.00

JUMLAH HARGA PERALATAN D E F JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) OVER HEAD & PROFIT 0% x D HARGA SATUAN PEKERJAAN (D + E)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NOMOR MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 2.2 Pasang Batu Belah ad. 1 Pc : 5 Psr M

NO. (a) A 1 2 3 B 1 2 3 C 1 2

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Batu Kali Semen (PC) Pasir Pasang PERALATAN Concrete Mixer Alat Bantu

SATUAN (c)

PERKIRAAN #VALUE! (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 50.66 #NAME? #NAME? #NAME? #NAME?

(L01) #NAME? 6.0000 (L02) #NAME? 1.0000 (L03) #NAME? 0.2500 JUMLAH HARGA TENAGA (M02) #NAME? 1.2220 (M12) #NAME? 158.4000 (M01) #NAME? 0.3580 JUMLAH HARGA BAHAN (E06) #NAME? 0.4444 Ls 1.0000 JUMLAH HARGA PERALATAN

#NAME? #NAME? #NAME?

#NAME? 50.66

D E F

JUMLAH HARGA TENAGA, BAHAN, PERALATAN (A + B + C) OVER HEAD & PROFIT 15% x D HARGA SATUAN PEKERJAAN (D + E)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 2.3 Beton Mutu Sedang (K.250 + Bekisting Plat Duiker) M

NO. (a) A 1 2 3 B 1 2 C 1

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Beton Readymix K 250 Slump 12 FA Bekisting Plat Duiker PERALATAN Concrete Vibrator

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

(L01) #NAME? 0.87010 (L02) #NAME? 0.21750 (L03) #NAME? 0.21750 JUMLAH HARGA TENAGA (M12) #NAME? 1.0000

#NAME? #NAME?

(M51) #NAME? 0.3441 JUMLAH HARGA BAHAN (E20) #NAME? 0.2175

#NAME?

JUMLAH HARGA PERALATAN D JUMLAH HARGA TENAGA, BAHAN, PERALATAN

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NOMOR MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka Analisa Pendukung Item Pembayaran No. 2.3 Bekisting Plat Duiker Panel

NO. (a) A 1 2 3 B 1 2 3 C 1

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHANKayu Kruing uk. 5/7 Terentang Palembang

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 32.30 32.30 #NAME?

(L01) #NAME? 0.43500 (L02) #NAME? 0.21750 (L03) #NAME? 0.21750 JUMLAH HARGA TENAGA (M38) #NAME? (M47) #NAME? 0.0945 0.7917

#NAME? #NAME? #NAME?

Triplek Uk. 4 x 8 Ft Teb. 9 mm Paku PERALATAN Alat Bantu

(M41) #NAME? 0.4000 JUMLAH HARGA BAHAN Ls 1.0000

32.30

D

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN, PERALATAN

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 7.1.(7a) Beton Mutu Sedang (K.175 + Bekisting Beton Jepit) M

NO. (a) A 1 2 3 B 1 2 C 1 2 D

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Beton Readymix K 175 Slump 12 FA Bekisting Beton Jepit PERALATAN Concrete Mixer Alat Bantu

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) #NAME? 8,682.90 11,309.37 #NAME? 7,554.99 9,840.28 #NAME? 625,000.00 #NAME? #NAME? 65,257.50 429.06 65,686.56 #NAME?

(L01) #NAME? 0.96130 (L02) Jam 0.87010 (L03) Jam 0.87010 JUMLAH HARGA TENAGA (M12) M 1.0000

625,000.00 #NAME?

(M51) Panel 0.3125 JUMLAH HARGA BAHAN Jam 0.8701 Ls 1.0000 JUMLAH HARGA PERALATAN (E20)

75,000.00 429.06

JUMLAH HARGA TENAGA, BAHAN, PERALATAN

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka Analisa Pendukung Item Pembayaran No. 7.1.(7a) Bekisting Beton Jepit Panel

NO. (a) A 1 2 3 B 1 2 3 C 1

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHANKayu Kruing uk. 5/7 Terentang Palembang

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 197.71 197.71 #NAME?

(L01) #NAME? 1.74020 (L02) #NAME? 0.87010 (L03) #NAME? 0.87010 JUMLAH HARGA TENAGA (M38) #NAME? (M47) #NAME? 0.0452 0.5000

#NAME? #NAME? #NAME?

Triplek Uk. 4 x 8 Ft Teb. 9 mm Paku PERALATAN Alat Bantu

(M41) #NAME? 0.4000 JUMLAH HARGA BAHAN Ls 1.0000

197.71

JUMLAH HARGA PERALATAN D JUMLAH HARGA TENAGA, BAHAN, PERALATAN

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 5.3.1 Perkerasan Jalan Beton (t = 20 cm, K.350) + Bekisting Rigid M

NO. (a) A 1 2 3 B 1 2 3 4 5 C 1 2

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Beton Readymix K 350 Slump 12 FA Oli / Gemuk Plastik Karung PERALATAN Concrete Vibrator Concrete Cutter

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 8,682.90 11,309.37 6,024.00 15,691.73 1,135.46 22,851.19 744,000.00 39,234.60 500.00 4,000.00 10,000.00 797,734.60 7,217.00 7,217.00 14,434.00 835,019.79 835,019.79 208,754.94

(L01) Jam 0.8032 (L02) Jam 1.8072 (L03) Jam 0.1004 JUMLAH HARGA TENAGA (M12) M 1.0000

744,000.00 82,895.85 1,000.00 800.00 1,000.00

Kayu Perancah (Bekisting) (M51)

Panel 0.4733 Liter 0.5000 M 5.0000 Lbr 10.0000 JUMLAH HARGA BAHAN Jam Jam 0.2062 0.2062

(E20)

35,000.00 35,000.00

JUMLAH HARGA PERALATAN D E F G JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) OVER HEAD & PROFIT 0% x D HARGA SATUAN PEKERJAAN (D + E) (M3) HARGA SATUAN PEKERJAAN (F X 0,25) DIJADIKAN M2

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka Analisa Pendukung Item Pembayaran No. 5.6.(1).(a) Bekisting Perkerasan Jalan Beton / Rigid Panel

NO. (a) A 1 2 3 B 1 2 3

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHAN Kaso uk. 5x7x400 cm Triplek Uk. 4 x 8 Ft Teb. 9 mm Paku

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 8,682.90 11,309.37 3,106.50 1,790.41 2,331.99 7,228.90 46,550.00 20,116.95 9,000.00 75,666.95 82,895.85

(L01) Jam 0.4142 (L02) Jam 0.2062 (L03) Jam 0.2062 JUMLAH HARGA TENAGA (M38) (M47) M Lbr 0.0266 0.1666

1,750,000.00 120,750.00 12,000.00

(M41) Kg 0.7500 JUMLAH HARGA BAHAN

C

JUMLAH HARGA TENAGA, BAHAN (A + B)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM KEGIATAN WILAYAH NO. MATA PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : :

PERIKANAN, KELAUTAN, DAN PERTERNAKAN PERIKANAN, KELAUTAN, DAN PERTERNAKAN Program peningkatan Sarana dan Prasarana Perikanan, Kelautan dan Perternaka 7.3.(1) Baja Tulangan BJ. 24 Polos Kg

NO. (a) A 1 2 3 B 1 2

KOMPONEN (b) TENAGA Pekerja Tukang Mandor BAHANBaja Tulangan (Polos) U24

SATUAN (c)

PERKIRAAN KUANTITAS (d)

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp) (e) (f) = ((d) x (e)) 7,500.00 8,682.90 11,309.37 787.50 303.90 395.82 1,487.22 9,625.00 30.00 9,655.00 11,142.22 1,114.22 12,256.44

(L01) Jam 0.1050 (L02) Jam 0.0350 (L03) Jam 0.0350 JUMLAH HARGA TENAGA(M39a) Kg 1.1000 (M14) Kg 0.0025 JUMLAH HARGA BAHAN

Kawat Beton

8,750.00 12,000.00

C D E

JUMLAH HARGA TENAGA, BAHAN (A + B) OVER HEAD & PROFIT 15% x C HARGA SATUAN PEKERJAAN (C + D)

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

REKAP ANALISA HARGA SATUAN JADIProgram Kegiatan Tahun Anggaran 1. : PERIKANAN, KELAUTAN, DAN PERTERNAKAN : PERIKANAN, KELAUTAN, DAN PERTERNAKAN : Peninggian Jalan Keluar Kawasan

Analisa Harga Satuan Jadi Perkerasan Beton lebar 4 m Item Pekerjaan Satuan : Perkerasan jalan beton lebar 4 m, tebal 20 cm, readymix K.350 slump 12 jenis FA + bekisting rigid, lembar plastik, curing, joint sealent, tulangan dowel dan tiebar : M SAT. M KOEF/ KUANTITAS 1.000 HARGA SATUAN (Rp.) 835,019.79 JUMLAH HARGA (Rp.) 835,019.79 KETERANGAN

NO. 1

URAIAN Perkerasan jalan beton t = 20 cm, readymixK.350 slump 12 jenis FA + bekisting rigid, lembar plastik, curing, joint sealent, olie / gemuk. Baja beton polos U.24, untuk pekerjaan beton (dowel dan tiebar)

2

Kg

22.550

12,256.44

276,382.72

TOTAL

1,111,402.51

2.

Analisa Harga Satuan Jadi Perkerasan Beton lebar = 4 m Pematian Item Pekerjaan : Perkerasan jalan beton lebar 4,5 m, tebal 20 cm, readymix K.350 slump 12 jenis FA + bekisting rigid, lembar plastik, curing, joint sealent, tulangan dowel dan tiebar, termasuk galian tanah berbatu + angkutan untuk pematian jalan : M SAT. M KOEF/ KUANTITAS 1.000 HARGA SATUAN (Rp.) 835,019.79 JUMLAH HARGA (Rp.) 835,019.79 KETERANGAN

Satuan NO. 1 URAIAN

Perkerasan jalan beton t = 20 cm, readymixK.350 slump 12 jenis FA + bekisting rigid, lembar plastik, curing, joint sealent, olie / gemuk. Baja beton polos U.24, untuk pekerjaan beton (dowel dan tiebar) Galian berbatu

2

Kg

22.550

12,256.44

276,382.72

3

M TOTAL

0.6250

80,771.81

50,482.38 1,161,884.89

Jakarta, 18 Oktober 2011 PT. UBER KARYA

GUSTRIANA SINURAT Direktur

3.

Analisa Harga Satuan Jadi Pasangan Turap 20/40-40-20-20 cm Item Pekerjaan Satuan : Pas. turap batu belah ad. 1pc : 3psr, uk. 20/40-40-20-20 cm (rata-rata) termasuk plesteran ad. 1pc : 3psr, galian tanah biasa : M SAT. M KOEF/ KUANTITAS 1.000 HARGA SATUAN (Rp.) 601,518.79 JUMLAH HARGA (Rp.) 601,518.79 KETERANGAN

NO. 1

URAIAN Pas. turap batu belah ad. 1pc : 3 psr uk. 20/40-40-20-20 cm Plesteran ad. 1pc : 3psr teb. 15 mm Galian tanah biasa

2

M

5.000

40,930.54

204,652.70

3

M DIBULATKAN

0.250

39,996.72

9,999.18 816,170.67

Jakarta, 18 Oktober 2011

PT. UBER KARYA

GUSTRIANA SINURAT Direktur

JADWAL PELAKSANAAN PEKERJAAN#REF! #REF! #REF! #REF! #REF! #REF! # # # # # # #REF! #REF! #REF! #REF! #REF! #REF!MINGGU KE NO. URAIAN JUMLAH (Rp.) BOBOT (%) I (1 - 7) Proses Administrasi & Peninjauan Lapangan #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! II (8 - 14) III (15 - 21) IV (22 - 28) V HARI KE (29 - 35) VI (36 - 42) VII (43 - 49) VIII (50 - 56) IX (57 - 60) % #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 90 % 80 % 70 % 60 % 50 % #REF! #REF! #REF! #REF! #REF! #REF! #REF! 40 % 30 % #REF! #REF! #REF! #REF! #REF! 20 % 10 % #REF! #REF! #REF!0.000 0.000 0.000 0.000 0.000 0.000 0.000

BOBOT (%)

#REF! #REF! #REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Perbaikan Kerusakan Jumlah Nilai Pekerjaan Kemajuan Mingguan Kumulatif Kemajuan #REF! #REF! #REF!

#REF! 0.000 #REF! #REF!

0.000

0

0%

(100 %) (%) (%)

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

0.000 #REF!

#REF! #REF!

#REF! #REF!