sutiknoalamsyahtpc.files.wordpress.com · Web viewNama Panggilan : Tikno Tempat, Tanggal Lahir :...
Transcript of sutiknoalamsyahtpc.files.wordpress.com · Web viewNama Panggilan : Tikno Tempat, Tanggal Lahir :...
CURICULUM VITAE
Nama Lengkap : Sutikno Alamsyah
Nama Panggilan : Tikno
Tempat, Tanggal Lahir : Bogor, 11 September 1993
NIK : 3201171109930001
Alamat : Jalan Kh. Abdul Hamid Pasar Senen. RT/RW
001/001. Kelurahan Ciasihan.Kecamatan
Pamijahan. Kabupaten Bogor (14340). Jawa Barat
Agama : Islam
Umur : 21 Tahun
Golongan Darah : O
Tinggi, Berat Badan : 160 cm, 45 Kg
Jenis Kelamin : Laki-laki
Pekerjaan : Mahasiswa
Status : Belum Menikah
Telpon (Hp) : +6285692482550
e-mail : [email protected]
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
Latar Belakang Pendidikan
Formal :
1. SD Negeri 02 Ciasmara : 2000 - 2006
2. SMP Negeri 1 Pamijahan : 2006 - 2009
3. SMA Negeri 1 Leuwiliang : 2009 - 2012
4. D.III Teknik Perminyakan Akamigas Balongan : 20012 - Sekarang
Non Formal :
1. Bimbel Umum "Garuda Madya College" : 2007
2. Kursus Bahasa Inggris "Garuda Madya College" : 2009
3. Kursus Komputer "Garuda Madya College" : 2009
4. Badan Eksekutif Mahasiswa "Departemen
Olahraga Dan Kesenian" : 2012 - Sekarang
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
Pendidikan dan Pelatihan
1. Pelatihan : "Character and Personality Building"
Tanggal : 19 September 20012
Tempat : Kampus Akademi Minyak dan Gas Balongan-Indramayu
2. Pelatihan : "Latihan Dasar Kepemimpinan
Mahasiswa"
Tanggal : 02 Nopember 2012
Tempat : Kampus Akademi Minyak dan Gas Balongan-Indramayu
3. Pelatihan : Stadium General "Directonal Drilling"
Tanggal : 23 Desember 2012
Tempat : Kampus Akademi Minyak dan Gas Balongan-Indramayu
4. Pelatihan : "State And Condition Of Hydrocarbons Exploration In
Eastern Indonesia"
Tanggal : 24 Desember 2012
Tempat : Universitas Padjajaran, Jatinangor-Bandung
5. Pelatihan : Stadium General "Directonal Drilling"
Tanggal : 23 Desember 2012
Tempat : Kampus Akademi Minyak dan Gas Balongan-Indramayu
Hormat Saya,
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
SUTIKNO ALAMSYAH
111201215
LEMBAR PENGESAHAN
Nama : Sutikno Alamsyah
NIM : 111201215
Program Studi : Teknik Perminyakan
Proposal Ini Telah Disetujui dan Disahkan oleh
Dosen Pembimbing Kerja Praktik
Indramayu, Januari 2014
PEMBIMBING
WINARTO, ST
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
KATA PENGANTAR
Syukur alhamdulillah penulis panjatkan kepada Allah SWT yang telah
melimpahkan segala rahmat dan hidayah-NYA sehingga penulis dapat
menyelesaikan Proposal Magang / PKL (Praktek Kerja Lapangan) ini dengan
judul Sistem Pengangkatan pada rig di Chevron Geothermal Salak Ltd kantor
cabang jalan Gunung Salak Sukabumi 43368 Jawa Barat. Proposal ini diajukan
untuk memenuhi syarat untuk melakukan Praktek Kerja Lapangan.
Perwujudan proposal ini adalah berkat bantuan dari berbagai pihak
sehingga laporan ini dapat diselesaikan. Oleh karena itu, pada kesempatan kali
ini perkenankanlah penulis untuk mengucapkan terima kasih kepada :
1. Orang Tuaku yang selalu saya cintai dan tak pernah lelah membimbingku.
2. Ibu Hj.Hanifah Handayani selaku Ketua Yayasan Bina Islami dan Akamigas
Balongan, Indramayu.
3. Bapak Drs.H.Nahdudin Islami selaku Direktur Akamigas Balongan,
Indramayu.
4. Rekan-rekan Akamigas Blongan, Indramayu.
Penulis menyadari bahwa dalam penulisan ini masih banyak terdapat
kekurangan baik dilihat dari segi menyajikan data maupun penulisannya. Kritik
dan saran yang membangun sangat penulis harapkan demi penulisan
selanjutnya yang lebih baik.
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
Indramayu, Januari 2014
Pemohon
DAFTAR ISI SEMENTARA
COVER ....................................................................................................CURICULUM VITAE ................................................................................LATAR BELAKANG PENDIDIKAN.........................................................PENDIDIKAN DAN PELATIHAN ............................................................LEMBAR PENGESAHAN .......................................................................KATA PENGANTAR ...............................................................................DAFTAR ISI ............................................................................................. 1. PENDAHULUAN .................................................................................
1.1 Latar Belakang ..............................................................................
1.2 Tujuan ...........................................................................................
A. Umum ......................................................................................
B. Khusus .....................................................................................
1.3 Manfaat .........................................................................................
A. Mahasiswa ...............................................................................
B. Akamigas Balongan .................................................................
C. Perusahaan ..............................................................................
1.4 Ruang Lingkup ..............................................................................
1.5 Waktu dan Tempat Pelaksanaan ..................................................
2. DASAR TEORI ....................................................................................2.1 Dasar Teori ....................................................................................
2.2 Struktur Penyangga........................................................................
A. Substructure .............................................................................
B. Lantai Bor (Rig Floor) ...............................................................
- Rotary Table .........................................................................
- Rotary Drive .........................................................................
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
- Drawwork ..............................................................................
- Drillers Console ....................................................................
- Make-up & Break-out Tongs .................................................
- Mouse Hole ...........................................................................
- Rate Hole ..............................................................................
- Dog House ............................................................................
- Pipe Ramp (V-ramp) .............................................................
- Cat Walk ...............................................................................
- Hydraulic Cathead ................................................................
C. Menara Pemboran (Drilling Tower) ..........................................
2.3 Tipe Menara .................................................................................
A. Standart (Derrick) ...................................................................
B. Portable (Mast) .......................................................................
C. Bagian-bagian Menara ...........................................................
- Gine Pole .............................................................................
- Water Table .......................................................................
- Cross Breacing ....................................................................
- Tiang Menara .....................................................................
- Girt .......................................................................................
- Monkey Board Platform .......................................................
2.4 Peralatan Pengangkatan ..............................................................
A. Drawwork .................................................................................
- Revolving Drum .....................................................................
- Breaking System .....................................................................
- Rotary Drive.............................................................................
- Catheads ................................................................................
B. Overhead Tools .......................................................................
- Crown Block............................................................................
- Travelling Block .......................................................................
- Hook ......................................................................................
- Elevator...................................................................................
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014
C. Drilling Line ..............................................................................
- Reveed “drilling line” ................................................................
- Dead Line ...............................................................................
- Dead Line Anchor ....................................................................
- Storage or Supply ....................................................................
3. METODOLOGI PELAKSANAAN ………………………………........... 3.1 Metode Pengambilan Data ............................................................
3.2 Tempat dan Waktu Pelaksanaan ...................................................
3.3 Rencana Praktek Kerja Lapangan .................................................
4.KESIMPULAN SEMENTARA...............................................................5.PENUTUP..............................................................................................
DAFTAR PUSTAKA SEMENTARA LAMPIRAN
Proposal Kerja Praktik Chevron Geothermal Salak Ltd 2014