Rincian Dana Venue

Post on 11-Nov-2015

221 views 0 download

description

Even more important things that make it happen again for all that you will have been the

Transcript of Rincian Dana Venue

Sheet1Rincian dana PJ Venueperlengkapan

nonama barangjumlahsatuanhargatotal1tong plastik 200kg9buahRp200,000.00Rp1,800,000.002pipa paralon inch3batangRp25,000.00Rp75,000.003elbow inch6buahRp2,500.00Rp15,000.004tee inch15buahRp3,000.00Rp45,000.005socket drat inch9buahRp2,200.00Rp19,800.006kran air 15buahRp25,000.00Rp375,000.007tramontina (golok)5buahRp150,000.00Rp750,000.008kawat 3kgRp20,000.00Rp60,000.009paku 2cm1kgRp20,000.00Rp20,000.0010palu2buahRp20,000.00Rp40,000.0011tali rafia 5rollRp10,000.00Rp50,000.0012safe line5rollRp100,000.00Rp500,000.0013bambu2batangRp100,000.00Rp200,000.0014obor penerangan10buahRp50,000.00Rp500,000.0015sentir100buahRp20,000.00Rp2,000,000.0016bahan bakar5literRp10,000.00Rp50,000.0017Cangkul2buahRp75,000.00Rp150,000.0018Bambu2batangRp20,000.00Rp40,000.0019MMT venue 2.25m2Rp30,000.00Rp67,500.0020garam krosok2kgRp10,000.00Rp20,000.0021print petunjuk jalan50lembarRp7,000.00Rp350,000.0022head lamp5buahRp50,000.00Rp250,000.0023baterai AAA (isi 6)3buahRp50,000.00Rp150,000.00jumlah totalRp7,527,300.00Rincian dana PJ VenueJasa

nonama barangjumlahsatuanjumlah harihargatotal1HTM500org1Rp5,000.00Rp2,500,000.002tenda peserta25buah4Rp30,000.00Rp3,000,000.003tenda pleton kap. 80 org2buah4Rp300,000.00Rp2,400,000.004tenda pleton kap. 40 org3buah4Rp250,000.00Rp3,000,000.005tratak 4x5 m22buah4Rp75,000.00Rp600,000.006paket kelistrikan*1paket4Rp1,200,000.00Rp4,800,000.007panggung 4x5 m21buah4Rp90,000.00Rp360,000.008lampu 10buah4Rp15,000.00Rp600,000.0091011jumlah totalRp17,260,000.00* genset, lampu 20 titik, 2 lampu tembak, bahan bakar