Podasi Batu Kali

Post on 03-Dec-2015

6 views 3 download

description

mmm

Transcript of Podasi Batu Kali

LEMBAR :

3b

TGL GAMBAR :

STRUKTUR :

ARSITEK :

PEMILIK :

JUDUL GAMBAR :

PROYEK :

DETAILPONDASI BATU KALI

Yogyakarta

Mutu beton = K300

Slump = 12

agrerat =

1

2

Selimut beton strauss :

5 cm

Selimut beton Poer + Sloof

atas = 5 cm

bawah = 5 cm

Besi :

D>=10mm, Fy=390MPa

D<10mm, Fy=240MPa

Wiremesh, Fy=550MPa

Handiyanto Dwikarya ,ST.

1.2.201.2.102.04.1066482

24 Januari 2015

PONDASI TYPE A PONDASI TYPE B