ANGGARAN PEMBUATAN PEKERJAAN ATAP STADION

NO. URAIAN PEKERJAAN Vol Rab VOL. Aktual Selisih SAT.I. PEKERJAAN KUDA-KUDA ATAP 1 2820.51 2820.51 0.00 kg2 5775.00 9450.00 3675.00 kg3 2560.36 4818.24 2257.88 kg4 7429.86 7429.86 0.00 kg5 9251.73 9251.73 0.00 kg6 Profil WF/H 400 dudukan breacing 2408.00 2408.00 0.00 kg7 Plat baja pengaku, T=10 mm 1520.99 1520.99 0.00 kg8 Angkur Baut, Dia.22 mm 448.00 504.00 56.00 Bh9 Cross Tank, Dia.16 mm 1057.95 1057.96 0.00 kg

II. PEKERJAAN GORDING 1 CNP 150.50.20.3,2 7041.22 7627.98 586.76 kg2 CNP 75.45.20.2.3 4709.25 5978.70 1269.45 kg3 Siku 70.70.7, penahan gording 420.93 1358.03 937.10 kg4 Baut 12mm 1624.00 1624.00 0.00 Bh5 Trestang, 16 mm 2073.75 1726.47 -347.28 kg

III. PEKERJAAN LAIN -LAIN 1 Pengecatan Zincromate Anti Karat 1169.65 1169.65 0.002 Alat Bantu dan Acsesories 1.00 1.00 0.00 Ls3 Pabrikasi dan Pemasangan 1.00 1.00 0.00 Ls

Rangka pipa black steel 41-JLS. G-3444, ø7"Rangka pipa black steel 41-JLS. G-3444, ø5"Rangka pipa black steel 41-JLS. G-3444, ø4"Rangka pipa black steel 41-JLS. G-3444, ø3"Rangka pipa black steel 41-JLS. G-3444, ø2.5"

M2