Perhitungan Kebutuhan Material Beton

Post on 14-Apr-2016

74 views 4 download

Transcript of Perhitungan Kebutuhan Material Beton

KEBUTUHAN CAMPURAN BETON K-250

PERBANDINGAN CAMPURAN

Material semen pasir splitKomposisi 1 : 5 : 9Satuan Zak Keranjang KeranjangBerat 50 kg 21 kg 19 kgBerat Total 50 kg 105 kg 171 kgBJ 1250 kg/m3 1400 kg/m3 1350 kg/m3Volume 0.04 m3 0.075 m3 0.126667 m3Komposisi 1 m3 1.875 m3 3.166667 m327 m3 4.4689655 m3 8.37931 m3 14.15172 m31 m3 0.1655172 m3 0.310345 m3 0.524138 m3kuantitas 206.89655 kg 434.4828 kg 707.5862 kg

4.1379311 m3 5 zak 410 kg 710 kg

27 m3 135 zak 11070 kg 19170 kg

6.041667 M3 beton

KEBUTUHAN CAMPURAN BETON K-250

PERBANDINGAN CAMPURAN

Material semen pasir splitKomposisi 1 : 5 : 9Satuan Zak Keranjang Keranjang

Volume 27 m^3

Material semen pasir splitKonversi (m3) 50 0.52 0.78komposisi (m3) 50 2.6 7.02

Semen 22.6 m^3 1506 kg/m^3 0.033201pasir 1.2 m^3 1400 kg/m^3split 3.2 m^3 1450 kg/m^3

682.0195 100 0.14662334100.97 9 7.6435922.64341 16 5.032816