KEBUTUHAN CAMPURAN BETON K-250
PERBANDINGAN CAMPURAN
Material semen pasir splitKomposisi 1 : 5 : 9Satuan Zak Keranjang KeranjangBerat 50 kg 21 kg 19 kgBerat Total 50 kg 105 kg 171 kgBJ 1250 kg/m3 1400 kg/m3 1350 kg/m3Volume 0.04 m3 0.075 m3 0.126667 m3Komposisi 1 m3 1.875 m3 3.166667 m327 m3 4.4689655 m3 8.37931 m3 14.15172 m31 m3 0.1655172 m3 0.310345 m3 0.524138 m3kuantitas 206.89655 kg 434.4828 kg 707.5862 kg
4.1379311 m3 5 zak 410 kg 710 kg
27 m3 135 zak 11070 kg 19170 kg
![Page 2: Perhitungan Kebutuhan Material Beton](https://reader036.fdokumen.com/reader036/viewer/2022072107/56d6be231a28ab301690c86c/html5/thumbnails/2.jpg)
6.041667 M3 beton
![Page 3: Perhitungan Kebutuhan Material Beton](https://reader036.fdokumen.com/reader036/viewer/2022072107/56d6be231a28ab301690c86c/html5/thumbnails/3.jpg)
KEBUTUHAN CAMPURAN BETON K-250
PERBANDINGAN CAMPURAN
Material semen pasir splitKomposisi 1 : 5 : 9Satuan Zak Keranjang Keranjang
Volume 27 m^3
Material semen pasir splitKonversi (m3) 50 0.52 0.78komposisi (m3) 50 2.6 7.02
Semen 22.6 m^3 1506 kg/m^3 0.033201pasir 1.2 m^3 1400 kg/m^3split 3.2 m^3 1450 kg/m^3
![Page 4: Perhitungan Kebutuhan Material Beton](https://reader036.fdokumen.com/reader036/viewer/2022072107/56d6be231a28ab301690c86c/html5/thumbnails/4.jpg)
682.0195 100 0.14662334100.97 9 7.6435922.64341 16 5.032816