DAFTAR UPAH MINGGUAN PEKERJA PROYEK14-Mar-15
Lokasi Proyek : Sudirman Square, Jalan Jend. Sudirman, Sungailiat, Bangka Minggu ke 4
Kav. Nomor : Harian Gudang Periode 8 Mar 2015 - 14 Mar 2015
HARI
M Sn Sl Rb Kms Jm Sab1 Ansori Gudang & Material 0
2 Ansori (*) Gudang & Material 7 Rp. 90.000,00 Rp. 630.000,00
3 Pak Haji Yadin Mandor x 6 Rp. 155.000,00 Rp. 930.000,00
4 Pak Haji Herdin Mandor 0
5 Obay Tukang Kayu 0
6 Jaya Tukang Batu 0
7 Jhonny Tukang Kayu 0
8 Sanusi Tukang Batu x 6 Rp. 130.000,00 Rp. 780.000,00
9 Doni Tukang Batu x 6 Rp. 130.000,00 Rp. 780.000,00
10 Godik Tukang 0
11 Dede Tukang 0
12 Miskat Tukang 0
13 Opan Tukang 0
14 Selihin Tukang 0
15 Wawan Tukang 0
16 Eko Tukang 0
17 Tatang Tukang 0
18 Janung Tukang 0
19 Saiful Bahri Tukang 0
20 Wahidin Tukang 0
21 Hadimi Tukang 0
22 Basri Tukang 0
23 Asep Tukang 0
24 Kole Tukang 0
25 Apit Tukang 0
26 Abdul Maliki Tukang 0
27 Anwar Tukang 0
28 0
29 0
30 0
31 0
32 0
33 0
34 0
35 0
Rp. 3.120.000,00
A) Total Kontrak Rp
B) Pengambilan S/d Minggu Lalu Rp Sungailiat, Tanggal : 14 Mar 2015Pengambilan Minggu ini Rp
Jumlah Sampai Minggu ini Rp
C) Progress Pekerjaan (A-B) Rp ..
Note : Hari Kamis Hujan seharian
JumlahNO. NAMA STATUS
Jumlah
Hari
Kerja
Upah Per Hari
Pemeriksa
( _________________)
Mandor
( _________________)tanda tangan nama jelas