  • DAFTAR UPAH MINGGUAN PEKERJA PROYEK14-Mar-15

    Lokasi Proyek : Sudirman Square, Jalan Jend. Sudirman, Sungailiat, Bangka Minggu ke 4

    Kav. Nomor : Harian Gudang Periode 8 Mar 2015 - 14 Mar 2015

    HARI

    M Sn Sl Rb Kms Jm Sab1 Ansori Gudang & Material 0

    2 Ansori (*) Gudang & Material 7 Rp. 90.000,00 Rp. 630.000,00

    3 Pak Haji Yadin Mandor x 6 Rp. 155.000,00 Rp. 930.000,00

    4 Pak Haji Herdin Mandor 0

    5 Obay Tukang Kayu 0

    6 Jaya Tukang Batu 0

    7 Jhonny Tukang Kayu 0

    8 Sanusi Tukang Batu x 6 Rp. 130.000,00 Rp. 780.000,00

    9 Doni Tukang Batu x 6 Rp. 130.000,00 Rp. 780.000,00

    10 Godik Tukang 0

    11 Dede Tukang 0

    12 Miskat Tukang 0

    13 Opan Tukang 0

    14 Selihin Tukang 0

    15 Wawan Tukang 0

    16 Eko Tukang 0

    17 Tatang Tukang 0

    18 Janung Tukang 0

    19 Saiful Bahri Tukang 0

    20 Wahidin Tukang 0

    21 Hadimi Tukang 0

    22 Basri Tukang 0

    23 Asep Tukang 0

    24 Kole Tukang 0

    25 Apit Tukang 0

    26 Abdul Maliki Tukang 0

    27 Anwar Tukang 0

    28 0

    29 0

    30 0

    31 0

    32 0

    33 0

    34 0

    35 0

    Rp. 3.120.000,00

    A) Total Kontrak Rp

    B) Pengambilan S/d Minggu Lalu Rp Sungailiat, Tanggal : 14 Mar 2015Pengambilan Minggu ini Rp

    Jumlah Sampai Minggu ini Rp

    C) Progress Pekerjaan (A-B) Rp ..

    Note : Hari Kamis Hujan seharian

    JumlahNO. NAMA STATUS

    Jumlah

    Hari

    Kerja

    Upah Per Hari

    Pemeriksa

    ( _________________)

    Mandor

    ( _________________)tanda tangan nama jelas