MANAJEMEN PROYEK
ISMU KUSUMANTO
Jurusan Teknik Elektro
UIN SUSKA Riau
2
Materi
Intro
Organization
Leadership Teams
Partnering
MonitoringProgress
Audit &Closure
Define Project
Project Networks
ReducingProject Time
SchedulingResources
ManagingRisks
3
The Technological and SocioculturalDimensions of the Project Management Process
SocioculturalLeadershipProblem solvingTeamworkNegotiationPoliticsCustomer expectations
TechnicalScopeWBSSchedulesResource allocationBaseline budgetsStatus reports
4
Evaluasi
No. Kegiatan Bobot
1. Absensi 10 %
2. Tugas 15 %
3. Quiz 20 %
4. Mid Test 25 %
5. Final Test 30 %
TOTAL 100%
5
Bahan Pustaka
“Project Management, the Managerial Process”, Gray & Larson, Mc Graw Hill, 2003.
Project Management, A System Approach to Planning, Scheduling & Controlling, Kerzner, John Wiley, 2003.
“Project Management, Techniques in Planning and Controlling Construction Projects”, Ahuja dkk, Wiley, 2000.
“Project Management for Engineering & Construction”, Oberlender, Mc Graw Hill, 2000.
6
FIRST THINGS FIRST : WHAT IS A PROJECT ???
The characteristics of projects : Complex and numerous activities Unique --- a one time set of events Limited resources and budget Many people involved, usually across several
functional areas in the organizations Sequenced activities Goal oriented End product or service must result
7
Variasi Produk vs Volume
Volume
Var
iasi
Pro
du
k
Rendah Tinggi
Rendah
Tinggi PROJECT
JOBBING
BATCH
LINE
CONTINUOUS PROCESS
8
Project Management
The art and science of coordinating people, equipment, materials, money and schedules to complete a specified project on time and within approved cost.
9
Everyone is a project manager,
but…not everyone knows how to
plan and manage the project
10
Manajemen Proyek vs Kegiatan Operasional
KEGIATAN PROYEK KEGIATAN OPERASIONAL
a. Bercorak dinamis, non rutinb. Siklus proyek relatif pendekc. Intensitas kegiatan didalam
periode siklus proyek berfluktuasi
d. Kegiatan harus diselesaikan berdasarkan anggaran dan jadwal yang telah ditentukan
e. Terdiri dari bermacam-macam kegiatan yang memerlukan berbagai disiplin ilmu
f. Keperluan sumber daya berubah, baik macam maupun volumenya
a. Berulang-ulang (rutin)b. Berlangsung dalam jangka
panjangc. Intensitas kegiatan relatif
sama.d. Batasan anggaran dan
jadwal tidak setajam dalam proyek.
e. Macam-macam kegiatan tidak terlalu banyak dan terkadang terdiri dari disiplin ilmu tunggal.
f. Macam dan volume keperluan sumber daya relatif konstan.
11
PROJECT SYSTEMS
Quality
Estimating
Safety
Equipment Control
Sub ContractAdminControl
Cost Control General Accounting
Material Control
ProgressControl
Small control
tool
Payroll &Personnel
ProjectPerformance
Analysis
Document control
PROJECT
12
Project Constraints/Trade-Offs
SCOPE
BUDGET SCHEDULE
QualityQuality
Quality
13
Project Life CycleDefinition Planning Execution Delivery
Lev
el o
f ef
fort
1. Goals2. Specifications3. Tasks4. Responsibilities5. Teams
1. Schedules2. Budgets3. Resources4. Risks5. Staffing
1. Status reports2. Changes3. Quality4. Forecasts
1. Train customer2. Transfer documents3. Release resources4. Reassign staff5. Lessons learned
14
5 PHASEPROJECT MANAGEMENT
CLOSE
Obtain clientacceptance
Installdeliverables
Document theproject
Issue the finalreport
Conduct postimplementationaudit
DEFINE
State theproblem
Identify projectgoals
List theobjectives
Determinepreliminaryresources
Identifyassumptionsand risks
PLAN
Identify projectactivities
Estimate time &cost
Sequenceproject activities
Identify criticalactivities
Write projectproposal
ORGANIZE
Determinepersonnel needs
Recruit projectmanager
Recruit projectteam
Organize projectteam
Assign workpackages
CONTROL
Definemanagementstyle
Establish controltools
Prepare statusreports
Review projectschedule
Issue changeorders
PLANNING IMPLEMENTATION
1 2 543
DELIVERABLES
15
PLAN
Identify project activities
Estimate time & cost
Sequence project activities
Identify critical activities
Write project proposal
• WBS
• Project Network
• Critical Path
• Project Proposal
16
ORGANIZE
• Recruitment Criteria• Work Package Description• Work Package Assignments
17
CONTROL
• Variance Reports• Status Reports• Staff Allocations Reports
CLOSE
• Final Reports• Audit Reports
18
Start of project
Before project During project
Project Planning
Project Scheduling
Project Controlling
Project Planning, Scheduling & Controlling
19
Perencanaan
Penetapan tujuan Mendefinisikan proyek Mengkaitkan kebutuhan dengan aktivitas
proyek Mengorganisasikan team
20
Tools Perencanaan Proyek
Estimasi waktu dan biaya Anggaran Cash flow Ketersediaan bahan Data personel Gambar-gambar teknik
21
Penjadwalan Proyek
Mengkaitkan sumber daya (TK, uang, bahan) dengan aktivitas-aktivitas tertentu.
Mengkaitkan satu aktivitas dengan aktivitas yang lain.
Meng-update dan merevisi jadwal secara berkala.
22
Tools Penjadwalan Proyek
Gantt charts CPM dan PERT Milestone chart Cash flow schedules
23
Pengendalian Proyek
Memonitor sumber daya, biaya, kualitas dan budgets.
Merevisi dan merubah rencana. Menggeser-geser sumber daya untuk
memenuhi permintaan terhadap waktu, biaya dan kualitas.
24
Tools Pengendalian Proyek
Report-report yang menggambarkan : Anggaran untuk setiap departemen Aktivitas-aktivitas yang tertunda Slack activities Kualitas pekerjaan yang telah diselesaikan.
25
ProjectSystems
ProjectPlan & Schedule
Revisions & Updates
ProductionDept.
PurchasingDept.
PersonnelDept.
EngineeringDept.
Subcontractors
Quality ControlDept.
Supplies
Resources
TopManagement
ProjectTeam
Ruang LingkupPekerjaan Manajer Proyek
Performance ReportsFeedback loop
Information regarding times, costs, problem, delays
26
Key areas of project management and project managers
Planning Scheduling Budgeting Managing resources Tracking & reporting progress
27
Integrated Management of Projects
Customer
Environmental analysisExternal Internal
Firmmission,
goals, strategies
Priorities
ProjectsEnvironmentand Culture
System
Project Implementation
Scope
Work Breakdown
Networks
Resources
Cost
Organization
Leadership
Teams
Partners