Post on 16-Apr-2015
description
Pengawasan Coal
Cleaning
Pengawasan
Teknik Coal
Getting
Pengawasan
Terhadap
Kontaminasi
(No Contaminant)
Pengawasan
Kondisi Front
Loading
Pengawasan
Ukuran Coal
(No Big Coal)
Hand PickingPengecekan Coal
Sebelum Diangkut
Pengawasan
Hauling
(Tidak Boleh
Tumpah)
ROM
Management
Klasifikasi Coal
First In First Out
Penanganan Fine
Coal
Penanganan Dirty
Coal
Pengawasan
ROM
Basement ROM
Drainage ROM
Penerangan ROM
Pengawasan
Kontaminasi Coal
Pengawasan
Kualitas Coal
Land Clearing
Topsoil RemovalTopsoil Stock
Disposal
Ripping
Overburden
Coal MiningOverburden To
Disposal
Coal Stock To
ROM
Coal Hauling To
Stockpile Port
Kegiatan Quality Control
Proses Produksi
Gambar :
Flowchart Quality Control
Dan Proses Produksi