ESTIMASI SAYATAN PLANIMETER

Post on 23-Jan-2016

10 views 0 download

description

vhjbvhgkhjkhjkhjk

Transcript of ESTIMASI SAYATAN PLANIMETER

LAMPIRAN

HASIL ESTIMASI CADANGAN MENGGUNAKAN METODE

CROSS SECTION DENGAN PLANIMETER

No Blok Seksi Luas Jarak Antar Seksi Volume Densitas Tonase      (m2) (m) (m3) (Ton/m3) (Ton)

1 I A - A' 218.67 40 50780.74 1.8 91405.3325    B - B' 3528.67        2 II B - B' 3528.67 40 209880 1.8 377784    C - C' 6965.33        3 III C - C' 6965.33 40 344246.6 1.8 619643.88    D - D' 10247        4 IV D - D' 10247 40 484500 1.8 872100    E - E' 13978        5 V E - E' 13978 40 547720 1.8 985896    F - F' 13408        6 VI F - F' 13408 40 439500 1.8 791100    G - G' 8567        7 VII G - G' 8567 40 378100 1.8 680580    H - H' 10338        8 VIII H - H' 10338 40 453933.4 1.8 817080.12    I - I' 12358.67        9 IX I - I' 12358.67 40 504706.8 1.8 908472.24    J - J' 12876.67        

10 X J - J' 12876.67 40 488893.4 1.8 880008.12    K - K' 11568        

11 XI K - K' 11568 40 406733.4 1.8 732120.12    L - L' 8768.67        

12 XII L - L' 8768.67 40 402686.8 1.8 724836.24    M - M' 11365.67        

13 XIII M - M' 11365.67 40 510686.8 1.8 919236.24    N - N' 14168.67        

14 XIV N - N' 14168.67 40 566073.4 1.8 1018932.12    O - O' 14135        

15 XV O - O' 14135 40 646060 1.8 1162908    P - P' 18168        

16 XVI P - P' 18168 40 811866.6 1.8 1461359.88    Q - Q' 22425.33        

17 XVII Q - Q' 22425.33 40 723753.2 1.8 1302755.76    R - R' 13762.33        

18 XVIII R - R' 13762.33 40 283033.7 1.8 509460.6613    S - S' 7320        

Estimasi Cadangan Batugamping Dengan Metode Cross Section Dengan Planimeter 14855678.71