REKAPITULASI ITEM PEKERJAAN No JENIS PEKERJAAN VOL SAT HARGA SATUAN (Rp) I PEKERJAAN PENDAHULUAN II PEKERJAAN BETON III PEKERJAAN DINDING IV PEKERJAAN PEMASANGAN KUSEN,PINTU DAN JENDELA V PEKERJAAN PEMASANGAN KUDA-KUDA DAN ATAP VI PEKERJAAN PEMASANGAN PLAFOND VII PEKERJAAN PEMASANGAN LANTAI TEGEL VIII INSTALASI LISTRIK IX PEKERJAAN PENGECATAN X PEKERJAAN PEMBERSIHAN (A) JUMLAH (B) PPN = 10% x (A) TOTAL (A) + (B) DIBULATKAN Terbilang : Tiga Ratus Lima Puluh Juta Rupiah Manado, 19 PRETTY S.M NAMA PEKERJAAN : PENAMBAHAN RUANGAN LANTAI II PUSKESMAS TIKALA BARU LOKASI : TIKALA BARU - KOTA MANADO TAHUN ANGGARAN : 2014

description

RAB PUSKESMAS TIKALA

Transcript of Rab Tikala Baru

Page 1: Rab Tikala Baru

REKAPITULASI ITEM PEKERJAAN

No JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

I PEKERJAAN PENDAHULUAN 10,496,358II PEKERJAAN BETON 17,477,316III PEKERJAAN DINDING 103,770,720IV PEKERJAAN PEMASANGAN KUSEN,PINTU DAN JENDELA 35,958,600V PEKERJAAN PEMASANGAN KUDA-KUDA DAN ATAP 37,490,938VI PEKERJAAN PEMASANGAN PLAFOND 40,450,544VII PEKERJAAN PEMASANGAN LANTAI TEGEL 22,821,750VIII INSTALASI LISTRIK 9,450,000IX PEKERJAAN PENGECATAN 36,927,517

X PEKERJAAN PEMBERSIHAN 3,915,000

(A) JUMLAH 318,758,742

(B) PPN = 10% x (A) 31,875,874

TOTAL (A) + (B) 350,634,616

DIBULATKAN 350,000,000Terbilang : Tiga Ratus Lima Puluh Juta Rupiah

Manado, 19 Mei 2014

PRETTY S.M NGANTUNGDIREKTUR

NAMA PEKERJAAN : PENAMBAHAN RUANGAN LANTAI II PUSKESMAS TIKALA BARULOKASI : TIKALA BARU - KOTA MANADOTAHUN ANGGARAN : 2014

Page 2: Rab Tikala Baru

RENCANA ANGGARAN BIAYA (RAB)

No JENIS PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA

(Rp) (Rp)I PEKERJAAN PENDAHULUAN1 Pek.Bongkaran Dinding untuk selasar 7.7 m2 121,500 935,5502 Pek.Buangan Bongkaran Ke tempat sampah 7.7 m2 47,250 363,8253 Pemasangan Bow plank 15 m 46,132 691,9834 Pembuatan Direksi Keet & Gudang Bahan 9 m2 337,500 3,037,500

5 Persiapan listrik dan air kerja 90 hr 60,750 5,467,500

SUB TOTAL I 10,496,358II PEKERJAAN BETON1 Pek.Kolom 30/30 2.88 m3 2,104,650 6,061,3922 Pek.Kolom 25/40 2.56 m3 2,104,650 5,387,9043 Pek.Kolom Praktis 15/15 0.4 m3 1,647,000 658,800

4 Pek.Ring Balok 15/20 3.26 m3 1,647,000 5,369,220

SUB TOTAL II 17,477,316

III PEKERJAAN DINDING1 Pek.Pasangan Dinding Bata 314 m2 141,750 44,509,5002 Pek.Plesteran 628 m2 54,000 33,912,000

3 Pek.Acian Dinding 628 m2 40,365 25,349,220

SUB TOTAL III 103,770,720

IV PEKERJAAN PEMASANGAN KUSEN,PINTU DAN JENDELA1 Pas.Kusen Pintu dan Jendela Kayu kls II 140 m1 112,928 15,809,8502 Pas.Daun Pintu Panel 7 bh 540,000 3,780,0004 Pas.Daun Jedela 80 m1 101,250 8,100,0005 Pas. Kaca Polos 5 mm 14 m2 405,000 5,670,0006 Pas. Engsel Pintu 7 bh 47,250 330,7507 Pas. Engsel Jendela 24 bh 40,500 972,0008 Pas.Grendel Jendela 24 unit 27,000 648,0009 Pas.Kait Angin 24 unit 27,000 648,000

SUB TOTAL V 35,958,600

VI PEKERJAAN PEMASANGAN KUDA-KUDA DAN ATAP1 Pek.Kuda-Kuda Baja Ringan + Atap 190 m2 189,000 35,910,000

1 Pek.Pasang Listplank GRC 1/20 21 m1 75,283 1,580,938

SUB TOTAL VI 37,490,938

VI PEKERJAAN PEMASANGAN PLAFOND1 Pek.Pas Rangka Plafond Alumunium Hollow 155 m2 129,346 20,048,6692 Pek.Pasang Plafond Gypsum 155 m1 94,500 14,647,500

3 Pek.Pasang Profil Gypsum 6cm 155 m1 37,125 5,754,375

SUB TOTAL VI 40,450,544

VIII PEKERJAAN PEMASANGAN LANTAI TEGEL

1 Pek.Pasang Tegel 147 m2 155,250 22,821,750

SUB TOTAL VIII 22,821,750

IX INSTALASI LISTRIK1 Pek. Instalasi Titik Lampu 15 ttk 270,000 4,050,0002 Pek.Pasang MCB + Box 1 ttk 270,000 270,0003 Pek. Pasang Stop Kontak 9 ttk 270,000 2,430,000

4 Pek. Pasang Saklar 10 ttk 270,000 2,700,000

SUB TOTAL IX 9,450,000

NAMA PEKERJAAN : PENAMBAHAN RUANGAN LANTAI II PUSKESMAS TIKALA BARULOKASI : TIKALA BARU - KOTA MANADOTAHUN ANGGARAN : 2014

Page 3: Rab Tikala Baru

X PEKERJAAN PENGECATAN1 Pek. Pengecatan Dinding Luar Dalam (3x lapis) setara Metrolite 629 m2 33,615 21,143,8352 Pek. Pengecatan Kusen Pintu dan Jendela 140 m1 40,581 5,681,3403 Pek. Pengecatan Pintu 12.6 m2 40,581 511,3214 Pek. Pengecatan Jendela 90.5 m1 40,581 3,672,5815 Pek. Pengecatan Plafond 155 m2 33,075 5,126,625

6 Pek. Pengecatan Listplank 21 m1 37,706 791,816

SUB TOTAL X 36,927,517

XI PEKERJAAN PEMBERSIHAN

1 Pek. Pembersihan Puing di buang ke tempat sampah 145 m1 27,000 3,915,000

SUB TOTAL XI 3,915,000

(A) JUMLAH 318,758,742

(B) PPN = 10% x (A) 31,875,874

TOTAL (A) + (B) 350,634,616

DIBULATKAN 350,000,000Terbilang : Tiga Ratus Lima Puluh Juta Rupiah

Manado, 19 Mei 2014di buat oleh:

Erry Mentang,A.Ma.TAPIMTEK

Page 4: Rab Tikala Baru

ANALISA HARGA SATUAN

No JENIS BAHAN DAN TENAGA SAT KOEF HARGA SATUAN JUMLAH HARGA(Rp) (Rp)

I PEKERJAAN PENDAHULUAN1 1M2 Pembersihan Lokasi 14,500

Pekerja HO 0.1 80,000 8,000Mandor HO 0.05 130,000 6,500

2 Pembuatan Direksi kit dan gudang 497,030Balok 6/10 m3 0.025 2,100,000 52,500Balok 5/7 m3 0.08 2,100,000 168,000Tripleks 3 mm m2 0.04 65,000 2,600Seng Gelombang m2 0.045 70,000 3,150Paku tripleks kg 0.165 18,000 2,970Paku 3' kg 0.06 13,000 780Tukang Kayu org 2 95,000 190,000Pekerja org 1 80,000 80,000

3 Persiapan listrik dan air kerja 53,000Listrik kwh 1.45 15,000 21,750Air ltr 250 125 31,250

4 1M1 Pemasangan Bow plank 34,172Papan kls III m3 0.0014 1,900,000 2,660Balok 5/7 m3 0.006 2,100,000 12,600Paku 4' kg 0.01 13,000 130Pekerja HO 0.1 80,000 8,000Tukang Kayu HO 0.1 95,000 9,500Kepala Tukang Kayu HO 0.01 110,000 1,100Mandor HO 0.0014 130,000 182

NAMA PEKERJAAN : REHABILITASI PUSTU LIWASLOKASI : LIWAS - KOTA MANADOTAHUN ANGGARAN : 2014

Page 5: Rab Tikala Baru

II PEKERJAAN PEMASANGAN PONDASI1 1M3 Pek. galian tanah 30,500

Mandor HO 0.05 130,000 6,500Pekerja HO 0.3 80,000 24,000

2 1 M3 Pek. urugan pasir bawah pondasi dan bawah lantai 197,800Pasir Kasar m3 1.2 143,750 172,500Pekerja org 0.3 80,000 24,000Mandor org 0.01 130,000 1,300

3 Pek.Lantai Kerja 983,950Semen sak 2.68 60,000 160,800Pasir Kasar m3 0.548 112,500 61,650Split m3 0.94 475,000 446,500Tukang Batu org 1 95,000 95,000Pekerja org 2.75 80,000 220,000

4 Pek.Pondasi batu pecah 895,440Batu Pecah m3 1.2 112,500 135,000Semen sak 5.294 60,000 317,640Pasir Kasar m3 0.52 112,500 58,500Pekerja HO 3.6 65,000 234,000Tukang HO 1.2 100,000 120,000Kepala Tukang HO 0.12 125,000 15,000Mandor HO 0.18 85,000 15,300

5 Pek.urugan tanah galian 55,330Tanah Urug m3 1 37,500 37,500Pekerja HO 0.192 80,000 15,360Mandor HO 0.019 130,000 2,470

III PEKERJAAN BETON1 Pek.Sloof 20/25 2,377,200

Semen zak 7.88 60,000 472,800Pasir Kasar m3 0.9 112,500 101,250Split m3 1.4 475,000 665,000Besi Ø 14 mm ulir kg 4.5 130,000 585,000

kg 1.55 45,000 69,750Kawat Bendrat kg 0.5 18,000 9,000Papan kls III m3 0.2 1,900,000 380,000Paku 1.5' kg 1.1 15,000 16,500Pekerja HO 0.5 80,000 40,000Tukang HO 0.3 95,000 28,500Kepala Tukang HO 0.05 110,000 5,500Mandor HO 0.03 130,000 3,900

2 Pek.Kolom 20/45 2,377,200Semen zak 7.88 60,000 472,800Pasir Kasar m3 0.9 112,500 101,250Split m3 1.4 475,000 665,000

kg 4.5 130,000 585,000Besi Beugel 8mm SNI kg 1.55 45,000 69,750Kawat Bendrat kg 0.5 18,000 9,000Papan kls III m3 0.2 1,900,000 380,000Paku 1.5' kg 1.1 15,000 16,500Pekerja HO 0.5 80,000 40,000Tukang HO 0.3 95,000 28,500Kepala Tukang HO 0.05 110,000 5,500Mandor HO 0.03 130,000 3,900

Besi Beugel (Ø 8mm)

Besi Ø 14 mm SNI ulir

Page 6: Rab Tikala Baru

2 Pek.Kolom Praktis 15/15 1,467,455Semen m3 0.88 60,000 52,800Pasir Kasar m3 6 112,500 675,000Split m3 0.009 475,000 4,275

kg 4.5 45,000 202,500Besi Beugel (6mm AB) kg 2.53 16,000 40,480Kawat Bendrat kg 1 18,000 18,000Papan kls III m3 0.2 1,900,000 380,000Paku 1.5' kg 1.1 15,000 16,500Pekerja HO 0.5 80,000 40,000Tukang HO 0.3 95,000 28,500Kepala Tukang HO 0.05 110,000 5,500Mandor HO 0.03 130,000 3,900

3 Pek. Ring Balok 20/30 933,755Semen m3 0.08 60,000 4,800Pasir Kasar m3 6 112,500 675,000Split m3 0.009 475,000 4,275

kg 4.5 45,000 202,500Besi Beugel (6mm AB) kg 1.53 16,000 24,480Kawat Bendrat kg 0.4 18,000 7,200Papan kls III m3 0.002 1,900,000 3,800Paku 1.5' kg 0.01 15,000 150Pekerja HO 0.06 80,000 4,800Tukang HO 0.06 95,000 5,700Kepala Tukang HO 0.006 110,000 660Mandor HO 0.003 130,000 390

4 Pek.Kanopi Beton t= 7 cm 525,155Semen m3 7.88 22,500 177,300Pasir Kasar m3 0.525 17,500 9,188Split m3 0.735 32,500 23,888

kg 4.5 45,000 202,500Besi Beugel (6mm AB) kg 1.53 16,000 24,480Kawat Bendrat kg 0.4 110,000 44,000Papan kls III m3 0.02 65,000 1,300Paku 1.5' kg 0.01 3,200,000 32,000Pekerja HO 0.6 80,000 48,000Tukang HO 0.1 95,000 9,500Kepala Tukang HO 0.06 110,000 6,600Mandor HO 0.03 130,000 3,900

4 Pek.Plat Lantai Beton t= 12 cm 2,457,700Semen m3 7.88 60,000 472,800Pasir Kasar m3 1 112,500 112,500Split m3 1.4 475,000 665,000

kg 5.5 130,000 715,000Kawat Bendrat kg 1 18,000 18,000Papan kls III m3 0.2 1,900,000 380,000Paku 1.5' kg 1.1 15,000 16,500Pekerja HO 0.5 80,000 40,000Tukang HO 0.3 95,000 28,500Kepala Tukang HO 0.05 110,000 5,500Mandor HO 0.03 130,000 3,900

Besi Ø 8mm

Besi Ø 8mm

Besi Ø 8mm

Besi Ø 12mm

Page 7: Rab Tikala Baru

IV PEMASANGAN BATA, PLESTERAN & ACIAN1 Pek.Pasangan Dinding Hollowbrick 98,025

Hollowbrick bh 14 3,000 42,000Semen sak 0.3 60,000 18,000Pasir Kasar m3 0.03 112,500 3,375Pekerja HO 0.3 80,000 24,000Tukang HO 0.08 95,000 7,600Kepala Tukang HO 0.01 110,000 1,100Mandor HO 0.015 130,000 1,950

1 Pek.Pasangan Dinding Bata 126,025Bata bh 70 1,000 70,000Semen sak 0.3 60,000 18,000Pasir Kasar m3 0.03 112,500 3,375Pekerja HO 0.3 80,000 24,000Tukang HO 0.08 95,000 7,600Kepala Tukang HO 0.01 110,000 1,100Mandor HO 0.015 130,000 1,950

2 Pek.Plesteran 61,230Semen sak 0.1555 60,000 9,330Pasir Halus m3 0.2 112,500 22,500Pekerja HO 0.1 80,000 8,000Tukang HO 0.2 95,000 19,000Kepala Tukang HO 0.01 110,000 1,100Mandor HO 0.01 130,000 1,300

2 Pek. Acian 17,850Semen sak 0.07 60,000 4,200Pekerja HO 0.077 80,000 6,160Tukang HO 0.068 95,000 6,460Kepala Tukang HO 0.007 110,000 770Mandor HO 0.002 130,000 260

V PEKERJAAN PEMASANGAN KUSEN,PINTU DAN JENDELA1 Pas.Kusen Pintu dan Jendela Kayu kls II 83,650

Kayu kls II m3 0.005 3,200,000 16,000Pekerja HO 0.01 80,000 800Tukang HO 0.7 95,000 66,500Kepala Tukang HO 0.002 110,000 220Mandor HO 0.001 130,000 130

2 Pas.Daun Jendela Depan Kayu kls II 70,850Kayu kls II m3 0.001 3,200,000 3,200Pekerja HO 0.01 80,000 800Tukang HO 0.7 95,000 66,500Kepala Tukang HO 0.002 110,000 220Mandor HO 0.001 130,000 130

2 Pas.Daun Pintu Depan Kayu Kls II 559,500Kayu kls II m3 0.01 3,200,000 32,000Pekerja HO 2 80,000 160,000Tukang HO 3.5 95,000 332,500Kepala Tukang HO 0.2 110,000 22,000Mandor HO 0.1 130,000 13,000

3 Pas.Daun Pintu Doblle Multipleks 531,450Kayu Kls II m3 0.037 3,200,000 118,400Paku tripleks kg 0.4 18,000 7,200Lem Kayu kg 0.37 15,000 5,550Multipleks lbr 1.8 23,000 41,400Pekerja HO 1.1 80,000 88,000Tukang HO 2 95,000 190,000Kepala Tukang HO 0.7 110,000 77,000Mandor HO 0.03 130,000 3,900

Page 8: Rab Tikala Baru

3 Pas.Kusen Pintu PVC 395,700Kusen & Pintu PVC (1 set ) set 1 300,000 300,000Pekerja HO 0.25 80,000 20,000Tukang HO 0.64 95,000 60,800Kepala Tukang HO 0.1 110,000 11,000Mandor HO 0.03 130,000 3,900

5 Pas. Kaca Polos 5 mm 232,448Kaca Polos 5 mm m2 1.1 200,000 220,000Pekerja HO 0.015 80,000 1,200Tukang HO 0.1 95,000 9,500Kepala Tukang HO 0.015 110,000 1,650Mandor HO 0.00075 130,000 98

6 Pas.Perlengkapan Pintu Utama 166,800Engsel Pintu 4' bh 1 15,000 15,000Kunci Tanam 25 cm bh 1 90,000 90,000Tukang Kayu org 0.6 95,000 57,000Pekerja org 0.06 80,000 4,800

7 Pas. Perlengkapan Pintu rangka tripleks 136,800Engsel Pintu 3' bh 1 10,000 10,000Kunci Tanam 15 cm bh 1 65,000 65,000Tukang Kayu org 0.6 95,000 57,000Pekerja org 0.06 80,000 4,800

8 Pas.Perlengkapan Jendela 39,950Engsel Jendela 2,5' bh 1 10,000 10,000Hendel Jendela bh 1 5,000 5,000Kait Angin bh 1 6,000 6,000Grendel bh 1 3,500 3,500Tukang Kayu org 0.15 95,000 14,250Pekerja org 0.015 80,000 1,200

VI PEKERJAAN PEMASANGAN KUDA-KUDA DAN PENUTUP ATAP

1 Pek.Kuda-Kuda Baja Ringan 166,085Baja Ringan C-75 m1 2.8 17,000 47,600Reng R.33-0,45 m3 5.1 9,000 45,900Paku Sekrup bh 25 400 10,000Pekerja HO 0.247 80,000 19,760Tukang HO 0.247 95,000 23,465Kepala Tukang HO 0.176 110,000 19,360

2 List Plank GRC 2/15 55,765GRC 2/15 m2 0.0145 21,750 315Paku Sekrup kg 0.06 120,000 7,200Pekerja HO 0.15 80,000 12,000Tukang HO 0.25 95,000 23,750Kepala Tukang HO 0.025 110,000 2,750Mandor HO 0.075 130,000 9,750

4 Pasang Atap Genteng Metal 58,890Genteng Metal sakura roof bh 1.02 38,000 38,760Paku seng kg 0.2 20,000 4,000Pekerja HO 0.2 80,000 16,000Tukang HO 0.1 95,000 9,500Kepala Tukang HO 0.01 110,000 1,100Mandor HO 0.001 130,000 130

VII PEKERJAAN PEMASANGAN PLAFOND1 Pek.Rangka Plafond Besi Hollow 57,830

Besi Hollow m3 6.52 6,500 42,380Paku sekrup kg 0.09 140,000 12,600Pekerja HO 0.135 80,000 10,800Tukang HO 0.2 95,000 19,000Kepala Tukang HO 0.02 110,000 2,200Mandor HO 0.005 130,000 650

2 Pek.Pasang Plafond GRC 5mm 35,650GRC 5 mm m2 0.4 22,000 8,800Paku sekrup kg 0.2 120,000 24,000Pekerja HO 0.135 80,000 10,800Tukang HO 0.2 95,000 19,000Kepala Tukang HO 0.02 110,000 2,200Mandor HO 0.005 130,000 650

VIII PEKERJAAN PEMASANGAN LANTAI 1 Pek.Peninggian Elevasi Lantai cor beton tumbuk 12 cm 104,456

Page 9: Rab Tikala Baru

Semen sak 0.549 60,000 32,940Pasir Kasar m3 0.0345 112,500 3,881Pekerja HO 0.45 80,000 36,000Tukang HO 0.29 95,000 27,550Kepala Tukang HO 0.02 110,000 2,200Mandor HO 0.0145 130,000 1,885

2 Pas.Lantai Keramik 40x40 putih polos 168,981Keramik 40x40 m1 1 60,000 60,000Semen sak 0.2276 60,000 13,656Pasir Kasar m3 0.042 112,500 4,725Pekerja HO 0.62 80,000 49,600Tukang HO 0.35 95,000 33,250Kepala Tukang HO 0.035 110,000 3,850Mandor HO 0.03 130,000 3,900

3 Pas.Lantai Keramik 20x20 Kamar Mandi 168,981Keramik 20x20 Kasar m1 1 60,000 60,000Semen sak 0.2276 60,000 13,656Pasir Kasar m3 0.042 112,500 4,725Pekerja HO 0.62 80,000 49,600Tukang HO 0.35 95,000 33,250Kepala Tukang HO 0.035 110,000 3,850Mandor HO 0.03 130,000 3,900

4 Pas.Dinding Keramik 20x25 Kamar Mandi 164,256Keramik 20x25 m1 1 60,000 60,000Semen sak 0.2276 60,000 13,656Pekerja HO 0.62 80,000 49,600Tukang HO 0.35 95,000 33,250Kepala Tukang HO 0.035 110,000 3,850Mandor HO 0.03 130,000 3,900

IX INSTALASI LISTRIK1 Pek. Instalasi Titik Lampu 304,000

Kabel Eterna 2 mm ( 2 warna ) m1 20 1,650 33,000Sadel bh 5 100 500Paralon PVC m1 8 2,000 16,000Sadel Paralon bh 5 200 1,000Veeting standart bh 1 15,000 15,000Lampu bh 1 25,000 25,000Tukang Listrik org 1 95,000 95,000Pekerja org 0.75 80,000 60,000Mandor org 0.45 130,000 58,500

X PEKERJAAN PENGECATAN1 Pek. Pengecatan Dinding Luar dan Dalam 52,200

Cat Dinding kg 0.36 15,000 5,400Plamur Tembok kg 0.16 17,500 2,800Amplas lbr 7.5 1,200 9,000Pekerja HO 0.16 65,000 10,400Tukang HO 0.2 100,000 20,000Kepala Tukang HO 0.03 125,000 3,750Mandor HO 0.01 85,000 850

2 Pek. Pengecatan Plafond 50,480Cat Dinding Metrolite kg 0.36 18,000 6,480Amplas lbr 7.5 1,200 9,000Pekerja HO 0.16 65,000 10,400Tukang HO 0.2 100,000 20,000Kepala Tukang HO 0.03 125,000 3,750Mandor HO 0.01 85,000 850

3 Pek. Pengecatan Kusen Pintu dan Jendela 30,060Cat Minyak Avian kg 0.43 40,000 17,200Dempul kg 0.057 15,000 855Minyak Cat kg 0.2 20,000 4,000Amplas lbr 0.2 1,200 240Pekerja HO 0.04 80,000 3,200Tukang HO 0.04 95,000 3,800Kepala Tukang HO 0.004 110,000 440Mandor HO 0.0025 130,000 325

4 Pek. Pengecatan Listplank 27,930Cat Minyak Avian kg 0.43 45,000 19,350Minyak Cat kg 0.057 20,000 1,140Pekerja HO 0.07 80,000 5,600Tukang HO 0.009 95,000 855Kepala Tukang HO 0.006 110,000 660Mandor HO 0.0025 130,000 325

Page 10: Rab Tikala Baru

XI PEKERJAAN SANITASIA PEK. JARINGAN AIR BERSIH1 Pek. Pas Pipa PVC dan Kelengkapannya 9,039

Pipa PVC 1/2' m1 1 5,500 5,500Kelengkapan (sock, Keni, dll) ls 0.5 3,000 1,500Lem Pipa gr 2.56 150 384Pekerja HO 0.01 80,000 800Tukang HO 0.001 95,000 95Kepala Tukang HO 0.001 110,000 110Mandor HO 0.005 130,000 650

A PEK. JARINGAN AIR KOTOR1 Pek. Pas Pipa PVC dan Kelengkapannya 34,210

Pipa PVC 3' m1 1 22,500 22,500Kelengkapan (sock, Keni, dll) ls 1 10,000 10,000Lem Pipa gr 4.7 150 705Pekerja HO 0.01 80,000 800Tukang HO 0.001 95,000 95Kepala Tukang HO 0.001 110,000 110Mandor HO 0.005 130,000 650

A PEKERJAAN SEPTICTANK1 Pek. Pasangan Dinding septik tank beserta kelengkapannya 940,324

Pek.Galian Tanah 1 x 1 x 1 mGalian Tanah 1 x 1 x 1 m m3 1 30,500 30,500Pasang Dinding Bata m2 5 126,025 630,125Urugan Split 3cm m3 0.03 40,000 1,200Pas. Ijuk m2 4.8 15,000 72,000Plat Beton Penutup m3 0.06 2,457,700 147,462Lantai Kerja m3 0.06 983,950 59,037

XII PEKERJAAN PEMBERSIHAN1 Pek. Pembersihan Puing di buang ke tempat sampah 79,800

Sewa Dumtruck jam 1 70,000 70,000Pekerja org 0.06 80,000 4,800Alat ls 1 5000 5,000

Page 11: Rab Tikala Baru

DAFTAR UPAH KERJA

No URAIAN SATUAN UPAH (Rp)1 Mandor org 85,0002 Kepala Tukang org 125,0003 Tukang org 100,0004 Pekerja org 65,000

Page 12: Rab Tikala Baru

Daftar Harga BarangURAIAN SAT HARGA (Rp)

Amplas kayu lbr 1,200Amplas Kayu (meteran) mBak cuci (kitchen zink) 1 lobang bh 175,000Bak cuci (kitchen zink) 2 lobang bh 350,000Bata bh 700Batu Pecah m3 87,500

ujg 36,500ujg 56,500

ujg 6,000Balok 5/10 m3 2,000,000Balok 5/7 m3 2,000,000Cat Kayu ( Listpalnk ) sendai kg 25,000Cat Kayu ( Pintu & Jendela ) Politur kg 40,000Cat Kayu ( Kusen ) avian kg 40,000Cat Dinding Jotun kg 200,000Closed duduk set (melody) bh 900,000Closed duduk tanpa tanki air bh 400,000Closed jongkok bh 80,000Engsel 3' bh 45,000Engsel 4' bhGypsum 6mm lbr 57,000Grendel Jendela bh 3,500Genteng Metal sakura roof bh 16,000Hendel Jendela bh 5,000Hollow Brick bh 2,700Ijuk m1Kabel Eterna 2mm m1Kait Angin bh 6,000Kaca 5mm polos m2Kaca 5mm rayben m2Kawat Bendrat kg 15,000Kayu kls II m3 3,200,000Kayu kls III m3 1,750,000Keran bh 10,000Kuas 2" - 4" bh 10,000Kuas Roll bh 15,000Kunci Tanam 25 cm (panel) bh 95,000Kunci Tanam 15 cm (kamar) bh 65,000Lampu SL 25 watt bh 17,500Lampu TL 50 watt bh 25,000Lem Aibon kgNok Genteng Metal bh 26,500

Besi Ø 8mm SNIBesi Ø 10mm super

Besi Ø 6mm AB (beugel)

Page 13: Rab Tikala Baru

Paku 1 1/2" kg 15,000Paku 3/4' kg 17,500Paku 4" kg 13,000Paku Gypsum kg 25,000Paku Seng kg 20,000Paku Tripleks Kg 18,000Papan Merah m3 2,200,000Papan kls III (papan mal) m3 2,800,000Pasir kasar m3 143,750Pasir Halus m3 120,000

m1 3,750m1 2,600

Pipa PVC 3" m1 3,000Pipa PVC 4" m1 3,750Politur kgPlamur Dinding kgProfil Gypsum sedang ujng 20,000Profil SP-3 ujng 11,000Saklar doble bh 18,500Saklar Tunggal bh 18,500Sambungan-sambungan pipa PVC bh 3,000Senar ls 11,000Seng soka Ceria bh 54,000Seng soka Jempol bh 30,000Seng Gelombang lbr 68,000Semen Putih zak 90,000Semen Portland zak 53,000Split m3 475,000Stop Kontak bh 17,000Tegel 40 x 40 m1 45,000Tegel 20 x 25 m1 43,000Tegel 20 x 20 m1 44,000Tripleks 6mm lbr 75,000Tripleks 3mm lbr 65,000Wastafel Keramik bh

Pipa PVC ½"Pipa PVC 2 ½"

Page 14: Rab Tikala Baru
Page 15: Rab Tikala Baru

Daftar Harga BarangURAIAN SAT HARGA (Rp)

Amplas kayu lbr 1,200Amplas Kayu (meteran) mBak cuci (kitchen zink) 1 lobang bh 175,000Bak cuci (kitchen zink) 2 lobang bh 350,000Bata bh 700Batu Pecah m3 87,500

ujg 36,500ujg 56,500

ujg 6,000Balok 5/10 m3 2,000,000Balok 5/7 m3 2,000,000Cat Kayu ( Listpalnk ) sendai kg 25,000Cat Kayu ( Pintu & Jendela ) Politur kg 40,000Cat Kayu ( Kusen ) avian kg 40,000Cat Dinding Jotun kg 200,000Closed duduk set (melody) bh 900,000Closed duduk tanpa tanki air bh 400,000Closed jongkok bh 80,000Engsel 3' bh 45,000Engsel 4' bhGypsum 6mm lbr 57,000Grendel Jendela bh 3,500Genteng Metal sakura roof bh 16,000Hendel Jendela bh 5,000Hollow Brick bh 2,700Ijuk m1Kabel Eterna 2mm m1Kait Angin bh 6,000Kaca 5mm polos m2Kaca 5mm rayben m2Kawat Bendrat kg 15,000Kayu kls II m3 3,200,000Kayu kls III m3 1,750,000Keran bh 10,000Kuas 2" - 4" bh 10,000Kuas Roll bh 15,000Kunci Tanam 25 cm (panel) bh 95,000Kunci Tanam 15 cm (kamar) bh 65,000Lampu SL 25 watt bh 17,500Lampu TL 50 watt bh 25,000Lem Aibon kgNok Genteng Metal bh 26,500

Besi Ø 8mm SNIBesi Ø 10mm super

Besi Ø 6mm AB (beugel)

Page 16: Rab Tikala Baru

Paku 1 1/2" kg 15,000Paku 3/4' kg 17,500Paku 4" kg 13,000Paku seng kg 20,000Paku Tripleks Kg 18,000Papan Merah m3 2,200,000Papan kls III (papan mal) m3 2,800,000Pasir kasar m3 120,000Pasir Halus m3 120,000

m1 3,750m1 2,600

Pipa PVC 3" m1 3,000Pipa PVC 4" m1 3,750Politur kgPlamur Dinding kgProfil SP-3 ujng 11,000Saklar doble bh 18,500Saklar Tunggal bh 18,500Sambungan-sambungan pipa PVC bh 3,000Senar ls 11,000Seng soka Ceria bh 54,000Seng soka Jempol bh 30,000Seng Gelombang lbr 68,000Semen Putih zak 90,000Semen Portland zak 53,000Split m3 475,000Stop Kontak bh 17,000Tegel 40 x 40 m1 65,000Tegel 20 x 25 m1 43,000Tegel 20 x 20 m1 44,000Tripleks 3mm lbr 65,000Wastafel Keramik bh

Pipa PVC ½"Pipa PVC 2 ½"