Safety and Plant Engineering Department
Plant & Facility Engineering Section
Production Engineering Division
Toyota Motor Asia Pacific Engineering and Manufacturing Co.,Ltd.
1st Edition
Year 2009
Plant & Facility Engineering Section has many experience for construction and safety management throughout the construction of various plants.
Toyota Part Center Asia PacificBANPHO Plant
Gymnasium (TMAP-EM) Engine Plant no.2 Siam Toyota Motor Test Building no.3
TAMP-EM Office BANPHO Test course
Introduction
We are expert in domestic construction and safety management systems such as CCCF ,Tool Box meeting ,Exercise ,Morning Talk ,Safety Patrol etc.
We would like to share & suggest our all experience and knowledge to AP affiliate throughout the implementation construction systems.
Tool Box meeting Morning Talk Safety PatrolExerciseCCCF
2
3
• To share & suggest safety construction management
• To use for safety conditions in bidding document.
• To understanding the expectation of roles that have to performed following the safety standards in each stage.
• To clarify the expectation of safety standards/rules.
• To advise the contractor can following &management the work throughout the construction period.
“ ZERO ACCIDENT ”
“NO HARZARDOUS IMPACT TO ENVIRONMENT”
Propose for this manual are:
4
Index
1.Safety Requirement for Project Bidding……………………………………….....5
2.Organization setup……………………………………………………………………7
3.Site Planning and Construction Temporary work………………………….....11
8.Further Safety Prevention………………………………………………………….57
4.Management and Safety Activities……………………………………………….29
5.Monitoring and Safety Visualization………………………………………….....35
6.Construction Safety Training………………………………………………...……43
7.Particular Safety Procedure……………………………………………………....47
5
1.Safety Requirement for Project Bidding1.Safety Requirement for Project Bidding
To clearly exhibit contractor commitment towards safety and communication of “safety First” policy to all concerns
Main contractor should clearly define safety policy and commitment to activity should be inline with policy
Owner or AP affiliate should confirm safety policy to main contractor and have the agreement of commitment with the own safety policy.
6
1.Safety Requirement for Project Bidding1.Safety Requirement for Project Bidding
Organization Setup
Site Planning and Construction
Temporary work
Management and Safety Activities
Monitoring and Safety Visualization
Construction Safety Training
Particular Safety Procedure
Further Safety Prevention
Safe
ty R
equi
rem
ent
for
Proj
ect
Bidd
ing
2
3
4
5
6
7
81
First, contractor should set up organization for clearly communication.
After that contractor must provide temporary facility for construction all period.
All member have safety activities together.
In order toward truly direction, Should have monitoring by visual control.
Contractor always take safety training course for workers.
In case of special work. Must have the safety procedure.
In others prevention of description detail.
Flow chart step
72.Organization setup2.Organization setup
1.Construction Organization 2.Safety Committee Organization
3.Emergency Route (In case accident)
Contractor should have appropriate safety organization with the clearly defined role and the responsibility (including emergency)
Chairman of their organization must be the top management to drive/ and focus “Safety First”. Moreover, contractor have to train the safety officer to promote the activity.
Propose of organization is nominating the leadership in each stage of project. And integration of the owners and contractor’s safety organization including emergency route.
1 2 3
8
1.Construction Organization
Project Name
In order to clarify
Plant & Facility Engineering Section (PFE) is Project
Main of contractor name
Project SupporterTMC and other section of
TMAP-EM which support & cooperation
Project owner such as affiliate country in Toyota group
Project Owner
Project ExecutiveToyota top management
which concern in this project
Project Leader
-To control main contractor job.
-To control safety, schedule, quality & budgeting.
-To construct base on USER requirement.
-Cooperate job to all concern.
TMAP Owner
TMAP TMAP TMC
Owner
2.Organization setup2.Organization setup
Contractor
the job’s responsibility for construction project. Flow charge as below:
Sample is TH
project
9
2.Safety Committee Organization Identify Safety committee route.
Top management
Management
Safety Leader
Safety Sub Leader
Safety member
2.Organization setup2.Organization setup
Sample is TH
project
Organization that combined with TMAP & Owner
TMAP Owner
10
3.Emergency RouteIn case of accident ,this organization will show the route to inform the accident occurrence.
Accident occur !!!
OwnerTMAP
TMAP
Owner
TMAPOwner
Top management
Top management
WorkingTeam
Management
Contractor
Project Name
2.Organization setup2.Organization setup
Sample is TH
project
11
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
1.Main Gate 2.Wheel Cleaning Station
3.Temporary Road 4.Morning Talk Stage
5.Morning Talk Area 6.Photo Tower
7.Material Storage 8.OBEYA room
9.Toyota Construction Site Office 10.First Aid Room
11.Training Room 12.Smoking Area
13.Electical box 14.Gas Welding & Cutting Devise Set
15.Garbage Bin 16.Labor Camp
Before the construction start. Contractor should planning and provide construction temporary work. In order to manage in overall construction period throughout to prepare the facility and necessity equipment which base on the owner’s safety control requirement.
The lists below are necessary for the temporary work that should be manage and control. (You can see the details of each items in next page)
12NORTH
Construction AreaConstruction Area
Temporary Site Control
1.Main Gate 6.Photo Tower
Temporary Fence 2.Wheel Cleaning Station
3.Temporary Road
5.Morning Talk Area
4.Morning Talk Stage
Around area
8.OBEYA rm.
7.Material Storage
Enclose area
15.Garbage Bin
10.First Aid rm.
11.Training rm. WWTPrimary water treatment before discharge
12.Smoking Area (More than 1)
Canteen
16.Labor Camp
Setup outside Construction site area
This layout show the location of necessary construction for the temporary work .
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
9.Toyota Construction
Site Office
13.Electical Box
For workers ,Labors and Staffs eating
area
14.Gas Welding & Cutting Devise Set
Can movable & (More than 1)
13
1.Main Gate
Propose to control In and Out of the person , vehicle, machine and equipment. Include Guard man for security monitoring.
Fence at least 2 m. high.
Canvas sliding gate
Safety sign board
Small guard box
Access road have stability
Prohibit Signs
Mandatory Sign
Warning Signs
Safe condition signs
Temporary fence must resistant strong wind
Detail are shown….
Construction site indication sign
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
With guard man all time.
14
2.Wheel Cleaning
Station
To prevent the soil stick on the truck wheel. Before truck go out of construction area.
Rough surface
Basin
Incase of civil work. Should have heavy spray water under the vehicle.
Vehicle from in site
Go to outside
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
In many case. If you don’t care the environment of the outside area which close to our construction. The nearly resident will complain to our company which it may be the environment’s dispute.
15
3.Temporary Road
Width at least 6 m.
In order to avoid unsafe from vehicle and Keep 4’S toward.
Show limited high
Crush stone / Soil compaction
SlopeTemporary drainage
w/slope Slope
Boundary line to separate man & vehicle
Traffic sign control
Speed < =30 km/hr
Grading Compaction
Spray water for Dust Protection
Provide Guardrial when cross gutter
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
4.Morning Talk Stage Layout work doing Safety Symbol
Safety Rule
Daily safety activities
President wording Attendant board Safety declaration Safety statistic
Stage for head man or group leader announcement. You should to provide the board
of Safety rule to remind all workers.
Visual board to monitor amount of worker everyday.
Daily cycle activities.
To record safety hour.To remind safety awareness. By contractor management.
Location of each job.
Every worker must follow the rules.
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
16
17
5.Morning Talk Area
Assembly point or Muster point for all workers make a row in front of Stage.
Stage
Row of worker
To identify subcontractor name
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
18
6.Photo Tower
The foundation must stability and strengthen with correctly install scaffolding by fixed support around the structure.
Safety symbol control
Highest stage have safety prevention
Net dust protection cover
Fixed end support
Sign warning
Support all around
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary workIncase of large area. should provide 2 location.
(If any)
19
7.Material Storage
Plastic sheet cover
Pallet floorBarricade
Support to prevent moisture from soil
Separate by function
Special material keep indoor areaHazard material must have containment
Boundary FenceIn area Keep 5’s
<=1.5 m.
Store keeper to control
3.Site Planning and Construction work3.Site Planning and Construction work
Contractor must take care all material and always keep 5’S rule for easy to use.
EX: Cement EX: Safety equipment
EX: Steel
EX: electrical wire
20
8.OBEYA Room
The place to presentation & meeting.
Layout plan For explain to Top Management
For explain to Guests or Visitors
Visualization boards around the room
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
Movable
hanging hanging
21
9.Toyota Construction Site Office
The place for site management and construction controlling.
For construction working team
For Toyota internal meeting
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
22
10.First Aid Room
Primary curing when accident happen.
Doctor or nurse stand by Medicine cabinet Bed
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
23
11.Training Room
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
The place for training new workers and meeting for safety knowledge distribution.
Welding maskHelmet GloveSafety Belt Leather glove Ear plug
Training new workers Special work training
Information boardSafety devise model
Equipment KY Sheet
Daily Safety MeetingSafety Unsafe
Example equipment for use :
goggle
24
12.Smoking Area
In doorOut door
Rest area for workers should to install on the flow freshening area. Have chairs with roof, cigarette bin and fire extinguisher.
Cigarette binSmoking sign
Fire extinguisher
Bin
Inside smoking area should have provide of…
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
25
13.Electrical Box
Detail of Elec. Box
QC Check ,ok!
Person in charged
RST. Phase
fire extinguisher separate of here plug
Main Elec. Box
Guard rail
In / Out
Number Box in work site
Propose for temporary use connecting with electrical equipment.
Cover around to prevent vehicle to cash or make it
stand out point
The person who can control and daily check it
Lock out system
Water proof prevent the rain
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
26
fire extinguisher and at least 2 full water
buckets to closely it.
QC Check flash back arrester
pressure reducing valve
pressure gageQC Check flash back arrester
pressure reducing valve
pressure gage
14.Gas Welding & Cutting Devise Set
2.Gas cylinder tank
1.Oxygen cylinder tank
Equipment set use for Welding & Cutting of steel work. Compose of oxygen and gas tank.
The equipment must have daily check of pressure gage, pressure reducing valve, connecting point and wire for safety using.
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
The kart can movable
The kart can movable
Bind tanks with chain
27
White RedGreenBlack Brown Blue
15.Garbage Bin
For plastics garbage such
as bottle
For Aluminum, Stanless ,Steel scrap
For paper rubbish For toxic and dangerous garbage
For general garbage
For oil contaminate
material garbage
Install on easy visual and separate garbage for environment keeping as color below.
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work
28
Canteen
Adipose prevention
Car Parking
Main Door for security and aluzinc
fence all around
Camp for sleeping Gutter for drainage
Septic tank
Cleaning Toilet
Shower RoomWaste water treatment
16.Labor Camp Provide for workers long stay. Everyone must follow the camp strict rule that concern with safety and environment procedure.
3.Site Planning and Construction Temporary work3.Site Planning and Construction Temporary work28
29
1.CCCF Activities (Completely Check Completely Find out)
2.Daily Patrol 3.Weekly Patrol
4.Monthly Patrol
In order to clearly exhibit contractor management towards safety and activities of “Safety First” policy to contractor ,subcontractor and Toyota member.
CCCF is proactively find out hazard in all area of construction and develop construction management before develop to accident by “GENCHI GENBUTSU” of Toyota way concept.
4.Management and Safety Activities4.Management and Safety Activities
Concentrate on safety patrolby use CCCF as a tool.
(See next page.)
Make countermeasure action planMake countermeasure action plan
Classify these hazard into 3 Level, Rank A, B, and C
Classify these hazard into 3 Level, Rank A, B, and C
Find a hazard from all working area especially low
frequency work
Find a hazard from all working area especially low
frequency work
11
Maintain safety operation standard and 5S and training all concern
Maintain safety operation standard and 5S and training all concern
22
33
44
Rank A : Death, Severe
CCCF Activities Procedure as sequences.
Rank B : Injury Rank C : Small injury
Before After
30
CCCF procedure
31Work Permit
Man-Powercontrol
DailySafetypatrol
EquipmentCondition
Check(daily check)
DailyConclusion
meeting
Morning Talk,KYT
New contractorTraining,
Contractorcard
Safety Sub-
committeeMeeting
Site area cleaning
Daily Meeting(AM , PM)
Top Mgt.Safety patrol
( Steering committee)
Safety PatrolBy sub-committee
EquipmentCondition Check
(Weekly cross check)
Monthly Morning Talk
Top Mgt.Safety patrolMD/DMD’s
Safety CommitteeMeeting
(MD/DMD (chairman)
ZERO ACCIDENT
ZERO ZERO ACCIDENTACCIDENT
DAILY MANAGEMENT
WEEKLYMANAGEMENT
MONTHLYMANAGEMENT Contractor activity +
Toyota audit
Toyota Participate + Contractor activity
Top management Activity
(Advisor)
(Each Team)
Safety Culture : Safety Control Cycle & Management
4.Management and Safety Activities4.Management and Safety Activities
Portion of safety activities to all concern during construction period.
Daily Patrol
Time : 9.00-10.00
(Morning & Afternoon)
Time : 11.00-11.30
5) Daily Safety Meeting
Time : 14.00-15.00
4) Safety Patrol
Time : 07.45-8.00
1) Daily Morning Talk
Time : 08.00-8.15
2) Tool Box Meeting
1.Exercise & enhance safety/health sense among all employee.2.To share safety information ,YOKOTEN points among all teams.
1.Daily basis discuss job allowance & overlap.2.Have common understanding roles & responsibility. Time : 08.15-8.30
3) Equipment Checking
1.Discuss & communicate problems, analysis and c/m. 2.reflect to training for unsafe act & unsafe condition.
4.Management and Safety Activities4.Management and Safety Activities
For everyday safety activities cycle.
32
Weekly Patrol
Time : 9.00-10.00
1) Weekly Safety Patrol
Time : 16.30-17.00
3) Site Cleaning
Time : 14.00-16.00
2) Weekly Safety Meeting
Identify unsafe act, unsafe conditions with appropriate
check sheet by daily audit team
4.Management and Safety Activities4.Management and Safety Activities
For every week safety activities cycle.
33
Monthly Patrol
Time : 07.45-08.00
1) Monthly Safety Promotion & Safety DemonstrationTime : 15.00-16.00
2) Monthly Safety MeetingBy Safety Committees
1.Standardization of contractor’s activity at site to stabilize safety condition during total project execution.
2. Main Contractor follow best practices & lead by example to his sub contractor’s.
4.Management and Safety Activities4.Management and Safety Activities
For every month safety activities cycle.
34
Time : 9.00-10.00
2) Weekly Safety Patrol
Identify unsafe act, unsafe conditions with appropriate
check sheet by daily audit team
35
Board 1 : Project Information Board 2 : Work Progressive
Board 3 : Safety Plan Board 4 : Safety Activities
Board 5 : Safety Patrol Monitoring Board 6 : CCCF Board
Board
7 :
Job Daily Management
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
When the construction is on the process. Everybody need to monitoring and visualization the construction work progressive and safety activities.
Contractor should provide visualization board and always update in order to present to top management and all concern to monitor and wrap up all of construction information.
36
Board 1 : Project Information
“Overview perspective picture”
To show the image project complete.
“Project Outline”To explain the
regular information of this project.
“Emergency Route Call”When accident occurrence.
This flow chart will show route line for report.
(See detail in portion 2 : Organization
“Emergency Route”)
“Safety Management”To show level of safety
concern and duty of safety member.
(See detail in portion 4 : Management and
Safety Activities “Safety Culture”)
“Contractor Organization”
To show organize all of contractor
company.
“Contractor Construction Site Organization”Show the details of
organize for smoothlyCommunicate.
“Organization Combination”
To show overall included owner, Toyota & contractor
organization level.
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
This board show general information.
“Design concept pictures”Detail for each view or
important area it needs more to explain.
37
“Work Progressive”To explain progressive of each work separate by layout. Easy to see
and understand.
“Overall Site Progressive Photo”
To show panorama photo every week by take photo at
“Photo Stage” for monitoring.
Ex: Roofing work show area finish and % progressive
Ex: %Floor work
Ex: % Roof steel work
“Site Plan Progressive Photo”To show photo and focus point s in each work area.
Layout show location
Photo detail
Photo detail
West view East view
Every month from started
Master schedule
3 weeks schedule
Manpower
3 month schedule
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 2 : Work Progressive Show construction work status.
38
“Overall Site Safety and Healthy Plan”The schedule combined construction master
schedule with Safety plan.We will know when period we should
concentrate or have safety training activity. Example site safety and healthy plan such as
-Priority prevention target.- Countermeasure.
“Safety Policy”Contractor company safety
policy & Motto for motivation.
“Monthly Safety control Plan”Detail by month from “overall safety plan”
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 3 : Safety Plan Show over all safety planning project.
39
“Safety Activity in Previous week”Training reason or photo during worker have
trained previously .Its show by topic.
“Safety Activity in Next week”Safety objective which contractor plan to
have training course in next time.
detail
detail
detail
detail
detail
detail
detail
Topic in next week
Event photo safety training in last week
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 4 : Safety Activity Explanation safety training course.
40
“Weekly Safety Patrol Follow Up Owner Comment”Show daily safety patrol activity by contractor Toyota member.
Happen in this week
Happen in last week
1ใM/E accident
2.Heavy object falling accident
3.Vehicle accident
4.Fall down accident
5.Electric accident
6.Hot works accident
Attach photo of countermeasure Before-After of each 6 type
Accident by type
1ใM/E accident
2.Heavy object falling accident
3.Vehicle accident
4.Fall down accident
5.Electric accident
6.Hot works accident
Improvement cycle
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 5 : Safety Patrol Monitoring
By histogram
By pie graph
By column graph
To follow CCCF activities.
“Data Summary”Show trend analysis
for project benchmarking.
41
“Completely Check Completely Find out ”Show risk highlight job,mornitoring by contractor Toyota member..
“CCCF Remark”How to separate by Type,Cause,Rank.
By Cause
By Type
By Rank
“CCCF Record”Accumulative by Type,
Cause, Rank.
CCCF List record
Layout show location
Before & After
Difference form safety patrol. Because this board it bring the unsafe highlights items only.
CCCF List record
CCCF List record
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 6 : CCCF Board
42
“Job Daily Management ”Show construction job control by contractor.
5.Monitroing and Safety Visualization5.Monitroing and Safety Visualization
Board 7 : Job Daily Management Contractor daily job control and management.
Layout which have construction work
Head man to control construction work
zone by zone
Date / Month/Year
Construction activities list
Safety OfficerSafety in charged
for today.
Comment by contractor
management
43
6.Construction Safety Training6.Construction Safety Training
100 % members must understand and proceed following the safety standards and safety rules which concern to his/her role.
Contractor should ensure 100 % that his employee already training & evaluation before entering site.
TMAP will check the trained members system by visual check. And the critical job will control through license system with special work training.
We separate group by 2 kind are…
1.Daily basis training 2.Weekly basis training
3.Monthly basis training
4.Speacial work training
A. Cycle road map training
B. Special work training
44
Training and Evaluation
Safety Standard Training Items.1.Construction regulation2.Safety awareness3.Stop 64.Permit system5.Safety rule6.Safety audit7.Denwacho8.Risk assessment9.etc
•Contractor management
•Contractor supervisor
•Contractor safety officer
•Contractor employee
•New worker
Toyota Safety Policy
Contractor Safety Policy
+
ID card of permissionEvaluation by Safety officer license
Person should be trained
If pass training. Issue contractor card
All new employees must pass training before start work.Step for work permit
45
6.Construction Safety Training6.Construction Safety Training
3.Monthly basis training
Fire freighting
Health checking
First Aid training
1.Daily basis training
Confine space trainingPPE safety training
Safety standard training
Small tool training
Common rule training
2.Weekly basis training
A. Cycle road map training
New worker training
For further detail,please see “ANZEN LEADER LISENCE TEXT BOOK” (1st Edition,1Apr’09)
46
By job training High work place training Roofing safety work
Steel truss safety work
Siding safety work
Prevent falling down training
Equipment safety training Boom lift usage trainingPiling work safety training
Foundation work safety training
Column work safety training
Prevent of machine accident
Electric equipment trainingPit work safety training
A frame ladder training
6.Construction Safety Training6.Construction Safety Training
B. Special work training For further detail,please see in Chapter 2 of “ANZEN LEADER LISENCE TEXT BOOK”
47
7.Particular Safety Procedure7.Particular Safety Procedure
Identify and control critical jobs through risk assessment and standardization of work procedure and confirm in the form of the work.
Contractor should prepare safety method statement and safety plan for all critical jobs and get approval and use for training before performing the job.
Toyota safety officer must check the statement, key point & Approval by safety manager of construction site by confirm during audit.
Workers should follow the procedure to avoid and control the risk due to change point and don’t change procedure without safety officer permission.
Toyota participation should to assign Toyota safety officer to strictly & follow up safety officer that available by contractor’s.
48
New Procedure requestition- Material ordering ?- Revised drawing ?- Any interference ?
Evaluation1. Workability ?2. Functional ?3. Safety condition ?
Checked &
Inspected by1. Job Controller2. Safety officer
Maker project managerapproval
Owner acknowledge or
confirm
Start to implementation
No
Yes
Yes
No
Risk Assessment
Review work procedure
7.Particular Safety Procedure7.Particular Safety Procedure
49
Check sheet and driver license
Sticker of audit
Check cable and marking
Check nut bolt and marking all
Strongly supportBarricade cover piling work
1.Piling workDiesel hammer machineA-frame machine
7.Particular Safety Procedure7.Particular Safety Procedure
Boundary for safety area.
Control all operation Signal man
Un concern person must avoid to nearly during piling machine operation.
50
1.Provide guardrail around the pit
4.Hook pile head during pound
3.Use fiber cutting with safety 2.Use crane hook the pile
5.After cut off, worker stand off6.To remove head trim by crane
2.Pile head trimming
7.Particular Safety Procedure7.Particular Safety Procedure
Mostly be careful during pile head cutting.
51
Install the balustrade around foundation
Install cable support steel bar for column
Install the stair with handrail
3.Foundation work
7.Particular Safety Procedure7.Particular Safety Procedure
Safety focus point are steel shaft edge and falling down to the pit.
52
Install the stair, handrail and foot plate
Install the guardrail around pit area
Install the movement meter around working area
4.Pit work
7.Particular Safety Procedure7.Particular Safety Procedure
Strong barricade
Steel sheet pile to prevent soil sliding
Safety focus point are narrow space for worker and heavy machine operation.
53
Install the guardrail around pit area.
Propose the stairs and handrail
Propose the lift line
5.Sum pit work
7.Particular Safety Procedure7.Particular Safety Procedure
Signal man
Beware steel bar shaft edge
Signal control is necessary .
Beware soil collapse.
54Strongly support Promise to use
Daily check sheet
Warning sign
Install cross bracing for more stronger
Install the handrail that high 90 cm.
Install the foot plate around the foot plate
7.Particular Safety Procedure7.Particular Safety Procedure
6.Column work Worker always use safety belts.
55
7.Particular Safety Procedure7.Particular Safety Procedure
7.Roofing work
Safety net (Prevent worker or object falling down)
Worker always use safety belts
Install life line all around
Signal man2
Signal man1
Barricade around operation area
During operation, all concern must follow safety and work procedure sequence by sequence.
56
7.Particular Safety Procedure7.Particular Safety Procedure
8.Welding and hot workWorker must use correct PPE and
beware heat from welding work.
Helmet with welding maskFire extinguisher and
at least 2 full water buckets to stand by.
Barricade
Use Gas cylinder tank
Leather glove
57
8.Further Safety Prevention8.Further Safety Prevention
Temporary safety prevention and look forward in case of risk or hazard that will be occur.
Everybody must sticky the safety rule with safety awareness all of activities which construction on process.
588.Further Safety Prevention8.Further Safety Prevention
Traffic control
Whistle
Red & Green flags
Helmet
Chinstrap
Reflective Jacket
Signal man always use PPE and control traffic at junction way.
Giving correct signal to driver
Green = Can operation Red = Stop !
1000
Sign BoardLimit Speed 30 km/hr
Warning Light
Speed Bumper Concrete Barrier
Warning light Traffic signal manHeavy machine should provide warning light
Signal manEquipment
necessary use to control vehicle
Example connection point from public road
598.Further Safety Prevention8.Further Safety Prevention
Hard barricade and fall down protection.
Hard barricade
Hard barricade for unsafe area
Small pit cover
Handrail separate by area
Example is piling work
Grill still cover
Example is gutter work
Prevention form public
608.Further Safety Prevention8.Further Safety Prevention
LightingMovable lighting set s
Fixed support for electrical wire
Light in high place
Make clearly of route line
QC Check ,ok!
Person in charged
618.Further Safety Prevention8.Further Safety Prevention
Equipment checking
QC Check ,ok!
Sticker guarantee, can use it.
Every equipment must check before use
Everyday must check tools by head man
628.Further Safety Prevention8.Further Safety Prevention
4’s and Site cleaning
In order to keep :
•Safety
•Healthy
•Clearly
•Environment
Public road cleaning Neighborhoods cleaning
On site cleaning