Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 1 of 47
All India Council for Technical Education (An Autonomous Organization, Under Ministry of HRD, Govt. of India)
Nelson Mandela Marg,Vasant Kunj, New Delhi-110067 Website: https://www.aicte-india.org
APPROVAL PROCESS 2019-20
Application Report Part-1
1. Guidelines on submission of documents along with print copy of application/s for New Institute/University Department (Refer annexure 16)
Ensure that all copies are in A4 size only (Land documents/building drawing may be up to A0 sizes). Also, ensure that all copies are attested.
Refer Documents for Approval Process 2019-20 (Annexure 16 & 17) uploaded on AICTE Website.
Please number all copies of documents as given below:
Your Regional office code Your Application Id Annexure Number Sr. No. as in Annexure 16 Page Number (3 digits)
E.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 16,
WRO 1-11234567 16.1 02 001WRO 1-11234567 16.1 02 002
The number so generated WRO1-1123456716.1002001 should be written on top of each page with bold pen as shown below
W R O 1 - 1 1 2 3 4 5 6 7 1 6 . 1 0 0 2 0 0 1Note: Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner. This set of knotted documents should be submitted.
Provide index page on top of set of documents as follows,
Region - WRO Application ID : 1-11234567Annexure No. Sr No.as in Annexure 17 (2 digits)of
documents which are being submitted nowPage No. (3 digits)From To
16.10 02 001 00216.10 03 001 005
2. Guidelines on submission of documents along with print copy of application/s for Approvals of Existing Institutes (Refer annexure 17)• Extension of Approval to the existing Institutions/ Continuation of approval after a break in the preceding Academic Year/ Restoration.• Extended EoA• Increase in Intake/ Additional Course(s)• Addition of Integrated/ Dual Degree Course• To Start Diploma in Degree Pharmacy Institutions and vice-versa• Conversion of Management Institutions running PGDM Course into MBA Course• Conversion of Second Shift Course(s) into First Shift Course(s)• Introduction of Fellowship Programme in Management• Introduction of Supernumerary Seats for Foreign Nationals/ Overseas Citizen of India (OCI)/ Persons of Indian Origin (PIO)/ Children of
Indian Workers in Gulf Countries• Introduction of seats for Non Resident Indian(s)• Change in name of the Course(s)/ Reduction in Intake/ Closure of Programme(s) and/ or Course(s)• Change in name of the Institution or Affiliating University/Board
Please number all copies of documents as given below:Your Regional office code Your Application Id Annexure No. Sr No. as in Annexure 17 Page No. (3 digits)
E.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 16,WRO 1-11234567 17.10 02 001WRO 1-11234567 17.10 02 002
The number so generated WRO1-1123456717.1002001 should be written on top of each page with bold pen as shown belowW R O 1 - 1 1 2 3 4 5 6 7 1 7 . 1 0 0 2 0 0 1Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner. This set of knotted documents should be submitted.
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 2 of 47
Provide index page on top of set of documents as follows,Region – WRO Application ID : 1-11234567Annexure No. Sr. No. as in annexure 18 (2 digits)of documents
which are being submitted nowPage No. (3 digits)From To
17.10 02 001 00217.10 03 001 005
Regional Office codesEastern ERO North-West NWR South Central SCR South- West SWRNorthern NRO Central CRO Guwahati Camp Office ERO Southern SROWestern WRO Central Camp office
VadodraCRO South West Camp office SWR
Important Note for Payments:
a) Institutions which do not follow the AICTE guidelines shall be responsible for rejection/ delay in updation of their application and neither AICTE nor the Collecting Bank shall be responsible for any such consequence."
b) No DD / Cheque / PO to be sent to either Head Office / Regional Office of AICTE. Such payments shall not be processed and the applications are liable to be rejected.
Note: Please submit the hard copy of this Report to Regional Officer only if Application status is "Submitted" and Application Substatus is "Payment Received" / "Payment Not Applicable" – IN CASE OF GOVT/GOVT. AIDED/ CENTRAL/STATE UNIVERSITY DEPT
**All the Dates in the Report are in dd/mm/yyyy format.
**NA refers to Not Applicable
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 3 of 47
Permanent Institute Id 1-3817141 Current Application No. 1-4262195747
Application Type Extension-Expansion-Closure AICTE File No. F.4-13/62-T.4Institute DetailsName of the Institute/University Department
SAMRAT ASHOK TECHNOLOGICAL INSTITUTE
Address of the Institute/University Department
CIVIL LINES, NETAJI SUBHASH MARG
State/UT Madhya Pradesh District VIDISHAPin 464001 AICTE Region CentralTown/Village VIDISHA STD code 7592Land Phone No. 250121 Email [email protected] No. Data Not Provided by the Institute
9826244840Alternate Email [email protected]
FAX No. 250124 Website www.satiengg.inInstitute Type Govt aided Women Only Institute NoType Of Minority Data Not Provided by the Institute Name of the Minority NAMinority Institute No Minority Name, if Linguistic NA PAN AAITS0937N Primary Bank Account No. 30842554902Bank Name SBI IFSC No. ISBN0012193Approval Year of First Course
1962 Date of First Approval by AICTE 15/09/1962
Questionnaire for Existing InstitutesSr. No. Particulars Details Provided by Institute
Question 1(i) Do you wish to apply for "Only Extension of Approval (EOA) for 2019-20"? No
Question 2(i) Do you have Autonomous Status (Academic Autonomy) as conferred by the Affiliating University? Yes(ii) Autonomy Issued Date 04/12/2017(iii) Autonomy Expiry Date 30/06/2020(iv) Autonomy Conferred by University(v) Order of Conferment VC of University
Question 3(i) Do you have a valid NBA Accreditation?
(Course should be accredited by NBA and Validity of Accredited Courses should be on or after 10th Apr,2018)
Yes
(ii) No of courses against which valid NBA Accreditation is present 2(iii) Do you wish to apply for University Name Change? No(iv) Whether your Institute is Under Submission Scheme? Data Not Provided by the Institute (v) At the time of 1st Approval where your Institute was located? Data Not Provided by the Institute
Question 4(i) Do you wish to apply for Restoration?
(Applicable ONLY to the Institutes where EoA for 2017-18/2018-19 granted with Punitive Action. No Admission issued Institutes need not have to answer this question.)
No
(ii) Do you wish to apply for Closure of Institute? No(iii) Do you wish to apply for Conversion from Diploma to Degree or Vice-Versa? No(iv) Whether your institution wish to apply for Merger of Courses ('ENGINEERING AND TECHNOLOGY'
ONLY)?No
(v) Whether your Institution is willing to add a New Program or New Level in existing Program? No(vi) Whether your institution wish to add New Course at Diploma level under existing UG Pharmacy
Program or Vice-Versa?No
(vii) Whether your Institute wishes to apply for conversion from PGDM to MBA ('MANAGEMENT' ONLY)?
No
(viii) Whether your Institute wishes to apply for Change of Shift from Second to First? No(ix) Whether your Institute wishes to apply for Course Name Change? No(x) Do you wish to apply for MBA to MCA Conversion or Vice Versa?
No
(xi) Whether your Institution is willing to convert existing direct 2nd Year division in Engineering & Technology and/or MCA courses into regular courses?
No
(xii) Whether your institution is selected for Study in India Program by Govt. by India? Yes(xiii) Whether your Institution has got affiliation from university or DTE or Board? (Applicable for Only
2018-2019 Approved New Institutes(Excluding Deemed to be (Universities))Data Not Provided by the Institute
(xiv) Whether your Institution is going for Merger with other Institution(s) under the same Trust/ Society/ Company operating in the same Campus?
No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 4 of 47
QuestionnaireSr. No. Particulars Details Provided by Institute
(i) Any Unaided Course(In case of Government Aided Institute)? No(ii) Number of teaching faculty approved by University/Government? 95(iii) Are all approved teaching faculty being paid as per VI pay commission? Yes(iv) Are all the teaching faculty, as per AICTE qualification? Yes(v) Do you wish to apply closure of Institute? No(vi) Type of Institute Closure Requested? NA(vii) Percentage Grant/Funds Received from Government? 100(viii) Whether Institute is operating from Permanent Site/Temporary Site? Permanent Site(ix) Whether mandatory disclosure is uploaded in Institute's website? Yes(x) Whether the Institute following ICAI(Institute of Chartered Accountants of India) Accounting
Formats?Yes
(xi) Fees to be charged, Reservation policy, Admission policy and Document retention policy are duly approved by State Govt?
Yes
(xii) Fees to be charged, Reservation policy, Admission policy and Document retention policy are duly approved by Affiliating Board/University?:
Yes
(xiii) Fees to be charged, Reservation policy, Admission policy and Document retention policy are uploaded in Institute's Website?
Yes
(xiv) Whether List of faculty along with details and other data uploaded/updated on the institute web Portal?
Yes
(xv) Courses/Approved Intake displayed at the entrance of the Institute? Yes(xvi) Is the Cafeteria shared among other Institutes? No(xvii) Is Library and Reading Room shared among other Institutes? No(xviii) Is the Computer Centre shared among other Institutes? No
Application DetailsSr. No. Particulars Details Provided by Institute
(i) Change of Institute Site No(ii) Increase in Intake / Application for New Course Yes(iii) Closure of Course / Reduction in Intake Yes(iv) PIO/FN/Gulf quota Approval status/OCI No(v) NRI No(vi) Change of Name of the Institute No(vii) Old Name of the Institute NA(viii) New Institute Name NA(ix) Conversion of Women's Institution into Co-Ed Institution No(x) Conversion of Co-ed Institution into Women Institution No(xi) Introducing a Twining Program with an AICTE approved Indian Institution No(xii) Introduction of New/Integrated Course No
Payment Details
Sr.No. Payment Id Mode of Payment
Bank Transaction Id
Transaction Id
Receipt Flag Part Payment Amount
Total Amount Transaction Date
1 CIB/Retail Banking(Other Bank)
196717 730637080 Y 200000 200000 02/03/2019
Details about Parent Organization(Trust/Company)Name of the Parent organization
MAHARAJA JIVAJI RAO EDUCATION SOCIETY
Address 22,SHRI RAM NAGAR,VIDISHA
Town/Village VIDISHA State/UT Madhya PradeshDistrict VIDISHA Pin Code 464001Website www.satiengg.in Type of the Organization SocietyRegistered with SOCIETY REGISTRATION ACT NO.53 OF
1950Registration Date 29/08/1956
Details about Contact PersonTitle Dr. First Name JANARDAN SINGH Last Name CHAUHANAddress DIRECTOR, SATI (DEG.) VIDISHA, (MP) Town/Village VIDISHAState/UT Madhya Pradesh District VIDISHAPin Code 464001 Designation DIRECTORCell No. 9826244840 Alternate Cell No. Data Not Provided by the Institute Email [email protected] Alternate Email Address [email protected] Code 7592 Land Phone No. 250121 Fax No. 250124Land Details
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 5 of 47
Location Rural North Eastern States/Land in Hilly Area
No
No. of pieces of Land 1 Max distance in farthest pieces NA
Land registered with DISTRICT ADMINISTRATION, VIDISHA
Land Piece Area 1 in acres 85
Land ownership details Registered Sale Deed Land Piece Area 2 in acres NA
Total area in acres 85 Land Piece Area 3 in acres NALand Registration Date 29/08/1956 Land Use Certificate issued by District Sub Divisional OfficerLand Use Certificate date 03/07/1957 Latitude and Longitude Latitude - 23, 31, 7
Longitude - 77, 49, 13Mortgage Details(if any) No Purpose of Mortgage No FSI Data Not Provided by the Institute Build Up Area(Sqm) Data Not Provided by the InstituteAdditional land for Merger or New Program Data Not Provided by the Institute
Other Land Details
Sr. No. 1 Land Registration No. 842Date of Registration 03/07/1957 Area of Land (acres) 85
Khasra Number 3965 Plot Number, Survey Number, etc
11, 12 , 1 , 3, 2, 5
Land Situated At Vidisha Land Registered in the name Of Samrat Ashok Technological InstituteType of Ownership (Sale deed/ Gift deed/Govt/Private Lease)
Ownership Land Use Certificate Issued No
In case of Private Lease- Name of the Leaser
Name of the Leasee
Owner of the land ( In whose name last sale deed was made)Land Use Certificate Issuing Authority
Data Not Provided by the Institute Is the Land Mortgaged No
Details of Land If the Land is Mortgaged
Data Not Provided by the Institute
Land required at the time of First AICTE approval(In Acres)
85
Land available at the time of First AICTE approval(In Acres) 85
Building DetailsBuilding Status Available Total built up Area(Sqm)
Planned16997
Total built up Area(Sqm) ready
35500 Total Carpet Area(Sqm)-Instructional-ready
11129
Total Carpet Area(Sqm) Administrative-ready
2492 Total Carpet Area (Sqm)-Amenities-ready
9696
Access and Circulation Area (Sqm)
5995 Activities in the building other than courses approved by AICTE
NIL
Whether Toilet Area is maintained as per NationalBuilding Code (NBC) Norms?
Yes Whether Access and CirculationArea is maintained as per National Building Code (NBC) Norms?
Yes
Funds Position for Building Construction(Rs in Lakhs) Loans: Data Not Provided
by the Institute Own Share: Data Not Provided
by the Institute Funds allocated: Data Not Provided
by the Institute Other Building Details
Data not entered by Institute
Programme and Courses
Sr. No. 1 Course Unique Id 1-1413336516 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course ELECTRICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1960 Applying For EoA Only
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 6 of 47
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
60
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 2 Course Unique Id 1-1413336518 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course COMPUTER SCIENCEAND ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1988 Applying For EoA Only
Course Duration 4 Current Intake (2018-19)
120 Applied for Intake(2019-20)
120
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 3 Course Unique Id 1-1413336520 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course ELECTRONICS AND INSTRUMENTATION ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1985 Applying For EoA & Increase in intake
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
120
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
Yes
Sr. No. 4 Course Unique Id 1-1413336522 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course ELECTRONICS AND COMMUNICATIONS ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2000 Applying For EoA Only
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
60
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 5 Course Unique Id 1-1413336526 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course BIOMEDICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2002 Applying For Closure of course
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 7 of 47
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 6 Course Unique Id 1-1413336528 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course CIVIL ENGINEERING Shift 1st Shift
FT/PT PART TIME Started In 1986 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 7 Course Unique Id 1-1413336530 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course MECHANICAL ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 1996 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 8 Course Unique Id 1-1413336532 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course ELECTRICAL ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 1996 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 9 Course Unique Id 1-1413336534 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course ELECTRONICS AND COMMUNICATIONS ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 2001 Applying For Closure Pending
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 8 of 47
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 10 Course Unique Id 1-1413336536 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course PRODUCTION ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 2001 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 11 Course Unique Id 1-1413336538 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course CONSTRUCTION TECHNOLOGY AND MANAGEMENT
Shift 1st Shift
FT/PT PART TIME Started In 2001 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 12 Course Unique Id 1-1413336540 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course CHEMICAL ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 2001 Applying For Closure Pending
Course Duration 4 Current Intake (2018-19)
0 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 13 Course Unique Id 1-1413336542 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course PETROCHEMICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2010 Applying For Closure of course
Course Duration 4 Current Intake 60 Applied for 0
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 9 of 47
(2018-19) Intake(2019-20)
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 14 Course Unique Id 1-1413336544 Programme MANAGEMENTLevel POST GRADUATE Course MASTERS IN
BUSINESS ADMINISTRATION
Shift 1st Shift
FT/PT FULL TIME Started In 2001 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
60 Applied for Intake(2019-20)
60
NRI Not interested University/ Board Barkatullah University, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 15 Course Unique Id 1-1413336546 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course COMPUTER SCIENCEAND ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2001 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
25 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 16 Course Unique Id 1-1413336548 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course ARTIFICIAL INTELLIGENCE
Shift 1st Shift
FT/PT FULL TIME Started In 2003 Applying For Closure of course
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 17 Course Unique Id 1-1413336550 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course CYBER SECURITY Shift 1st Shift
FT/PT FULL TIME Started In 2004 Applying For Closure of course
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi PIO / FN / Gulf Quota Not interested
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 10 of 47
Proudyogiki Vishwavidyalaya, Bhopal
Approval status OCI
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 18 Course Unique Id 1-1413336552 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course THERMAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2004 Applying For Closure of course
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 19 Course Unique Id 1-1413336554 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course ADVANCED PRODUCTION SYSTEMS
Shift 1st Shift
FT/PT FULL TIME Started In 1993 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 20 Course Unique Id 1-1413336556 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course CONSTRUCTION TECHNOLOGY AND MANAGEMENT
Shift 1st Shift
FT/PT FULL TIME Started In 1997 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 21 Course Unique Id 1-1413336560 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course TRANSPORTATION ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2001 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi PIO / FN / Gulf Quota Not interested
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 11 of 47
Proudyogiki Vishwavidyalaya, Bhopal
Approval status OCI
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 22 Course Unique Id 1-1413336562 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course ENVIRONMENTAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1999 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 23 Course Unique Id 1-1413336564 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course POWER ELECTRONICS
Shift 1st Shift
FT/PT FULL TIME Started In 1997 Applying For EoA Only
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
18
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 24 Course Unique Id 1-1413336566 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course ELECTRICAL MACHINES AND DRIVES
Shift 1st Shift
FT/PT FULL TIME Started In 2003 Applying For Closure of course
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 25 Course Unique Id 1-1413336568 Programme ENGINEERING AND TECHNOLOGY
Level POST GRADUATE Course DIGITAL COMMUNICATION
Shift 1st Shift
FT/PT FULL TIME Started In 2010 Applying For Closure of course
Course Duration 2 Current Intake (2018-19)
18 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 12 of 47
Vishwavidyalaya, Bhopal
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 26 Course Unique Id 1-1413336570 Programme MCALevel POST GRADUATE Course MASTERS IN
COMPUTER APPLICATIONS
Shift 1st Shift
FT/PT FULL TIME Started In 1988 Applying For Closure of course
Course Duration 3 Current Intake (2018-19)
60 Applied for Intake(2019-20)
0
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 27 Course Unique Id 1-1413336572 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course CIVIL ENGINEERING Shift 1st Shift
FT/PT FULL TIME Started In 1960 Applying For EoA Only
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
60
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 28 Course Unique Id 1-1602796246 Programme ENGINEERING AND TECHNOLOGY
Level UNDER GRADUATE Course MECHANICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1960 Applying For EoA & Increase in intake
Course Duration 4 Current Intake (2018-19)
60 Applied for Intake(2019-20)
120
NRI Not interested University/ Board Rajiv Gandhi Proudyogiki Vishwavidyalaya, Bhopal
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
Yes
Dual Degree/Integrated Course Details
Data not entered by InstituteVocational Course Details
Sr.No.
Course Unique Id
Level Program Course Approved Intake for 2018-19
Intake Appliedfor 2019-20
Applied for
1 1-3737310276 BACHELOR OF VOCATION (B. VOC)
MANAGEMENT/IT/ ITES SOFTWARE DEVELOPMENT
25 25
2 1-3737454938 BACHELOR OF VOCATION (B. VOC)
ENGINEERING AND TECHNOLOGY
REFRIGERATION AND AIRCONDITIONING
25 25
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 13 of 47
3 1-3737668156 BACHELOR OF VOCATION (B. VOC)
ENGINEERING AND TECHNOLOGY
MOBILE COMMUNICATION
25 25
4 1-3740090223 BACHELOR OF VOCATION (B. VOC)
MANAGEMENT/IT/ ITES BFSI 25 25
Instructional Area
Sr. No.
Programme Level BuildingNo.
Building Name
Room Type
Room No.
Average Carpet Area (Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom BM-C2
66 Ready Ready Ready Ready
2 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom BM-C3
66 Ready Ready Ready Ready
3 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom BM-C4
66 Ready Ready Ready Ready
4 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom BM-C5
66 Ready Ready Ready Ready
5 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB1
129.4 Ready Ready Ready Ready
6 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB2
129.4 Ready Ready Ready Ready
7 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB3
129.4 Ready Ready Ready Ready
8 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB4
129.4 Ready Ready Ready Ready
9 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB5
129.4 Ready Ready Ready Ready
10 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB6
129.4 Ready Ready Ready Ready
11 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB7
129.4 Ready Ready Ready Ready
12 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory BM-LB8
129.4 Ready Ready Ready Ready
13 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
BM-S1
132 Ready Ready Ready Ready
14 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
BM-T1
36 Ready Ready Ready Ready
15 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
BM-T2
36 Ready Ready Ready Ready
16 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C1
66 Ready Ready Ready Ready
17 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C10
66 Ready Ready Ready Ready
18 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom CE-C2
66 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 14 of 47
19 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom CE-C3
66 Ready Ready Ready Ready
20 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C4
66 Ready Ready Ready Ready
21 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C5
66 Ready Ready Ready Ready
22 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C6
66 Ready Ready Ready Ready
23 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C7
66 Ready Ready Ready Ready
24 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CE-C8
66 Ready Ready Ready Ready
25 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom CE-C9
66 Ready Ready Ready Ready
26 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory CE-LB1
129.4 Ready Ready Ready Ready
27 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory CE-LB2
129.4 Ready Ready Ready Ready
28 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory CE-LB3
129.4 Ready Ready Ready Ready
29 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory CE-LB4
129.4 Ready Ready Ready Ready
30 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Research Laboratory
CE-RL
78.5 Ready Ready Ready Ready
31 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
CE-S1
132 Ready Ready Ready Ready
32 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
CE-S2
132 Ready Ready Ready Ready
33 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Seminar Hall
CE-S3
132 Ready Ready Ready Ready
34 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
CE-T1
36 Ready Ready Ready Ready
35 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CE-T2
36 Ready Ready Ready Ready
36 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
CE-T3
36 Ready Ready Ready Ready
37 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CE-T4
36 Ready Ready Ready Ready
38 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CE-T5
36 Ready Ready Ready Ready
39 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CE-T6
36 Ready Ready Ready Ready
40 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CE-T7
36 Ready Ready Ready Ready
41 ENGINEERING POST 1 Main Tutorial CE- 36 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 15 of 47
AND TECHNOLOGY
GRADUATE Building Rooms - PG
T8
42 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Rooms - PG
CE-T9
36 Ready Ready Ready Ready
43 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CS-C1
66 Ready Ready Ready Ready
44 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CS-C2
66 Ready Ready Ready Ready
45 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom CS-C3
66 Ready Ready Ready Ready
46 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom CS-C4
66 Ready Ready Ready Ready
47 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom CS-C5
66 Ready Ready Ready Ready
48 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory CS-LB1
129.4 Ready Ready Ready Ready
49 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory CS-LB2
129.4 Ready Ready Ready Ready
50 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Research Laboratory
CS-RL
78.5 Ready Ready Ready Ready
51 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
CS-S1
132 Ready Ready Ready Ready
52 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
CS-T1
36 Ready Ready Ready Ready
53 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CS-T2
36 Ready Ready Ready Ready
54 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CS-T3
36 Ready Ready Ready Ready
55 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
CS-T4
36 Ready Ready Ready Ready
56 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Drawing Hall
D-HALL
150 Ready Ready Ready Ready
57 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EC-C1
66 Ready Ready Ready Ready
58 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EC-C2
66 Ready Ready Ready Ready
59 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EC-C3
66 Ready Ready Ready Ready
60 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EC-C4
66 Ready Ready Ready Ready
61 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom EC-C5
66 Ready Ready Ready Ready
62 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EC-C6
66 Ready Ready Ready Ready
63 ENGINEERINGAND
UNDER GRADUATE
1 Main Building
Laboratory EC-LB1
129.4 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 16 of 47
TECHNOLOGY 64 ENGINEERING
AND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EC-LB2
129.4 Ready Ready Ready Ready
65 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EC-LB3
129.4 Ready Ready Ready Ready
66 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EC-LB4
129.4 Ready Ready Ready Ready
67 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
EC-S1
132 Ready Ready Ready Ready
68 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Seminar Hall
EC-S2
132 Ready Ready Ready Ready
69 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EC-T1
36 Ready Ready Ready Ready
70 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
EC-T2
36 Ready Ready Ready Ready
71 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EE-C1
66 Ready Ready Ready Ready
72 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EE-C2
66 Ready Ready Ready Ready
73 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom EE-C3
66 Ready Ready Ready Ready
74 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom EE-C4
66 Ready Ready Ready Ready
75 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EE-C5
66 Ready Ready Ready Ready
76 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EE-C6
66 Ready Ready Ready Ready
77 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Classroom EE-C7
66 Ready Ready Ready Ready
78 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EE-LB1
129.4 Ready Ready Ready Ready
79 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EE-LB2
129.4 Ready Ready Ready Ready
80 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory EE-LB3
129.4 Ready Ready Ready Ready
81 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory EE-LB4
129.4 Ready Ready Ready Ready
82 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Research Laboratory
EE-RL
78.5 Ready Ready Ready Ready
83 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
EE-S1
132 Ready Ready Ready Ready
84 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
EE-S2
132 Ready Ready Ready Ready
85 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Seminar Hall
EE-S3
132 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 17 of 47
86 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EE-T1
36 Ready Ready Ready Ready
87 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
EE-T2
36 Ready Ready Ready Ready
88 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EE-T3
36 Ready Ready Ready Ready
89 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
EE-T4
36 Ready Ready Ready Ready
90 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
EE-T5
36 Ready Ready Ready Ready
91 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
EE-T6
36 Ready Ready Ready Ready
92 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EI-C1
66 Ready Ready Ready Ready
93 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EI-C2
66 Ready Ready Ready Ready
94 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EI-C3
66 Ready Ready Ready Ready
95 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EI-C4
66 Ready Ready Ready Ready
96 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom EI-C5
66 Ready Ready Ready Ready
97 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EI-LB1
129.4 Ready Ready Ready Ready
98 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EI-LB2
129.4 Ready Ready Ready Ready
99 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EI-LB3
129.4 Ready Ready Ready Ready
100 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory EI-LB4
129.4 Ready Ready Ready Ready
101 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
EI-S1
132 Ready Ready Ready Ready
102 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EI-T1
36 Ready Ready Ready Ready
103 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EI-T2
36 Ready Ready Ready Ready
104 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EI-T3
36 Ready Ready Ready Ready
105 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
EI-T4
36 Ready Ready Ready Ready
106 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom IT-C1
66 Ready Ready Ready Ready
107 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom IT-C2
66 Ready Ready Ready Ready
108 ENGINEERING UNDER 1 Main Classroom IT- 66 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 18 of 47
AND TECHNOLOGY
GRADUATE Building C3
109 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom IT-C4
66 Ready Ready Ready Ready
110 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Classroom IT-C5
66 Ready Ready Ready Ready
111 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory IT-LB1
129.4 Ready Ready Ready Ready
112 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory IT-LB2
129.4 Ready Ready Ready Ready
113 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Laboratory IT-LB3
129.4 Ready Ready Ready Ready
114 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory IT-LB4
129.4 Ready Ready Ready Ready
115 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory IT-LB5
129.4 Ready Ready Ready Ready
116 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Laboratory IT-LB6
129.4 Ready Ready Ready Ready
117 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Research Laboratory
IT-RL
78.5 Ready Ready Ready Ready
118 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Seminar Hall
IT-S1
132 Ready Ready Ready Ready
119 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Seminar Hall
IT-S2
132 Ready Ready Ready Ready
120 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
1 Main Building
Tutorial Room
IT-T1 36 Ready Ready Ready Ready
121 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
IT-T2 36 Ready Ready Ready Ready
122 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
IT-T3 36 Ready Ready Ready Ready
123 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
1 Main Building
Tutorial Room
IT-T4 36 Ready Ready Ready Ready
124 MANAGEMENT
POST GRADUATE
20 Management Department
Classroom MBA-C1
66 Ready Ready Ready Ready
125 MANAGEMENT
POST GRADUATE
20 Management Department
Classroom MBA-C2
66 Ready Ready Ready Ready
126 MANAGEMENT
POST GRADUATE
20 Management Department
Seminar Hall
MBA-S1
132 Ready Ready Ready Ready
127 MANAGEMENT
POST GRADUATE
20 Management Department
Tutorial Room
MBA-T1
33 Ready Ready Ready Ready
128 MANAGEMENT
POST GRADUATE
3 MBA Computer Laboratory
MBACC
82 Ready Ready Ready Ready
129 MCA POST GRADUATE
1 Main Building
Classroom MCA-C1
66 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 19 of 47
130 MCA POST GRADUATE
1 Main Building
Classroom MCA-C2
66 Ready Ready Ready Ready
131 MCA POST GRADUATE
1 Main Building
Classroom MCA-C3
66 Ready Ready Ready Ready
132 MCA POST GRADUATE
1 Main Building
Classroom MCA-C4
66 Ready Ready Ready Ready
133 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom MCA-C5
66 Ready Ready Ready Ready
134 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom MCA-C6
66 Ready Ready Ready Ready
135 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory MCA-L1
66 Ready Ready Ready Ready
136 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Research Laboratory
MCA-RL
78.5 Ready Ready Ready Ready
137 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Seminar Hall
MCA-S1
132 Ready Ready Ready Ready
138 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Seminar Hall
MCA-S2
132 Ready Ready Ready Ready
139 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
MCA-T1
36 Ready Ready Ready Ready
140 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
MCA-T2
36 Ready Ready Ready Ready
141 MCA POST GRADUATE
1 MainBuilding
Computer Laboratory
MCACC
132 Ready Ready Ready Ready
142 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory MCALB1
129.4 Ready Ready Ready Ready
143 MCA POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory MCALB2
129.4 Ready Ready Ready Ready
144 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Drawing Hall
MDH-1
132 Ready Ready Ready Ready
145 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom ME-C1
66 Ready Ready Ready Ready
146 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom ME-C2
66 Ready Ready Ready Ready
147 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom ME-C3
66 Ready Ready Ready Ready
148 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the
Data Not Provided by the
Classroom ME-C4
66 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 20 of 47
Institute Institute 149 ENGINEERING
AND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom ME-C5
66 Ready Ready Ready Ready
150 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB1
129.4 Ready Ready Ready Ready
151 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB2
129.4 Ready Ready Ready Ready
152 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB3
129.4 Ready Ready Ready Ready
153 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB4
129.4 Ready Ready Ready Ready
154 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB5
129.4 Ready Ready Ready Ready
155 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB6
129.4 Ready Ready Ready Ready
156 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB7
129.4 Ready Ready Ready Ready
157 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB8
129.4 Ready Ready Ready Ready
158 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory ME-LB9
129.4 Ready Ready Ready Ready
159 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Research Laboratory
ME-RL
78.5 Ready Ready Ready Ready
160 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Seminar Hall
ME-S1
132 Ready Ready Ready Ready
161 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Seminar Hall
ME-S2
132 Ready Ready Ready Ready
162 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Seminar Hall
ME-S3
132 Ready Ready Ready Ready
163 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
ME-T1
36 Ready Ready Ready Ready
164 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
ME-T2
36 Ready Ready Ready Ready
165 ENGINEERINGAND
UNDER GRADUATE
Data Not Provided
Data Not Provided
Tutorial Room
ME-T3
36 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 21 of 47
TECHNOLOGY by the Institute
by the Institute
166 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
ME-T4
36 Ready Ready Ready Ready
167 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
ME-T5
36 Ready Ready Ready Ready
168 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
ME-T6
36 Ready Ready Ready Ready
169 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory MELB10
129.4 Ready Ready Ready Ready
170 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory OPEN-1
5000 Not Ready Not Ready
Ready Not Ready
171 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory PC-LB1
129.4 Ready Ready Ready Ready
172 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory PC-LB2
129.4 Ready Ready Ready Ready
173 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory PC-LB3
129.4 Ready Ready Ready Ready
174 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Laboratory PC-LB4
129.4 Ready Ready Ready Ready
175 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom PCE-C1
66 Ready Ready Ready Ready
176 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom PCE-C2
66 Ready Ready Ready Ready
177 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom PCE-C3
66 Ready Ready Ready Ready
178 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Classroom PCE-C4
66 Ready Ready Ready Ready
179 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
PCE-T1
36 Ready Ready Ready Ready
180 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Tutorial Room
PCE-T2
36 Ready Ready Ready Ready
181 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
Data Not Provided by the Institute
Data Not Provided by the Institute
Workshop WS 527 Ready Ready Ready Ready
182 ENGINEERING UNDER WS-02 Charkha Additional WS- 806 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 22 of 47
AND TECHNOLOGY
GRADUATE Kandra Workshop 02
Instructional Area Common FacilitiesSr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture &Fixtures
1 1 Admin Block Language Laboratory
LANG 70 Ready Ready Ready Ready
2 1 Admin Block Library&Reading Room
LIB 710 Ready Ready Ready Ready
3 1 Admin Block Computer Center
VVNCC 715 Ready Ready Ready Ready
Administrative Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture &Fixtures
1 1 Admin Block Department Office
ACAD1 20.2 Ready Ready Ready Ready
2 1 Admin Block Department Office
ACAD2 20.2 Ready Ready Ready Ready
3 1 Admin Block Department Office
ACAD3 20.2 Ready Ready Ready Ready
4 1 Admin Block Department Office
ACAD4 20.2 Ready Ready Ready Ready
5 1 Admin Block Department Office
ACC1 20.2 Ready Ready Ready Ready
6 1 Admin Block Department Office
ACC2 20.2 Ready Ready Ready Ready
7 1 Admin Block Department Office
ACC3 20.2 Ready Ready Ready Ready
8 01 Admin Block Office All Inclusive
ADMIN1 112.5 Ready Ready Ready Ready
9 1 Admin Block Office All Inclusive
ADMIN2 112.5 Ready Ready Ready Ready
10 1 Admin Block Office All Inclusive
ADMIN3 100 Ready Ready Ready Ready
11 1 Admin Block Office All Inclusive
ADMIN4 40 Ready Ready Ready Ready
12 1 Admin Block Department Office
AUDIO 20.2 Ready Ready Ready Ready
13 13 Building Section Department Office
B.S. 20.2 Ready Ready Ready Ready
14 1 Admin Block Board Room BOG-R 30 Ready Ready Ready Ready
15 11 Canteen Pantry for Staff
CANT1 37 Ready Ready Ready Ready
16 1 Admin Block Principal Directors Office
D-1 99 Ready Ready Ready Ready
17 1 Admin Block Exam Control Office
EC1 78.5 Ready Ready Ready Ready
18 1 Admin Block Exam Control Office
EC2 78.5 Ready Ready Ready Ready
19 1 Admin Block Department Office
EDC 20.2 Ready Ready Ready Ready
20 1 Admin Block Department Office
ELECTM 20.2 Ready Ready Ready Ready
21 1 Admin Block Department Office
ESTT 20.2 Ready Ready Ready Ready
22 1 civil department Faculty Room FR1 9.29 Ready Ready Ready Ready
23 1 civil department Faculty Room FR10 9.29 Ready Ready Ready Ready
24 1 civil department Faculty Room FR11 9.29 Ready Ready Ready Ready
25 1 civil department Faculty Room FR12 9.29 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 23 of 47
26 1 civil department Faculty Room FR13 9.29 Ready Ready Ready Ready
27 1 civil department Faculty Room FR14 9.29 Ready Ready Ready Ready
28 1 Mechanical
DepartmentFaculty Room FR15 9.29 Ready Ready Ready Ready
29 1 Mechanical
DepartmentFaculty Room FR16 9.29 Ready Ready Ready Ready
30 1 Mechanical
DepartmentFaculty Room FR17 9.29 Ready Ready Ready Ready
31 1 Mechanical
DepartmentFaculty Room FR18 9.29 Ready Ready Ready Ready
32 1 Mechanical
DepartmentFaculty Room FR19 9.29 Ready Ready Ready Ready
33 1 Mechanical
DepartmentFaculty Room FR2 9.29 Ready Ready Ready Ready
34 1 Electrical Department Faculty Room FR20 9.29 Ready Ready Ready Ready
35 1 Electrical Department Faculty Room FR21 9.29 Ready Ready Ready Ready
36 1 Electrical Department Faculty Room FR22 9.29 Ready Ready Ready Ready
37 1 Electrical Department Faculty Room FR23 9.29 Ready Ready Ready Ready
38 1 Electrical Department Faculty Room FR24 9.29 Ready Ready Ready Ready
39 1 Electrical Department Faculty Room FR25 9.29 Ready Ready Ready Ready
40 1 CSE Department Faculty Room FR26 9.29 Ready Ready Ready Ready
41 1 CSE Department Faculty Room FR27 9.29 Ready Ready Ready Ready
42 1 CSE Department Faculty Room FR28 9.29 Ready Ready Ready Ready
43 1 CSE Department Faculty Room FR29 9.29 Ready Ready Ready Ready
44 1 CSE Department Faculty Room FR3 9.29 Ready Ready Ready Ready
45 1 CSE Department Faculty Room FR30 9.29 Ready Ready Ready Ready
46 1 EI Department Faculty Room FR31 9.29 Ready Ready Ready Ready
47 1 EI Department Faculty Room FR32 9.29 Ready Ready Ready Ready
48 1 EI Department Faculty Room FR33 9.29 Ready Ready Ready Ready
49 1 EI Department Faculty Room FR34 9.29 Ready Ready Ready Ready
50 1 EI Department Faculty Room FR35 9.29 Ready Ready Ready Ready
51 1 EI Department Faculty Room FR36 9.29 Ready Ready Ready Ready
52 1 EC Department Faculty Room FR37 9.29 Ready Ready Ready Ready
53 1 EC Department Faculty Room FR38 9.29 Ready Ready Ready Ready
54 1 EC Department Faculty Room FR39 9.29 Ready Ready Ready Ready
55 1 EC Department Faculty Room FR4 9.29 Ready Ready Ready Ready
56 1 EC Department Faculty Room FR40 9.29 Ready Ready Ready Ready
57 1 EC Department Faculty Room FR41 9.29 Ready Ready Ready Ready
58 1 BME Department Faculty Room FR42 9.29 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 24 of 47
59 1 BME Department Faculty Room FR43 9.29 Ready Ready Ready Ready
60 1 BME Department Faculty Room FR44 9.29 Ready Ready Ready Ready
61 1 BME Department Faculty Room FR45 9.29 Ready Ready Ready Ready
62 1 BME Department Faculty Room FR46 9.29 Ready Ready Ready Ready
63 1 Chemical Department Faculty Room FR47 9.29 Ready Ready Ready Ready
64 1 Chemical Department Faculty Room FR48 9.29 Ready Ready Ready Ready
65 1 Chemical Department Faculty Room FR49 9.29 Ready Ready Ready Ready
66 1 Chemical Department Faculty Room FR5 9.29 Ready Ready Ready Ready
67 1 Chemical Department Faculty Room FR50 9.29 Ready Ready Ready Ready
68 1 CA Department Faculty Room FR51 9.29 Ready Ready Ready Ready
69 1 CA Department Faculty Room FR52 9.29 Ready Ready Ready Ready
70 1 CA Department Faculty Room FR53 9.29 Ready Ready Ready Ready
71 1 CA Department Faculty Room FR54 9.29 Ready Ready Ready Ready
72 1 CA Department Faculty Room FR55 9.29 Ready Ready Ready Ready
73 1 CA Department Faculty Room FR56 9.29 Ready Ready Ready Ready
74 1 Applied Sc. Faculty Room FR57 9.29 Ready Ready Ready Ready
75 1 Applied Sc. Faculty Room FR58 9.29 Ready Ready Ready Ready
76 1 Applied Sc. Faculty Room FR59 9.29 Ready Ready Ready Ready
77 1 Applied Sc. Faculty Room FR6 9.29 Ready Ready Ready Ready
78 1 Applied Sc. Faculty Room FR60 9.29 Ready Ready Ready Ready
79 1 Applied Math Faculty Room FR61 9.29 Ready Ready Ready Ready
80 1 Applied Math Faculty Room FR62 9.29 Ready Ready Ready Ready
81 1 Applied Math Faculty Room FR63 9.29 Ready Ready Ready Ready
82 1 Applied Math Faculty Room FR64 9.29 Ready Ready Ready Ready
83 1 Applied Math Faculty Room FR65 9.29 Ready Ready Ready Ready
84 20 MBA Department Faculty Room FR66 9.29 Ready Ready Ready Ready
85 20 MBA Department Faculty Room FR67 9.29 Ready Ready Ready Ready
86 20 MBA Department Faculty Room FR68 9.29 Ready Ready Ready Ready
87 20 MBA Department Faculty Room FR69 9.29 Ready Ready Ready Ready
88 20 Humanities Department Faculty Room FR7 9.29 Ready Ready Ready Ready
89 20 Humanities Department Faculty Room FR70 9.29 Ready Ready Ready Ready
90 20 Humanities Department Faculty Room FR71 9.29 Ready Ready Ready Ready
91 1 Civil Deparment Faculty Room FR72 18.46 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 25 of 47
92 1 Mechanical
DepartmetnFaculty Room FR73 18.46 Ready Ready Ready Ready
93 1 IT Department Faculty Room FR8 9.29 Ready Ready Ready Ready
94 1 IT Department Faculty Room FR9 9.29 Ready Ready Ready Ready
95 23 Trisem Housekeeping HK1 13.33 Ready Ready Ready Ready
96 23 Trisem Housekeeping HK2 13.33 Ready Ready Ready Ready
97 23 Trisem Housekeeping HK3 13.33 Ready Ready Ready Ready
98 23 Trisem Housekeeping HK4 13.33 Ready Ready Ready Ready
99 23 Trisem Housekeeping HK5 13.33 Ready Ready Ready Ready
100 23 Trisem Housekeeping HK6 13.33 Ready Ready Ready Ready
101 1 Civil Department Cabin for
Head of DeptHODC1 18.46 Ready Ready Ready Ready
102 1 Mechanical
DepartmentCabin for Head of Dept
HODC10 18.46 Ready Ready Ready Ready
103 1 Electrical Department Cabin for Head of Dept
HODC11 18.46 Ready Ready Ready Ready
104 1 CSE Department Cabin for Head of Dept
HODC12 18.46 Ready Ready Ready Ready
105 1 EI Department Cabin for Head of Dept
HODC13 18.46 Ready Ready Ready Ready
106 1 EC Department Cabin for Head of Dept
HODC14 18.46 Ready Ready Ready Ready
107 1 BME Department Cabin for Head of Dept
HODC15 18.46 Ready Ready Ready Ready
108 1 Chemical Department Cabin for Head of Dept
HODC2 18.46 Ready Ready Ready Ready
109 1 IT Department Cabin for Head of Dept
HODC3 18.46 Ready Ready Ready Ready
110 1 Management Department
Cabin for Head of Dept
HODC4 18.46 Ready Ready Ready Ready
111 1 Applied Math Department
Cabin for Head of Dept
HODC5 18.46 Ready Ready Ready Ready
112 1 Applied Science Department
Cabin for Head of Dept
HODC6 18.46 Ready Ready Ready Ready
113 1 Humanities Department Cabin for Head of Dept
HODC7 18.46 Ready Ready Ready Ready
114 1 Admin Block Department Office
LEGAL 20.2 Ready Ready Ready Ready
115 13 Building Section Maintenance MAIN1 20.6 Ready Ready Ready Ready
116 1 Electrical maint. Maintenance MAIN2 20.6 Ready Ready Ready Ready
117 1 CMC Maintenance MAIN3 20.6 Ready Ready Ready Ready
118 24 Vic. Maintain. Maintenance MAIN4 20.6 Ready Ready Ready Ready
119 24 Water Sup. Maint Maintenance MAIN5 20.6 Ready Ready Ready Ready
120 13 NCC Department Office
NCC 20.2 Ready Ready Ready Ready
121 13 NSS Department Office
NSS 20.2 Ready Ready Ready Ready
122 7 Building Centre Other Office OFF 185 Ready Ready Ready Ready
123 1 Admin Block Reception Area
RESC 95 Ready Ready Ready Ready
124 1 Admin Block Department SALARY 20.2 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 26 of 47
Office 125 1 Main Gate Security SECU1 13.33 Ready Ready Ready Ready
126 38 Hostel Gate Security SECU2 13.33 Ready Ready Ready Ready
127 22 Staff Gate Security SECU3 13.33 Ready Ready Ready Ready
128 1 Admin Block Central Store STORE 71 Ready Ready Ready Ready
129 1 Admin Block Department
OfficeT&P 20.2 Ready Ready Ready Ready
130 1 Admin Block Placement
OfficeT&P-1 34.5 Ready Ready Ready Ready
131 1 Admin Block Placement
OfficeT&P-2 34.5 Ready Ready Ready Ready
132 1 Admin Block Department
OfficeTEQIP 20.2 Ready Ready Ready Ready
Amenities Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 13 Student Activity Student activity / GCR
ACT-RM 380 Ready Ready Ready Ready
2 20 Kailash Satyarthi Auditorium AUD 625 Ready Ready Ready Ready
3 1 Admin Block Boys Common Room
BCR 125 Ready Ready Ready Ready
4 11 Canteen Cafeteria CANT. 240 Ready Ready Ready Ready
5 15 Madhav Sports Club Sports Club CLUB 583 Ready Ready Ready Ready
6 30 C.V. Raman Boys' Hostel CVRR1 20.07 Ready Ready Ready Ready
7 30 C.V. Raman Boys' Hostel CVRR10 20.07 Ready Ready Ready Ready
8 30 C.V. Raman Boys' Hostel CVRR11 20.07 Ready Ready Ready Ready
9 30 C.V. Raman Boys' Hostel CVRR12 20.07 Ready Ready Ready Ready
10 30 C.V. Raman Boys' Hostel CVRR13 20.07 Ready Ready Ready Ready
11 30 C.V. Raman Boys' Hostel CVRR14 20.07 Ready Ready Ready Ready
12 30 C.V. Raman Boys' Hostel CVRR15 20.07 Ready Ready Ready Ready
13 30 C.V. Raman Boys' Hostel CVRR16 20.07 Ready Ready Ready Ready
14 30 C.V. Raman Boys' Hostel CVRR17 20.07 Ready Ready Ready Ready
15 30 C.V. Raman Boys' Hostel CVRR18 20.07 Ready Ready Ready Ready
16 30 C.V. Raman Boys' Hostel CVRR19 20.07 Ready Ready Ready Ready
17 30 C.V. Raman Boys' Hostel CVRR2 20.07 Ready Ready Ready Ready
18 30 C.V. Raman Boys' Hostel CVRR20 20.07 Ready Ready Ready Ready
19 30 C.V. Raman Boys' Hostel CVRR21 20.07 Ready Ready Ready Ready
20 30 C.V. Raman Boys' Hostel CVRR22 20.07 Ready Ready Ready Ready
21 30 C.V. Raman Boys' Hostel CVRR23 20.07 Ready Ready Ready Ready
22 30 C.V. Raman Boys' Hostel CVRR24 20.07 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 27 of 47
23 30 C.V. Raman Boys' Hostel CVRR25 20.07 Ready Ready Ready Ready
24 30 C.V. Raman Boys' Hostel CVRR26 20.07 Ready Ready Ready Ready
25 30 C.V. Raman Boys' Hostel CVRR27 20.07 Ready Ready Ready Ready
26 30 C.V. Raman Boys' Hostel CVRR28 20.07 Ready Ready Ready Ready
27 30 C.V. Raman Boys' Hostel CVRR29 20.07 Ready Ready Ready Ready
28 30 C.V. Raman Boys' Hostel CVRR3 20.07 Ready Ready Ready Ready
29 30 C.V. Raman Boys' Hostel CVRR30 20.07 Ready Ready Ready Ready
30 30 C.V. Raman Boys' Hostel CVRR31 20.07 Ready Ready Ready Ready
31 30 C.V. Raman Boys' Hostel CVRR32 20.07 Ready Ready Ready Ready
32 30 C.V. Raman Boys' Hostel CVRR33 20.07 Ready Ready Ready Ready
33 30 C.V. Raman Boys' Hostel CVRR34 20.07 Ready Ready Ready Ready
34 30 C.V. Raman Boys' Hostel CVRR4 20.07 Ready Ready Ready Ready
35 30 C.V. Raman Boys' Hostel CVRR5 20.07 Ready Ready Ready Ready
36 30 C.V. Raman Boys' Hostel CVRR6 20.07 Ready Ready Ready Ready
37 30 C.V. Raman Boys' Hostel CVRR7 20.07 Ready Ready Ready Ready
38 30 C.V. Raman Boys' Hostel CVRR8 20.07 Ready Ready Ready Ready
39 30 C.V. Raman Boys' Hostel CVRR9 20.07 Ready Ready Ready Ready
40 10 Director Banglow Principal's Quarter
DIR-B 400 Ready Ready Ready Ready
41 28 Old Hostel First aid cum Sick Room
F-AID 21 Ready Ready Ready Ready
42 01 Admin Block Girls CommonRoom
GCR 125 Ready Ready Ready Ready
43 09 Vip Guest House Guest House GHOUSE 180 Ready Ready Ready Ready
44 40 I. Girl Hostel Girls' Hostel IGR1 13.5 Ready Ready Ready Ready
45 40 I. Girl Hostel Girls' Hostel IGR10 13.5 Ready Ready Ready Ready
46 40 I. Girl Hostel Girls' Hostel IGR11 13.5 Ready Ready Ready Ready
47 40 I. Girl Hostel Girls' Hostel IGR12 13.5 Ready Ready Ready Ready
48 40 I. Girl Hostel Girls' Hostel IGR13 13.5 Ready Ready Ready Ready
49 40 I. Girl Hostel Girls' Hostel IGR14 13.5 Ready Ready Ready Ready
50 40 I. Girl Hostel Girls' Hostel IGR15 13.5 Ready Ready Ready Ready
51 40 I. Girl Hostel Girls' Hostel IGR16 13.5 Ready Ready Ready Ready
52 40 I. Girl Hostel Girls' Hostel IGR17 13.5 Ready Ready Ready Ready
53 40 I. Girl Hostel Girls' Hostel IGR18 13.5 Ready Ready Ready Ready
54 40 I. Girl Hostel Girls' Hostel IGR19 13.5 Ready Ready Ready Ready
55 40 I. Girl Hostel Girls' Hostel IGR2 13.5 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 28 of 47
56 40 I. Girl Hostel Girls' Hostel IGR20 13.5 Ready Ready Ready Ready
57 40 I. Girl Hostel Girls' Hostel IGR21 13.5 Ready Ready Ready Ready
58 40 I. Girl Hostel Girls' Hostel IGR22 13.5 Ready Ready Ready Ready
59 40 I. Girl Hostel Girls' Hostel IGR23 13.5 Ready Ready Ready Ready
60 40 I. Girl Hostel Girls' Hostel IGR24 13.5 Ready Ready Ready Ready
61 40 I. Girl Hostel Girls' Hostel IGR25 13.5 Ready Ready Ready Ready
62 40 I. Girl Hostel Girls' Hostel IGR26 13.5 Ready Ready Ready Ready
63 40 I. Girl Hostel Girls' Hostel IGR27 13.5 Ready Ready Ready Ready
64 40 I. Girl Hostel Girls' Hostel IGR28 13.5 Ready Ready Ready Ready
65 40 I. Girl Hostel Girls' Hostel IGR29 13.5 Ready Ready Ready Ready
66 40 I. Girl Hostel Girls' Hostel IGR3 13.5 Ready Ready Ready Ready
67 40 I. Girl Hostel Girls' Hostel IGR30 13.5 Ready Ready Ready Ready
68 40 I. Girl Hostel Girls' Hostel IGR31 13.5 Ready Ready Ready Ready
69 40 I. Girl Hostel Girls' Hostel IGR32 13.5 Ready Ready Ready Ready
70 40 I. Girl Hostel Girls' Hostel IGR33 13.5 Ready Ready Ready Ready
71 40 I. Girl Hostel Girls' Hostel IGR34 13.5 Ready Ready Ready Ready
72 40 I. Girl Hostel Girls' Hostel IGR35 13.5 Ready Ready Ready Ready
73 40 I. Girl Hostel Girls' Hostel IGR36 13.5 Ready Ready Ready Ready
74 40 I. Girl Hostel Girls' Hostel IGR37 13.5 Ready Ready Ready Ready
75 40 I. Girl Hostel Girls' Hostel IGR38 13.5 Ready Ready Ready Ready
76 40 I. Girl Hostel Girls' Hostel IGR39 13.5 Ready Ready Ready Ready
77 40 I. Girl Hostel Girls' Hostel IGR4 13.5 Ready Ready Ready Ready
78 40 I. Girl Hostel Girls' Hostel IGR40 13.5 Ready Ready Ready Ready
79 40 I. Girl Hostel Girls' Hostel IGR41 13.5 Ready Ready Ready Ready
80 40 I. Girl Hostel Girls' Hostel IGR42 13.5 Ready Ready Ready Ready
81 40 I. Girl Hostel Girls' Hostel IGR43 13.5 Ready Ready Ready Ready
82 40 I. Girl Hostel Girls' Hostel IGR44 13.5 Ready Ready Ready Ready
83 40 I. Girl Hostel Girls' Hostel IGR45 13.5 Ready Ready Ready Ready
84 40 I. Girl Hostel Girls' Hostel IGR46 13.5 Ready Ready Ready Ready
85 40 I. Girl Hostel Girls' Hostel IGR47 13.5 Ready Ready Ready Ready
86 40 I. Girl Hostel Girls' Hostel IGR48 13.5 Ready Ready Ready Ready
87 40 I. Girl Hostel Girls' Hostel IGR5 13.5 Ready Ready Ready Ready
88 40 I. Girl Hostel Girls' Hostel IGR6 13.5 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 29 of 47
89 40 I. Girl Hostel Girls' Hostel IGR7 13.5 Ready Ready Ready Ready
90 40 I. Girl Hostel Girls' Hostel IGR8 13.5 Ready Ready Ready Ready
91 40 I. Girl Hostel Girls' Hostel IGR9 13.5 Ready Ready Ready Ready
92 32 J.Lal Nehru Boys' Hostel JLNR1 13.5 Ready Ready Ready Ready
93 32 J.Lal Nehru Boys' Hostel JLNR10 13.5 Ready Ready Ready Ready
94 32 J.Lal Nehru Boys' Hostel JLNR11 13.5 Ready Ready Ready Ready
95 32 J.Lal Nehru Boys' Hostel JLNR12 13.5 Ready Ready Ready Ready
96 32 J.Lal Nehru Boys' Hostel JLNR13 13.5 Ready Ready Ready Ready
97 32 J.Lal Nehru Boys' Hostel JLNR14 13.5 Ready Ready Ready Ready
98 32 J.Lal Nehru Boys' Hostel JLNR15 13.5 Ready Ready Ready Ready
99 32 J.Lal Nehru Boys' Hostel JLNR16 13.5 Ready Ready Ready Ready
100 32 J.Lal Nehru Boys' Hostel JLNR17 13.5 Ready Ready Ready Ready
101 32 J.Lal Nehru Boys' Hostel JLNR18 13.5 Ready Ready Ready Ready
102 32 J.Lal Nehru Boys' Hostel JLNR19 13.5 Ready Ready Ready Ready
103 32 J.Lal Nehru Boys' Hostel JLNR2 13.5 Ready Ready Ready Ready
104 32 J.Lal Nehru Boys' Hostel JLNR20 13.5 Ready Ready Ready Ready
105 32 J.Lal Nehru Boys' Hostel JLNR21 13.5 Ready Ready Ready Ready
106 32 J.Lal Nehru Boys' Hostel JLNR22 13.5 Ready Ready Ready Ready
107 32 J.Lal Nehru Boys' Hostel JLNR23 13.5 Ready Ready Ready Ready
108 32 J.Lal Nehru Boys' Hostel JLNR24 13.5 Ready Ready Ready Ready
109 32 J.Lal Nehru Boys' Hostel JLNR25 13.5 Ready Ready Ready Ready
110 32 J.Lal Nehru Boys' Hostel JLNR26 13.5 Ready Ready Ready Ready
111 32 J.Lal Nehru Boys' Hostel JLNR27 13.5 Ready Ready Ready Ready
112 32 J.Lal Nehru Boys' Hostel JLNR28 13.5 Ready Ready Ready Ready
113 32 J.Lal Nehru Boys' Hostel JLNR29 13.5 Ready Ready Ready Ready
114 32 J.Lal Nehru Boys' Hostel JLNR3 13.5 Ready Ready Ready Ready
115 32 J.Lal Nehru Boys' Hostel JLNR30 13.5 Ready Ready Ready Ready
116 32 J.Lal Nehru Boys' Hostel JLNR31 13.5 Ready Ready Ready Ready
117 32 J.Lal Nehru Boys' Hostel JLNR32 13.5 Ready Ready Ready Ready
118 32 J.Lal Nehru Boys' Hostel JLNR33 13.5 Ready Ready Ready Ready
119 32 J.Lal Nehru Boys' Hostel JLNR34 13.5 Ready Ready Ready Ready
120 32 J.Lal Nehru Boys' Hostel JLNR35 13.5 Ready Ready Ready Ready
121 32 J.Lal Nehru Boys' Hostel JLNR36 13.5 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 30 of 47
122 32 J.Lal Nehru Boys' Hostel JLNR37 13.5 Ready Ready Ready Ready
123 32 J.Lal Nehru Boys' Hostel JLNR38 13.5 Ready Ready Ready Ready
124 32 J.Lal Nehru Boys' Hostel JLNR39 13.5 Ready Ready Ready Ready
125 32 J.Lal Nehru Boys' Hostel JLNR4 13.5 Ready Ready Ready Ready
126 32 J.Lal Nehru Boys' Hostel JLNR40 13.5 Ready Ready Ready Ready
127 32 J.Lal Nehru Boys' Hostel JLNR41 13.5 Ready Ready Ready Ready
128 32 J.Lal Nehru Boys' Hostel JLNR42 13.5 Ready Ready Ready Ready
129 32 J.Lal Nehru Boys' Hostel JLNR43 13.5 Ready Ready Ready Ready
130 32 J.Lal Nehru Boys' Hostel JLNR44 13.5 Ready Ready Ready Ready
131 32 J.Lal Nehru Boys' Hostel JLNR45 13.5 Ready Ready Ready Ready
132 32 J.Lal Nehru Boys' Hostel JLNR46 13.5 Ready Ready Ready Ready
133 32 J.Lal Nehru Boys' Hostel JLNR47 13.5 Ready Ready Ready Ready
134 32 J.Lal Nehru Boys' Hostel JLNR48 13.5 Ready Ready Ready Ready
135 32 J.Lal Nehru Boys' Hostel JLNR49 13.5 Ready Ready Ready Ready
136 32 J.Lal Nehru Boys' Hostel JLNR5 13.5 Ready Ready Ready Ready
137 32 J.Lal Nehru Boys' Hostel JLNR50 13.5 Ready Ready Ready Ready
138 32 J.Lal Nehru Boys' Hostel JLNR51 13.5 Ready Ready Ready Ready
139 32 J.Lal Nehru Boys' Hostel JLNR52 13.5 Ready Ready Ready Ready
140 32 J.Lal Nehru Boys' Hostel JLNR6 13.5 Ready Ready Ready Ready
141 32 J.Lal Nehru Boys' Hostel JLNR7 13.5 Ready Ready Ready Ready
142 32 J.Lal Nehru Boys' Hostel JLNR8 13.5 Ready Ready Ready Ready
143 32 J.Lal Nehru Boys' Hostel JLNR9 13.5 Ready Ready Ready Ready
144 41 Kalpana Chawala Girls' Hostel KCR1 20.07 Ready Ready Ready Ready
145 41 Kalpana Chawala Girls' Hostel KCR10 17.42 Ready Ready Ready Ready
146 41 Kalpana Chawala Girls' Hostel KCR11 17.42 Ready Ready Ready Ready
147 41 Kalpana Chawala Girls' Hostel KCR12 17.42 Ready Ready Ready Ready
148 41 Kalpana Chawala Girls' Hostel KCR13 17.42 Ready Ready Ready Ready
149 41 Kalpana Chawala Girls' Hostel KCR14 17.42 Ready Ready Ready Ready
150 41 Kalpana Chawala Girls' Hostel KCR15 17.42 Ready Ready Ready Ready
151 41 Kalpana Chawala Girls' Hostel KCR16 17.42 Ready Ready Ready Ready
152 41 Kalpana Chawala Girls' Hostel KCR17 17.42 Ready Ready Ready Ready
153 41 Kalpana Chawala Girls' Hostel KCR18 17.42 Ready Ready Ready Ready
154 41 Kalpana Chawala Girls' Hostel KCR19 17.42 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 31 of 47
155 41 Kalpana Chawala Girls' Hostel KCR2 20.07 Ready Ready Ready Ready
156 41 Kalpana Chawala Girls' Hostel KCR20 17.42 Ready Ready Ready Ready
157 41 Kalpana Chawala Girls' Hostel KCR21 13.38 Ready Ready Ready Ready
158 41 Kalpana Chawala Girls' Hostel KCR22 13.38 Ready Ready Ready Ready
159 41 Kalpana Chawala Girls' Hostel KCR23 13.38 Ready Ready Ready Ready
160 41 Kalpana Chawala Girls' Hostel KCR24 13.38 Ready Ready Ready Ready
161 41 Kalpana Chawala Girls' Hostel KCR25 13.38 Ready Ready Ready Ready
162 41 Kalpana Chawala Girls' Hostel KCR26 13.38 Ready Ready Ready Ready
163 41 Kalpana Chawala Girls' Hostel KCR27 13.38 Ready Ready Ready Ready
164 41 Kalpana Chawala Girls' Hostel KCR28 13.38 Ready Ready Ready Ready
165 41 Kalpana Chawala Girls' Hostel KCR29 13.38 Ready Ready Ready Ready
166 41 Kalpana Chawala Girls' Hostel KCR3 20.07 Ready Ready Ready Ready
167 41 Kalpana Chawala Girls' Hostel KCR30 13.38 Ready Ready Ready Ready
168 41 Kalpana Chawala Girls' Hostel KCR31 13.38 Ready Ready Ready Ready
169 41 Kalpana Chawala Girls' Hostel KCR32 13.38 Ready Ready Ready Ready
170 41 Kalpana Chawala Girls' Hostel KCR33 13.38 Ready Ready Ready Ready
171 41 Kalpana Chawala Girls' Hostel KCR34 13.38 Ready Ready Ready Ready
172 41 Kalpana Chawala Girls' Hostel KCR35 13.38 Ready Ready Ready Ready
173 41 Kalpana Chawala Girls' Hostel KCR36 13.38 Ready Ready Ready Ready
174 41 Kalpana Chawala Girls' Hostel KCR37 13.38 Ready Ready Ready Ready
175 41 Kalpana Chawala Girls' Hostel KCR38 13.38 Ready Ready Ready Ready
176 41 Kalpana Chawala Girls' Hostel KCR39 13.38 Ready Ready Ready Ready
177 41 Kalpana Chawala Girls' Hostel KCR4 20.07 Ready Ready Ready Ready
178 41 Kalpana Chawala Girls' Hostel KCR40 13.38 Ready Ready Ready Ready
179 41 Kalpana Chawala Girls' Hostel KCR41 13.38 Ready Ready Ready Ready
180 41 Kalpana Chawala Girls' Hostel KCR42 13.38 Ready Ready Ready Ready
181 41 Kalpana Chawala Girls' Hostel KCR43 13.38 Ready Ready Ready Ready
182 41 Kalpana Chawala Girls' Hostel KCR44 13.38 Ready Ready Ready Ready
183 41 Kalpana Chawala Girls' Hostel KCR45 13.38 Ready Ready Ready Ready
184 41 Kalpana Chawala Girls' Hostel KCR46 13.38 Ready Ready Ready Ready
185 41 Kalpana Chawala Girls' Hostel KCR47 13.38 Ready Ready Ready Ready
186 41 Kalpana Chawala Girls' Hostel KCR48 13.38 Ready Ready Ready Ready
187 41 Kalpana Chawala Girls' Hostel KCR49 11.15 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 32 of 47
188 14 Kalpana Chawala Girls' Hostel KCR5 30.11 Ready Ready Ready Ready
189 41 Kalpana Chawala Girls' Hostel KCR50 11.15 Ready Ready Ready Ready
190 41 Kalpana Chawala Girls' Hostel KCR51 13.38 Ready Ready Ready Ready
191 41 Kalpana Chawala Girls' Hostel KCR52 13.38 Ready Ready Ready Ready
192 41 Kalpana Chawala Girls' Hostel KCR6 30.11 Ready Ready Ready Ready
193 41 Kalpana Chawala Girls' Hostel KCR7 30.11 Ready Ready Ready Ready
194 41 Kalpana Chawala Girls' Hostel KCR8 30.11 Ready Ready Ready Ready
195 41 Kalpana Chawala Girls' Hostel KCR9 17.42 Ready Ready Ready Ready
196 31 Ravindra Nath Tagore Boys' Hostel RNTR1 20.07 Ready Ready Ready Ready
197 31 Ravindra Nath Tagore Boys' Hostel RNTR10 20.07 Ready Ready Ready Ready
198 31 Ravindra Nath Tagore Boys' Hostel RNTR11 20.07 Ready Ready Ready Ready
199 31 Ravindra Nath Tagore Boys' Hostel RNTR12 20.07 Ready Ready Ready Ready
200 31 Ravindra Nath Tagore Boys' Hostel RNTR13 20.07 Ready Ready Ready Ready
201 31 Ravindra Nath Tagore Boys' Hostel RNTR14 20.07 Ready Ready Ready Ready
202 31 Ravindra Nath Tagore Boys' Hostel RNTR15 20.07 Ready Ready Ready Ready
203 31 Ravindra Nath TagoreRavindra Nath Tagore
Boys' Hostel RNTR16 20.07 Ready Ready Ready Ready
204 31 Ravindra Nath Tagore Boys' Hostel RNTR17 20.07 Ready Ready Ready Ready
205 31 Ravindra Nath Tagore Boys' Hostel RNTR18 20.07 Ready Ready Ready Ready
206 31 Ravindra Nath Tagore Boys' Hostel RNTR19 20.07 Ready Ready Ready Ready
207 31 Ravindra Nath Tagore Boys' Hostel RNTR2 20.07 Ready Ready Ready Ready
208 31 Ravindra Nath Tagore Boys' Hostel RNTR20 20.07 Ready Ready Ready Ready
209 31 Ravindra Nath Tagore Boys' Hostel RNTR21 20.07 Ready Ready Ready Ready
210 31 Ravindra Nath Tagore Boys' Hostel RNTR22 20.07 Ready Ready Ready Ready
211 31 Ravindra Nath Tagore Boys' Hostel RNTR23 20.07 Ready Ready Ready Ready
212 31 Ravindra Nath Tagore Boys' Hostel RNTR24 20.07 Ready Ready Ready Ready
213 31 Ravindra Nath Tagore Boys' Hostel RNTR25 20.07 Ready Ready Ready Ready
214 31 Ravindra Nath Tagore Boys' Hostel RNTR26 20.07 Ready Ready Ready Ready
215 31 Ravindra Nath Tagore Boys' Hostel RNTR27 20.07 Ready Ready Ready Ready
216 31 Ravindra Nath Tagore Boys' Hostel RNTR28 20.07 Ready Ready Ready Ready
217 31 Ravindra Nath Tagore Boys' Hostel RNTR29 20.07 Ready Ready Ready Ready
218 31 Ravindra Nath Tagore Boys' Hostel RNTR3 20.07 Ready Ready Ready Ready
219 31 Ravindra Nath Tagore Boys' Hostel RNTR30 20.07 Ready Ready Ready Ready
220 31 Ravindra Nath Tagore Boys' Hostel RNTR31 20.07 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 33 of 47
221 31 Ravindra Nath Tagore Boys' Hostel RNTR32 20.07 Ready Ready Ready Ready
222 31 Ravindra Nath Tagore Boys' Hostel RNTR33 20.07 Ready Ready Ready Ready
223 31 Ravindra Nath Tagore Boys' Hostel RNTR34 20.07 Ready Ready Ready Ready
224 31 Ravindra Nath Tagore Boys' Hostel RNTR4 20.07 Ready Ready Ready Ready
225 31 Ravindra Nath Tagore Boys' Hostel RNTR5 20.07 Ready Ready Ready Ready
226 31 Ravindra Nath Tagore Boys' Hostel RNTR6 20.07 Ready Ready Ready Ready
227 31 Ravindra Nath Tagore Boys' Hostel RNTR7 20.07 Ready Ready Ready Ready
228 31 Ravindra Nath Tagore Boys' Hostel RNTR8 20.07 Ready Ready Ready Ready
229 31 Ravindra Nath Tagore Boys' Hostel RNTR9 20.07 Ready Ready Ready Ready
230 28 Old Hostel Stationery
StoreSTORE1 10 Ready Ready Ready Ready
231 28 Old Hoste Stationery
StoreSTORE2 9 Ready Ready Ready Ready
232 1 Admin Block Civil
DepartmentToilet TO-1 6 Ready Ready Ready Ready
233 1 Admin Block Civil
DepartmentToilet TO-10 6 Ready Ready Ready Ready
234 1 Admin Block
Mechanical Department
Toilet TO-11 6 Ready Ready Ready Ready
235 1 Admin Block Mechanical Department
Toilet TO-12 6 Ready Ready Ready Ready
236 1 Admin Block Electrical Department
Toilet TO-13 6 Ready Ready Ready Ready
237 1 Admin Block Electrical Department
Toilet TO-14 6 Ready Ready Ready Ready
238 1 Admin Block CSE Department
Toilet TO-15 6 Ready Ready Ready Ready
239 1 Admin Block CSE Department
Toilet TO-16 6 Ready Ready Ready Ready
240 1 Admin Block EI Department
Toilet TO-17 6 Ready Ready Ready Ready
241 1 Admin Block EI Department
Toilet TO-18 6 Ready Ready Ready Ready
242 Data Not Provided by the Institute
Admin Block BM Department
Toilet TO-19 6 Ready Ready Ready Ready
243 Data Not Provided by the Institute
Admin Block BM Department
Toilet TO-2 6 Ready Ready Ready Ready
244 Data Not Provided by the Institute
Admin Block EC Department
Toilet TO-20 6 Ready Ready Ready Ready
245 Data Not Provided by the Institute
Admin Block EC Department
Toilet TO-21 6 Ready Ready Ready Ready
246 Data Not Provided by the Institute
Admin Block Chemical Department
Toilet TO-22 6 Ready Ready Ready Ready
247 Data Not Provided
Admin Block Chemical Department
Toilet TO-23 6 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 34 of 47
by the Institute
248 Data Not Provided by the Institute
Admin Block CA Department
Toilet TO-24 6 Ready Ready Ready Ready
249 Data Not Provided by the Institute
Admin Block CA Department
Toilet TO-25 6 Ready Ready Ready Ready
250 Data Not Provided by the Institute
Admin Block IT Department
Toilet TO-26 6 Ready Ready Ready Ready
251 Data Not Provided by the Institute
Admin Block IT Department
Toilet TO-27 6 Ready Ready Ready Ready
252 20 Admin Block management Department
Toilet TO-28 6 Ready Ready Ready Ready
253 20 Admin Block management Department
Toilet TO-29 6 Ready Ready Ready Ready
254 20 Auditorium Toilet TO-3 6 Ready Ready Ready Ready
255 20 Auditorium Toilet TO-30 6 Ready Ready Ready Ready
256 15 Sport Hall Toilet TO-31 6 Ready Ready Ready Ready
257 15 Sport Hall Toilet TO-32 6 Ready Ready Ready Ready
258 11 Canteen Toilet TO-33 6 Ready Ready Ready Ready
259 11 Canteen Toilet TO-34 6 Ready Ready Ready Ready
260 41 KC Toilet TO-35 6 Ready Ready Ready Ready
261 41 KC Toilet TO-36 6 Ready Ready Ready Ready
262 41 KC Toilet TO-37 6 Ready Ready Ready Ready
263 41 Kc Toilet TO-38 6 Ready Ready Ready Ready
264 40 IG Toilet TO-39 6 Ready Ready Ready Ready
265 40 IG Toilet TO-4 6 Ready Ready Ready Ready
266 40 IG Toilet TO-40 6 Ready Ready Ready Ready
267 40 IG Toilet TO-41 6 Ready Ready Ready Ready
268 040 IG Toilet TO-42 6 Ready Ready Ready Ready
269 40 IG Toilet TO-43 6 Ready Ready Ready Ready
270 31 RNT Toilet TO-44 6 Ready Ready Ready Ready
271 31 RNT Toilet TO-45 6 Ready Ready Ready Ready
272 31 RNT Toilet TO-46 6 Ready Ready Ready Ready
273 31 RNT Toilet TO-47 6 Ready Ready Ready Ready
274 30 CVR Toilet TO-48 6 Ready Ready Ready Ready
275 30 CVR Toilet TO-49 6 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 35 of 47
276 30 CVR Toilet TO-5 6 Ready Ready Ready Ready
277 30 CVR Toilet TO-50 6 Ready Ready Ready Ready
278 32 JLN Toilet TO-6 6 Ready Ready Ready Ready
279 32 JLN Toilet TO-7 6 Ready Ready Ready Ready
280 32 JLN Toilet TO-8 6 Ready Ready Ready Ready
281 32 JLN Toilet TO-9 6 Ready Ready Ready Ready
Circulation Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 Data Not Provided by the Institute
Data Not Provided by the Institute
Corridors 1800 Yes Ready Ready Ready N
2 Data Not Provided by the Institute
Data Not Provided by the Institute
Other Areas (in Sq m)
4709 Yes Ready Ready Data Not Provided by the Institute
N
3 Data Not Provided by the Institute
Data Not Provided by the Institute
Other Common Area (in Sq m)
486 Yes Ready Ready Ready Y
Laboratory Details
Sr. No.
Programme Level Course Building No.
Building Name
Name of Lab Yearly Budget(E) (Rs)
Yearly Budget(C)(Rs)
Investment till Date (Rs)
Research Lab?
1 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
ADVANCED PRODUCTION SYSTEMS
Data Not Provided by the Institute
Mechanical Department
APS LAB 100000 2000 2000000
No
2 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
BIOCHEMICAL ENGINEERING
Data Not Provided by the Institute
BME department
BIOMEDICAL INSTRUMENTATION, COMMUNICATION, PCB, POWER ELECTRONICS, PE, PROCESS&CONTROL, MICROPROCESS
200000 10000 2500000
No
3 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
COMPUTER INTEGRATED MANUFACTURING
Data Not Provided by the Institute
Mechanical Department
CIM LAB 100000 2000 1500000
No
4 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
ELECTRONICS AND INSTRUMENTATION ENGINEERING
Data Not Provided by the Institute
EI Department
COMM PCB, PE,INSTRU, PROCESS CONTL, MICROPROC LAB VIEW LABS,DIGITAL CI
200000 10000 2500000
No
5 MCA POST GRADUATE
MASTERS IN COMPUTER
Data Not Provided
CA Departme
COMPUTER APPLICATIO
200000 10000 3000000
No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 36 of 47
APPLICATIONS by the Institute
nt N CENTER
6 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
SOFTWARE SYSTEMS
Data Not Provided by the Institute
IT Department
COMPUTER CENTRE
100000 2000 1000000
No
7 MANAGEMENT
POST GRADUATE
MASTERS IN BUSINESS MANAGEMENT
Data Not Provided by the Institute
management Department
COMPUTER CENTRE ANDSOFTWARE
100000 2000 1500000
No
8 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
INFORMATION TECHNOLOGY
Data Not Provided by the Institute
IT Department
COMPUTER CENTRE ANDSOFTWARES
200000 10000 3000000
No
9 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
INFORMATION TECHNOLOGY
Data Not Provided by the Institute
IT Department
COMPUTER CENTRE FORIT, SS PG COURCES
100000 2000 1000000
No
10 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
CONSTRUCTIONTECHNOLOGY AND MANAGEMENT
Data Not Provided by the Institute
Civil Department
CTM LAB 100000 2000 2000000
No
11 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
ELECTRICAL ENGINEERING
Data Not Provided by the Institute
Electrical Department
ELECTRICAL & MACHINE, CONTROL SYSTEM & MICROPROCESSOR, INSTRUMENTATION & POWER SYSTEM, C.C.
200000 10000 5000000
No
12 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
ELECTRICAL MACHINES AND DRIVES
Data Not Provided by the Institute
Electrical Department
ELECTRICAL DRIVES LAB
100000 2000 1000000
No
13 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
ENVIRONMENTAL ENGINEERING
Data Not Provided by the Institute
Civil Department
ENVIRONMENTAL LABS
100000 2000 1500000
No
14 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
MECHANICAL ENGINEERING
Data Not Provided by the Institute
Mechanical Department
FMS, ROBOTICS AND AUTO, HEAT&MASS TRANS, HEL, AC&REF. MECHTRONICS, CAD, METROLOGY, DYNAMICS, WORKSHO
200000 10000 30000000
No
15 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
COMPUTER SCIENCE AND ENGINEERING
Data Not Provided by the Institute
CSE Department
HARDWARE, COMPUTER CENTRE, NETWORKING, & FUZZY LOGIC& ANN LAB
200000 10000 10000000
No
16 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
PETROCHEMICAL ENGINEERING
Data Not Provided by the Institute
Chemical Department
HEAT TRANSFER, MASSS TRANSFER, CHEMICAL REASTION, MECH OPER,PROCESS
200000 10000 5000000
No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 37 of 47
CONT, FLUIDMECH,FUEL TECH,PCP
17 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
ELECTRONICS AND COMMUNICATIONS ENGINEERING
Data Not Provided by the Institute
Department of EC
LABVIEW, DIGITAL SIGNAL, VLSI.
100000 2000 1500000
No
18 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
COMPUTER SCIENCE & ENGINEERING
Data Not Provided by the Institute
CSE Department
M.TECH . COMPUTER CENTRE
100000 2000 2000000
No
19 MANAGEMENT
POST GRADUATE
MASTER OF BUSINESS ADMINISTRATION (INTEGRATED)
MBA MBA Building
MBA COMPUTER CENTRE
200000 10000 2000000
No
20 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
ELECTRONICS AND COMMUNICATIONS ENGINEERING
Data Not Provided by the Institute
Department of EC
OPTICAL COMM,A&D COMM,ELEC CIRC,DIGITAL CIRC,MICROWAVE,LABVIEW, CONTO.SYS,INSTRU,NETWORK ANA,VLSI
200000 10000 5000000
No
21 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
POWER ELECTRONICS
Data Not Provided by the Institute
Electrical Department
POWER ELECTRONICS LAB
100000 2000 2000000
No
22 ENGINEERINGAND TECHNOLOGY
UNDER GRADUATE
CIVIL ENGINEERING
Data Not Provided by the Institute
Civil Department
SOM, GEO TECH, GEOLOGY, STRUCT., CONCT, TRANS, ENVR, SURVEY, FM LABS
200000 10000 10000000
No
23 ENGINEERINGAND TECHNOLOGY
POST GRADUATE
TRANSPORTATION ENGINEERING
Data Not Provided by the Institute
Civil Department
TRANSPORTATION LAB
100000 2000 1000000
No
Library Books
Sr. No.
Programme Titles Volumes No. of Journals Published Abroad
No. of Journals Published in India
No. of e-BookTitles
No. of e-Book Volumes
1 ENGINEERING AND TECHNOLOGY
108864 159816 234 306 0 0
2 MCA 320 5233 0 9 0 03 MANAGEMENT 272 3346 0 6 0 0
Library Facilities
Sr. No
Working Hrs.
E journal Subscription
Annual Budget (Rs)
Area in Sqm
Library Networking
Bar Code orRF Tab book handling
ReprographicFacility
Reading Room Capacity (No. of Students)
Multimedia PCs (No.)
Library Management Software
1 09:00 AMto 8:00 PM
IEEE,ASCE,ASME,ELSEVIER,J-GATE,AIP,AR,CU,SC. DIRE
300000 495.89 Yes Yes Y 155
15
Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 38 of 47
e-Journal Declaration Status of declaration check box
BY CLICKING THIS CHECK BOX THE INSTITUTE HEREBY DECLARES THAT IT HAS SUBSCRIBED FOR ALL THE REQUIRED E-JOURNALS AS MENTIONED IN APPROVAL PROCESS HANDBOOK 2019-2020.
No
Computational Facility
S
r. N
o
Leg
al S
yste
m S
oft
war
e
Leg
al A
pp
licat
ion
S
oft
war
e
Inte
rnet
Ban
dw
idth
in
Mb
ps
Inte
rnet
Co
nte
nti
on
R
atio
PC
s/L
apto
p
excl
usi
vely
ava
ilab
le t
ost
ud
ents
PC
s/L
apto
p a
vaila
ble
in
Ad
min
istr
ativ
e O
ffic
e
No
. of
PC
s/L
apto
p
avai
lab
le
in L
ibra
ry
No
. of
PC
s/L
apto
p in
la
ng
uag
e la
b
PC
s/L
apto
p a
vaila
ble
to
Fac
ult
y M
emb
ers
Pri
nte
rs a
vaila
ble
to
st
ud
ent
1 10 252 100 1:1 727 25 15 30 81 115
Hostel Facility
Sr
No
.
No
. of
roo
ms
hav
ing
Sin
gle
b
ed/r
oo
m &
Are
a o
f ro
om
in s
q.m
.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
Do
ub
le/T
wo
bed
/ro
om
& A
rea
of
roo
m in
sq
.m.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
T
rip
le/T
hre
e b
ed/r
oo
m &
Are
a o
f ro
om
in s
q.m
.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
Fo
ur
bed
/ro
om
& A
rea
of
roo
m in
sq
.m.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
1 Boys 34&
1120
34 &
1120
Boys 52&
1354
&2010
2 Girls 52 &
1459
40&
210
848 Girls 48&
1391
&
Operational FundsBank Name Account No. Bank Statement Date Cash BalanceSBi SB A/C No. 53030893528 Data Not Provided by the Institute 14393.89SBI SB A/C No. 107659442142 Data Not Provided by the Institute 10224Allahabad Bank SB A/c. No. 20618685836 Data Not Provided by the Institute 3555.7Canara Bank SB A/c. No. 23461010000298 Data Not Provided by the Institute 14543Central Bank of India A/c. No. 1373734949 Data Not Provided by the Institute 10091Central Bank of India CD A/c. No. 3007721242 Data Not Provided by the Institute 14388.82Central Bank of India CD A/c. No. 1373731198 Data Not Provided by the Institute 5673.4Central Bank of India SB A/c. No. 1373761757 Data Not Provided by the Institute 6433.25Central Bank of India SB A/c. No. 1373775839 Data Not Provided by the Institute 2376Central Bank of India SB A/c. No. 1373734097 Data Not Provided by the Institute 2556.28Central Bank of India SB A/c. No.1375054247 Data Not Provided by the Institute 4530Central Bank of India SB A/c. No. 1373714560 Data Not Provided by the Institute 4495Oriental Bank of Commerce SB A/c. No. 065820100012730 Data Not Provided by the Institute 4824.09Oriental Bank of Commerce SB A/c. No. 065820100008380 Data Not Provided by the Institute 1939State Bank of Indore SB A/c. No. 53014262301 Data Not Provided by the Institute 24365.32Union Bank of India CD A/c. No. 364701010014030 Data Not Provided by the Institute 6238462.41United Commercial Bank SB A/c. No. 00100100006800 Data Not Provided by the Institute 9445.51Cash-in-hand Data Not Provided by the Institute Data Not Provided by the Institute 203471.6Central Bank of India CD A/c. 1373728889 Data Not Provided by the Institute 25349.94Central Bank of India SB A/c. No. 1373739266 Data Not Provided by the Institute 153062FDR A/c. Data Not Provided by the Institute Data Not Provided by the Institute 74797547SBI C/D DIRECTOR SATI SB A/c. No. 31613807383 Data Not Provided by the Institute 104530State Bank of India SB A/c. No. 30812076917 Data Not Provided by the Institute 43825State Bank of India SB A/c. No. 30784120720 Data Not Provided by the Institute 7192.98State Bank of India CD A/c. 30842554902 Data Not Provided by the Institute 896052.56State Bank of India CD A/c. No. 33413638463 Data Not Provided by the Institute 25
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 39 of 47
Financial Details(in Rs)
Funds/ Grants from Central Government 0 Funds/ Grants from UGC 0Funds/ Grants from Student Fees 117386096.48 Funds/ Grants from Donations 0Funds/ Grants from State Government 49599999
Funds/ Grants from Other Bodies 0
Funds/ Grants raised from Other Sources/ Internal Revenue
5142258.61 Salary to the Teaching Staff 120484450.85
Remuneration to Visiting/Guest Faculty 0 Salary to Non-teaching Staff: 101783433.15 Library (Investments) 27289 Equipment (Investments) 1655Building Maintenance Expenses 423026 Other Expenditure (if any) 15347028 Company/Industry DetailsAre you a Company/Industry wishing to set up a new Institute?: NoType of Company/Industry: NA Is the company having Minimum
100 Cr Turnover for the last 3 years? (Attach supporting documents):
NA
Company/Industry PAN No.: NA Company/Industry TAN No.: NA Company/Industry Registered Address: NA Company/Industry Year of
Registration: NA
Ombudsman/Grievance DetailsGrievance Committee Appointment Yes OMBUDSMAN Appointment NoOmbudsman Appointment/Grievance Committee Details
Sr.
No
.
Co
mm
itte
e T
ype
Ap
po
intm
ent
Ord
er R
efer
ence
No
.
Dat
e o
f A
pp
oin
tmen
t
Nam
e o
f th
e C
om
mit
tee
Mem
ber
Pro
fess
ion
Ad
dre
ss
Ass
oci
ated
Wit
h
Mo
bile
No
.
E-M
ail A
dd
ress
Fax
No
.
1 Grievance Redressal
2379 08/02/2018 Dr. Kanak Saxena Teaching
Department CSE
9826280706
250124
2 Grievance Redressal
2379 08/02/2018 Dr. Manorma Saini
Teaching
Department of Humanities
9425432339
3 Grievance Redressal
2379 08/02/2018 Vinita Singh Teaching
Department of Applied math
9425673743
4 Grievance Redressal
2379 08/02/2018 Shaila Chugh Teaching
Department of CSE
9926337014
5 Grievance Redressal
2379 08/02/2018 Poonam lata Prabhakar
Teaching
Department of Applied math
9425673743
6 Grievance Redressal
2379 08/02/2018 Bhawana Shrivastava
Non Teaching
Department of Mechanical engineering
9425620691
7 Grievance Redressal
2379 08/02/2018 Ritu Raghuwanshi Non Teaching
Women Hostel
9755295409
Anti-Ragging Related Details Provided by the Institute
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 40 of 47
1 Constitution of Anti-Ragging Committee Yes2 Constitution of Anti-Ragging Squad Yes3 Undertaking obtained from all Students Yes4 Appointment of Counselors Yes5 Undertaking obtained from parents of all the students Yes6 Undertaking obtained from students staying in Hostel Yes7 Undertaking obtained from parents of students staying in Hostel Yes
Anti-Ragging Committee/Squad Details
Sr.
No
.
Co
mm
itte
e T
ype
Ap
po
intm
ent
Ord
er r
efer
ence
No
.
Dat
e o
f A
pp
oin
tmen
t
Nam
e o
f th
e C
om
mit
tee
Mem
ber
Pro
fess
ion
Ad
dre
ss
Ass
oci
ated
W
ith
Mo
bile
No
.
E-M
ail A
dd
ress
Fax
No
.
1 Anti-Ragging Committee
1680 05/09/2018 Dr. Lokesh Bajpai
Teaching 9893251054
2 Anti-Ragging Committee
1680 05/09/2018 Prof. S.P.Phulambrikar
Teaching 9827674462
3 Anti-Ragging Committee
1680 05/09/2018 Dr. Kanak Saxena
Teaching 9826280706
4 Anti-Ragging Committee
1680 05/09/2018 Dr. R.N. sukla Teaching 8989872181
5 Anti-Ragging Committee
1680 05/09/2018 Dr. Sanjay Bhandari
Teaching 9826089073
6 Anti-Ragging Committee
1680 05/09/2018 Dr. Pankaj Agrawal
Teachign 9826278881
7 Anti-Ragging Committee
1680 05/09/2018 Prof. Sanjay Jain
Teaching 9827089239
8 Anti-Ragging Committee
1680 05/09/2018 Dr. Umesh Banodha
Teaching 9425640876
9 Anti-Ragging Committee
1680 05/09/2018 Prof. J.Ogale Teaching 9827223171
10 Anti-Ragging Committee
1680 05/09/2018 Prof. Ajay Goyal
Teaching 9926220339
11 Anti-Ragging Committee
1680 05/09/2018 Prof. M.L. Jatav Teaching 8989750530
12 Anti-Ragging Committee
1680 05/09/2018 Er. Praveen Karkare
Registrar 8319071505
13 Anti-Ragging
1323 10/08/2018 Prof. R.R. Ahirwar
Teachig 9424458047
ram2004_ahriwal200
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 41 of 47
Squad [email protected]
14 Anti-Ragging Squad
1323 10/08/2018 Prof. Sudhir Sharma
Teaching 9424457143
15 Anti-Ragging Squad
1323 10/08/2018 Prof. J.P.Shakya
Teaching 9425444820
16 Anti-Ragging Squad
1323 10/08/2018 Prof. Pradeep Samil
Teaching 8962786127
17 Anti-Ragging Squad
1323 10/08/2018 Prof. Bharti Mehra
Teaching 9584144049
18 Anti-Ragging Squad
1323 10/08/2018 Dr. Preeti D. Swami
Teaching 9406522431
19 Anti-Ragging Squad
1323 10/08/2018 Prof. C.S.Sharma
Teaching 9406539958
20 Anti-Ragging Squad
1323 10/08/2018 Prof. J.S. Shakya
Teaching 9425642164
21 Anti-Ragging Squad
1323 10/08/2018 Dr.Y.P. Joshi Teaching CE 9893254398
22 Anti-Ragging Squad
1323 10/08/2018 Sheena Kumar Teaching 7898251789
23 Anti-Ragging Squad
1323 10/08/2018 Dr. P.L.Verma Teaching 9425640741
24 Anti-Ragging Committee
1323 10/08/2018 Abhishek mathur
Teaching IT 9827798341
25 Anti-Ragging Squad
1323 10/08/2018 Poonam Lata Sagar
Teaching Math 9425148677
26 Anti-Ragging Squad
1323 10/08/2018 Satish Dhariya Teaching CSE 9300864621
27 Anti-Ragging Squad
1323 10/08/2018 D.P.S.Rajput Teaching PCE 9713898310
28 Anti-Ragging Squad
1323 10/08/2018 Prachi kanherkar
Teaching ME 7828093016
29 Anti-Ragging Squad
1323 10/08/2018 Y.K.jain Teaching EI 9826461191
30 Anti-Ragging Squad
1323 10/08/2018 Sandeep Jain Teaching ME 9826273342
31 Anti-Ragging Squad
1323 10/08/2018 S.S.Goliya Teaching CE 9826258340
32 Anti-Ragging Squad
1323 10/08/2018 K.G.Kirar Teaching EI 9827598226
33 Anti-Ragging Squad
1323 10/08/2018 Abhishek Jain Teaching EC 9300618580
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 42 of 47
34 Anti-Ragging Squad
1323 10/08/2018 Dr. Salish Jalori Teaching Math 9424418356
35 Anti-Ragging Squad
1323 10/08/2018 Shilpa Datar Teaching EI 9425620740
36 Anti-Ragging Squad
1323 10/08/2018 shaksham Vasudev
Teaching CSE 7828364336
37 Anti-Ragging Squad
1323 10/08/2018 Ruchi Chouhan Teaching PCe 9407213622
38 Anti-Ragging Squad
1323 10/08/2018 Vaibhav jain Teaching BME 9424458504
39 Anti-Ragging Squad
1323 10/08/2018 Deepak Sen Teaching IT 9827613248
40 Anti-Ragging Squad
1323 10/08/2018 Dr. Sunil Joshi Teaching CA 9425372362
41 Anti-Ragging Squad
1323 10/08/2018 Anand Chandrawanshi
Teaching MBA 9424492947
42 Anti-Ragging Squad
1323 10/08/2018 Devendra Tiwari
Teaching EE 9407263970
43 Anti-Ragging Squad
1323 10/08/2018 Aman Sharma Teaching EC 9424608922
44 Anti-Ragging Squad
1323 10/08/2018 Amitosh Singh Teaching Humanities
9406549654
45 Anti-Ragging Squad
1323 10/08/2018 S.K Dhakad Teaching ME 9827231814
46 Anti-Ragging Squad
1323 10/08/2018 Satish Pawar Teaching CSE 9893269683
47 Anti-Ragging Squad
1323 10/08/2018 Prof. Neeraj Sen
Teaching ME 9827363557
48 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt. Suchi Mishra
Teaching EI 9424425840
49 Anti-Ragging Squad
1323 10/08/2018 Dr. Jitendra Parashar
Teaching Physics
9424415354
50 Anti-Ragging Squad
1323 10/08/2018 Prof. ShivendraSingh Thakur
Teaching EE 9425463869
51 Anti-Ragging Squad
1323 10/08/2018 Dr. Devendra Kr. Shakya
Teaching BM 9406522481
52 Anti-Ragging Squad
1323 10/08/2018 Prof. Neelesh Mehra
Teaching EC 9425642202
53 Anti-Ragging Squad
1323 10/08/2018 Prof. Sooraj Jain
Teaching Civil 9893800358
54 Anti-Ragging
1323 10/08/2018 Prof. Narendra Mahawar
Teaching BM 9993399744
nmahawar03@gmail.
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 43 of 47
Squad com 55 Anti-
Ragging Squad
1323 10/08/2018 Dr. Alok Jain Teaching EI 9425463116
56 Anti-Ragging Squad
1323 10/08/2018 Prof. K.K. Punjabi
Teaching Civil 9425642159
57 Anti-Ragging Squad
1323 10/08/2018 Dr. Sachin Mahajan
Teaching Physics
9424415357
58 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt Shaila Chugh
Teaching CSE 9926337014
59 Anti-Ragging Squad
1323 10/08/2018 Prof. Sachin Jain
Teaching MBA 9425432335
60 Anti-Ragging Squad
1323 10/08/2017 Prof. SatyendraKr. Jain
Teaching MCA 9826633018
61 Anti-Ragging Squad
1323 10/08/2018 Prof. Vivek Sharma
Teaching CSE 9589518257
62 Anti-Ragging Squad
1323 10/08/2018 Prof. Sanjeev Kumar Sharma
Teaching EI 9826489524
63 Anti-Ragging Squad
1323 10/08/2018 Prof. Sanjeev Gupta
Teaching EE 9425150167
64 Anti-Ragging Squad
1323 10/08/2018 Dr. Ravi Jain Teaching Physics
9893731008
65 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt. Smriti Dubey
Teaching CSE 7389199866
66 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt Anusha Lahoti
Teaching EE 9406506455
67 Anti-Ragging Squad
1323 10/08/2018 Prof. Ku. Tanu Chaturvedi
Teaching Civil 8435070208
68 Anti-Ragging Squad
1323 10/08/2018 Prof. Nirmal Gaud
Teaching CSE 9685559262
69 Anti-Ragging Squad
1323 10/08/2018 Prof. Rajeev Jain
Teaching Civil 9425003796
70 Anti-Ragging Squad
1323 10/08/2018 Dr. Dharmesh Jain
Teaching MBA 9827456901
71 Anti-Ragging Squad
1323 10/08/2018 Prof. Munna LalJatav
Teaching EC 8989750530
72 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt. Vinita Singh
Teaching maths 9425673743
73 Anti-Ragging Squad
1323 10/08/2018 Prof. Naveen Malviya
Teaching EI 8109842202
74 Anti-Ragging Squad
1323 10/08/2018 Prof. Anil Suryavanshi
Teaching CSE 9713026406
75 Anti-Ragging Squad
1323 10/08/2018 Dr. Smt. Manorama Saini
Teaching MBA 9827229764
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 44 of 47
76 Anti-Ragging Squad
1323 10/08/2018 Dr. Umesh Kumar Banodha
Teaching CA 9425640876
77 Anti-Ragging Squad
1323 10/08/2018 Prof. Gayatri Kushwaha
Teaching Mechanical
8349055330
78 Anti-Ragging Squad
1323 10/08/2018 Dr. Sachin Kamely
Teaching CA 9981025897
79 Anti-Ragging Squad
1323 10/08/2018 Dr. Sanjeev N. Sharma
Teaching EC 9425150391
80 Anti-Ragging Squad
1323 10/08/2018 Dr. Shailendra Shrivastava
Teaching CSE 9425150410
81 Anti-Ragging Squad
1323 10/08/2018 Prof. Satyam Maheshwari
Teaching CA 9826528887
82 Anti-Ragging Squad
1323 10/08/2018 Dr. RavindramohanSaxena
Teaching ME 9424421247
83 Anti-Ragging Squad
1323 10/08/2018 Prof. Chandrapal Singh
Teaching ME 9826227054
84 Anti-Ragging Squad
1323 10/08/2018 Dr. Sanjay Katarey
Teaching ME 9826050049
85 Anti-Ragging Squad
1323 10/08/2018 Dr. Manoj Datar Teaching Chemical
9425620738
86 Anti-Ragging Committee
1323 10/08/2018 Smt. Jyotsana V. Ogale
Teaching EC 9827223171
87 Anti-Ragging Squad
1323 10/08/2018 Prof. Hemant Dangi
Teaching BM 9981969911
88 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt. Vibha Jain
Teaching Maths 9993191172
89 Anti-Ragging Squad
1323 10/08/2018 Dr. Ashutosh Datar
Teaching BM 9826216560
90 Anti-Ragging Committee
1323 10/08/2018 Prof. Sanjay Jain
Teaching ME 9827089239
91 Anti-Ragging Squad
1323 10/08/2018 Dr. Veena Datar
Teaching MBA 9406958988
92 Anti-Ragging Squad
1323 10/08/2018 Prof. Sourabh Jain
Teaching EE 8989961761
93 Anti-Ragging Squad
1323 10/08/2018 Prof. Mukesh Parmar
Teaching PCE 8889196496
94 Anti-Ragging Squad
1323 10/08/2018 Prof. Anil Debey
Teaching Maths 8109191151
95 Anti-Ragging Squad
1323 10/08/2018 Prof. Sushil Kr. Verma
Teaching CA 9826988603
96 Anti- 1323 10/08/2018 Dr. Asit Sexna Teaching Civil 94244 saxenaash
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 45 of 47
Ragging Squad
06239 [email protected]
97 Anti-Ragging Squad
1323 10/08/2018 Dr. Ashish Manoriya
Teaching ME 9425463722
98 Anti-Ragging Squad
1323 10/08/2018 Prof. Pradeep Purohit
Teaching Civil 9407264679
99 Anti-Ragging Squad
1323 10/08/2018 Prof. Sandeep Raghuwanshi
Teaching CSE 9827264002
100 Anti-Ragging Squad
1323 10/08/2018 Prof. Ku. Varsha Parashar
Teaching PCE 8871399039
101 Anti-Ragging Squad
1323 10/08/2018 Prof. Sanjay Saraswat
Teaching Civil 9424426389
102 Anti-Ragging Squad
1323 10/08/2018 Prof. Pradeep Sharma
Teaching Chemistry
9406566154
103 Anti-Ragging Squad
1323 10/08/2018 Dr. Rajendra Kr. Pathak
Teaching Maths 9893540442
104 Anti-Ragging Squad
1323 10/08/2018 Prof. Ms. Anamika Kushwah
Teaching PCE 8103807263
105 Anti-Ragging Squad
1323 10/08/2018 Dr. Soniya Rajput
Teaching MBA 9827711711
106 Anti-Ragging Squad
1323 10/08/2018 Prof. Prashant Tiwari
Teaching MBA 9827384835
107 Anti-Ragging Squad
1323 10/08/2018 Prof. Smt. Shakuntala Chouhan
Teaching BM 8878694936
108 Anti-Ragging Squad
1323 10/08/2018 Prof. Sourabh Sharma
Teaching CA 9406926807
109 Anti-Ragging Squad
1323 10/08/2018 Prof. Narendra Kr. Gupta
Teaching CA 9098224282
Renewable Energy Related Details/Conservation of Energy DetailsSr. No. Particulars Details Provided by Institute
1 Total land available (in Sqm.) 3441292 No. of buildings with roof tops 303 Annual electricity consumption (No. of units) during previous financial year 7353884 Electricity Bill-Average rate per unit paid during previous financial year (Rs. / unit) & No. of units used 9.655 Renewable Energy, if any, used at present Yes6 Land available for placing solar photovoltaic panels (in Sqm.) 300007 Total approximate roof- top area available for placing solar photovoltaic panel (in Sqm.) 200008 Whether a policy has been adopted to use only LED lamps ? No9 Remarks Data Not Provided by the Institute
Other FacilitiesAll Weather Approach (Motorized Road)
Yes Backup Electric Supply Yes
Barrier free Environment Yes CCTV Security YesERP Software Yes Electric Supply YesGeneral Insurance Yes Group Insurance YesInstitution Web Site Yes Insurance for Students YesInternal Quality Assurance Cell Yes Fire and Safety Certificate Yes
Media Cell Yes Backup Electric Supply Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 46 of 47
Medical & Counseling facilities Yes Notice Boards YesPublic Announcement System Yes Potable Water Supply YesPost & Banking/ATM Yes Projectors in Classrooms YesSewage Disposal System Yes Staff Quarters YesSports facilities Yes Auditorium Yes
Intellectual Property Right Cell Yes Innovation Cell/Club Yes
Telephone & FAX Yes Transport Facility YesVehicle Parking Facility Yes First Aid Facility YesRain Water Harvesting Yes Solar Power Systems YesAppointment Of Student Counselor Yes Establishment Of Anti Ragging
CommitteeYes
Establishment Of Committee For SC/ST
Yes Provision to watch MOOCS Courses through Swayam
Yes
Implementation of Unnat Bharath Abhiyan:
Yes Institution-Industry Cell: Yes
Implementation of examination reforms
Yes Implementation of Startup Policy
Yes
Implementation of mandatory Internship policy for students
Yes Implementation of teacher training policy
Yes
Participation in the National Innovation Ranking
Yes Group Accident Policy to be provided for the employees
Yes
Stand Alone Language Laboratory (Minimum 25 PCs/Laptop up to total intake of 1000.Further additional 25PCs/Laptop per intake of 1000):
Yes
Safety Provisions including fire and other calamities YesEstablishment of Internal Complaint Committee (ICC) Committee As per section 4 of Sexual Harassment of Women at Workplace(Prevention, Prohibition and Redressal) Act, 2013
Yes
Establishment of Grievance Redressal Committee in the Institute and Appointment of OMBUDSMAN by theUniversity
Yes
Digital Payment for all Financial Transactions as per MHRD Directives YesCompliance of the National Academic Depository(NAD) as per MHRD Directives YesDisplay Board within the premises as well as in the Website of the Institution Indicating the Feedback Facility of Students and Faculty Available in the AICTE Web Portal
Yes
Implementing Food Safety and Standard Act,2006 in the Institution YesImplementation of Schemes Announced by MHRD YesOffering of Skill Development Courses Approved by the Council YesParticipation in the National Institutional Ranking Framework(NIRF) YesFabrication Facility Laboratory(FABLAB) Tinkering Laboratory/Innovation Laboratory YesWaste Management and Environment Improvement Measures to Ensure a Sustainable Green Campus YesCopies of AICTE Approvals (LOA and EOA of subsequent years)obtained since Inception of Institution till date shall be placed in the Website of the Institution
Yes
Applied for Membership of National Digital Library YesEstablishment of Online Grievance Rederssal Mechanism YesWhether the institution has implemented Safety and Security measures in the Campus? YesAvailability of quality sanitary napkins through sanitary napkin vending machines and ensuring safe and environment friendly disposal of used sanitary napkin through sanitary napkin incinerator
Yes
In the Class Rooms available, at least ONE shall be a Smart Class Room per Department YesTraining and Placement Cell with budget allocation proof of 1% of the total Institutional budget Yes
Whether your Institution has introduced online Aadhar linked Biometric attendance for regular faculty members?
Yes
Display of Course(s) and "Approved Intake" in the Institution at the entrance of the Institution. Course(s) taken through duly recognized MOOCs shall be used as Supplementary Course(s)
Yes
Efforts to encourage Final Year students to appear GATE examination Yes
Display of information submitted to AICTE (including the accreditation status and Board of Governors) along with mandatory disclosures in the Web site of the Institution
Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Received
Report Generated on :-05/03/2019
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : ae039551 Page 47 of 47
DECLARATIONBY THE PRINCIPAL/DIRECTOR/REGISTRAR OF THE INSTITUTE/UNIVERSITY DEPARTMENT
I, as the Head of the Institution, hereby declare that:
a) I have carefully gone through the AICTE Regulations Notification dated on 30th November, 2016, published in the Gazette of India -Extraordinary Part III, Section- 4 and its amendment 05th December 2017 also the various provisions mentioned in the Approval ProcessHand Book 2019-20.
b) I am fully aware of the data uploaded by me in respect of my institute on the web portal.
c) I am aware that there is no provision for correction of data, alteration of data, subsequent editing and appeal etc. for the online applicationonce uploaded on the web portal.
d) I am also aware that application for seeking Extension of Approval(EOA), Increase/Reduction of intake, Addition of new courses, Change ofsite, Closure of course, Supernumerary Seats under PIO/FN/Gulf quota Approval status/OCI, NRI, Change of name, and Conversion of womeninstitute into Co-ed institute and vice versa (as applicable), shall be processed as per relevant provisions enumerated in the ApprovalProcess Hand Book 2019-20.
e) I am aware of the Deficiencies (if any) pointed out in the Report generated online, based on the factual data uploaded by my institute on theportal.
f) I am also aware that Institute is eligible for grant ofExtension of Approval to the Existing Institutions,Extended EoA(if Applicable as per APH 2019-20),Increase in Intake/ Additional Course(s),Change in name of the Course(s)/ Reduction in Intake/ Closure of Programme(s) and/ or Course(s),only on fulfillment of prescribed norms & requirements as mentioned in the Approval Process Hand Book 2019-20.
Signature of Principal/Director/Registrar
Name :
Seal/Stamp of the Institute/University Department