PERSIAPANI UPAH KERJA

NO KUALIFIKASI QTY SATUAN HARGA SATUAN1 Helper 56 HRS 57,000 2 Pipe Fitter 2 56 68,000 3 Pengatur Mekanik 28 82,500

Jumlah

II MATERIALNO KUALIFIKASI QTY SATUAN HARGA SATUAN

Jumlah

III SEWA ALAT KERJANO KUALIFIKASI QTY SATUAN HARGA SATUAN

1 mob/demob scaffolding(kontainer 20ft)

Jumlah 21 97,500,000

PEKERJAAN

I UPAH KERJA

Helper(44 harix200 orgx14 H) 123,200 68,000 Scaffold SV(44 hari orgx8 orgx14H) 4,928 82,500 Safety Man(44 hari orgx8 orgx14H) 4,928 75,000

Jumlah II MATERIAL

1 Scaffolding 1 lot 2,389,695,000

Mobil Truk 2 44 unithari 1,350,000 Mobil Pick Up 1 44 unithari 650,000

Jumlah

Page 2: Workbook 1

1

SUB JUMLAH 3,192,000 3,808,000 2,310,000

9,310,000

SUB JUMLAH

SUB JUMLAH

2,047,500,000

8,377,600,000 406,560,000 369,600,000

9,153,760,000

2,389,695,000

118,800,000 28,600,000

147,400,000

FALSE

Page 3: Workbook 1

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011

HARGA SATUAN (RP)NO URAIAN KEGIATAN VOL SATUAN UPAH

-1 Pek. Persiapan 1 lot 9,310,000

2 Pek. Pasang dan Bongkar Scaffoldi 1 lot 9,153,760,000

Page 4: Workbook 1

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011

HARGA SATUAN (RP) JUMLAH HARGA (RP)MATERIAL ALAT UPAH MATERIAL ALAT

2,047,500,000 9,310,000 2,047,500,000

2,389,695,000 9,153,760,000 2,389,695,000

Page 5: Workbook 1

SUB JUMLAH

2,056,810,000

11,543,455,000

13,600,265,000

Page 6: Workbook 1

PERSIAPANI UPAH KERJA

NO KUALIFIKASI QTY SATUAN HARGA SATUAN1 Helper 56 HRS2 Pipe Fitter 2 563 Pengatur Mekanik 28

Jumlah

II MATERIALNO KUALIFIKASI QTY SATUAN HARGA SATUAN

Jumlah

III SEWA ALAT KERJANO KUALIFIKASI QTY SATUAN HARGA SATUAN

1 mob/demob scaffolding(kontainer 20ft)

Jumlah 21 105,242,381

PEKERJAAN

1 UPAH KERJA

Helper(44 harix200 orgx14 H) 123,200 39,000 Scaffold SV(44 hari orgx8 orgx14H) 4,928 61,000 Safety Man(44 hari orgx8 orgx14H) 4,928 45,000

Jumlah

2 MATERIAL1 Scaffolding 1 lot ###

Mobil Truk 2 44 unithari 1,350,000 Mobil Pick Up 1 44 unithari 650,000

Jumlah

Page 7: Workbook 1

1

SUB JUMLAH - - -

36,500,000

SUB JUMLAH

SUB JUMLAH

2,210,090,000

4,804,800,000 300,608,000 221,760,000

5,327,168,000

2,002,476,300,000

118,800,000 28,600,000

147,400,000

Page 8: Workbook 1

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011

HARGA SATUAN (RP)NO URAIAN KEGIATAN VOL SATUAN UPAH MATERIAL

-1 Pek. Persiapan 1 lot 36,500,000

2 Pek. Pasang dan Bongkar Scaffoldi 1 lot 5,327,168,000 2,210,090,000

Page 9: Workbook 1

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011

HARGA SATUAN (RP) JUMLAH HARGA (RP) SUB JUMLAHALAT UPAH MATERIAL ALAT

2,210,090,000 36,500,000 2,210,090,000 2,246,590,000

147,400,000 5,327,168,000 2,210,090,000 147,400,000 5,474,568,000

7,721,158,000

Page 10: Workbook 1

REKAPITULASI HARGA PENAWARANPROYEK / PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, Area HCC dan HSC, Tahun 2011.

A UPAH KERJA KESELURUHAN

B MATERIAL

C SEWA PERALATAN

D SUB JUMLAH ( A + B + C )

E KEUNTUNGAN DAN RESIKO

F JAMSOSTEK

G TANDA PENGENAL & ID CARD

H JUMLAH KESELURUHAN

I DIBULATKAN

Page 11: Workbook 1

PROYEK / PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, Area HCC dan HSC, Tahun 2011.