PT.SENTRA INSAN GARUDA
SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET
AYAM BROILER DI TASIKMALAYA DAN CIAMIS
UNIT KONTRUKSI PRODUKSI TOTAL
1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 39,222,000,000 8,773,016,250 47,995,016,250 2 Desa Cijulang Kec Cineam Tasikmalaya 110 41,159,500,000 8,583,016,250 49,742,516,250
3 Desa Kawasen Kec Banjarsari Ciamis 220 70,559,500,000 15,303,672,500 85,863,172,500
440 150,941,000,000 32,659,705,000 183,600,705,000
UNIT EKOR RESIKO MATI 15% TOTAL1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 110 325,000 48,750 276,250 2 Desa Cijulang Kec Cineam Tasikmalaya 110 325,000 48,750 276,250 3 Desa Kawasen Kec Banjarsari Ciamis 220 650,000 97,500 552,500
440 1,300,000 195,000 1,105,000
EKOR PRODUKSI1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 16,210 2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 16,250 3 Desa Kawasen Kec Banjarsari Ciamis 552,500 15,778
1,105,000 48,238
EKOR HARGA JUAL1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 276,250 17,800 2 Desa Cijulang Kec Cineam Tasikmalaya 276,250 17,800 3 Desa Kawasen Kec Banjarsari Ciamis 552,500 17,800
1,105,000
PANEN KREDIT1 MODAL INVESTOR2 PENGEMBALIAN MODAL 1 1,666,666,667 3 PROFIT MARGIN 120 19,669,000,000
PRODUKSI PROFIT1 Desa Sarimanggu Kec Karangnunggal Tasikmalaya 4,071,016,250 846,233,750 2 Desa Cijulang Kec Cineam Tasikmalaya 4,081,016,250 836,233,750 3 Desa Kawasen Kec Banjarsari Ciamis 7,924,672,500 1,909,827,500
16,076,705,000 3,592,295,000
KREDIT SALDO1 Pengembalian modal 1,666,666,667 1,925,628,333 2 Bunga 1.00% 35,922,950
1,889,705,383 1 Pengembangan usaha 10%2 Social work 2.50%
I INVESTORII OWNER
TOTAL
661,396,884.17
-
JUMLAH
1,653,492,210 JUMLAH PROFIT
992,095,326.25
188,970,538 47,242,635
1,889,705,383
236,213,173 JUMLAH
NETT PROFIT
1,653,492,210.42
URAIAN
JUMLAH
40%
4,917,250,000
19,669,000,000
4,917,250,000 9,834,500,000
LOKASI PROJECT INTAN
LOKASI PROJECT INTAN
JUMLAH
LOKASI PROJECT INTAN
JUMLAH
LOKASI PROJECT INTAN
60%
TOTAL4,917,250,000 4,917,250,000 9,834,500,000
19,669,000,000
PROFIT3,592,295,000
TOTAL4,478,117,875 4,489,117,875 8,717,139,750
17,684,375,500
JUMLAH
JUMLAH
3,592,295,000
URAIAN JUMLAH200,000,000,000 200,000,000,000
MARGIN
2,360,280,000,000 PROFIT MARGIN
LOKASI PROJECT INTAN
SUMMARY PROJECT : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA
NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH
I DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA1 Pek.Persiapan I Item 6 1,343,500,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 870,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000 8 Biaya oprasional produksi I Item 5 2,795,000,000 9 Biaya oprasional produksi II Item 6 2,340,000,000
10 Biaya oprasional produksi III Item 9 2,362,000,000 11 Biaya oprasional produksi IV Item 4 212,016,250 12 Biaya oprasional kantor Item 4 1,064,000,000 13 Biaya pajak dan lain-lain Item 5 4,196,000,000
52,191,016,250 52,191,016,250 II DESA CIJULANG,CINEAM TASIKMALAYA1 Pek.Persiapan I Item 6 1,366,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000 8 Biaya oprasional produksi I Item 5 2,795,000,000 9 Biaya oprasional produksi II Item 6 2,340,000,000
10 Biaya oprasional produksi III Item 9 2,162,000,000 11 Biaya oprasional produksi IV Item 4 212,016,250 12 Biaya oprasional kantor Item 4 1,074,000,000 13 Biaya pajak dan lain-lain Item 5 4,387,500,000
54,130,016,250 54,130,016,250 III DESA KAWASEN,BANJARSARI CIAMIS1 Pek.Persiapan I Item 6 1,591,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000 5 Pek.Tahap 3 Electrical Item 4 3,205,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000 8 Biaya oprasional produksi I Item 5 5,590,000,000 9 Biaya oprasional produksi II Item 6 4,680,000,000
10 Biaya oprasional produksi III Item 9 2,699,000,000 11 Biaya oprasional produksi IV Item 4 384,672,500 12 Biaya oprasional kantor Item 4 1,950,000,000 13 Biaya pajak dan lain-lain Item 5 7,705,000,000
93,568,172,500 93,568,172,500
199,889,205,000
Dibulatkan 200,000,000,000
TOTAL JUMLAHRp.200,000,000,000,00Terbilang
Tasikmalaya,....Nopember 2013
Managemen
RENCANA ANGGARAN BIAYA : PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA
JUMLAH I
JUMLAH II
JUMLAH III
( Dua ratus milyar rupiah )
JUMLAH I+II+III
NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH
I1 Pek.Persiapan I Item 6 1,343,500,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 4,110,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 870,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,850,000,000
39,222,000,000 39,222,000,000 II1 Pek.Persiapan I Item 6 1,366,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 5,840,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 24,970,000,000 5 Pek.Tahap 3 Electrical Item 4 2,160,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,005,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 4,900,000,000
41,159,500,000 III DESA KAWASEN,BANJARSARI CIAMIS1 Pek.Persiapan I Item 6 1,591,000,000 2 Pek.Persiapan II Item 6 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur Item 4 8,140,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam Item 5 49,940,000,000 5 Pek.Tahap 3 Electrical Item 4 3,205,000,000 6 Pek.Tahap 4 Mekanical Item 4 1,365,000,000 7 Pek.Tahap 5 Sarana penunjang Item 6 5,400,000,000
70,559,500,000 150,941,000,000
TOTAL 150,941,000,000
TOTAL JUMLAHRp.150,941,000,000,00Terbilang
RENCANA ANGGARAN BIAYA : PEMBANGUNAN INFRASTUKTUR,KANDANG AYAM,FASILITAS,MEKANIKAL,ELEKTRIKAL &PENUNJANG LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA
( Seratus lima puluh milyar sembilan ratus empat puluh satu juta rupiah )
Tasikmalaya,....Nopember2013
70,559,500,000
Management
JUMLAH I+II+III
DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
JUMLAH IDESA CIJULANG,CINEAM TASIKMALAYA
JUMLAH II 41,159,500,000
JUMLAH III
NO LOKASI PEKERJAAN SATUAN VOLUME JUMLAH TOTAL JUMLAH
I1 Biaya oprasional produksi I Item 5 2,795,000,000 2 Biaya oprasional produksi II Item 6 2,340,000,000 3 Biaya oprasional produksi III Item 9 2,362,000,000 4 Biaya oprasional produksi IV Item 4 212,016,250 5 Biaya oprasional kantor Item 4 1,064,000,000
8,773,016,250 8,773,016,250 8,773,016,250 I1 Biaya oprasional produksi I Item 5 2,795,000,000 2 Biaya oprasional produksi II Item 6 2,340,000,000 3 Biaya oprasional produksi III Item 9 2,162,000,000 4 Biaya oprasional produksi IV Item 4 212,016,250 5 Biaya oprasional kantor Item 4 1,074,000,000
############ 8,583,016,250 8,583,016,250 II DESA KAWASEN,BANJARSARI CIAMIS1 Biaya oprasional produksi I Item 5 5,590,000,000 2 Biaya oprasional produksi II Item 6 4,680,000,000 3 Biaya oprasional produksi III Item 9 2,699,000,000 4 Biaya oprasional produksi IV Item 4 384,672,500 5 Biaya oprasional kantor Item 4 1,950,000,000
############ 15,303,672,500 15,303,672,500 32,659,705,000
TOTAL 32,659,705,000
TOTAL JUMLAHRp. 32,659,705,000 Terbilang
JUMLAH II
RENCANA ANGGARAN BIAYA : PRODUKSI,DISTRIBUSI DAN MARKET AYAM BROILER LOKASI : KARANGNUNGGAL,CINEAM KAB TASIKMALAYA DAN BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA
DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
JUMLAH II
Management
Tasikmalaya,....Nopember 2013
JUMLAH III
( Tiga puluh dua milyar seratus enam puluh juta sembilan ratus lima ribu rupiah )
JUMLAH I+II+III
DESA CIJULANG,CINEAM TASIKMALAYA
NO URAIAN PEKERJAAN JUMLAH BULAN 1 BULAN 2 BULAN 3
I1 Pek.Persiapan I 1,343,500,000 1,343,500,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 4,110,000,000 2,055,000,000 2,055,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000 5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000 6 Pek.Tahap 4 Mekanical 870,000,000 261,000,000 7 Pek.Tahap 5 Sarana penunjang 4,850,000,000 2,425,000,000 8 Biaya oprasional produksi I 2,795,000,000 9 Biaya oprasional produksi II 2,340,000,000
10 Biaya oprasional produksi III 2,362,000,000 11 Biaya oprasional produksi IV 212,016,250 12 Biaya oprasional kantor 1,064,000,000 13 Biaya pajak dan lain-lain 4,196,000,000 4,196,000,000
52,191,016,250 8,513,000,000 9,807,000,000 3,721,000,000 II1 Pek.Persiapan I 1,366,000,000 1,366,000,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 5,840,000,000 2,920,000,000 2,920,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 24,970,000,000 7,491,000,000 5 Pek.Tahap 3 Electrical 2,160,000,000 1,296,000,000 6 Pek.Tahap 4 Mekanical 1,005,000,000 301,500,000 7 Pek.Tahap 5 Sarana penunjang 4,900,000,000 2,450,000,000 8 Biaya oprasional produksi I 2,795,000,000 9 Biaya oprasional produksi II 2,340,000,000
10 Biaya oprasional produksi III 2,162,000,000 11 Biaya oprasional produksi IV 212,016,250 12 Biaya oprasional kantor 1,074,000,000 13 Biaya pajak dan lain-lain 4,387,500,000 4,387,500,000
54,130,016,250 9,592,000,000 10,712,500,000 3,746,000,000 III1 Pek.Persiapan I 1,591,000,000 1,591,000,000 2 Pek.Persiapan II 918,500,000 918,500,000 3 Pek.Tahap 1 Pematangan lahan & Infrastruktur 8,140,000,000 4,070,000,000 4,070,000,000 4 Pek.Tahap 2 Pembangunan kandang ayam 49,940,000,000 14,982,000,000 5 Pek.Tahap 3 Electrical 3,205,000,000 1,923,000,000 6 Pek.Tahap 4 Mekanical 1,365,000,000 409,500,000 7 Pek.Tahap 5 Sarana penunjang 5,400,000,000 2,700,000,000
8 Biaya oprasional produksi I 5,590,000,000 9 Biaya oprasional produksi II 4,680,000,000
10 Biaya oprasional produksi III 2,699,000,000 11 Biaya oprasional produksi IV 384,672,500 12 Biaya oprasional kantor 1,950,000,000 13 Biaya pajak dan lain-lain 7,705,000,000 7,705,000,000
93,568,172,500 14,284,500,000 19,461,500,000 4,623,000,000
199,889,205,000 32,389,500,000 39,981,000,000 12,090,000,000
1 PEK PERSIAPAN 2 PEK INFRASTRUKTUR DAN KONTRUKSI KANDANG 3 PEK PEMBANGUNAN GUDANG DAN KANTOR4 PRODUKSI BERJALAN5 PERALATAN PRODUKSI6 PAJAK DAN BIAYA LAIN-LAIN
KETERANGAN WARNA DALAM KOLOM
CASH FLOW :PEMBANGUNAN INDUSTRI TERNAK AYAM,PRODUKSI DAN DISTRIBUSI AYAM BROILER LOKASI :KEC CINEAM,KARANGNUNGGAL KAB TASIKMALAYA & KEC BANJARSARI KAB CIAMIS PT.SENTRA INSAN GARUDA
JUMLAH I
JUMLAH II
JUMLAH III
JUMLAH TOTAL
DESA SARIMANGGU,KARANGNUNGGAL TASIKMALAYA
DESA CIJULANG,CINEAM TASIKMALAYA
DESA KAWASEN,BANJARSARI CIAMIS
BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12
8,739,500,000 7,491,000,000 1,248,500,000 864,000,000
435,000,000 174,000,000 1,455,000,000 970,000,000 2,795,000,000
2,340,000,000 2,362,000,000
212,016,250 1,064,000,000
13,876,500,000 6,390,016,250 7,665,000,000 2,218,500,000 -
8,739,500,000 7,491,000,000 1,248,500,000 864,000,000
502,500,000 201,000,000 1,470,000,000 980,000,000 2,795,000,000
2,340,000,000 2,162,000,000
212,016,250 1,074,000,000
13,744,000,000 6,415,016,250 7,692,000,000 2,228,500,000 -
17,479,000,000 14,982,000,000 2,497,000,000 1,282,000,000
682,500,000 273,000,000 1,620,000,000 1,080,000,000
5,590,000,000 4,680,000,000
2,699,000,000 384,672,500
1,950,000,000
25,540,500,000 10,826,672,500 15,255,000,000 3,577,000,000
53,161,000,000 23,631,705,000 30,612,000,000 8,024,000,000
Managemen
Tasikmalaya,.......Nopember 2013
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 150,000 1 450 67,500,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 150,000 1 1,000 150,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 150,000 1 800 120,000,000
1,343,500,000 II1 Direksi kit Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
918,500,000 III1 Cut and fill M2 75,000 1 18,000 1,350,000,000 2 Pematangan lahan/land clearing M2 75,000 1 2,000 150,000,000 3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 150,000 1 3,000 450,000,000
4,110,000,000 IV1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000 2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000 3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000 4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000 5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000 6 Overhead Unit 110 1 10,000,000 1,100,000,000
24,970,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000 4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000 5 Overhead Unit 110 1 2,500,000 275,000,000
2,160,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 11 1 20,000,000 220,000,000 3 Pemasangan water pump Unit 11 1 15,000,000 165,000,000 4 Overhead Unit 11 1 10,000,000 110,000,000
870,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 13 1 50,000,000 650,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000
4,850,000,000 VIII
1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000 2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000 3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000 4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000 5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000
2,795,000,000
JUMLAH IVPEK.TAHAP 4 MEKANICAL
JUMLAH IIPEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
JUMLAH IIIPEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA SARIMANGGU KARANGNUNGGAL - TASIKMALAYA
PEK.PERSIAPAN I
JUMLAH IPEK.PERSIAPAN II
JUMLAH IVPEK.TAHAP 3 ELECTRIKAL
JUMLAH VIII
JUMLAH VPEK.TAHAP 5 SARANA PENUNJANG
JUMLAH VIIBIAYA OPERASIONAL PRODUKSI 1
IX1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000 2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000 3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000 5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000
2,340,000,000 X1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000 5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000 9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000
2,362,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 69 1 2,500,000 172,656,250 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
212,016,250 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 457 1 2,000,000 914,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
1,064,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000 2 Pajak infrastruktur Persen 10 1 4,110,000,000 411,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 3,030,000,000 303,000,000 4 Pajak kontruksi gudang Persen 10 1 4,850,000,000 485,000,000 5 Biaya tambahan List 5 1 100,000,000 500,000,000
JUMLAH XII 4,196,000,000
52,191,016,250
48,120,000,000
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 II BIAYA OPRASIONAL KANTOR 1,276,016,250
52,191,016,250
1 VOLUME AYAM Ekor 325,000 2 RESIKO KEMATIAN 15% Ekor 48,750 3 JUMLAH AYAM BERSIH Ekor 276,250 4 MODAL DASAR AYAM/EKOR JUMLAH 14,737
PPN 10% 1,474 TOTAL 16,210
Ekor 276,250 17,800 4,917,250,000 TOTAL 4,917,250,000
Ekor 276,250 1,590 439,132,125
Per panen 1 4,917,250,000 Per panen 1 4,071,016,250 Per panen 1 846,233,750
JUMLAH XBIAYA OPERASIONAL KANTOR
JUMLAH XI
JUMLAH TOTAL
ASUMSI I
JUMLAH VIIIBIAYA OPERASIONAL PRODUKSI 3
JUMLAH IXBIAYA OPERASIONAL PRODUKSI 4
BIAYA OPERASIONAL PRODUKSI 2
TOTAL PENGELUARAN PRODUKSI BERJALAN 4,071,016,250 TOTAL
RENCANA PENDAPATAN
BIAYA PENGELUARAN PEMBANGUNAN 48,120,000,000 BIAYA PENGELUARAN PRODUKSI
KEUNTUNGAN JUAL AYAM PER EKOR
ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI
HARGA JUAL AYAM PER EKOR
PROFIT
Bulan 120 434,925,135.42 Persen 1% 2,174,625.68
437,099,761.09
409,133,988.91
1 PENGEMBANGAN USAHA Per panen 1 10% 40,913,398.89 2 SOCIAL WORK Per panen 1 2.50% 10,228,349.72
51,141,748.61 357,992,240.29
1 INVESTOR Per panen 1 60% 214,795,344.18 2 OWNER Per panen 1 40% 143,196,896.12
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000 II BIAYA OPRASIONAL KANTOR 1,276,016,250 120 153,121,950,000
488,521,950,000
1 VOLUME AYAM Ekor 39,000,000 2 RESIKO KEMATIAN 15% Ekor 5,850,000 3 JUMLAH AYAM BERSIH Ekor 33,150,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,737
PPN 10% 1,474 TOTAL 16,210
Ekor 33,150,000 17,800 590,070,000,000 TOTAL 590,070,000,000
Ekor 33,150,000 1,590 52,695,855,000
Panen 120 590,070,000,000 Panen 120 488,521,950,000 Panen 120 101,548,050,000
Bulan 120 52,191,016,250 434,925,135.42 52,191,016,250.00 Persen 1% 260,955,081.25
52,451,971,331.25
49,096,078,668.75
1 PENGEMBANGAN USAHA Panen 120 10% 4,909,607,866.88 2 SOCIAL WORK Panen 120 2.50% 1,227,401,966.72
6,137,009,833.59 42,959,068,835.16
JUMLAHNETT PROFIT
ASUMSI BUNGAJUMLAH
TOTAL PROFIT
PROFIT 120 KALI PANEN
ASUMSI PENGEMBALIAN MODAL
HARGA JUAL AYAM PER EKOR
KEUNTUNGAN JUAL AYAM PER EKOR
ASUMSI PROFIT PANENPROFIT MARGINBIAYA PRODUKSI
PROFIT
TOTAL PENGELUARAN PRODUKSI 488,521,950,000 TOTAL
RENCANA PENDAPATAN
SHARING PROFIT
ASUMSI IIBIAYA PENGELUARAN PRODUKSI
JUMLAH
TOTAL PROFIT PER PANEN
PROFIT PER 1 KALI PANEN
JUMLAH
ASUMSI PENGEMBALIAN MODAL 52,191,016,250
ASUMSI BUNGA
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 160,000 1 450 72,000,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 160,000 1 1,000 160,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 160,000 1 800 128,000,000
1,366,000,000 II1 Direksikeet Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
918,500,000 III1 Cut and fill M2 160,000 1 18,000 2,880,000,000 2 Pematangan lahan/Land clearing M2 160,000 1 2,000 320,000,000 3 Infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 160,000 1 3,000 480,000,000
5,840,000,000 IV1 Pembangunan Kandang ayam Unit 110 1 170,000,000 18,700,000,000 2 Pembangunan fasilitas pendukung Unit 11 1 10,000,000 110,000,000 3 Infrastruktur jalan kandang ayam List 11 1 215,000,000 2,365,000,000 4 Pemagaran per 10 unit kandang List 11 1 120,000,000 1,320,000,000 5 Pekerjaan tambahan Unit 11 1 125,000,000 1,375,000,000 6 Overhead Unit 110 1 10,000,000 1,100,000,000
24,970,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 Instalasi listrik kandang ayam Unit 1100 1 300,000 330,000,000 4 Pekerjaan tambahan Unit 110 1 4,000,000 440,000,000 5 Overhead Unit 110 1 2,500,000 275,000,000
2,160,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 14 1 20,000,000 280,000,000 3 Pemasangan water pump Unit 14 1 15,000,000 210,000,000 4 Overhead Unit 14 1 10,000,000 140,000,000
1,005,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 14 1 50,000,000 700,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000
4,900,000,000 VIII1 Beli DOC Ekor 325,000 1 4,500 1,462,500,000 2 Beli Pakan ayam Kilo gram 9,750,000 1 100 975,000,000 3 Beli Vaksin ayam Kilo gram 650,000 1 250 162,500,000 4 Beli Vitamin ayam Kilo gram 4,875,000 1 25 121,875,000 5 Biaya Lain-lain Kilo gram 4,875,000 1 15 73,125,000
2,795,000,000
BIAYA OPERASIONAL PRODUKSI 1
PEK.TAHAP 5 SARANA PENUNJANGJUMLAH V
JUMLAH VII
JUMLAH VIII
RENCANA ANGGARAN BIAYA PROJECT INDUSTRI TERNAK AYAM NUSANTARA"INTAN" DESA CIJULANG KEC CINEAM KAB TASIKMALAYA
PEK.TAHAP 4 MEKANIKAL
PEK.TAHAP 3 ELECTRIKAL
PEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
PEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
JUMLAH IV
JUMLAH IV
PEK.PERSIAPAN II
PEK.PERSIAPAN I
JUMLAH I
JUMLAH II
JUMLAH III
IX1 Peralatan Makan dan minum ayam Unit 110 1 8,000,000 880,000,000 2 Keranjang ayam kecil Pcs 1,000 1 240,000 240,000,000 3 Keranjang ayam besar Pcs 1,000 1 290,000 290,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 1,000 1 600,000 600,000,000 5 Peralatan obat dan vaksin Unit 110 1 2,000,000 220,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 110 1 1,000,000 110,000,000
2,340,000,000 X1 Beli Mesin peghangat C-50AT Set 1,000 1 200,000 200,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 1 1 156,000,000 156,000,000 5 Beli mobil Panter pick up Unit 1 1 145,000,000 145,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 15 12 500,000 90,000,000 9 Perbaikan kendaraan inventaris Unit 15 12 1,000,000 180,000,000
2,162,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 69 1 2,500,000 172,656,250 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
212,016,250 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 462 1 2,000,000 924,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
1,074,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 24,970,000,000 2,497,000,000 2 Pajak infrastruktur Persen 10 1 5,840,000,000 584,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 3,165,000,000 316,500,000 4 Pajak kontruksi gudang Persen 10 1 4,900,000,000 490,000,000 5 Biaya tambahan List 5 1 100,000,000 500,000,000
JUMLAH XIII 4,387,500,000
54,130,016,250
50,049,000,000
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 II BIAYA OPRASIONAL KANTOR 1,286,016,250
54,130,016,250
1 VOLUME AYAM Ekor 325,000 2 RESIKO KEMATIAN 15% Ekor 48,750 3 JUMLAH AYAM BERSIH Ekor 276,250 4 MODAL DASAR AYAM/EKOR JUMLAH 14,773
PPN 10% 1,477 TOTAL 16,250
Kilogram 276,250 17,800 4,917,250,000 TOTAL 4,917,250,000
Kilogram 276,250 1,550 428,132,125
Per panen 1 4,917,250,000 Per panen 1 4,081,016,250 Per panen 1 836,233,750
JUMLAH IX
BIAYA OPERASIONAL PRODUKSI 2
BIAYA OPERASIONAL PRODUKSI 4
BIAYA OPERASIONAL PRODUKSI 3
50,049,000,000
JUMLAH TOTAL
BIAYA OPERASIONAL KANTORJUMLAH XI
JUMLAH XII
ASUMSI I
JUMLAH X
BIAYA PENGELUARAN PEMBANGUNAN
TOTAL
RENCANA PENDAPATAN
BIAYA PENGELUARAN PRODUKSI
4,081,016,250 TOTAL PENGELUARAN PRODUKSI BERJALAN
HARGA JUAL AYAM PER KILOGRAM
KEUNTUNGAN JUAL AYAM PER KILOGRAM
ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI
PROFIT
Bulan 120 451,083,468.75 Persen 1% 2,255,417.34
453,338,886.09
382,894,863.91
1 PENGEMBANGAN USAHA Per panen 1 10% 38,289,486.39 2 SOCIAL WORK Per panen 1 2.50% 9,572,371.60
47,861,857.99 335,033,005.92
1 INVESTOR Per panen 1 60% 201,019,803.55 2 OWNER Per panen 1 40% 134,013,202.37
I BIAYA OPRASIONAL PRODUKSI 2,795,000,000 120 335,400,000,000 II BIAYA OPRASIONAL KANTOR 1,286,016,250 120 154,321,950,000
489,721,950,000
1 VOLUME AYAM Ekor 39,000,000 2 RESIKO KEMATIAN 15% Ekor 5,850,000 3 JUMLAH AYAM BERSIH Ekor 33,150,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,773
PPN 10% 1,477 TOTAL 16,250
Ekor 33,150,000 17,800 590,070,000,000 TOTAL 590,070,000,000
Ekor 33,150,000 1,550 51,375,855,000
Panen 120 590,070,000,000 Panen 120 489,721,950,000 Panen 120 100,348,050,000
Bulan 120 54,130,016,250 451,083,468.75 54,130,016,250.00 Persen 1% 270,650,081.25
54,400,666,331.25
45,947,383,668.75
1 PENGEMBANGAN USAHA Panen 120 10% 4,594,738,366.88 2 SOCIAL WORK Panen 120 2.50% 1,148,684,591.72
5,743,422,958.59 40,203,960,710.16
TOTAL PENGELUARAN PRODUKSI 489,721,950,000
TOTAL PROFIT PER PANEN
54,130,016,250
JUMLAH
PROFIT PER 1 KALI PANEN
ASUMSI PENGEMBALIAN MODAL
ASUMSI BUNGA
ASUMSI II
TOTAL
BIAYA PENGELUARAN PRODUKSI
RENCANA PENDAPATAN
SHARING PROFITJUMLAH
ASUMSI BUNGAJUMLAH
TOTAL PROFIT
PROFIT 120 KALI PANEN
PROFIT MARGINBIAYA PRODUKSI
PROFIT
ASUMSI PENGEMBALIAN MODAL
HARGA JUAL AYAM PER EKOR
KEUNTUNGAN JUAL AYAM PER EKOR
ASUMSI PROFIT PANEN
JUMLAHNETT PROFIT
NO URAIAN SATUAN VOLUME ASUMSI HARGA JUMLAH TOTAL JUMLAH
1 2 3 4 5 6 7I1 Sosialisasi Masyarakat List 3 1 10,000,000 30,000,000 2 Pengukuran Lahan M2 260,000 1 450 117,000,000 3 Pengukuran jalan akses M2 40,000 1 400 16,000,000 4 Land Clearing Lahan/Ganti rugi pohon M2 260,000 1 1,000 260,000,000 5 Pembebasan Jalan akses M2 16,000 1 60,000 960,000,000 6 Perijinan Proyek & usaha peternakan M2 260,000 1 800 208,000,000
1,591,000,000 II1 Direksi kit Unit 2 1 10,000,000 20,000,000 2 Peralatan kantor List 10 1 5,000,000 50,000,000 3 Peralatan rumah tangga kantor Unit 25 1 2,500,000 62,500,000 4 Mobilisasi Kantor Unit 1 1 156,000,000 156,000,000 5 Motoris Kantor Unit 2 1 15,000,000 30,000,000 6 Biaya oprasional kantor Bulan 6 20 5,000,000 600,000,000
918,500,000 III1 Cut and fill M2 260,000 1 18,000 4,680,000,000 2 Pematangan lahan/Land clearing M2 260,000 1 2,000 520,000,000 3 infrastruktur jalan akses ke lokasi M2 16,000 1 100,000 1,600,000,000 4 Drainase M2 8,000 1 70,000 560,000,000 5 Overhead M2 260,000 1 3,000 780,000,000
8,140,000,000 IV1 Pembangunan Kandang ayam Unit 220 1 170,000,000 37,400,000,000 2 Pembangunan fasilitas pendukung Unit 22 1 10,000,000 220,000,000 3 infrastruktur jalan kandang ayam List 22 1 215,000,000 4,730,000,000 4 Pemagaran per 10 unit kandang List 22 1 120,000,000 2,640,000,000 5 Pekerjaan tambahan Unit 22 1 125,000,000 2,750,000,000 6 Overhead Unit 220 1 10,000,000 2,200,000,000
49,940,000,000 V1 Pemasangan Listrik dari PLN Unit 82 1 7,500,000 615,000,000 2 Beli Genset Unit 2 1 250,000,000 500,000,000 3 instalasi listrik kandang ayam Unit 2200 1 300,000 660,000,000 4 Pekerjaan tambahan Unit 220 1 4,000,000 880,000,000 5 Overhead Unit 220 1 2,500,000 550,000,000
3,205,000,000 VI1 Pengeboran air bersih Unit 5 1 75,000,000 375,000,000 2 instalisasi air bersih Unit 22 1 20,000,000 440,000,000 3 Pemasangan water pump Unit 22 1 15,000,000 330,000,000 4 Overhead Unit 22 1 10,000,000 220,000,000
1,365,000,000 VII1 Tanah & bangunan kantor Unit 1 1 400,000,000 400,000,000 2 Tanah & bangunan work shop Unit 1 1 150,000,000 150,000,000 3 Pembangunan gapura Unit 2 1 75,000,000 150,000,000 4 Pembangunan pos satpam dan musolah Unit 24 1 50,000,000 1,200,000,000 5 Tanah & bangunan gudang utama Unit 3 1 1,000,000,000 3,000,000,000 6 Overhead Unit 1 1 500,000,000 500,000,000
5,400,000,000 VIII
1 Beli DOC Ekor 650,000 1 4,500 2,925,000,000 2 Beli Pakan ayam Kilo gram 19,500,000 1 100 1,950,000,000 3 Beli Vaksin ayam Kilo gram 1,300,000 1 250 325,000,000 4 Beli Vitamin ayam Kilo gram 9,750,000 1 25 243,750,000 5 Biaya Lain-lain Kilo gram 9,750,000 1 15 146,250,000
5,590,000,000
SUMMARY PROJECT PEMBANGUNAN KANDANG AYAM,PRODUKSI DAN MARKET AYAM BROILER DI DESA KAWASEN BANJARSARI -CIAMIS
PEK.PERSIAPAN I
JUMLAH IPEK.PERSIAPAN II
JUMLAH IVPEK.TAHAP 3 ELECTRIKAL
JUMLAH IVPEK.TAHAP 4 MEKANICAL
JUMLAH IIPEK.TAHAP 1 PEMATANGAN LAHAN & INFRASTRUKTUR
JUMLAH IIIPEK.TAHAP 2 PEMBANGUNAN KANDANG & FASILITASNYA
JUMLAH VPEK.TAHAP 5 SARANA PENUNJANG
JUMLAH VIIBIAYA OPERASIONAL PRODUKSI 1
JUMLAH VIII
IX1 Peralatan Makan dan minum ayam Unit 220 1 8,000,000 1,760,000,000 2 Keranjang ayam kecil Pcs 2,000 1 240,000 480,000,000 3 Keranjang ayam besar Pcs 2,000 1 290,000 580,000,000 4 Pemanas LPG kap.1000+kelengkapannya Pcs 2,000 1 600,000 1,200,000,000 5 Peralatan obat dan vaksin Unit 220 1 2,000,000 440,000,000 6 Peralatan pendukung fasilitas 10 unit Unit 220 1 1,000,000 220,000,000
4,680,000,000 X1 Beli Mesin peghangat C-50AT Set 2,000 1 200,000 400,000,000 2 Beli perlengkapan kantor Unit 20 1 5,000,000 100,000,000 3 Beli truck FE 74 HD 125 PS Unit 5 1 232,200,000 1,161,000,000 4 Beli mobil ALL NEW AVANZA 1.3 E A/T Unit 2 1 156,000,000 312,000,000 5 Beli mobil Panter pick up Unit 2 1 145,000,000 290,000,000 6 Beli motor roda 3 viar Unit 4 1 17,500,000 70,000,000 7 Beli motor roda 2 Honda Supra New Unit 4 1 15,000,000 60,000,000 8 Perawatan kendaraan inventaris Unit 17 12 500,000 102,000,000 9 Perbaikan kendaraan inventaris Unit 17 12 1,000,000 204,000,000
2,699,000,000 XI1 Biaya Marketing List 30 2 500,000 30,000,000 2 Biaya Trucking Unit 138 1 2,500,000 345,312,500 3 Biaya Mobilisasi oprasional Unit 2 26 100,000 5,200,000 4 Biaya Motoris oprasional Unit 8 26 20,000 4,160,000
384,672,500 XII1 Gaji karyawan kantor Orang 20 1 5,000,000 100,000,000 2 Gaji karyawan kandang Orang 900 1 2,000,000 1,800,000,000 3 Biaya alat-alat dan ATK Kantor List 25 1 1,000,000 25,000,000 4 Biaya Lain-lain List 25 1 1,000,000 25,000,000
1,950,000,000 XIII PAJAK DAN BIAYA LAINNYA1 Pajak kontruksi kandang ayam Persen 10 1 49,940,000,000 4,994,000,000 2 Pajak infrastruktur Persen 10 1 8,140,000,000 814,000,000 3 Pajak mekanikal & elektrikal Persen 10 1 4,570,000,000 457,000,000 4 Pajak kontruksi gudang Persen 10 1 5,400,000,000 540,000,000 5 Biaya tambahan List 9 1 100,000,000 900,000,000 7,705,000,000
JUMLAH XIII93,568,172,500
85,643,500,000
I BIAYA OPRASIONAL PRODUKSI 5,590,000,000 II BIAYA OPRASIONAL KANTOR 2,334,672,500
93,568,172,500
1 VOLUME AYAM Ekor 650,000 2 RESIKO KEMATIAN 15% Ekor 97,500 3 JUMLAH AYAM BERSIH Ekor 552,500 4 MODAL DASAR AYAM/EKOR JUMLAH 14,343
PPN 10% 1,434 TOTAL 15,778
Ekor 552,500 17,800 9,834,500,000 TOTAL 9,834,500,000
Ekor 552,500 2,022 1,117,360,250
Per panen 1 9,834,500,000 Per panen 1 7,924,672,500 Per panen 1 1,909,827,500
BIAYA OPERASIONAL PRODUKSI 2
JUMLAH XIBIAYA OPERASIONAL KANTOR
JUMLAH XII
JUMLAH TOTAL
ASUMSI I
JUMLAH IXBIAYA OPERASIONAL PRODUKSI 3
JUMLAH XBIAYA OPERASIONAL PRODUKSI 4
TOTAL PENGELUARAN PRODUKSI BERJALAN 7,924,672,500 TOTAL
RENCANA PENDAPATAN
BIAYA PENGELUARAN PEMBANGUNAN 85,643,500,000 BIAYA PENGELUARAN PRODUKSI 1
KEUNTUNGAN JUAL AYAM PER EKOR
ASUMSI PROFIT PER PANENPROFIT MARGINBIAYA PRODUKSI
HARGA JUAL AYAM PER EKOR
PROFIT
Bulan 120 779,734,770.83 Persen 1% 3,898,673.85
783,633,444.69
1,126,194,055.31
1 PENGEMBANGAN USAHA Per panen 1 10% 112,619,405.53 2 SOCIAL WORK Per panen 1 2.50% 28,154,851.38
140,774,256.91 985,419,798.40
1 INVESTOR Per panen 1 60% 591,251,879.04 2 OWNER Per panen 1 40% 394,167,919.36
I BIAYA OPRASIONAL PRODUKSI 5,590,000,000 120 670,800,000,000 II BIAYA OPRASIONAL KANTOR 2,334,672,500 120 280,160,700,000
950,960,700,000
1 VOLUME AYAM Ekor 78,000,000 2 RESIKO KEMATIAN 15% Ekor 11,700,000 3 JUMLAH AYAM BERSIH Ekor 66,300,000 4 MODAL DASAR AYAM/EKOR JUMLAH 14,343
PPN 10% 1,434 TOTAL 15,778
Ekor 66,300,000 17,800 1,180,140,000,000 TOTAL 1,180,140,000,000
Ekor 66,300,000 2,022 134,083,230,000
Panen 120 1,180,140,000,000 Panen 120 950,960,700,000 Panen 120 229,179,300,000
Bulan 120 93,568,172,500 779,734,770.83 93,568,172,500.00 Persen 1% 467,840,862.50
94,036,013,362.50
135,143,286,637.50
1 PENGEMBANGAN USAHA Panen 120 10% 13,514,328,663.75 2 SOCIAL WORK Panen 120 2.50% 3,378,582,165.94
16,892,910,829.69 118,250,375,807.81
1 INVESTOR Panen 120 60% 70,950,225,484.69 2 OWNER Panen 120 40% 47,300,150,323.13
Catatan
JUMLAH
TOTAL PROFIT PER PANEN
PROFIT PER 1 KALI PANEN
JUMLAH
ASUMSI PENGEMBALIAN MODAL 93,568,172,500
ASUMSI BUNGA
TOTAL PENGELUARAN PRODUKSI 950,960,700,000 TOTAL
RENCANA PENDAPATAN
SHARING PROFIT
ASUMSI IIBIAYA PENGELUARAN PRODUKSI
HARGA JUAL AYAM PER EKOR
KEUNTUNGAN JUAL AYAM PER EKOR
ASUMSI PROFIT PANENPROFIT MARGIN
Harga Kontruksi dan Produksi sewaktu-waktu dapat berubah mengikuti pasar,kebijakan pemerintah dan management.
JUMLAHNETT PROFIT
ASUMSI BUNGAJUMLAH
TOTAL PROFIT
PROFIT 120 KALI PANEN
BIAYA PRODUKSIPROFIT
ASUMSI PENGEMBALIAN MODAL
TERIMA KASIH
PT.SENTRA INSAN GARUDA