ANALISA HARGA SATUAN BOW 2010PEKERJAAN KAYU

INDEK SAT U R A I A N HARGA SATUAN (Rp)

HARGA

JUMLAH HARGA (Rp)BAHAN UPAH

( Rp ) ( Rp )

A. PEKERJAAN PONDASI KAYU

A.1.BOW SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 M

DICINCIN, DILANCIP DAN DITUMBUK

0.0200 M3 Balok ulin @ 4,500,000.00 90,000.00

0.5100 OH tukang kayu @ 70,000.00 35,700.00

0.8750 OH pekerja @ 55,000.00 48,125.00

0.0510 OH kepala tukang @ 75,000.00 3,825.00

0.0440 OH mandor @ 75,000.00 3,300.00

JUMLAH 90,000.00 90,950.00 180,950.00

A.1.1BOW SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 80 CM

DICINCIN, DILANCIP DAN DITUMBUK

0.0080 M3 Balok ulin @ 4,500,000.00 36,000.00

0.5100 OH tukang kayu @ 70,000.00 35,700.00

0.8750 OH pekerja @ 55,000.00 48,125.00

0.0510 OH kepala tukang @ 75,000.00 3,825.00

0.0440 OH mandor @ 75,000.00 3,300.00

JUMLAH 36,000.00 90,950.00 126,950.00

A.2 SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M

2 SAMBUNGAN DGN PIPA GALVANIS

0.0800 M3 Balok ulin @ 4,500,000.00 360,000.00

0.5100 OH tukang kayu @ 70,000.00 35,700.00

0.8750 OH pekerja @ 55,000.00 48,125.00

0.0510 OH kepala tukang @ 75,000.00 3,825.00

0.0440 OH mandor @ 75,000.00 3,300.00

JUMLAH 360,000.00 90,950.00 450,950.00

A.3 SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M'

0.0400 M3 Balok ulin @ 4,500,000.00 180,000.00

0.5100 OH tukang kayu @ 70,000.00 35,700.00

0.8750 OH pekerja @ 55,000.00 48,125.00

0.0510 OH kepala tukang @ 75,000.00 3,825.00

0.0440 OH mandor @ 75,000.00 3,300.00

JUMLAH 180,000.00 90,950.00 270,950.00

A. 4 1 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN

1.1000 M3 papan siring kayu ulin @ 4,500,000.00 4,950,000.00

3.0000 kg paku ulin @ 19,800.00 59,400.00

15.0000 OH tukang kayu @ 70,000.00 1,050,000.00

4.0000 OH pekerja @ 55,000.00 220,000.00

1.5000 OH kepala tukang @ 75,000.00 112,500.00

0.2000 OH mandor @ 75,000.00 15,000.00

JUMLAH 5,009,400.00 1,397,500.00 6,406,900.00

A. 5

1.1000 M3 balok ky ulin @ 4,500,000.00 4,950,000.00

15.0000 OH tukang kayu @ 70,000.00 1,050,000.00

5.0000 OH pekerja @ 55,000.00 275,000.00

1.5000 OH kepala tukang @ 75,000.00 112,500.00

0.2500 OH mandor @ 75,000.00 18,750.00

JUMLAH 4,950,000.00 1,456,250.00 6,406,250.00

B. PEKERJAAN LANTAI KAYU

B. 1 1 M3 MENGERJAKAN SLOOF DAN GELAGAR KY ULIN

1.1000 M3 balok ky ulin @ 4,500,000.00 4,950,000.00

10.0000 Kg paku ulin @ 19,800.00 198,000.00

15.0000 OH tukang kayu @ 70,000.00 1,050,000.00

5.0000 OH pekerja @ 55,000.00 275,000.00

1.5000 OH kepala tukang @ 75,000.00 112,500.00

0.2500 OH mandor @ 75,000.00 18,750.00

JUMLAH 5,148,000.00 1,456,250.00 6,604,250.00

B. 2 1 M2 LANTAI PAPAN KAYU ULIN DIKETAM

0.0254 M3 papan kayu ulin @ 4,500,000.00 114,300.00

0.2500 Kg paku ulin @ 19,800.00 4,950.00

0.8000 OH tukang kayu @ 70,000.00 56,000.00

0.2800 OH pekerja @ 55,000.00 15,400.00

0.0800 OH kepala tukang @ 75,000.00 6,000.00

0.0140 OH mandor @ 75,000.00 1,050.00

JUMLAH 119,250.00 78,450.00 197,700.00

B. 3 1 M2 LANTAI PAPAN KAYU MERANTI DIKETAM

0.0254 M3 papan kayu meranti klas 1 @ 2,100,000.00 53,340.00

0.2500 Kg paku biasa @ 16,650.00 4,162.50

0.8000 OH tukang kayu @ 70,000.00 56,000.00

0.2800 OH pekerja @ 55,000.00 15,400.00

0.0800 OH kepala tukang @ 75,000.00 6,000.00

0.0140 OH mandor @ 75,000.00 1,050.00

JUMLAH 57,502.50 78,450.00 135,952.50

KODE ANALISA

1 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk )

Page 2: RAB Siring

B. PEKERJAAN DINDING KAYU

B. 4 1 M3 MENGERJAKAN RANGKA RUMAH KAYU ULIN (termasuk kusen)

1.1000 M3 balok ky ulin @ 4,500,000.00 4,950,000.00

5.0000 Kg paku ulin @ 19,800.00 99,000.00

20.0000 OH tukang kayu @ 70,000.00 1,400,000.00

10.0000 OH pekerja @ 55,000.00 550,000.00

2.0000 OH kepala tukang @ 75,000.00 150,000.00

0.5000 OH mandor @ 75,000.00 37,500.00

JUMLAH 5,049,000.00 2,137,500.00 7,186,500.00

B. 5 1 M3 MENGERJAKAN RANGKA RUMAH KAYU MERANTI (termasuk kusen)

1.1000 M3 balok ky meranti @ 2,100,000.00 2,310,000.00

5.0000 Kg paku biasa @ 16,650.00 83,250.00

20.0000 OH tukang kayu @ 70,000.00 1,400,000.00

10.0000 OH pekerja @ 55,000.00 550,000.00

2.0000 OH kepala tukang @ 75,000.00 150,000.00

0.5000 OH mandor @ 75,000.00 37,500.00

JUMLAH 2,393,250.00 2,137,500.00 4,530,750.00

B. 6 1 M2 DINDING PAPAN ULIN DIKETAM

0.0240 M3 papan kayu ulin @ 3,600,000.00 86,400.00

0.2000 Kg paku ulin @ 19,800.00 3,960.00

0.8000 OH tukang kayu @ 70,000.00 56,000.00

0.2800 OH pekerja @ 55,000.00 15,400.00

0.0800 OH kepala tukang @ 75,000.00 6,000.00

0.0100 OH mandor @ 75,000.00 750.00

JUMLAH 90,360.00 78,150.00 168,510.00

B. 7 1 M2 DINDING PAPAN MERANTI DIKETAM

0.0240 M3 papan kayu meranti @ 1,786,000.00 42,864.00

0.2000 Kg paku biasa @ 16,650.00 3,330.00

0.8000 OH tukang kayu @ 70,000.00 56,000.00

0.2800 OH pekerja @ 55,000.00 15,400.00

0.0800 OH kepala tukang @ 75,000.00 6,000.00

0.0100 OH mandor @ 75,000.00 750.00

JUMLAH 46,194.00 78,150.00 124,344.00

B. 8 1 M2 DINDING SUSUN SIRIH PAPAN MERANTI

0.0250 M3 papan kayu meranti @ 1,786,000.00 44,650.00

0.1500 Kg paku biasa @ 16,650.00 2,497.50

0.4000 OH tukang kayu @ 70,000.00 28,000.00

0.1400 OH pekerja @ 55,000.00 7,700.00

0.0400 OH kepala tukang @ 75,000.00 3,000.00

0.0070 OH mandor @ 75,000.00 525.00

JUMLAH 47,147.50 39,225.00 86,372.50

B. 9 1 M2 DINDING PAPAN MERANTI SUSUN SIRIH DIKETAM

0.0250 M3 papan kayu meranti @ 1,786,000.00 44,650.00

0.2000 Kg paku biasa @ 16,650.00 3,330.00

0.8000 OH tukang kayu @ 70,000.00 56,000.00

0.2800 OH pekerja @ 55,000.00 15,400.00

0.0800 OH kepala tukang @ 75,000.00 6,000.00

0.0100 OH mandor @ 75,000.00 750.00

JUMLAH 47,980.00 78,150.00 126,130.00

B. 10 1 M2 MENGERJAKAN DINDING PARTISI KAYU

MERANTI DAN LAPISAN MULTIPLEK 9 MM

0.0210 M3 papan kayu meranti @ 1,786,000.00 37,506.00

0.7000 LBR Multiplek 9 mm @ 129,000.00 90,300.00

0.0400 KG Paku biasa @ 16,650.00 666.00

0.0400 KG Paku plywood @ 23,500.00 940.00

0.0150 OH Tukang kayu @ 70,000.00 1,050.00

0.8000 OH Pekerja @ 55,000.00 44,000.00

0.0150 OH kepala tukang @ 75,000.00 1,125.00

0.0400 OH Mandor @ 75,000.00 3,000.00

JUMLAH 129,412.00 49,175.00 178,587.00

Page 3: RAB Siring

G. PEKERJAAN BETON

G.6.6.1 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr

218.0000 kg semen portland @ 1,270.00 276,860.00

0.5200 m3 pasir beton @ 280,000.00 145,600.00

0.8700 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 304,500.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

726,960.00 116,125.00 843,085.00

G.6.6.2 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr

197.0000 kg semen portland @ 1,270.00 250,190.00

0.4700 m3 pasir beton @ 280,000.00 131,600.00

0.9400 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 329,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

710,790.00 116,125.00 826,915.00

G.6.6.3 1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr

173.0000 kg semen portland @ 1,270.00 219,710.00

0.5700 m3 pasir beton @ 280,000.00 159,600.00

0.8700 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 304,500.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

683,810.00 116,125.00 799,935.00

G.6.6.4 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0260 m3 pasir beton @ 280,000.00 7,280.00

0.0440 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 15,400.00

1.1500 oh pekerja @ 55,000.00 63,250.00

0.0200 oh tukang batu @ 70,000.00 1,400.00

0.0020 oh kepala tukang @ 75,000.00 150.00

0.0060 oh mandor @ 75,000.00 450.00

35,380.00 65,250.00 100,630.00

Page 4: RAB Siring

G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Krayan

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 250,000.00 135,000.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 283,500.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 845,220.00 212,125.00 1,057,345.00

G.6.6.5..a 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Palu

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 415,000.00 224,100.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu @ 415,000.00 336,150.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 986,970.00 212,125.00 1,199,095.00

G.6.6.5.b 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Sepaku

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 330,000.00 178,200.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku @ 437,500.00 354,375.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 959,295.00 212,125.00 1,171,420.00

G.6.6.6 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

280.0000 kg semen portland @ 1,270.00 355,600.00

0.4500 m3 pasir beton @ 250,000.00 112,500.00

0.9000 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 315,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 783,100.00 116,125.00 899,225.00

G.6.6.7 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr)

352.0000 kg semen portland @ 1,270.00 447,040.00

0.5600 m3 pasir beton @ 250,000.00 140,000.00

0.7000 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 245,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 832,040.00 116,125.00 948,165.00

Page 5: RAB Siring

G.6.6.8 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr)

357.0000 kg semen portland @ 1,270.00 453,390.00

0.4200 m3 pasir beton @ 250,000.00 105,000.00

0.5400 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 189,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 747,390.00 116,125.00 863,515.00

G.6.6.9 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr)

386.0000 kg semen portland @ 1,270.00 490,220.00

0.4700 m3 pasir beton @ 250,000.00 117,500.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 273,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 880,720.00 116,125.00 996,845.00

Page 6: RAB Siring

G.6.6.10 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr)

479.0000 kg semen portland @ 1,270.00 608,330.00

0.3700 m3 pasir beton @ 250,000.00 92,500.00

0.7400 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 259,000.00

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 959,830.00 116,125.00 1,075,955.00

G.6.6.11 1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON

440.0000 kg semen portland @ 1,270.00 558,800.00

0.5000 m3 pasir beton @ 250,000.00 125,000.00

0.8000 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 280,000.00

2.4600 galon Rapidrant @ 26,000.00 -

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 963,800.00 116,125.00 1,079,925.00

G.6.6.12 1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 250,000.00 135,000.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 283,500.00

1.0000 ltr puzzdith - 100 XR @ -

1.6500 oh pekerja @ 55,000.00 90,750.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0800 oh mandor @ 75,000.00 6,000.00

JUMLAH 845,220.00 116,125.00 961,345.00

G.6.6.13 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Krayan

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 250,000.00 135,000.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 283,500.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 845,220.00 212,125.00 1,057,345.00

G.6.6.13.a 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Palu

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 250,000.00 135,000.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu @ 415,000.00 336,150.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 897,870.00 212,125.00 1,109,995.00

Page 7: RAB Siring

G.6.6.13.b 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Sepaku

336.0000 kg semen portland @ 1,270.00 426,720.00

0.5400 m3 pasir beton @ 250,000.00 135,000.00

0.8100 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku @ 437,500.00 354,375.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 916,095.00 212,125.00 1,128,220.00

G.6.6.14 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

291.0000 kg semen portland @ 1,270.00 369,570.00

0.4700 m3 pasir beton @ 250,000.00 117,500.00

0.9300 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 325,500.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 812,570.00 212,125.00 1,024,695.00

Page 8: RAB Siring

G.6.6.15 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr)

367.0000 kg semen portland @ 1,270.00 466,090.00

0.4400 m3 pasir beton @ 250,000.00 110,000.00

0.8800 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 308,000.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 884,090.00 212,125.00 1,096,215.00

G.6.6.16 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr)

400.0000 kg semen portland @ 1,270.00 508,000.00

0.4800 m3 pasir beton @ 250,000.00 120,000.00

0.8000 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 280,000.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 908,000.00 212,125.00 1,120,125.00

G.6.6.17 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr)

615.0000 kg semen portland @ 1,270.00 781,050.00

0.5200 m3 pasir beton @ 250,000.00 130,000.00

0.5200 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 182,000.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor @ 75,000.00 75,000.00

JUMLAH 1,093,050.00 212,125.00 1,305,175.00

G.6.6.18 1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100

400.0000 kg semen portland @ 1,270.00 508,000.00

0.4800 m3 pasir beton @ 250,000.00 120,000.00

0.8000 m3 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan @ 350,000.00 280,000.00

1.2000 Kg Strorox - 100 @ -

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

1.0000 oh mandor 75,000.00 75,000.00

JUMLAH 908,000.00 212,125.00 1,120,125.00

G.6.6.19 1M' MEMASANG PVC WATERSTOP LEBAR 150 MM

1.0500 m' waterstop lebar 150 mm @ -

0.0500 oh pekerja @ 55,000.00 2,750.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH - 5,225.00 5,225.00

Page 9: RAB Siring

G.6.6.20 1M' MEMASANG PVC WATERSTOP LEBAR 200 MM

1.0500 m' waterstop lebar 200 mm @ 185,000.00 194,250.00

0.0500 oh pekerja @ 55,000.00 2,750.00

0.0350 oh tukang batu @ 70,000.00 2,450.00

0.0035 oh kepala tukang @ 75,000.00 262.50

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH 194,250.00 5,612.50 199,862.50

G.6.6.21 1M' MEMASANG PVC WATERSTOP LEBAR 230 MM

1.0500 m' waterstop lebar 230 mm @ - -

0.5500 oh pekerja @ 55,000.00 30,250.00

0.0350 oh tukang batu @ 70,000.00 2,450.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH - 32,925.00 32,925.00

G.6.6.22 1M' MEMASANG PVC WATERSTOP LEBAR 250 MM

1.0500 m' waterstop lebar 250 mm @ - -

0.5500 oh pekerja @ 55,000.00 30,250.00

0.0350 oh tukang batu @ 70,000.00 2,450.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH - 32,925.00 32,925.00

G.6.6.23 1M' MEMASANG PVC WATERSTOP LEBAR 300 MM

1.0500 m' waterstop lebar 300 mm @ -

0.5500 oh pekerja @ 55,000.00 30,250.00

0.0350 oh tukang batu @ 70,000.00 2,450.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH - 32,925.00 32,925.00

G.6.6.24 1M' MEMASANG PVC WATERSTOP LEBAR 320 MM

1.0500 m' waterstop lebar 320 mm @ -

0.0500 oh pekerja @ 55,000.00 2,750.00

0.0350 oh tukang batu @ 70,000.00 2,450.00

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH - 5,350.00 5,350.00

G.6.6.25 1 KG PEMBESIAN DG BESI POLOS

1.0500 Kg Besi beton @ 10,000.00 10,500.00

0.0150 Kg Kawat beton @ 19,600.00 294.00

0.0070 OH pekerja @ 55,000.00 385.00

0.0070 OH tukang besi @ 70,000.00 490.00

0.0007 OH kepala tukang @ 75,000.00 52.50

0.0003 OH mandor @ 75,000.00 22.50

@ JUMLAH 10,794.00 950.00 11,744.00

G.6.6.25 1 KG PEMBESIAN DG BESI ULIR

1.0500 Kg Besi beton @ 11,750.00 12,337.50

0.0150 Kg Kawat beton @ 19,600.00 294.00

0.0070 OH pekerja @ 55,000.00 385.00

0.0070 OH tukang besi @ 70,000.00 490.00

0.0007 OH kepala tukang @ 75,000.00 52.50

0.0003 OH mandor @ 75,000.00 22.50

@ JUMLAH 12,631.50 950.00 13,581.50

Page 10: RAB Siring

G.6.6.26 1 KG KABEL PRESSTRESSED POLOS/STRANDS

1.0500 Kg besi presstressed polos @ 10,000.00 10,500.00

0.0100 Kg Kawat beton @ 19,600.00 196.00

0.0050 OH pekerja @ 55,000.00 275.00

0.0050 OH tukang besi @ 70,000.00 350.00

0.0005 OH kepala tukang @ 75,000.00 37.50

0.0003 OH mandor @ 75,000.00 22.50

JUMLAH 10,696.00 685.00 11,381.00

G.6.6.27 1 KG JARING KAWAT BAJA

1.0200 Kg Besi jaring kawat baja @ 28,350.00 28,917.00

0.8050 Kg Kawat beton @ 19,600.00 15,778.00

0.0250 OH pekerja @ 55,000.00 1,375.00

0.0250 OH tukang besi @ 70,000.00 1,750.00

0.0025 OH kepala tukang @ 75,000.00 187.50

0.0015 OH mandor @ 75,000.00 112.50

JUMLAH 44,695.00 3,425.00 48,120.00

G.6.6.28 1M2 PASANG BEKISTING UNTUK PONDASI

0.0400 M3 kayu terentang @ 2,100,000.00 84,000.00

0.3000 Kg paku biasa 2' - 5' @ 16,650.00 4,995.00

0.1000 lt minyak bekisting @ 12,000.00 1,200.00

0.3000 OH pekerja @ 55,000.00 16,500.00

0.2600 OH tukang besi @ 70,000.00 18,200.00

0.0260 OH kepala tukang @ 75,000.00 1,950.00

0.0050 OH mandor @ 75,000.00 375.00

JUMLAH 90,195.00 37,025.00 127,220.00

G. 6.6.29 1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai )

0.0450 m3 papan kayu kelas 2 @ 2,500,000.00 112,500.00

0.3000 kg paku biasa 2' - 5' @ 16,650.00 4,995.00

0.1000 lt minyak bekisting @ 12,000.00 1,200.00

0.3000 OH pekerja @ 55,000.00 16,500.00

0.2600 OH tukang kayu @ 70,000.00 18,200.00

0.0260 OH kepala tukang @ 75,000.00 1,950.00

0.0050 OH mandor @ 75,000.00 375.00

JUMLAH 118,695.00 37,025.00 155,720.00

G. 6.6.30 1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai )

0.0400 m3 papan kayu kelas 2 @ 2,500,000.00 100,000.00

0.4000 kg paku biasa 2' - 5' @ 16,650.00 6,660.00

0.2000 lt minyak bekisting @ 12,000.00 2,400.00

0.0150 m3 balok kayu meranti @ 2,100,000.00 31,500.00

0.3500 lbr plywood tebal 9 mm @ 116,500.00 40,775.00

2.0000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 22,400.00 9500

0.3000 oh pekerja @ 55,000.00 16,500.00

0.3300 oh tukang kayu @ 70,000.00 23,100.00

0.0330 oh kepala tukang @ 75,000.00 2,475.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 203,735.00 42,525.00 246,260.00

Page 11: RAB Siring

G. 6.6.31 1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai )

0.0400 m3 papan kayu kelas 2 @ 2,500,000.00 100,000.00

0.4000 kg paku biasa 2' - 5' @ 16,650.00 6,660.00

0.2000 lt minyak bekisting @ 12,000.00 2,400.00

0.0180 m3 balok kayu meranti @ 2,100,000.00 37,800.00

0.3500 lbr plywood tebal 9 mm @ 116,500.00 40,775.00

2.0000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 22,400.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.3300 oh tukang kayu @ 70,000.00 23,100.00

0.0330 oh kepala tukang @ 75,000.00 2,475.00

0.0060 oh mandor @ 75,000.00 450.00

146,860.00 106,800.00 253,660.00

G. 6.6.32 1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai )

0.0400 m3 papan kayu kelas 2 @ 2,500,000.00 100,000.00

0.4000 kg paku biasa 2' - 5' @ 16,650.00 6,660.00

0.2000 lt minyak bekisting @ 12,000.00 2,400.00

0.0150 m3 balok kayu meranti @ 2,100,000.00 31,500.00

0.3500 lbr plywood tebal 9 mm @ 116,500.00 40,775.00

6.0000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 67,200.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.3300 oh tukang kayu @ 70,000.00 23,100.00

0.0330 oh kepala tukang @ 75,000.00 2,475.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 140,560.00 151,600.00 292,160.00

G. 6.6.33 1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai )

0.0300 m3 papan kayu kelas 2 @ 2,500,000.00 75,000.00

0.4000 kg paku biasa 2' - 5' @ 16,650.00 6,660.00

0.2000 lt minyak bekisting @ 12,000.00 2,400.00

0.0200 m3 balok kayu meranti @ 2,100,000.00 42,000.00

0.3500 lbr plywood tebal 9 mm @ 116,500.00 40,775.00

3.0000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 33,600.00

4.0000 bh formtie/penjaga jarak/spacer @ 55,000.00 220,000.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.3300 oh tukang kayu @ 70,000.00 23,100.00

0.0330 oh kepala tukang @ 75,000.00 2,475.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 420,435.00 43,625.00 464,060.00

Page 12: RAB Siring

G. 6.6.34 1 M2 PASANG BEKISTING UNTUK TANGGA

0.0300 m3 kayu terentang @ 2,100,000.00 63,000.00

0.4000 kg paku biasa 2' - 5' @ 16,650.00 6,660.00

0.1500 lt minyak bekisting @ 12,000.00 1,800.00

0.0150 m3 balok kayu meranti @ 2,100,000.00 31,500.00

0.3500 lbr plywood tebal 9 mm @ 116,500.00 40,775.00

2.0000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 22,400.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.3300 oh tukang kayu @ 70,000.00 23,100.00

0.0330 oh kepala tukang @ 75,000.00 2,475.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 166,135.00 43,625.00 209,760.00

G. 6.6.35.A 1M3 MEMBUAT BETON DENGAN MUTU K 225 EX. Lokal

388.0000 m3 Semen portland @ 1,270.00 492,760.00

0.6500 kg Pasir beton @ 280,000.00 182,000.00

0.6500 lt Batu Split ( ukuran 2-3 cm/1-2 )Ex.lokal @ 350,000.00 227,500.00

6.0000 oh pekerja @ 55,000.00 330,000.00

1.0000 oh tukang kayu @ 70,000.00 70,000.00

0.1000 oh kepala tukang @ 75,000.00 7,500.00

0.3000 oh mandor @ 75,000.00 22,500.00

JUMLAH 902,260.00 430,000.00 1,332,260.00

G. 6.6.36.A 1M3 MEMBUAT BETON DENGAN MUTU K 275 Ex.lokal

400.0000 m3 Semen portland @ 1,270.00 508,000.00

0.4000 kg Pasir beton @ 280,000.00 112,000.00

0.8200 lt Batu Split ( ukuran 2-3 cm/1-2 )Ex. Lokal @ 350,000.00 287,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

1.0000 oh tukang kayu @ 70,000.00 70,000.00

0.1000 oh kepala tukang @ 75,000.00 7,500.00

0.3000 oh mandor @ 75,000.00 22,500.00

JUMLAH 907,000.00 430,000.00 1,337,000.00

G. 6.6.35 1M3 MEMBUAT BETON DENGAN MUTU K 225 Ex.Palu

388.0000 m3 Semen portland @ 1,270.00 492,760.00

0.6500 kg Pasir beton @ 415,000.00 269,750.00

0.6500 lt Batu Split ( ukuran 2-3 cm/1-2 )Ex. Palu @ 415,000.00 269,750.00

6.0000 oh pekerja @ 55,000.00 330,000.00

1.0000 oh tukang kayu @ 70,000.00 70,000.00

0.1000 oh kepala tukang @ 75,000.00 7,500.00

0.3000 oh mandor @ 75,000.00 22,500.00

JUMLAH 1,032,260.00 430,000.00 1,462,260.00

G. 6.6.36 1M3 MEMBUAT BETON DENGAN MUTU K 275 Ex.Palu

400.0000 m3 Semen portland @ 1,270.00 508,000.00

0.4000 kg Pasir beton @ 415,000.00 166,000.00

0.8200 lt Batu Split ( ukuran 2-3 cm/1-2 )Ex. Palu @ 415,000.00 340,300.00

6.0000 oh pekerja @ 55,000.00 330,000.00

1.0000 oh tukang kayu @ 70,000.00 70,000.00

0.1000 oh kepala tukang @ 75,000.00 7,500.00

0.3000 oh mandor @ 75,000.00 22,500.00

JUMLAH 1,014,300.00 430,000.00 1,444,300.00

G. 6.6.37 1 M2 PASANG JEMBATAN COR

0.0264 m3 kayu terentang @ 2,100,000.00 55,440.00

0.6000 kg paku biasa 2' - 5' @ 16,650.00 9,990.00

Page 13: RAB Siring

0.5000 btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 5,600.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0500 oh tukang kayu @ 70,000.00 3,500.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 71,030.00 12,650.00 83,680.00

Page 14: RAB Siring

G. 6.6.38 1M3 MEMBUAT PONDASI BETON BERTULANG (100KG BESI + BEKISTING)

0.2000 m3 kayu terentang @ 2,100,000.00 420,000.00

1.5000 kg paku biasa 2' - 5' @ 16,650.00 24,975.00

0.4000 lt minyak bekisting @ 12,000.00 4,800.00

100.0000 kg besi beton polos @ 10,000.00 1,000,000.00

2.2500 kg kawat beton @ 19,600.00 44,100.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

3.9000 oh pekerja @ 55,000.00 214,500.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

1.0400 oh tukang kayu @ 70,000.00 72,800.00

1.0500 oh Tukang Besi @ 70,000.00 73,500.00

0.2450 oh kepala tukang @ 75,000.00 18,375.00

0.1650 oh mandor @ 75,000.00 12,375.00

JUMLAH 2,443,585.00 416,050.00 2,859,635.00

G. 6.6.39 1M3 MEMBUAT SLOOF BETON BERTULANG (100KG BESI + BEKISTING)

0.2700 m3 kayu terentang @ 2,100,000.00 567,000.00

2.0000 kg paku biasa 2' - 5' @ 16,650.00 33,300.00

0.6000 lt minyak bekisting @ 12,000.00 7,200.00

100.0000 kg besi beton polos @ 10,000.00 1,000,000.00

3.0000 kg kawat beton @ 19,600.00 58,800.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

4.8500 oh pekerja @ 55,000.00 266,750.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

1.5600 oh tukang kayu @ 70,000.00 109,200.00

1.4000 oh Tukang Besi @ 70,000.00 98,000.00

0.3310 oh kepala tukang @ 75,000.00 24,825.00

0.1700 oh mandor @ 75,000.00 12,750.00

JUMLAH 2,616,010.00 536,025.00 3,152,035.00

Page 15: RAB Siring

G. 6.6.40 1M3 MEMBUAT KOLOM BETON BERTULANG (90KG BESI + BEKISTING)

0.4000 m3 kayu terentang @ 2,100,000.00 840,000.00

4.0000 kg paku biasa 2' - 5' @ 16,650.00 66,600.00

2.0000 lt minyak bekisting @ 12,000.00 24,000.00

90.0000 kg besi beton polos @ 10,000.00 900,000.00

4.5000 kg kawat beton @ 19,600.00 88,200.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

0.1500 m3 Kayu meranti balok @ 2,100,000.00 315,000.00

3.5000 lbr Plywood 9 mm @ 116,500.00 407,750.00

20.0000 Btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 224,000.00

7.3000 oh pekerja @ 55,000.00 401,500.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

3.3000 oh tukang kayu @ 70,000.00 231,000.00

2.1000 oh Tukang Besi @ 70,000.00 147,000.00

0.5700 oh kepala tukang @ 75,000.00 42,750.00

0.2500 oh mandor @ 75,000.00 18,750.00

JUMLAH 3,815,260.00 865,500.00 4,680,760.00

G. 6.6.41 1M3 MEMBUAT BALOK BETON BERTULANG (80KG BESI + BEKISTING)

0.3200 m3 kayu terentang @ 2,100,000.00 672,000.00

3.2000 kg paku biasa 2' - 5' @ 16,650.00 53,280.00

1.6000 lt minyak bekisting @ 12,000.00 19,200.00

80.0000 kg besi beton polos @ 10,000.00 800,000.00

3.0000 kg kawat beton @ 19,600.00 58,800.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

0.1400 m3 Kayu meranti balok @ 2,100,000.00 294,000.00

2.8000 lbr Plywood 9 mm @ 116,500.00 326,200.00

16.0000 Btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 179,200.00

5.9600 oh pekerja @ 55,000.00 327,800.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

2.8000 oh tukang kayu @ 70,000.00 196,000.00

1.4000 oh Tukang Besi @ 70,000.00 98,000.00

0.4550 oh kepala tukang @ 75,000.00 34,125.00

0.2080 oh mandor @ 75,000.00 15,600.00

JUMLAH 3,352,390.00 696,025.00 4,048,415.00

Page 16: RAB Siring

G. 6.6.42 1M3 MEMBUAT BALOK BETON BERTULANG (100KG BESI + BEKISTING)

0.3200 m3 kayu terentang @ 2,100,000.00 672,000.00

3.2000 kg paku biasa 2' - 5' @ 16,650.00 53,280.00

1.6000 lt minyak bekisting @ 12,000.00 19,200.00

100.0000 kg besi beton polos @ 10,000.00 1,000,000.00

2.2500 kg kawat beton @ 19,600.00 44,100.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

0.1200 m3 Kayu meranti balok @ 2,100,000.00 252,000.00

2.8000 lbr Plywood 9 mm @ 116,500.00 326,200.00

32.0000 Btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 358,400.00

5.8000 oh pekerja @ 55,000.00 319,000.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

2.8000 oh tukang kayu @ 70,000.00 196,000.00

1.0500 oh Tukang Besi @ 70,000.00 73,500.00

0.4200 oh kepala tukang @ 75,000.00 31,500.00

0.1850 oh mandor @ 75,000.00 13,875.00

JUMLAH 3,674,890.00 658,375.00 4,333,265.00

G. 6.6.43 1M3 MEMBUAT DINDING BETON BERTULANG (120 KG BESI + BEKISTING)

0.2400 m3 kayu terentang @ 2,100,000.00 504,000.00

3.2000 kg paku biasa 2' - 5' @ 16,650.00 53,280.00

1.6000 lt minyak bekisting @ 12,000.00 19,200.00

120.0000 kg besi beton polos @ 10,000.00 1,200,000.00

2.2500 kg kawat beton @ 19,600.00 44,100.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

0.1600 m3 Kayu meranti balok @ 2,100,000.00 336,000.00

2.8000 lbr Plywood 9 mm @ 116,500.00 326,200.00

24.0000 Btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 268,800.00

5.6000 oh pekerja @ 55,000.00 308,000.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

2.6400 oh tukang kayu @ 70,000.00 184,800.00

1.0500 oh Tukang Besi @ 70,000.00 73,500.00

0.4000 oh kepala tukang @ 75,000.00 30,000.00

0.1930 oh mandor @ 75,000.00 14,475.00

JUMLAH 3,701,290.00 635,275.00 4,336,565.00

Page 17: RAB Siring

G. 6.6.44 1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING)

0.2500 m3 kayu terentang @ 2,100,000.00 525,000.00

3.0000 kg paku biasa 2' - 5' @ 16,650.00 49,950.00

1.2000 lt minyak bekisting @ 12,000.00 14,400.00

200.0000 kg besi beton polos @ 10,000.00 2,000,000.00

3.0000 kg kawat beton @ 19,600.00 58,800.00

323.0000 kg Semen portland @ 1,270.00 410,210.00

0.5200 m3 Pasir beton @ 415,000.00 215,800.00

0.7800 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 323,700.00

0.1050 m3 Kayu meranti balok @ 2,100,000.00 220,500.00

2.5000 lbr Plywood 9 mm @ 116,500.00 291,250.00

14.0000 Btg dolken kayu galam dia 8 - 10/4 @ 11,200.00 156,800.00

5.6000 oh pekerja @ 55,000.00 308,000.00

0.3500 oh Tukang batu @ 70,000.00 24,500.00

2.3000 oh tukang kayu @ 70,000.00 161,000.00

1.4000 oh Tukang Besi @ 70,000.00 98,000.00

0.4050 oh kepala tukang @ 75,000.00 30,375.00

0.2020 oh mandor @ 75,000.00 15,150.00

JUMLAH 4,266,410.00 637,025.00 4,903,435.00

G. 6.6.45 1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM

0.0020 m3 kayu terentang @ 2,100,000.00 4,200.00

0.0100 kg paku biasa 2' - 5' @ 16,650.00 166.50

3.0000 kg besi beton polos @ 10,000.00 30,000.00

0.4500 kg kawat beton @ 19,600.00 8,820.00

4.0000 kg Semen portland @ 1,270.00 5,080.00

0.0060 m3 Pasir beton @ 415,000.00 2,490.00

0.0090 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 3,735.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0200 oh Tukang batu @ 70,000.00 1,400.00

0.0200 oh tukang kayu @ 70,000.00 1,400.00

0.0200 oh Tukang Besi @ 70,000.00 1,400.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 54,491.50 8,175.00 62,666.50

Page 18: RAB Siring

G. 6.6.46 1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM

0.0030 m3 Kayu meranti, balok @ 2,100,000.00 6,300.00

0.0200 kg paku biasa 2' - 5' @ 16,650.00 333.00

3.6000 kg besi beton polos @ 10,000.00 36,000.00

0.0500 kg kawat beton @ 19,600.00 980.00

5.5000 kg Semen portland @ 1,270.00 6,985.00

0.0090 m3 Pasir beton @ 415,000.00 3,735.00

0.0150 m3 Batu Split ( ukuran 2-3 cm/1-2 ) @ 415,000.00 6,225.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0330 oh Tukang batu @ 70,000.00 2,310.00

0.0330 oh tukang kayu @ 70,000.00 2,310.00

0.0330 oh Tukang Besi @ 70,000.00 2,310.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 60,558.00 13,555.00 74,113.00

H. PEKERJAAN PENUTUP ATAP

H. 6.6.1 1M2 PASANG ATAP GENTENG PALENTONG KECIL

25.0000 bh genteng palentong @ -

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH - 14,700.00 14,700.00

H. 6.6.2 1M2 PASANG ATAP GENTENG KODOK /GLAZZUR

25.0000 bh genteng kodok @ 2,500.00 62,500.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 62,500.00 14,700.00 77,200.00

H. 6.6.3 1M2 PASANG ATAP GENTENG KERAMIK

10.0000 bh genteng keramik Setara M Clas, KIA @ 7,500.00 75,000.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0600 oh tukang kayu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 75,000.00 13,500.00 88,500.00

H. 6.6.4 1M2 PASANG ATAP GENTENG BUBUNGAN KERAMIK

3.0000 bh genteng bubung @ 17,500.00 52,500.00

8.0000 kg Semen Portland @ 1,270.00 10,160.00

0.0320 m3 Pasir pasang @ 280,000.00 8,960.00

0.4000 oh pekerja @ 55,000.00 22,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH 71,620.00 37,650.00 109,270.00

Page 19: RAB Siring

H. 6.6.5 1M' PASANG BUBUNG GENTENG KODOK

5.0000 bh genteng bubung kodok @ 20,300.00 101,500.00

8.0000 kg Semen Portland @ 1,270.00 10,160.00

0.0320 m3 Pasir pasang @ 280,000.00 8,960.00

0.4000 oh pekerja @ 55,000.00 22,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH 120,620.00 37,650.00 158,270.00

H. 6.6.6 1M2 PASANG BUBUNG GENTENG PALENTONG BESAR

4.0000 bh genteng bubung palentong @ - -

8.0000 kg Semen Portland @ 1,270.00 10,160.00

0.0320 m3 Pasir pasang @ 280,000.00 8,960.00

0.4000 oh pekerja @ 55,000.00 22,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0020 oh mandor @ 75,000.00 150.00

JUMLAH 14,866.14 30,320.00 45,186.14

H. 6.6.7 1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM

0.6000 bh Roof light fibreglass @ - -

0.0500 kg paku biasa 1/2" - 1" @ 16,650.00 832.50

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 591.25 10,825.00 11,416.25

H. 6.6.8 1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM

0.5000 lbr asbes gelombang @ 35,200.00 17,600.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 19,598.00 14,150.00 33,748.00

H. 6.6.9 1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM

0.6000 lbr asbes gelombang @ 35,200.00 21,120.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 23,118.00 14,150.00 37,268.00

Page 20: RAB Siring

H. 6.6.10 1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM

0.6000 lbr asbes gelombang @ 35,200.00 21,120.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 23,118.00 14,000.00 37,118.00

H. 6.6.11 1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM

0.7500 lbr asbes gelombang @ 33,000.00 24,750.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 26,748.00 14,000.00 40,748.00

H. 6.6.12 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM

0.3500 lbr asbes gelombang @ 35,200.00 12,320.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 14,318.00 14,000.00 28,318.00

H. 6.6.13 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM

0.4200 lbr asbes gelombang @ 35,200.00 14,784.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 16,782.00 14,000.00 30,782.00

H. 6.6.14 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM

0.4400 lbr asbes gelombang @ 35,200.00 15,488.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 17,486.00 13,440.00 30,926.00

Page 21: RAB Siring

H. 6.6.15 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM

0.5100 lbr asbes gelombang @ 35,200.00 17,952.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 19,950.00 13,440.00 33,390.00

H. 6.6.16 1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM

0.8000 lbr asbes gelombang @ 35,200.00 28,160.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 30,158.00 13,440.00 43,598.00

H. 6.6.17 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM

0.3700 lbr asbes gelombang @ 35,200.00 13,024.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 15,022.00 13,440.00 28,462.00

H. 6.6.18 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM

0.3800 lbr asbes gelombang @ 35,200.00 13,376.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 15,374.00 13,440.00 28,814.00

H. 6.6.19 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM

0.4600 lbr asbes gelombang @ 35,200.00 16,192.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 18,190.00 13,440.00 31,630.00

Page 22: RAB Siring

H. 6.6.20 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM

0.4900 lbr asbes gelombang @ 35,200.00 17,248.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 19,246.00 13,440.00 32,686.00

H. 6.6.21 1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM

0.5700 lbr asbes gelombang @ 35,200.00 20,064.00

0.1200 kg paku pancing 60 x 230 @ 16,650.00 1,998.00

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0670 oh tukang kayu @ 70,000.00 4,690.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 22,062.00 13,440.00 35,502.00

H. 6.6.22 1M' PASANG BUBUNG STEL GELOMBANG 0,92 M

2.4000 lbr bubung stel gelombang @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00

H. 6.6.23 1M' PASANG NOK STEL GELOMBANG 1,05 M

2.1000 lbr nok stel gelombang @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00 ###

H. 6.6.24 1M' PASANG NOK STEL GELOMBANG 1,08 M

2.0500 lbr nok stel gelombang @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00

Page 23: RAB Siring

H. 6.6.25 1M' PASANG NOK paten 0,92 m

1.2000 lbr nok paten @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00

H. 6.6.26 1M' PASANG NOK PATEN 1,05 M

1.2000 lbr nok paten @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00

H. 6.6.27 1M' PASANG NOK PATEN 1,08 M

1.2000 lbr nok paten @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.0840 oh pekerja @ 55,000.00 4,620.00

0.1250 oh tukang kayu @ 70,000.00 8,750.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 14,645.00 83,645.00

H. 6.6.28 1M' PASANG NOK STEL RATA 0,92 M

1.1000 lbr nok stel rata @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1500 oh tukang kayu @ 70,000.00 10,500.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 17,275.00 86,275.00

H. 6.6.29 1M' PASANG NOK STEL RATA 1,05 M

1.1000 lbr nok stel rata @ - -

6.0000 bh paku skrup 3,5" @ 11,500.00 69,000.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1500 oh tukang kayu @ 70,000.00 10,500.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 69,000.00 17,275.00 86,275.00

Page 24: RAB Siring

H. 6.6.30 1M2 PASANG ATAP GENTENG BETON

11.0000 bh genteng beton @ 3,500.00 38,500.00

0.0300 kg Paku biasa 2" - 5" @ 16,650.00 499.50

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 38,999.50 19,500.00 58,499.50

H. 6.6.31 1M2 PASANG ATAP GENTENG ASPAL

6.9000 lbr genteng aspal @ 2,500.00 17,250.00

0.3500 lbr Plywood 4" x 8" x 6 mm @ 79,000.00 27,650.00

0.0300 kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.5000 bh Plastic aerator @ 1,200.00 600.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.3000 oh tukang kayu @ 70,000.00 21,000.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 45,999.50 32,975.00 78,974.50

H. 6.6.32 1M2 PASANG ATAP GENTENG METAL

1.4200 lbr genteng metal @ 40,900.00 58,078.00

0.2000 kg Paku paku atap metal @ 29,200.00 5,840.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0010 oh mandor @ 75,000.00 75.00

JUMLAH 63,918.00 18,825.00 82,743.00

H. 6.6.33 1M' PASANG ATAP SIRAP

60.0000 bh genteng sirap @ 1,500.00 90,000.00

0.2000 kg paku biasa 1/2" - 1" @ 16,650.00 3,330.00

0.1660 oh pekerja @ 55,000.00 9,130.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 93,330.00 29,105.00 122,435.00

H. 6.6.34 1M' PASANG NOK GENTENG BETON

3.5000 bh nok genteng beton @ 5,000.00 17,500.00

0.0500 kg Paku pancing @ 30,250.00 1,512.50

10.8000 kg Semen abu - abu @ 1,270.00 13,716.00

0.0320 m3 Pasir pasang @ 280,000.00 8,960.00

1.0000 kg Semen warna @ 13,500.00 13,500.00

0.4000 oh pekerja @ 55,000.00 22,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0200 oh mandor @ 75,000.00 1,500.00

JUMLAH 55,188.50 39,000.00 94,188.50

Page 25: RAB Siring

H. 6.6.35 1M' PASANG NOK GENTENG ASPAL

2.0000 bh genteng aspal @ 2,500.00 5,000.00

0.0500 kg paku seng @ 26,350.00 1,317.50

0.0035 m3 kayu meranti, balok @ 2,100,000.00 7,350.00

0.1250 oh pekerja @ 55,000.00 6,875.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 13,667.50 26,700.00 40,367.50

H. 6.6.36 1M' PASANG NOK GENTENG METAL

1.1000 bh genteng decra bond @ - -

0.0500 kg paku biasa 1/2" - 1" @ 16,650.00 832.50

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1500 oh tukang kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 832.50 26,350.00 27,182.50

H. 6.6.37 1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm

0.4000 lbr seng plat @ 53,600.00 21,440.00

0.1100 kg paku seng @ 26,350.00 2,898.50

0.0040 oh kayu meranti papan 3 cm @ 2,100,000.00 8,400.00

0.1250 oh pekerja @ 55,000.00 6,875.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 32,738.50 26,700.00 59,438.50

H. 6.6.38 1 M2 MEMASANG ATAP SENG

0.7000 lbr seng gelombang bjls @ 40,900.00 28,630.00

0.0200 kg paku seng @ 26,350.00 527.00

0.1200 oh pekerja @ 55,000.00 6,600.00

0.0600 oh tukang kayu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 29,157.00 11,700.00 40,857.00

H. 6.6.39 1 M2 MEMASANG BUBUNGAN ATAP SENG

1.1000 lbr seng plat @ 53,600.00 58,960.00

0.0500 kg paku seng @ 26,350.00 1,317.50

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 60,277.50 27,850.00 88,127.50

Page 26: RAB Siring

H. 6.6.40 1 M2 PASANG ATAP ALUMUNIUM

1.0500 m2 atap alumunium gelombang tebal 0,55 @ 154,000.00 161,700.00

0.0200 kg paku hak panjang 15 cm @ 26,350.00 527.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.7500 oh tukang kayu @ 70,000.00 52,500.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH 162,227.00 61,800.00 224,027.00

H. 6.6.41 1 M2 PASANG NOK ALUMUNIUM

1.2000 m2 Nok standar 40 cm 18, swg 22 @ 154,000.00 184,800.00

0.0400 kg paku hak panjang 15 cm @ 26,350.00 1,054.00

0.1000 oh pekerja @ 55,000.00 5,500.00

1.0000 oh tukang kayu @ 70,000.00 70,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 185,854.00 77,000.00 262,854.00

H. 6.6.42 1 M2 PASANG ALUMUNIUM FOIL /SISALATION

1.0500 lbr Sisalation / alumunium foil @ 605,000.00 635,250.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0500 oh tukang kayu @ 70,000.00 3,500.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0080 oh mandor @ 75,000.00 600.00

JUMLAH 635,250.00 12,725.00 647,975.00

I. PEKERJAAN PLAFOND

I. 6.6.1 1 M2 GRC (1,00 X 1,00) M, TEBAL 9 MM

1.1000 lbr pelat GRC 6 mm @ 143,000.00 157,300.00

0.0100 kg paku plywood @ 23,500.00 235.00

0.0300 oh pekerja @ 55,000.00 1,650.00

0.0700 oh tukang kayu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0015 oh mandor @ 75,000.00 112.50

JUMLAH 157,535.00 7,187.50 164,722.50

I. 6.6.2 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM

1.1000 lbr pelat asbes tebal 5 mm @ 143,000.00 157,300.00

0.0100 kg paku plywood @ 23,500.00 235.00

0.0300 oh pekerja @ 55,000.00 1,650.00

0.0700 oh tukang kayu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0015 oh mandor @ 75,000.00 112.50

JUMLAH 157,535.00 7,187.50 164,722.50

Page 27: RAB Siring

I. 6.6.3 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM

1.1000 lbr pelat asbes tebal 4 mm @ 44,500.00 48,950.00

0.0100 kg paku plywood @ 23,500.00 235.00

0.0300 oh pekerja @ 55,000.00 1,650.00

0.0700 oh tukang kayu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0015 oh mandor @ 75,000.00 112.50

JUMLAH 49,185.00 7,187.50 56,372.50

I. 6.6.4 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM

1.1000 lbr pelat asbes tebal 5 mm @ 44,500.00 48,950.00

0.0100 kg paku plywood @ 23,500.00 235.00

0.0300 oh pekerja @ 55,000.00 1,650.00

0.0700 oh tukang kayu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0015 oh mandor @ 75,000.00 112.50

JUMLAH 49,185.00 7,187.50 56,372.50

I. 6.6.5 1 M2 PLAFOND AKUSTIK (30 X 30) CM

11.5000 lbr akustik ukuran 30 x 30 cm @ -

0.0500 kg paku plywood @ 23,500.00 1,175.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.1200 oh tukang kayu @ 70,000.00 8,400.00

0.1200 oh kepala tukang @ 75,000.00 9,000.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 1,175.00 20,925.00 22,100.00

I. 6.6.6 1 M2 PLAFOND AKUSTIK (30 X 60) CM

5.8000 lbr akustik ukuran 30 x 60 cm @ -

0.0500 kg paku plywood @ 23,500.00 1,175.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 1,175.00 11,275.00 12,450.00

I. 6.6.7 1 M2 PLAFOND AKUSTIK (60 X 120) CM

1.5000 lbr akustik arm strong 60 x 120 cm @ -

0.0500 kg paku plywood @ 23,500.00 1,175.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 1,175.00 11,275.00 12,450.00

Page 28: RAB Siring

I. 6.6.8 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM

0.3600 lbr Plywood 4mm @ 56,500.00 20,340.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 21,045.00 11,862.50 32,907.50

I. 6.6.9 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM

0.3600 lbr Plywood 6mm @ 116,500.00 41,940.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 42,645.00 11,862.50 54,507.50

I. 6.6.10 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM

0.3750 lbr Plywood 2mm @ 44,600.00 16,725.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 17,430.00 11,862.50 29,292.50

I. 6.6.11 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM

0.3750 lbr Plywood 6mm @ 79,000.00 29,625.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 30,330.00 11,862.50 42,192.50

I. 6.6.12 1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM

0.3600 lbr Teakwood 4 mm @ 99,300.00 35,748.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 36,453.00 11,862.50 48,315.50

Page 29: RAB Siring

I. 6.6.13 1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM

0.3750 lbr Teakwood 4 mm @ 120,200.00 45,075.00

0.0300 kg paku plywood @ 23,500.00 705.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0035 oh mandor @ 75,000.00 262.50

JUMLAH 45,780.00 11,862.50 57,642.50

I. 6.6.14 1M2 PLAFOND LAT KAYU JATI, PAPAN

0.0240 lbr Kayu jati, papan @ 7,000,000.00 168,000.00

0.0100 Kg paku biasa @ 16,650.00 166.50

0.0500 kg paku sekrup @ 11,500.00 575.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 168,741.50 30,250.00 198,991.50

I. 6.6.15 1M2 PLAFOND LAT KAYU MERANTI

0.0240 lbr Kayu meranti, papan @ 2,100,000.00 50,400.00

0.0100 Kg paku biasa @ 16,650.00 166.50

0.0500 kg paku sekrup @ 11,500.00 575.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 51,141.50 30,250.00 81,391.50

I. 6.6.16 1M2 PLAFOND LAT KAYU BENGKIRAI

0.0240 lbr Kayu bengkirai, papan @ 3,500,000.00 84,000.00

0.0100 Kg paku biasa @ 16,650.00 166.50

0.0500 kg paku sekrup @ 11,500.00 575.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH 84,741.50 30,250.00 114,991.50

I. 6.6.17 1M2 PLAFOND SOFTBOARD

0.3500 lbr Softboard 4' x 8' x 4 mm @ -

0.0300 Kg paku biasa @ 16,650.00 499.50

0.6000 oh pekerja @ 55,000.00 33,000.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 499.50 40,975.00 41,474.50

Page 30: RAB Siring

I. 6.6.18 1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM

3.6000 M' Profil alumunium T @ -

0.1500 kg Kawat seng polos @ -

1.0000 bh Ramset / dina bold @ -

1.5000 lbr akustik arm strong 60 x 120 cm @ - -

0.1500 oh pekerja @ 55,000.00 8,250.00

0.5000 oh tukang kayu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0075 oh mandor @ 75,000.00 562.50

JUMLAH - 47,562.50 47,562.50

I. 6.6.19 1M2 PLAFOND KAYU PROFIL

1.1000 lbr List kayu profil bengkirai @ 10,300.00 11,330.00

0.0100 Kg paku biasa @ 16,650.00 166.50

0.0500 oh pekerja @ 55,000.00 2,750.00

0.0500 oh tukang kayu @ 70,000.00 3,500.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 11,496.50 6,850.00 18,346.50

I. 6.6.20 1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI

0.0120 m3 kayu meranti @ 2,100,000.00 25,200.00

0.0600 Kg paku biasa @ 16,650.00 999.00

1.1000 lbr asbes 1,00 x 1,00 m @ 44,500.00 48,950.00

0.1800 oh pekerja @ 55,000.00 9,900.00

0.3200 oh tukang kayu @ 70,000.00 22,400.00

0.0320 oh kepala tukang @ 75,000.00 2,400.00

0.0090 oh mandor @ 75,000.00 675.00

JUMLAH 75,149.00 35,375.00 110,524.00

I. 6.6.21 1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI

0.0230 m3 kayu meranti @ 2,100,000.00 48,300.00

0.0600 kg paku biasa @ 16,650.00 999.00

0.3900 lbr Plywood 4' x 8' x 4mm @ 56,500.00 22,035.00

0.2700 oh pekerja @ 55,000.00 14,850.00

0.4000 oh tukang kayu @ 70,000.00 28,000.00

0.0400 oh kepala tukang @ 75,000.00 3,000.00

0.0135 oh mandor @ 75,000.00 1,012.50

JUMLAH 71,334.00 46,862.50 118,196.50

I. 6.6.22 1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI

0.0230 m3 kayu meranti @ 2,100,000.00 48,300.00

0.0600 kg paku biasa @ 16,650.00 999.00

5.8000 bh akustik 30 x 60 cm @ - -

0.2600 oh pekerja @ 55,000.00 14,300.00

0.4000 oh tukang kayu @ 70,000.00 28,000.00

0.0400 oh kepala tukang @ 75,000.00 3,000.00

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 49,299.00 46,275.00 95,574.00

Page 31: RAB Siring

I. 6.6.23 1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI

0.0270 m3 kayu meranti, balok @ 2,100,000.00 56,700.00

0.0600 kg paku @ 16,650.00 999.00

11.5000 bh akustik 30 x30 cm @ - -

0.3100 oh pekerja @ 55,000.00 17,050.00

0.4700 oh tukang kayu @ 70,000.00 32,900.00

0.0470 oh kepala tukang @ 75,000.00 3,525.00

0.0155 oh mandor @ 75,000.00 1,162.50

JUMLAH 57,699.00 54,637.50 112,336.50

I. 6.6.24 1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM

0.3640 lbr Gypsum board ( 120 x 240 x 9 ) mm @ 48,800.00 17,763.20

0.1100 kg paku sekrup @ 11,500.00 1,265.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0500 oh tukang kayu @ 70,000.00 3,500.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 19,028.20 9,750.00 28,778.20

J. PEKERJAAN SANITAIR

J. 6.6.1 MEMASANG 1 BH CLOSED DUDUK / MONOBLOK Ex. Toto

1.0000 bh closed duduk monoblok @ 2,400,000.00 2,400,000.00

6.0000 % perlengkapan (6 % harga klosed) @ 144,000.00 144,000.00

3.3000 oh pekerja @ 55,000.00 181,500.00

1.1000 oh tukang kayu @ 70,000.00 77,000.00

0.0010 oh kepala tukang @ 75,000.00 75.00

0.1600 oh mandor @ 75,000.00 12,000.00

JUMLAH 2,544,000.00 270,575.00 2,814,575.00

J. 6.6.2 MEMASANG 1 BH CLOSED JONGKOK KERAMIK

1.0000 bh closed jongkok keramik @ 146,600.00 146,600.00

6.0000 kg semen portland @ 1,270.00 7,620.00

0.0100 m3 pasir pasang @ 280,000.00 2,800.00

1.0000 oh pekerja @ 55,000.00 55,000.00

1.5000 oh tukang kayu @ 70,000.00 105,000.00

1.5000 oh kepala tukang @ 75,000.00 112,500.00

0.1600 oh mandor @ 75,000.00 12,000.00

JUMLAH 157,020.00 284,500.00 441,520.00

J. 6.6.3 MEMASANG 1 BH CLOSED JONGKOK TERASO

1.0000 bh closed jongkok teraso @ 211,800.00 211,800.00

7.0000 bh Bata Merah @ 900.00 6,300.00

6.0000 Kg semen portland @ 1,270.00 7,620.00

0.0100 m3 pasir pasang @ 280,000.00 2,800.00

1.0000 oh Pekerja @ 55,000.00 55,000.00

1.5000 oh Tukang Batu @ 70,000.00 105,000.00

0.3000 oh kepala tukang @ 75,000.00 22,500.00

0.1100 oh mandor @ 75,000.00 8,250.00

JUMLAH 228,520.00 190,750.00 419,270.00 Hal : 467

Page 32: RAB Siring

J. 6.6.4 MEMASANG 1 BH URINOIR

1.0000 bh urinoir @ 1,865,500.00 1,865,500.00

30.0000 % Perlengkapan @ 559,650.00 559,650.00

6.0000 Kg Semen Portland @ 1,270.00 7,620.00

0.0100 m3 Pasir Pasang @ 280,000.00 2,800.00

1.0000 oh pekerja @ 55,000.00 55,000.00

1.0000 oh Tukang Batu @ 70,000.00 70,000.00

0.1000 oh kepala tukang @ 75,000.00 7,500.00

0.1000 oh mandor @ 75,000.00 7,500.00

- 2,435,570.00 140,000.00 2,575,570.00

J. 6.6.5 MEMASANG 1 BH WASTAFEL -

1.0000 bh Wastafel @ 1,865,500.00 1,865,500.00

12.0000 % Perlengkapan @ 559,650.00 559,650.00

6.0000 Kg Semen Portland @ 1,270.00 7,620.00

0.0100 m3 pasir pasang @ 280,000.00 2,800.00

1.2000 oh pekerja @ 55,000.00 66,000.00

1.4500 oh Tukang Batu @ 70,000.00 101,500.00

0.1500 oh kepala tukang @ 75,000.00 11,250.00

0.1000 oh mandor @ 75,000.00 7,500.00

JUMLAH 2,435,570.00 186,250.00 2,621,820.00

J. 6.6.6 MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3

1.0000 bh Bak Teraso @ 185,000.00 185,000.00

6.0000 Kg semen portland @ 1,270.00 7,620.00

0.0100 m3 pasir pasang @ 280,000.00 2,800.00

2.1000 oh pekerja @ 55,000.00 115,500.00

0.7500 oh Tukang Batu @ 70,000.00 52,500.00

0.0700 oh kepala tukang @ 75,000.00 5,250.00

0.1100 oh mandor @ 75,000.00 8,250.00

JUMLAH 195,420.00 181,500.00 376,920.00

J. 6.6.7 MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3

1.0000 bh Bak Fiberglass @ 500,000.00 500,000.00

18.0000 % Perlengkapan @ 90,000.00 90,000.00

1.8000 oh pekerja @ 55,000.00 99,000.00

2.7000 oh Tukang Batu @ 70,000.00 189,000.00

0.5400 oh kepala tukang @ 75,000.00 40,500.00

0.1100 oh mandor @ 75,000.00 8,250.00

JUMLAH 590,000.00 336,750.00 926,750.00

J. 6.6.8 MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 )

2.4000 0.4000 bh batu bata @ 900.00 360.00

0.012 120.0000 kg semen portland @ 1,270.00 152,400.00

0.3000 m3 pasir pasang @ 280,000.00 84,000.00

360.0000 Bh Porselen ( 11x11)cm @ 2,500.00 900,000.00

6.0000 kg Semen nat @ 12,000.00 72,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

3.0000 oh tukang batu @ 70,000.00 210,000.00

0.3000 oh kepala tukang @ 75,000.00 22,500.00

0.3000 oh mandor @ 75,000.00 22,500.00

JUMLAH 1,208,760.00 585,000.00 1,793,760.00

Page 33: RAB Siring

J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN

1.0000 bh Badkip @ -

6.0000 % Perlengkapan @ - -

- oh pekerja @ 55,000.00 -

0.0750 oh Tukang Batu @ 70,000.00 5,250.00

0.7500 oh kepala tukang @ 75,000.00 56,250.00

0.2500 oh mandor @ 75,000.00 18,750.00

JUMLAH - 80,250.00 80,250.00

J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN

1.0000 bh Badkip @ - -

6.0000 % Perlengkapan @ - -

- oh pekerja @ 55,000.00 -

0.0750 oh Tukang Batu @ 70,000.00 5,250.00

0.7500 oh kepala tukang @ 75,000.00 56,250.00

0.2500 oh mandor @ 75,000.00 18,750.00

JUMLAH - 80,250.00 80,250.00

J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN

1.0000 bh Badkip @ - -

6.0000 % Perlengkapan @ - -

- oh pekerja @ 55,000.00 -

0.0750 oh Tukang Batu @ 70,000.00 5,250.00

0.7500 oh kepala tukang @ 75,000.00 56,250.00

0.2500 oh mandor @ 75,000.00 18,750.00

JUMLAH - 80,250.00 80,250.00

J. 6.6.10 MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR

0.9000 m3 Beton 1 : 1,5 : 2,5 @ 1,120,125.00 1,008,112.50

180.0000 kg Besi Beton @ 10,000.00 1,800,000.00

8.0000 m3 kayu cetakan @ 240,000.00 1,920,000.00

5.0000 m2 Ubin Porselen @ 70,000.00 350,000.00

10.0000 % Perlengkapan @ 7,000.00 70,000.00

3.5000 oh pekerja @ 55,000.00 192,500.00

4.5000 oh Tukang Batu @ 70,000.00 315,000.00

0.9000 oh kepala tukang @ 75,000.00 67,500.00

0.9000 oh mandor @ 75,000.00 67,500.00

JUMLAH 5,148,112.50 642,500.00 5,790,612.50

J. 6.6.11 MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR

1.0000 bh Bak Fiberglass @ 450,000.00 450,000.00

12.0000 % Perlengkapan @ 54,000.00 54,000.00

3.0000 oh pekerja @ 55,000.00 165,000.00

4.5000 oh Tukang Batu @ 70,000.00 315,000.00

0.9000 oh kepala tukang @ 75,000.00 67,500.00

0.9000 oh mandor @ 75,000.00 67,500.00

JUMLAH 504,000.00 615,000.00 1,119,000.00

Page 34: RAB Siring

J. 6.6.12 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM

1.6000 bh Pipa tanah @ 71,500.00 114,400.00

0.6800 kg Semen Portland @ 1,270.00 863.60

0.0130 m3 pasir pasang @ 280,000.00 3,640.00

0.0110 m3 pasir urug @ 51,900.00 570.90

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh Tukang Batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 119,474.50 5,812.50 125,287.00

J. 6.6.13 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM

1.6000 bh Pipa tanah @ 26,000.00 41,600.00

0.8700 kg Semen Portland @ 1,270.00 1,104.90

0.0140 m3 pasir pasang @ 280,000.00 3,920.00

0.0140 m3 pasir urug @ 51,900.00 726.60

0.0800 oh pekerja @ 55,000.00 4,400.00

0.0400 oh Tukang Batu @ 70,000.00 2,800.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 47,351.50 8,025.00 55,376.50

J. 6.6.14 MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM

1.1000 bh pipa beton @ - -

0.0270 m3 Batu bata @ 900.00 24.30

3.9200 kg Semen Portland @ 1,270.00 4,978.40

0.0560 m3 pasir pasang @ 280,000.00 15,680.00

0.0240 m3 pasir urug @ 51,900.00 1,245.60

0.1400 oh pekerja @ 55,000.00 7,700.00

0.0700 oh Tukang Batu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ 75,000.00 525.00

0.0070 oh mandor @ 75,000.00 525.00

JUMLAH 21,928.30 13,650.00 35,578.30

J. 6.6.15 MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM

1.1000 bh pipa beton @ 626,000.00 688,600.00

0.5500 m3 Batu bata @ 900.00 495.00

10.3000 kg Semen Portland @ 1,270.00 13,081.00

0.0610 m3 pasir pasang @ 280,000.00 17,080.00

0.0690 m3 pasir urug @ 51,900.00 3,581.10

0.3800 oh pekerja @ 55,000.00 20,900.00

0.1900 oh Tukang Batu @ 70,000.00 13,300.00

0.0190 oh kepala tukang @ 75,000.00 1,425.00

0.0190 oh mandor @ 75,000.00 1,425.00

JUMLAH 722,837.10 37,050.00 759,887.10

Page 35: RAB Siring

J. 6.6.16 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 CM

0.1450 bh Batu bata @ 900.00 130.50

44.0000 m3 Semen Portland @ 1,270.00 55,880.00

0.0700 kg pasir pasang @ 280,000.00 19,600.00

0.0700 m3 Batu kerikil @ 263,000.00 18,410.00

1.6000 kg Besi Beton @ 10,000.00 16,000.00

0.0600 m3 Pasir Beton @ 250,000.00 15,000.00

3.2000 oh pekerja @ 55,000.00 176,000.00

1.0150 oh Tukang Batu @ 70,000.00 71,050.00

0.0015 oh kepala tukang @ 75,000.00 112.50

0.0160 oh mandor @ 75,000.00 1,200.00

JUMLAH 110,020.50 263,362.50 373,383.00

J. 6.6.17 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 CM

0.2500 bh Batu bata @ 900.00 225.00

77.0000 m3 Semen Portland @ 1,270.00 97,790.00

0.1300 kg pasir pasang @ 280,000.00 36,400.00

0.0200 m3 Batu kerikil @ 263,000.00 5,260.00

2.6000 kg Besi Beton @ 10,000.00 26,000.00

0.0900 m3 Pasir Beton @ 250,000.00 22,500.00

1.4200 oh pekerja @ 55,000.00 78,100.00

0.4730 oh Tukang Batu @ 70,000.00 26,015.00

0.0470 oh kepala tukang @ 75,000.00 2,820.00

0.0710 oh mandor @ 75,000.00 4,260.00

JUMLAH 188,175.00 111,195.00 299,370.00

J. 6.6.18 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 CM

0.3710 bh Batu bata @ 900.00 333.90

114.0000 m3 Semen Portland @ 1,270.00 144,780.00

0.1840 kg pasir pasang @ 280,000.00 51,520.00

0.0330 m3 Batu koral @ 263,000.00 8,679.00

4.8500 kg Besi Beton @ 10,000.00 48,500.00

0.1200 m3 Pasir Beton @ 250,000.00 30,000.00

2.1600 oh pekerja @ 55,000.00 118,800.00

0.7200 oh Tukang Batu @ 70,000.00 50,400.00

0.0720 oh kepala tukang @ 75,000.00 5,400.00

0.1080 oh mandor @ 75,000.00 8,100.00

0.1000 oh Tukang gali @ 55,000.00 5,500.00

JUMLAH 283,812.90 188,200.00 472,012.90

J. 6.6.19 MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2"

1.2000 m' Pipa galvanis @ 52,100.00 62,520.00

35.0000 % Perlengkapan @ 18,235.00 18,235.00

0.0540 oh pekerja @ 55,000.00 2,970.00

0.0900 oh Tukang Batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0270 oh mandor @ 75,000.00 2,025.00

JUMLAH 80,755.00 11,970.00 92,725.00

Page 36: RAB Siring

J. 6.6.20 MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4"

1.2000 m' Pipa galvanis @ 52,100.00 62,520.00

35.0000 % Perlengkapan @ 3,937.50 3,937.50

0.0540 oh pekerja @ 55,000.00 2,970.00

0.0900 oh Tukang Batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0270 oh mandor @ 75,000.00 2,025.00

JUMLAH 151,312.50 9,540.00 160,852.50

J. 6.6.21 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 "

1.2000 m' Pipa galvanis @ 52,100.00 62,520.00

35.0000 % Perlengkapan @ 18,235.00 18,235.00

0.0540 oh pekerja @ 55,000.00 2,970.00

0.0900 oh Tukang Batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0270 oh mandor @ 75,000.00 2,025.00

JUMLAH 80,755.00 11,970.00 92,725.00

J. 6.6.22 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 "

1.2000 m' Pipa galvanis @ 103,100.00 123,720.00

35.0000 % Perlengkapan @ 36,085.00 36,085.00

0.1080 oh pekerja @ 55,000.00 5,940.00

0.1800 oh Tukang Batu @ 70,000.00 12,600.00

0.0180 oh kepala tukang @ 75,000.00 1,350.00

0.0054 oh mandor @ 75,000.00 405.00

JUMLAH 159,805.00 20,295.00 180,100.00

J. 6.6.23 MEMASANG 1M' PIPA GALVANIS DIAMETER 3"

1.2000 m' Pipa galvanis @ 182,150.00 218,580.00

35.0000 % Perlengkapan @ 63,752.50 63,752.50

0.1080 oh pekerja @ 55,000.00 5,940.00

0.1800 oh Tukang Batu @ 70,000.00 12,600.00

0.0180 oh kepala tukang @ 75,000.00 1,350.00

0.0054 oh mandor @ 75,000.00 405.00

JUMLAH 282,332.50 16,164.00 298,496.50

J. 6.6.24 MEMASANG 1M' PIPA GALVANIS DIAMETER 4 "

1.2000 m' Pipa galvanis @ 259,300.00 311,160.00

35.0000 % Perlengkapan @ 90,755.00 90,755.00

0.1350 oh pekerja @ 55,000.00 7,425.00

0.2250 oh Tukang Batu @ 70,000.00 15,750.00

0.0225 oh kepala tukang @ 75,000.00 1,687.50

0.0068 oh mandor @ 75,000.00 510.00

JUMLAH 401,915.00 25,372.50 427,287.50

Page 37: RAB Siring

J. 6.6.25 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 "

1.2000 m' Pipa PVC @ 20,200.00 24,240.00

35.0000 % Perlengkapan @ 7,070.00 7,070.00

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 31,310.00 6,765.00 38,075.00

J. 6.6.26 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4"

1.2000 m' Pipa PVC @ 4,912.50 5,895.00

35.0000 % Perlengkapan @ 1,719.38 1,719.38

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 7,614.38 6,765.00 14,379.38

J. 6.6.27 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 "

1.2000 m' Pipa PVC @ 6,025.00 7,230.00

35.0000 % Perlengkapan @ 2,108.75 2,108.75

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 9,338.75 6,765.00 16,103.75

J. 6.6.28 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 "

1.2000 m' Pipa PVC @ 12,225.00 14,670.00

35.0000 % Perlengkapan @ 4,278.75 4,278.75

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 18,948.75 6,765.00 25,713.75

J. 6.6.29 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2"

1.2000 m' Pipa PVC @ 25,775.00 30,930.00

35.0000 % Perlengkapan @ 9,021.25 9,021.25

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 39,951.25 6,765.00 46,716.25

Page 38: RAB Siring

J. 6.6.30 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2"

1.2000 m' Pipa PVC @ 12,225.00 14,670.00

35.0000 % Perlengkapan @ 4,278.75 4,278.75

0.0360 oh pekerja @ 55,000.00 1,980.00

0.0600 oh Tukang Batu @ 70,000.00 4,200.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0018 oh mandor @ 75,000.00 135.00

JUMLAH 18,948.75 6,765.00 25,713.75

J. 6.6.31 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3"

1.2000 m' Pipa PVC @ 38,500.00 46,200.00

35.0000 % Perlengkapan @ 13,475.00 13,475.00

0.0810 oh pekerja @ 55,000.00 4,455.00

0.1350 oh Tukang Batu @ 70,000.00 9,450.00

0.0135 oh kepala tukang @ 75,000.00 1,012.50

0.0041 oh mandor @ 75,000.00 307.50

JUMLAH 59,675.00 15,225.00 74,900.00

J. 6.6.32 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4"

1.2000 m' Pipa PVC @ 28,100.00 33,720.00

35.0000 % Perlengkapan @ 9,835.00 9,835.00

0.0810 oh pekerja @ 55,000.00 4,455.00

0.1350 oh Tukang Batu @ 70,000.00 9,450.00

0.0135 oh kepala tukang @ 75,000.00 1,012.50

0.0041 oh mandor @ 75,000.00 307.50

JUMLAH 43,555.00 15,225.00 58,780.00

J. 6.6.33 MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL

1.0000 bh Bak cuci stainless steel @ 427,700.00 427,700.00

1.0000 set Water drain + Asseories @ 35,000.00 35,000.00

0.0300 oh pekerja @ 55,000.00 1,650.00

0.3000 oh Tukang Batu @ 70,000.00 21,000.00

0.0300 oh kepala tukang @ 75,000.00 2,250.00

0.0015 oh mandor @ 75,000.00 112.50

JUMLAH 230,000.00 25,012.50 255,012.50

J. 6.6.34 MEMASANG 1 BH BAK CUCI PIRING TERASO

1.0000 bh bak cuci teraso @ 293,000.00 293,000.00

1.0000 set Water drain + Asseories @ 35,000.00 35,000.00

20.0000 Kg Semen Portland @ 1,270.00 25,400.00

0.0500 m3 Pasir @ 280,000.00 14,000.00

0.0500 oh Pekerja @ 55,000.00 2,750.00

0.5000 oh Tukang Batu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 367,400.00 41,687.50 409,087.50

Page 39: RAB Siring

J. 6.6.35 MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2"

1.0000 Bh Kran Air @ 25,000.00 25,000.00

0.0250 Bh Seal Tape @ 4,000.00 100.00

0.0100 oh pekerja @ 55,000.00 550.00

0.1000 oh Tukang Batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 25,100.00 8,675.00 33,775.00

J. 6.6.36 MEMASANG 1BH FLOOR DRAIN

1.0000 Bh Floor drain @ 31,700.00 31,700.00

0.0100 oh pekerja @ 55,000.00 550.00

0.1000 oh Tukang Batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 31,700.00 8,675.00 40,375.00

K. PEKERJAAN BESI

K. 6.6.1 1 KG PASANG RANGKA ATAP BAJA

1.1000 Kg Besi Profil WF @ 15,000.00 16,500.00

0.0800 Kg Meni Besi @ 35,200.00 2,816.00

0.0060 oh Tukang Besi @ 70,000.00 420.00

0.0600 oh Pekerja @ 55,000.00 3,300.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0003 oh mandor @ 75,000.00 22.50

JUMLAH 19,316.00 4,192.50 23,508.50

K. 6.6.2 1 M2 PASANG PINTU BESI BAJA

1.1000 m2 Pintu Besi Baja @ -

0.0060 oh Tukang Besi Konstruksi @ 70,000.00 420.00

0.0600 oh Pekerja @ 55,000.00 3,300.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0003 oh mandor @ 75,000.00 22.50

JUMLAH - 4,192.50 4,192.50

K. 6.6.3 1 M2 PASANG JENDELA BESI

1.0000 m2 Jendela Besi @ -

1.0500 oh Tukang Besi Konstruksi @ 70,000.00 73,500.00

1.0500 oh Pekerja @ 55,000.00 57,750.00

0.1050 oh kepala tukang @ 75,000.00 7,875.00

0.0053 oh mandor @ 75,000.00 393.75

JUMLAH - 139,518.75 139,518.75

Page 40: RAB Siring

K. 6.6.4 1 M2 PASANG JENDELA BESI TAHAN API

1.0000 m2 Jendela Besi tahan api @ -

1.2000 oh Tukang Besi Konstruksi @ 70,000.00 84,000.00

1.0220 oh Pekerja @ 55,000.00 56,210.00

0.1200 oh kepala tukang @ 75,000.00 9,000.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH - 149,660.00 149,660.00

K. 6.6.5 1 M2 PASANG PINTU GULUNG BESI

1.0000 m2 Pintu Gulung besi @ -

1.2000 oh Tukang Besi Konstruksi @ 70,000.00 84,000.00

1.2000 oh Pekerja @ 55,000.00 66,000.00

0.1200 oh kepala tukang @ 75,000.00 9,000.00

0.0060 oh mandor @ 75,000.00 450.00

JUMLAH - 159,450.00 159,450.00

K. 6.6.6 1 M2 PASANG PINTU LIPAT

1.1000 m2 Pintu Lipat @ -

0.0060 oh Tukang Besi Konstruksi @ 70,000.00 420.00

0.0600 oh Pekerja @ 55,000.00 3,300.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0003 oh mandor @ 75,000.00 22.50

JUMLAH - 4,192.50 4,192.50

K. 6.6.7 1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM

1.0000 m2 Sunscreen Allumunium @ -

0.8000 oh Tukang Besi Konstruksi @ 70,000.00 56,000.00

0.0800 oh Pekerja @ 55,000.00 4,400.00

0.0800 oh kepala tukang @ 75,000.00 6,000.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH - 66,700.00 66,700.00

K. 6.6.8 1 M2 PASANG ROLLING DOOR

1.0000 m2 Roll Door @ -

1.5000 oh Tukang Besi Konstruksi @ 70,000.00 105,000.00

1.0500 oh Pekerja @ 55,000.00 57,750.00

0.1050 oh kepala tukang @ 75,000.00 7,875.00

0.0052 oh mandor @ 75,000.00 390.00

JUMLAH - 171,015.00 171,015.00

K. 6.6.9 1 M2 PASANG PINTU ALLUMUNIUM

1.0000 m2 Pintu Allumunium @ -

1.0500 oh Tukang Besi Konstruksi @ 70,000.00 73,500.00

1.0500 oh Pekerja @ 55,000.00 57,750.00

0.1050 oh kepala tukang @ 75,000.00 7,875.00

0.0052 oh mandor @ 75,000.00 390.00

JUMLAH - 139,515.00 139,515.00

Page 41: RAB Siring

K. 6.6.10 1 M2 PASANG VENETIONS BLINDS

1.0000 m2 Venetions Blinds @ -

0.3500 oh Tukang kayu @ 70,000.00 24,500.00

0.3500 oh Pekerja @ 55,000.00 19,250.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0018 oh mandor @ 75,000.00 131.25

JUMLAH - 46,506.25 46,506.25

K. 6.6.11 1 M2 PASANG VERTIKALS BLINDS

1.0000 m2 Vertikals blinds @ -

0.3500 oh Tukang Kayu @ 70,000.00 24,500.00

0.3500 oh Pekerja @ 55,000.00 19,250.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0018 oh mandor @ 75,000.00 131.25

JUMLAH - 46,506.25 46,506.25

K. 6.6.12 1 M2 PASANG TERALI BESI

11.5000 m2 Besi Strip 2 x 3 @ 31,800.00 365,700.00

1.2000 oh Tukang Besi Konstruksi @ 70,000.00 84,000.00

1.2000 oh Pekerja @ 55,000.00 66,000.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0006 oh mandor @ 75,000.00 45.00

JUMLAH 365,700.00 150,945.00 516,645.00

K. 6.6.13 1 M2 PASANG KAWAT HARMONIKA

1.1000 m2 kawat harmonika @ 28,350.00 31,185.00

0.0200 kg paku biasa 1/2" - 1" @ 16,650.00 333.00

0.0018 m3 papan ky meranti @ 2,100,000.00 3,780.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 43,624.13 10,630.00 54,254.13

K. 6.6.14 1 M2 PASANG KAWAT NYAMUK

1.1000 m2 kawat nyamuk @ 24,300.00 26,730.00

0.0200 kg paku biasa 1/2" - 1" @ 16,650.00 333.00

0.0018 m3 papan ky meranti @ 2,100,000.00 3,780.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 30,843.00 13,287.50 44,130.50

K. 6.6.15 1 M2 PASANG KAWAT KASSA

1.1000 m2 kawat kassa @ 8,000.00 8,800.00

0.0200 kg paku biasa 1/2" - 1" @ 16,650.00 333.00

0.0018 m3 kayu bengkirai papan @ 2,100,000.00 3,780.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 12,913.00 13,287.50 26,200.50

Page 42: RAB Siring

K. 6.6.16 1 M2 PASANG KAWAT BURUNG

1.1000 m2 kawat Burung @ 107,300.00 118,030.00

0.0200 kg paku biasa 1/2" - 1" @ 16,650.00 333.00

0.0018 m3 kayu bengkirai papan @ 3,500,000.00 6,300.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 124,663.00 13,287.50 137,950.50

K. 6.6.17 1 M2 PASANG JENDELA NAKO & TRALIS

1.1000 m2 Jendela Nako @ 326,700.00 359,370.00

0.0200 kg paku biasa 1/2" - 1" @ 16,650.00 333.00

0.0250 m3 Besi Strip @ 31,800.00 795.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0010 oh mandor @ 75,000.00 75.00

JUMLAH 360,498.00 26,575.00 387,073.00

K. 6.6.18 1 M' PASANG TALANG DATAR, SENG BLJS 28

0.5000 Lbr Seng plat 3' x 6' bljs 28 @ 53,600.00 26,800.00

0.0150 kg paku biasa 1/2" - 1" @ 16,650.00 249.75

0.0096 m3 Kayu ulin, papan @ 3,100,000.00 29,760.00

0.2500 kg Flincote / Meni Besi @ 39,000.00 9,750.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.4000 oh tukang kayu @ 70,000.00 28,000.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 66,559.75 38,218.75 104,778.50

K. 6.6.19 1 M' PASANG TALANG MIRING, SENG BLJS 28

0.5000 Lbr Seng plat 3' x 6' bljs 28 @ 53,600.00 26,800.00

0.0150 kg paku biasa 1/2" - 1" @ 16,650.00 249.75

0.0190 m3 Kayu ulin, papan @ 3,100,000.00 58,900.00

0.3000 kg Flincote / Meni Besi @ 39,000.00 11,700.00

0.0400 oh pekerja @ 55,000.00 2,200.00

0.4000 oh tukang kayu @ 70,000.00 28,000.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 97,649.75 32,168.75 129,818.50

K. 6.6.20 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28

0.3000 lbr Seng plat 3' x 6' bljs 28 @ 53,600.00 16,080.00

0.1000 kg paku biasa 1/2" - 1" @ 16,650.00 1,665.00

0.0190 m3 Kayu ulin, papan @ 3,100,000.00 58,900.00

0.5000 kg besi Strip @ 31,800.00 15,900.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 92,545.00 27,718.75 120,263.75

Page 43: RAB Siring

K. 6.6.21 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24

0.5000 m2 Seng plat 3' x 6' bljs 28 @ 53,600.00 26,800.00

0.0150 kg paku biasa 1/2" - 1" @ 16,650.00 249.75

0.0190 m3 Kayu ulin, papan @ 3,100,000.00 58,900.00

0.3000 kg besi Strip @ 31,800.00 9,540.00

0.0400 oh pekerja @ 55,000.00 2,200.00

0.4000 oh tukang kayu @ 70,000.00 28,000.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 95,489.75 32,168.75 127,658.50

L. PEKERJAAN KUNCI DAN KACA

L. 6.6.1 1 BUAH PASANG KUNCI TANAM ANTIK

1.0000 Bh Kunci tanam antik @ 132,800.00 132,800.00

0.0600 oh Pekerja @ 55,000.00 3,300.00

0.6000 oh Tukang Kayu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 132,800.00 50,025.00 182,825.00

L. 6.6.2 1 BUAH PASANG KUNCI TANAM BIASA

1.0000 Bh Kunci tanam biasa @ 132,800.00 132,800.00

0.0100 oh Pekerja @ 55,000.00 550.00

0.0500 oh Tukang Kayu @ 70,000.00 3,500.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 132,800.00 5,175.00 137,975.00

L. 6.6.3 1 BUAH PASANG KUNCI KAMAR MANDI

1.0000 Bh Kunci tanam kamar mandi @ 132,800.00 132,800.00

0.0050 oh Pekerja @ 55,000.00 275.00

0.5000 oh Tukang Kayu @ 70,000.00 35,000.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 132,800.00 35,837.50 168,637.50

L. 6.6.4 1 BUAH PASANG KUNCI SILINDER

1.0000 Bh Kunci Silinder @ -

0.0050 oh Pekerja @ 55,000.00 275.00

0.5000 oh Tukang Kayu @ 70,000.00 35,000.00

0.0050 oh kepala tukang @ 75,000.00 375.00

0.0003 oh mandor @ 75,000.00 18.75

JUMLAH - 35,668.75 28,040.00

L. 6.6.5 1 BUAH PASANG ENGSEL PINTU

1.0000 Bh Engsel Pintu @ 27,800.00 27,800.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 27,800.00 12,506.25 40,306.25

Page 44: RAB Siring

L. 6.6.6 1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU

1.0000 Bh Engsel Jendela @ 23,000.00 23,000.00

0.0100 oh Pekerja @ 55,000.00 550.00

0.1000 oh Tukang Kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 23,000.00 8,337.50 31,337.50

L. 6.6.7 1 BUAH PASANG ENGSEL ANGIN

1.0000 Bh Engsel angin @ -

0.0200 oh Pekerja @ 55,000.00 1,100.00

0.2000 oh Tukang Kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0100 oh mandor @ 75,000.00 750.00

JUMLAH - 17,350.00 17,350.00

L. 6.6.8 1 BUAH PASANG SPRING KNIP

1.0000 Bh Spring Knip @ -

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH - 12,506.25 12,506.25

L. 6.6.8a 1 BUAH PASANG ENGSEL JENDELA

1.0000 Bh Engsel jendela @ 23,000.00 23,000.00

0.0100 oh Pekerja @ 55,000.00 550.00

0.1000 oh Tukang Kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 23,000.00 8,337.50 31,337.50

L. 6.6.8b 1 BUAH PASANG GRENDEL JENDELA

1.0000 Bh Grendel jendela @ 9,000.00 9,000.00

0.0100 oh Pekerja @ 55,000.00 550.00

0.1000 oh Tukang Kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 9,000.00 8,337.50 17,337.50

L. 6.6.9 1 BUAH PASANG KAIT ANGIN

1.0000 Bh Kait angin @ 29,700.00 29,700.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 29,700.00 12,506.25 42,206.25

L. 6.6.10 1 BUAH PASANG DOOR CLOSER

1.0000 Bh Door Closer @ 286,000.00 286,000.00

0.0500 oh Pekerja @ 55,000.00 2,750.00

0.5000 oh Tukang Kayu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 286,000.00 41,687.50 327,687.50

L. 6.6.11 1 BUAH PASANG KUNCI SELOT

1.0000 Bh Kunci selot @ 93,500.00 93,500.00

Page 45: RAB Siring

0.0200 oh Pekerja @ 55,000.00 1,100.00

0.2000 oh Tukang Kayu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0010 oh mandor @ 75,000.00 75.00

JUMLAH 93,500.00 16,675.00 110,175.00

Page 46: RAB Siring

L. 6.6.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER

1.0000 Bh Door Holder @ 79,750.00 79,750.00

0.0500 oh Pekerja @ 55,000.00 2,750.00

0.5000 oh Tukang Kayu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 79,750.00 41,687.50 121,437.50

L. 6.6.12a 1 BUAH PASANG PEGANGAN JENDELA

1.0000 Bh Handle jendela @ 8,300.00 8,300.00

0.0500 oh Pekerja @ 55,000.00 2,750.00

0.5000 oh Tukang Kayu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 8,300.00 41,687.50 49,987.50

L. 6.6.13 1 BUAH PASANG DOOR STOP

1.0000 Bh Door Stop @ 79,200.00 79,200.00

0.0100 oh Pekerja @ 55,000.00 550.00

0.1000 oh Tukang Kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0005 oh mandor @ 75,000.00 37.50

JUMLAH 79,200.00 8,337.50 87,537.50

L. 6.6.14 1 BUAH PASANG REL PINTU DORONG

1.0000 Bh Rel pintu dorong @ 117,700.00 117,700.00

0.0600 oh Pekerja @ 55,000.00 3,300.00

0.6000 oh Tukang Kayu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 117,700.00 50,025.00 167,725.00

L. 6.6.15 1 BUAH PASANG KUNCI LEMARI

1.0000 Bh Kunci Lemari @ 279,500.00 279,500.00

0.0250 oh Pekerja @ 55,000.00 1,375.00

0.2500 oh Tukang Kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 279,500.00 20,843.75 300,343.75

L. 6.6.16 1 M2 PASANG KACA, TEBAL 3 MM

1.1000 m2 kaca @ 84,700.00 93,170.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 93,170.00 12,506.25 105,676.25

L. 6.6.17 1 M2 PASANG KACA, TEBAL 5 MM

1.1000 m2 Kaca @ 102,300.00 112,530.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 112,530.00 12,506.25 125,036.25

Page 47: RAB Siring

L. 6.6.18 1 M2 PASANG KACA, TEBAL 8 MM 16,000.00

1.1000 m2 Kaca @ 127,000.00 139,700.00

0.0165 oh Pekerja @ 55,000.00 907.50

0.1650 oh Tukang Kayu @ 70,000.00 11,550.00

0.0165 oh kepala tukang @ 75,000.00 1,237.50

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 139,700.00 13,751.25 153,451.25

L. 6.6.19 1 M2 PASANG KACA GELAP, TEBAL 5 MM

1.1000 m2 kaca gelap @ 127,000.00 139,700.00

0.0500 kg Sealent @ 35,000.00 1,750.00

0.0250 oh Pekerja @ 55,000.00 1,375.00

0.2500 oh Tukang Kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ 75,000.00 1,875.00

0.0013 oh mandor @ 75,000.00 93.75

JUMLAH 141,450.00 20,843.75 162,293.75

L. 6.6.20 1 M2 PASANG KACA CERMIN, TEBAL 5 MM

1.1000 m2 Kaca cermin @ 114,000.00 125,400.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 125,400.00 12,506.25 137,906.25

L. 6.6.21 1 M2 PASANG KACA CERMIN, TEBAL 6 MM

1.1000 m2 Kaca cermin @ 114,000.00 125,400.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 125,400.00 12,506.25 137,906.25

L. 6.6.22 1 M2 PASANG KACA CERMIN, TEBAL 8 MM

1.0000 m2 Kaca cermin @ 152,000.00 152,000.00

0.0165 oh Pekerja @ 55,000.00 907.50

0.1650 oh Tukang Kayu @ 70,000.00 11,550.00

0.0165 oh kepala tukang @ 75,000.00 1,237.50

0.0008 oh mandor @ 75,000.00 60.00

JUMLAH 152,000.00 13,755.00 165,755.00

L. 6.6.23 1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM

1.1000 m2 Kaca Wireglass @ 2,050,000.00 2,255,000.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 2,255,000.00 12,506.25 2,267,506.25

Page 48: RAB Siring

L. 6.6.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM

1.1000 m2 Kaca Patri @ 275,000.00 302,500.00

0.0150 oh Pekerja @ 55,000.00 825.00

0.1500 oh Tukang Kayu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0008 oh mandor @ 75,000.00 56.25

JUMLAH 302,500.00 12,506.25 315,006.25

M. PEKERJAAN PENUTUP LANTAI & DINDING

M.6.6.1 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM

0.04 6.6300 Bh Ubin abu-abu 40 x 40 cm @ 7,466.06 49,500.00

9.8000 kg Semen portland @ 1,270.00 12,446.00

0.0215 m3 Pasir pasang @ 280,000.00 6,020.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 67,966.00 23,987.50 91,953.50

M.6.6.2 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM

0.09 11.8700 Bh Ubin abu-abu 30 x 30 cm @ 3,454.09 41,000.00

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

0.2600 oh pekerja @ 55,000.00 14,300.00

0.1250 oh tukang batu @ 70,000.00 8,750.00

0.0125 oh kepala tukang @ 75,000.00 937.50

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 59,720.00 24,962.50 84,682.50

M.6.6.3 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM

0.09 26.5000 Bh Ubin abu-abu 20 x 20 cm @ 1,660.38 44,000.00

10.4000 kg semen portland @ 1,270.00 13,208.00

0.0135 m3 pasir pasang @ 280,000.00 3,780.00

0.2700 oh pekerja @ 55,000.00 14,850.00

0.1300 oh tukang batu @ 70,000.00 9,100.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0135 oh mandor @ 75,000.00 1,012.50

JUMLAH 60,988.00 25,937.50 86,925.50

Page 49: RAB Siring

M.6.6.4 1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM

0.09 6.6300 Bh Ubin Warna 40 x 40 cm @ 7,466.06 49,500.00

8.1600 kg semen portland @ 1,270.00 10,363.20

0.0230 m3 pasir pasang @ 280,000.00 6,440.00

0.9000 kg Semen warna @ 19,250.00 17,325.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 83,628.20 23,987.50 107,615.70

M.6.6.5 1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM

0.09 11.8700 Bh Ubin Warna 30 x 30 cm @ 3,117.10 37,000.00

8.3600 kg semen portland @ 1,270.00 10,617.20

0.0230 m3 pasir pasang @ 280,000.00 6,440.00

0.9000 kg Semen warna @ 19,250.00 17,325.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 71,382.20 23,987.50 95,369.70

M.6.6.6 1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM

0.09 26.5000 Bh Ubin Warna 20 x 20 cm @ 1,660.38 44,000.00

8.7600 kg semen portland @ 1,270.00 11,125.20

0.0230 m3 pasir pasang @ 280,000.00 6,440.00

0.9000 kg Semen warna @ 19,250.00 17,325.00

0.2700 oh pekerja @ 55,000.00 14,850.00

0.1300 oh tukang batu @ 70,000.00 9,100.00

0.0130 oh kepala tukang @ 75,000.00 975.00

0.0135 oh mandor @ 75,000.00 1,012.50

JUMLAH 78,890.20 25,937.50 104,827.70

M.6.6.7 1 M2 PASANG LANTAI ex. Roman UKURAN 40 x 40 CM

0.09 6.2500 Bh Keramik Type B 40 x 40 cm @ 14,240.00 89,000.00 14,240.00

8.8000 kg semen portland @ 1,270.00 11,176.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

0.9000 kg Semen warna @ 19,250.00 17,325.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 123,521.00 23,987.50 147,508.50

Page 50: RAB Siring

M.6.6.8 1 M2 PASANG LANTAI Keramik UKURAN 40 x 40 CM Type A

0.09 6.2500 Bh Keramik 40x40 cm @ 13,600.00 85,000.00 13,600.00

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.5400 kg Semen warna @ 19,250.00 29,645.00

0.2600 oh pekerja @ 55,000.00 14,300.00

0.1250 oh tukang batu @ 70,000.00 8,750.00

0.0125 oh kepala tukang @ 75,000.00 937.50

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 133,365.00 24,962.50 158,327.50

M.6.6.9 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM

0.09 6.9300 Bh Ubin granito 40 x 40 cm @ 36,666.67 254,100.00

9.8000 kg semen portland @ 1,270.00 12,446.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.3000 kg Semen warna @ 19,250.00 25,025.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 297,591.00 23,987.50 321,578.50

M.6.6.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM

0.09 11.8700 Bh Ubin granito 30 x 30 cm @ 9,000.00 106,830.00

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.5000 kg Semen warna @ 19,250.00 28,875.00

0.2600 oh pekerja @ 55,000.00 14,300.00

0.1250 oh tukang batu @ 70,000.00 8,750.00

0.0125 oh kepala tukang @ 75,000.00 937.50

0.0130 oh mandor @ 75,000.00 975.00

JUMLAH 154,425.00 24,962.50 179,387.50

M.6.6.11 1 M2 PASANG LANTAI UBIN TERALUX KERANG UKURAN 40 X 40 CM

0.09 6.2500 Bh Ubin teralux terang 40 x 40 cm @ -

8.8000 kg semen portland @ 1,270.00 11,176.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.3000 kg Semen warna @ 19,250.00 25,025.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 42,221.00 23,987.50 66,208.50

Page 51: RAB Siring

M.6.6.12 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM

0.09 11.8070 Bh Ubin teralux terang 30 x 30 cm @ -

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.1250 kg Semen warna @ 19,250.00 21,656.25

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 40,376.25 23,987.50 64,363.75

M.6.6.13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM

0.09 5.6000 Bh Ubin teralux marmer 60 x 60 cm @ -

8.1900 kg semen portland @ 1,270.00 10,401.30

0.0450 m3 pasir pasang @ 280,000.00 12,600.00

1.0000 kg Semen warna @ 19,250.00 19,250.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0125 oh mandor @ 75,000.00 937.50

JUMLAH 42,251.30 23,987.50 66,238.80

M.6.6.14 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM

0.09 6.2500 Bh Ubin teralux marmer 40 x 40 cm @ -

8.8000 kg semen portland @ 1,270.00 11,176.00

0.0215 m3 pasir pasang @ 280,000.00 6,020.00

1.3000 kg Semen warna @ 19,250.00 25,025.00

0.6720 oh pekerja @ 55,000.00 36,960.00

0.2240 oh tukang batu @ 70,000.00 15,680.00

0.0220 oh kepala tukang @ 75,000.00 1,650.00

0.0340 oh mandor @ 75,000.00 2,550.00

JUMLAH 42,221.00 56,840.00 99,061.00

M.6.6.15 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM

0.09 11.8700 Bh Ubin teralux marmer 30 x 30 cm @ -

10.0000 kg semen portland @ 1,270.00 12,700.00

0.0250 m3 pasir pasang @ 280,000.00 7,000.00

1.5000 kg Semen warna @ 19,250.00 28,875.00

0.7000 oh pekerja @ 55,000.00 38,500.00

0.3400 oh tukang batu @ 70,000.00 23,800.00

0.0340 oh kepala tukang @ 75,000.00 2,550.00

0.0350 oh mandor @ 75,000.00 2,625.00

JUMLAH 48,575.00 67,475.00 116,050.00

Page 52: RAB Siring

M.6.6.16 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM

0.09 5.3000 Bh Plint Ubin 15 x 20 cm @ 1,660.38 8,800.00

1.5600 kg semen portland @ 1,270.00 1,981.20

0.0040 m3 pasir pasang @ 280,000.00 1,120.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 11,901.20 5,850.00 17,751.20

M.6.6.17 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM

0.09 3.5300 Bh Plint Ubin 10 x 30 cm @ 1,151.36 4,064.31

1.5600 kg semen portland @ 1,270.00 1,981.20

0.0030 m3 pasir pasang @ 280,000.00 840.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 6,885.51 5,850.00 12,735.51

M.6.6.18 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM

0.09 2.6500 Bh Plint Ubin 10 x 40 cm @ 1,866.52 4,946.27

1.5600 kg semen portland @ 1,270.00 1,981.20

0.0030 m3 pasir pasang @ 280,000.00 840.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 7,767.47 5,850.00 13,617.47

M.6.6.19 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM

0.09 5.3000 Bh Plint Ubin Pc Warna 10 x 20 cm @ 830.19 4,400.00

1.2000 kg semen portland @ 1,270.00 1,524.00

0.0030 m3 pasir pasang @ 280,000.00 840.00

0.1900 kg Semen warna @ 13,500.00 2,565.00

0.0600 oh pekerja @ 70,000.00 4,200.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 9,329.00 6,750.00 16,079.00

M.6.6.20 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM

0.09 3.3300 Bh Plint Ubin Pc Warna 10 x 30 cm @ 1,039.03 3,459.98

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 7,801.48 5,850.00 13,651.48

Page 53: RAB Siring

M.6.6.21 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM

0.09 2.6500 Bh Plint Ubin Pc Warna 10 x 40 cm @ 1,866.52 4,946.27

1.2000 kg semen portland @ 1,270.00 1,524.00

0.0030 m3 pasir pasang @ 280,000.00 840.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.0800 oh pekerja @ 55,000.00 4,400.00

0.0400 oh tukang batu @ 70,000.00 2,800.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 8,660.27 7,800.00 16,460.27

M.6.6.22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM

0.09 3.5300 Bh Plint Ubin Teraso 10 x 30 cm @ 2,000.00 7,060.00

1.5600 kg semen portland @ 1,270.00 1,981.20

0.0030 m3 pasir pasang @ 280,000.00 840.00

0.1900 kg Semen warna @ 13,500.00 2,565.00

0.0800 oh pekerja @ 55,000.00 4,400.00

0.0400 oh tukang batu @ 70,000.00 2,800.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 12,446.20 7,800.00 20,246.20

M.6.6.23 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM

0.09 2.6500 Bh Plint Ubin Teraso 10 x 40 cm @ 2,500.00 6,625.00

1.2000 kg semen portland @ 1,270.00 1,524.00

0.0030 m3 pasir pasang @ 280,000.00 840.00

1.0000 kg Semen warna @ 13,500.00 13,500.00

0.0800 oh pekerja @ 55,000.00 4,400.00

0.0400 oh tukang batu @ 70,000.00 2,800.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0040 oh mandor @ 75,000.00 300.00

JUMLAH 22,489.00 7,800.00 30,289.00

M.6.6.24 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM

0.09 2.6500 Bh Plint Ubin Granito 10 x 40 cm @ 3,750.00 9,937.50

1.2000 kg semen portland @ 1,270.00 1,524.00

0.0030 m3 pasir pasang @ 280,000.00 840.00

1.0000 kg Semen warna @ 13,500.00 13,500.00

0.0600 oh pekerja @ 55,000.00 3,300.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0030 oh kepala tukang @ 75,000.00 225.00

0.0030 oh mandor @ 75,000.00 225.00

JUMLAH 25,801.50 5,850.00 31,651.50

Page 54: RAB Siring

M.6.6.25 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM

0.09 3.3300 Bh Plint Ubin Granito 10 x 30 cm @ 3,000.00 9,990.00

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 14,331.50 56,812.50 71,144.00

M.6.6.26 1M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM

0.09 2.5000 Bh plint Ubin teralux kerang 10 x 40 cm @ - -

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 4,341.50 56,812.50 61,154.00

M.6.6.27 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM

0.09 3.3300 Bh plint Ubin teralux kerang 10 x 30 cm @ - -

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 4,341.50 56,812.50 61,154.00

M.6.6.28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM

0.09 1.7000 Bh Plint Ubin teralux marmer 10 x 60 cm @ - -

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 4,341.50 56,812.50 61,154.00

Page 55: RAB Siring

M.6.6.29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM

0.09 2.5000 Bh Plint Ubin teralux marmer 10 x 40 cm @ - -

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 2,377.61 56,812.50 59,190.11

M.6.6.30 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM

0.09 3.3000 Bh Plint Ubin teralux marmer 10 x 30 cm @ - -

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m3 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH 4,341.50 56,812.50 61,154.00

M.6.6.31 1 M2 PASANG TERASO COR DITEMPAT

0.09 0.0036 m3 Bahan Teraso Cor @ -

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH - 56,812.50 56,812.50

M.6.6.32 1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM

0.09 0.0036 m3 Bahan Teraluc cor @ -

0.9000 oh pekerja @ 55,000.00 49,500.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

JUMLAH - 56,812.50 56,812.50

M.6.6.33 1 M2 PASANG UBIN TAHAN ASAM

0.09 1.0500 m2 Ubin tahan asam @ -

14.1400 kg semen tahan asam @ -

0.0400 m2 pasir pasang @ 280,000.00 11,200.00

0.2700 oh pekerja @ 55,000.00 14,850.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0135 oh mandor @ 75,000.00 1,012.50

JUMLAH 11,200.00 27,487.50 38,687.50

Page 56: RAB Siring

M.6.6.34 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM

0.09 50.0000 bh ubin keramik artistik 10 x 20 cm @ 1,200.00 60,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 106,462.60 63,475.00 169,937.60

M.6.6.35 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM

0.09 100.0000 bh ubin keramik artistik 10 x 10 cm @ 750.00 75,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

2.0000 kg Semen warna @ 13,500.00 27,000.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 128,212.60 63,475.00 191,687.60

M.6.6.36 1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM

0.09 100.0000 m2 ubin keramik artistik 5 x 20 cm @ 600.00 60,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 106,462.60 63,475.00 169,937.60

M.6.6.37 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM

0.09 5.0000 m2 Plint keramik artistik 10 x 20 cm @ 1,200.00 6,000.00

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m2 pasir pasang @ 280,000.00 896.00

0.1000 kg Semen warna @ 13,500.00 1,350.00

0.0900 oh pekerja @ 55,000.00 4,950.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

0.09 JUMLAH 10,341.50 12,262.50 22,604.00

Page 57: RAB Siring

M.6.6.38 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM

0.09 5.0000 m2 Plint keramik artistik 10 x 10 cm @ 750.00 3,750.00

1.6500 kg semen portland @ 1,270.00 2,095.50

0.0032 m2 pasir pasang @ 280,000.00 896.00

0.1200 kg Semen warna @ 13,500.00 1,620.00

0.0900 oh pekerja @ 55,000.00 4,950.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

0.09 JUMLAH 8,361.50 12,262.50 20,624.00

M.6.6.39 1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM

0.09 5.0000 m2 Plint keramik artistik 5 x 20 cm @ 600.00 3,000.00

0.8500 kg semen portland @ 1,270.00 1,079.50

0.0022 m2 pasir pasang @ 280,000.00 616.00

0.0800 kg Semen warna @ 13,500.00 1,080.00

0.0900 oh pekerja @ 55,000.00 4,950.00

0.0900 oh tukang batu @ 70,000.00 6,300.00

0.0090 oh kepala tukang @ 75,000.00 675.00

0.0045 oh mandor @ 75,000.00 337.50

0.09 JUMLAH 5,775.50 12,262.50 18,038.00

M.6.6.40 1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM

0.09 10.0000 m2 Interval cove ( 5 x 5 x 20 ) cm @ -

1.4150 kg semen portland @ 1,270.00 1,797.05

0.0390 m2 pasir pasang @ 280,000.00 10,920.00

1.2000 kg Semen warna @ 13,500.00 16,200.00

0.7500 oh pekerja @ 55,000.00 41,250.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0375 oh mandor @ 75,000.00 2,812.50

0.09 JUMLAH 28,917.05 78,937.50 107,854.55

M.6.6.41 1 M' PASANG PLINT VINYL TANPA ADUKAN

0.09 3.5000 Bh Lt vinyl karet 30 x 30 kwl @ -

0.0800 kg Lem vinyl @ -

0.0800 oh pekerja @ 55,000.00 4,400.00

0.0800 oh tukang batu @ 70,000.00 5,600.00

0.0080 oh kepala tukang @ 75,000.00 600.00

0.0040 oh mandor @ 75,000.00 300.00

0.09 JUMLAH - 10,900.00 10,900.00

M.6.6.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM

50.0000 Bh Ubin keramik artistik 10 x 20 cm @ 700.00 35,000.00

11.3000 kg semen portland @ 1,270.00 14,351.00

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 81,361.00 63,475.00 144,836.00

Page 58: RAB Siring

M.6.6.43 1 M2 PASANG LANTAI KERAMIK 15 X 15 CM

0.09 44.0000 Bh Ubin keramik 15 x 15 cm @ 850.00 37,400.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 83,862.60 63,475.00 147,337.60

M.6.6.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

0.09 25.0000 Bh Ubin keramik 20 x 20 cm @ 2,600.00 65,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 111,462.60 63,475.00 174,937.60

M.6.6.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM

0.09 16.0000 Bh Ubin keramik 25 x 25 cm @ 2,750.00 44,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 90,462.60 63,475.00 153,937.60

M.6.6.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM

0.09 35.0000 Bh Ubin keramik 15 x 20 cm @ 2,224.00 77,840.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 124,302.60 63,475.00 187,777.60

M.6.6.47 1 M2 PASANG LANTAI KERAMIK 20 x 20 CM ANTI SLIP

0.09 25.0000 Bh keramik 20 x 20 cm ANTI SLIP @ 2,160.00 54,000.00

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

Page 59: RAB Siring

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 100,462.60 63,475.00 163,937.60

Page 60: RAB Siring

M.6.6.47 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM

0.09 11.1111 Bh Ubin keramik 30 x 30 cm @ 8,090.91 89,898.99

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 136,361.59 63,475.00 199,836.59

M.6.6.48 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP

0.09 11.1111 Bh Ubin keramik 30 X 30 cm Anti slip @ 7,727.27 85,858.59

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 132,321.19 63,475.00 195,796.19

M.6.6.49 1 M2 PASANG LANTAI KERAMIK 10 x 33 CM

0.09 33.0000 Bh Ubin keramik 10 x 33 cm @ - -

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m2 pasir pasang @ 280,000.00 11,760.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 46,462.60 63,475.00 109,937.60

M.6.6.50 1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL

0.09 12.0000 Bh Mosaik 30 x 30 cm @ -

14.1500 kg semen portland @ 1,270.00 17,970.50

0.0390 m2 pasir pasang @ 280,000.00 10,920.00

2.0000 kg Semen warna @ 13,500.00 27,000.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 55,890.50 63,475.00 119,365.50

Page 61: RAB Siring

M.6.6.51 1 M2 PASANG LANTAI MARMER

0.09 1.0520 Bh Marmer @ 495,000.00 520,740.00

14.1500 kg semen portland @ 1,270.00 17,970.50

0.0390 m2 pasir pasang @ 280,000.00 10,920.00

2.0000 kg Semen warna @ 13,500.00 27,000.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 576,630.50 63,475.00 640,105.50

M.6.6.52 1 M2 PASANG LANTAI KARPET 100 % WOOL

0.09 1.0500 Bh Feltex carpet 100% wool T-21 @ -

0.3500 kg Lem Vinyl @ 35,000.00 12,250.00

0.1700 oh pekerja @ 55,000.00 9,350.00

0.1700 oh tukang batu @ 70,000.00 11,900.00

0.0170 oh kepala tukang @ 75,000.00 1,275.00

0.0085 oh mandor @ 75,000.00 637.50

0.09 JUMLAH - 23,162.50 23,162.50

M.6.6.53 1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON

0.09 1.0500 Bh Carpet 80%, 20% nylon @ -

0.3500 kg Lem Vinyl @ 35,000.00 12,250.00

0.1700 oh pekerja @ 55,000.00 9,350.00

0.1700 oh tukang batu @ 70,000.00 11,900.00

0.0170 oh kepala tukang @ 75,000.00 1,275.00

0.0085 oh mandor @ 75,000.00 637.50

0.09 JUMLAH 12,250.00 23,162.50 35,412.50

M.6.6.54 1 M2 PASANG UNDRLYER, TEBAL 6 MM

0.09 1.0500 Bh Underlyer tebal 6 mm / rubber corrugated @ -

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0060 oh mandor @ 75,000.00 450.00

0.09 JUMLAH - 16,350.00 16,350.00

M.6.6.55 1 M2 PASANG LANTAI KARPET

0.09 1.0500 Bh Carpet @ -

0.3500 kg Lem Vinyl @ 35,000.00 12,250.00

0.1700 oh pekerja @ 55,000.00 9,350.00

0.1700 oh tukang batu @ 70,000.00 11,900.00

0.0170 oh kepala tukang @ 75,000.00 1,275.00

0.0085 oh mandor @ 75,000.00 637.50

0.09 JUMLAH 12,250.00 23,162.50 35,412.50

Page 62: RAB Siring

M.6.6.56 1 M2 PASANG LANTAI PARQUET JATI

0.09 1.0500 Bh Parquet jati @ -

0.3500 kg Lem Vinyl @ 35,000.00 12,250.00

0.1700 oh pekerja @ 55,000.00 9,350.00

0.1700 oh tukang batu @ 70,000.00 11,900.00

0.0170 oh kepala tukang @ 75,000.00 1,275.00

0.0085 oh mandor @ 75,000.00 637.50

0.09 JUMLAH 12,250.00 23,162.50 18,530.00

M.6.6.57 1 M2 PASANG GYMFLOOR

0.09 1.0500 Bh Gymfloor @ -

0.6000 kg Lem Vinyl @ 35,000.00 21,000.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0325 oh mandor @ 75,000.00 2,437.50

0.09 JUMLAH 21,000.00 65,312.50 86,312.50

M.6.6.58 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH

0.09 83.0000 Bh porselin 11 x 11 cm @ - -

9.3000 kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 Kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.5000 oh tukang batu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 37,101.00 75,100.00 112,201.00

M.6.6.59 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA

0.09 83.0000 Bh porselin 11 x 11 cm warna @ - -

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.5000 oh tukang batu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 37,101.00 75,100.00 112,201.00

M.6.6.60 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH

0.09 45.0000 Bh porselin 15 x 15 cm putih @ 2,300.00 103,500.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 118,390.21 56,250.00 174,640.21

Page 63: RAB Siring

M.6.6.61 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA

0.09 45.0000 Bh porselin 15 x 15 cm putih @ 2,800.00 126,000.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 163,101.00 70,125.00 233,226.00

M.6.6.62 1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA

0.09 50.0000 Bh porselin 10 x 20 cm, warna @ 2,500.00 125,000.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 162,101.00 70,125.00 232,226.00

M.6.6.63 1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA

0.09 25.0000 Bh porselin 20 x 20 cm, warna @ 3,000.00 75,000.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.1800 m3 pasir pasang @ 280,000.00 50,400.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 157,461.00 70,125.00 227,586.00

M.6.6.64 1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM

0.09 100.0000 Bh Keramik artistik 10 x 20 cm @ 1,000.00 100,000.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 137,101.00 70,125.00 207,226.00

Page 64: RAB Siring

M.6.6.65 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM

0.09 100.0000 Bh Keramik artistik 5 x 20 cm @ 500.00 50,000.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 87,101.00 70,125.00 157,226.00

M.6.6.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM

0.09 50.0000 Bh Keramik 10 x 20 cm @ 1,102.22 55,111.11

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 92,212.11 70,125.00 162,337.11

M.6.6.67 1 M2 PASANG DINDING KERAMIK 15 x 15 CM

0.09 45.0000 Bh Keramik 15 x 15 cm @ 850.00 38,250.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 75,351.00 70,125.00 145,476.00

M.6.6.68 1 M2 PASANG DINDING KERAMIK 20 x 20 CM

0.09 25.0000 Bh Keramik 20 x 20 cm @ 1,222.22 30,555.56

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.4500 oh tukang batu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ 75,000.00 3,375.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 67,656.56 70,125.00 137,781.56

M.6.6.68a 1 M2 PASANG DINDING KERAMIK 20 x 25 CM

0.09 1.1000 m2 Keramik 20 x 25 cm @ 55,600.00 61,160.00

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.1250 oh tukang batu @ 70,000.00 8,750.00

0.0125 oh kepala tukang @ 75,000.00 937.50

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 98,261.00 44,937.50 143,198.50

Page 65: RAB Siring

M.6.6.69 1 M2 PASANG DINDING KERAMIK 10 x 20 CM

0.09 50.0000 Bh Keramik 10 x 20 cm @ 1,102.22 55,111.11

9.3000 Kg Semen abu-abu @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.6000 oh pekerja @ 55,000.00 33,000.00

0.1250 oh tukang batu @ 70,000.00 8,750.00

0.0125 oh kepala tukang @ 75,000.00 937.50

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 92,212.11 44,937.50 137,149.61

M.6.6.70 1 M2 PASANG DINDING MARMER

0.09 1.0200 m2 marmer @ - -

2.0000 Kg Pacu Pancing 60 x 230 @ 25,000.00 50,000.00

12.4400 Kg Semen abu-abu @ 1,270.00 15,798.80

0.0250 m3 pasir pasang @ 280,000.00 7,000.00

1.5000 kg Semen warna @ 13,500.00 20,250.00

0.7200 oh pekerja @ 55,000.00 39,600.00

0.6500 oh tukang batu @ 70,000.00 45,500.00

0.0650 oh kepala tukang @ 75,000.00 4,875.00

0.0350 oh mandor @ 75,000.00 2,625.00

0.09 JUMLAH 93,048.80 92,600.00 185,648.80

M.6.6.71 1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM

0.09 60.0000 Bh Bata Pelapis dinding @ 770.00 46,200.00

12.4400 Kg Semen abu-abu @ 1,270.00 15,798.80

0.0250 m3 pasir pasang @ 280,000.00 7,000.00

0.6500 oh pekerja @ 13,500.00 8,775.00

0.5000 oh tukang batu @ 55,000.00 27,500.00

0.0500 oh kepala tukang @ 75,000.00 3,750.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 68,998.80 42,275.00 111,273.80

M.6.6.72 1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM

0.09 80.0000 Bh Bata Pelapis klinker @ 770.00 61,600.00

12.4400 Kg Semen abu-abu @ 1,270.00 15,798.80

0.0250 m3 pasir pasang @ 280,000.00 7,000.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0350 oh mandor @ 75,000.00 2,625.00

0.09 JUMLAH 84,398.80 63,850.00 148,248.80

M.6.6.73 1 M2 PASANG DINDING BATU PAROS

0.09 1.0500 m2 Batu paros @ -

11.7500 Kg Semen abu-abu @ 1,500.00 17,625.00

0.0350 m3 pasir pasang @ 280,000.00 9,800.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 27,425.00 63,475.00 90,900.00

Page 66: RAB Siring

M.6.6.74 1 M2 PASANG DINDING BATU TEMPEL HITAM

0.09 1.0500 m2 Batu tempel hitam @ -

11.7500 Kg Semen abu-abu @ 1,270.00 14,922.50

0.0350 m3 pasir pasang @ 280,000.00 9,800.00

0.6200 oh pekerja @ 55,000.00 34,100.00

0.3500 oh tukang batu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ 75,000.00 2,625.00

0.0300 oh mandor @ 75,000.00 2,250.00

0.09 JUMLAH 24,722.50 63,475.00 88,197.50

M.6.6.75 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I

0.09 11.0500 m2 Vinyl karet 30 x 30 cm KL I @ -

0.3500 Kg Lem Vinyl @ 35,000.00 12,250.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0075 oh mandor @ 75,000.00 562.50

0.09 JUMLAH 12,250.00 20,437.50 32,687.50

M.6.6.76 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II

0.09 11.0500 m2 Vinyl karet 30 x 30 cm KL II @ -

0.3500 Kg Lem Vinyl @ 35,000.00 12,250.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0075 oh mandor @ 75,000.00 562.50

0.09 JUMLAH 12,250.00 20,437.50 32,687.50

M.6.6.77 1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM

0.09 11.0500 m2 Vinyl asbes 30 x 30 cm @ -

0.3500 Kg Lem Vinyl @ 35,000.00 12,250.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0075 oh mandor @ 75,000.00 562.50

0.09 JUMLAH 12,250.00 20,437.50 32,687.50

M.6.6.78 1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM

0.09 11.0500 m2 Vinyl motif kembang 30 x 30 cm @ -

0.3500 Kg Lem Vinyl @ 35,000.00 12,250.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ 75,000.00 1,125.00

0.0075 oh mandor @ 75,000.00 562.50

0.09 JUMLAH 12,250.00 20,437.50 32,687.50

Page 67: RAB Siring

M.6.6.79 1 M2 PASANG WALL COVERING LEBAR 50 CM

0.09 1.1000 m2 Vinyl Wall covering, lebar 50 cm @ -

0.2500 Kg Lem @ - -

0.7500 oh pekerja @ 55,000.00 41,250.00

0.1700 oh tukang batu @ 70,000.00 11,900.00

0.0170 oh kepala tukang @ 75,000.00 1,275.00

0.0085 oh mandor @ 75,000.00 637.50

0.09 JUMLAH - 55,062.50 55,062.50

M.6.6.80 1 M2 FLOOR HARDENER FERROVAX

0.09 3.0000 Kg Floor hardener ferrovax @ -

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0060 oh mandor @ 75,000.00 450.00

0.09 JUMLAH - 16,350.00 16,350.00

M.6.6.81 1 M2 FLOOR HARDENER MASTERCRON

0.09 5.0000 Kg Mastercron "S" @ -

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0060 oh mandor @ 75,000.00 450.00

0.09 JUMLAH - 16,350.00 16,350.00

M.6.6.82 1 M2 PLINT KAYU 2 X 10 CM

0.09 0.0024 m3 kayu Jati papan @ 7,000,000.00 16,800.00

0.0500 Kg Paku skrup 3,5 " @ 11,500.00 575.00

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0060 oh mandor @ 75,000.00 450.00

0.09 JUMLAH 16,800.00 16,925.00 33,725.00

N. PEKERJAAN CAT - CATAN

N. 6.6.1 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA

0.0500 kg Soda Api @ -

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang cat @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ 75,000.00 562.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH - 14,250.00 14,250.00

N. 6.6.2 1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT

0.0500 kg Sabun @ 10,500.00 525.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang cat @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ 75,000.00 562.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 525.00 14,250.00 14,775.00

Page 68: RAB Siring

N. 6.6.3 1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL

0.0500 kg Sabun @ 10,500.00 525.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang cat @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ 75,000.00 562.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 525.00 14,250.00 14,775.00

N. 6.6.4 1 M2 MENYABUN PERMUKAAN TEMBOK LAMA

0.0500 kg Sabun @ 10,500.00 525.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0750 oh tukang cat @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ 75,000.00 562.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 525.00 14,250.00 14,775.00

N. 6.6.5 1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR

PASIR ( SANBLASTING ) DENGAN TINGKAT KEBERSIHAN Sa 2 1/2

40.0000 kg Pasir silika @ -

10.0000 Ltr BBM, solar @ 6,950.00 69,500.00

1.0000 Hr Kompressor, blasting pot @ 425,197.11 425,197.11

Selang dan Nozzle -

1.6000 oh pekerja @ 55,000.00 88,000.00

1.6000 oh tukang cat @ 70,000.00 112,000.00

0.8000 oh kepala tukang @ 75,000.00 60,000.00

0.5000 oh mandor @ 75,000.00 37,500.00

JUMLAH - 792,197.11 792,197.11

N. 6.6.6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU

0.0800 kg Dempul jadi @ 20,000.00 1,600.00

0.0200 kg Minyak cat @ 12,500.00 250.00

0.0100 kg Batu apung @ 15,125.00 151.25

0.0400 oh pekerja @ 55,000.00 2,200.00

0.0400 oh tukang cat @ 70,000.00 2,800.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 2,001.25 5,487.50 7,488.75

N. 6.6.7 1 M2 PENGECATAN BIDANG KAYU LAMA

0.1500 kg plamir @ 18,500.00 2,775.00

0.1700 kg cat dasar @ 18,350.00 3,119.50

0.1700 kg cat penutup/kilap @ 34,650.00 5,890.50

0.0700 oh pekerja @ 55,000.00 3,850.00

0.0750 oh tukang cat @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ 75,000.00 562.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 11,785.00 9,850.00 21,635.00

Page 69: RAB Siring

N. 6.6.8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR,

2 LAPIS CAT PENUTUP

0.2000 kg cat meni @ 18,350.00 3,670.00

0.1200 kg Plamir @ 20,800.00 2,496.00

0.1700 kg cat dasar @ 20,800.00 3,536.00

0.2600 kg cat penutup 2 kali @ 34,650.00 9,009.00

0.0700 oh pekerja @ 55,000.00 3,850.00

0.0090 oh tukang cat @ 70,000.00 630.00

0.0060 oh kepala tukang @ 75,000.00 450.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 18,711.00 5,117.50 23,828.50

N. 6.6.9 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR )

1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP

0.2000 kg cat meni @ 18,350.00 3,670.00

0.1500 kg plamir @ 20,800.00 3,120.00

0.1700 kg cat dasar @ 20,800.00 3,536.00

0.3500 oh cat penutup 3 kali @ 34,650.00 12,127.50

0.0700 oh pekerja @ 55,000.00 3,850.00

0.1050 oh tukang cat @ 70,000.00 7,350.00

0.0040 oh kepala tukang @ 75,000.00 300.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 22,453.50 11,687.50 34,141.00

N. 6.6.10 1 M2 PELABURAN BIDANG KAYU DENGAN OLI BEKAS

0.3600 ltr oli bekas @ 37,300.00 13,428.00

0.0400 oh pekerja @ 55,000.00 2,200.00

0.0630 oh tukang cat @ 70,000.00 4,410.00

0.0630 oh kepala tukang @ 75,000.00 4,725.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 13,428.00 11,522.50 24,950.50

N. 6.6.11 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

0.1500 ltr plitur @ 42,500.00 6,375.00

0.3720 ltr plitur jadi @ 42,500.00 15,810.00

2.0000 lbr ampelas @ 2,750.00 5,500.00

- oh pekerja @ -

0.0600 oh tukang cat @ 70,000.00 4,200.00

0.0160 oh kepala tukang @ 75,000.00 1,200.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 27,685.00 5,587.50 33,272.50

N. 6.6.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

0.3500 ltr Residu atau ter @ 5,000.00 1,750.00

0.1000 oh pekerja @ 45,000.00 4,500.00

- oh tukang cat @ -

- oh kepala tukang @ -

0.0060 oh mandor @ 60,000.00 360.00

JUMLAH 6,250.00 360.00 6,610.00

Page 70: RAB Siring

N. 6.6.13 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS

0.1500 ltr Vernis @ 10,000.00 1,500.00

0.0500 Kg Dempul @ 20,000.00 1,000.00

0.1000 Ltr ampelas @ 2,750.00 275.00

0.0100 bh Kuas @ 7,500.00 75.00

0.1600 oh pekerja @ 55,000.00 8,800.00

0.1600 oh tukang cat @ 70,000.00 11,200.00

0.0160 oh kepala tukang @ 75,000.00 1,200.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 2,850.00 21,387.50 24,237.50

N. 6.6.14 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup ) Komilex setara

0.1000 kg plamir @ 18,500.00 1,850.00 9,250.00

0.1000 kg cat dasar @ 20,800.00 2,080.00

0.2600 kg cat penutup @ 1,200.00 312.00

0.0200 oh pekerja @ 55,000.00 1,100.00

0.0630 oh tukang cat @ 70,000.00 4,410.00

0.0063 oh kepala tukang @ 75,000.00 472.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 4,242.00 6,170.00 10,412.00

N. 6.6.14a 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup ) Envitex setara

0.1000 kg alkalie @ 48,638.10 4,863.81

0.1000 kg cat dasar @ 18,000.00 1,800.00

0.2600 kg cat penutup @ 18,000.00 4,680.00

0.0200 oh pekerja @ 55,000.00 1,100.00

0.0630 oh tukang cat @ 70,000.00 4,410.00

0.0063 oh kepala tukang @ 75,000.00 472.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 11,343.81 6,170.00 17,513.81

N. 6.6.14b 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup ) interior Mowilex setara

0.1000 kg plamir @ 20,800.00 2,080.00

0.1000 kg cat dasar @ 47,080.00 4,708.00

0.2600 kg cat penutup @ 47,080.00 12,240.80

0.0200 oh pekerja @ 55,000.00 1,100.00

0.0630 oh tukang cat @ 70,000.00 4,410.00

0.0063 oh kepala tukang @ 75,000.00 472.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 19,028.80 6,170.00 25,198.80

N. 6.6.14c 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup ) eksterior Mowilex setara

0.1000 kg plamir @ 20,800.00 2,080.00

0.1000 kg cat dasar @ 67,500.00 6,750.00

0.2600 kg cat penutup @ 67,500.00 17,550.00

0.0200 oh pekerja @ 55,000.00 1,100.00

0.0630 oh tukang cat @ 70,000.00 4,410.00

0.0063 oh kepala tukang @ 75,000.00 472.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 26,380.00 6,170.00 32,550.00

N. 6.6.15 1 M2 PENGECATAN TEMBOK LAMA

Page 71: RAB Siring

( 1 lapis cat dasar, 2 lapis cat penutup )

0.1200 kg cat dasar @ 20,800.00 2,496.00

0.1800 kg cat penutup 2 x @ 47,080.00 8,474.40

0.0280 oh pekerja @ 47,080.00 1,318.24

0.0420 oh tukang cat @ 70,000.00 2,940.00

0.0042 oh kepala tukang @ 75,000.00 315.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 10,970.40 4,760.74 15,731.14

N. 6.6.16 1 M2 MELABUR TEMBOK DENGAN KALKARIUM

0.1000 ltr Kalkarium @ -

0.0280 oh pekerja @ 55,000.00 1,540.00

0.0420 oh tukang cat @ 70,000.00 2,940.00

0.0042 oh kepala tukang @ 75,000.00 315.00

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH - 4,982.50 4,982.50

N. 6.6.17 1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH

0.1000 lbr Ampelas @ 2,750.00 275.00

0.2500 Ikat Alang-alang @ 500.00 125.00

0.0020 m3 Perancah kayu @ 2,100,000.00 4,200.00

0.1500 kg kapur sirih @ 10,000.00 1,500.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0010 oh tukang cat @ 70,000.00 70.00

0.0001 oh kepala tukang @ 75,000.00 7.50

0.0025 oh mandor @ 75,000.00 187.50

JUMLAH 6,100.00 8,515.00 14,615.00

Page 72: RAB Siring

N. 6.6.18 1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN )

0.0020 lbr Perancah kayu @ 2,100,000.00 4,200.00

0.3000 kg kapur sirih @ 10,000.00 3,000.00

0.0400 oh pekerja @ 55,000.00 2,200.00

0.0050 oh tukang cat @ 70,000.00 350.00

0.0005 oh kepala tukang @ 75,000.00 37.50

0.0025 oh Mandor @ 75,000.00 187.50

JUMLAH 7,200.00 2,775.00 9,975.00

N. 6.6.19 1 M2 PEMASANGAN WALL PAPER

1.2000 lbr Wall paper @ - -

0.2000 kg Perekat @ 10,000.00 2,000.00

0.0200 oh pekerja @ 55,000.00 1,100.00

0.2000 oh tukang cat @ 70,000.00 14,000.00

0.0020 oh kepala tukang @ 75,000.00 150.00

0.0025 oh Mandor @ 75,000.00 187.50

JUMLAH 2,000.00 15,437.50 17,437.50

N. 6.6.20 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

0.1000 kg meni besi @ 35,200.00 3,520.00

0.0100 Ikat Kuas @ 8,300.00 83.00

0.0200 oh pekerja @ 55,000.00 1,100.00

0.2000 oh tukang cat @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ 75,000.00 1,500.00

0.0100 oh Mandor @ 75,000.00 750.00

JUMLAH 3,603.00 17,350.00 20,953.00

N. 6.6.21 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH

0.1000 kg meni besi @ 35,200.00 3,520.00

0.0100 Ikat Kuas @ 8,300.00 83.00

0.0020 m3 Perancah kayu @ 2,100,000.00 4,200.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2250 oh tukang cat @ 70,000.00 15,750.00

0.0225 oh kepala tukang @ 75,000.00 1,687.50

0.0075 oh Mandor @ 75,000.00 562.50

JUMLAH 7,803.00 31,750.00 39,553.00

N. 6.6.22 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

SISTEM 4 LAPIS CAT KONVENSIONAL DENGAN TEBAL 200 UM

0.1000 kg meni ( read lead ) A @ -

0.1000 kg meni ( read lead ) B @ -

0.0400 kg Alumunium C @ -

0.0400 kg Alumunium C @ -

0.0100 Ltr Pengencer @ -

0.0020 m3 Perancah kayu @ 2,100,000.00 4,200.00

0.0060 oh pekerja @ 55,000.00 330.00

0.0060 oh tukang cat @ 70,000.00 420.00

0.0225 oh kepala tukang @ 75,000.00 1,687.50

0.0075 oh Mandor @ 75,000.00 562.50

JUMLAH 4,200.00 3,000.00 7,200.00

Page 73: RAB Siring

N. 6.6.23 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

SISTEM 1 LAPIS CAT MUTAKHIR DENGAN TEBAL 200 UM

0.3000 kg cat @ -

0.0060 oh pekerja @ 55,000.00 330.00

0.0600 oh tukang cat @ 70,000.00 4,200.00

0.0120 oh kepala tukang @ 75,000.00 900.00

0.0060 oh Mandor @ 75,000.00 450.00

JUMLAH - 5,880.00 5,880.00

N. 6.6.24 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

SISTEM 3 LAPIS CAT KONVENSIONAL DENGAN TEBAL 200 UM

0.1100 Kg Cat dasar @ -

0.1700 kg cat antara @ -

0.0800 kg cat penutup @ -

0.5000 oh pekerja @ 55,000.00 27,500.00

0.8000 oh tukang cat @ 70,000.00 56,000.00

0.3000 oh kepala tukang @ 75,000.00 22,500.00

0.2000 oh Mandor @ 75,000.00 15,000.00

JUMLAH - 121,000.00 121,000.00

N. 6.6.25 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT

( AIRLESS SPRAY ) SISTEM 1 LAPIS CAT MUTAKHIR DENGAN TEBAL 200 UM

0.3000 kg cat dasar @ -

0.4000 oh pekerja @ 55,000.00 22,000.00

0.7000 oh tukang cat @ 70,000.00 49,000.00

0.2000 oh kepala tukang @ 75,000.00 15,000.00

0.2000 oh Mandor @ 75,000.00 15,000.00

JUMLAH - 101,000.00 101,000.00

Page 74: RAB Siring

### Semen

###

Page 75: RAB Siring

2600

Page 76: RAB Siring
Page 77: RAB Siring
Page 78: RAB Siring

ANALISA HARGA SATUAN SNI 2010

INDEK SATUAN U R A I A N HARGA SATUAN ( Rp )

HARGA

JUMLAH HARGA ( Rp )BAHAN UPAH

( Rp ) ( Rp )

A. PEKERJAAN PERSIAPAN

A. 6.6.1 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M

1.2500 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 14,000.00

2.5000 kg Semen portland @ 1,298.00 3,245.00

0.0050 m3 Pasir beton @ 250,000.00 1,250.00

0.0090 m3 Koral beton @ 263,000.00 2,367.00

0.0720 m3 Kayu 5/7 @ 2,100,000.00 151,200.00

0.0600 kg Paku biasa 2'-5' @ 16,650.00 999.00

0.4000 lt Residu @ 18,350.00 7,340.00

0.2000 oh Tukang kayu @ 70,000.00 14,000.00

0.4000 oh Pekerja @ 55,000.00 22,000.00

0.0200 oh Kepala tukang @ 75,000.00 1,500.00

0.0200 oh Mandor @ 75,000.00 1,500.00

JUMLAH 180,401.00 39,000.00 219,401.00

A. 6.6.2 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M

1.2500 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 14,000.00

2.5000 kg Semen portland @ 1,298.00 3,245.00

1.2000 Lbr Seng gelombang 3" - 5 " @ 40,900.00 49,080.00

0.0050 m3 Pasir Beton @ 250,000.00 1,250.00

0.0090 m3 Koral beton @ 263,000.00 2,367.00

0.0720 kg Kayu 5/7 @ 2,100,000.00 151,200.00

0.0600 kg Paku biasa 2'-5' @ 16,650.00 999.00

0.4500 Kg Meni besi @ 18,350.00 8,257.50

0.2000 oh Tukang kayu @ 70,000.00 14,000.00

0.4000 oh Pekerja @ 55,000.00 22,000.00

0.0200 oh Kepala tukang @ 75,000.00 1,500.00

0.0200 oh Mandor @ 75,000.00 1,500.00

JUMLAH 230,398.50 39,000.00 269,398.50

A. 6.6.3 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M

1.2500 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 14,000.00

2.5000 kg Semen portland @ 1,270.00 3,175.00

25.0000 kg Kawat Duri @ 74,850.00 1,871,250.00

0.0050 m3 Pasir Beton @ 250,000.00 1,250.00

0.0090 m3 Koral beton @ 263,000.00 2,367.00

0.0720 kg Paku biasa 2'-5' @ 16,650.00 1,198.80

0.2000 oh Tukang kayu @ 70,000.00 14,000.00

0.3000 oh Pekerja @ 55,000.00 16,500.00

0.0200 oh Kepala tukang @ 75,000.00 1,500.00

0.0200 oh Mandor @ 75,000.00 1,500.00

JUMLAH 1,893,240.80 33,500.00 1,926,740.80

Hal : 404

KODE ANALISA

Page 79: RAB Siring

A. 6.6.4 1 M' MENGUKUR DAN MEMASANG BOUWPLANK

0.0120 m3 kayu meranti, balok @ 2,100,000.00 25,200.00

0.0200 kg Paku Biasa 2' - 5' @ 16,650.00 333.00

0.0070 m3 kayu papan 3/20 @ 2,100,000.00 14,700.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0100 oh kepala tukang @ 75,000.00 750.00

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 40,233.00 13,625.00 53,858.00

A. 6.6.5 1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN

1.2500 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 14,000.00

0.1800 kg Kayu @ 2,100,000.00 378,000.00

0.8500 m3 Kayu Biasa @ 2,100,000.00 1,785,000.00

1.1000 m3 Besi Strip @ 31,800.00 34,980.00

35.0000 kg Semen portland @ 1,270.00 44,450.00

0.1500 kg Pasir Pasang @ 280,000.00 42,000.00

0.1000 m3 Pasir Beton @ 250,000.00 25,000.00

0.1500 m3 Koral beton @ 263,000.00 39,450.00

30.0000 Bh Bata merah @ 900.00 27,000.00

0.2500 Lbr Seng Plat @ 53,600.00 13,400.00

2.0000 Bh Jendela Nako @ 326,700.00 653,400.00

0.0800 m2 Kaca Polos @ 102,300.00 8,184.00

0.0150 Bh Kunci Tanam @ 132,800.00 1,992.00

0.0600 Lbr Plywood 4 mm @ 56,500.00 3,390.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

1.0000 oh Tukang Batu @ 70,000.00 70,000.00

2.0000 oh pekerja @ 55,000.00 110,000.00

0.3000 oh Kepala tukang @ 75,000.00 22,500.00

0.0500 oh Mandor @ 75,000.00 3,750.00

JUMLAH 3,070,246.00 346,250.00 3,416,496.00

A. 6.6.6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT

1.7000 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 19,040.00

0.2100 kg Kayu @ 2,100,000.00 441,000.00

0.3000 kg Paku biasa 2'-5' @ 16,650.00 4,995.00

10.5000 kg Semen portland @ 1,270.00 13,335.00

0.0300 m3 Pasir Beton @ 250,000.00 7,500.00

0.0500 m3 Koral beton @ 263,000.00 13,150.00

1.5000 Lbr Seng gelombang @ 40,900.00 61,350.00

2.0000 oh Tukang kayu @ 70,000.00 140,000.00

1.0000 oh Pekerja @ 55,000.00 55,000.00

0.2000 oh Kepala tukang @ 75,000.00 15,000.00

0.0500 oh Mandor @ 75,000.00 3,750.00

JUMLAH 560,370.00 213,750.00 774,120.00

Page 80: RAB Siring

A. 6.6.7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU

3.0000 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 33,600.00

0.2760 kg Kayu @ 2,100,000.00 579,600.00

0.7000 kg Paku biasa 2'-5' @ 16,650.00 11,655.00

1.5000 Lbr Seng gelombang bljs 32 @ 40,900.00 61,350.00

1.5000 oh Tukang kayu @ 70,000.00 105,000.00

1.0000 oh Pekerja @ 55,000.00 55,000.00

0.1500 oh Kepala tukang @ 75,000.00 11,250.00

0.0500 oh Mandor @ 75,000.00 3,750.00

JUMLAH 686,205.00 175,000.00 861,205.00

A. 6.6.8 1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0500 oh mandor @ 75,000.00 3,750.00

JUMLAH - 9,250.00 9,250.00

A. 6.6.9 1 M2 PEMBUATAN BEDENG BURUH

1.2500 btg Dolken kayu dia 8-10/4 m' @ 11,200.00 14,000.00

0.1860 kg Kayu @ 2,100,000.00 390,600.00

0.3000 Kg Paku biasa 2'-5' @ 16,650.00 4,995.00

18.0000 kg Semen portland @ 1,270.00 22,860.00

0.0300 m3 Pasir Beton @ 250,000.00 7,500.00

0.0500 m3 Koral beton @ 263,000.00 13,150.00

1.5000 Lbr Seng gelombang bljs 32 @ 40,900.00 61,350.00

1.3500 Lbr Plywood 4 mm @ 56,500.00 76,275.00

2.0000 oh Tukang kayu @ 70,000.00 140,000.00

1.0000 oh Pekerja @ 55,000.00 55,000.00

0.2000 oh Kepala tukang @ 75,000.00 15,000.00

0.0500 oh Mandor @ 75,000.00 3,750.00

JUMLAH 590,730.00 213,750.00 804,480.00

A. 6.6.10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM

0.0360 m3 Kayu Terentang @ 2,100,000.00 75,600.00

0.0800 kg Paku biasa 2'-5' @ 16,650.00 1,332.00

1.0000 btg kaso 5/7 @ 55,000.00 55,000.00

0.3000 oh Tukang kayu @ 70,000.00 21,000.00

0.0015 oh Mandor @ 75,000.00 112.50

JUMLAH 131,932.00 21,112.50 153,044.50

A. 6.6.11 1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM

1.0000 btg Bambu dia. 6 - 8 / 600 cm @ 11,200.00 11,200.00

0.2500 kg Tali Ijuk @ 25,000.00 6,250.00

0.0170 oh Tukang kayu @ 70,000.00 1,190.00

0.2500 oh Pekerja @ 55,000.00 13,750.00

0.0020 oh Kepala tukang @ 75,000.00 150.00

0.0130 oh Mandor @ 75,000.00 975.00

JUMLAH 17,450.00 16,065.00 29,335.00

Page 81: RAB Siring

A. 6.6.12 1 M2 PEMBUATAN JALAN SEMENTARA

0.1500 m3 Batu Belah 15/20 @ 200,000.00 30,000.00

0.0900 m3 Batu Pecah 5/7 @ 165,250.00 14,872.50

0.0100 m3 Pasir pasang @ 280,000.00 2,800.00

1.0000 oh pekerja @ 55,000.00 55,000.00

0.0500 oh mandor @ 75,000.00 3,750.00

JUMLAH 47,672.50 58,750.00 106,422.50

A. 6.6.13 1 M3 BONGKARAN BETON BERTULANG

6.6670 oh pekerja @ 55,000.00 366,685.00

0.3330 oh Mandor @ 75,000.00 24,975.00

JUMLAH - 391,660.00 391,660.00

A. 6.6.14 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

6.6670 oh pekerja @ 55,000.00 366,685.00

0.3330 oh Mandor @ 75,000.00 24,975.00

JUMLAH - 391,660.00 391,660.00

A. 6.6.15 1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M

0.4340 m2 Pagar Kawat jaring @ 107,300.00 46,568.20

0.0420 oh Pekerja @ 55,000.00 2,310.00

0.0040 oh Kepala tukang @ 75,000.00 300.00

0.0420 oh Tukang @ 70,000.00 2,940.00

0.0020 oh Mandor @ 75,000.00 150.00

JUMLAH 46,568.20 5,700.00 52,268.20

A. 6.6.16 1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM

0.9860 lbr Panel Beton Pracetak @ -

0.5250 btg Kolom Beton Pracetak @ -

0.0740 m3 Pasir Beton @ 250,000.00 18,500.00

0.1460 m3 Koral @ 263,000.00 38,398.00

45.0000 kg Semen Abu- abu @ 1,270.00 57,150.00

0.1250 oh Tukang batu @ 70,000.00 8,750.00

0.0120 oh Kepala tukang @ 75,000.00 900.00

0.3750 oh pekerja @ 55,000.00 20,625.00

0.0190 oh mandor @ 75,000.00 1,425.00

JUMLAH 114,048.00 31,700.00 145,748.00

B. PEKERJAAN TANAH

B. 6.6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M'

0.4000 oh pekerja @ 55,000.00 22,000.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0400 oh mandor @ 75,000.00 3,000.00

JUMLAH 25,000.00 25,000.00

Page 82: RAB Siring

B. 6.6.2 1 M3 GALIAN TANAH BIASA SEDALAM 2 M'

0.5260 oh pekerja @ 55,000.00 28,930.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0520 oh mandor @ 75,000.00 3,900.00

JUMLAH 32,830.00 32,830.00

B. 6.6.3 1 M3 GALIAN TANAH BIASA SEDALAM 3 M'

0.7350 oh pekerja @ 55,000.00 40,425.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0730 oh mandor @ 75,000.00 5,475.00

JUMLAH 45,900.00 45,900.00

B. 6.6.4 1 M3 GALIAN TANAH KERAS SEDALAM 1 M'

0.6250 oh pekerja @ 55,000.00 34,375.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0620 oh mandor @ 75,000.00 4,650.00

JUMLAH 39,025.00 39,025.00

B. 6.6.5 1 M3 GALIAN TANAH CADAS SEDALAM 1 M

1.2500 oh pekerja @ 55,000.00 68,750.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.1250 oh mandor @ 75,000.00 9,375.00

JUMLAH 78,125.00 78,125.00

B. 6.6.6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M'

0.8230 oh pekerja @ 55,000.00 45,265.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0830 oh mandor @ 75,000.00 6,225.00

JUMLAH 51,490.00 51,490.00

B. 6.6.7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 M

0.0500 oh pekerja @ 55,000.00 2,750.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0050 oh mandor @ 75,000.00 375.00

JUMLAH 3,125.00 3,125.00

B. 6.6.8 1 M3 PEMBUANGAN TANAH SEJAUH 150 M

0.5160 oh pekerja @ 55,000.00 28,380.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0500 oh mandor @ 75,000.00 3,750.00

JUMLAH 32,130.00 32,130.00

Page 83: RAB Siring

B. 6.6.9 1 M3 URUGAN KEMBALI

0.1920 oh pekerja @ 55,000.00 10,560.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0190 oh mandor @ 75,000.00 1,425.00

JUMLAH 11,985.00 11,985.00

B. 6.6.10 PEMADATAN TANAH

0.5000 oh pekerja @ 55,000.00 27,500.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0500 oh mandor @ 75,000.00 3,750.00

JUMLAH 31,250.00 31,250.00

B. 6.6.11 1 M3 URUGAN TANAH

1.2000 M3 Tanah urug @ 51,900.00 62,280.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.0250 oh mandor @ 75,000.00 1,875.00

1.0000 oh Ls biaya pemadatan @ 31,250.00 31,250.00

JUMLAH 62,280.00 46,875.00 109,155.00

B. 6.6.11.a 1 M3 URUGAN PASIR

1.2000 M3 pasir urug @ 51,900.00 62,280.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.0100 oh mandor @ 75,000.00 750.00

1.0000 oh Ls biaya pemadatan @ 31,250.00 31,250.00

JUMLAH 62,280.00 48,500.00 110,780.00

B. 6.6.12 1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL

0.3300 M3 pasir urug @ 51,900.00 17,127.00

0.1090 M3 kapur padam @

0.7630 M3 tanah liat @

0.8330 oh pekerja @ 55,000.00 45,815.00

0.4160 oh tukang batu @ 70,000.00 29,120.00

0.0400 oh kepala tukang @ 75,000.00 3,000.00

0.0830 oh mandor @ 75,000.00 6,225.00

JUMLAH 17,127.00 84,160.00 133,602.12

B. 6.6.13 1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL

0.2000 M3 kapur padam @ -

1.0000 M3 tanah liat @ -

0.8330 oh pekerja @ 55,000.00 45,815.00

0.4160 oh tukang batu @ 70,000.00 29,120.00

0.0410 oh kepala tukang @ 75,000.00 3,075.00

0.0810 oh mandor @ 75,000.00 6,075.00

JUMLAH - 84,085.00 84,085.00

Page 84: RAB Siring

B. 6.6.14 1 M3 PEMASANGAN LAPISAN IJUK

1.2000 m3 ijuk @

0.1500 oh pekerja @ 55,000.00 8,250.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0150 oh mandor @ 75,000.00 1,125.00

JUMLAH - 9,375.00 9,375.00

B. 6.6.15 1 M3 URUGAN SIRTU

1.2000 M3 Sirtu @ 274,800.00 329,760.00

0.2500 oh pekerja @ 55,000.00 13,750.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.0250 oh mandor @ 75,000.00 1,875.00

JUMLAH 329,760.00 15,625.00 345,385.00

B. 6.6.16 1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM

0.2750 m3 batu belah @ 200,000.00 55,000.00

0.0300 m3 kerikil /Koral @ 263,000.00 7,890.00

0.0500 m3 pasir @ 280,000.00 14,000.00

1.0000 oh pekerja @ 55,000.00 55,000.00

- oh tukang gali @ 70,000.00 -

- oh kepala tukang @ 75,000.00 -

0.1000 oh mandor @ 75,000.00 7,500.00

JUMLAH 76,890.00 62,500.00 139,390.00

C. PEKERJAAN PONDASI

C.6.6.1 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

392.0000 kg semen porland @ 1,270.00 497,840.00

0.3140 m3 pasir pasang @ 280,000.00 87,920.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0750 oh mandor @ 75,000.00 5,625.00

JUMLAH 805,760.00 134,625.00 940,385.00

C.6.6.2 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

267.0000 kg semen porland @ 1,270.00 339,090.00

0.4270 m3 pasir pasang @ 280,000.00 119,560.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0750 oh mandor @ 75,000.00 5,625.00

JUMLAH 678,650.00 134,625.00 813,275.00

Page 85: RAB Siring

C.6.6.3 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

392.0000 kg semen porland @ 1,270.00 497,840.00

0.3140 m3 pasir pasang @ 280,000.00 87,920.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0750 oh mandor @ 75,000.00 5,625.00

JUMLAH 805,760.00 134,625.00 940,385.00

C.6.6.4 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

202.0000 kg semen porland @ 1,270.00 256,540.00

0.4850 m3 pasir pasang @ 280,000.00 135,800.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ 75,000.00 4,500.00

0.0750 oh mandor @ 75,000.00 5,625.00

JUMLAH 612,340.00 134,625.00 746,965.00

C.6.6.5 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

163.0000 kg semen porland @ 1,270.00 207,010.00

0.5200 m3 Pasir Pasang sungai ex. Kandilo @ 280,000.00 145,600.00

9 1.5000 oh pekerja @ 55,000.00 82,500.00

3.6 0.6000 oh tukang batu @ 70,000.00 42,000.00

0.36 0.0600 oh kepala tukang @ -

0.45 0.0750 oh mandor @ -

JUMLAH 572,610.00 124,500.00 697,110.00

C.6.6.5.a 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih)

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

163.0000 kg semen porland @ 1,270.00 207,010.00

0.5200 m3 pasir pasang Putih @ 61,800.00 32,136.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 459,146.00 124,500.00 583,646.00

C.6.6.5.b 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih Sepaku)

1.1000 m3 batu belah 15/20 cm (SEPAKU) @ 225,000.00 247,500.00

163.0000 kg semen porland @ 1,270.00 207,010.00

0.5200 m3 Pasir pasang putih Sepaku @ 225,000.00 117,000.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 571,510.00 124,500.00 696,010.00

Page 86: RAB Siring

C.6.6.6 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

136.0000 kg semen porland @ 1,270.00 172,720.00

0.5440 m3 pasir pasang @ 280,000.00 152,320.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 545,040.00 124,500.00 669,540.00

C.6.6.7 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

117.0000 kg semen porland @ 1,270.00 148,590.00

0.5610 m3 pasir pasang @ 280,000.00 157,080.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 525,670.00 124,500.00 650,170.00

Page 87: RAB Siring

C.6.6.8 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

91.0000 kg semen porland @ 1,270.00 115,570.00

0.5610 m3 pasir pasang @ 280,000.00 157,080.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 492,650.00 124,500.00 617,150.00

C.6.6.9 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

0.2290 kg kapur pasang @ 1,270.00 290.83

0.2290 m3 semen merah @ 1,600.00 366.40

0.5440 oh pasir pasang @ 280,000.00 152,320.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 373,299.60 108,600.00 481,899.60

C.6.6.10 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

0.1700 kg kapur pasang @ 1,270.00 215.90

0.1700 m3 semen merah @ 1,600.00 272.00

0.3400 oh pasir pasang @ 280,000.00 95,200.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 315,687.90 124,500.00 440,187.90

C.6.6.11 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

156.0000 kg semen portland @ 1,270.00 198,120.00

0.0320 m3 kapur pasang @ 5,000.00 160.00

0.5480 oh pasir pasang @ 280,000.00 153,440.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 571,720.00 124,500.00 696,220.00

Page 88: RAB Siring

C.6.6.12 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

61.0000 kg semen portland @ 1,270.00 77,470.00

0.1470 m3 kapur pasang @ 5,000.00 735.00

0.4920 oh pasir pasang @ 280,000.00 137,760.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 435,965.00 124,500.00 560,465.00

C.6.6.13 1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps

1.1000 m3 batu belah 15/20 cm @ 200,000.00 220,000.00

41.0000 kg semen portland @ 1,270.00 52,070.00

0.1310 m3 kapur pasang @ 5,000.00 655.00

0.5230 oh pasir pasang @ 280,000.00 146,440.00

1.5000 oh pekerja @ 55,000.00 82,500.00

0.6000 oh tukang batu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 419,165.00 124,500.00 543,665.00

C. 6.6.14 1 M3 PASANGAN BATU KOSONG (AANSTAMPING)

1.2000 m3 batu gunung @ 200,000.00 240,000.00

0.3000 m3 pasir urug @ 51,900.00 15,570.00

0.7800 oh pekerja @ 55,000.00 42,900.00

0.3900 oh tukang batu @ 70,000.00 27,300.00

0.0390 oh kepala tukang @ - -

0.0390 oh mandor @ - -

JUMLAH 255,570.00 70,200.00 325,770.00

C. 6.6.15 1 M3 PASANG PONDASI SIKLOP 40 % BATU KALI

75.0000 kg besi beton @ 10,000.00 750,000.00

202.0000 kg semen portland @ 1,270.00 256,540.00

0.3200 m3 pasir beton @ 250,000.00 80,000.00

0.4900 m3 koral beton @ 263,000.00 128,870.00

0.8000 kg kawat beton @ 19,600.00 15,680.00

3.0000 oh pekerja @ 55,000.00 165,000.00

0.8500 oh tukang batu @ 70,000.00 59,500.00

0.0850 oh kepala tukang @ - -

0.1500 oh mandor @ - -

JUMLAH 1,231,090.00 224,500.00 1,455,590.00

Page 89: RAB Siring

C. 6.6.16 1 M3 PASANG PONDASI SUMURAN DIA 100 CM

0.4500 kg batu belah 15/20 @ 200,000.00 90,000.00

280.0000 kg semen portland @ 1,270.00 355,600.00

0.4500 m3 pasir beton @ 250,000.00 112,500.00

0.6700 m3 koral beton @ 263,000.00 176,210.00

2.3800 oh pekerja @ 55,000.00 130,900.00

0.3000 oh tukang batu @ 70,000.00 21,000.00

0.0300 oh kepala tukang @ - -

0.0800 oh mandor @ - -

JUMLAH 734,310.00 151,900.00 886,210.00

C. 6.6.17 PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG

0.0190 m3 pasir urug darat @ 51,900.00 986.10

0.0940 m3 pasir beton @ 250,000.00 23,500.00

0.1500 m3 koral beton @ 263,000.00 39,450.00

60.5000 kg semen portland @ 1,270.00 76,835.00

45.0000 kg besi beton @ 11,750.00 528,750.00

0.9000 kg kawat beton @ 19,600.00 17,640.00

0.0320 m3 kayu kaso 5/7 @ 2,100,000.00 67,200.00

0.1200 kg paku @ 16,650.00 1,998.00

0.0900 lt minyak bekisting @ 12,000.00 1,080.00

0.2400 kg plamur tembok @ 18,500.00 4,440.00

1.0000 oh pekerja @ 55,000.00 55,000.00

0.6700 oh tukang batu @ 70,000.00 46,900.00

0.0670 oh kepala tukang @ - -

0.0500 oh mandor @ - -

JUMLAH 761,879.10 101,900.00 863,779.10

C. 6.6.18 PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG

0.0160 m3 pasir urug darat @ 51,900.00 830.40

0.0800 m3 pasir beton @ 250,000.00 20,000.00

0.1250 m3 koral beton @ 263,000.00 32,875.00

49.0000 kg semen portland @ 1,270.00 62,230.00

34.5000 kg besi beton @ 11,750.00 405,375.00

0.7000 kg kawat beton @ 19,600.00 13,720.00

0.0270 m3 kayu kaso 5/7 @ 2,100,000.00 56,700.00

0.1200 kg paku @ 16,650.00 1,998.00

0.0900 lt minyak bekisting @ 12,000.00 1,080.00

0.2000 kg plamur tembok @ 18,500.00 3,700.00

0.8000 oh pekerja @ 55,000.00 44,000.00

0.5000 oh tukang batu @ 70,000.00 35,000.00

0.0500 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 598,508.40 79,000.00 677,508.40

Page 90: RAB Siring

D. PEKERJAAN DINDING

D.6.6.1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps

120.0000 bh bata merah @ 900.00 108,000.00

64.0300 kg semen portland @ 1,270.00 81,318.10

0.0590 m3 pasir pasang @ 280,000.00 16,520.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 205,838.10 49,750.00 255,588.10

D.6.6.2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps

120.0000 bh bata merah @ 900.00 108,000.00

43.5000 kg semen portland @ 1,270.00 55,245.00

0.0800 m3 pasir pasang @ 280,000.00 22,400.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 185,645.00 49,750.00 235,395.00

D.6.6.3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps

120.0000 bh bata merah @ 900.00 108,000.00

32.9500 kg semen portland @ 1,270.00 41,846.50

0.0910 m3 pasir pasang @ 280,000.00 25,480.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 175,326.50 49,750.00 225,076.50

D.6.6.4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps

120.0000 bh bata merah @ 900.00 108,000.00

26.5500 kg semen portland @ 1,270.00 33,718.50

0.0930 m3 pasir pasang @ 280,000.00 26,040.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 167,758.50 49,750.00 217,508.50

D.6.6.4.a 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps (Pasir putih)

120.0000 bh bata merah @ 900.00 108,000.00

26.5500 kg semen portland @ 1,270.00 33,718.50

0.0930 m3 Pasir pasang putih @ 61,800.00 5,747.40

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 147,465.90 49,750.00 197,215.90

Page 91: RAB Siring

D.6.6.4.b 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps (Pasir putih Sepaku)

120.0000 bh bata merah @ 900.00 108,000.00

26.5500 kg semen portland @ 1,270.00 33,718.50

0.0930 m3 Pasir pasang putih Sepaku @ 225,000.00 20,925.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 162,643.50 49,750.00 212,393.50

D.6.6.5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps

120.0000 bh bata merah @ 900.00 108,000.00

22.2000 kg semen portland @ 1,270.00 28,194.00

0.1020 m3 pasir pasang @ 280,000.00 28,560.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 164,754.00 49,750.00 214,504.00

Page 92: RAB Siring

D.6.6.6 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps

120.0000 bh bata merah @ 900.00 108,000.00

22.2000 kg semen portland @ 1,270.00 28,194.00

0.1020 m3 pasir pasang @ 280,000.00 28,560.00

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 164,754.00 49,750.00 214,504.00

D.6.6.7 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 Ps @

120.0000 bh bata merah @ 900.00 108,000.00

10.0800 kg semen portland @ 1,270.00 12,801.60

0.0925 m3 pasir pasang @ 280,000.00 25,900.00

0.0275 m3 kapur pasang @ 5,000.00 137.50

0.6500 oh pekerja @ 55,000.00 35,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 146,839.10 49,750.00 196,589.10

D.6.6.8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps

60.0000 bh bata merah @ 900.00 54,000.00

27.8000 kg semen portland @ 1,270.00 35,306.00

0.0280 m3 pasir pasang @ 280,000.00 7,840.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 97,146.00 24,600.00 121,746.00

D. 6.6.9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

18.9500 kg semen porland @ 1,270.00 24,066.50

0.0380 m3 pasir pasang @ 280,000.00 10,640.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 88,706.50 24,600.00 113,306.50

D. 6.6.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

14.3700 kg semen porland @ 1,270.00 18,249.90

0.0400 m3 pasir pasang @ 280,000.00 11,200.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 83,449.90 24,600.00 108,049.90

Page 93: RAB Siring

D. 6.6.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

11.5000 kg semen porland @ 1,270.00 14,605.00

0.0430 m3 pasir pasang @ 280,000.00 12,040.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 80,645.00 24,600.00 105,245.00

D. 6.6.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

9.6800 kg semen porland @ 1,270.00 12,293.60

0.0450 m3 pasir pasang @ 280,000.00 12,600.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 78,893.60 24,600.00 103,493.60

D. 6.6.13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

8.3200 kg semen porland @ 1,270.00 10,566.40

0.0490 m3 pasir pasang @ 280,000.00 13,720.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 78,286.40 24,600.00 102,886.40

D. 6.6.14 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

6.5000 kg semen porland @ 1,270.00 8,255.00

0.0500 m3 pasir pasang @ 280,000.00 14,000.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 76,255.00 24,600.00 100,855.00

Page 94: RAB Siring

D. 6.6.15 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps

60.0000 bh bata merah 8 x 8 x 15 cm @ 900.00 54,000.00

4.5000 kg semen porland @ 1,270.00 5,715.00

0.0500 m3 pasir pasang @ 280,000.00 14,000.00

0.0150 m3 kapur padam @ 5,000.00 75.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 73,715.00 24,675.00 98,390.00

D. 6.6.16 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps

60.0000 bh bata merah @ 900.00 54,000.00

0.0180 kg semen merah/bata merah tumbuk @ 1,270.00 22.86

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

0.0180 m3 kapur padam @ 5,000.00 90.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 59,152.86 24,600.00 83,752.86

D. 6.6.17 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps

60.0000 bh bata merah @ 900.00 54,000.00

0.0140 kg semen merah/bata merah tumbuk @ 1,270.00 17.78

0.0280 m3 pasir pasang @ 280,000.00 7,840.00

0.0140 m3 kapur padam @ 5,000.00 70.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 61,927.78 24,600.00 86,527.78

D. 6.6.18 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20)

12.5000 bh Hollow block @ 900.00 11,250.00

13.5000 kg semen portland @ 1,270.00 17,145.00

0.0480 m3 pasir pasang @ 280,000.00 13,440.00

1.9500 m3 besi beton polos @ 10,000.00 19,500.00

0.3500 oh pekerja @ 55,000.00 19,250.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0170 oh mandor @ - -

JUMLAH 61,335.00 29,750.00 91,085.00

Page 95: RAB Siring

D. 6.6.19 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15)

12.5000 bh Hollow block @ 13,375.00 167,187.50

10.4500 kg semen portland @ 1,270.00 13,271.50

0.0380 m3 pasir pasang @ 280,000.00 10,640.00

1.9500 m3 besi beton polos @ 10,000.00 19,500.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1200 oh tukang batu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 210,599.00 26,000.00 236,599.00

D. 6.6.20 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10)

12.5000 bh Hollow block @ 13,375.00 167,187.50

7.5000 kg semen portland @ 1,270.00 9,525.00

0.0270 m3 pasir pasang @ 280,000.00 7,560.00

1.9500 m3 besi beton polos @ 10,000.00 19,500.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 203,772.50 24,600.00 228,372.50

D. 6.6.21 1 M2 PASANGAN DINDING CON BLOCK (HB.20)

12.5000 bh concrete block @ 13,375.00 167,187.50

14.0500 kg semen portland @ 1,270.00 17,843.50

0.0040 m3 pasir beton @ 250,000.00 1,000.00

0.0420 m3 pasir pasang @ 61,800.00 2,595.60

3.8700 kg besi beton polos @ 10,000.00 38,700.00

0.0060 kg paku biasa 2" - 5" @ 16,650.00 99.90

0.0010 kg kayu terentang @ 55,000.00 55.00

0.0300 kg kawat beton @ 19,600.00 588.00

0.0050 kg koral beton @ 263,000.00 1,315.00

0.3700 oh pekerja @ 55,000.00 20,350.00

0.1570 oh tukang batu @ 70,000.00 10,990.00

0.0070 oh tukang besi @ 70,000.00 490.00

0.0164 oh kepala tukang @ - -

0.0185 oh mandor @ - -

JUMLAH 229,384.50 31,830.00 261,214.50

Page 96: RAB Siring

D. 6.6.22 1 M2 PASANGAN DINDING CON BLOCK (HB.15)

12.5000 bh concrete block @ 13,375.00 167,187.50

10.4600 kg semen portland @ 1,270.00 13,284.20

0.0300 m3 pasir beton @ 250,000.00 7,500.00

0.0320 m3 pasir pasang @ 61,800.00 1,977.60

0.8700 kg besi beton polos @ 10,000.00 8,700.00

0.0040 kg paku biasa 2" - 5" @ 16,650.00 66.60

0.0010 kg kayu terentang @ 55,000.00 55.00

0.0200 kg kawat beton @ 19,600.00 392.00

0.0040 kg koral beton @ 263,000.00 1,052.00

0.3400 oh pekerja @ 55,000.00 18,700.00

0.1300 oh tukang batu @ 70,000.00 9,100.00

0.0070 oh tukang besi @ 70,000.00 490.00

0.0137 oh kepala tukang @ - -

0.0170 oh mandor @ - -

JUMLAH 200,214.90 28,290.00 228,504.90

D. 6.6.23 1 M2 PASANGAN DINDING CON BLOCK (HB.10)

12.5000 bh concrete block @ 13,375.00 167,187.50

7.2000 kg semen portland @ 1,270.00 9,144.00

0.0020 m3 pasir beton @ 250,000.00 500.00

0.0210 m3 pasir pasang @ 61,800.00 1,297.80

2.5400 kg besi beton polos @ 10,000.00 25,400.00

0.0030 kg paku biasa 2" - 5" @ 16,650.00 49.95

0.0010 kg kayu terentang @ 55,000.00 55.00

0.0150 kg kawat beton @ 19,600.00 294.00

0.0030 kg koral beton @ 263,000.00 789.00

0.3400 oh pekerja @ 55,000.00 18,700.00

0.1070 oh tukang batu @ 70,000.00 7,490.00

0.0070 oh tukang besi @ 70,000.00 490.00

0.0114 oh kepala tukang @ - -

0.0170 oh mandor @ - -

JUMLAH 204,717.25 26,680.00 231,397.25

D. 6.6.24 1 M2 PASANGAN DINDING LATAI

2.5000 bh bondbeam 40x20x20 cm @ - -

5.1000 kg semen portland @ 1,270.00 6,477.00

0.0800 m3 pasir beton @ 250,000.00 20,000.00

1.5000 kg besi beton polos @ 10,000.00 15,000.00

0.1500 m3 koral beton @ 263,000.00 39,450.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0300 oh tukang batu @ 70,000.00 2,100.00

0.0300 oh tukang besi @ 70,000.00 2,100.00

0.0060 oh kepala tukang @ - -

0.005 oh mandor @ - -

JUMLAH 80,927.00 9,700.00 90,627.00

Page 97: RAB Siring

D. 6.6.25 1 M2 PASANGAN DINDING ROSTER 20 X 20

0.04 26.0000 bh roster / terawang @ 33,000.00 858,000.00

25 12.8000 kg semen porland @ 1,270.00 16,256.00

0.0350 m3 pasir pasang @ 280,000.00 9,800.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.1000 oh tukang batu @ 70,000.00 7,000.00

0.0150 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 884,056.00 23,500.00 907,556.00

D. 6.6.26 1 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm

0.04 80.0000 bh bata berongga @ 900.00 72,000.00

25 23.6500 kg semen porland @ 1,270.00 30,035.50

0.5700 m3 pasir pasang @ 280,000.00 159,600.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 261,635.50 28,100.00 289,735.50

D. 6.6.27 1 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU

0.04 1.5000 m2 bilik bambu @ 2,500.00 3,750.00

25 0.0140 m3 kayu @ 2,100,000.00 29,400.00

0.0120 kg paku @ 16,650.00 199.80

0.0030 m3 list kayu 2/4 @ 2,100,000.00 6,300.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.0500 oh tukang batu @ 70,000.00 3,500.00

0.0050 oh kepala tukang @ - -

0.0020 oh mandor @ - -

39,649.80 9,000.00 48,649.80

D. 6.6.28 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP

RANGKA KAYU MERANTI

0.0195 m3 balok kayu meranti @ 2,100,000.00 40,950.00

0.0070 m3 papan kayu meranti @ 2,100,000.00 14,700.00

0.1000 kg paku biasa 2' - 5' @ 16,650.00 1,665.00

1.0000 lbr plywood 4 mm @ 56,500.00 56,500.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.6000 oh tukang kayu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 113,815.00 53,000.00 166,815.00

Page 98: RAB Siring

E. PEKERJAAN PLESTERAN

E. 6.6.1 1 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM

12.9200 kg semen portland @ 1,270.00 16,408.40

0.0130 m3 pasir pasang @ 280,000.00 3,640.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

20,048.40 21,500.00 41,548.40

E. 6.6.2 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM

8.5200 kg semen portland @ 1,270.00 10,820.40

0.0170 m3 pasir pasang @ 280,000.00 4,760.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 15,580.40 21,500.00 37,080.40

E. 6.6.3 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM

6.4800 kg semen portland @ 1,270.00 8,229.60

0.0190 m3 pasir pasang @ 280,000.00 5,320.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 13,549.60 21,500.00 35,049.60

E. 6.6.4 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM

5.2000 kg semen portland @ 1,270.00 6,604.00

0.0200 m3 pasir pasang @ 280,000.00 5,600.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 12,204.00 21,500.00 33,704.00

E. 6.6.4.a 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih)

5.2000 kg semen portland @ 1,270.00 6,604.00

0.0200 m3 Pasir pasang putih @ 61,800.00 1,236.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 7,840.00 21,500.00 29,340.00

E. 6.6.4.b 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih Sepaku)

5.2000 kg semen portland @ 1,270.00 6,604.00

0.0200 m3 Pasir pasang putih Sepaku @ 225,000.00 4,500.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

Page 99: RAB Siring

JUMLAH 11,104.00 21,500.00 32,604.00

E. 6.6.5 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM

4.3200 kg semen portland @ 1,270.00 5,486.40

0.0220 m3 pasir pasang putih @ 61,800.00 1,359.60

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 6,846.00 21,500.00 28,346.00

Page 100: RAB Siring

E. 6.6.6 1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM

3.6800 kg semen portland @ 1,270.00 4,673.60

0.0230 m3 pasir pasang putih @ 61,800.00 1,421.40

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 6,095.00 21,500.00 27,595.00

E. 6.6.7 1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM

2.8800 kg semen portland @ 1,270.00 3,657.60

0.0240 m3 pasir pasang @ 280,000.00 6,720.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 10,377.60 21,500.00 31,877.60

E. 6.6.8 1 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM

5.7600 kg semen portland @ 1,270.00 7,315.20

0.0030 m3 Kapur padam @ 5,000.00 15.00

0.0130 m3 pasir pasang @ 280,000.00 3,640.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 10,970.20 21,500.00 32,470.20

E. 6.6.9 1 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM

1.8400 kg semen portland @ 1,270.00 2,336.80

0.0060 m3 Kapur padam @ 5,000.00 30.00

0.0140 m3 pasir pasang @ 280,000.00 3,920.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 6,286.80 21,500.00 27,786.80

E. 6.6.10 1 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM

3.0000 kg semen portland @ 1,270.00 3,810.00

0.0050 m3 Kapur padam @ 5,000.00 25.00

0.0190 m3 pasir pasang @ 280,000.00 5,320.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 9,155.00 21,500.00 30,655.00

Page 101: RAB Siring

E. 6.6.11 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM

0.0090 kg semen merah @ 1,270.00 11.43

0.0090 m3 Kapur padam @ 5,000.00 45.00

0.0090 m3 pasir pasang @ 280,000.00 2,520.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 2,576.43 21,500.00 24,076.43

E. 6.6.12 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM

0.0070 kg semen merah @ 1,270.00 8.89

0.0070 m3 Kapur padam @ 5,000.00 35.00

0.0150 m3 pasir pasang @ 280,000.00 4,200.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.1500 oh tukang batu @ 70,000.00 10,500.00

0.0150 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 4,243.89 21,500.00 25,743.89

E. 6.6.13 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM

14.2800 kg semen portland @ 1,270.00 18,135.60

0.0230 m3 pasir pasang @ 280,000.00 6,440.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 24,575.60 27,750.00 52,325.60

E. 6.6.14 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM

10.8000 kg semen portland @ 1,270.00 13,716.00

0.0260 m3 pasir pasang @ 280,000.00 7,280.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 20,996.00 27,750.00 48,746.00

E. 6.6.15 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM

8.6800 kg semen portland @ 1,270.00 11,023.60

0.0280 m3 pasir pasang @ 280,000.00 7,840.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 18,863.60 27,750.00 46,613.60

Page 102: RAB Siring

E. 6.6.16 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM

7.2900 kg semen portland @ 1,270.00 9,258.30

0.0280 m3 pasir pasang @ 280,000.00 7,840.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 17,098.30 27,750.00 44,848.30

E. 6.6.17 1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM

6.2400 kg semen portland @ 1,270.00 7,924.80

0.0300 m3 pasir pasang putih @ 280,000.00 8,400.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 16,324.80 27,750.00 44,074.80

E. 6.6.18 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM

0.0090 kg semen merah @ 1,270.00 11.43

0.0090 m3 Kapur padam @ 5,000.00 45.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 5,096.43 27,750.00 32,846.43

E. 6.6.19 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM

15.5000 kg semen portland @ 1,270.00 19,685.00

0.0130 m3 pasir pasang @ 280,000.00 3,640.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 23,325.00 30,500.00 53,825.00

E. 6.6.20 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM

11.7500 kg semen portland @ 1,270.00 14,922.50

0.0350 m3 pasir pasang @ 280,000.00 9,800.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 24,722.50 30,500.00 55,222.50

Page 103: RAB Siring

E. 6.6.21 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM

9.4800 kg semen portland @ 1,270.00 12,039.60

0.0380 m3 pasir pasang @ 280,000.00 10,640.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 22,679.60 30,500.00 53,179.60

E. 6.6.22 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM

7.9400 kg semen portland @ 1,270.00 10,083.80

0.0390 m3 pasir pasang @ 280,000.00 10,920.00

0.3000 oh pekerja @ 55,000.00 16,500.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 21,003.80 30,500.00 51,503.80

E. 6.6.23 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM

18.6500 kg semen portland @ 1,270.00 23,685.50

0.0350 m3 pasir pasang @ 280,000.00 9,800.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 33,485.50 35,100.00 68,585.50

E. 6.6.24 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM

14.1500 kg semen portland @ 1,270.00 17,970.50

0.0390 m3 pasir pasang @ 280,000.00 10,920.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0150 oh mandor @ - -

28,890.50 35,100.00 63,990.50

E. 6.6.25 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM

11.3800 kg semen portland @ 1,270.00 14,452.60

0.0420 m3 pasir pasang @ 280,000.00 11,760.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 26,212.60 35,100.00 61,312.60

Page 104: RAB Siring

E. 6.6.26 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM

8.1900 kg semen portland @ 1,270.00 10,401.30

0.0450 m3 pasir pasang @ 280,000.00 12,600.00

0.3200 oh pekerja @ 55,000.00 17,600.00

0.2500 oh tukang batu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0150 oh mandor @ - -

JUMLAH 23,001.30 35,100.00 58,101.30

E. 6.6.27 1 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM

7.0700 kg semen portland @ 1,270.00 8,978.90

0.0210 m3 pasir pasang @ 280,000.00 5,880.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0700 oh tukang batu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ - -

0.0080 oh mandor @ - -

JUMLAH 14,858.90 13,150.00 28,008.90

E. 6.6.28 1 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM

5.6700 kg semen portland @ 1,270.00 7,200.90

0.0230 m3 pasir pasang @ 280,000.00 6,440.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.0700 oh tukang batu @ 70,000.00 4,900.00

0.0070 oh kepala tukang @ - -

0.0080 oh mandor @ - -

JUMLAH 13,640.90 13,150.00 26,790.90

E. 6.6.29 1 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM

9.3000 kg semen portland @ 1,270.00 11,811.00

0.0180 m3 pasir pasang @ 280,000.00 5,040.00

0.0260 oh pekerja @ 55,000.00 1,430.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 16,851.00 15,430.00 32,281.00

E. 6.6.30 1 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM

7.0700 kg semen portland @ 1,270.00 8,978.90

0.0210 m3 pasir pasang @ 280,000.00 5,880.00

0.0260 oh pekerja @ 55,000.00 1,430.00

0.2000 oh tukang batu @ 70,000.00 14,000.00

0.0200 oh kepala tukang @ - -

0.0130 oh mandor @ - -

JUMLAH 14,858.90 15,430.00 30,288.90

Page 105: RAB Siring

E. 6.6.31 1 M2 PLESTERAN SKONING 1 pc ; 2ps

0.5000 kg semen portland @ 1,270.00 635.00

0.0020 m3 pasir pasang @ 280,000.00 560.00

0.0570 oh pekerja @ 55,000.00 3,135.00

0.0380 oh tukang batu @ 70,000.00 2,660.00

0.0380 oh kepala tukang @ - -

0.0020 oh mandor @ - -

JUMLAH 1,195.00 5,795.00 6,990.00

E. 6.6.32 1 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM

0.1440 kg Pc Warna 13,500.00 1,944.00

15.0000 kg Batu Granito 15,000.00 225,000.00

0.0500 oh pekerja 55,000.00 2,750.00

0.0200 oh tukang batu 70,000.00 1,400.00

0.0020 oh kepala tukang - -

0.0050 oh mandor - -

JUMLAH 226,944.00 4,150.00 231,094.00

E. 6.6.33 1 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM

0.4400 kg Pc Warna 13,500.00 5,940.00

11.5000 kg Batu teraso 15,000.00 172,500.00

0.4500 oh pekerja 55,000.00 24,750.00

0.2000 oh tukang batu 70,000.00 14,000.00

0.0200 oh kepala tukang - -

0.0250 oh mandor - -

JUMLAH 178,440.00 38,750.00 217,190.00

E. 6.6.34 1 M2 PLESTERAN CIPRAT 1 pc ; 2ps

4.3200 kg semen portland 1,270.00 5,486.40

0.0160 m3 pasir pasang 280,000.00 4,480.00

0.2500 oh pekerja 55,000.00 13,750.00

0.1000 oh tukang batu 70,000.00 7,000.00

0.0100 oh kepala tukang - -

0.0150 oh mandor - -

JUMLAH 9,966.40 20,750.00 30,716.40

E. 6.6.35 1 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps

4.3200 kg semen portland 1,270.00 5,486.40

0.0160 m3 pasir pasang 280,000.00 4,480.00

0.0150 oh pekerja 55,000.00 825.00

0.0700 oh tukang batu 70,000.00 4,900.00

0.0070 oh kepala tukang - -

0.0080 oh mandor - -

JUMLAH 9,966.40 5,725.00 15,691.40

Page 106: RAB Siring

E. 6.6.36 1 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS

0.5000 kg semen portland 1,270.00 635.00

2.9000 kg Batacote 1,800.00 5,220.00

0.0060 m3 pasir pasang 280,000.00 1,680.00

0.3000 oh pekerja 55,000.00 16,500.00

0.2000 oh tukang batu 70,000.00 14,000.00

0.0200 oh kepala tukang - -

0.0150 oh mandor - -

JUMLAH 7,535.00 30,500.00 38,035.00

F. PEKERJAAN KAYU

F.6.6.1

1.1000 m3 kayu jati, balok @ 5,000,000.00 5,500,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

20.0000 oh tukang kayu @ 70,000.00 1,400,000.00

2.0000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 5,500,000.00 1,730,000.00 7,230,000.00

F.6.6.2

1.2000 m3 kayu bengkirai, balok @ 5,000,000.00 6,000,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

18.0000 oh tukang kayu @ 70,000.00 1,260,000.00

2.0000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 6,000,000.00 1,590,000.00 7,590,000.00

F.6.6.3

1.2000 m3 kayu ulin, balok @ 4,500,000.00 5,400,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

18.0000 oh tukang kayu @ 70,000.00 1,260,000.00

2.0000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 5,400,000.00 1,590,000.00 6,990,000.00

F.6.6.4

1.2000 m3 kayu meranti, balok @ 2,100,000.00 2,520,000.00

6.0000 oh pekerja @ 55,000.00 330,000.00

18.0000 oh tukang kayu @ 70,000.00 1,260,000.00

2.0000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 2,520,000.00 1,590,000.00 4,110,000.00

F.6.6.5

0.0360 m3 Kayu bengkirai, papan @ 3,500,000.00 126,000.00

0.0500 kg Paku Biasa 2" - 5" @ 16,650.00 832.50

0.3500 oh pekerja @ 55,000.00 19,250.00

1.0500 oh tukang kayu @ 70,000.00 73,500.00

0.1050 oh kepala tukang @ - -

0.0180 oh mandor @ - -

JUMLAH 126,832.50 92,750.00 219,582.50

1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU JATI

1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI

1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU ULIN

1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH

1 M2 PASANG PINTU KLAMP KAYU BENGKIRAI

Page 107: RAB Siring

F.6.6.6

0.0360 m3 Kayu ulin, papan @ 3,100,000.00 111,600.00

0.0500 kg Paku ulin @ 19,800.00 990.00

0.3500 oh pekerja @ 55,000.00 19,250.00

1.0500 oh tukang kayu @ 70,000.00 73,500.00

0.1050 oh kepala tukang @ - -

0.0180 oh mandor @ - -

JUMLAH 112,590.00 92,750.00 205,340.00

F.6.6.7

0.0400 m3 Kayu Jati, papan @ 7,000,000.00 280,000.00

1.0000 oh pekerja @ 55,000.00 55,000.00

2.5000 oh tukang kayu @ 70,000.00 175,000.00

0.2500 oh kepala tukang @ - -

0.0500 oh mandor @ - -

JUMLAH 280,000.00 230,000.00 510,000.00

F.6.6.8

0.0400 m3 Kayu bengkirai, papan @ 3,500,000.00 140,000.00

1.0000 oh pekerja @ 55,000.00 55,000.00

2.5000 oh tukang kayu @ 70,000.00 175,000.00

0.2500 oh kepala tukang @ - -

0.0500 oh mandor @ - -

JUMLAH 140,000.00 230,000.00 370,000.00

F.6.6.9

0.0350 m3 Kayu Jati, papan @ 7,000,000.00 245,000.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 245,000.00 184,000.00 429,000.00

F.6.6.10

0.0350 m3 Kayu Bengkirai, papan @ 3,500,000.00 122,500.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 122,500.00 184,000.00 306,500.00

F.6.6.11

0.0350 m3 Kayu Ulin, papan @ 3,100,000.00 108,500.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 108,500.00 184,000.00 292,500.00

1 M2 PASANG PINTU KLAMP KAYU ULIN

1 M2 PASANG PINTU PANEL KAYU JATI

1 M2 PASANG PINTU PANEL KAYU BENGKIRAI

1 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI

1 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI

1 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN

Page 108: RAB Siring

F.6.6.12

0.0640 m3 Kayu Jati, papan @ 7,000,000.00 448,000.00

1.0000 oh pekerja @ 55,000.00 55,000.00

3.0000 oh tukang kayu @ 70,000.00 210,000.00

0.3000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 448,000.00 265,000.00 713,000.00

F.6.6.13

0.0640 m3 Kayu bengkirai, papan @ 3,500,000.00 224,000.00

1.0000 oh pekerja @ 55,000.00 55,000.00

3.0000 oh tukang kayu @ 70,000.00 210,000.00

0.3000 oh kepala tukang @ - -

0.3000 oh mandor @ - -

JUMLAH 224,000.00 265,000.00 489,000.00

F.6.6.14

0.0196 m3 Kayu jati, papan @ 7,000,000.00 137,200.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.3000 ltr lem kayu @ 15,000.00 4,500.00

1.0000 lbr plywood 4' x 3' x 4 mm @ 56,500.00 56,500.00

0.6000 oh pekerja @ 55,000.00 33,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 198,699.50 173,000.00 371,699.50

F.6.6.15

0.0196 m3 Kayu bangkirai, papan @ 3,500,000.00 68,600.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.3000 ltr lem kayu @ 15,000.00 4,500.00

1.0000 lbr plywood 4' x 3' x 4 mm @ 56,500.00 56,500.00

0.6000 oh pekerja @ 55,000.00 33,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 130,099.50 173,000.00 303,099.50

F.6.6.16

0.0600 m3 Kayu jati, papan @ 7,000,000.00 420,000.00

0.1500 Kg paku biasa 1/2" - 1" @ 16,650.00 2,497.50

0.5000 oh pekerja @ 55,000.00 27,500.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0250 oh mandor @ - -

JUMLAH 422,497.50 167,500.00 589,997.50

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI

1 M2 PASANG JALUSI MATI KUSEN KAYU JATI

Page 109: RAB Siring

F.6.6.17

0.0600 m3 Kayu bengkirai, papan @ 3,500,000.00 210,000.00

0.1500 Kg paku biasa 1/2" - 1" @ 16,650.00 2,497.50

0.5000 oh pekerja @ 55,000.00 27,500.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0250 oh mandor @ - -

JUMLAH 212,497.50 167,500.00 379,997.50

F.6.6.18

0.0196 m3 Kayu ulin, papan @ 3,100,000.00 60,760.00

0.0300 Kg paku ulin @ 19,800.00 594.00

0.3000 ltr lem kayu @ 15,000.00 4,500.00

1.0000 lbr plywood 4' x 3' x 4 mm @ 56,500.00 56,500.00

0.6000 oh pekerja @ 55,000.00 33,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 122,354.00 173,000.00 295,354.00

F.6.6.19

0.0196 m3 Kayu jati, papan @ 7,000,000.00 137,200.00

0.3000 Kg paku biasa 1/2" - 1" @ 19,800.00 5,940.00

0.3000 ltr lem kayu @ 15,000.00 4,500.00

1.0000 lbr teakwood 4 mm @ 56,500.00 56,500.00

0.6000 oh pekerja @ 55,000.00 33,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 204,140.00 173,000.00 377,140.00

F.6.6.20

0.0196 m3 kayu Bengkirai, papan @ 3,500,000.00 68,600.00

0.0300 Kg paku biasa 1/2" - 1" @ 19,800.00 594.00

0.3000 ltr lem kayu @ 15,000.00 4,500.00

1.0000 lbr teakwood 4 mm @ 56,500.00 56,500.00

0.6000 oh pekerja @ 55,000.00 33,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2000 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 130,194.00 173,000.00 303,194.00

1 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI

Page 110: RAB Siring

F.6.6.21

0.0196 m3 kayu jati, papan @ 7,000,000.00 137,200.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.8000 ltr lem kayu @ 15,000.00 12,000.00

1.0000 lbr plywood 4' x 3' x 4 mm @ 56,500.00 56,500.00

0.5000 lbr Formika @ 75,000.00 37,500.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2500 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 243,699.50 184,000.00 427,699.50

F.6.6.22

0.0196 m3 kayu bengkirai, papan @ 3,500,000.00 68,600.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.8000 ltr lem kayu @ 15,000.00 12,000.00

1.0000 lbr plywood 4' x 3' x 4 mm @ 56,500.00 56,500.00

0.5000 lbr Formika @ 104,300.00 52,150.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2500 oh kepala tukang @ - -

0.0400 oh mandor - -

JUMLAH 189,749.50 184,000.00 373,749.50

F.6.6.23

0.0196 m3 kayu jati, papan @ 7,000,000.00 137,200.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.8000 ltr lem kayu @ 15,000.00 12,000.00

0.5000 lbr teakwood 4' x 8' x 4 mm @ 120,200.00 60,100.00

0.5000 lbr Formika 4' x 3' @ 104,300.00 52,150.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2500 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 261,949.50 184,000.00 445,949.50

F.6.6.24

0.0196 m3 kayu bengkirai, papan @ 3,500,000.00 68,600.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

0.8000 ltr lem kayu @ 15,000.00 12,000.00

0.5000 lbr teakwood 4' x 8' x 4 mm @ 120,200.00 60,100.00

0.5000 ltr vernis @ 35,000.00 17,500.00

0.5000 lbr Formika 4' x 8' @ 104,300.00 52,150.00

0.8000 oh pekerja @ 55,000.00 44,000.00

2.0000 oh tukang kayu @ 70,000.00 140,000.00

0.2500 oh kepala tukang @ - -

0.0400 oh mandor @ - -

JUMLAH 210,849.50 184,000.00 394,849.50

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI

1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI

Page 111: RAB Siring

F.6.6.25

0.0196 m3 kayu jati, papan @ 7,000,000.00 137,200.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

1.2000 ltr lem kayu @ 15,000.00 18,000.00

1.0000 lbr plywood 4' x 8' x 4 mm @ 56,500.00 56,500.00

1.0000 lbr Formika 4' x 8' @ 104,300.00 104,300.00

1.0000 oh pekerja @ 55,000.00 55,000.00

2.6000 oh tukang kayu @ 70,000.00 182,000.00

0.2600 oh kepala tukang @ - -

0.0500 oh mandor @ - -

JUMLAH 316,499.50 237,000.00 553,499.50

F.6.6.26

0.0196 m3 kayu bengkirai, papan @ 3,500,000.00 68,600.00

0.0300 Kg paku biasa 1/2" - 1" @ 16,650.00 499.50

1.2000 ltr lem kayu @ 15,000.00 18,000.00

1.0000 lbr plywood 4' x 8' x 4 mm @ 56,500.00 56,500.00

1.0000 lbr Formika 4' x 8' @ 104,300.00 104,300.00

1.0000 oh pekerja @ 55,000.00 55,000.00

2.6000 oh tukang kayu @ 70,000.00 182,000.00

0.2600 oh kepala tukang @ - -

0.0500 oh mandor - -

JUMLAH 247,899.50 237,000.00 484,899.50

F.6.6.27 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI

1.1000 m3 kayu jati, balok @ 5,000,000.00 5,500,000.00

15.0000 Kg besi strip @ 31,800.00 477,000.00

0.8000 Kg Paku Biasa 2" - 5" @ 16,650.00 13,320.00

4.0000 oh pekerja @ 55,000.00 220,000.00

12.0000 oh tukang kayu @ 70,000.00 840,000.00

1.2000 oh kepala tukang @ - -

0.2000 oh mandor @ - -

JUMLAH 5,990,320.00 1,060,000.00 7,050,320.00

F.6.6.28 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI

1.1000 m3 kayu bengkirai, balok @ 5,000,000.00 5,500,000.00

15.0000 Kg besi strip @ 31,800.00 477,000.00

0.8000 Kg Paku Biasa 2" - 5" @ 16,650.00 13,320.00

4.0000 oh pekerja @ 55,000.00 220,000.00

12.0000 oh tukang kayu @ 70,000.00 840,000.00

1.2000 oh kepala tukang @ - -

0.2000 oh mandor @ - -

JUMLAH 5,990,320.00 1,060,000.00 7,050,320.00

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI

Page 112: RAB Siring

F.6.6.29 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN

1.1000 m3 kayu ulin, balok @ 4,500,000.00 4,950,000.00

15.0000 Kg besi strip @ 31,800.00 477,000.00

0.8000 Kg Paku ulin @ 16,650.00 13,320.00

4.0000 oh pekerja @ 55,000.00 220,000.00

12.0000 oh tukang kayu @ 70,000.00 840,000.00

1.2000 oh kepala tukang @ - -

0.2000 oh mandor @ - -

JUMLAH 5,440,320.00 1,060,000.00 6,500,320.00

F.6.6.30 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI

1.1000 m3 kayu meranti, balok @ 2,100,000.00 2,310,000.00

15.0000 Kg besi strip @ 31,800.00 477,000.00

0.8000 Kg Paku Biasa 2" - 5" @ 16,650.00 13,320.00

4.0000 oh pekerja @ 55,000.00 220,000.00

12.0000 oh tukang kayu @ 70,000.00 840,000.00

1.2000 oh kepala tukang @ - -

0.2000 oh mandor @ - -

JUMLAH 2,800,320.00 1,060,000.00 3,860,320.00

F.6.6.31 1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI

0.0120 m3 kayu bengkirai, balok @ 5,000,000.00 60,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 62,497.50 12,500.00 74,997.50

F.6.6.32 1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN

0.0120 m3 kayu ulin, balok @ 4,500,000.00 54,000.00

0.1500 Kg Paku ulin @ 19,800.00 2,970.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 56,970.00 12,500.00 69,470.00

F.6.6.33 1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI

0.0140 m3 kayu jati, balok @ 5,000,000.00 70,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 72,497.50 12,500.00 84,997.50

Page 113: RAB Siring

F.6.6.34 1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI

0.0140 m3 kayu bengkirai, balok @ 5,000,000.00 70,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 72,497.50 12,500.00 84,997.50

F.6.6.35 1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI

0.0140 m3 kayu bengkirai, balok @ 5,000,000.00 70,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 72,497.50 12,500.00 84,997.50

F.6.6.35a 1M2 PASANG KASO + RENG GENTENG METAL KAYU MERANTIBENGKIRAI

0.0140 m3 kayu meranti, balok @ 2,100,000.00 29,400.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 31,897.50 12,500.00 44,397.50

F.6.6.36 1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI

0.1650 m3 kayu bengkirai, balok @ 5,000,000.00 825,000.00

0.2000 Kg Paku Biasa 2" - 5" @ 16,650.00 3,330.00

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang kayu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ - -

0.0060 oh mandor @ - -

JUMLAH 828,330.00 15,000.00 843,330.00

F.6.6.37 1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN

0.1650 m3 kayu ulin, balok @ 5,000,000.00 825,000.00

0.2000 Kg Paku ulin @ 19,800.00 3,960.00

0.1200 oh pekerja @ 55,000.00 6,600.00

0.1200 oh tukang kayu @ 70,000.00 8,400.00

0.0120 oh kepala tukang @ - -

0.0060 oh mandor @ - -

JUMLAH 828,960.00 15,000.00 843,960.00

F.6.6.38 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI

0.0120 m3 kayu jati, balok @ 5,000,000.00 60,000.00

0.1000 Kg Paku Biasa 2" - 5" @ 16,650.00 1,665.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0750 oh mandor - -

Page 114: RAB Siring

JUMLAH 61,665.00 25,750.00 87,415.00

Page 115: RAB Siring

F.6.6.39 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI

0.0120 m3 kayu bengkirai, balok @ 5,000,000.00 60,000.00

0.1000 Kg Paku Biasa 2" - 5" @ 16,650.00 1,665.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 61,665.00 25,750.00 87,415.00

F.6.6.40 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN

0.0120 m3 kayu ulin, balok @ 4,500,000.00 54,000.00

0.1000 Kg Paku ulin @ 19,800.00 1,980.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 55,980.00 25,750.00 81,730.00

F.6.6.41 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI

0.0230 m3 Kayu jati, balok @ 5,000,000.00 115,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.2000 oh pekerja @ 55,000.00 11,000.00

0.3000 oh tukang kayu @ 70,000.00 21,000.00

0.0300 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 116,773.75 27,900.00 144,673.75

F.6.6.42 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI

0.0230 m3 kayu bengkirai, balok @ 5,000,000.00 115,000.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.2000 oh pekerja @ 55,000.00 11,000.00

0.3000 oh tukang kayu @ 70,000.00 21,000.00

0.0300 oh kepala tukang @ - -

0.0100 oh mandor @ - -

JUMLAH 117,497.50 32,000.00 74,237.90

F.6.6.43 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI

0.0230 m3 kayu meranti, balok @ 2,100,000.00 48,300.00

0.1500 Kg Paku Biasa 2" - 5" @ 16,650.00 2,497.50

0.2000 oh pekerja @ 55,000.00 11,000.00

0.3000 oh tukang kayu @ 70,000.00 21,000.00

0.0300 oh kepala tukang @ - -

0.0100 oh mandor - -

JUMLAH 50,797.50 32,000.00 82,797.50

Page 116: RAB Siring

F.6.6.44 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI

0.0270 m3 kayu jati, balok @ 5,000,000.00 135,000.00

0.2000 Kg Paku Biasa 2" - 5" @ 16,650.00 3,330.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.3500 oh tukang kayu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 138,330.00 38,250.00 176,580.00

F.6.6.45 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI

0.0270 m3 kayu bengkirai, balok @ 5,000,000.00 135,000.00

0.2000 Kg Paku Biasa 2" - 5" @ 16,650.00 3,330.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.3500 oh tukang kayu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 138,330.00 38,250.00 176,580.00

F.6.6.46 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI

0.0270 m3 kayu meranti, balok @ 2,100,000.00 56,700.00

0.2000 Kg Paku Biasa 2" - 5" @ 16,650.00 3,330.00

0.2500 oh pekerja @ 55,000.00 13,750.00

0.3500 oh tukang kayu @ 70,000.00 24,500.00

0.0350 oh kepala tukang @ - -

0.0125 oh mandor @ - -

JUMLAH 60,030.00 38,250.00 98,280.00

F.6.6.47 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI

0.0072 m3 kayu jati, papan @ 7,000,000.00 50,400.00

0.0500 Kg Paku Biasa 2" - 5" @ 16,650.00 832.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0250 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 51,232.50 19,500.00 70,732.50

F.6.6.48 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI

0.0072 m3 kayu bengkirai, papan @ 3,500,000.00 25,200.00

0.0500 Kg Paku Biasa 2" - 5" @ 16,650.00 832.50

0.1000 oh pekerja @ 55,000.00 5,500.00

0.2000 oh tukang kayu @ 70,000.00 14,000.00

0.0250 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 26,032.50 19,500.00 45,532.50

Page 117: RAB Siring

F.6.6.49 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI

0.0110 m3 kayu jati, papan @ 7,000,000.00 77,000.00

0.0500 Kg Paku Biasa 2" - 5" @ 16,650.00 832.50

0.1100 oh pekerja @ 55,000.00 6,050.00

0.2200 oh tukang kayu @ 70,000.00 15,400.00

0.0220 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 77,832.50 21,450.00 99,282.50

F.6.6.50 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI

0.0110 m3 kayu bengkirai, papan @ 5,000,000.00 55,000.00

0.0500 Kg Paku Biasa 2" - 5" @ 16,650.00 832.50

0.1100 oh pekerja @ 55,000.00 6,050.00

0.2200 oh tukang kayu @ 70,000.00 15,400.00

0.0220 oh kepala tukang @ - -

0.0050 oh mandor @ - -

JUMLAH 55,832.50 21,450.00 77,282.50

F.6.6.51 1M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI

0.0145 m3 kayu bengkirai, papan @ 5,000,000.00 72,500.00

0.0600 Kg Paku Biasa 2" - 5" @ 16,650.00 999.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.2500 oh tukang kayu @ 70,000.00 17,500.00

0.0250 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 73,499.00 25,750.00 99,249.00

F.6.6.52 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI

0.0086 m3 kayu bengkirai, papan @ 5,000,000.00 43,000.00

0.0600 Kg Paku Biasa 2" - 5" @ 16,650.00 999.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0500 oh mandor - -

@ JUMLAH 43,999.00 12,500.00 56,499.00

F. 6.6.53. 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN

0.0086 m3 kayu ulin, papan @ 4,500,000.00 38,700.00

0.0600 kg paku biasa 2' - 5' @ 16,650.00 999.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0500 oh mandor @ - -

JUMLAH 39,699.00 12,500.00 52,199.00

F. 6.6.53a. 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU meranti

0.0086 m3 kayu meranti, papan @ 2,100,000.00 18,060.00

0.0600 kg paku biasa 2' - 5' @ 16,650.00 999.00

0.1000 oh pekerja @ 55,000.00 5,500.00

0.1000 oh tukang kayu @ 70,000.00 7,000.00

0.0100 oh kepala tukang @ - -

0.0500 oh mandor @ - -

Page 118: RAB Siring

JUMLAH 19,059.00 12,500.00 31,559.00

F. 6.6.54 1M2 PASANG RANGKA DINDING PEMISAH KAYU BENGKIRAI

0.0195 m3 kayu bengkirai, balok @ 5,000,000.00 97,500.00

0.0070 m3 kayu bengkirai, papan @ 3,500,000.00 24,500.00

0.1000 kg paku biasa 2' - 5' @ 16,650.00 1,665.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.4500 oh tukang kayu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 123,665.00 39,750.00 163,415.00

F. 6.6.55 1M2 PASANG RANGKA DINDING PEMISAH KAYU ULIN

0.0195 m3 kayu ulin, balok @ 4,500,000.00 87,750.00

0.0070 m3 kayu ulin, papan @ 3,500,000.00 24,500.00

0.1000 kg paku biasa 2' - 5' @ 16,650.00 1,665.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.4500 oh tukang kayu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 113,915.00 39,750.00 153,665.00

F. 6.6.56 1M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI

0.0195 m3 kayu bengkirai, balok @ 5,000,000.00 97,500.00

0.0070 m3 kayu bengkirai, papan @ 3,500,000.00 24,500.00

0.1000 kg paku biasa 2' - 5' @ 16,650.00 1,665.00

0.1500 oh pekerja @ 55,000.00 8,250.00

0.4500 oh tukang kayu @ 70,000.00 31,500.00

0.0450 oh kepala tukang @ - -

0.0750 oh mandor @ - -

JUMLAH 123,665.00 39,750.00 163,415.00

F. 6.6.57 1M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER

0.0195 m3 kayu bengkirai, balok @ 5,000,000.00 97,500.00

0.0070 m3 kayu bengkirai, papan @ 3,500,000.00 24,500.00

0.1000 lt paku biasa 2' - 5' @ 16,650.00 1,665.00

0.5600 lbr lem kayu @ 15,000.00 8,400.00

1.0000 kg plywood 4' x 8' x 4 mm @ 56,500.00 56,500.00

0.2000 oh pekerja @ 55,000.00 11,000.00

0.6000 oh tukang kayu @ 70,000.00 42,000.00

0.0600 oh kepala tukang @ - -

0.0100 oh mandor - -

JUMLAH 188,565.00 53,000.00 241,565.00

Page 119: RAB Siring

F. 6.6.58 1M2 PASANG DINDING LAMBRISIRING DARI PAPAN JATI

0.0070 m3 kayu jati, balok @ 5,000,000.00 35,000.00

0.1000 kg paku biasa 2' - 5' @ 16,650.00 1,665.00

0.1500 kg paku skrup 3,5" @ 11,500.00 1,725.00

0.6000 oh pekerja @ 55,000.00 33,000.00

1.8000 oh tukang kayu @ 70,000.00 126,000.00

0.1800 oh kepala tukang @ - -

0.0300 oh mandor @ - -

JUMLAH 38,390.00 159,000.00 197,390.00

F. 6.6.59 1M2 PASANG PLYWOOD TEBAL 3 MM, UNTUK DINDING

0.4000 lbr plywood 4 mm @ 56,500.00 22,600.00

0.0500 kg paku biasa 1/2" - 1" @ 16,650.00 832.50

0.0250 oh pekerja @ 55,000.00 1,375.00

0.0750 oh tukang kayu @ 70,000.00 5,250.00

0.0075 oh kepala tukang @ - -

0.0013 oh mandor @ - -

JUMLAH 23,432.50 6,625.00 30,057.50

F. 6.6.60 1M2 PASANG LIST PLAFOND, KAYU PROFIL

1.0500 m' kayu profil @ 10,300.00 10,815.00

0.0210 oh pekerja @ 55,000.00 1,155.00

0.0210 oh tukang kayu @ 70,000.00 1,470.00

0.0210 oh kepala tukang @ - -

0.0010 oh mandor @ - -

JUMLAH 10,815.00 2,625.00 13,440.00

Page 120: RAB Siring

63,500.00

1298

Page 121: RAB Siring

BEKISTING SLOOP 15/20 JUMLAH (Kg) BESI SLOOP 15/20 PER M3

0.4 vol.bekisting/m' Dia ( mm ) Berat kg/m' Panjang Batang Jumlah (kg)

0.03 vol.beton/m' 12.00 0.89 1.05 4.00 3.74

33.333333333 panjang beton/m3 10.00 0.62 0.60 7.67 2.85 jarak begel / 15 cm'

13.333333333 13.333 6.00 0.22 - - -

TOTAL KG 6.59

VOLUME BETON / M' 0.03 219.67

PANJANG BETON / M3 33.33333

Page 122: RAB Siring

13500

Page 123: RAB Siring

6,000.00

Page 124: RAB Siring

15000

15000

Page 125: RAB Siring

75000

35000

Page 126: RAB Siring
Page 127: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

G. PEKERJAAN BETON

G.6.6.1 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr 827,485.00

G.6.6.2 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr 812,815.00

G.6.6.3 1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr 782,835.00

G.6.6.4 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr 99,850.00

G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) 1,057,345.00

G.6.6.6 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 899,225.00

G.6.6.7 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr) 948,165.00

G.6.6.8 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr) 863,515.00

G.6.6.9 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr) 996,845.00

G.6.6.10 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr) 1,075,955.00

G.6.6.11 1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON 1,079,925.00

G.6.6.12 1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR 961,345.00

G.6.6.13 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) 1,057,345.00

G.6.6.14 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 1,024,695.00

G.6.6.15 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr) 1,096,215.00

G.6.6.16 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr) 1,120,125.00

G.6.6.17 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr) 1,305,175.00

G.6.6.18 1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100 1,120,125.00

G.6.6.19 1M' MEMASANG PVC WATERSTOP LEBAR 150 MM 5,225.00

G.6.6.20 1M' MEMASANG PVC WATERSTOP LEBAR 200 MM 5,612.50

G.6.6.21 1M' MEMASANG PVC WATERSTOP LEBAR 230 MM 32,925.00

G.6.6.22 1M' MEMASANG PVC WATERSTOP LEBAR 250 MM 32,925.00

G.6.6.23 1M' MEMASANG PVC WATERSTOP LEBAR 300 MM 32,925.00

G.6.6.24 1M' MEMASANG PVC WATERSTOP LEBAR 320 MM 5,350.00

G.6.6.25 1 KG PEMBESIAN DG BESI POLOS 11,744.00

G.6.6.25 1 KG PEMBESIAN DG BESI ULIR 13,581.50

G.6.6.26 1 KG KABEL PRESSTRESSED POLOS/STRANDS 11,381.00

G.6.6.27 1 KG JARING KAWAT BAJA 48,120.00

G.6.6.28 1M2 PASANG BEKISTING UNTUK PONDASI 112,140.00

G. 6.6.29 1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai ) 110,720.00

G. 6.6.30 1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai ) 197,205.00

Page 128: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

G. 6.6.31 1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai ) 203,474.00

G. 6.6.32 1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai ) 236,305.00

G. 6.6.33 1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai ) 427,780.00

G. 6.6.34 1 M2 PASANG BEKISTING UNTUK TANGGA 189,395.00

G. 6.6.35 1M3 MEMBUAT BETON DENGAN MUTU K 225 1,356,510.00

G. 6.6.36 1M3 MEMBUAT BETON DENGAN MUTU K 275 1,391,000.00

G. 6.6.37 1 M2 PASANG JEMBATAN COR 72,877.20

G. 6.6.38 1M3 MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING) 3,233,535.00

G. 6.6.39 1M3 MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING) 3,999,545.00

G. 6.6.40 1M3 MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING) 6,488,710.00

G. 6.6.41 1M3 MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING) 4,997,095.00

G. 6.6.42 1M3 MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING) 4,562,285.00

G. 6.6.43 1M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) 4,394,265.00

G. 6.6.44 1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING) 4,695,100.00

G. 6.6.45 1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM 61,327.50

G. 6.6.46 1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM 72,007.00

H. PEKERJAAN PENUTUP ATAP

H. 6.6.1 1M2 PASANG ATAP GENTENG PALENTONG KECIL 14,700.00

H. 6.6.2 1M2 PASANG ATAP GENTENG KODOK /GLAZZUR 77,200.00

H. 6.6.3 1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR 13,500.00

H. 6.6.4 1M2 PASANG ATAP GENTENG BUBUNG PALENTONG 56,770.00

H. 6.6.5 1M' PASANG BUBUNG GENTENG KODOK 74,270.00

H. 6.6.6 1M2 PASANG BUBUNG GENTENG PALENTONG BESAR 45,186.14

H. 6.6.7 1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM 11,416.25

H. 6.6.8 1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM 30,498.00

H. 6.6.9 1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM 29,948.00

H. 6.6.10 1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM 29,798.00

H. 6.6.11 1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM 33,248.00

H. 6.6.12 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM 24,048.00

H. 6.6.13 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM 25,658.00

H. 6.6.14 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM 25,558.00

H. 6.6.15 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM 27,168.00

H. 6.6.16 1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM 33,838.00

Page 129: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

H. 6.6.17 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM 23,948.00

H. 6.6.18 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM 24,178.00

H. 6.6.19 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM 26,018.00

H. 6.6.20 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM 26,708.00

H. 6.6.21 1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM 28,548.00

H. 6.6.22 1M' PASANG BUBUNG STEL GELOMBANG 0,92 M 83,645.00

H. 6.6.23 1M' PASANG NOK STEL GELOMBANG 1,05 M 83,645.00

H. 6.6.24 1M' PASANG NOK STEL GELOMBANG 1,08 M 83,645.00

H. 6.6.25 1M' PASANG NOK paten 0,92 m 83,645.00

H. 6.6.26 1M' PASANG NOK PATEN 1,05 M 83,645.00

H. 6.6.27 1M' PASANG NOK PATEN 1,08 M 83,645.00

H. 6.6.28 1M' PASANG NOK STEL RATA 0,92 M 86,275.00

H. 6.6.29 1M' PASANG NOK STEL RATA 1,05 M 86,275.00

H. 6.6.30 1M2 PASANG ATAP GENTENG BETON 58,499.50

H. 6.6.31 1M2 PASANG ATAP GENTENG ASPAL 78,974.50

H. 6.6.32 1M2 PASANG ATAP GENTENG METAL 81,465.00

H. 6.6.33 1M' PASANG ATAP SIRAP 122,435.00

H. 6.6.34 1M' PASANG NOK GENTENG BETON 94,188.50

H. 6.6.35 1M' PASANG NOK GENTENG ASPAL 39,048.00

H. 6.6.36 1M' PASANG NOK GENTENG METAL 27,182.50

H. 6.6.37 1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm 58,182.50

H. 6.6.38 1 M2 MEMASANG ATAP SENG 40,857.00

H. 6.6.39 1 M2 MEMASANG BUBUNGAN ATAP SENG 88,127.50

H. 6.6.40 1 M2 PASANG ATAP ALUMUNIUM 62,327.00

H. 6.6.41 1 M2 PASANG NOK ALUMUNIUM 78,054.00

H. 6.6.42 1 M2 PASANG ALUMUNIUM FOIL /SISALATION 485,225.00

I. PEKERJAAN PLAFOND

I. 6.6.1 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM 39,762.50

I. 6.6.2 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM 39,762.50

I. 6.6.3 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM 56,372.50

I. 6.6.4 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM 56,372.50

I. 6.6.5 1 M2 PLAFOND AKUSTIK (30 X 30) CM 22,100.00

I. 6.6.6 1 M2 PLAFOND AKUSTIK (30 X 60) CM 12,450.00

Page 130: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I. 6.6.7 1 M2 PLAFOND AKUSTIK (60 X 120) CM 12,450.00

I. 6.6.8 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM 32,907.50

I. 6.6.9 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM 54,507.50

I. 6.6.10 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM 29,292.50

I. 6.6.11 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM 42,192.50

I. 6.6.12 1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM 48,315.50

I. 6.6.13 1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM 57,642.50

I. 6.6.14 1M2 PLAFOND LAT KAYU JATI 198,991.50

I. 6.6.15 1M2 PLAFOND LAT KAYU MERANTI 73,855.50

I. 6.6.16 1M2 PLAFOND LAT KAYU BENGKIRAI 126,799.50

I. 6.6.17 1M2 PLAFOND SOFTBOARD 41,474.50

I. 6.6.18 1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM 47,562.50

I. 6.6.19 1M2 PLAFOND KAYU PROFIL 18,346.50

I. 6.6.20 1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI 106,000.00

I. 6.6.21 1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI 110,974.50

I. 6.6.22 1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI 88,352.00

I. 6.6.23 1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI 102,157.50

I. 6.6.24 1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM 28,778.20

J. PEKERJAAN SANITAIR

J. 6.6.1 MEMASANG 1 BH CLOSED DUDUK / MONOBLOK 1,722,775.00

J. 6.6.2 MEMASANG 1 BH CLOSED JONGKOK KERAMIK 441,520.00

J. 6.6.3 MEMASANG 1 BH CLOSED JONGKOK TERASO 418,430.00

J. 6.6.4 MEMASANG 1 BH URINOIR 2,575,570.00

J. 6.6.5 MEMASANG 1 BH WASTAFEL 2,621,820.00

J. 6.6.6 MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3 376,920.00

J. 6.6.7 MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3 525,550.00

J. 6.6.8 MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 ) 1,793,712.00

J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN 80,250.00

J. 6.6.10 MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR 15,870,612.50

J. 6.6.11 MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR 1,119,000.00

J. 6.6.12 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM 10,887.00

J. 6.6.13 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM 13,776.50

J. 6.6.14 MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM 35,575.06

Hal : 520

Page 131: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

J. 6.6.15 MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM 71,221.10

J. 6.6.16 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 C 373,365.60

J. 6.6.17 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 C 299,340.00

J. 6.6.18 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 471,968.38

J. 6.6.19 MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2" 92,725.00

J. 6.6.20 MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4" 160,852.50

J. 6.6.21 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 " 92,725.00

J. 6.6.22 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 " 151,890.00

J. 6.6.23 MEMASANG 1M' PIPA GALVANIS DIAMETER 3" 298,496.50

J. 6.6.24 MEMASANG 1M' PIPA GALVANIS DIAMETER 4 " 427,287.50

J. 6.6.25 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 " 38,075.00

J. 6.6.26 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4" 14,379.38

J. 6.6.27 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 " 16,103.75

J. 6.6.28 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 " 25,713.75

J. 6.6.29 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2" 46,716.25

J. 6.6.30 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2" 25,713.75

J. 6.6.31 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3" 74,900.00

J. 6.6.32 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4" 58,780.00

J. 6.6.33 MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL 255,012.50

J. 6.6.34 MEMASANG 1 BH BAK CUCI PIRING TERASO 409,087.50

J. 6.6.35 MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2" 33,775.00

J. 6.6.36 MEMASANG 1BH FLOOR DRAIN 40,375.00

K. PEKERJAAN BESI

K. 6.6.1 1 KG PASANG RANGKA ATAP BAJA 5,660.50

K. 6.6.2 1 M2 PASANG PINTU BESI BAJA 4,192.50

K. 6.6.3 1 M2 PASANG JENDELA BESI 139,518.75

K. 6.6.4 1 M2 PASANG JENDELA BESI TAHAN API 149,660.00

K. 6.6.5 1 M2 PASANG PINTU GULUNG BESI 159,450.00

K. 6.6.6 1 M2 PASANG PINTU LIPAT 4,192.50

K. 6.6.7 1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM 66,700.00

K. 6.6.8 1 M2 PASANG ROLLING DOOR 171,015.00

K. 6.6.9 1 M2 PASANG PINTU ALLUMUNIUM 139,515.00

K. 6.6.10 1 M2 PASANG VENETIONS BLINDS 46,506.25

Page 132: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

K. 6.6.11 1 M2 PASANG VERTIKALS BLINDS 46,506.25

K. 6.6.12 1 M2 PASANG TERALI BESI 516,645.00

K. 6.6.13 1 M2 PASANG KAWAT HARMONIKA 54,254.13

K. 6.6.14 1 M2 PASANG KAWAT NYAMUK 43,565.30

K. 6.6.15 1 M2 PASANG KAWAT KASSA 25,635.30

K. 6.6.16 1 M2 PASANG KAWAT BURUNG 138,836.10

K. 6.6.17 1 M2 PASANG JENDELA NAKO & TRALIS 387,073.00

K. 6.6.18 1 M' PASANG TALANG DATAR, SENG BLJS 28 109,578.50

K. 6.6.19 1 M' PASANG TALANG MIRING, SENG BLJS 28 139,318.50

K. 6.6.20 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28 129,763.75

K. 6.6.21 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24 137,158.50

L. PEKERJAAN KUNCI DAN KACA

L. 6.6.1 1 BUAH PASANG KUNCI TANAM ANTIK 182,825.00

L. 6.6.2 1 BUAH PASANG KUNCI TANAM BIASA 137,975.00

L. 6.6.3 1 BUAH PASANG KUNCI KAMAR MANDI 168,637.50

L. 6.6.4 1 BUAH PASANG KUNCI SILINDER 28,040.00

L. 6.6.5 1 BUAH PASANG ENGSEL PINTU 40,306.25

L. 6.6.6 1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU 31,337.50

L. 6.6.7 1 BUAH PASANG ENGSEL ANGIN 17,350.00

L. 6.6.8 1 BUAH PASANG SPRING KNIP 12,506.25

L. 6.6.9 1 BUAH PASANG KAIT ANGIN 24,506.25

L. 6.6.10 1 BUAH PASANG DOOR CLOSER 41,687.50

L. 6.6.11 1 BUAH PASANG KUNCI SELOT 16,675.00

L. 6.6.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER 41,687.50

L. 6.6.13 1 BUAH PASANG DOOR STOP 8,337.50

L. 6.6.14 1 BUAH PASANG REL PINTU DORONG 50,025.00

L. 6.6.15 1 BUAH PASANG KUNCI LEMARI 45,843.75

L. 6.6.16 1 M2 PASANG KACA, TEBAL 3 MM 105,676.25

L. 6.6.17 1 M2 PASANG KACA, TEBAL 5 MM 125,036.25

L. 6.6.18 1 M2 PASANG KACA, TEBAL 8 MM 153,451.25

L. 6.6.19 1 M2 PASANG KACA GELAP, TEBAL 5 MM 162,293.75

L. 6.6.20 1 M2 PASANG KACA CERMIN, TEBAL 5 MM 137,906.25

L. 6.6.21 1 M2 PASANG KACA CERMIN, TEBAL 6 MM 137,906.25

Page 133: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

L. 6.6.22 1 M2 PASANG KACA CERMIN, TEBAL 8 MM 165,755.00

L. 6.6.23 1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM 12,506.25

L. 6.6.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM 452,506.25

M. PEKERJAAN PENUTUP LANTAI & DINDING

M.6.6.1 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM 91,953.50

M.6.6.2 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM 84,682.50

M.6.6.3 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM 86,925.50

M.6.6.4 1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM 107,615.70

M.6.6.5 1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM 95,369.70

M.6.6.6 1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM 104,827.70

M.6.6.7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 x 40 CM 121,008.50

M.6.6.8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 x 30 CM 144,547.50

M.6.6.9 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM 171,428.50

M.6.6.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM 179,387.50

M.6.6.11 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 40 X 40 CM 66,208.50

M.6.6.12 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM 64,363.75

M.6.6.13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM 66,238.80

M.6.6.14 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM 99,061.00

M.6.6.15 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM 116,050.00

M.6.6.16 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM 17,751.20

M.6.6.17 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM 12,735.51

M.6.6.18 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM 13,617.47

M.6.6.19 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM 16,079.00

M.6.6.20 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM 13,651.48

M.6.6.21 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM 16,460.27

M.6.6.22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM 20,246.20

M.6.6.23 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM 30,289.00

M.6.6.24 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM 31,651.50

M.6.6.25 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM 71,144.00

M.6.6.26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM 61,154.00

M.6.6.27 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM 61,154.00

M.6.6.28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM 61,154.00

M.6.6.29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM 59,190.11

Page 134: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

M.6.6.30 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM 61,154.00

M.6.6.31 1 M2 PASANG TERASO COR DITEMPAT 56,812.50

M.6.6.32 1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM 56,812.50

M.6.6.33 1 M2 PASANG UBIN TAHAN ASAM 38,687.50

M.6.6.34 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM 169,937.60

M.6.6.35 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM 191,687.60

M.6.6.36 1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM 169,937.60

M.6.6.37 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM 22,604.00

M.6.6.38 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM 20,624.00

M.6.6.39 1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM 18,038.00

M.6.6.40 1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM 107,854.55

M.6.6.41 1 M' PASANG PLINT VINYL TANPA ADUKAN 10,900.00

M.6.6.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 144,836.00

M.6.6.43 1 M2 PASANG LANTAI KERAMIK 15 X 15 CM 147,337.60

M.6.6.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 174,937.60

M.6.6.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 153,937.60

M.6.6.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 187,777.60

M.6.6.47 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM 159,432.55

M.6.6.48 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP 165,998.21

M.6.6.49 1 M2 PASANG LANTAI KERAMIK 10 x 33 CM 109,937.60

M.6.6.50 1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL 119,365.50

M.6.6.51 1 M2 PASANG LANTAI MARMER 640,105.50

M.6.6.52 1 M2 PASANG LANTAI KARPET 100 % WOOL 23,162.50

M.6.6.53 1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON 23,162.50

M.6.6.54 1 M2 PASANG UNDRLYER, TEBAL 6 MM 16,350.00

M.6.6.55 1 M2 PASANG LANTAI KARPET 23,162.50

M.6.6.56 1 M2 PASANG LANTAI PARQUET JATI 18,530.00

M.6.6.57 1 M2 PASANG GYMFLOOR 65,312.50

M.6.6.58 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH 112,201.00

M.6.6.59 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA 112,201.00

M.6.6.60 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH 174,640.21

M.6.6.61 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA 233,226.00

M.6.6.62 1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA 232,226.00

Page 135: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

M.6.6.63 1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA 227,586.00

M.6.6.64 1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM 207,226.00

M.6.6.65 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM 157,226.00

M.6.6.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM 162,337.11

M.6.6.67 1 M2 PASANG DINDING KERAMIK 15 x 15 CM 145,476.00

M.6.6.68 1 M2 PASANG DINDING KERAMIK 20 x 20 CM 137,781.56

M.6.6.69 1 M2 PASANG DINDING KERAMIK 10 x 20 CM 137,149.61

M.6.6.70 1 M2 PASANG DINDING MARMER 185,648.80

M.6.6.71 1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM 111,273.80

M.6.6.72 1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM 148,248.80

M.6.6.73 1 M2 PASANG DINDING BATU PAROS 90,900.00

M.6.6.74 1 M2 PASANG DINDING BATU TEMPEL HITAM 88,197.50

M.6.6.75 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I 20,437.50

M.6.6.76 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II 20,437.50

M.6.6.77 1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM 20,437.50

M.6.6.78 1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM 20,437.50

M.6.6.79 1 M2 PASANG WALL COVERING LEBAR 50 CM 55,062.50

M.6.6.80 1 M2 FLOOR HARDENER FERROVAX 16,350.00

M.6.6.81 1 M2 FLOOR HARDENER MASTERCRON 16,350.00

M.6.6.82 1 M2 PLINT KAYU 2 X 10 CM 33,725.00

N. PEKERJAAN CAT - CATAN

N. 6.6.1 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA 14,250.00

N. 6.6.2 1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT 14,775.00

N. 6.6.3 1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL 14,775.00

N. 6.6.4 1 M2 MENYABUN PERMUKAAN TEMBOK LAMA 14,775.00

N. 6.6.5 1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR 792,197.11

N. 6.6.6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU 7,488.75

N. 6.6.7 1 M2 PENGECATAN BIDANG KAYU LAMA 21,635.00

N. 6.6.8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR, 23,828.50

N. 6.6.9 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ) 34,141.00

N. 6.6.10 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL 24,950.50

N. 6.6.11 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 33,272.50

N. 6.6.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER 6,610.00

Page 136: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

N. 6.6.13 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS 24,237.50

N. 6.6.14 1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir, 23,658.00

N. 6.6.15 1 M2 PENGECATAN TEMBOK LAMA 14,840.90

N. 6.6.16 1 M2 MELABUR TEMBOK DENGAN KALKARIUM 4,982.50

N. 6.6.17 1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH 13,987.00

N. 6.6.18 1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN ) 9,347.00

N. 6.6.19 1 M2 PEMASANGAN WALL PAPER 17,437.50

N. 6.6.20 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 19,268.00

N. 6.6.21 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH 37,240.00

N. 6.6.22 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 6,572.00

N. 6.6.23 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 5,880.00

N. 6.6.24 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 121,000.00

N. 6.6.25 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT 101,000.00

Page 137: RAB Siring

827,485.00 1

812,815.00 1

782,835.00 1

99,850.00 1

1,057,345.00 1

899,225.00 1

948,165.00 1

863,515.00 1

996,845.00 1

1,075,955.00 1

1,079,925.00 1

961,345.00 1

1,057,345.00 1

1,024,695.00 1

1,096,215.00 1

1,120,125.00 1

1,305,175.00 1

1,120,125.00 1

5,225.00 1

5,612.50 1

32,925.00 1

32,925.00 1

32,925.00 1

5,350.00 1

11,744.00 1

13,581.50 1

11,381.00 1

48,120.00 1

112,140.00 1

110,720.00 1

197,205.00 1

1

Page 138: RAB Siring

1

0

203,474.00 1

236,305.00 1

427,780.00 1

189,395.00 1

1,356,510.00 1

1,391,000.00 1

72,877.20 1

3,233,535.00 1

3,999,545.00 1

6,488,710.00 1

4,997,095.00 1

4,562,285.00 1

4,394,265.00 1

4,695,100.00 1

61,327.50 1

72,007.00 1

1

14,700.00 1

77,200.00 1

13,500.00 1

56,770.00 1

74,270.00 1

45,186.14 1

11,416.25 1

30,498.00 1

29,948.00 1

29,798.00 1

33,248.00 1

24,048.00 1

25,658.00 1

25,558.00 1

27,168.00 1

33,838.00 1

1

Page 139: RAB Siring

1

0

23,948.00 1

24,178.00 1

26,018.00 1

26,708.00 1

28,548.00 1

83,645.00 1

83,645.00 1

83,645.00 1

83,645.00 1

83,645.00 1

83,645.00 1

86,275.00 1

86,275.00 1

58,499.50 1

78,974.50 1

81,465.00 1

122,435.00 1

94,188.50 1

39,048.00 1

27,182.50 1

58,182.50 1

40,857.00 1

88,127.50 1

62,327.00 1

78,054.00 1

485,225.00 1

1

39,762.50 1

39,762.50 1

56,372.50 1

56,372.50 1

22,100.00 1

12,450.00 1

1

Page 140: RAB Siring

1

0

12,450.00 1

32,907.50 1

54,507.50 1

29,292.50 1

42,192.50 1

48,315.50 1

57,642.50 1

198,991.50 1

73,855.50 1

126,799.50 1

41,474.50 1

47,562.50 1

18,346.50 1

106,000.00 1

110,974.50 1

88,352.00 1

102,157.50 1

28,778.20 1

1

1,722,775.00 1

441,520.00 1

418,430.00 1

2,575,570.00 1

2,621,820.00 1

376,920.00 1

525,550.00 1

1,793,712.00 1

80,250.00 1

15,870,612.50 1

1,119,000.00 1

10,887.00 1

13,776.50 1

35,575.06 1

0

Page 141: RAB Siring

1

0

71,221.10 1

373,365.60 1

299,340.00 1

471,968.38 1

92,725.00 1

160,852.50 1

92,725.00 1

151,890.00 1

298,496.50 1

427,287.50 1

38,075.00 1

14,379.38 1

16,103.75 1

25,713.75 1

46,716.25 1

25,713.75 1

74,900.00 1

58,780.00 1

255,012.50 1

409,087.50 1

33,775.00 1

40,375.00 1

1

5,660.50 1

4,192.50 1

139,518.75 1

149,660.00 1

159,450.00 1

4,192.50 1

66,700.00 1

171,015.00 1

139,515.00 1

46,506.25 1

1

Page 142: RAB Siring

1

0

46,506.25 1

516,645.00 1

54,254.13 1

43,565.30 1

25,635.30 1

138,836.10 1

387,073.00 1

109,578.50 1

139,318.50 1

129,763.75 1

137,158.50 1

1

182,825.00 1

137,975.00 1

168,637.50 1

28,040.00 1

40,306.25 1

31,337.50 1

17,350.00 1

12,506.25 1

24,506.25 1

41,687.50 1

16,675.00 1

41,687.50 1

8,337.50 1

50,025.00 1

45,843.75 1

105,676.25 1

125,036.25 1

153,451.25 1

162,293.75 1

137,906.25 1

137,906.25 1

1

Page 143: RAB Siring

1

0

165,755.00 1

12,506.25 1

452,506.25 1

1

91,953.50 1

84,682.50 1

86,925.50 1

107,615.70 1

95,369.70 1

104,827.70 1

121,008.50 1

144,547.50 1

171,428.50 1

179,387.50 1

66,208.50 1

64,363.75 1

66,238.80 1

99,061.00 1

116,050.00 1

17,751.20 1

12,735.51 1

13,617.47 1

16,079.00 1

13,651.48 1

16,460.27 1

20,246.20 1

30,289.00 1

31,651.50 1

71,144.00 1

61,154.00 1

61,154.00 1

61,154.00 1

59,190.11 1

1

Page 144: RAB Siring

1

0

61,154.00 1

56,812.50 1

56,812.50 1

38,687.50 1

169,937.60 1

191,687.60 1

169,937.60 1

22,604.00 1

20,624.00 1

18,038.00 1

107,854.55 1

10,900.00 1

144,836.00 1

147,337.60 1

174,937.60 1

153,937.60 1

187,777.60 1

159,432.55 1

165,998.21 1

109,937.60 1

119,365.50 1

640,105.50 1

23,162.50 1

23,162.50 1

16,350.00 1

23,162.50 1

18,530.00 1

65,312.50 1

112,201.00 1

112,201.00 1

174,640.21 1

233,226.00 1

232,226.00 1

1

Page 145: RAB Siring

1

0

227,586.00 1

207,226.00 1

157,226.00 1

162,337.11 1

145,476.00 1

137,781.56 1

137,149.61 1

185,648.80 1

111,273.80 1

148,248.80 1

90,900.00 1

88,197.50 1

20,437.50 1

20,437.50 1

20,437.50 1

20,437.50 1

55,062.50 1

16,350.00 1

16,350.00 1

33,725.00 1

1

14,250.00 1

14,775.00 1

14,775.00 1

14,775.00 1

792,197.11 1

7,488.75 1

21,635.00 1

23,828.50 1

34,141.00 1

24,950.50 1

33,272.50 1

6,610.00 1

1

Page 146: RAB Siring

1

0

24,237.50 1

23,658.00 1

14,840.90 1

4,982.50 1

13,987.00 1

9,347.00 1

17,437.50 1

19,268.00 1

37,240.00 1

6,572.00 1

5,880.00 1

121,000.00 1

101,000.00 11

Page 147: RAB Siring

REKAPITULASI ANALISA SNI 2010

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

A. PEKERJAAN PERSIAPAN

A. 6.6.1 1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M 219,401.00

A. 6.6.2 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M 269,398.50

A. 6.6.3 1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M 1,926,740.80

A. 6.6.4 1 M' MENGUKUR DAN MEMASANG BOUWPLANK 53,858.00

A. 6.6.5 1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN 3,416,496.00

A. 6.6.6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT 774,120.00

A. 6.6.7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 861,205.00

A. 6.6.8 1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN 9,250.00

A. 6.6.9 1 M2 PEMBUATAN BEDENG BURUH 804,480.00

A. 6.6.10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM 153,044.50

A. 6.6.11 1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM 29,335.00

A. 6.6.12 1 M2 PEMBUATAN JALAN SEMENTARA 106,422.50

A. 6.6.13 1 M3 BONGKARAN BETON BERTULANG 391,660.00

A. 6.6.14 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 391,660.00

A. 6.6.15 1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M 52,268.20

A. 6.6.16 1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM 145,748.00

B. PEKERJAAN TANAH

B. 6.6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M' 25,000.00

B. 6.6.2 1 M3 GALIAN TANAH BIASA SEDALAM 2 M' 32,830.00

B. 6.6.3 1 M3 GALIAN TANAH BIASA SEDALAM 3 M' 45,900.00

B. 6.6.4 1 M3 GALIAN TANAH KERAS SEDALAM 1 M' 39,025.00

B. 6.6.5 1 M3 GALIAN TANAH CADAS SEDALAM 1 M 78,125.00

B. 6.6.6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M' 51,490.00

B. 6.6.7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 M 3,125.00

B. 6.6.8 1 M3 PEMBUANGAN TANAH SEJAUH 150 M 32,130.00

B. 6.6.9 1 M3 URUGAN KEMBALI 11,985.00

B. 6.6.10 PEMADATAN TANAH 31,250.00

B. 6.6.11 1 M3 URUGAN TANAH 109,155.00

B. 6.6.11.a 1 M3 URUGAN PASIR 110,780.00

B. 6.6.12 1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL 133,602.12

B. 6.6.13 1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL 84,085.00

B. 6.6.14 1 M3 PEMASANGAN LAPISAN IJUK 9,375.00

B. 6.6.15 1 M3 URUGAN SIRTU 345,385.00

B. 6.6.16 1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM 139,390.00

C. PEKERJAAN PONDASI

C.6.6.1 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps 940,385.00

C.6.6.2 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps 813,275.00

C.6.6.3 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps 940,385.00

C.6.6.4 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps 746,965.00

C.6.6.5 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps 707,235.00

C.6.6.5.a 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih) 593,771.00

C.6.6.5.b 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih Sepaku) 706,135.00

C.6.6.6 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps 679,665.00

C.6.6.7 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps 660,295.00

C.6.6.8 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps 627,275.00

C.6.6.9 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps 481,899.60

C.6.6.10 1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps 450,312.90

C.6.6.11 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps 706,345.00

C.6.6.12 1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps 570,590.00

C.6.6.13 1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps 553,790.00

C. 6.6.14 1 M3 PASANGAN BATU KOSONG (AANSTAMPING) 331,620.00

C. 6.6.15 1 M3 PASANG PONDASI SIKLOP 40 % BATU KALI 1,473,215.00

C. 6.6.16 1 M3 PASANG PONDASI SUMURAN DIA 100 CM 894,460.00

C. 6.6.17 PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG 872,554.10

C. 6.6.18 PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG 684,258.40

Page 148: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

D. PEKERJAAN DINDING

D.6.6.1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps 259,338.10

D.6.6.2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps 239,145.00

D.6.6.3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps 228,826.50

D.6.6.4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps 221,258.50

D.6.6.4.a 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps (Pasir putih) 200,965.90

D.6.6.4.b 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps (Pasir putih Sepaku) 216,143.50

D.6.6.5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps 218,254.00

D.6.6.6 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps 218,254.00

D.6.6.7 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 Ps 200,339.10

D.6.6.8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps 123,621.00

D. 6.6.9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps 115,181.50

D. 6.6.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps 109,924.90

D. 6.6.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps 107,120.00

D. 6.6.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps 105,368.60

D. 6.6.13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps 104,761.40

D. 6.6.14 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps 102,730.00

D. 6.6.15 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps 100,265.00

D. 6.6.16 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps 85,627.86

D. 6.6.17 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps 88,402.78

D. 6.6.18 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20) 93,485.00

D. 6.6.19 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15) 238,624.00

D. 6.6.20 1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10) 230,247.50

D. 6.6.21 1 M2 PASANGAN DINDING CON BLOCK (HB.20) 263,832.00

D. 6.6.22 1 M2 PASANGAN DINDING CON BLOCK (HB.15) 230,807.40

D. 6.6.23 1 M2 PASANGAN DINDING CON BLOCK (HB.10) 233,527.25

D. 6.6.24 1 M2 PASANGAN DINDING LATAI 91,452.00

D. 6.6.25 1 M2 PASANGAN DINDING ROSTER 20 X 20 909,806.00

D. 6.6.26 1 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm 291,985.50

D. 6.6.27 1 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU 49,174.80

D. 6.6.28 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP 172,065.00

E. PEKERJAAN PLESTERAN

E. 6.6.1 1 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM 43,423.40

E. 6.6.2 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM 38,955.40

E. 6.6.3 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM 36,924.60

E. 6.6.4 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM 35,579.00

E. 6.6.4.a 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih) 31,215.00

E. 6.6.4.b 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih Sepaku) 34,479.00

E. 6.6.5 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM 30,221.00

E. 6.6.6 1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM 29,470.00

E. 6.6.7 1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM 33,752.60

E. 6.6.8 1 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM 34,345.20

E. 6.6.9 1 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM 29,661.80

E. 6.6.10 1 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM 32,530.00

E. 6.6.11 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM 25,951.43

E. 6.6.12 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM 27,618.89

E. 6.6.13 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM 54,763.10

E. 6.6.14 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM 51,183.50

E. 6.6.15 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM 49,051.10

E. 6.6.16 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM 47,285.80

E. 6.6.17 1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM 46,512.30

E. 6.6.18 1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM 35,283.93

E. 6.6.19 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM 56,300.00

E. 6.6.20 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM 57,697.50

E. 6.6.21 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM 55,654.60

E. 6.6.22 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM 53,978.80

E. 6.6.23 1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM 71,585.50

E. 6.6.24 1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM 66,990.50

E. 6.6.25 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM 64,312.60

Page 149: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

E. 6.6.26 1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM 61,101.30

E. 6.6.27 1 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM 29,133.90

E. 6.6.28 1 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM 27,915.90

E. 6.6.29 1 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM 34,756.00

E. 6.6.30 1 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM 32,763.90

E. 6.6.31 1 M2 PLESTERAN SKONING 1 pc ; 2ps 9,990.00

E. 6.6.32 1 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM 231,619.00

E. 6.6.33 1 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM 220,565.00

E. 6.6.34 1 M2 PLESTERAN CIPRAT 1 pc ; 2ps 32,591.40

E. 6.6.35 1 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps 16,816.40

E. 6.6.36 1 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS 40,660.00

F. PEKERJAAN KAYU

F.6.6.1 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU JATI 7,402,500.00

F.6.6.2 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI 7,762,500.00

F.6.6.3 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU ULIN 7,162,500.00

F.6.6.4 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH 4,282,500.00

F.6.6.5 1 M2 PASANG PINTU KLAMP KAYU BENGKIRAI 228,807.50

F.6.6.6 1 M2 PASANG PINTU KLAMP KAYU ULIN 214,565.00

F.6.6.7 1 M2 PASANG PINTU PANEL KAYU JATI 532,500.00

F.6.6.8 1 M2 PASANG PINTU PANEL KAYU BENGKIRAI 392,500.00

F.6.6.9 1 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI 447,000.00

F.6.6.10 1 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI 324,500.00

F.6.6.11 1 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN 310,500.00

F.6.6.12 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI 758,000.00

F.6.6.13 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI 534,000.00

F.6.6.14 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI 388,949.50

F.6.6.15 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI 320,349.50

F.6.6.16 1 M2 PASANG JALUSI MATI KUSEN KAYU JATI 606,872.50

F.6.6.17 1 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI 396,872.50

F.6.6.18 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN 312,604.00

F.6.6.19 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI 394,390.00

F.6.6.20 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI 320,444.00

F.6.6.21 1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI 449,449.50

F.6.6.22 1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 395,499.50

F.6.6.23 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI 467,699.50

F.6.6.24 1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI 416,599.50

F.6.6.25 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI 576,749.50

F.6.6.26 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI 508,149.50

F.6.6.27 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI 7,155,320.00

F.6.6.28 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI 7,155,320.00

F.6.6.29 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN 6,605,320.00

F.6.6.30 1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI 3,965,320.00

F.6.6.31 1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI 76,122.50

F.6.6.32 1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN 70,595.00

F.6.6.33 1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI 86,122.50

F.6.6.34 1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI 86,122.50

F.6.6.35 1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI 86,122.50

F.6.6.35a 1M2 PASANG KASO + RENG GENTENG METAL KAYU MERANTIBENGKIRAI 45,522.50

F.6.6.36 1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI 844,680.00

F.6.6.37 1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN 845,310.00

F.6.6.38 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI 94,915.00

F.6.6.39 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI 94,915.00

F.6.6.40 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN 89,230.00

F.6.6.41 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI 144,673.75

F.6.6.42 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI 74,237.90

F.6.6.43 1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI 85,797.50

F.6.6.44 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI 180,142.50

F.6.6.45 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI 180,142.50

F.6.6.46 1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI 101,842.50

Page 150: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

F.6.6.47 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI 72,982.50

F.6.6.48 1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI 47,782.50

F.6.6.49 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI 101,307.50

F.6.6.50 1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI 62,807.50

F.6.6.51 1M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI 84,999.00

F.6.6.52 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI 48,099.00

F. 6.6.53. 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN 44,659.00

F. 6.6.53a. 1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU meranti 31,559.00

F. 6.6.54 1M2 PASANG RANGKA DINDING PEMISAH KAYU BENGKIRAI 172,415.00

F. 6.6.55 1M2 PASANG RANGKA DINDING PEMISAH KAYU ULIN 162,665.00

F. 6.6.56 1M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI 172,415.00

F. 6.6.57 1M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER 246,815.00

F. 6.6.58 1M2 PASANG DINDING LAMBRISIRING DARI PAPAN JATI 213,140.00

F. 6.6.59 1M2 PASANG PLYWOOD TEBAL 3 MM, UNTUK DINDING 30,717.50

F. 6.6.60 1M2 PASANG LIST PLAFOND, KAYU PROFIL 15,090.00

G. PEKERJAAN BETON

G.6.6.1 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr 843,085.00

G.6.6.2 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr 826,915.00

G.6.6.3 1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr 799,935.00

G.6.6.4 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr 100,630.00

G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Krayan 1,057,345.00

G.6.6.5.a 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Palu 1,199,095.00

G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Sepaku 1,171,420.00

G.6.6.6 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 899,225.00

G.6.6.7 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr) 948,165.00

G.6.6.8 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr) 863,515.00

G.6.6.9 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr) 996,845.00

G.6.6.10 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr) 1,075,955.00

G.6.6.11 1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON 1,079,925.00

G.6.6.12 1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR 961,345.00

G.6.6.13 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Krayan 1,057,345.00

G.6.6.13.a 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Palu 1,109,995.00

G.6.6.13.b 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Sepaku 1,128,220.00

G.6.6.14 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr) 1,024,695.00

G.6.6.15 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr) 1,096,215.00

G.6.6.16 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr) 1,120,125.00

G.6.6.17 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr) 1,305,175.00

G.6.6.18 1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100 1,120,125.00

G.6.6.19 1M' MEMASANG PVC WATERSTOP LEBAR 150 MM 5,225.00

G.6.6.20 1M' MEMASANG PVC WATERSTOP LEBAR 200 MM 199,862.50

G.6.6.21 1M' MEMASANG PVC WATERSTOP LEBAR 230 MM 32,925.00

G.6.6.22 1M' MEMASANG PVC WATERSTOP LEBAR 250 MM 32,925.00

G.6.6.23 1M' MEMASANG PVC WATERSTOP LEBAR 300 MM 32,925.00

G.6.6.24 1M' MEMASANG PVC WATERSTOP LEBAR 320 MM 5,350.00

G.6.6.25 1 KG PEMBESIAN DG BESI POLOS 11,744.00

G.6.6.25 1 KG PEMBESIAN DG BESI ULIR 13,581.50

G.6.6.26 1 KG KABEL PRESSTRESSED POLOS/STRANDS 11,381.00

G.6.6.27 1 KG JARING KAWAT BAJA 48,120.00

G.6.6.28 1M2 PASANG BEKISTING UNTUK PONDASI 127,220.00

G. 6.6.29 1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai ) 155,720.00

G. 6.6.30 1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai ) 246,260.00

G. 6.6.31 1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai ) 253,660.00

G. 6.6.32 1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai ) 292,160.00

G. 6.6.33 1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai ) 464,060.00

G. 6.6.34 1 M2 PASANG BEKISTING UNTUK TANGGA 209,760.00

G. 6.6.35 1M3 MEMBUAT BETON DENGAN MUTU K 225 EX. LOKAL 1,332,260.00

G.6.6.35a 1M3 MEMBUAT BETON DENGAN MUTU K 275 EX. LOKAL 1,337,000.00

G. 6.6.36 1M3 MEMBUAT BETON DENGAN MUTU K 225 EX. PALU 1,462,260.00

G.3.6.6.36a 1M3 MEMBUAT BETON BERTULANG MUTU K 275 EX. PALU 1,444,300.00

G. 6.6.37 1 M2 PASANG JEMBATAN COR 83,680.00

G. 6.6.38 1M3 MEMBUAT PONDASI BETON BERTULANG (100KG BESI + BEKISTING) 2,859,635.00

G. 6.6.39 1M3 MEMBUAT SLOOF BETON BERTULANG (100KG BESI + BEKISTING) 3,152,035.00

G. 6.6.40 1M3 MEMBUAT KOLOM BETON BERTULANG (90KG BESI + BEKISTING) 4,680,760.00

Page 151: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

G. 6.6.41 1M3 MEMBUAT BALOK BETON BERTULANG (80KG BESI + BEKISTING) 4,048,415.00

G. 6.6.42 1M3 MEMBUAT BALOK BETON BERTULANG (100KG BESI + BEKISTING) 4,333,265.00

G. 6.6.43 1M3 MEMBUAT DINDING BETON BERTULANG (120 KG BESI + BEKISTING) 4,336,565.00

G. 6.6.44 1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING) 4,903,435.00

G. 6.6.45 1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM 62,666.50

G. 6.6.46 1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM 74,113.00

H. PEKERJAAN PENUTUP ATAP

H. 6.6.1 1M2 PASANG ATAP GENTENG PALENTONG KECIL 14,700.00

H. 6.6.2 1M2 PASANG ATAP GENTENG KODOK /GLAZZUR 77,200.00

H. 6.6.3 1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR 88,500.00

H. 6.6.4 1M2 PASANG ATAP GENTENG BUBUNG PALENTONG 109,270.00

H. 6.6.5 1M' PASANG BUBUNG GENTENG KODOK 158,270.00

H. 6.6.6 1M2 PASANG BUBUNG GENTENG PALENTONG BESAR 45,186.14

H. 6.6.7 1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM 11,416.25

H. 6.6.8 1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM 33,748.00

H. 6.6.9 1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM 37,268.00

H. 6.6.10 1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM 37,118.00

H. 6.6.11 1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM 40,748.00

H. 6.6.12 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM 28,318.00

H. 6.6.13 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM 30,782.00

H. 6.6.14 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM 30,926.00

H. 6.6.15 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM 33,390.00

H. 6.6.16 1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM 43,598.00

H. 6.6.17 1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM 28,462.00

H. 6.6.18 1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM 28,814.00

H. 6.6.19 1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM 31,630.00

H. 6.6.20 1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM 32,686.00

H. 6.6.21 1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM 35,502.00

H. 6.6.22 1M' PASANG BUBUNG STEL GELOMBANG 0,92 M 83,645.00

H. 6.6.23 1M' PASANG NOK STEL GELOMBANG 1,05 M 83,645.00

H. 6.6.24 1M' PASANG NOK STEL GELOMBANG 1,08 M 83,645.00

H. 6.6.25 1M' PASANG NOK paten 0,92 m 83,645.00

H. 6.6.26 1M' PASANG NOK PATEN 1,05 M 83,645.00

H. 6.6.27 1M' PASANG NOK PATEN 1,08 M 83,645.00

H. 6.6.28 1M' PASANG NOK STEL RATA 0,92 M 86,275.00

H. 6.6.29 1M' PASANG NOK STEL RATA 1,05 M 86,275.00

H. 6.6.30 1M2 PASANG ATAP GENTENG BETON 58,499.50

H. 6.6.31 1M2 PASANG ATAP GENTENG ASPAL 78,974.50

H. 6.6.32 1M2 PASANG ATAP GENTENG METAL 82,743.00

H. 6.6.33 1M' PASANG ATAP SIRAP 122,435.00

H. 6.6.34 1M' PASANG NOK GENTENG BETON 94,188.50

H. 6.6.35 1M' PASANG NOK GENTENG ASPAL 40,367.50

H. 6.6.36 1M' PASANG NOK GENTENG METAL 27,182.50

H. 6.6.37 1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm 59,438.50

H. 6.6.38 1 M2 MEMASANG ATAP SENG 40,857.00

H. 6.6.39 1 M2 MEMASANG BUBUNGAN ATAP SENG 88,127.50

H. 6.6.40 1 M2 PASANG ATAP ALUMUNIUM 224,027.00

H. 6.6.41 1 M2 PASANG NOK ALUMUNIUM 262,854.00

H. 6.6.42 1 M2 PASANG ALUMUNIUM FOIL /SISALATION 647,975.00

I. PEKERJAAN PLAFOND

I. 6.6.1 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM 164,722.50

I. 6.6.2 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM 164,722.50

I. 6.6.3 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM 56,372.50

I. 6.6.4 1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM 56,372.50

I. 6.6.5 1 M2 PLAFOND AKUSTIK (30 X 30) CM 22,100.00

Page 152: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I. 6.6.6 1 M2 PLAFOND AKUSTIK (30 X 60) CM 12,450.00

I. 6.6.7 1 M2 PLAFOND AKUSTIK (60 X 120) CM 12,450.00

I. 6.6.8 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM 32,907.50

I. 6.6.9 1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM 54,507.50

I. 6.6.10 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM 29,292.50

I. 6.6.11 1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM 42,192.50

I. 6.6.12 1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM 48,315.50

I. 6.6.13 1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM 57,642.50

I. 6.6.14 1M2 PLAFOND LAT KAYU JATI 198,991.50

I. 6.6.15 1M2 PLAFOND LAT KAYU MERANTI 81,391.50

I. 6.6.16 1M2 PLAFOND LAT KAYU BENGKIRAI 114,991.50

I. 6.6.17 1M2 PLAFOND SOFTBOARD 41,474.50

I. 6.6.18 1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM 47,562.50

I. 6.6.19 1M2 PLAFOND KAYU PROFIL 18,346.50

I. 6.6.20 1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI 110,524.00

I. 6.6.21 1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI 118,196.50

I. 6.6.22 1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI 95,574.00

I. 6.6.23 1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI 112,336.50

I. 6.6.24 1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM 28,778.20

J. PEKERJAAN SANITAIR

J. 6.6.1 MEMASANG 1 BH CLOSED DUDUK / MONOBLOK 2,814,575.00

J. 6.6.2 MEMASANG 1 BH CLOSED JONGKOK KERAMIK 441,520.00

J. 6.6.3 MEMASANG 1 BH CLOSED JONGKOK TERASO 419,270.00

J. 6.6.4 MEMASANG 1 BH URINOIR 2,575,570.00

J. 6.6.5 MEMASANG 1 BH WASTAFEL 2,621,820.00

J. 6.6.6 MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3 376,920.00

J. 6.6.7 MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3 926,750.00

J. 6.6.8 MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 ) 1,793,760.00

J. 6.6.9 MEMASANG 1 BH BADKIP PORSELEN 80,250.00

J. 6.6.10 MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR 5,790,612.50

J. 6.6.11 MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR 1,119,000.00

J. 6.6.12 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM 125,287.00

J. 6.6.13 MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM 55,376.50

J. 6.6.14 MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM 35,578.30

J. 6.6.15 MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM 759,887.10

J. 6.6.16 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 CM 373,383.00

J. 6.6.17 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 CM 299,370.00

J. 6.6.18 MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 CM 472,012.90

J. 6.6.19 MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2" 92,725.00

J. 6.6.20 MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4" 160,852.50

J. 6.6.21 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 " 92,725.00

J. 6.6.22 MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 " 180,100.00

J. 6.6.23 MEMASANG 1M' PIPA GALVANIS DIAMETER 3" 298,496.50

J. 6.6.24 MEMASANG 1M' PIPA GALVANIS DIAMETER 4 " 427,287.50

J. 6.6.25 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 " 38,075.00

J. 6.6.26 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4" 14,379.38

J. 6.6.27 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 " 16,103.75

J. 6.6.28 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 " 25,713.75

J. 6.6.29 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2" 46,716.25

J. 6.6.30 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2" 25,713.75

J. 6.6.31 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3" 74,900.00

J. 6.6.32 MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4" 58,780.00

J. 6.6.33 MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL 255,012.50

Page 153: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

J. 6.6.34 MEMASANG 1 BH BAK CUCI PIRING TERASO 409,087.50

J. 6.6.35 MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2" 33,775.00

J. 6.6.36 MEMASANG 1BH FLOOR DRAIN 40,375.00

K. PEKERJAAN BESI

K. 6.6.1 1 KG PASANG RANGKA ATAP BAJA 23,508.50

K. 6.6.2 1 M2 PASANG PINTU BESI BAJA 4,192.50

K. 6.6.3 1 M2 PASANG JENDELA BESI 139,518.75

K. 6.6.4 1 M2 PASANG JENDELA BESI TAHAN API 149,660.00

K. 6.6.5 1 M2 PASANG PINTU GULUNG BESI 159,450.00

K. 6.6.6 1 M2 PASANG PINTU LIPAT 4,192.50

K. 6.6.7 1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM 66,700.00

K. 6.6.8 1 M2 PASANG ROLLING DOOR 171,015.00

K. 6.6.9 1 M2 PASANG PINTU ALLUMUNIUM 139,515.00

K. 6.6.10 1 M2 PASANG VENETIONS BLINDS 46,506.25

K. 6.6.11 1 M2 PASANG VERTIKALS BLINDS 46,506.25

K. 6.6.12 1 M2 PASANG TERALI BESI 516,645.00

K. 6.6.13 1 M2 PASANG KAWAT HARMONIKA 54,254.13

K. 6.6.14 1 M2 PASANG KAWAT NYAMUK 44,130.50

K. 6.6.15 1 M2 PASANG KAWAT KASSA 26,200.50

K. 6.6.16 1 M2 PASANG KAWAT BURUNG 137,950.50

K. 6.6.17 1 M2 PASANG JENDELA NAKO & TRALIS 387,073.00

K. 6.6.18 1 M' PASANG TALANG DATAR, SENG BLJS 28 104,778.50

K. 6.6.19 1 M' PASANG TALANG MIRING, SENG BLJS 28 129,818.50

K. 6.6.20 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28 120,263.75

K. 6.6.21 1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24 127,658.50

L. PEKERJAAN KUNCI DAN KACA

L. 6.6.1 1 BUAH PASANG KUNCI TANAM ANTIK 182,825.00

L. 6.6.2 1 BUAH PASANG KUNCI TANAM BIASA 137,975.00

L. 6.6.3 1 BUAH PASANG KUNCI KAMAR MANDI 168,637.50

L. 6.6.4 1 BUAH PASANG KUNCI SILINDER 28,040.00

L. 6.6.5 1 BUAH PASANG ENGSEL PINTU 40,306.25

L. 6.6.6 1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU 31,337.50

L. 6.6.7 1 BUAH PASANG ENGSEL ANGIN 17,350.00

L. 6.6.8 1 BUAH PASANG SPRING KNIP 12,506.25

L. 6.6.8a 1 BUAH PASANG ENGSEL JENDELA 31,337.50

L. 6.6.8b 1 BUAH PASANG GRENDEL JENDELA 17,337.50

L. 6.6.9 1 BUAH PASANG KAIT ANGIN 42,206.25

L. 6.6.10 1 BUAH PASANG DOOR CLOSER 327,687.50

L. 6.6.11 1 BUAH PASANG KUNCI SELOT 110,175.00

L. 6.6.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER 121,437.50

L. 6.6.12a 1 BUAH PASANG PEGANGAN JENDELA 49,987.50

L. 6.6.13 1 BUAH PASANG DOOR STOP 87,537.50

L. 6.6.14 1 BUAH PASANG REL PINTU DORONG 50,025.00

L. 6.6.15 1 BUAH PASANG KUNCI LEMARI 45,843.75

L. 6.6.16 1 M2 PASANG KACA, TEBAL 3 MM 105,676.25

L. 6.6.17 1 M2 PASANG KACA, TEBAL 5 MM 125,036.25

L. 6.6.18 1 M2 PASANG KACA, TEBAL 8 MM 153,451.25

L. 6.6.19 1 M2 PASANG KACA GELAP, TEBAL 5 MM 162,293.75

L. 6.6.20 1 M2 PASANG KACA CERMIN, TEBAL 5 MM 137,906.25

L. 6.6.21 1 M2 PASANG KACA CERMIN, TEBAL 6 MM 137,906.25

L. 6.6.22 1 M2 PASANG KACA CERMIN, TEBAL 8 MM 165,755.00

L. 6.6.23 1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM 12,506.25

L. 6.6.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM 452,506.25

M. PEKERJAAN PENUTUP LANTAI & DINDING

M.6.6.1 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM 91,953.50

M.6.6.2 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM 84,682.50

M.6.6.3 1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM 86,925.50

M.6.6.4 1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM 107,615.70

M.6.6.5 1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM 95,369.70

M.6.6.6 1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM 104,827.70

Page 154: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

M.6.6.7 1 M2 PASANG LANTAI ex. Roman UKURAN 40 x 40 CM 147,508.50

M.6.6.8 1 M2 PASANG LANTAI Keramik UKURAN 40 x 40 CM Type A 158,327.50

M.6.6.9 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM 321,578.50

M.6.6.10 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM 179,387.50

M.6.6.11 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 40 X 40 CM 66,208.50

M.6.6.12 1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM 64,363.75

M.6.6.13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM 66,238.80

M.6.6.14 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM 99,061.00

M.6.6.15 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM 116,050.00

M.6.6.16 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM 17,751.20

M.6.6.17 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM 12,735.51

M.6.6.18 1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM 13,617.47

M.6.6.19 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM 16,079.00

M.6.6.20 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM 13,651.48

M.6.6.21 1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM 16,460.27

M.6.6.22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM 20,246.20

M.6.6.23 1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM 30,289.00

M.6.6.24 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM 31,651.50

M.6.6.25 1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM 71,144.00

M.6.6.26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM 61,154.00

M.6.6.27 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM 61,154.00

M.6.6.28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM 61,154.00

M.6.6.29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM 59,190.11

M.6.6.30 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM 61,154.00

M.6.6.31 1 M2 PASANG TERASO COR DITEMPAT 56,812.50

M.6.6.32 1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM 56,812.50

M.6.6.33 1 M2 PASANG UBIN TAHAN ASAM 38,687.50

M.6.6.34 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM 169,937.60

M.6.6.35 1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM 191,687.60

M.6.6.36 1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM 169,937.60

M.6.6.37 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM 22,604.00

M.6.6.38 1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM 20,624.00

M.6.6.39 1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM 18,038.00

M.6.6.40 1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM 107,854.55

M.6.6.41 1 M' PASANG PLINT VINYL TANPA ADUKAN 10,900.00

M.6.6.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM 144,836.00

M.6.6.43 1 M2 PASANG LANTAI KERAMIK 15 X 15 CM 147,337.60

M.6.6.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 174,937.60

M.6.6.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM 153,937.60

M.6.6.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM 187,777.60

M.6.6.47 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM 159,432.55

M.6.6.48 1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP 165,998.21

M.6.6.49 1 M2 PASANG LANTAI KERAMIK 10 x 33 CM 109,937.60

M.6.6.50 1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL 119,365.50

M.6.6.51 1 M2 PASANG LANTAI MARMER 640,105.50

M.6.6.52 1 M2 PASANG LANTAI KARPET 100 % WOOL 23,162.50

M.6.6.53 1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON 23,162.50

M.6.6.54 1 M2 PASANG UNDRLYER, TEBAL 6 MM 16,350.00

M.6.6.55 1 M2 PASANG LANTAI KARPET 23,162.50

M.6.6.56 1 M2 PASANG LANTAI PARQUET JATI 18,530.00

M.6.6.57 1 M2 PASANG GYMFLOOR 65,312.50

M.6.6.58 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH 112,201.00

M.6.6.59 1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA 112,201.00

M.6.6.60 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH 174,640.21

M.6.6.61 1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA 233,226.00

M.6.6.62 1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA 232,226.00

M.6.6.63 1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA 227,586.00

M.6.6.64 1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM 207,226.00

Page 155: RAB Siring

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

M.6.6.65 1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM 157,226.00

M.6.6.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM 162,337.11

M.6.6.67 1 M2 PASANG DINDING KERAMIK 15 x 15 CM 145,476.00

M.6.6.68 1 M2 PASANG DINDING KERAMIK 20 x 20 CM 137,781.56

M.6.6.68a 1 M2 PASANG DINDING KERAMIK 20 x 25 CM 143,198.50

M.6.6.69 1 M2 PASANG DINDING KERAMIK 10 x 20 CM 137,149.61

M.6.6.70 1 M2 PASANG DINDING MARMER 185,648.80

M.6.6.71 1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM 111,273.80

M.6.6.72 1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM 148,248.80

M.6.6.73 1 M2 PASANG DINDING BATU PAROS 90,900.00

M.6.6.74 1 M2 PASANG DINDING BATU TEMPEL HITAM 88,197.50

M.6.6.75 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I 20,437.50

M.6.6.76 1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II 20,437.50

M.6.6.77 1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM 20,437.50

M.6.6.78 1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM 20,437.50

M.6.6.79 1 M2 PASANG WALL COVERING LEBAR 50 CM 55,062.50

M.6.6.80 1 M2 FLOOR HARDENER FERROVAX 16,350.00

M.6.6.81 1 M2 FLOOR HARDENER MASTERCRON 16,350.00

M.6.6.82 1 M2 PLINT KAYU 2 X 10 CM 33,725.00

N. PEKERJAAN CAT - CATAN

N. 6.6.1 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA 14,250.00

N. 6.6.2 1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT 14,775.00

N. 6.6.3 1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL 14,775.00

N. 6.6.4 1 M2 MENYABUN PERMUKAAN TEMBOK LAMA 14,775.00

N. 6.6.5 1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR 792,197.11

N. 6.6.6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU 7,488.75

N. 6.6.7 1 M2 PENGECATAN BIDANG KAYU LAMA 21,635.00

N. 6.6.8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR, 23,828.50

N. 6.6.9 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ) 34,141.00

N. 6.6.10 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL 24,950.50

N. 6.6.11 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR 33,272.50

N. 6.6.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER 6,610.00

N. 6.6.13 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS 24,237.50

N. 6.6.14 I M2 PENGECATAN TEMBOK BARU (1 lapir plamir, 1 lapis cat dasar, 2 lapis cat penutup) Komilex setara 10,412.00

N. 6.6.14a I M2 PENGECATAN TEMBOK BARU (1 lapir plamir, 1 lapis cat dasar, 2 lapis cat penutup) Envitex setara 17,513.81

N. 6.6.14b I M2 PENGECATAN TEMBOK BARU (1 lapir plamir, 1 lapis cat dasar, 2 lapis cat penutup) Int. Mowilex setara 25,198.80

N. 6.6.14c I M2 PENGECATAN TEMBOK BARU (1 lapir plamir, 1 lapis cat dasar, 2 lapis cat penutup) Ex. Mowilex setara 32,550.00

N. 6.6.15 1 M2 PENGECATAN TEMBOK LAMA 15,731.14

N. 6.6.16 1 M2 MELABUR TEMBOK DENGAN KALKARIUM 4,982.50

N. 6.6.17 1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH 14,615.00

N. 6.6.18 1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN ) 9,975.00

N. 6.6.19 1 M2 PEMASANGAN WALL PAPER 17,437.50

N. 6.6.20 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI 20,953.00

N. 6.6.21 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH 37,240.00

N. 6.6.22 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 6,572.00

N. 6.6.23 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 5,880.00

N. 6.6.24 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL 121,000.00

N. 6.6.25 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT 101,000.00

Page 156: RAB Siring

DAFTAR HARGA SATUAN UPAH DAN BAHAN

BIDANG : Cipta Karya

TAHUN ANGGARAN : 2010

NO URAIAN SAT KETERANGAN

1 2 3 4 = 6+5 5 6 7

A UPAH KERJA ###

1 Pekerja ( Buruh semi terlatih ) Hari 55,000.00 - 55,000.00

2 Pekerja Terampil Hari 55,000.00 - 55,000.00

3 Penjaga Malam Hari 55,000.00 - 55,000.00

4 Operator Hari 75,000.00 - 75,000.00

5 Pembantu Operator Hari 50,000.00 50,000.00 ###

6 Tukang Batu Hari 70,000.00 - 70,000.00 ###

7 Kepala Tukang Batu Hari 75,000.00 75,000.00 ###

8 Tukang Kayu Hari 70,000.00 - 70,000.00 ###

9 Kepala Tukang Kayu Hari 75,000.00 75,000.00 ###

10 Tukang Besi Hari 75,000.00 - 75,000.00 ###

11 Tukang Cat Hari 75,000.00 - 75,000.00 ###

12 Kepala Tukang Hari 60,000.00 - 60,000.00 ###

13 Mandor Hari 45,000.00 - 45,000.00 ###

14 Sopir Hari 75,000.00 - 75,000.00

15 Pembantu Sopir Hari 50,000.00 - 50,000.00

B Harga Bahan ###

1 Aluminium foil single sided Roll 605,000.00 - 605,000.00 ###

2 Alkalie Kg 48,638.10 48,638.10

3 Ampelas Lbr 2,750.00 - 2,750.00 ###

4 Atap Asbes Gelombang Besar Lbr 28,700.00 - 28,700.00 ###

5 Asbes Gelombang 2,5x092 m 55 mm Lbr 35,200.00 35,200.00

6 Asbes Gelombang 1x0,92 m 55 mm Lbr 33,000.00 33,000.00

7 Atap Genteng Kodok Bh 6,750.00 - 6,750.00 ###

8 Atap Metal Berkualitas ( 2 ssn, 8 daun ) Lbr 40,200.00 - 40,200.00 ###

14 Atap Plastik gelombang 60 x 170 Lbr 31,750.00 - 31,750.00 ###

15 Atap Sirap Ikat 69,500.00 - 69,500.00 isi 100 bh

16 Atap Tilux Bh 29,200.00 - 29,200.00 ###

17 Atap Aluminium Lbr 154,000.00 154,000.00

18 Bahan Plafond Asbes Semen 5 mm M2 44,500.00 - 44,500.00 ###

19 Bahan Plafond eternit 4 mm M2 58,100.00 - 58,100.00 ###

20 Bahan Plafond Hardplex 5 mm 120 x 130 Lbr 56,400.00 - 56,400.00 ###

21 Bahan Politur ( sirlak ) India Kg 75,100.00 - 75,100.00 ###

22 Bak Air Fiber (60 x 60 cm) Bh 207,000.00 - 207,000.00 ###

23 Bak Air Fiber (60 x 80 cm) Bh 236,000.00 - 236,000.00 ###

24 Bak Cuci Piring Stainles Lobang 1 Bh 229,400.00 - 229,400.00 ###

25 Bak Cuci Piring Stainles Lobang 2 Bh 427,700.00 - 427,700.00 ###

26 Bak Kontrol 50 x 50 x 40 cm Bh 121,000.00 - 121,000.00 ###

27 Bak air Traso Besar Bh 293,000.00 - 293,000.00 ###

28 Balok Klas I Bangkirai M3 5,000,000.00 - 5,000,000.00

29 Balok Klas I Ulin M3 4,500,000.00 - 4,500,000.00

30 Balok Kayu Meranti M3 2,100,000.00 - 2,100,000.00

31 Batako Bh 1,800.00 - 1,800.00 ###

32 Batu alam M2 188,300.00 - 188,300.00 ###

33 Batu Bata Bh 900.00 - 900.00 ###

34 Batu apung Kg 850.00 - 850.00

35 Batu Gunung M3 200,000 - 200,000

36 Batu Gunung (SEPAKU) M3 225,000 - 225,000

37 Baut Bh 4,000.00 - 4,000.00

38 Bensin Lt 5,300.00 - 5,300.00 ###

39 Besi Beton Polos Kg 10,000.00 - 10,000.00 10.68

40 Besi Beton Ulir Kg 11,750.00 - 11,750.00 7022.47191011236

41 Besi penggantung plafond Kg 16,300.00 - 16,300.00 14513.1086142322

42 Besi strip Kg 31,800.00 - 31,800.00 ###

43 Box MCB 2 group Unit 97,000.00 - 97,000.00 ###

44 Box MCB 4 group Unit 156,800.00 - 156,800.00 ###

45 Breaker Bh 25,000.00 - 25,000.00 ###

46 Buis Beton Dia 80 cm tanpa tulangan Bh 506,500.00 - 506,500.00 ###

49 Buis Beton Dia 100 cm tanpa tulangan Bh 626,000.00 - 626,000.00 ###

51 Cat Air / tembok interior ex. Mowilex setara Kg 47,080.00 - 47,080.00 941,600.00

52 Cat Air / tembok ex.setara ICI,dulux,mowilex Kg 67,500.00 67,500.00 1,350,000.00

53 Cat tembok Ex. Envitex setara Kg 18,000.00 18,000.00

54 Cat tembok Komilex setara Kg 1,200.00 1,200.00

55 Cat besi Kg 39,000.00 - 39,000.00 ###

56 Cat Dasar / plamir Kg 20,800.00 - 20,800.00 ###

57 Cat Dasar Besi Kg 35,200.00 35,200.00

58 Cat Kilap / Kayu Kg 34,650.00 - 34,650.00 ###

59 Cat Menie kayu Kg 18,350.00 - 18,350.00 ###

60 Closed Jongkok Keramik berkualitas Bh 146,600.00 - 146,600.00 ###

61 Closed Jongkok Keramik Toto Bh 750,000.00 - 750,000.00 ###

62 Closed Jongkok Teraso Bh 211,800.00 - 211,800.00 ###

63 Closet Duduk Type Keramik Berkualitas Unit 1,370,000.00 - 1,370,000.00 ###

64 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm Bh 374,800.00 - 374,800.00 ###

65 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm Bh 314,600.00 - 314,600.00 ###

HARGA DASAR TANPA PAJAK

BIAYA ANGKUT

HARGA DASAR SATUAN

Page 157: RAB Siring

NO URAIAN SAT KETERANGAN

1 2 3 4 = 6+5 5 6 7

HARGA DASAR TANPA PAJAK

BIAYA ANGKUT

HARGA DASAR SATUAN

66 Daun Pintu Plywood Bag. Dlm Lapis Aluminium Foil Bh 454,000.00 - 454,000.00 ###

67 Daun Ventilasi Bh 78,650.00 - 78,650.00 ###

68 Dempul Halus ( INFRA ) Kg 35,200.00 - 35,200.00 ###

69 Dempul kayu Kg 20,000.00 - 20,000.00 ###

70 Dempul Politur Kg 37,700.00 - 37,700.00 ###

71 Door Holder Bh 79,750.00 79,750.00

72 Door Closer Bh 286,000.00 286,000.00

73 Door Stop Bh 79,200.00 79,200.00

74 Engsel Jendela Lokal 3 " Bh 23,000.00 - 23,000.00 ###

75 Engsel Pintu Lokal 5 " Bh 27,800.00 - 27,800.00 ###

76 Espagnolet Bh 26,700.00 - 26,700.00 ###

77 Floor Drain Bh 31,700.00 - 31,700.00 ###

78 Formika Ukuran Pintu Lbr 104,300.00 - 104,300.00 ###

79 Genteng keramik Bh 7,500.00 - 7,500.00 ###

80 Glass block Bh 30,000.00 - 30,000.00 ###

81 Grendel Jendela Bh 9,000.00 - 9,000.00 ###

82 Grendel Pintu Bh 16,500.00 - 16,500.00 ###

83 Grendel tanam Pintu Bh 37,000.00 - 37,000.00 ###

84 GRC 9 mm Lbr 143,000.00 143,000.00

85 Gypsum board, t = 9 mm Lbr 48,800.00 - 48,800.00 ###

86 Hak Angin Bh 9,400.00 - 9,400.00 ###

87 Handle Jendela putih Bh 8,300.00 - 8,300.00 ###

88 Handle Pintu Bh 109,000.00 - 109,000.00 ###

89 Jalusi Atap Bh 565,700.00 - 565,700.00 ###

90 Jalusi Kayu Bangkirai M' 40,000.00 - 40,000.00 ###

91 Kabel NGA 2,5 Rol 230,000.00 - 230,000.00 ###

93 Kaca Naco ( kerangka/daun ) 5 mm Set 326,700.00 - 326,700.00 ###

94 Kaca polos 2 mm M2 72,600.00 - 72,600.00 ###

95 Kaca polos 3 mm M2 84,700.00 - 84,700.00 ###

96 Kaca polos 5 mm M2 102,300.00 - 102,300.00 16,000.00

97 Kaca Rayben 5 mm M2 127,000.00 - 127,000.00 ###

98 Kaca Cermin M2 93,500.00 93,500.00

99 Kaca Wireglass M2 2,050,000.00 2,050,000.00

100 Kaca Patri M2 275,000.00 275,000.00

101 Kait Angin bh 29,700.00 29,700.00

102 Kanopi Atap Bh 546,000.00 - 546,000.00 ###

103 Kawat Bendrat / Beton Kg 19,600.00 - 19,600.00

104 Kawat Bronjong Kg 107,300.00 - 107,300.00 ###

105 Kawat Duri Rol 74,850.00 - 74,850.00 ###

106 Kawat Harmonika m2 28,350.00 - 28,350.00 ###

107 Kawat nyamuk besi/aluminium m2 24,300.00 - 24,300.00 ###

108 Kawat nyamuk plastik m2 8,000.00 - 8,000.00 ###

109 Kayu Klas 2 M3 2,100,000.00 - 2,100,000.00 ###

110 Kayu galam dia 10 - 12 cm Btg 11,200.00 - 11,200.00 ###

111 Keramik 10 x 20 cm M2 49,600.00 - 49,600.00 ###

112 Keramik 20 x 25 cm M2 55,600.00 - 55,600.00 ###

113 Keramik 20 x 20 cm M2 55,000.00 - 55,000.00 ###

Keramik 20 x 20 cm kasar M2 54,000.00 54,000.00

114 Keramik 30 x 30 cm Halus M2 49,000.00 - 49,000.00 ###

115 Keramik 30 x 30 cm Kasar M2 55,500.00 - 55,500.00 ###

116 Keramik 40 x 40 cm Halus Type B M2 89,000.00 - 89,000.00 ###

117 Keramik 40 x 40 cm Type A M2 85,000.00 85,000.00

118 Keramik 40 x 40 cm Ex. Roman Setara, Granito M2 220,000.00 220,000.00

119 Karet Talang M' 8,650.00 - 8,650.00 ###

120 Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu M3 415,000.00 - 415,000.00

121 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan M3 350,000.00 - 350,000.00

122 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku M3 437,500.00 - 437,500.00

123 Koral (ex.Lokal) M3 263,000.00 - 263,000.00

124 Kran Air Dia 1" Bh 26,000.00 - 26,000.00 ###

125 Kran Air Dia 3/4 Bh 26,500.00 - 26,500.00 ###

126 Kuas 3 " Bh 8,300.00 - 8,300.00 ###

127 Kunci Pintu 2 Slag berkualitas Bh 161,750.00 - 161,750.00 ###

128 Kunci Pintu Double Ex Cisa Bh 216,000.00 - 216,000.00 ###

129 Kunci Pintu Double Lengkap Dgn Accecories Bh 255,900.00 - 255,900.00 ###

130 Kunci Pintu Tanam antik Bh 132,800.00 - 132,800.00 ###

131 Kunci Slot Bh 93,500.00 93,500.00

132 Kunci Lemari Bh 279,500.00 279,500.00

133 Kusen aluminium 1 - - - ###

134 Kusen aluminium 2 - - - ###

135 Kusen aluminium 3 - - - ###

137 Lampu 2 - TL 40 Watt Double + Instalasi Bh 154,000.00 - 154,000.00 ###

139 Lampu Merkury 250 wt Bh 154,000.00 - 154,000.00 ###

140 Lampu Pijar 10 Watt Bh 6,300.00 - 6,300.00 ###

141 Lampu Pijar 100 Watt Bh 8,200.00 - 8,200.00 ###

142 Lampu Pijar 15 Watt Bh 7,100.00 - 7,100.00 ###

143 Lampu Pijar 25 Watt Bh 9,250.00 - 9,250.00 ###

144 Lampu Pijar 40 Watt Bh 6,300.00 - 6,300.00 ###

145 Lampu Pijar 5 Watt Bh 5,200.00 - 5,200.00 ###

146 Lampu Pijar 60 Watt Bh 10,000.00 - 10,000.00 ###

Page 158: RAB Siring

NO URAIAN SAT KETERANGAN

1 2 3 4 = 6+5 5 6 7

HARGA DASAR TANPA PAJAK

BIAYA ANGKUT

HARGA DASAR SATUAN

147 Lampu Philip SL 20 Watt + Fitting Bh 42,100.00 - 42,100.00 ###

149 Lampu TL Philip + Fitting 20 Watt Bh 83,250.00 - 83,250.00 ###

150 Lampu TL 20 Watt Double (Trafo) Bh 74,800.00 - 74,800.00 ###

151 Lampu TL 40 Watt (Trafo) Bh 91,000.00 - 91,000.00 ###

152 Lampu TL 40 Watt Double (Trafo) Bh 101,800.00 - 101,800.00 ###

153 Lem Kayu ( Fox ) Ltr 15,000.00 - 15,000.00 ###

154 Lem Paralon Bh 6,200.00 - 6,200.00 ###

155 Lem Vinyl Kg 35,000.00 35,000.00

156 List Cornice Gypsum M' 27,500.00 - 27,500.00 ###

157 List Plafond Gypsum M' 27,500.00 - 27,500.00 ###

158 List Plafond Plywood M' 27,500.00 - 27,500.00 ###

159 List Profil Sudut 3/5 Ky Bangkirai M' 10,300.00 - 10,300.00 ###

160 List Profil Sudut 3/5 Ky Meranti M' 6,050.00 - 6,050.00 ###

161 Listplank kayu ukir M' 66,550.00 - 66,550.00 32,692.62

162 List plafond gypsum M' 36,000.00 - 36,000.00 5,000.00

163 Macam2 Sambungan PVC AW Dia 1 " Bh 34,000.00 - 34,000.00 ###

164 Macam2 Sambungan PVC AW Dia 1/2 " Bh 2,500.00 - 2,500.00 ###

165 Macam2 Sambungan PVC AW Dia 2 " Bh 5,600.00 - 5,600.00 ###

166 Macam2 Sambungan PVC AW Dia 3/4 " Bh 5,100.00 - 5,100.00 ###

167 Macam2 Sambungan PVC AW Dia 4 " Bh 12,900.00 - 12,900.00 ###

168 Marmer lokal m2 495,000.00 - 495,000.00 ###

169 Minyak cat Ltr 20,000.00 - 20,000.00 ###

170 Minyak bekisting Ltr 12,000.00 - 12,000.00 ###

171 Multiplek 4 mm Lbr 62,000.00 - 62,000.00 66,666.67

172 Multiplek 6 mm Lbr 129,000.00 - 129,000.00 100,000.00

173 Multiplek 9 mm Lbr 205,000.00 - 205,000.00 16,666.67

174 Multiplek 15 mm Lbr 219,000.00 - 219,000.00 250,000.00

175 Multiplek 18 mm Lbr 223,300.00 - 223,300.00 300,000.00

176 Multiplex 12 mm Lbr 155,700.00 - 155,700.00 200,000.00

177 Nok Genteng Kodok Bh 20,300.00 - 20,300.00 ###

178 Nok Genteng keramik Bh 17,500.00 - 17,500.00 ###

179 Nok Model U ukuran 110 x 5 x 6 cm M' 36,700.00 - 36,700.00 ###

180 Nok Model U Verza Roof 40 x 12 cm Bh 32,700.00 - 32,700.00 ###

181 Oker Kg 22,500.00 - 22,500.00 ###

182 Oli / pelumas Ltr 37,300.00 - 37,300.00

183 Pagar besi motif BRC 1,2 x 2,4 m' M' - - -

184 Pagar besi motif BRC 1,75 x 2,4 m' M' - - -

185 Paku Asbes + Karet Kg 27,300.00 - 27,300.00 ###

186 Paku Beton Bh 19,800.00 - 19,800.00 ###

187 Paku bor Kg 27,500.00 - 27,500.00 ###

188 Paku Genteng metal Kg 29,200.00 - 29,200.00 ###

189 Paku Kayu / biasa Kg 16,650.00 - 16,650.00 ###

190 Paku Keling Kg 30,250.00 - 30,250.00 ###

191 Paku Seng Kg 26,350.00 - 26,350.00 ###

192 Paku Ulin Kg 19,800.00 - 19,800.00 ###

193 Paku Plywood Kg 23,500.00 - 23,500.00 ###

194 Paku Sekrup Kg 11,500.00 - 11,500.00 ###

195 Papan Kayu Bangkirai M3 5,000,000.00 - 5,000,000.00

196 Papan Kayu Ulin M3 4,500,000.00 - 4,500,000.00

197 Papan Kayu kelas 2 M3 2,500,000.00 - 2,500,000.00

198 Papan Kayu Meranti M3 2,100,000.00 - 2,100,000.00

199 Papan Nama Proyek Bh 550,000.00 - 550,000.00 ###

200 Papan Reuter Bengkirai M' 24,200.00 - 24,200.00 ###

201 Pas. Lampu Baret + Instalasi Unit 513,000.00 - 513,000.00 ###

202 Pas. Lampu Gantung Unit 607,400.00 - 607,400.00 ###

203 Pasir Beton Ex. Lokal samuntai M3 250,000.00 - 250,000.00

204 Pasir Beton (sepaku) M3 330,000.00 - 330,000.00

205 Pasir Beton ex.Palu M3 415,000.00 415,000.00

206 Pasir Pasang sungai ex. Kandilo M3 280,000.00 - 280,000.00

207 Pasir pasang putih M3 61,800.00 - 61,800.00

208 Pasir pasang putih Sepaku M3 225,000.00 - 225,000.00

209 Pasir Urug M3 51,900.00 - 51,900.00

210 Paving blok biasa bh 3,680.00 - 3,680.00 ###

211 Paving block K - 127 m2 104,350.00 - 104,350.00 ###

212 Penangkal Petir + Instalasi unit 3,920,000.00 - 3,920,000.00 ###

213 Pintu Panel Double ky Bangkirai Bh 1,089,000.00 - 1,089,000.00 ###

214 Pintu Double Plywood Bh 332,750.00 - 332,750.00 ###

215 Pintu Panel ky Bangkirai Uk. Besar L 80 cm Bh 544,500.00 - 544,500.00 ###

216 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm Bh 484,000.00 - 484,000.00 ###

217 Pintu Panel kayu Ulin Ukuran Besar L 80 cm Bh 513,700.00 - 513,700.00 ###

218 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm Bh 484,000.00 - 484,000.00 ###

219 Pintu Panel Lapis Formika (Fabrikasi) Bh 363,000.00 - 363,000.00 ###

220 Pintu Skat Bh 385,000.00 - 385,000.00 ###

221 Pipa Galvanis AW Dia 1 " M' 52,100.00 - 52,100.00 ###

222 Pipa Galvanis AW Dia 2 " M' 103,100.00 - 103,100.00 ###

223 Pipa Galvanis AW Dia 3 " M' 182,150.00 - 182,150.00 ###

224 Pipa Galvanis AW Dia 4 " M' 259,300.00 - 259,300.00 ###

225 Pipa PVC AW Dia 1 " Btg 24,100.00 - 24,100.00 4 m' / btg

Page 159: RAB Siring

NO URAIAN SAT KETERANGAN

1 2 3 4 = 6+5 5 6 7

HARGA DASAR TANPA PAJAK

BIAYA ANGKUT

HARGA DASAR SATUAN

226 Pipa PVC AW Dia 1/2 " Btg 20,200.00 - 20,200.00 4 m' / btg

227 Pipa PVC AW Dia 2 " Btg 48,900.00 - 48,900.00 4 m' / btg

228 Pipa PVC AW Dia 3/4 " Btg 19,650.00 - 19,650.00 4 m' / btg

229 Pipa PVC AW Dia 4 " Btg 112,400.00 - 112,400.00 4 m' / btg

230 Pipa PVC Limbah M' 156,000.00 156,000.00

231 Pipa stainless steel 2 " M' 37,400.00 - 37,400.00 ###

232 Pipa stainless steel 3 " M' 67,000.00 - 67,000.00 ###

233 Pitting Bh 6,450.00 - 6,450.00 ###

234 Plamir Kg 18,500.00 - 18,500.00 ###

235 Plitur Kg 42,500.00 - 42,500.00 ###

236 Plint / list lantai keramik Bh 3,100.00 - 3,100.00 ###

237 Plint marmer 10 x 40 cm Bh 21,800.00 - 21,800.00 ###

238 Plywood 3 mm Lbr 44,600.00 - 44,600.00 15,333.33

239 Plywood 4 mm Lbr 56,500.00 - 56,500.00 61,333.33

240 Plywood 6 mm Lbr 79,000.00 - 79,000.00 92,000.00

241 Plywood 9 mm Lbr 116,500.00 - 116,500.00 184,000.00

242 Plywood 12 mm Lbr 220,000.00 - 220,000.00 230,000.00

243 Plywood 18 mm Lbr 231,000.00 - 231,000.00 276,000.00

244 Porselen 20 x 20 cm Bh 52,000.00 - 52,000.00 ###

245 Polycarbonat M2 825,000.00 - 825,000.00 ###

246 Rangka besi hollow M' 53,500.00 - 53,500.00 ###

247 Rel Pintu Dorong Bh 117,700.00 117,700.00

248 Rol Cat Tembok Bh 16,500.00 - 16,500.00 ###

249 Rolling door Standart Indall Setara M2 750,000.00 - 750,000.00

250 Roster beton 20 x 20 cm Bh 33,000.00 - 33,000.00 ###

251 Roster beton 20 x 30 cm Bh 46,000.00 - 46,000.00 ###

252 Roster kayu bangkirai 20 x 20 cm Bh 36,000.00 - 36,000.00 ###

253 Rumput Hias M2 27,500.00 - 27,500.00 ###

254 Saklar Ganda Bh 16,700.00 - 16,700.00 ###

255 Saklar Tunggal Bh 12,800.00 - 12,800.00 ###

256 Sekering Kas 3 Group + Instalasi Unit 146,800.00 - 146,800.00 ###

257 Semen Abu - Abu / PC ( 50 kg/Zak ) Zak 63,500.00 - 63,500.00 1,270.00

258 Semen Warna Kg 13,500.00 - 13,500.00 ###

259 Semen putih Kg 19,250.00 - 19,250.00 ###

260 Seng gelombang Besar / kecil Lbr 40,900.00 - 40,900.00 ###

262 Seng Plat Lbr 53,600.00 - 53,600.00 ###

263 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 ) Unit 695,000.00 - 695,000.00 ###

264 Septictank Kayu Unit 1,815,000.00 - 1,815,000.00 ###

265 Sirlak Kg 29,700.00 - 29,700.00 ###

266 Sirtu m3 274,800.00 - 274,800.00

267 Solar Ltr 6,950.00 - 6,950.00 ###

268 Spritus Ltr 14,800.00 - 14,800.00 ###

269 Stop Kontak Bh 12,500.00 - 12,500.00 ###

270 Talang Air PVC Maspion M' 89,100.00 - 89,100.00 Perbatang 4 m'

271 Tambah daya Listrik Wt - - - ###

272 Tanah Urug M3 51,900.00 - 51,900.00

273 Tandon Air 2 x 1200 ltr + Menara + Atap Unit 5,406,900.00 - 5,406,900.00 ###

274 Tandon Air 1 x 1200 ltr + Menara + Atap Unit 3,177,300.00 - 3,177,300.00 ###

275 Tangga Naik Tinggi 1 m Bh 231,000.00 - 231,000.00 ###

276 Tanki Air Viberglass 1200 Ltr Bh 1,235,400.00 - 1,235,400.00 ###

277 Tanki Air Viberglass 2500 Ltr Bh 2,613,000.00 - 2,613,000.00 ###

278 Tanki Air Viberglass 550 Ltr Bh 930,800.00 - 930,800.00 ###

279 Teakwood 3 mm Lbr 99,300.00 - 99,300.00 28,333.33

280 Teakwood 4 mm Lbr 120,200.00 - 120,200.00 113,333.33

281 Teakwood 6 mm Lbr 195,850.00 - 195,850.00 170,000.00

282 Ter / Residu Kg 45,300.00 - 45,300.00 ###

283 Terpentin Ltr 4,750.00 - 4,750.00 ###

284 Tiang Lampu Tunggal 11 m' Bt 2,984,700.00 - 2,984,700.00 ###

285 Tiang Lampu Tunggal 9 m' Bt 1,960,000.00 - 1,960,000.00 ###

286 Tiang Lampu Ganda 11 m' Bt 3,520,000.00 - 3,520,000.00 ###287 Tiang Lampu ganda 9 m' Bt 2,311,000.00 - 2,311,000.00 ###

288 Tinner A Ltr 23,500.00 - 23,500.00 ###

289 Titik Mata Lampu Ttk 169,400.00 - 169,400.00 ###

290 Trap Depan Papan Tulis Bak Lapis Keramik Bh 275,000.00 - 275,000.00 ###

291 Ukiran jamang pada puncak Bh 440,000.00 - 440,000.00 ###

292 Ukiran jamang pada listplank Bh 495,000.00 - 495,000.00 ###

293 Urinoir Bh 1,865,500.00 - 1,865,500.00 ###

294 Kloset duduk Ex. Toto Bh 2,400,000.00 2,400,000.00

295 Pasir beton Exs. Palu m3 415,000.00 415,000.00

296 Waterstop lebar 200 mm m' 185,000.00 185,000.00

297 Washtafel + Cermin Bh 439,000.00 - 439,000.00 ###

T. A 2010 ###

###

Catatan : ###

1. Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal ###

2. Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran ###

3. Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut ###

4 Harga belum termasuk PPn ###

Page 160: RAB Siring

DAFTAR HARGA SATUAN UPAH DAN BAHAN

BIDANG : Cipta Karya

TAHUN ANGGARAN : 2009

NO URAIAN SAT

A UPAH KERJA

1 Pekerja ( Buruh semi terlatih ) Hari 55,000.00

2 Tukang Batu Hari 70,000.00

3 Tukang Kayu Hari 70,000.00

4 Tukang Besi Hari 70,000.00

5 Tukang Cat Hari 70,000.00

6 Kepala Tukang Hari 75,000.00

7 Mandor Hari 75,000.00

8 Sopir Hari 60,000.00

9 Pembantu Sopir Hari 45,000.00

B Harga Bahan

1 Aluminium foil single sided Roll 550,000.00

2 Ampelas Lbr 2,750.00

3 Atap Asbes Gelombang Besar Lbr 23,000.00

4 Atap Genteng Kodok Bh 1,650.00

5 Atap Metal Berkualitas ( 2 ssn, 8 daun ) Lbr 38,500.00

6 Atap Plastik gelombang 60 x 170 Lbr 27,500.00

7 Atap Sirap Ikat 63,250.00

8 Atap Tilux Bh 26,565.00

9 Bahan Plafond Asbes Semen 5 mm M2 44,000.00

10 Bahan Plafond eternit 4 mm M2 55,000.00

11 Bahan Plafond Hardplex 5 mm 120 x 130 Lbr 46,750.00

12 Bahan Politur ( sirlak ) India Kg 36,300.00

13 Bak Air Fiber (60 x 60 cm) Bh 242,000.00

14 Bak Air Fiber (60 x 80 cm) Bh 275,000.00

15 Bak Cuci Piring Stainles Lobang 1 Bh 198,000.00

16 Bak Cuci Piring Stainles Lobang 2 Bh 385,000.00

17 Bak Kontrol 50 x 50 x 40 cm Bh 110,000.00

18 Bak air Traso Besar Bh 257,400.00

19 Balok Klas I Bangkirai M3 3,118,500.00

HARGA DASAR TANPA PAJAK 2008

Page 161: RAB Siring

20 Balok Klas I Ulin M3 2,623,500.00

T. A 2008

Page 162: RAB Siring

NO URAIAN SAT

21 Balok Kayu Meranti M3 1,633,500.00

22 Batako Bh 2,200.00

23 Batu alam M2 176,000.00

24 Batu Bata Bh 770.00

25 Batu apung Kg 770.00

26 Batu Gunung M3 286,000.00

27 Baut Bh 4,070.00

28 Bensin Lt 7,700.00

29 Besi Beton Polos Dia 6 - 22 mm Kg 14,850.00

30 Besi Beton Ulir Dia 6 - 22 mm Kg 16,000.00

31 Besi penggantung plafond Kg 14,850.00

32 Besi strip Kg 34,650.00

33 Box MCB 2 group Unit 176,000.00

34 Box MCB 4 group Unit 286,000.00

35 Breaker Bh 16,500.00

36 Buis Beton Dia 80 cm tanpa tulangan Bh 460,460.00

39 Buis Beton Dia 100 cm tanpa tulangan Bh 569,250.00

41 Cat Air / tembok Kg 16,500.00

42 Cat besi Kg 39,600.00

43 Cat Dasar / plamir Kg 16,500.00

44 Cat Kilap / Kayu Kg 39,600.00

45 Cat Menie kayu Kg 16,500.00

46 Closed Jongkok Keramik berkualitas Bh 165,000.00

47 Closed Jongkok Keramik Toto Bh 247,500.00

48 Closed Jongkok Teraso Bh 74,250.00

49 Closet Duduk Type Keramik Berkualitas Unit 1,430,000.00

50 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm Bh 330,000.00

51 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm Bh 286,000.00

52 Daun Pintu Plywood Bag. Dlm Lapis Aluminium F Bh 440,000.00

53 Daun Ventilasi Bh 71,500.00

54 Dempul Halus ( INFRA ) Kg 28,600.00

55 Dempul kayu Kg 16,500.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 163: RAB Siring

NO URAIAN SAT

56 Dempul Politur Kg 28,600.00

57 Engsel Jendela Lokal 3 " Bh 22,440.00

58 Engsel Pintu Lokal 5 " Bh 31,240.00

59 Espagnolet Bh 24,200.00

60 Floor Drain Bh 31,790.00

61 Formika Ukuran Pintu Lbr 94,875.00

62 Genteng keramik Bh 9,350.00

63 Glass block Bh 24,200.00

64 Grendel Jendela Bh 14,300.00

65 Grendel Pintu Bh 22,000.00

66 Grendel tanam Pintu Bh 38,500.00

67 Gypsum board, t = 9 mm Lbr 52,800.00

68 Hak Angin Bh 12,100.00

69 Handle Jendela putih Bh 17,380.00

70 Handle Pintu Bh 165,000.00

71 Jalusi Atap Bh 514,250.00

72 Jalusi Kayu Bangkirai M' 36,300.00

73 Kabel NGA 2,5 Rol 297,000.00

74 Kaca Naco ( kerangka/daun ) 5 mm Set 297,000.00

75 Kaca polos 2 mm M2 66,000.00

76 Kaca polos 3 mm M2 77,000.00

77 Kaca polos 5 mm M2 93,000.00

78 Kaca Rayben 5 mm M2 115,500.00

79 Kanopi Atap Bh 412,500.00

80 Kawat Bendrat / Beton Kg 22,000.00

81 Kawat Bronjong Kg 34,787.00

82 Kawat Duri Rol 71,500.00

83 Kawat Harmonika m2 17,500.00

84 Kawat nyamuk besi/aluminium m2 22,000.00

85 Kawat nyamuk plastik m2 5,500.00

86 Kayu Klas 2 M3 1,320,000.00

87 Kayu galam dia 10 - 12 cm Btg 6,600.00

88 Keramik 10 x 20 cm M2 46,000.00

89 Keramik 20 x 25 cm M2 60,500.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 164: RAB Siring

NO URAIAN SAT

90 Keramik 20 x 20 cm M2 52,800.00

91 Keramik 30 x 30 cm Halus M2 46,200.00

92 Keramik 30 x 30 cm Kasar M2 60,500.00

93 Keramik 40 x 40 anti slip M2 75,000.00

94 Karet Talang M' 8,800.00

95 Kerikil Beton / Split ( ukuran 2-3 cm ) M3 385,000.00

96 Koral M3 247,500.00

97 Kran Air Dia 1" Bh 21,780.00

98 Kran Air Dia 3/4 Bh 18,150.00

99 Kuas 3 " Bh 7,700.00

100 Kunci Pintu 2 Slag berkualitas Bh 159,500.00

101 Kunci Pintu Double Ex Cisa Bh 231,000.00

102 Kunci Pintu Double Lengkap Dgn Accecories Bh 192,500.00

103 Kunci Pintu Tanam antik Bh 137,500.00

104 Kusen aluminium 1 -

105 Kusen aluminium 2 -

106 Kusen aluminium 3 -

107 Lampu 2 - TL 40 Watt Double + Instalasi Bh 112,750.00

108 Lampu Merkury 250 wt Bh 165,000.00

109 Lampu Pijar 10 Watt Bh 5,500.00

110 Lampu Pijar 100 Watt Bh 11,000.00

111 Lampu Pijar 15 Watt Bh 5,500.00

112 Lampu Pijar 25 Watt Bh 5,500.00

113 Lampu Pijar 40 Watt Bh 6,600.00

114 Lampu Pijar 5 Watt Bh 3,850.00

115 Lampu Pijar 60 Watt Bh 6,600.00

116 Lampu Philip SL 20 Watt + Fitting Bh 44,000.00

117 Lampu TL Philip + Fitting 20 Watt Bh 71,500.00

118 Lampu TL 20 Watt Double (Trafo) Bh 63,250.00

119 Lampu TL 40 Watt (Trafo) Bh 45,870.00

120 Lampu TL 40 Watt Double (Trafo) Bh 99,000.00

121 Lem Kayu Ltr 23,100.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 165: RAB Siring

NO URAIAN SAT

122 Lem Paralon Bh 8,800.00

123 List Cornice Gypsum M' 18,975.00

124 List Plafond Gypsum M' 37,950.00

125 List Plafond Plywood M' 5,500.00

126 List Profil Sudut 3/5 Ky Bangkirai M' 9,350.00

127 List Profil Sudut 3/5 Ky Meranti M' 5,500.00

128 Listplank kayu ukir M' 60,500.00

129 List plafond gypsum M' 33,000.00

130 Macam2 Sambungan PVC AW Dia 1 " Bh 2,750.00

131 Macam2 Sambungan PVC AW Dia 1/2 " Bh 1,650.00

132 Macam2 Sambungan PVC AW Dia 2 " Bh 4,400.00

133 Macam2 Sambungan PVC AW Dia 3/4 " Bh 2,750.00

134 Macam2 Sambungan PVC AW Dia 4 " Bh 11,000.00

135 Marmer lokal m2 450,000.00

136 Minyak cat Ltr 22,000.00

137 Minyak bekisting Ltr 7,150.00

138 Multiplek 4 mm Lbr 57,500.00

139 Multiplek 6 mm Lbr 126,500.00

140 Multiplek 9 mm Lbr 211,200.00

141 Multiplek 15 mm Lbr 203,500.00

142 Multiplek 18 mm Lbr 203,500.00

143 Multiplex 12 mm Lbr 143,000.00

144 Nok Genteng Kodok Bh 16,500.00

145 Nok Genteng keramik Bh 24,667.00

146 Nok Model U ukuran 110 x 5 x 6 cm M' 34,100.00

147 Nok Model U Verza Roof 40 x 12 cm Bh 29,700.00

148 Oker Kg 18,975.00

149 Oli / pelumas Ltr 34,650.00

150 Pagar besi motif BRC 1,2 x 2,4 m' M' -

151 Pagar besi motif BRC 1,75 x 2,4 m' M' -

152 Paku Asbes + Karet Kg 26,400.00

153 Paku Beton Bh 660.00

154 Paku bor Kg 16,500.00

155 Paku Genteng metal Kg 26,400.00

156 Paku Kayu / biasa Kg 20,900.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 166: RAB Siring

NO URAIAN SAT

157 Paku Keling Kg 27,500.00

158 Paku Seng Kg 26,400.00

159 Paku Ulin Kg 24,200.00

160 Paku Plywood Kg 26,400.00

161 Paku Sekrup Kg 7,700.00

162 Papan Kayu Bangkirai M3 3,723,500.00

163 Papan Kayu Ulin M3 3,393,500.00

164 Papan Kayu kelas 2 M3 1,413,500.00

165 Papan Kayu Meranti M3 1,633,500.00

166 Papan Nama Proyek Bh 495,000.00

167 Papan Reuter Bengkirai M' 22,000.00

168 Pas. Lampu Baret + Instalasi Unit 550,000.00

169 Pas. Lampu Gantung Unit 616,000.00

170 Pasir Beton M3 247,500.00

171 Pasir Pasang sungai M3 220,000.00

172 Pasir pasang putih M3 60,500.00

173 Pasir Urug M3 60,500.00

174 Paving blok biasa bh 3,500.00

175 Paving block K - 127 m2 94,875.00

176 Penangkal Petir + Instalasi unit 3,850,000.00

177 Pintu Panel Double ky Bangkirai Bh 990,000.00

178 Pintu Double Plywood Bh 302,500.00

179 Pintu Panel ky Bangkirai Uk. Besar L 80 cm Bh 495,000.00

180 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm Bh 440,000.00

181 Pintu Panel kayu Ulin Ukuran Besar L 80 cm Bh 467,000.00

182 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm Bh 440,000.00

183 Pintu Panel Lapis Formika (Fabrikasi) Bh 330,000.00

184 Pintu Skat Bh 350,000.00

185 Pipa Galvanis AW Dia 1 " M' 30,250.00

186 Pipa Galvanis AW Dia 2 " M' 71,500.00

187 Pipa Galvanis AW Dia 3 " M' 154,000.00

188 Pipa Galvanis AW Dia 4 " M' 220,000.00

189 Pipa PVC AW Dia 1 " Btg 30,250.00

190 Pipa PVC AW Dia 1/2 " Btg 18,750.00

191 Pipa PVC AW Dia 2 " Btg 71,500.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 167: RAB Siring

NO URAIAN SAT

192 Pipa PVC AW Dia 3/4 " Btg 24,200.00

193 Pipa PVC AW Dia 4 " Btg 220,000.00

194 Pipa stainless steel 2 " M' 34,000.00

195 Pipa stainless steel 3 " M' 65,000.00

196 Pitting Bh 7,700.00

197 Plamir Kg 16,500.00

198 Plitur Kg 44,000.00

199 Plint / list lantai keramik Bh 2,200.00

200 Plint marmer 10 x 40 cm Bh 19,800.00

201 Plywood 3 mm Lbr 49,500.00

202 Plywood 4 mm Lbr 68,200.00

203 Plywood 6 mm Lbr 89,100.00

204 Plywood 9 mm Lbr 126,500.00

205 Plywood 12 mm Lbr 230,000.00

206 Plywood 18 mm Lbr 222,750.00

207 Porselen 20 x 20 cm Bh 46,200.00

208 Polycarbonat -

209 Rangka besi hollow M' 75,900.00

210 Rol Cat Tembok Bh 16,500.00

211 Rolling door -

212 Roster beton 20 x 20 cm Bh 4,400.00

213 Roster beton 20 x 30 cm Bh 5,225.00

214 Roster kayu bangkirai 20 x 20 cm Bh 71,500.00

215 Rumput Hias M2 25,000.00

216 Saklar Ganda Bh 18,700.00

217 Saklar Tunggal Bh 13,750.00

218 Sekering Kas 3 Group + Instalasi Unit 142,450.00

219 Semen Abu - Abu / PC ( 50 kg/Zak ) Zak 64,900.00

220 Semen Warna Kg 7,700.00

221 Semen putih Kg 2,200.00

222 Seng gelombang Besar / kecil Lbr 49,500.00

223 Seng Plat Lbr 45,000.00

224 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 ) Unit 6,331,325.00

225 Septictank Kayu Unit 1,650,000.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 168: RAB Siring

NO URAIAN SAT

226 Sirlak Kg 27,000.00

227 Sirtu m3 275,000.00

228 Solar Ltr 13,750.00

229 Spritus Ltr 13,200.00

230 Stop Kontak Bh 13,750.00

231 Talang Air PVC Maspion M' 22,000.00

232 Tambah daya Listrik Wt

233 Tanah Urug M3 66,000.00

234 Tandon Air 2 x 1200 ltr + Menara + Atap Unit 5,225,000.00

235 Tandon Air 1 x 1200 ltr + Menara + Atap Unit 3,025,000.00

236 Tangga Naik Tinggi 1 m Bh 210,000.00

237 Tanki Air Viberglass 1200 Ltr Bh 1,200,000.00

238 Tanki Air Viberglass 2500 Ltr Bh 2,300,000.00

239 Tanki Air Viberglass 550 Ltr Bh 850,000.00

240 Teakwood 3 mm Lbr 99,000.00

241 Teakwood 4 mm Lbr 115,500.00

242 Teakwood 6 mm Lbr 193,600.00

243 Ter / Residu Kg 38,500.00

244 Terpentin Ltr 3,000.00

245 Tiang Lampu Tunggal 11 m' Bt 2,713,370.00

246 Tiang Lampu Tunggal 9 m' Bt 1,781,120.00

247 Tiang Lampu Ganda 11 m' Bt 3,200,450.00

248 Tiang Lampu ganda 9 m' Bt 2,101,110.00

249 Tinner A Ltr 22,000.00

250 Titik Mata Lampu Ttk 154,000.00

251 Trap Depan Papan Tulis Bak Lapis Keramik Bh 250,000.00

252 Ukiran jamang pada puncak Bh 400,000.00

253 Ukiran jamang pada listplank Bh 450,000.00

254 Urinoir Bh 1,899,700.00

255 Washtafel + Cermin Bh 385,000.00

T. A 2006

Catatan :1. Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal2. Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran3. Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut

HARGA DASAR TANPA PAJAK

Page 169: RAB Siring

4 Harga belum termasuk PPn

Page 170: RAB Siring

DAFTAR HARGA SATUAN UPAH DAN BAHAN

BIDANG : Cipta Karya

TAHUN ANGGARAN : 2010

NO URAIAN SAT

A UPAH KERJA

1 Pekerja ( Buruh semi terlatih ) Hari 55,000.00

2 Tukang Batu Hari 70,000.00

3 Tukang Kayu Hari 70,000.00

4 Tukang Besi Hari 70,000.00

5 Tukang Cat Hari 70,000.00

6 Kepala Tukang Hari 75,000.00

7 Mandor Hari 75,000.00

8 Sopir Hari 60,000.00

9 Pembantu Sopir Hari 45,000.00

B Harga Bahan

1 Aluminium foil single sided Roll 550,000.00

2 Ampelas Lbr 2,750.00

3 Atap Asbes Gelombang Besar Lbr 23,000.00

4 Atap Genteng Kodok Bh 1,650.00

5 Atap Metal Berkualitas ( 2 ssn, 8 daun ) Lbr 38,500.00

6 Atap Metal Surya Roof ( 2 ssn, 8 daun ) Lbr -

7 Atap Metal Mega Color ( 1 ssn, 5 daun ) Lbr -

8 Atap Metal Verza roof ( 1 ssn, 5 daun ) Lbr -

9 Atap Metal Multi roof ( 2 susun ) Lbr -

10 Atap Metal Multi color ( 1 susun ) Lbr -

6 Atap Plastik gelombang 60 x 170 Lbr 27,500.00

7 Atap Sirap Ikat 63,250.00

8 Atap Tilux Bh 26,565.00

9 Bahan Plafond Asbes Semen 5 mm M2 44,000.00

10 Bahan Plafond eternit 4 mm M2 55,000.00

11 Bahan Plafond Hardplex 5 mm 120 x 130 Lbr 46,750.00

12 Bahan Politur ( sirlak ) India Kg 36,300.00

13 Bak Air Fiber (60 x 60 cm) Bh 242,000.00

14 Bak Air Fiber (60 x 80 cm) Bh 275,000.00

15 Bak Cuci Piring Stainles Lobang 1 Bh 198,000.00

16 Bak Cuci Piring Stainles Lobang 2 Bh 385,000.00

HARGA DASAR TANPA PAJAK 2008

Page 171: RAB Siring

17 Bak Kontrol 50 x 50 x 40 cm Bh 110,000.00

18 Bak air Traso Besar Bh 257,400.00

19 Balok Klas I Bangkirai M3 3,118,500.00

20 Balok Klas I Ulin M3 2,623,500.00

T. A 2008

NO URAIAN SAT

21 Balok Kayu Meranti M3 1,633,500.00

22 Batako Bh 2,200.00

23 Batu alam M2 176,000.00

24 Batu Bata Bh 770.00

25 Batu apung Kg 770.00

26 Batu Gunung M3 286,000.00

27 Baut Bh 4,070.00

28 Bensin Lt 7,700.00

29 Besi Beton Polos Dia 6 - 22 mm Kg 14,850.00

30 Besi Beton Ulir Dia 6 - 22 mm Kg 16,000.00

31 Besi penggantung plafond Kg 14,850.00

32 Besi strip Kg 34,650.00

33 Box MCB 2 group Unit 176,000.00

34 Box MCB 4 group Unit 286,000.00

35 Breaker Bh 16,500.00

36 Buis Beton Dia 80 cm tanpa tulangan Bh 460,460.00

37 Buis Beton Dia 60 Bh 150,000.00

38 Buis Beton Dia 80 Bh 175,000.00

39 Buis Beton Dia 100 cm tanpa tulangan Bh 569,250.00

40 Buis Beton Dia 120 Bh 275,000.00

41 Cat Air / tembok Kg 16,500.00

42 Cat besi Kg 39,600.00

43 Cat Dasar / plamir Kg 16,500.00

44 Cat Kilap / Kayu Kg 39,600.00

45 Cat Menie kayu Kg 16,500.00

46 Closed Jongkok Keramik berkualitas Bh 165,000.00

47 Closed Jongkok Keramik Toto Bh 247,500.00

48 Closed Jongkok Teraso Bh 74,250.00

49 Closet Duduk Type Keramik Berkualitas Unit 1,430,000.00

50 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm Bh 330,000.00

51 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm Bh 286,000.00

52 Daun Pintu Plywood Bag. Dlm Lapis Aluminium F Bh 440,000.00

53 Daun Ventilasi Bh 71,500.00

54 Dempul Halus ( INFRA ) Kg 28,600.00

HARGA DASAR TANPA PAJAK

Page 172: RAB Siring

55 Dempul kayu Kg 16,500.00

T. A 2008

NO URAIAN SAT

56 Dempul Politur Kg 28,600.00

57 Engsel Jendela Lokal 3 " Bh 22,440.00

58 Engsel Pintu Lokal 5 " Bh 31,240.00

59 Espagnolet Bh 24,200.00

60 Floor Drain Bh 31,790.00

61 Formika Ukuran Pintu Lbr 94,875.00

62 Genteng keramik Bh 9,350.00

63 Glass block Bh 24,200.00

64 Grendel Jendela Bh 14,300.00

65 Grendel Pintu Bh 22,000.00

66 Grendel tanam Pintu Bh 38,500.00

67 Gypsum board, t = 9 mm Lbr 52,800.00

68 Hak Angin Bh 12,100.00

69 Handle Jendela putih Bh 17,380.00

70 Handle Pintu Bh 165,000.00

71 Jalusi Atap Bh 514,250.00

72 Jalusi Kayu Bangkirai M' 36,300.00

73 Kabel NGA 2,5 Rol 297,000.00

74 Kaca Naco ( kerangka/daun ) 7 mm Set 125,000.00

74 Kaca Naco ( kerangka/daun ) 5 mm Set 297,000.00

75 Kaca polos 2 mm M2 66,000.00

76 Kaca polos 3 mm M2 77,000.00

77 Kaca polos 5 mm M2 93,000.00

78 Kaca Rayben 5 mm M2 115,500.00

79 Kanopi Atap Bh 412,500.00

80 Kawat Bendrat / Beton Kg 22,000.00

81 Kawat Bronjong Kg 34,787.00

82 Kawat Duri Rol 71,500.00

83 Kawat Harmonika m2 17,500.00

84 Kawat nyamuk besi/aluminium m2 22,000.00

85 Kawat nyamuk plastik m2 5,500.00

86 Kayu Klas 2 M3 1,320,000.00

87 Kayu galam dia 10 - 12 cm Btg 6,600.00

88 Keramik 10 x 20 cm M2 46,000.00

89 Keramik 20 x 25 cm M2 60,500.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 173: RAB Siring

NO URAIAN SAT

90 Keramik 20 x 20 cm M2 52,800.00

91 Keramik 30 x 30 cm Halus M2 46,200.00

92 Keramik 30 x 30 cm Kasar M2 60,500.00

93 Keramik 40 x 40 anti slip M2 75,000.00

94 Karet Talang M' 8,800.00

95 Kerikil Beton / Split ( ukuran 2-3 cm ) M3 385,000.00

96 Koral M3 247,500.00

97 Kran Air Dia 1" Bh 21,780.00

98 Kran Air Dia 3/4 Bh 18,150.00

99 Kuas 3 " Bh 7,700.00

100 Kunci Pintu 2 Slag berkualitas Bh 159,500.00

101 Kunci Pintu Double Ex Cisa Bh 231,000.00

102 Kunci Pintu Double Lengkap Dgn Accecories Bh 192,500.00

103 Kunci Pintu Tanam antik Bh 137,500.00

104 Kusen aluminium 1 -

105 Kusen aluminium 2 -

106 Kusen aluminium 3 -

107 Lampu 1 - TL 40 Watt Double + Instalasi Bh 150,000.00

107 Lampu 2 - TL 40 Watt Double + Instalasi Bh 112,750.00

108 Lampu Down Light Type A003 CD5 RSL E 27 Unit 125,000.00

108 Lampu Merkury 250 wt Bh 165,000.00

109 Lampu Pijar 10 Watt Bh 5,500.00

110 Lampu Pijar 100 Watt Bh 11,000.00

111 Lampu Pijar 15 Watt Bh 5,500.00

112 Lampu Pijar 25 Watt Bh 5,500.00

113 Lampu Pijar 40 Watt Bh 6,600.00

114 Lampu Pijar 5 Watt Bh 3,850.00

115 Lampu Pijar 60 Watt Bh 6,600.00

116 Lampu Philip SL 20 Watt + Fitting Bh 44,000.00

117 Lampu TL 10 watt Bh 26,000.00

117 Lampu TL Philip + Fitting 20 Watt Bh 71,500.00

118 Lampu TL 20 Watt Double (Trafo) Bh 63,250.00

119 Lampu TL 40 Watt (Trafo) Bh 45,870.00

120 Lampu TL 40 Watt Double (Trafo) Bh 99,000.00

121 Lem Kayu (fox) Ltr 23,100.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 174: RAB Siring

NO URAIAN SAT

122 Lem Paralon Bh 8,800.00

123 List Cornice Gypsum M' 18,975.00

124 List Plafond Gypsum M' 37,950.00

125 List Plafond Plywood M' 5,500.00

126 List Profil Sudut 3/5 Ky Bangkirai M' 9,350.00

127 List Profil Sudut 3/5 Ky Meranti M' 5,500.00

128 Listplank kayu ukir M' 60,500.00

129 List plafond gypsum M' 33,000.00

130 Macam2 Sambungan PVC AW Dia 1 " Bh 2,750.00

131 Macam2 Sambungan PVC AW Dia 1/2 " Bh 1,650.00

132 Macam2 Sambungan PVC AW Dia 2 " Bh 4,400.00

133 Macam2 Sambungan PVC AW Dia 3/4 " Bh 2,750.00

134 Macam2 Sambungan PVC AW Dia 4 " Bh 11,000.00

135 Marmer lokal m2 450,000.00

136 Minyak cat Ltr 22,000.00

137 Minyak bekisting Ltr 7,150.00

138 Multiplek 4 mm Lbr 57,500.00

139 Multiplek 6 mm Lbr 126,500.00

140 Multiplek 9 mm Lbr 211,200.00

141 Multiplek 15 mm Lbr 203,500.00

142 Multiplek 18 mm Lbr 203,500.00

143 Multiplex 12 mm Lbr 143,000.00

144 Nok Genteng Kodok Bh 16,500.00

145 Nok Genteng keramik Bh 24,667.00

146 Nok Model U ukuran 110 x 5 x 6 cm M' 34,100.00

147 Nok Model U Verza Roof 40 x 12 cm Bh 29,700.00

148 Oker Kg 18,975.00

149 Oli / pelumas Ltr 34,650.00

150 Pagar besi motif BRC 1,2 x 2,4 m' M' -

151 Pagar besi motif BRC 1,75 x 2,4 m' M' -

152 Paku Asbes + Karet Kg 26,400.00

153 Paku Beton Bh 660.00

154 Paku bor Kg 16,500.00

155 Paku Genteng metal Kg 26,400.00

156 Paku Kayu / biasa Kg 20,900.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 175: RAB Siring

NO URAIAN SAT

157 Paku Keling Kg 27,500.00

158 Paku Seng Kg 26,400.00

159 Paku Ulin Kg 24,200.00

160 Paku Plywood Kg 26,400.00

161 Paku Sekrup Kg 7,700.00

162 Papan Kayu Bangkirai M3 3,723,500.00

163 Papan Kayu Ulin M3 3,393,500.00

164 Papan Kayu kelas 2 M3 1,413,500.00

165 Papan Kayu Meranti M3 1,633,500.00

166 Papan Nama Proyek Bh 495,000.00

167 Papan Reuter Bengkirai M' 22,000.00

168 Pas. Lampu Baret + Instalasi Unit 550,000.00

169 Pas. Lampu Gantung Unit 616,000.00

170 Pasir Beton M3 247,500.00

171 Pasir Pasang sungai M3 220,000.00

172 Pasir pasang putih M3 60,500.00

173 Pasir Urug M3 60,500.00

174 Paving blok biasa bh 3,500.00

175 Paving block K - 127 m2 94,875.00

176 Penangkal Petir + Instalasi unit 3,850,000.00

177 Pintu Panel Double ky Bangkirai Bh 990,000.00

178 Pintu Double Plywood Bh 302,500.00

179 Pintu Panel ky Bangkirai Uk. Besar L 80 cm Bh 495,000.00

180 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm Bh 440,000.00

181 Pintu Panel kayu Ulin Ukuran Besar L 80 cm Bh 467,000.00

182 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm Bh 440,000.00

183 Pintu Panel Lapis Formika (Fabrikasi) Bh 330,000.00

184 Pintu Skat Bh 350,000.00

185 Pipa Galvanis AW Dia 1 " M' 30,250.00

186 Pipa Galvanis AW Dia 2 " M' 71,500.00

187 Pipa Galvanis AW Dia 3 " M' 154,000.00

188 Pipa Galvanis AW Dia 4 " M' 220,000.00

189 Pipa PVC AW Dia 1 " Btg 30,250.00

190 Pipa PVC AW Dia 1/2 " Btg 18,750.00

191 Pipa PVC AW Dia 2 " Btg 71,500.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 176: RAB Siring

NO URAIAN SAT

192 Pipa PVC AW Dia 3/4 " Btg 24,200.00

193 Pipa PVC AW Dia 4 " Btg 220,000.00

194 Pipa stainless steel 2 " M' 34,000.00

195 Pipa stainless steel 3 " M' 65,000.00

196 Pitting Bh 7,700.00

197 Plamir Kg 16,500.00

198 Plitur Kg 44,000.00

199 Plint / list lantai keramik Bh 2,200.00

200 Plint marmer 10 x 40 cm Bh 19,800.00

201 Plywood 3 mm Lbr 49,500.00

202 Plywood 4 mm Lbr 68,200.00

203 Plywood 6 mm Lbr 89,100.00

204 Plywood 9 mm Lbr 126,500.00

205 Plywood 12 mm Lbr 230,000.00

206 Plywood 18 mm Lbr 222,750.00

207 Porselen 20 x 20 cm Bh 46,200.00

208 Polycarbonat -

209 Rangka besi hollow M' 75,900.00

210 Rol Cat Tembok Bh 16,500.00

211 Rolling door -

212 Roster beton 20 x 20 cm Bh 4,400.00

213 Roster beton 20 x 30 cm Bh 5,225.00

214 Roster kayu bangkirai 20 x 20 cm Bh 71,500.00

215 Rumput Hias M2 25,000.00

216 Saklar Ganda Bh 18,700.00

217 Saklar Tunggal Bh 13,750.00

218 Sekering Kas 3 Group + Instalasi Unit 142,450.00

219 Semen Abu - Abu / PC ( 50 kg/Zak ) Zak 64,900.00

220 Semen Warna Kg 7,700.00

221 Semen putih Kg 2,200.00

222 Seng gelombang Besar / kecil Lbr 49,500.00

223 Seng Plat BJLS 30 M' 12,500.00

223 Seng Plat Lbr 45,000.00

224 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 ) Unit 6,331,325.00

225 Septictank Kayu Unit 1,650,000.00

T. A 2008

HARGA DASAR TANPA PAJAK

Page 177: RAB Siring

NO URAIAN SAT

226 Sirlak Kg 27,000.00

227 Sirtu m3 275,000.00

228 Solar Ltr 13,750.00

229 Spritus Ltr 13,200.00

230 Stop Kontak Bh 13,750.00

231 Talang Air PVC Maspion M' 22,000.00

232 Tambah daya Listrik Wt

233 Tanah Urug M3 66,000.00

234 Tandon Air 2 x 1200 ltr + Menara + Atap Unit 5,225,000.00

235 Tandon Air 1 x 1200 ltr + Menara + Atap Unit 3,025,000.00

236 Tangga Naik Tinggi 1 m Bh 210,000.00

237 Tanki Air Viberglass 1200 Ltr Bh 1,200,000.00

238 Tanki Air Viberglass 2500 Ltr Bh 2,300,000.00

239 Tanki Air Viberglass 550 Ltr Bh 850,000.00

240 Teakwood 3 mm Lbr 99,000.00

241 Teakwood 4 mm Lbr 115,500.00

242 Teakwood 6 mm Lbr 193,600.00

243 Ter / Residu Kg 38,500.00

244 Terpentin Ltr 3,000.00

245 Tiang Lampu Tunggal 11 m' Bt 2,713,370.00

246 Tiang Lampu Tunggal 9 m' Bt 1,781,120.00

247 Tiang Lampu Ganda 11 m' Bt 3,200,450.00

248 Tiang Lampu ganda 9 m' Bt 2,101,110.00

249 Tinner A Ltr 22,000.00

250 Titik Mata Lampu Ttk 154,000.00

251 Trap Depan Papan Tulis Bak Lapis Keramik Bh 250,000.00

252 Ukiran jamang pada puncak Bh 400,000.00

253 Ukiran jamang pada listplank Bh 450,000.00

254 Urinoir Bh 1,899,700.00

255 Washtafel + Cermin Bh 385,000.00

256 Washtafel Type S5 ex TOTO Unit 500,000.00

T. A 2006

Catatan :1. Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal2. Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran3. Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut4 Harga belum termasuk PPn

HARGA DASAR TANPA PAJAK

Page 178: RAB Siring

DAFTAR ONGKOS ANGKUT MATERIAL

BIDANG : CIPTA KARYATAHUN : September 2008

NO MATERIAL SATJUMLAH

1 Balok Klas I Bangkirai m3 - #REF!2 Balok Klas I Ulin m3 - #REF!3 Balok Kayu Meranti m3 - #REF!4 Batu Gunung m3 - #REF!5 Kayu Klas 2 m3 - 1,230,000.00 6 Kayu galam dia 10 - 12 cm btg - 9,500.00 7 Kerikil Beton / Split ( 2-3 cm ) m3 - #REF!8 Koral m3 - #REF!9 Papan Kayu Bangkirai m3 - #REF!

10 Papan Kayu Ulin m3 - #REF!11 Papan Kayu kelas 2 m3 - #REF!12 Papan Kayu Meranti m3 - #REF!13 Pasir Beton m3 - #REF!14 Pasir Pasang sungai m3 - #REF!15 Pasir pasang putih m3 - #REF!16 Pasir Urug m3 - #REF!17 Sirtu m3 - #REF!18 Tanah Urug m3 - #REF!

JARAK ANGKUT RATA-RATA 46 - 70

ONGKOS ANGKUT

Page 179: RAB Siring

RENCANA ANGGARAN BIAYA

Pekerjaan : Pembangunan Siring Jalan KuburanLokasi : Desa Gunung Intan T.A : 2010

NO URAIAN PEKERJAAN SAT VOLHARGA JUMLAH

SATUAN (Rp) (Rp) 1 2 4 5 6 7=5*6

I BIAYA UMUM 1 Administrasi dan Pelaporan bln 1.00 1,000,000.00 1,000,000.00 2 Papan nama proyek bh 1.00 300,000.00 300,000.00

Sub Total 1,300,000.00 II PEKERJAAN STRUKTUR DAN BETON

1 Cor Pondasi / Siring batu gunung m3 0.00 615,893.75 - 2 Cor lantai kerja t=10 cm, 1:2:2 m3 0.00 672,562.50 - 3 Cor dinding siring m3 0.00 672,562.50 - 4 Plesteran dinding kiri kanan siring m2 0.00 35,146.40 - 5 Material on site (batu gunung) m3 5.25 200,000.00 1,050,000.00

Sub Total 1,050,000.00

Page 180: RAB Siring

ANGGARAN BIAYA

Pekerjaan : Pembangunan Siring Jalan KuburanLokasi : Desa Gunung Intan T.A : 2010

NO URAIAN PEKERJAAN SAT VOL

1 2 4 5

I BIAYA UMUM 1 Administrasi dan Pelaporan bln 1.00 2 Papan nama proyek bh 1.00

II PEKERJAAN STRUKTUR DAN BETON 1 Cor Pondasi / Siring batu gunung m3 0.00 2 Cor lantai kerja t=10 cm, 1:2:2 m3 0.00 3 Cor dinding siring m3 0.00 4 Plesteran dinding kiri kanan siring m2 0.00 5 Material on site (batu gunung) m3 5.25

Penajam,03 Agustus 2011Tim Teknis Bangunan

1. M. Ali Musthofa, ST : NIP. 19781003 200701 1 009

2. Eko B. Setiawan, ST : NIP. 19810318 201001 1 007

Page 181: RAB Siring

REKAPITULASIANGGARAN BIAYA

Pekerjaan : Pembangunan Siring Jalan KuburanLokasi : Desa Gunung Intan T.A : 2010

NO URAIAN PEKERJAANJUMLAH HARGA

( Rp )I BIAYA UMUM 1,300,000.00II PEKERJAAN STRUKTUR DAN BETON 1,050,000.00

A JUMLAH 2,350,000.00B PPN = 10 % x A 235,000.00D TOTAL 2,585,000.00

DIBULATKAN 2,585,000.00Terbilang :

#ADDIN?

Penajam, 03 Agustus 2011Tim Teknis Bangunan

Page 182: RAB Siring

BACK UP VOLUME RUMAH DINAS TIPE 45

SKETSA GAMBAR NO PEKERJAAN KETERANGAN RUMUSA PENDAHULUAN

Pembersihan lokasiPembuatan papan namaDireksi keetPasangan bouplank A = Pj gedung L =

B = Lbr gedung

B PEK. TANAHGalian tanah A = Pj atas VOL =

C = Lbr bawah Lx =B = Kedalaman Ly =L = Pj galian L =

Urugan tanah kembali VOL =

Urugan tanah pondasi VOL =

Urugan pasir bwh lantai 10 cm VOL =

Urugan Pasir bwh ponds D = Lbr pas bt kosng VOL = E = Tinggi pasir

C PEK. PONDASIPasangan batu D = Lbr pas bt kosng VOL = kosong C = Tinggi bt ksng( Anstamping ) L = Pj bt kosng.

5 Pasangan pondasi A = Pj ponds atas VOL = batu gunung B = Tinggi pondasi

E = Pj ponds bawahL = Pj pas pondasi

bt gunung / kaliD PEK. BETON

Sloof 15/20 A = Lbr sloof VOL = B = Tinggi sloof Lx =L = Pj sloof Ly =

L =

Kolom 15/15 A = Lbr kolm prkts VOL = B = Panjng kolm prkts

GEDUNG

A

B

A

B

C

D

EPASIR

Tanah galian

B

A

C

D

BT KOSONG

E

Pasangan ponds bt

A

B

A

B

G3
Administators: Bila yang bersangkutan minta back up, kolom keterangan tidak perlu dilihatkan / dicetak / diprint.
F7
Administators: Pembersihan lokasi dihitung Lump Sum, biaya diperkirakan berdasarkan kondisi lokasi.
F8
Administators: Untuk pekerjaan yg resmi ( punya pemerintah ) atau proyek besar. Untuk rumah pribadi tidak perlu dihitung.
F9
Administators: Berfungsi sebagai gudang, site office, atau tempat tinggal karyawan. Dihitung lump sum.
F10
Administators: Bouplank dihitung keliling. Panjang/lebar bangunan ditambah 2m ke kiri dan 2m ke kanan.
F17
Administators: Galian pondasi dianggap trapesium. Untuk galian berbentuk persegi dihitung A*B*L.
F42
Administators: Pasang pondasi batu gunung / kali. Pebedaan hitungan campuran ( camp 1:2 / 1:4 dst) dpt dilihat di SNI
Page 183: RAB Siring

T = Tinggi kolm prktsN = Jml kolm prkts

Kolom 15/40 A = Lbr kolm prkts VOL = B = Panjng kolm prktsT = Tinggi kolm prktsN = Jml kolm prkts

Kolom 20/50 A = Lbr kolm prkts VOL = B = Panjng kolm prktsT = Tinggi kolm prktsN = Jml kolm prkts

Balok 15/20 A = Lbr sloof VOL = B = Tinggi sloof Lx =L = Pj sloof Ly =

L =

Ring balk 15/15 A = Lbr ring balk VOL = B = Tinggi ring balk Lx =L = Panjng ring balk Ly =

L =

Kanopi t = 8 cm A = Panjang kanopi Vol =B = Lebar kanopi A=t = Tebal B=

Plat dak beton t = 12 cm A = panjang Vol =B = lebar A=t = Tebal B=

L1=A=B=L2=

E PEK. PEMBESIAN

Sloop Sengkang :D = Lebar ( A - 4 ) Sengkang :C = Tinggi ( B - 4 ) VOL =4d= Panj bengkokanL = Pj Sloopn = Jml sengkang

(n = L/s +1)Ws =Berat besi sengkd = Diametr sengkngs = Jarak sengkang

B

A

B

B

o

A

Pj bengkokan 4d

Selimut beton 2cm

Besi tulangan

Sengkang

CD

o

A

B

Page 184: RAB Siring

W = Berat besiTulangan : Pembesian :N = Jml besi tulng VOL =

Kolom praktis D = Lebar ( A - 4 ) Sengkang :C = Tinggi Tulngn(B-4) VOL =4d= Panj bengkokanTk = Tinggi Kolm Prktsn = Jml sengkang

(n = Tk/s +1)Ws =Berat besi sengk

d = Diametr sengkngs = Jarak sengkangW = Berat besiTulangan : Pembesian :N = Jml besi tulng VOL =

Ring balk D = Lebar ( A - 4 ) Sengkang :C = Tinggi Tulngn(B-4) VOL =4d= Panj bengkokanL = Pj Ring balkn = Jml sengkang

(n = L/s +1)Ws =Berat besi sengk

d = Diametr sengkngs = Jarak sengkang Pembesian :W = Berat besi VOL =N = Jml besi tulng

Kanopi A = Pj besi VOL pj =

4d= Panj bengkokan ny =B = Lebar kanopi nx =t = Tebal VOL pd=s = Jarak tulangan

Cart port

F PEK BEGESTING( Begesting 2 x pakai )

SloofKolom 15/15

W ø10 =

B

o

A

Pj bengkokan 4d Selimut beton 2cm

Besi tulangan

Sengkang

CDo

Bo

A

Pj bengkokan 4d Selimut beton 2cm

Besi tulangan

Sengkang

CDo

t

A

Tulangan

O

Page 185: RAB Siring

Kolom 15/25Kolom 20/50Ring balkKanopiDak

G PEK PASNGN DINDING L =

11.34 P1 =39.16 P2 =

15.664 P3 =PJ =

12.705 J1 =28.369 J2 =

J3 =BV =KR =

14.85 Pas dinding 1 : 4Pas dinding 1 : 2

H PEK LANTAI & DINDNGCor lantai dasar 1:3:5 7cm Vol =Cor lantai saluran Vol=Pas. Lantai kermk 30x30 halus L =Pas. Lantai teras 25x25 L =Pas. Lantai km mandi 20x20 L =Pas. Dinding keramik 20x25 L =Plesteran 1 : 2 L =Plesteran 1 : 4 L =Rabat 1 : 3 : 5, 7 cmCarport 1 : 2 : 3, 8 cm

I PEK KOSEN/PINTU/JENDLAKosen ky bengkirai 5/12 Vol =

P1 =P2 =P3 =PJ =J1 =J2 =J3 =BV =KR =

Pintu ky bangkiraiPintu ky ulinJend kc beningKaca bening 5 mm

J PEK ALAT PENGGANTUNG1 Kunci pintu tanam2 Engsel pintu 3 bh/dn

Page 186: RAB Siring

3 Grendel jendela 2 bh/dn4 Engsel jendela 2 bh/dn5 Hak jendela 2 bh/dn6 Handle jendela 1 bh/dn

K PEK RANGKA ATAPKuda - kuda Kuda - kuda kecil VOL =

b =t =L =

Kuda - kuda besar

Gording 6/12

Nok 6/12

Gording, Nok 6/12 bengkirai Vol =

Papan reuter 2/20

Suai angin bangkirai 5/10

Lisplang bangkirai 2 x 2/20

Pek kasau 5/7, reng 3/5

Atap

Bubungan gt metal

Pasang talang air hujan Pj =

L PEKERJAAN PLAFONDList Profil

t

b

t

b

Page 187: RAB Siring

Rangka plafond 5/7 meranti

Pek plafond plywood

M PEKERJAAN INSTALASI LISTRIK1 Instalasi titik lampu2 Pasang lampu Philip SL 20 w 3 Pasang lampu pijar 15 w 4 Saklar ganda + instalasi5 Saklar tunggal + instalasi6 Stop kontak + instalasi7 Box MCB 4 group

N PEKERJAAN FINISHING CAT - CATAN

1 Cat dinding luar dalam L =2 Cat plafond L =3 Cat kilap L =4 Ter - teran Ls

O PEKERJAAN SANITASI 1 Septick tank + sumur peresapan2 Bak air pasangan batu bata3 Kran air dia 3/4"4 Closed jongkok keramik Berkualitas5 Floor drain stainless steel6 Pipa PVC dia 3/4" Pj =7 Pipa PVC dia 4" Pj =8 Pas. Washtufle + Cermin 40 x 60 cm

P PEKERJAAN SALURAN1 Galian tanah2 Pasir urug3 Pasangan 1/2 bata 1 : 24 Plesteran 1 : 25 Cor lantai 1 : 3 : 5 t=8 cm

Page 188: RAB Siring

BACK UP VOLUME RUMAH DINAS TIPE 45

RUMUS HITUNGAN SAT

LsLs

Ls2*((A+4)+(B+4)) A = 9 M1

B = 4.5 M1L = 27 M1

27.27 0.675

(A+C)/2*B*L A = 1.64 M121.4 B = 0.8 M1

19 C = 0.78 M140.4 L = 40.4 M1

VOL = 39.11 M3

1/3*galian tanah VOL = 13.04 M3

4.138 VOL = 4.138 M3 8.122.5

7.122.069 VOL = 2.069 m3 0.35

7.13(D+C)/2*E*L D = 0.9 M1 7.05

E = 0.1 M13.232 C = 0.78 M1

L = 40.4 M1VOL = 3.39 M3

D*C*L D = 0.8 M1C = 0.2 M1L = 40.4 M1VOL = 6.9665 M3

(A+E)/2*B*L A = 0.3 M1 0.55 0.35B = 0.6 M1 0.7 0.7E = 0.6 M1 0.85 0.8L = 40.4 M1 1.05 1.15VOL = 10.908 M3 0.51 0.46 11.89

Bs = 0.02A*B*L A = 0.15 M1

19.45 B = 0.2 M114.25 L = 33.7 M1

33.7 VOL = 1.01 M3Bs = 0.04

A*B*T*N A = 0.15 M1B = 0.15 M1

K3
Administators: Ini merupakan contoh hitungan VOLUME. Untuk menghitung VOLUME gantilah angka yg diberi tanda hijau pd kolom HITUNGAN, otomatis hasilnya ketemu/warna kuning.
Page 189: RAB Siring

T = 2.85 M1N = 15 bhVOL = 0.96 M3

A*B*T*N A = 0.2 M1B = 0.4 M1T = 3.3 M1N = 1 bhVOL = 0.26 M3

A*B*T*N A = 0.2 M1B = 0.5 M1T = 3.6 M1N = 1 bhVOL = 0.36 M3

A*B*L A = 0.15 M1B = 0.2 M1L = 2.85 M1

10.76 VOL = 0.09 M3

Bs = 0.02A*B*L A = 0.15 M1

19.45 B = 0.15 M114.25 L = 33.7 M1

33.7 VOL = 0.76 M3

A*B*t A= 4.62 M4.62 B= 0.5 M

0.5 t= 0.1 MVol = 0.23 M3

A*B*t L1= 3.37 M3.45 L2= 0 M

1.4 t= 0.12 M3.37 Vol = 0.40 M3

Sengkang : D = 0.11 M1(2*D+2*C+(2*4*d))*n)*Ws C = 0.16 M1

Bengkkn = 0.06 M1L = 33.7 M1s = 0.17 M1n = 199 bh

0.220 Kg/MVOL = 26.2991 KgWs ø6 =

Page 190: RAB Siring

Pembesian : N = 4 bhN*L*W 0.620 kg/m

VOL = 83.576 KgVOL tot= 109.875 kg

Sengkang : D = 0.11 M1(2*D+2*C+(2*4*d))*n)*W*JK C = 0.11 M1

Bengkkn = 0.04 m1Tk = 3.8 M1s = 0.17 M1n = 23 bhJK = 24 bh

0.220 Kg/mVOL = 59.19 Kg

N = 4 bhPembesian : 0.62 kg/m

(N*Tk*W+(0.25*N*Tk*W))*JK VOL = 270.816 KgVOL = 330.00

Sengkang : D = 0.11 M1(2*D+2*C+(2*4*d))*n)*Ws C = 0.11 M1

L = 33.7 M1s = 0.17 M1n = 199 bh

0.220 Kg/mVOL = 19.286 Kg

Pembesian : N = 4 bhN*L*W 0.62 kg/m

VOL = 83.576 KgVOL = 102.86

(Apdk+8*d)*n pj*W A pdk = 0.57 MA pj = 0.06 m

(n = L/s +1) 4d = 0.048 M(n = L/s +1) 0.62 Kg/m(A pj+8*d)*n pdk*W d = 0.012 M

s = 0.2 Mn pj = 1.5 bhn pdk = 4VOL pj = 0.61938 KgVOL pd = 0.37237 KgVOL = 0.99175 Kg

0.620 kg/m((4.56*14.8)+(2.96*18.24))*0.62 75.32 kg

Luas = 26.96 m2Luas = 45.56 m2

W ø10 =

Ws ø6 =

W ø10 =

Ws ø6 =

W ø10 =

W ø10 =

Page 191: RAB Siring

Luas = 5.6Luas = 3.6Luas = 26.96 m2

(L67*0.4)+((L67+0.7)*0.05) Luas = 0.61 m21.41

Luas dindng - luas kusen L din= 91.54 m2 17.5 31L kusn= 12.31 13.5

4.12 Vol Pint= 9.78 m22.86 6.2

2.8 9.440 15.64

1.23 Vol jnd= 1.75 m20

0.520.52 Vol Bv= 0.78 m20.26

L = 79.23 m218.52+12.76 L = 47.95 m2

L = 31.28 m2

3.1773 Vol = 3.1773 m30.100625 Vol= 0.10063

54 - L km mandi L = 47.875 m21.5+3 L = 4.5 m22*0.85*1.75 L = 2.975 m2(1.75*1.5*6)+(0.75*1.5*2) L = 15.75 m22*pas din 1:2 L = 62.56 m22*pas din 1:4 L = 95.90 m230.7735*0.07 0.26 m311.9*0.08 0.95 m3

Pj ky*0.05*0.12 Vol = 0.47023 m36.12

104.259.456.629.04

13.591.84 0.013248

4.465.31

Vol = 4 bhVol = 2 bhVol = 8 bhVol = 5.57 m2

Vol = 6 bhVol = 18 bh

Page 192: RAB Siring

Vol = 16 bhVol = 16 bhVol = 16 bhVol = 8 bh

b*t*L b = 0.06 mLebar kayu t = 0.12 mTinggi kayu L = 33.54 mPanjang kayu Vol 1 = 0.24149 m3

L = 49 mVol 2 = 0.35 m3Vol tot= 0.59 m3

14.64 L = 3.25 m49.92 n = 6 bh

4.21 Vol 1 = 0.1404 m328

96.77 L = 4.8 m0.696744 n = 1 bh

L = 8.3 mn = 5 bh

L = 7.9 mn = 2 bhVol 2 = 0.45 m3Vol tot= 0.59 m3

L = 11.25 mVol = 0.081 m3

Gording + Nok Vol = 0.67

L = 11.25 m1

b = 0.05 m1t = 0.1 m1L = 30.6 m1Vol = 0.153 m3

L = 54.75 m1

Luas = 110.64 m2

Vol = 110.64 m2

Vol = 11.25 m1

2*1.1+3.75 Pj = 5.95 m1

List luar= 80.45 m1List dlm= 78.05 m1

Page 193: RAB Siring

Jml = 158.5 m1

Luas luar= 30.78 m2Luas dlm= 54 m2Luas tot = 84.78 m2Luas tot = 84.78 m2

11 ttk6 bh5 bh3 bh5 bh5 bh1 unit

21.46+31.96-18 L = 63.48 m284.78 L = 84.78 m2

84.65*(0.1+0.12) L = 17.24 m2Harga 1 Ls

1 Unit2 bh4 bh2 bh2 bh

7+9+1+1+0.75+0.85+1.75+6 27.35 m15.55+6.95 12.5 m1

1 bh

0.58*0.6*45 18 m30.1*0.5*45 2.25 m30.4*45*2 36 m2((0.4*2)+(0.15*2))*45 49.5 m20.08*0.5*45 1.8 m3