  • REKAPITULASI PEKERJAAN

    KEGIATAN : Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan TahunPEKERJAAN : BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 17)LOKASI : SDN PAKIS 1,2,9 Surabaya

    NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

    A PEKERJAAN LANTAI 1I PEKERJAAN PENDAHULUAN 11,574,513.57 II PEKERJAAN TANAH 87,505,190.41 III PEKERJAAN PONDASI & BETON 709,232,731.34 IV PEKERJAAN PASANGAN & PLESTERAN 137,456,786.56 V PEKERJAAN KERAMIK 157,119,550.99 VI PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI 68,666,297.37 VII PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR 14,365,993.11 VIII PEKERJAAN PENGECATAN 28,619,502.78 IX PEKERJAAN INSTALASI LISTRIK 11,902,573.10 X PEKERJAAN SANITAIR & INSTALASI AIR 34,180,004.09

    JUMLAH A 1,260,623,143.31

    B PEKERJAAN LANTAI 2I PEKERJAAN BETON 404,532,551.77 II PEKERJAAN PASANGAN & PLESTERAN 145,741,929.88 III PEKERJAAN KERAMIK 157,119,550.99 IV PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI 68,666,297.37 V PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR 14,365,993.11 VI PEKERJAAN PENGECATAN 40,815,154.54 VII PEKERJAAN INSTALASI LISTRIK 11,902,573.10 VIII PEKERJAAN SANITAIR & INSTALASI AIR 26,567,355.68

    JUMLAH B 869,711,406.44

    C PEKERJAAN LANTAI 3I PEKERJAAN BETON 132,499,220.23 II PEKERJAAN LAIN-LAIN 1,950,000.00

    JUMLAH C 134,449,220.23

    JUMLAH TOTAL (A+B+C) 2,264,783,769.98

    JUMLAH TOTAL 2,264,783,769.98 PPN 10% 226,478,377.00 NILAI PEKERJAAN 2,491,262,146.98 DIBULATKAN 2,491,262,000.00

    Terbilang :DUA MILYAR EMPAT RATUS SEMBILAN PULUH SATU JUTA DUA RATUS ENAM PULUH DUA RIBU

    Surabaya , Dibuat oleh :CV. MAKARYA ENGINEERING

  • NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

    SHOLEHUDDIN, STDirektur

  • RINCIAN PEKERJAAN

    KEGIATAN : Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan TahunPEKERJAAN : BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 59)LOKASI : SDN PAKIS 1, 2, 9 Surabaya

    NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI

    1 2 3 4 5I PEKERJAAN PENDAHULUAN

    Pembongkaran Ruang Kelas, R.Kelas & R.TU (4 ruang, = 224 M2) 8 7 Uitzet dan Pemasangan bowplank 68 49pembongkaran pertemuan pondasi pertitik

    memanjang 36 Pembuangan bekas bongkaran & galian keluar proyek

    II PEKERJAAN TANAH Galian Tanah Konstruksipoer 1 1.7 1 0.5poer 2 1 1 0.5

    Galian Pondasi Bor Pile 40cm - 10m (Alat) 10

    Urugan Sirtu Padat Kelas & KM 7.85 6.85 0.5bawah tangga 6.85 3.85 0.5Teras 36.4 3.08 0.5

    Urugan Pasir Padat Bawah Pondasi poer 1 1.5 0.8 0.05poer 2 0.8 0.8 0.05

    Sloof S1 sloof memanjang AS 1-2 36 0.25 0.053.1 0.25 0.05

    sloof memanjang AS 2-3 2.63 0.25 0.051.33 0.25 0.05

    sloof melintang 3.68 0.25 0.05

    Sloof S2 sloof As 1 & 2 3.6 0.2 0.053.75 0.2 0.05

    Sloof SL tangga 3.75 0.2 0.05

    Pondasi Rolak Pot Taman 12.2 0.22 0.38.35 0.22 0.3

    III PEKERJAAN PONDASI & BETON Rabat Beton Tebal 5 cm Bawah Pondasi & Sloof

    poer 1 1.5 0.8 0.05poer 2 0.8 0.8 0.05

  • Sloof S1 sloof memanjang AS 1-2 36 0.25 0.053.1 0.25 0.05

    sloof memanjang AS 2-3 2.63 0.25 0.051.33 0.25 0.05

    sloof melintang 3.68 0.25 0.05

    Sloof S2 sloof As 1 & 2 3.6 0.2 0.053.75 0.2 0.05

    Sloof SL tangga 3.75 0.2 0.05

    Rabat Beton Tebal 5 cm Bawah Lantaikelas 7.85 6.85 0.05pengurangan kolom

    Kamar Mandi 7.85 6.85 0.05pengurangan kolom

    bawah tangga 6.85 3.85 0.05pengurangan kolom

    Teras 36.4 3.08 0.05pengurangan kolom

    Bor Pile 40cm - 10m 12

    poer 1 1.5 0.8 0.4poer 2 0.8 0.8 0.4

    Sloof S1 25/50sloof memanjang AS 1-2 6.6 0.25 0.5

    3.1 0.25 0.5sloof memanjang AS 2-3 2.63 0.25 0.5

    1.33 0.25 0.5sloof melintang 3.68 0.25 0.5

    Sloof S2 20/40sloof As 1 & 2 3.6 0.2 0.4

    3.75 0.2 0.44.18 0.2 0.4

    Sloof SL tangga 20/40 3.75 0.2 0.4

  • Kolom K1 40/40 0.4 0.4 4.6

    Kolom K2 25/25 0.25 0.25 4.6

    Kolom Praktis KP 12/12 0.12 0.12 3.6

    Balok B1 25/50keliling balokbalok memanjang AS 1-2 6.6 0.25 0.5

    3.1 0.25 0.5balok memanjang AS 2-3 2.63 0.25 0.5

    1.33 0.25 0.5

    Balok B2 20/40keliling balokbalok As 1 & 2 3.6 0.2 0.4

    3.75 0.2 0.4

    Balok B3 15/25 3.68 0.15 0.25keliling balok

    Balok Latei BL 12/20BL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Balok Level BLV 12/20keliling balokBL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Plat Level tebal 10 cm3.15 1.2 0.1

    1.6 1.2 0.11.1 1.2 0.1

    Plat Lantai tebal 12 cm Type A 3.75 3.3 0.12Pengurangan sap 0.6 1.6 0.12koridor 3.75 2.75 0.12

    3.75 1.36 0.120.57 1.35 0.12

    depan tangga 3.75 1.55 0.12

    Tangga 7.725 1.8 0.12Bordes 3.85 1.78 0.12Anak Tangga 1.8 0.3 0.18

    IV PEKERJAAN PASANGAN & PLESTERAN Pasangan Dinding biasa 1/2 bata (1pc : 5ps)

  • As A, B 3.6 3.75As 1 - 6 6.6 3.65Kamar Mandi 63.21 1.85Dinding Pot Taman 25.3 0.6

    Factor PengurangJ1 2.65 1.52J2 1.52 1.35P2 2.68 1.5PVK 0.2 0.98PV 0.2 0.78BV 0.7 0.5

    Pasangan Dinding Trasram 1/2 bata (1pc : 3ps)Kamar Mandi 63.21 1.9

    Factor PengurangPVK 1.9 0.98PV 1.9 0.78

    Plesteran Halus biasa (1pc : 5ps) Plesteran Halus trasram (1pc : 3ps) Acian Dinding

    Benangan dindingAs A 4As B 4

    Acian BetonKolomBalok

    Benangan Beton4

    V PEKERJAAN KERAMIK Lantai keramik 40 x 40 cm

    Ruang Kelas 7.85 6.85

    Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga)teras 36.13 1.45

    28.9 1.35

  • bawah tangga 6.7 3.85Bordes 3.85 1.5Anak Tanggatanjakan 0.18 1.8pijakan 0.3 1.8

    Plint keramik 10 x 40 cmKelas 82.8Tangga 16.8Teras 24.475

    Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM) 7.85 6.85Pengurangan dinding 63.21 0.15

    Keramik Dinding 30 x 60 cm (Dinding KM)km siswa 5.8 2.75Pengurangan PV 0.8 2.1BV 0.65 0.5

    Km guru 6.9 2.75Pengurangan PV 0.8 2.1PVK 0.9 2.1

    wastafel guru 12.8 2.7510.4 2.75

    Pengurangan PV 0.8 2.1gawangan 0.8 2.1PS

    wastafel + urinoir siswa 10.4 2.75Pengurangan PV 0.8 2.1BV 0.7 0.5

    VI PEKERJAAN PLAFOND1 Pasang Plafon Kalsiboard 6 mm rangka Hollow 7.85 6.85

    Pengurangan dinding 63.21 0.15

    2 Pasang List Plafond Gypsum 123.8

    VI PEKERJAAN PINTU DAN JENDELA DAN PENGUNCIPas. Kusen Type P2

    Kusen 4" Horisontal 3Kusen 4" Vertical 5.94Pintu Wpc L=140cm T=210cm 1Kisi-Kisi 0.86

    Pas. Kusen Type J1Kusen 4" Vertical 7.6Kusen 4" Horisontal 7.95

  • Kusen Slimar 12.8Kisi-Kisi 0.3Kaca Bening 5mm 1.89

    Pas. Kusen Type J2Kusen 4" Vertical 4.56Kusen 4" Horisontal 4.05Kusen Slimar 6.4Kisi-Kisi 0.3Kaca Bening 5mm 1.26

    Pas. Kusen Type PVKusen 4" Vertical 5.36Kusen 4" Horisontal 1.6Pintu WPC L=70cm T=210cm 1

    Pas. Kusen Type PVKKusen 4" Vertical 5.36Kusen 4" Horisontal 2Pintu WPC L=90cm T=210cm 1

    Pas. Kusen Type BVKusen 4" Vertical 1Kusen 4" Horisontal 1.6Kaca Bening 5mm 0.4

    VII PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASARPas. Sunscreen 3.4

    Railing Tangga Besi Hollow 9.2 0.9VIII PEKERJAAN PENGECATAN

    Cat Dinding Tembok Interior (Enamel/spotless)Ruang Kelas 29.3 3.8dak ekspose 6.85 7.85Area Tangga 17.55 3.8Factor PengurangP2 2.68 1.5J1 2.65 1.52J2 1.52 1.35

    Cat Dinding Tembok Exterior (Weathershield)Ruang Kelas 87.6 4Kolom K2 1 4Kolom K1 1.6 4

    Factor PengurangP2 2.68 1.5J1 2.65 1.52J2 1.52 1.35BV 0.7 0.5PVK 1 2.1

    Cat Plafond Interior (Enamel/spotless)

  • Cat Plafond Exterior (Weathershield)Plafond InteriorPlafond Exterior

    teras 36.4 1.4528.9 1.33

    Cat Besi Railing Tangga Waterproofing Plat Level

    Area Toilet 7.85 6.85Canoipy J1 3.15 1.2 0.1Canoipy BV2 1.6 1.2 0.1Canopy BV 1.1 1.2 0.1

    IX PEKERJAAN INSTALASI LISTRIK Instalasi Titik Lampu + fitting lampu Instalasi Titik Stop Kontak + Stop Kontak Pemasangan Saklar Tunggal Pemasangan Saklar Ganda Pemasangan Panel Box MCB 9 Modul

    X PEKERJAAN SANITAIR & INSTALASI AIR Pemasangan Pipa Air Bersih PVC Type AW 3/4"

    Up 32.5Down 18.6

    Pemasangan Pipa Air Kotor PVC Type D 3" 35.63

    Pemasangan Pipa Air Kloset PVC Type D 4" 46.76 Kloset JongkokKloset Duduk Pasang Kran Air Pasang Avour Wastafel + Kran + CerminUrinoir + Sekat Septic Tank Beton Kap. 3 m3 eks Fabrikan Sumur ResapanPompa elektric (kapasitas hisap 30m,dorong 30m )

  • RINCIAN PEKERJAAN

    JUMLAH LUAS TOTAL VOLUME

    6 7 8.00 9

    4 56 224.00 117.00 117

    131

    22 18.70 18.70 7 3.50 3.50

    22.2051 510.00 510.00 38

    244 107.55 4

    13.19 56.06

    176.79

    22 1.32 7 0.22

    1.549 4.05 2 0.08 8 0.26 2 0.03 2 0.09

    4.52 4.5218 0.65 14 0.53

    1.17 1.171 0.04 0.04

    7.27

    0.80520.5511 1.36 1.36

    22 1.32 7 0.22

  • 1.549 4.05 2 0.08 8 0.26 2 0.03 2 0.09

    4.52 4.5218 0.65 14 0.53

    1.17 1.171 0.04 0.04

    7.27

    3 8.07 8.07 2 0.05 0.10 0.16 4 0.015 0.06

    7.91

    1 2.69 2.69 1 0.05 0.05 0.11 4 0.015 0.06

    2.58

    1 1.32 1.32 4 0.015 0.06 0.06

    1.26

    5.61 5.61 9 0.05 0.45 1.03 7 0.06 0.42 1 0.16 0.16

    4.58 16.32

    51 0.1256 76.87 76.8672

    22 10.56 10.567 1.79 1.79

    9 7.43 2 0.78 8 2.63 2 0.33 2 0.92

    12.08

    18 5.18 13 3.90 1 0.33

    9.421 0.30 0.30

  • 22 7.36 16.19 16.19 161.92

    7 4.6 2.01 2.01 32.2

    23 1.728 1.19 1.19 39.744233.864

    1.59 9.9 7.43 89.12 4.65 0.78 9.38 3.945 2.63 31.562 1.995 0.33 3.99

    11.16 133.95

    1.218 4.32 5.18 77.7614 4.5 4.20 63

    9.38 140.76

    2 0.28 0.280.7

    2.576 5.152

    9 0.78 0.31 1.08 1.08

    0.649 2.304 0.78 20.736

    8.1664 0.31 8.1664 1.08 1.08 28.9024

    6 2.27 4 0.77 2 0.26

    3.30 3.30

    16 23.76 1 0.12 7 8.66 2 1.22 1 0.09 1 0.70

    34.32 34.32

    1.67 0.82

    22 0.027 1.07 3.56 3.56

  • 13 175.50 4 96.36 21.61 116.94 13.2

    15.18 6.4 403.98 403.98 26.6

    9 36.25 PINTU SAP TIDAK ADA3 6.16 3 12.06 1 0.20 8 1.25

    10 3.50 59.41 59.41

    344.57

    1 120.10 120.10 120.10

    1 1.86 8 11.86

    13.72 13.72

    106.38

    689.13 689.13 212.76 212.762 689.13 689.133

    54 216.00 44 176.00

    - 392.00

    233.86 308.76 542.63 162.79

    19 76 304.00 91.20

    3 161.32

    52.39 39.02

  • 25.80 5.78

    22 7.13 22 11.88

    141.98 141.98

    82.80 16.80 24.48 124.08 124.08

    53.77 9.48 44.29 44.29

    6 95.7 84.97 6 10.082 0.65

    3 56.925 51.68 2 3.361 1.89

    1 35.2 53.72 1 28.64 6.722 3.36

    2 57.2 41.66 8 13.446 2.1

    232.03 232.03

    53.77 44.29 9.48

    123.80

  • 7 23.80 23.80 23.8 8.28 8.28

    3 334.02 562.03 3 161.32 1 66.69

    3 12.06 9 36.25 3 6.16

    54.47 54.47 507.56

    350.40 7 28.00 1 6.40

    384.80 384.80

    3 12.06 9 36.25 3 6.16

    10 3.50 1 2.10

    60.07 60.07 324.73

    44.29

  • 52.78 91.22 38.44

    8.28

    53.77 6 2.27 4 0.77 2 0.26

    57.07 57.07

    38201151

    32.50 18.60 51.10 51.1 35.63 35.63 35.63 46.76 46.76 6.00 6 3.00 3 6.00 6 9.00 9 3.00 3 3.00 3 1.00 1 1.00 1 1.00 1

  • RINCIAN PEKERJAAN

    KEGIATAN : Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan TahunPEKERJAAN : BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 59)LOKASI : SDN PAKIS 1, 2, 9 Surabaya

    NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI

    1 2 3 4 5

    PEKERJAAN LANTAI 2I PEKERJAAN BETON

    Kolom K1 40/40 0.4 0.4 4

    Kolom K2 25/25 0.25 0.25 4

    Kolom Praktis KP 12/12 0.12 0.12 3.6

    Balok B1 25/50keliling balokbalok memanjang AS 1-2 6.6 0.25 0.5

    3.1 0.25 0.5balok memanjang AS 2-3 2.63 0.25 0.5

    1.33 0.25 0.5

    Balok B2 20/40keliling balokbalok As 1 & 2 3.6 0.2 0.4

    3.75 0.2 0.4

    Balok B3 15/25 3.68 0.15 0.25keliling balok

    Balok Latei BL 12/20BL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Balok Level BLV 12/20keliling balokBL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Plat Level tebal 10 cm3.15 1.2 0.11.6 1.2 0.11.1 1.2 0.1

    Plat Lantai tebal 12 cm Type A 3.75 3.3 0.12Pengurangan sap 0.6 1.6 0.12

  • koridor 3.75 2.75 0.123.75 1.36 0.120.57 1.35 0.12

    depan tangga 3.75 1.55 0.12

    Tangga 7.725 1.8 0.12Bordes 3.85 1.78 0.12Anak Tangga 1.8 0.3 0.18

    IV PEKERJAAN PASANGAN & PLESTERAN Pasangan Dinding biasa 1/2 bata (1pc : 5ps)

    As A, B 3.6 3.75As 1 - 6 6.6 3.65Kamar Mandi 63.21 1.85Dinding Pot Taman 25.3 0.6Dinding selasar 28.9 1

    Factor PengurangJ1 2.65 1.52J2 1.52 1.35P2 2.68 1.5PVK 0.2 0.98PV 0.2 0.78BV 0.7 0.5

    Pasangan Dinding Trasram 1/2 bata (1pc : 3ps)Kamar Mandi 63.21 1.9

    Factor PengurangPVK 1.9 0.98PV 1.9 0.78

    Plesteran Halus biasa (1pc : 5ps) Plesteran Halus trasram (1pc : 3ps) Acian Dinding

    Benangan dindingAs A 4As B 4

    Acian BetonKolom

  • Balok

    Benangan Beton4

    V PEKERJAAN KERAMIK Lantai keramik 40 x 40 cm

    Ruang Kelas 7.85 6.85

    Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga)teras 36.13 1.45

    28.9 1.35bawah tangga 6.7 3.85Bordes 3.85 1.5Anak Tanggatanjakan 0.18 1.8pijakan 0.3 1.8

    Plint keramik 10 x 40 cmKelas 82.8Tangga 16.8Teras 24.475

    Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM) 7.85 6.85Pengurangan dinding 63.21 0.15

    Keramik Dinding 30 x 60 cm (Dinding KM)km siswa 5.8 2.75Pengurangan PV 0.8 2.1BV 0.65 0.5

    Km guru 6.9 2.75Pengurangan PV 0.8 2.1PVK 0.9 2.1

    wastafel guru 12.8 2.7510.4 2.75

    Pengurangan PV 0.8 2.1gawangan 0.8 2.1PS

    wastafel + urinoir siswa 10.4 2.75Pengurangan PV 0.8 2.1BV 0.7 0.5

    VI PEKERJAAN PLAFOND1 Pasang Plafon Kalsiboard 6 mm rangka Hollow 7.85 6.85

    Pengurangan dinding 63.21 0.15

  • 2 Pasang List Plafond Gypsum 123.8

    VI PEKERJAAN PINTU DAN JENDELA DAN PENGUNCIPas. Kusen Type P2

    Kusen 4" Horisontal 3Kusen 4" Vertical 5.94Pintu Wpc L=140cm T=210cm 1Kisi-Kisi 0.86

    Pas. Kusen Type J1Kusen 4" Vertical 7.6Kusen 4" Horisontal 7.95Kusen Slimar 12.8Kisi-Kisi 0.3Kaca Bening 5mm 1.89

    Pas. Kusen Type J2Kusen 4" Vertical 4.56Kusen 4" Horisontal 4.05Kusen Slimar 6.4Kisi-Kisi 0.3Kaca Bening 5mm 1.26

    Pas. Kusen Type PVKusen 4" Vertical 5.36Kusen 4" Horisontal 1.6Pintu WPC L=70cm T=210cm 1

    Pas. Kusen Type PVKKusen 4" Vertical 5.36Kusen 4" Horisontal 2Pintu WPC L=90cm T=210cm 1

    Pas. Kusen Type BVKusen 4" Vertical 1Kusen 4" Horisontal 1.6Kaca Bening 5mm 0.4

    VII PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASARPas. Sunscreen 3.4

    Railing Tangga Besi Hollow 9.2 0.9VIII Cat Dinding Tembok Interior (Enamel/spotless)

    Cat Dinding Tembok Interior (Enamel/spotless)Ruang Kelas 29.3 3.8dak ekspose 6.85 7.85Area Tangga 17.55 3.8Factor PengurangP2 2.68 1.5J1 2.65 1.52J2 1.52 1.35

    Cat Dinding Tembok Exterior (Weathershield)Ruang Kelas 87.6 4Kolom K2 1 4

  • Kolom K1 1.6 4

    Factor PengurangP2 2.68 1.5J1 2.65 1.52J2 1.52 1.35BV 0.7 0.5PVK 1 2.1

    Cat Plafond Interior (Enamel/spotless)

    Cat Plafond Exterior (Weathershield)Plafond InteriorPlafond Exterior

    teras 36.4 1.4528.9 1.33

    Cat Besi Railing Tangga Waterproofing Plat Level

    Area Toilet 7.85 6.85Canoipy J1 3.15 1.2 0.1Canoipy BV2 1.6 1.2 0.1Canopy BV 1.1 1.2 0.1

    Waterprofing Plat Lantai 36 736 1.45

    28.9 1.33

    IX URAIAN PEKERJAAN Instalasi Titik Lampu + fitting lampu Instalasi Titik Stop Kontak + Stop Kontak Pemasangan Saklar Tunggal Pemasangan Saklar Ganda Pemasangan Panel Box MCB 9 Modul

    X PEKERJAAN SANITAIR & INSTALASI AIR Pemasangan Pipa Air Bersih PVC Type AW 3/4"

    Up 32.5Down 18.6

    Pemasangan Pipa Air Kotor PVC Type D 3" 35.63

    Pemasangan Pipa Air Kloset PVC Type D 4" 46.76 Kloset JongkokKloset Duduk Pasang Kran Air Pasang Avour Wastafel + Kran + CerminUrinoir + Sekat

  • RINCIAN PEKERJAAN

    JUMLAH LUAS TOTAL VOLUME

    6 7 8 9

    22 6.4 14.08 14.08

    7 4 1.75 1.75

    23 1.728 1.19 1.19

    1.59 9.9 7.43 2 4.65 0.78 8 3.945 2.63 2 1.995 0.33

    11.16

    1.218 4.32 5.18 14 4.5 4.20

    9.38

    2 0.28 0.280.7

    2.576

    9 0.78 0.31 1.08 1.08

    0.649 2.304 0.78

    8.1664 0.31 1.08 1.08

    6 2.27 4 0.77 2 0.26

    3.30 3.30

    16 23.76 1 0.12

  • 7 8.66 2 1.22 1 0.09 1 0.70

    34.32 34.32

    1.67 0.82

    22 0.027 1.07 3.56 3.56

    13 175.50 4 96.36 1 116.94

    15.18 28.90 432.88 432.88

    9 36.25 3 6.16 3 12.06 1 0.20 8 1.25

    10 3.50 59.41 59.41

    373.47

    1 120.10 120.10 120.10

    1 1.86 8 11.86

    13.72 13.72

    106.38

    746.93 746.93 212.76 212.762 746.93 746.933

    54 216.00 44 176.00

    - 392.00

    233.86

  • 308.76 542.63 162.79

    19 76 304.00 91.20

    3 161.32

    52.39 39.02 25.80 5.78

    22 7.13 22 11.88

    141.98 141.98

    82.80 16.80 24.48 124.08 124.08

    53.77 9.48 44.29 44.29

    6 95.7 84.97 6 10.082 0.65

    3 56.925 51.68 2 3.361 1.89

    1 35.2 53.72 1 28.64 6.722 3.36

    2 57.2 41.66 8 13.446 2.1

    232.03 232.03

    53.77 44.29 9.48

  • 123.80

    7 23.80 23.80 23.8 8.28 8.28

    3 334.02 562.03 3 161.32 1 66.69

    3 12.06 9 36.25 3 6.16

    54.47 54.47 507.56

    350.40 7 28.00

  • 1 6.40 384.80 384.80

    3 12.06 9 36.25 3 6.16

    10 3.50 1 2.10

    60.07 60.07 324.73

    44.29

    52.78 91.22 38.44

    8.28

    53.77 6 2.27 4 0.77 2 0.26 57.07

    25252.2

    38.437 342.64

    38201151

    32.50 18.60 51.10 51.1 35.63 35.63 35.63 46.76 46.76 6.00 6 3.00 3 6.00 6 9.00 9 3.00 3 3.00 3

  • -0.504

  • KEGIATAN : Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan TahunPEKERJAAN : BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 59)

    LOKASI : SDN PAKIS 1, 2, 9 Surabaya

    NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI

    1 2 3 4 5PEKERJAAN LANTAI 3

    PEKERJAAN BETON

    Kolom K1 40/40 0.4 0.4 4.6

    Kolom K2 25/25 0.25 0.25 4.6

    Kolom Praktis KP 12/12 0.12 0.12 3.6

    Balok B1 25/50balok memanjang AS 1-2 6.6 0.25 0.5

    3.1 0.25 0.5balok memanjang AS 2-3 2.63 0.25 0.5

    1.33 0.25 0.5

    Balok B2 20/40balok As 1 & 2 3.6 0.2 0.4

    3.75 0.2 0.4

    Balok B3 15/25 3.68 0.25 0.5

    Balok Latei BL 12/20BL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Balok Level BLV 12/20BL Memanjang As A 3.6 0.12 0.2BL KM 12.76 0.12 0.2

    Plat Level tebal 10 cm3.15 1.2 0.11.6 1.2 0.11.1 1.2 0.1

    Plat Lantai tebal 12 cm Type A 3.75 3.3 0.12koridor 3.75 2.75 0.12

    3.75 1.42 0.12depan tangga 3.75 1.55 0.12

    Tangga 15.45 1.8 0.12Bordes 3.85 1.78 0.12Anak Tangga 1.8 0.3

  • PEKERJAAN PASANGAN & PLESTERAN Pasangan Dinding biasa 1/2 bata (1pc : 5ps)

    As A, B 3.6 3.65As 1 - 6 6.6 3.65Kamar Mandi 63.21 3.65Dinding Pot Taman 25.3 0.6

  • JUMLAH LUAS TOTAL VOLUME

    6 7 8 9

    22 16.19 16.19

    7 2.01 2.01

    23 1.19 1.19

    9 7.43 2 0.78 8 2.63 2 0.33

    11.16

    18 5.18 14 4.20

    9.382 0.92 0.92

    9 0.78 0.31 1.08 1.08

    9 0.78 0.31 1.08 1.08

    6 2.27 4 0.77 2 0.26

    3.30 3.30

    16 23.76 7 8.66 2 1.28 1 0.70

    34.40 34.40

    3.34 0.82

    22 11.88 11.88 16.04 16.04

  • 13 170.82 4 96.36 1 230.72

    15.18 513.08 513.08

  • RINCIAN PEKERJAAN

    KEGIATAN : Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan TahunPEKERJAAN : BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 17)LOKASI : SDN PAKIS 1,2,9 Surabaya

    NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    1 2 4 5 6

    A PEKERJAAN LANTAI 1

    I PEKERJAAN PENDAHULUAN1 Pembongkaran Ruang Kelas, R.Kelas & R.TU (4 ruang, = 224 M2) 1.00 ls 3,900,000.00 3,900,000.00 2 Pembongkaran Pertemuan Pondasi Pertitik 1.00 ls 750,000.00 750,000.00 3 Uitzet dan Pemasangan bowplank 29.00 titik 104,293.57 3,024,513.57 4 Pembuangan bekas bongkaran & galian keluar proyek 1.00 ls 3,900,000.00 3,900,000.00

    JUMLAH I 11,574,513.57

    II PEKERJAAN TANAH1 Galian Tanah Konstruksi 22.20 m3 69,250.00 1,537,350.00 2 Galian Pondasi Bor Pile 40cm - 10m (Alat) 510.00 m3 101,125.40 51,573,954.00 3 Urugan Sirtu Padat 176.79 m3 185,200.00 32,740,998.70 4 Urugan Pasir Padat Bawah Pondasi 1.54 m3 177,700.00 274,368.80 5 Pondasi Rolak Pot Taman 1.36 m3 1,016,382.00 1,378,518.91

    JUMLAH II 87,505,190.41

    III PEKERJAAN PONDASI & BETON1 Rabat Beton Tebal 5 cm Bawah Pondasi & Sloof K175 7.27 m3 879,675.42 6,395,460.25 2 Rabat Beton Tebal 5 cm Bawah Lantai K175 16.32 m3 879,675.42 14,355,181.34 3 K250 76.87 m3 2,106,168.32 161,895,261.48 4 Poer P1 K250 10.56 m3 2,250,783.02 23,768,268.70 5 Poer P2 K250 1.79 m3 3,240,158.74 5,806,364.46 6 Sloof S1 25/50 K250 12.08 m3 3,718,450.44 44,928,177.47 7 Sloof S2 20/40 K250 9.42 m3 3,675,476.85 34,617,111.14 8 Sloof SL Tangga 20/40 K250 0.30 m3 3,675,476.85 1,102,643.05 9 Kolom K1 40/40 K250 16.19 m3 4,243,586.41 68,712,151.14

    10 Kolom K2 25/25 K250 2.01 m3 4,793,580.98 9,647,081.72 11 Kolom Praktis KP 12/12 K250 1.19 m3 5,906,246.12 7,042,135.37 12 Balok B1 25/50 K250 11.16 m3 5,134,926.90 57,318,621.50 13 Balok B2 20/40 K250 9.38 m3 5,782,954.70 54,267,246.88 14 Balok B3 15/25 K250 0.28 m3 6,791,354.23 1,874,413.77 15 Balok Latei BL 12/20 K250 1.08 m3 6,708,443.83 7,270,879.76 16 Balok Level BLV 12/20 K250 1.08 m3 7,217,237.17 7,822,330.33 17 Plat Level tebal 10 cm K250 3.30 m3 5,081,251.09 16,768,128.59 18 Plat Lantai tebal 12 cm Type A K250 34.32 m3 4,933,151.39 169,311,379.47 19 Tangga K250

    Plat Tangga 2.49 m3 5,139,895.32 12,803,273.65 Anak Tangga 1.07 m3 3,298,373.79 3,526,621.26

    JUMLAH III 709,232,731.34

    IV PEKERJAAN PASANGAN & PLESTERAN1 Pasangan Dinding biasa 1/2 bata (1pc : 5ps) 344.57 m2 109,980.60 37,895,630.41 2 Pasangan Dinding Trasram 1/2 bata (1pc : 3ps) 106.38 m2 115,890.40 12,328,536.64 3 Plesteran Halus biasa (1pc : 5ps) 689.13 m2 54,746.28 37,727,468.18 4 Plesteran Halus trasram (1pc : 3ps) 212.76 m2 57,976.92 12,335,285.45 5 Acian Dinding 689.13 m2 33,605.00 23,158,314.47 6 Benangan 392.00 m1 17,676.00 6,928,992.00 7 Acian Beton (30%) 162.79 m2 33,605.00 5,470,508.21 8 Benangan Beton (30%) 91.20 m1 17,676.00 1,612,051.20

    JUMLAH IV 137,456,786.56

    Bor Pile 40cm - 10m

  • NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    1 2 4 5 6

    V PEKERJAAN KERAMIK1 Lantai keramik 40 x 40 cm 161.32 m2 221,555.00 35,740,698.71 2 Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga) 141.98 m2 226,859.00 32,209,781.11 3 Plint keramik 10 x 40 cm 124.08 m1 28,032.80 3,478,169.66 4 Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM) 44.29 m2 215,327.00 9,537,048.16 5 Keramik Dinding 30 x 60 cm (Dinding KM) 232.03 m2 328,214.00 76,153,853.35

    JUMLAH V 157,119,550.99

    VI PEKERJAAN PLAFOND1 Pasang Plafon Kalsiboard 6 mm rangka Hollow 44.29 m2 Rp 112,561.69 Rp 4,985,469.86 2 Pasang List Plafond Gypsum 123.80 m2 Rp 19,891.00 Rp 2,462,505.80

    JUMLAH V 7,447,975.66

    VII PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI1 Pas. Kusen Type P2 3.00 unit 2,813,720.77 8,441,162.31 2 Pas. Kusen Type J1 9.00 unit 3,482,470.05 31,342,230.44 4 Pas. Kusen Type J2 3.00 unit 1,768,105.10 5,304,315.31 5 Pas. Kusen Type PV 8.00 unit 2,249,361.59 17,994,892.72 6 Pas. Kusen Type PVK 1.00 unit 2,249,361.59 2,249,361.59 7 Pas. Kusen Type BV 10.00 unit 333,433.50 3,334,335.00

    JUMLAH VII 68,666,297.37

    VIII PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR1 Pas. Sunscreen 23.80 m1 485,916.00 11,564,800.80 2 Railing Tangga Besi Hollow 8.28 m2 338,308.25 2,801,192.31

    JUMLAH VIII 14,365,993.11

    IX PEKERJAAN PENGECATAN1 Cat Dinding Tembok Interior (Enamel/spotless) 507.56 m2 25,481.44 12,933,345.73 2 Cat Dinding Tembok Exterior (Weathershield) 324.73 m2 29,567.50 9,601,513.41 3 Cat Plafond Interior (Enamel/spotless) 44.29 m2 25,481.44 1,128,598.35 4 Cat Plafond Exterior (Weathershield) 91.22 m2 29,567.50 2,697,058.65 5 Cat Besi Railing Tangga 8.28 m2 63,214.00 523,411.92 6 Waterproofing Plat Level 57.07 m2 30,410.00 1,735,574.73

    JUMLAH IX 28,619,502.78

    X PEKERJAAN INSTALASI LISTRIK1 Instalasi Titik Lampu + fitting lampu 38.00 bh 215,330.00 8,182,540.00 2 Instalasi Titik Stop Kontak + Stop Kontak 20.00 bh 114,189.10 2,283,782.00 3 Pemasangan Saklar Tunggal 11.00 bh 32,439.10 356,830.10 4 Pemasangan Saklar Ganda 5.00 bh 41,539.10 207,695.50 5 Pemasangan Panel Box MCB 9 Modul 1.00 unit 871,725.50 871,725.50

    JUMLAH X 11,902,573.10

    XI PEKERJAAN SANITAIR & INSTALASI AIR1 Pemasangan Pipa Air Bersih PVC Type AW 3/4" 51.10 m1 17,122.20 874,944.42 2 Pemasangan Pipa Air Kotor PVC Type D 3" 35.63 m1 33,502.20 1,193,683.39 3 Pemasangan Pipa Air Kloset PVC Type D 4" 46.76 m1 45,502.20 2,127,682.87 4 Kloset Jongkok 6.00 bh 721,415.00 4,328,490.00 5 Kloset Duduk 3.00 bh 2,531,395.00 7,594,185.00 6 Jet Shower 3.00 bh 782,395.00 2,347,185.00 7 Pasang Kran Air 6.00 bh 49,725.00 298,350.00 8 Pasang Avour 9.00 bh 34,225.00 308,025.00 9 Wastafel + Kran + Cermin 3.00 bh 823,255.00 2,469,765.00

    10 Urinoir + Sekat 3.00 bh 1,675,015.00 5,025,045.00 11 Septic Tank Beton Kap. 3 m3 eks Fabrikan 1.00 Unit 3,600,000.00 3,600,000.00 12 Sumur Resapan 1.00 bh 3,045,923.41 3,045,923.41 13 Pompa elektric (kapasitas hisap 30m,dorong 30m ) 1.00 Unit 966,725.00 966,725.00

    JUMLAH X 34,180,004.09

    JUMLAH A 1,268,071,118.97

  • NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    1 2 4 5 6

    B PEKERJAAN LANTAI 2

    I PEKERJAAN BETON1 Kolom K1 40/40 K250 14.08 m3 4,243,586.41 59,749,696.65 2 Kolom K2 25/25 K250 1.75 m3 4,793,580.98 8,388,766.71 3 Kolom Praktis KP 12/12 K250 1.19 m3 5,906,246.12 7,042,135.37 4 Balok B1 25/50 K250 11.16 m3 5,134,926.90 57,318,621.50 5 Balok B2 20/40 K250 9.38 m3 5,782,954.70 54,267,246.88 6 Balok B3 15/25 K250 0.28 m3 954,607.25 263,471.60 7 Balok Latei BL 12/20 K250 1.08 m3 6,708,443.83 7,270,879.76 8 Balok Level BLV 12/20 K250 1.08 m3 7,217,237.17 7,822,330.33 9 Plat Level tebal 10 cm K250 3.30 m3 5,081,251.09 16,768,128.59

    10 Plat Lantai tebal 12 cm Type A K250 34.32 m3 4,933,151.39 169,311,379.47 11 Tangga K250

    Plat Tangga 2.49 m3 5,139,895.32 12,803,273.65 Anak Tangga 1.07 m3 3,298,373.79 3,526,621.26

    JUMLAH I 404,532,551.77

    II PEKERJAAN PASANGAN & PLESTERAN1 Pasangan Dinding biasa 1/2 bata (1pc : 5ps) 373.47 m2 109,980.60 41,074,069.75 2 Pasangan Dinding Trasram 1/2 bata (1pc : 3ps) 106.38 m2 115,890.40 12,328,536.64 3 Plesteran Halus biasa (1pc : 5ps) 746.93 m2 54,746.28 40,891,803.16 4 Plesteran Halus trasram (1pc : 3ps) 212.76 m2 57,976.92 12,335,285.45 5 Acian Dinding 746.93 m2 33,605.00 25,100,683.47 6 Benangan 392.00 m1 17,676.00 6,928,992.00 7 Acian Beton (30%) 162.79 m2 33,605.00 5,470,508.21 8 Benangan Beton (30%) 91.20 m1 17,676.00 1,612,051.20

    JUMLAH II 145,741,929.88

    III PEKERJAAN KERAMIK1 Lantai keramik 40 x 40 cm 161.32 m2 221,555.00 35,740,698.71 2 Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga) 141.98 m2 226,859.00 32,209,781.11 3 Plint keramik 10 x 40 cm 124.08 m1 28,032.80 3,478,169.66 4 Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM) 44.29 m2 215,327.00 9,537,048.16 5 Keramik Dinding 30 x 60 cm (Dinding KM) 232.03 m2 328,214.00 76,153,853.35

    JUMLAH III 157,119,550.99

    VI PEKERJAAN PLAFOND1 Pasang Plafon Kalsiboard 6 mm rangka Hollow 44.29 m2 Rp 112,561.69 Rp 4,985,469.86 2 Pasang List Plafond Gypsum 123.80 m2 Rp 19,891.00 Rp 2,462,505.80

    JUMLAH V 7,447,975.66

    IV PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI1 Pas. Kusen Type P2 3.00 unit 2,813,720.77 8,441,162.31 2 Pas. Kusen Type J1 9.00 unit 3,482,470.05 31,342,230.44 3 Pas. Kusen Type J2 3.00 unit 1,768,105.10 5,304,315.31 4 Pas. Kusen Type PV 8.00 unit 2,249,361.59 17,994,892.72 5 Pas. Kusen Type PVK 1.00 unit 2,249,361.59 2,249,361.59 6 Pas. Kusen Type BV 10.00 unit 333,433.50 3,334,335.00

    JUMLAH V 68,666,297.37

    V PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR1 Pas. Sunscreen 23.80 m1 485,916.00 11,564,800.80 2 Railing Tangga Besi Hollow 8.28 m2 338,308.25 2,801,192.31

    JUMLAH VI 14,365,993.11

    VI PEKERJAAN PENGECATAN1 Cat Dinding Tembok Interior (Enamel/spotless) 507.56 m2 25,481.44 12,933,345.73 2 Cat Dinding Tembok Exterior (Weathershield) 384.80 m2 29,567.50 11,377,574.00 3 Cat Plafond Interior (Enamel/spotless) 44.29 m2 25,481.44 1,128,598.35 4 Cat Plafond Exterior (Weathershield) 91.22 m2 29,567.50 2,697,058.65 5 Cat Besi Railing Tangga 8.28 m2 63,214.00 523,411.92 6 Waterproofing Plat Level 57.07 m2 30,410.00 1,735,574.73 7 Waterproofing Plat Atap 342.64 m2 30,410.00 10,419,591.17

    JUMLAH VII 40,815,154.54

    VII PEKERJAAN INSTALASI LISTRIK

  • NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    1 2 4 5 61 Instalasi Titik Lampu + fitting lampu 38.00 bh 215,330.00 8,182,540.00 2 Instalasi Titik Stop Kontak + Stop Kontak 20.00 bh 114,189.10 2,283,782.00 3 Pemasangan Saklar Tunggal 11.00 bh 32,439.10 356,830.10 4 Pemasangan Saklar Ganda 5.00 bh 41,539.10 207,695.50 5 Pemasangan Panel Box MCB 9 Modul 1.00 unit 871,725.50 871,725.50

    JUMLAH VIII 11,902,573.10

    VIII PEKERJAAN SANITAIR & INSTALASI AIR1 Pemasangan Pipa Air Bersih PVC Type AW 3/4" 51.10 m1 17,122.20 874,944.42 2 Pemasangan Pipa Air Kotor PVC Type D 3" 35.63 m1 33,502.20 1,193,683.39 3 Pemasangan Pipa Air Kloset PVC Type D 4" 46.76 m1 45,502.20 2,127,682.87 4 Kloset Jongkok 6.00 bh 721,415.00 4,328,490.00 5 Kloset Duduk 3.00 bh 2,531,395.00 7,594,185.00 6 Jet Shower 3.00 bh 782,395.00 2,347,185.00 7 Pasang Kran Air 6.00 bh 49,725.00 298,350.00 8 Pasang Avour 9.00 bh 34,225.00 308,025.00 9 Wastafel + Kran + Cermin 3.00 bh 823,255.00 2,469,765.00

    10 Urinoir + Sekat 3.00 bh 1,675,015.00 5,025,045.00 JUMLAH VIII 26,567,355.68

    JUMLAH B 877,159,382.10

    C PEKERJAAN LANTAI 3

    I PEKERJAAN BETON1 Kolom K1 40/40 K250 14.08 m3 4,243,586.41 59,749,696.65 2 Kolom K2 25/25 K250 1.75 m3 4,793,580.98 8,388,766.71 3 Kolom Praktis KP 12/12 K250 1.19 m3 5,906,246.12 7,042,135.37 4 Balok B1 25/50 K250 11.16 m3 5,134,926.90 57,318,621.50

    JUMLAH I 132,499,220.23

    III PEKERJAAN LAIN-LAIN1 Pembersihan Akhir 1.00 ls 975,000.00 975,000.00 2 Pekerjaan Penutup Tangga Lt. 2 (Sementara) 1.00 ls 975,000.00 975,000.00

    JUMLAH II 1,950,000.00

    JUMLAH C 134,449,220.23

    JUMLAH TOTAL (A+B+C) 2,279,679,721.29

  • DAFTAR STANDAR HARGA SATUAN DASAR(SHSD)

    No Namadan Spesifikasi Satuan Harga(Rp) Keterangan1 2 3 4 5

    I MATERIAL.1 Air (Biaya air tawar) ltr Rp 30.00 2 Aluminium 4" (silver) M1 Rp 90,000.00 YKK3 Aluminium 4" (dark brown) M1 Rp 90,000.00 YKK4 Aluminium 4" (brown) M1 Rp 90,000.00 YKK5 Aluminium 4" (powder coating) M2 Rp 100,000.00 YKK6 Aluminium 3" (silver) M1 Rp 90,000.00 YKK7 Aluminium 3" (dark brown) M1 Rp 90,000.00 YKK8 Aluminium 3" (brown) M1 Rp 90,000.00 YKK9 Aluminium 3" (powder coating) M2 Rp 100,000.00 YKK10 Aluminium Composite Panel 1,22x2,44 (0.21PVDV) lembar Rp 192,000.00 goldstar11 Aluminium Composite Panel 1,22x2,44 (0.21PVDV) lembar Rp 192,000.00 alumebond12 Aluminium Composite Panel 1,22x2,44 (0.21 PE) lembar Rp 204,000.00 Alustar13 Aluminium Composite Panel 1,22x2,44 (0.3 PVDV) lembar Rp 264,000.00 Alustar14 Aluminium Composite Panel 1,22x2,44 (0.21 PE) lembar Rp 204,000.00 seven15 Aluminium Composite Panel 1,22x2,44 (0.3 PVDV) lembar Rp 264,000.00 seven16 Aluminium Composite Panel 1,22x2,44 (0.5 PVDV) lembar Rp 324,000.00 seven17 Aluminium Composite Panel 1,22x2,44 (0.21 PE) lembar Rp 264,000.00 New Alucopan18 Aluminium Composite Panel 1,22x2,44 (0.21PVDV) lembar Rp 312,000.00 New Alucopan19 Aluminium Composite Panel 1,22x2,44 (0.5 PVDV) lembar Rp 384,000.00 Alcopla20 Aluminium Composite Panel 1,22x2,44 (0.3 PVDV) lembar Rp 570,000.00 Alucobond21 Aluminium Composite Panel 1,22x2,44 (0.5 PVDV) lembar Rp 636,000.00 Alucobond22 Aluminium Composite Panel 1,22x2,44 (0.21PVDV) lembar Rp 192,000.00 marks23 Kisi-kisi Aluminium Profil Z m1 Rp 13,500.00 24 Asbes datar Tb. 4 mm (1x1m) Lembar Rp 16,000.00 Djabesment25 Asbes gelombang besar M2 Rp 35,000.00 Djabesment26 Asbes gelombang kecil (150x108x0,5 cm) M2 Rp 35,371.43 Djabesment27 Asbes gelombang kecil (180x108x0,5 cm) M2 Rp 36,352.94 Djabesment28 Asbes gelombang kecil (210x108x0,5 cm) M2 Rp 33,375.00 Djabesment29 Asbes gelombang kecil (150x108x0,4 cm) M2 Rp 27,714.29 Djabesment30 Asbes gelombang kecil (180x108x0,4 cm) M2 Rp 27,364.71 Djabesment31 Asbes gelombang kecil (210x108x0,4 cm) M2 Rp 27,000.00 Djabesment32 Aqua Proof kg Rp 45,500.00 No drop33 Angkur dia 12mm kg Rp 14,000.00 Hi Steel34 Avour bh Rp 17,500.00 axel35 Wuwung asbes gelombang besar m1 Rp 55,000.00 Djabesment36 Wuwung asbes gelombang kecil m1 Rp 29,500.00 Djabesment37 Batu ampyang m2 Rp 29,300.00 Rockindo38 Batu alam m2 Rp 32,100.00 Rockindo39 Batu bobos uk10x20x1,5cm m2 Rp 123,500.00 Rockindo40 Batu Gilang ex jember uk.20x20cm m2 Rp 76,500.00 Rockindo41 Batu Gilang ex jember m2 Rp 72,000.00 Rockindo42 Batu Gilang ex Cirebon uk. 20x20 m2 Rp 103,600.00 Rockindo43 Batu Gilang ex Cirebon m2 Rp 60,700.00 Rockindo44 Batu hias m2 Rp 80,300.00 Rockindo45 Batu kali pecah15/20 m3 Rp 140,200.00 Ex. UD. Hartono46 Batu pecah mesin 1/2 m3 Rp 250,000.00 Ex. UD. Hartono47 Batu pecah mesin 2/3 m3 Rp 150,000.00 Ex. UD. Hartono48 Batu Kali Pecah 5/7 M3 Rp 215,000.00 Ex. UD. Hartono49 Batu Kerikil M3 Rp 150,000.00 Ex. UD. Hartono50 Bataco t =10 cm Bh Rp 4,600.00 Ex. UD. Hartono51 Bata merah (kelas 1) Bh Rp 730.00 MRH52 Bata Berongga Expose Bh Rp 4,200.00 Ex. UD. Hartono53 Bata ringan m3 Rp 830,000.00 citicon54 Batu Klinker Bh Rp 28,700.00 Ex. UD. Hartono

  • 55 Baut HTB 16 mm bh Rp 3,000.00 56 Angkur dia 19mm bh Rp 30,000.00 57 Besi beton polos/ulir Kg Rp 9,200.00 Setia Agung Jaya58 Besi Wiremesh Kg Rp 18,714.04 CV. Sembilan perkasa59 Besi plat strip + baut mur Kg Rp 16,309.70 Abadi metal utama60 Besi plat strip Kg Rp 13,059.70 Abadi metal utama61 Besi plat tebal 1cm Kg Rp 26,000.00 Abadi metal utama62 Besi profil (baja konstruksi) Kg Rp 18,200.00 Abadi metal utama63 Besi profil siku 50x50x6 Kg Rp 7,300.00 Abadi metal utama64 Batu gilang ex cirebon(110x20x1,5) Kg Rp 5,200.00 Rockindo65 Bambu Bongkotan d 8-12 cm pj 3m btg Rp 22,000.00 66 Bambu Bongkotan d 8-12 cm pj 4m btg Rp 27,000.00 67 Bambu Ori 10-12Cm P j 3.00 Mt btg Rp 31,000.00 68 Besi Profil C100-150mm Kg Rp 12,500.00 69 Besi Profil WF Kg Rp 12,500.00 Abadi metal utama70 Besi Profil (Baja Konstruksi) Kg Rp 12,500.00 Abadi metal utama71 Besi Plat Bordes 4\"x8\"Tebal 3 mm kg Rp 12,500.00 Abadi metal utama72 Besi Plat Bordes 4\"x8\"Tebal 2 mm kg Rp 12,500.00 Abadi metal utama73 Besi Plat landas tb12mm kg Rp 12,500.00 Abadi metal utama74 Besi Plat Strip Pj6,00m3x30mm kg Rp 12,500.00 Abadi metal utama75 Blank Flanged 100 kg Rp 84,200.00 Global Exporter76 Box Bak Kontrol m3 Rp 1,801,200.00 Ex. UD. Hartono77 Bondek 1mmx1000mm m2 Rp 150,000.00 Bluescope78 Buis beton bulat uk. 100x50 cm bh Rp 70,000.00 Ex. UD. Hartono79 Cat Alkali Resisting Primer kg Rp 25,000.00 Jotun, dulux80 Cat Emco kg Rp 45,700.00 Emco81 Cat Genteng kg Rp 58,400.00 Avian Paint82 Cat tembok luar (5kg) Kaleng Rp 300,000.00 jotashiled, dulux weatershield83 Cat tembok dalam (5kg) Kaleng Rp 215,000.00 jotun majestic, dulux pentalite84 Cat tembok dalam spotless (2,5 ltr) kebutuhan 3,74 ltr Kaleng Rp 221,408.00 Nipo Paint85 Cat dasar (dempul tembok) Kg Rp 15,000.00 gm286 Cat dasar/primer (2,5 ltr)_kebutuhan 3,74 ltr (5kg) Kg Rp 24,600.00 dulux87 Cat Meni Besi Kg Rp 32,000.00 emco88 Cat Meni Kayu Kg Rp 46,000.00 emco89 Cat Kayu Kg Rp 43,000.00 emco90 Cat Penutup Kayu Kg Rp 20,950.00 emco91 Cerlak kg Rp 11,500.00 multi jaya92 Clear doof kg Rp 46,000.00 Suzuka93 Closed Jongkok Porselain bh Rp 300,000.00 Toto CE694 Closed Duduk Porselain bh Rp 2,000,000.00 Toto CW661jt195 Closed Duduk Porselain tanpa reservoir bh Rp 700,000.00 Toto C5096 Coating kg Rp 5,000.00 kyoto97 Coumpond kg Rp 19,000.00 Blinken98 Daun pintu PVC bh Rp 195,000.00 varian99 Daun Pintu WPC + Kaca + Finishing Politur (92x210) bh Rp 1,350,000.00

    100 Daun Pintu WPC + Finishing Politur (82x210) bh Rp 1,200,000.00 101 Daun Pintu WPC + Finishing Politur (72x210) bh Rp 1,130,000.00 102 Engsel Kuningan ARCH u Pintu Stel Rp 26,000.00 Solid103 Engsel H Stel Rp 10,000.00 Solid104 Engsel Kuningan ARCH u Jendela Stel Rp 13,500.00 Solid105 Engsel Casement u Jendela Stel Rp 40,000.00 106 Elektroda las Kg Rp 29,200.00 Badak Steel107 Elektroda baja(20%) Kg Rp 30,000.00 Badak Steel108 Elektroda baja Kg Rp 49,325.00 Badak Steel109 FBBT 100 Bh Rp 412,000.00 Maspion110 Fitting Plafond Bh Rp 42,500.00 Broco111 Fiber Glass m2 Rp 33,500.00 Sunloid112 Fitrase m2 Rp 325,600.00 Bekron113 Foam Lapisan Karet m2 Rp 49,200.00 Utama Berdikari114 Gedeg Guling m2 Rp 38,750.00

  • 115 Glangsing 25 kg (isi 150 kg sedimen) Lembar Rp 1,500.00 welttech116 Genteng flam pres jawa Bh Rp 1,750.00 PG. Genteng Press117 Genteng Kaca Bh Rp 22,000.00 M Class118 Genteng karang Pilang / Wisma Bh Rp 4,000.00 Karang Pilang119 Genteng Keramik Bh Rp 8,500.00 M class120 Genteng Galvalume lbr Rp 49,200.00 Profile Asia121 Genteng Wuwung Jawa bh Rp 4,000.00 PG. Genteng Press122 Genteng wuwung karang Pilang / Wisma Bh Rp 12,300.00 Karang Pilang123 Genteng wuwung Keramik Bh Rp 83,600.00 M class124 Genteng Wuwung Asbes Gelombang Kecil bh Rp 29,000.00 Djabesment125 GentengWuwung Galvalume bh Rp 67,525.00 Profile Asia126 Glass Blok bh Rp 16,500.00 Mulia127 Gorden Ekksklusif bh Rp 42,000.00 Famili Gorden128 Grendel Panjang bh Rp 20,000.00 Solid129 Grendel Biasa Kecil bh Rp 12,500.00 Solid130 Grendel Biasa Besar bh Rp 17,000.00 Solid131 Grendel Tanam bh Rp 102,000.00 Solid132 Grendel Ekspanyolet bh Rp 69,300.00 Solid133 Gym Floor m2 Rp 270,000.00 Connor Sport.134 Gypsumt =9mm lbr Rp 53,500.00 Jayaboard135 Gypsumt =12 mm lbr Rp 72,500.00 Jayaboard136 Kalsiboard EG Uk. 240 x 120 x 9mm Lembar Rp 146,500.00 Kalsiboard137 Kalsiboard EG Uk. 240 x 120 x 4mm Lembar Rp 72,890.00 Kalsiboard138 Kalsiboard EG Uk. 240 x 120 x 6mm Lembar Rp 106,750.00 Kalsiboard139 Kalsiplank polos Uk. 30 x 300 x 8mm Lembar Rp 52,000.00 140 Kalsiplank polos Uk. 20 x 300 x 8mm Lembar Rp 34,000.00 141 Hakangin sikutan (biasa) bh Rp 9,500.00 solid142 Hakangin sikutan (kuningan) Stel Rp 11,200.00 solid143 Hakangin Lurus bh Rp 27,200.00 solid144 Hakangin Lurus kuningan bisa disetel maju/mundur bh Rp 16,500.00 solid145 Handle + Kunci Tanam besar 2x putar kuningan bh Rp 125,000.00 146 Head Penangkal Petir bh Rp 4,720,000.00 kurn 150147 Isolator Bh Rp 30,200.00 Vickers148 Ijuk Kg Rp 10,250.00 UD lestari149 Wuwung Genteng karangPilang/Wisma Bh Rp 8,200.00 Karang Pilang150 Kaca Cermin t=5mm m2 Rp 182,000.00 Assahimass151 Kanstin BDCM 21,5 m m Rp 65,700.00 Kanstin152 KanstinTrap. Uk.15.25.40 m Rp 55,650.00 Kanstin153 Kapur pasang m3 Rp 60,000.00 154 Kapur Gamping m3 Rp 67,200.00 155 Karpet Wold Cels m2 Rp 292,500.00 156 Kawat Bendrat Kg Rp 14,500.00 Hi Steel157 Kawat Baja Hitam 10mm Kg Rp 14,000.00 Hi Steel158 Kawat Duri Pagar Kg Rp 61,000.00 Hi Steel159 Kawat Harmonika lebar 90cm m2 Rp 16,100.00 Hi Steel160 Kawat Nyamuk kasa Plastik Lebar 90 cm m2 Rp 19,000.00 Hi Steel161 Kawat Nyamuk kasa Aluminium Lebar 90 cm m2 Rp 29,500.00 Hi Steel162 Kawat Ikat m2 Rp 12,300.00 Hi Steel163 Kawat Beton Diameter 30 cm Kg Rp 14,500.00 Hi Steel164 Kayu jati reng m3 Rp 4,820,000.00 165 Dolken Kayu Gelam 8-10cm p=4m btg Rp 6,800.00 166 Kayu Jati papan klas II m3 Rp 14,900,000.00 167 Kayu Jati Balok (8/12) m3 Rp 14,584,000.00 168 Kayu Jati Balok (6/15) m3 Rp 4,822,000.00 169 Kayu Jati usuk (5/7) m3 Rp 14,584,000.00 170 Kayu Kamper Balok (6/15) m3 Rp 9,027,777.78 171 Kayu Kamper balok 8/12 m3 Rp 6,500,000.00 172 Kayu Kamper 2/20 cm m3 Rp 4,875,000.00 173 Kayu Kamper 3/30 cm m3 Rp 8,190,277.78 174 Kayu Kamper 1/3cm m3 Rp 6,250,000.00

  • 175 Kayu Kamper 1/5cm m3 Rp 4,300,000.00 176 Kayu kamper (slimar) m3 Rp 5,150,000.00 177 Kayu Kamper Usuk m3 Rp 3,300,000.00 178 Kayu Kamper reng (balok 3/5) m3 Rp 4,816,666.67 179 Kayu Meranti 3/5 m3 Rp 4,816,666.67 180 Kayu Meranti Balok 8/12 m3 Rp 5,333,333.33 181 Kayu Meranti Usuk 4/6 m3 Rp 4,166,666.67 182 Kayu Meranti Usuk balok 5/7 m3 Rp 4,160,714.29 183 Kayu Meranti (Papan 2/20) m3 Rp 5,000,000.00 184 Kayu Meranti Bekisting m3 Rp 3,500,000.00 185 Kayu Meranti papan 3/30 m3 Rp 6,162,500.00 186 Kayu usuk meranti (SKUR) m3 Rp 3,854,166.67 187 Keramik 20x20cm (motif/warna) m2 Rp 47,000.00 Asia / Roman188 Keramik 30x 30putihpolos m2 Rp 47,500.00 Asia / Roman189 Keramik 30x 30cm (motif/warna) m2 Rp 70,000.00 Asia / Roman190 Keramik 40x 40cm putih polos m2 Rp 70,000.00 Platinum / Roman191 Keramik 40x 40cm (motif/warna) m2 Rp 80,000.00 Platinum / Roman192 Keramik 40x40cm Tekstur Kasar m2 Rp 85,000.00 193 Keramik 50x 50cm putih polos m2 Rp 82,500.00 Platinum / Roman194 Keramik 50x 50cm (motif/warna) m2 Rp 86,000.00 Platinum / Roman195 Keramik 60x 60cm (motif/warna) m2 Rp 140,000.00 Platinum / Roman196 Keramik 20x 33cm putih polos m2 Rp 80,000.00 Platinum / Roman197 Keramik 20x 33cm (motif/warna) m2 Rp 65,000.00 Platinum / Roman198 Keramik 20x 50cm putih polos m2 Rp 90,000.00 Platinum / Roman199 Keramik 20x 50cm (motif/warna) m2 Rp 85,000.00 Platinum / Roman200 Keramik 30x 60cm (motif/warna) m2 Rp 152,500.00 Platinum / Roman201 Keramik tegel plint warna/motif 7,5x20 bh Rp 7,200.00 Platinum / Roman202 Keramik tegel plint warna/motif 7,5x21 bh Rp 7,200.00 Platinum / Roman203 Keramik Tegel Porselain11x11 m2 Rp 89,700.00 Mulia204 Keramik step nosing 8x30 cm bh Rp 11,000.00 Platinum / Roman205 Keramik lantai marmer m2 Rp 427,000.00 ex. Tulung Agung206 Kuku Macan bh Rp 1,000.00 Mulia207 Granite Tile 30x30 m2 Rp 245,000.00 Roman208 Granite Tile 15x60 m2 Rp 270,000.00 Roman209 Granite Tile 20x60 m2 Rp 270,000.00 Roman210 Granite Tile 30x60 m2 Rp 295,000.00 Roman211 Granite Tile 60x60 m2 Rp 270,000.00 Roman212 Granite Tile 15x90 m2 Rp 420,000.00 Roman213 Granite Tile 30x90 m2 Rp 420,000.00 Roman214 Keramik tegel trotoar m2 Rp 47,000.00 Asia tile215 Kertas gosok No. 150 Lbr Rp 8,750.00 Taiyo216 Kertas gosok No. 280 Lbr Rp 10,250.00 Taiyo217 Kran air1/2\"sun'i Bh Rp 57,000.00 sun'i218 Kran air Ex Import Bh Rp 22,300.00 Onda219 Krepyak Nako bh Rp 9,750.00 Esia220 Kuas Bh Rp 8,500.00 Eterna221 Kunci Tanam besar 2x putar kuningan Bh Rp 97,000.00 solid222 Kunci Tanam Kecil Bh Rp 75,000.00 solid223 Kaca Polost =5mm m2 Rp 90,000.00 Assahimass224 Kaca Polost =3mm m2 Rp 55,000.00 Assahimass225 Kaca Reyben t = 5 mm m2 Rp 97,200.00 Assahimass226 Kaca Gravier m2 Rp 273,000.00 Assahimass227 Kaca Stainglass m2 Rp 296,000.00 Assahimass228 Kabel NYA 1x1,5 m Rp 1,450.00 Eterna229 Kabel NYA 1x2.5 m Rp 2,300.00 Eterna230 Kabel NYA 1x4 m Rp 3,600.00 Eterna231 Kabel NYA 1x6 m Rp 5,300.00 Eterna232 Kabel NYA 1x10 m Rp 8,770.00 Eterna233 Kabel NYA 500 volt 2 x 2,5 mm2 m Rp 6,500.00 Eterna234 Kabel NYM 3X1,5 m Rp 5,860.00 Eterna

  • 235 Kabel NYM 3X2,5 m Rp 8,340.00 Eterna236 Kabel NYM 2X1,5 m Rp 4,580.00 Eterna237 Kabel NYM 2X2,5 m Rp 6,560.00 Eterna238 Kabel NYM 3X4 m Rp 13,740.00 Eterna239 Kabel NYM 4X2,5 m Rp 10,700.00 Eterna240 Kabel NYM 4X4 m Rp 17,700.00 Eterna241 Kabel NYM 4X6 m Rp 24,900.00 Eterna242 Kabel NYM 4X10 m Rp 40,540.00 Eterna243 Kabel NYY 2X1,5 m Rp 6,440.00 Eterna244 Kabel NYY 2X2,5 m Rp 8,680.00 Eterna245 Kabel NYY 3X1,5 m Rp 7,960.00 Eterna246 Kabel NYY 3X2,5 m Rp 10,700.00 Eterna247 Kabel NYY 3X4 m Rp 16,600.00 Eterna248 Kabel NYY 3X6 m Rp 22,000.00 Eterna249 Kabel NYY 4X2,5 m Rp 12,960.00 Eterna250 Kabel NYY 4X4 m Rp 20,200.00 Eterna251 Kabel NYY 4X6 m Rp 26,200.00 Eterna252 Kabel NYY 4X10 m Rp 44,400.00 Eterna253 Kabel NYY 4 x 16 mm2 m1 Rp 95,000.00 254 Kabel BC 50 mm m1 Rp 40,000.00 255 Las Doof bh Rp 750.00 Shukaku256 Lampu TL 18 Watt bh Rp 9,500.00 Phillips257 Lampu SL 5 Watt bh Rp 21,000.00 Phillips258 Lampu SL 8 Watt bh Rp 21,000.00 Phillips259 Lampu SL 11 Watt bh Rp 26,000.00 Phillips260 Lampu SL 14 Watt bh Rp 27,000.00 Phillips261 Lampu SL 18 Watt bh Rp 29,000.00 Phillips262 Lampu SL 23 Watt bh Rp 35,000.00 Phillips263 Lampu SL 35 Watt bh Rp 87,000.00 Phillips264 Lampu SL 50 Watt bh Rp 120,000.00 Phillips265 Lampu SL 70 Watt bh Rp 140,000.00 Phillips266 Lampu TL waterproof 2x36watt bh Rp 590,000.00 267 Lampu Tempel hias SL 18 Watt bh Rp 96,000.00 Phillips268 Downligth 4" bh Rp 22,500.00 Vacolux269 Lapis triplek 0,4cm lbr Rp 58,250.00 Cooltech270 Lem kayu kg Rp 7,800.00 rajawali271 Lem PVC bh Rp 7,200.00 masplast272 Lem Wall Paper kg Rp 43,200.00 wallpac273 Lem Epoxi kg Rp 133,000.00 avian274 Lem Gypsum kg Rp 14,000.00 275 List plafond Gypsum bh Rp 9,300.00 jayaboard276 List Kayu 1/4 m1 Rp 10,000.00 277 L PVC 100x90 bh Rp 256,325.00 Maspion278 L PVC 100x45 bh Rp 256,325.00 Maspion279 Eternit gresik lbr Rp 31,200.00 jayaboard280 Minyak Cat (Afdunner) Ltr Rp 6,300.00 Asoka281 Minyak Bekisting Ltr Rp 8,500.00 Robinair282 Minyak pelumas Ltr Rp 22,900.00 Mesran283 Metal stud m3 Rp 3,750,000.00 Kalsi284 MCB bh Rp 40,250.00 schneider285 Panel Box MCB bh Rp 675,000.00 286 Paku kayu Kg Rp 13,850.00 Hi Steel287 Paku reng Kg Rp 12,750.00 Hi Steel288 Paku usuk Kg Rp 13,850.00 Hi Steel289 Panel lantai m3 Rp 2,350,000.00 citicon290 skrup Bh Rp 150.00 Hi Steel291 Paku Seng Payung kg Rp 19,000.00 Hi Steel292 Paku triplek Kg Rp 12,500.00 Hi Steel293 Paku triplek/eternit Kg Rp 16,000.00 Hi Steel294 Paku Asbes Kg Rp 37,500.00 Hi Steel

  • 295 Pasir Cor m3 Rp 187,500.00 296 Paku Klem (No.4) kg Rp 13,850.00 Hi Steel297 Paku Klem (No.4) doz Rp 20,000.00 Hi Steel298 Paku Biasa 2"-5" kg Rp 12,750.00 Hi Steel299 Paras m3 Rp 90,000.00 300 Pasir Pasang m3 Rp 150,000.00 301 Pasir Urug m3 Rp 125,000.00 302 Pipa paralon 5/8\" m Rp 5,000.00 maspion303 Profil hollow 2x4 m Rp 19,000.00 Hi Steel304 Pewarna sct Rp 700.00 merak305 Kran Pelampung Set Rp 19,750.00 onda306 Pagar BRC/pmg A (uk. 1,2x2,4) unit Rp 297,500.00 Hi Steel307 Pagar BRC/pmg unit Rp 297,500.00 Hi Steel308 Pintu swing ganda BRC / PMG uk. 1,2x3m unit Rp 398,750.00 Hi Steel309 Pintu dorong ganda BRC / PMG uk. 1,2x3m unit Rp 398,750.00 Hi Steel310 Pintu pagar besi komplit dengan asesoris m2 Rp 625,000.00 Hi Steel311 Penambahan daya listrik ls Rp 2,200,000.00 312 Pipa Pipa Galvanis medium 1/2" m1 Rp 19,600.00 Hi Steel313 Pipa Pipa Galvanis medium 3/4" m1 Rp 24,166.67 Hi Steel314 Pipa Pipa Galvanis medium 1" m1 Rp 36,083.33 Hi Steel315 Pipa Pipa Galvanis medium 2" m1 Rp 71,125.00 Hi Steel316 Pipa Pipa Galvanis medium 2 1/2" m1 Rp 90,250.00 Hi Steel317 Pipa Pipa Galvanis medium 3" m1 Rp 115,416.67 Hi Steel318 Pipa Pipa Galvanis medium 4" m1 Rp 167,166.67 Hi Steel319 Pipa Pipa Galvanis medium 5" m1 Rp 169,666.67 Hi Steel320 Pipa Pipa Galvanis medium 1 1/4" m1 Rp 46,416.67 Hi Steel321 Pipa Pipa Galvanis medium 8" m1 Rp 131,250.00 Hi Steel322 Pipa Pipa Galvanis medium 6" m1 Rp 1,701,666.67 Hi Steel323 Pipa Galvanis 1,5" m1 Rp 39,916.67 Hi Steel324 Pipa Galvanis 2" m1 Rp 53,416.67 Hi Steel325 Pipa Galvanis 2,5" m1 Rp 70,583.33 Hi Steel326 Pipa Galvanis 3" m1 Rp 82,833.33 Hi Steel327 Pipa PVC 1/2\ "Type AW batang Rp 20,000.00 Wavin328 Pipa PVC 3/4\ "Type AW batang Rp 25,400.00 Wavin329 Pipa PVC 1\ "Type AW batang Rp 30,600.00 Wavin330 Pipa PVC 11/2\ "Type AW batang Rp 46,500.00 Wavin331 Pipa PVC 3\ "AW panjang 4 mtr ljr Rp 127,500.00 Wavin332 Pipa PVC 3\ "AW panjang 6 mtr ljr Rp 707,500.00 Wavin333 Pipa PVC 4\ "AW panjang 4 mtr ljr Rp 227,500.00 Wavin334 Pipa PVC 4\ "AW panjang 6 mtr ljr Rp 335,200.00 Wavin335 Pipa PVC 5\ "AW panjang 4 mtr ljr Rp 352,500.00 Wavin336 Pipa PVC 11/2\"C ljr Rp 14,200.00 maspion337 Pipa PVC 2\"C m Rp 33,500.00 maspion338 Pipa PVC 4\"C batang Rp 63,450.00 maspion339 Pipa PVC 3\"C batang Rp 49,300.00 maspion340 Pipa PVC 5\"C batang Rp 96,200.00 maspion341 Pipa PVC 6\"C ljr Rp 125,200.00 maspion342 Pipa PVC D 5 (@4 meter) batang Rp 160,000.00 maspion343 Pipa PVC D 4 (@4 meter) batang Rp 120,000.00 maspion344 Pipa PVC D 3 (@4 meter) batang Rp 80,000.00 maspion345 Pipa PVC 110 m Rp 20,100.00 maspion346 Pipa PVC 160 m Rp 73,750.00 maspion347 Pipa Cooker 150 m Rp 156,900.00 maspion348 Pipa baja (Hitam) 2\"medium m Rp 11,000.00 Wavin349 Pipa baja (Hitam) 3\"medium m Rp 13,000.00 Wavin350 Pipa baja (Hitam) 4\"medium m Rp 15,000.00 Wavin351 Pipa baja (Hitam) 5\"medium m Rp 17,200.00 Wavin352 Pipa pe 12 mm m Rp 23,750.00 Wavin353 Pipa stainless steel SCH 40 welded 1" m Rp 96,725.00 Wavin354 Pipa stainless steel SCH 40 welded 2" m Rp 97,200.00 Wavin

  • 355 Plamur Tembok kg Rp 46,000.00 Big lion356 Plamur Kayu kg Rp 23,000.00 Emco357 Profil tank 650 litter kg Rp 719,200.00 Cipta Proma perkasa358 Profil tank 800 litter kg Rp 818,400.00 Cipta Proma perkasa359 Profil tank 1100 litter kg Rp 1,054,000.00 Cipta Proma perkasa360 Profil tank 550 litter steinless kg Rp 1,229,000.00 Cipta Proma perkasa361 Profil tank 700 litter steinless kg Rp 1,521,000.00 Cipta Proma perkasa362 Profil tank 1100 litter steinless kg Rp 2,383,000.00 Cipta Proma perkasa363 Klem PVC Bh Rp 1,925.00 maspion364 Plywood Tegofilm tebal 9mm lbr Rp 300,000.00 365 Plywood tebal 9mm lbr Rp 82,600.00 Parindo366 Profil Alumunium putih uk. 4x10, profil 4" m1 Rp 33,200.00 Hi Steel367 Precast Pagar Panil/Pabrikasi m1 Rp 40,000.00 Lisa368 Saklar Tunggal Bh Rp 8,500.00 Broco369 Saklar Ganda Bh Rp 17,600.00 Broco370 Shanding kg Rp 50,500.00 Peacock371 Ramset / dynabolt buah Rp 2,500.00 Ramset TM372 Rol (Tba) Roll Rp 3,000.00 Fukuda373 Rangka Galvalume uk 0.8 mm m2 Rp 237,600.00 Hi Steel374 Rangka Galvalume uk 0.5 mm m2 Rp 186,500.00 Hi Steel375 Rangka Galvalume Campuran m2 Rp 205,200.00 Hi Steel376 Usuk Galvalum 5/7cm tebal 0,55mm m1 Rp 25,000.00 377 Reng Galvalum tebal 0,45mm m1 Rp 18,500.00 378 Skrup + Plat Galvalum kg Rp 20,000.00 379 Roof Drain bh Rp 45,000.00 380 Metal furing 2/4 cm ex. Sakura trust, bluscoopsteel m1 Rp 13,500.00 381 Semen Pc 50kg Zak Rp 71,000.00 Gresik / Holcim382 Semen Pc 40kg Zak Rp 57,000.00 Gresik / Holcim383 Semen Grouting 25kg Zak Rp 160,000.00 sikagrout384 Semen berwarna yiyitan kg Rp 11,200.00 MU385 Seng Gelombang BJLS 30uk(08x1.5) m2 Rp 56,200.00 Hi Steel386 Seng Gelombang BJLS 40uk(08x1.5) m2 Rp 49,700.00 Hi Steel387 Seng Gelombang BJLS 30uk(08x1.5)L=60cm m2 Rp 23,000.00 Hi Steel388 Seng Gelombang BJLS 30uk(80x180 cm) lembar Rp 55,650.00 Hi Steel389 Seng Gelombang BJLS 30uk(80x150 cm) lembar Rp 51,200.00 Hi Steel390 Seng BJLS 30L=90cm ml Rp 27,940.00 Hi Steel391 Seng BJLS 30L=60cm ml Rp 23,500.00 Hi Steel392 Seng BJLS 40L=60cm ml Rp 22,250.00 Hi Steel393 Seng BJLS 40L=90cm ml Rp 42,500.00 Hi Steel394 Seng datar BJLS 40 ml Rp 39,200.00 Hi Steel395 Serat fiber m2 Rp 4,500.00 serat mat396 Sifon Wasser m2 Rp 12,000.00 onda397 Sirap Asbes 4mm lbr Rp 17,250.00 Djabesment398 Sirtu m3 Rp 115,000.00 399 Slang spiral Set Rp 23,200.00 Raja Selang400 Slimar Alumunium3/8" m1 Rp 62,375.00 YKK401 Sealent tube Rp 26,800.00 Shirikon402 Solar ltr Rp 5,500.00 Pertamina403 Spritus Ltr Rp 12,500.00 Naga404 Stop Kontak Broco Bh Rp 18,500.00 Broco405 Stopper uskup tbl.6cm Bh Rp 7,200.00 conblock406 Sun Screen m2 Rp 96,750.00 Alexindo407 Tanah katel m3 Rp 109,200.00 408 Tempat sabun bh Rp 18,500.00 Krisbow409 T doos PVC Bh Rp 1,750.00 Maspion410 Teak wood t= 4mm Lbr Rp 61,000.00 Parindo411 Teak wood uk. 122x244 t=3mm Lbr Rp 65,300.00 Parindo412 Tee 150x150 bh Rp 563,200.00 Hi Steel413 Tee 100x100 bh Rp 295,600.00 Hi Steel414 Triplek uk. 110x244 t=3 mm meranti Lbr Rp 43,000.00 Parindo

  • 415 Triplek uk. 110x244 t=4mm meranti Lbr Rp 53,000.00 Parindo416 Triplek uk. 110x244 t=8 mm meranti Lbr Rp 86,000.00 Parindo417 Triplek uk. 110x244 t=9 mm meranti Lbr Rp 93,500.00 Parindo418 Triplek uk. 110x244 t=12 mm meranti Lbr Rp 150,000.00 Parindo419 Triplek uk. 110x244 t=15 mm meranti Lbr Rp 180,000.00 Parindo420 Triplek uk. 110x244 t=18 mm meranti Lbr Rp 225,000.00 Parindo421 Triplek uk. 110x244 t=3 mm meranti Lbr Rp 66,500.00 Parindo422 Triplek uk. 110x244 t=3 mm meranti Lbr Rp 66,500.00 Parindo423 Triplek uk. 110x244 t=12 mm film satu muka Lbr Rp 110,000.00 Parindo424 Triplek uk. 110x244 t=15 mm film satu muka Lbr Rp 225,000.00 Parindo425 Triplek uk. 110x244 t=12 mm film dua muka Lbr Rp 205,000.00 Parindo426 Triplek uk. 110x244 t=15 mm film dua muka Lbr Rp 245,000.00 Parindo427 Triplek uk. 110x244 t=18 mm film dua muka Lbr Rp 275,000.00 Parindo428 Lbr Rp 210,000.00 429 Teer Kg Rp 5,750.00 Teer430 Tanah Urug m3 Rp 115,000.00 431 Thinner A ltr Rp 24,000.00 Thinner432 Tiang Pancang 20/20 m Rp 137,500.00 metro pile433 Tiang Pancang 25/25 m Rp 189,200.00 metro pile434 Tiang Pancang 30/30 m Rp 223,000.00 metro pile435 U Gutter U1000/1000-2400 (K 350 Besi 130 kg) (Fabrikasi) bh Rp 2,426,500.00 436 Urinoir bh Rp 1,250,000.00 437 Cover 1000x1000x2400 (K 350; besi 160 kg ) (Fabrikasi) bh Rp 2,426,500.00 438 Vertical Blind m2 Rp 182,100.00 Ellite439 Valve 100 bh Rp 1,019,300.00 maspion440 Valve 150 bh Rp 2,096,500.00 maspion441 Wall Paper m2 Rp 96,000.00 Ellite442 Wastafel Besar Warna bh Rp 327,000.00 Toto L38V1443 Waterproofing kg Rp 38,750.00 No drop444 Wood filler kg Rp 27,500.00 Emco445 Wood plank + pemasangan m1 Rp 62,000.00 Elephant446 Walter Moer bh Rp 15,200.00 onda447 Besi Hollow 4/4 m1 Rp 21,000.00 Hi Steel448 Besi Hollow 4/4 m1 Rp 21,000.00 Hi Steel449 Besi Hollow 5/5 m1 Rp 45,000.00 Hi Steel450 Besi Hollow 2/4 m1 Rp 19,500.00 Hi Steel451 Got talang R25 (Segmen) bh Rp 26,750.00 Ex. UD. Hartono452 Got talang R15 (Segmen) bh Rp 18,700.00 Ex. UD. Hartono453 Got talang R10 (Segmen) bh Rp 17,000.00 Ex. UD. Hartono454 Got talang R25 (1/2 lingkaran) bh Rp 24,000.00 Ex. UD. Hartono455 Got talang R15 (1/2 lingkaran) bh Rp 16,000.00 Ex. UD. Hartono456 Got talang R10 (1/2 lingkaran) bh Rp 25,000.00 Ex. UD. Hartono457 Paving abu-abu tbl. 6 cm (4 persegi pj ) bh Rp 1,500.00 conblock458 Paving abu-abu tbl. 8 cm (4 persegi pj ) bh Rp 1,800.00 conblock459 Paving stone merah tbl. 8 cm (4 persegi pj ) bh Rp 2,500.00 conblock460 Paving stone full warna tbl. 6 cm (4 persegi pj ) bh Rp 1,800.00 conblock461 Paving stone motif warna abu abu tbl. 6 cm (4 persegi pj ) bh Rp 1,800.00 conblock462 Paving Cassada abu-abu T=8mm m2 Rp 90,000.00 Alexis463 Paving Cassada warna T=8mm m2 Rp 120,000.00 Alexis464 GRC Board 4 mm Lembar Rp 54,000.00 grc465 cross runner 50x25 m' Rp 27,000.00 Kalsi466 main runner 38x13 m' Rp 22,500.00 Kalsi467 root hanger 8mm m' Rp 11,000.00 Kalsi468 Beton ready mix k-175 m' Rp 879,675.42 jaya mix469 Beton ready mix k-250 m' Rp 954,607.25 jaya mix470 Beton ready mix k-300 m' Rp 685,000.00 jaya mix471 Beton ready mix k-350 m' Rp 735,000.00 jaya mix472 Perlengkapan Penangkal Petir473 Pasang Head splitz petir CU 3/4" dengan pipa GIP D 1" Bh Rp 250,000.00 474 Kabel BC dia 50 mm2 m1 Rp 40,000.00

    Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm

  • 475 Isolator pipa PVC AW D 3/4" + klem plat m1 Rp 27,000.00 476 Pentanahan grounding Kabel BC 50 mm2 Unit Rp 350,000.00 477 Bak kontrol grounding Unit Rp 45,000.00 478 Box test line Set Rp 250,000.00 479 Kabel Schoon Set Rp 7,500.00 480 Connector Set Rp 8,500.00 481 Peralatan Bantu Jam Rp 1,000.00 482 Testing dan Commissioning termasuk ijin-ijin penangkal petir Ls Rp 500,000.00 483 Tandon Air Beton Kap. 4 m3 eks Fabrikan + pasang bh Rp 5,400,000.00 484 Septic tank Kap 3 m3 eks fabrikan + pasang bh Rp 3,600,000.00 485 Profil tank kapasitas 1,1 m3 (stenlessteel) Unit Rp 2,350,000.00 486 Pompa elektric (kapasitas hisap 30m,dorong 30m ) unit Rp 950,000.00 487 Plastik m2 Rp 2,000.00

    II TENAGA1 Mandor hr Rp 97,000.00 1 Surveyor Geodesi hr Rp 97,000.00 2 Kepala Tukang Batu hr Rp 95,000.00 3 Kepala Tukang Besi hr Rp 95,000.00 4 Kepala Tukang Cat hr Rp 95,000.00 5 Kepala Tukang Kayu hr Rp 95,000.00 6 Kepala Tukang Listrik hr Rp 95,000.00 7 Kepala Tukang Pipa hr Rp 95,000.00 8 Tukang Batu hr Rp 92,500.00 9 Tukang Besi hr Rp 92,500.00 10 Tukang Cat hr Rp 92,500.00 11 Tukang Kayu hr Rp 92,500.00 12 Tukang Las hr Rp 92,500.00 13 Tukang Listrik hr Rp 92,500.00 14 Tukang Pipa hr Rp 92,500.00 15 Pekerja Terampil hr Rp 89,100.00 16 Pekerja / Buruh Tak Terampil hr Rp 89,100.00 17 Petugas Survey hr Rp 97,000.00

    III. PERALATAN1 Sewa Compresor Jam Rp 33,250.00 2 Sewa Concreate Mixer m3 (min 3jam) Jam Rp 61,750.00 3 Sewa Concreate Pump (min 3 jam ) Jam Rp 61,750.00 4 Sewa Concreate vibrator Jam Rp 14,250.00 5 Sewa Crane 30ton-min8jam (termasuk mob/demob.6 Opertor, BBM) Jam Rp 130,625.00 7 Sewa Hammer tiang pancang-min8jam Hidrolis (termasuk8 mob/demob,operator, BBM) Jam Rp 175,750.00 9 Sewa Bucket dan crane/draglin scraper Jam Rp 76,000.00 10 Sewa Motor Grader125-140Pk (min5jam) Jam Rp 261,250.00 11 Sewa PhenumaticTire Roller (min5jam) Jam Rp 209,000.00 12 SewaTruck Tangki Air (min 5 jam) Jam Rp 470,250.00 13 Sewa Truk Kelas 3 Dalam kota Jam Rp 727,500.00 13 Sewa Vibrator Roller (min 5 jam) Jam Rp 128,250.00 14 Sewa Excavator 6m Jam Rp 123,500.00 15 SewaTheodolit set Rp 329,175.00 16 Sewa Welding Set (min 5 jam) hari Rp 28,500.00 17 Sewa Alat Bantu (1 set@3alat ) jam Rp 950.00 18 Sewa Dump truck 6T min(5jam) jam Rp 65,000.00 19 Sewa Dump truck 5T min(5jam) jam Rp 61,750.00 17 Sewa Dump truck 3,5T min(5jam) jam Rp 61,750.00 18 Sewa alat bantu boor pile jam Rp 275,000.00 19 Sewa Stampper jam Rp 150,000.00

  • DAFTAR HARGA SATUAN POKOK KEGIATAN BANGUNAN GEDUNG Pekerjaan Persiapan & TanahPembuatan Bouwplank (UITZET) m1Upah:Kepala Tukang Kayu 0.0100 O.H 95,000.00 950.00 Tukang Kayu 0.1000 O.H 92,500.00 9,250.00 Pekerja 0.1000 O.H 89,100.00 8,910.00

    Jumlah: 19,110.00 Bahan/Material:Kayu Meranti (Papan 2/20) 0.0070 m3 5,000,000.00 35,000.00 Kayu Meranti (Usuk 5/7) 0.0120 m3 4,160,714.29 49,928.57 Paku biasa 2" - 5" 0.0200 Kg 12,750.00 255.00

    Jumlah: 85,183.57 Nilai HSPK : 104,293.57 Pengangkutan Tanah keluar Proyek m3Upah:Pekerja 0.2500 O.H 89,100.00 22,275.00

    Jumlah: 22,275.00 Sewa Peralatan:Sewa Dump Truck 5 T (min 5 jam) 0.2500 Jam 61,750.00 15,437.50

    Jumlah: 15,437.50 Nilai HSPK : 37,712.50

    Penggalian Tanah untuk Konstruksi m3Upah:Mandor 0.0250 O.H 97,000.00 2,425.00 Pekerja 0.7500 O.H 89,100.00 66,825.00

    Jumlah: 69,250.00 Nilai HSPK : 69,250.00

    Pengurugan Tanah Kembali untuk Konstruksi m3Upah:Mandor 0.0083 O.H 97,000.00 808.33 Pekerja 0.2500 O.H 89,100.00 22,275.00

    Jumlah: 23,083.33 Nilai HSPK : 23,083.33

    Pengurugan Pasir (PADAT) m3Upah:Mandor 0.0100 O.H 97,000.00 970.00 Pekerja 0.3000 O.H 89,100.00 26,730.00

    Jumlah: 27,700.00 Bahan:Pasir Urug 1.2000 m3 125,000.00 150,000.00

    Jumlah: 150,000.00 Nilai HSPK : 177,700.00

    Pengurugan Sirtu (PADAT) m3Upah:Mandor 0.0250 O.H 97,000.00 2,425.00 Pekerja 0.2500 O.H 89,100.00 22,275.00

    Jumlah: 24,700.00 Bahan:Tasirtu/ Sirtu 1.2000 m3 115,000.00 138,000.00 Sewa Stampper 0.1500 jam 150,000.00 22,500.00

    Jumlah: 160,500.00 Nilai HSPK : 185,200.00

    m3Upah:Mandor 0.0390 O.H 97,000.00 3,783.00 Kepala Tukang Batu 0.0390 O.H 95,000.00 3,705.00 Tukang Batu 0.3900 O.H 92,500.00 36,075.00 Pekerja 0.7800 O.H 89,100.00 69,498.00

    Jumlah: 113,061.00 Bahan:Batu Kali Belah 15/20 cm 1.2000 m3 140,200.00 168,240.00 Pasir Urug 0.4320 m3 125,000.00 54,000.00

    Jumlah: 222,240.00 Nilai HSPK : 335,301.00

    Pekerjaan Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) m3

    Upah:Mandor 0.0750 O.H 97,000.00 7,275.00 Kepala Tukang Batu 0.0750 O.H 95,000.00 7,125.00 Tukang Batu 0.7500 O.H 92,500.00 69,375.00 Pekerja 1.5000 O.H 89,100.00 133,650.00

    Jumlah: 217,425.00 Bahan:Semen portland (50kg) 3.2600 Zak 71,000.00 231,460.00 Pasir Pasang 0.5200 m3 150,000.00 78,000.00 Batu Kali Belah 15/20 cm 1.2000 m3 140,200.00 168,240.00

    Jumlah: 477,700.00 Nilai HSPK : 695,125.00

    M3

    UPAH :Mandor 0.16 O.H Rp 97,000.00 Rp 15,520.00 Kepala Tukang Batu 0.12 O.H Rp 95,000.00 Rp 11,400.00 Tukang Batu 1.2 O.H Rp 92,500.00 Rp 111,000.00 Pekerja 3.6 O.H Rp 89,100.00 Rp 320,760.00

    Jumlah : Rp 458,680.00

    Pemasangan Batu Kali Belah Kosongan (aanstamping)

    Pemasangan Batu Merah 1 Pc : 5 Ps tinggi s/d 2 m

  • BAHAN :Semen Holcim 50 kg holcim 1.862 Zak Rp 71,000.00 Rp 132,202.00 Pasir Pasang 0.452 m3 Rp 150,000.00 Rp 67,800.00

    490 Buah Rp 730.00 Rp 357,700.00 Jumlah : Rp 557,702.00

    Rp 1,016,382.00

    Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata m2

    Upah:Mandor 0.0150 O.H 97,000.00 1,455.00 Kepala Tukang Batu 0.0100 O.H 95,000.00 950.00 Tukang Batu 0.1000 O.H 92,500.00 9,250.00 Pekerja 0.3000 O.H 89,100.00 26,730.00

    Jumlah: 38,385.00 Bahan:Semen PC (Portland Cement) 50 kg 0.2874 Zak 71,000.00 20,405.40 Pasir Pasang 0.0400 m3 150,000.00 6,000.00 Batu Bata Merah uk 22 x 11 x 4.5 cm 70.0000 Buah 730.00 51,100.00

    Jumlah: 77,505.40 Nilai HSPK : 115,890.40

    Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata m2

    Upah:Mandor 0.0150 O.H 97,000.00 1,455.00 Kepala Tukang Batu 0.0100 O.H 95,000.00 950.00 Tukang Batu 0.1000 O.H 92,500.00 9,250.00 Pekerja 0.3000 O.H 89,100.00 26,730.00

    Jumlah: 38,385.00 Bahan:Semen PC (Portland Cement) 50 kg 0.1936 Zak 71,000.00 13,745.60 Pasir Pasang 0.0450 m3 150,000.00 6,750.00 Batu Bata Merah uk 22 x 11 x 4.5 cm 70.0000 Buah 730.00 51,100.00

    Jumlah: 71,595.60 Nilai HSPK : 109,980.60

    Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm m2Upah:Mandor 0.0150 O.H 97,000.00 1,455.00 Kepala Tukang Batu 0.0150 O.H 95,000.00 1,425.00 Tukang Batu 0.1500 O.H 92,500.00 13,875.00 Pekerja 0.3000 O.H 89,100.00 26,730.00

    Jumlah: 43,485.00 Bahan:Semen PC (Portland Cement) 50 kg 0.1555 Zak 71,000.00 11,041.92 Pasir Pasang 0.0230 m3 150,000.00 3,450.00

    Jumlah: 14,491.92 Nilai HSPK : 57,976.92

    Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm m2Upah:Mandor 0.0150 O.H 97,000.00 1,455.00 Kepala Tukang Batu 0.0150 O.H 95,000.00 1,425.00 Tukang Batu 0.1500 O.H 92,500.00 13,875.00 Pekerja 0.3000 O.H 89,100.00 26,730.00

    Jumlah: 43,485.00 Bahan:Semen PC (Portland Cement) 50 kg 0.1037 Zak 71,000.00 7,361.28 Pasir Pasang 0.0260 m3 150,000.00 3,900.00

    Jumlah: 11,261.28 Nilai HSPK : 54,746.28

    Pasang Benangan 1 Pc: 2Ps mUpah:Mandor 0.0040 O.H 97,000.00 388.00 Kepala Tukang Batu 0.0400 O.H 95,000.00 3,800.00 Tukang Batu 0.0400 O.H 92,500.00 3,700.00 Pekerja 0.0800 O.H 89,100.00 7,128.00

    Jumlah: 15,016.00 Bahan:Semen PC (Portland Cement) 50 kg 0.0100 Zak 71,000.00 710.00 Pasir Pasang 0.0130 m3 150,000.00 1,950.00

    Jumlah: 2,660.00 Nilai HSPK : 17,676.00

    Pekerjaan Acian m2Upah:Mandor 0.0100 O.H 97,000.00 970.00 Kepala Tukang Batu 0.0100 O.H 95,000.00 950.00 Tukang Batu 0.1000 O.H 92,500.00 9,250.00 Pekerja 0.2000 O.H 89,100.00 17,820.00

    Jumlah: 28,990.00 Bahan:Semen portland (50 kg) 0.0650 Zak 71,000.00 4,615.00

    Jumlah: 4,615.00 Nilai HSPK : 33,605.00

    Plamur Tembok m2Upah:Mandor 0.0010 O.H 97,000.00 97.00 Kepala Tukang Cat 0.0030 O.H 95,000.00 285.00 Tukang Cat 0.0300 O.H 92,500.00 2,775.00 Pekerja 0.0200 O.H 89,100.00 1,782.00

    Jumlah: 4,939.00

    Batu Bata Merah uk 22 x 11 x 4.5 cm

    Nilai HSPK :

  • Bahan:Plamur Tembok 0.1000 Kg 46,000.00 4,600.00 Kertas Gosok no 150 0.5000 Lembar 8,750.00 4,375.00

    Jumlah: 8,975.00 Nilai HSPK : 13,914.00

    Pemasangan Tegel Keramik 30x30 cm tekstur kasar m2Upah:Mandor 0.0350 O.H