DAFTAR HARGA UPAH DAN BAHAN

No URAIAN SATUAN

A. UPAH 1 Pekerja 45,000.00 Orang/Hari2 Tukang 55,000.00 Orang/Hari3 Kepala Tukang 70,000.00 Orang/Hari4 Mandor 58,000.00 Orang/Hari

B. BAHAN

Pasangan dan beton1 Tanah urug 96,408.00 2 Timbunan pilihan 111,240.00 /M³3 Pasir urug 74,160.00 /M³4 Pasir pasang 108,000.00 /M³5 Pasir beton 129,600.00 /M³6 Kerikil beton 150,000.00 /M³7 Batu kali/batu belah (sungai/gunung) 279,600.00 /M³8 Bata merah 960.00 /Buah9 Paving Block 2,100.00 /Buah

10 Semen PC @ 50 Kg 88,800.00 /Zak11 Semen PC 1,480.00 /Kg12 Semen warna 1,780.00 /Kg13 Semen putih @ 50 Kg 106,800.00 /Zak14 Semen putih 1,780.00 /Kg15 Sirtu 240,000.00 /M³16 Plywood 9 mm 162,000.00 /Lbr17 Air 150.00 /Liter18 Besi beton polos 11,280.00 /Kg19 Besi beton ulir 12,480.00 /Kg20 Kawat beton 14,400.00 /Kg21 Paku kayu 14,160.00 /Kg22 Minyak bekisting 12,000.00 /Liter

Kayu1 Kayu kelas I 3,048,000.00 /M³2 Kayu kelas II 2,916,000.00 /M³3 Kayu kelas III 1,830,000.00 /M³4 Kayu Perancah 2,440,800.00 /M³5 Kayu/Papan Bekisting 2,440,800.00 /M³6 Dolken kayu galam Ø (8-10) cm, panjang 4 m 24,720.00 /Btg7 Lem Kayu 18,000.00 /Kg

Atap dan plafond1 Konstruksi kuda-kuda baja ringan 150,000.00 2 Multiplek / plywood 4 mm 65,000.00 /Lbr3 Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board) 102,000.00 /Lbr4 Genteng metal 0,3 75,000.00 5 Rabung seng genteng metal 30,000.00 /M'6 List Profil 12,000.00 /M'7 Paku Skrup 300.00 /Bh8 Seng Plat 108,000.00 /Lbr

Keramik1 Keramik sisi kulit jeruk 20x20 cm 5,280.00 /Bh2 Keramik 20 x 20 cm 5,280.00 /Bh3 Keramik 20 x 25 6,240.00 /Bh4 Keramik 30x30 cm Polished 7,200.00 /Bh5 Keramik 30x30 cm Unpolished 7,560.00 /Bh6 Keramik 40x40 cm (polished) 8,400.00 /Bh7 Keramik 40x40 cm (unpolished) 8,760.00 /Bh

HARGA SATUAN Rp.

/M3

/M2

/M2

Page 2: rab kantin

Cat dan Residu1 Dempul kayu 29,700.00 /Kg2 Plamur / dempul tembok 16,500.00 /Kg3 Cat dasar 22,000.00 /Kg4 Cat manie 17,561.50 /Kg5 Cat synthetik enamel (cat kayu mengkilap) 34,650.00 /Kg6 Cat acrylic emultion paint (cat tembok) / waterprofing 30,800.00 /Kg7 Minyak cat 45,100.00 /Liter8 Kertas amplas 3,690.00 /Lembar

Instalasi listrik1 Instalasi Tititk lampu 120,000.00 /Ttk2 Instalasi Stop kontak 108,000.00 /Ttk3 Lampu Hemat Energi 24 watt 42,000.00 /Bh4 Lampu Hemat Energi 12 watt 30,000.00 /Bh5 Box Sekering + MCB 60,000.00 /Bh6 Stop Kontak 18,000.00 /Bh7 Schakelar tunggal 30,000.00 /Bh8 Schakelar ganda 32,400.00 /Bh9 Schakelar Triple 36,000.00 /Bh

Sanitair1 Tempat sabun keramik 30,000.00 /Bh2 Kran air biasa 24,000.00 /Bh3 Kran air sink/leher angsa 60,000.00 /Bh4 720,000.00 /Bh5 Closet jongkok (setara TOTO) 390,000.00 /Bh6 Floor drain 15,000.00 /Bh7 Pembuangan bak air 21,600.00 /Bh8 Wastafel + Accessories 861,000.00 /Unit9 Tempat Cuci Stainless Stell 2 Sink 492,000.00 /Unit

10 Tempat Cuci Stainless Stell 1 Sink 344,400.00 /Unit11 Septictank + Resapan + Bak Kontrol 3,690,000.00 /Pkt12 Pipa PVC Ø 1/2" 3,478.44 /M'13 Pipa PVC Ø 3/4" 5,150.01 /M'14 Pipa PVC Ø 1 1/2" 20,677.53 /M'15 Pipa PVC Ø 2" 23,370.00 /M'16 Pipa PVC Ø 2 1/2" 35,670.00 /M'17 Pipa PVC Ø 3" 69,955.02 /M'18 Pipa PVC Ø 4" 86,100.00 /M'19 Seal tape 9,225.00 /Bh

Kunci-Kunci dan Kaca1 Kunci tanam 2 slaag 136,800.00 /Bh2 Kunci tanam biasa 108,000.00 /Bh3 Engsel pintu 30,000.00 /Psg5 Engsel jendela / ventilasi 20,400.00 /Psg6 Grendel jendela 12,000.00 /Bh7 Hak angin jendela 10,800.00 /Bh8 Pegengan jendela 13,200.00 /Bh9 Pacok pintu (untuk pintu double) 48,000.00 /Bh

10 Kaca Bening, t = 3 mm 108,000.00

11 Kaca Bening, t = 5 mm 165,000.00

12 Kaca Rayband, t = 5 mm 201,600.00

Singkil, 2013 Konsultan Perencana :

CV. HIKMAH CONSULTANT

HILDA FAZLIANA Direktris

Bak air fiber kapasitas 0,3 M3

/M2

/M2

/M2

Page 3: rab kantin

DAFTAR ANALISA HARGA SATUAN

RSNI T-12-2002.6.4 1m' Pengukuran dan Pemasangan BouwplankBahanKayu 5/7 Kelas III 0.012 M³ x Rp. 1,830,000.00 = Rp. 21,960.00 Paku biasa 2" - 5" 0.020 Kg x Rp. 14,160.00 = Rp. 283.20 Kayu papan 3/20 0.007 M³ x Rp. 2,440,800.00 = Rp. 17,085.60

Jumlah (1) = Rp. 39,328.80 TenagaPekerja 0.100 OH x Rp. 45,000.00 = Rp. 4,500.00 Tukang kayu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.005 OH x Rp. 58,000.00 = Rp. 290.00

Jumlah (2) = Rp. 10,990.00 Jumlah (1) + (2) = Rp. 50,318.80

Diambil 1/2 dari Jumlah (1) + (2) = Rp. 25,159.40

RSNI T-12-2002.6.8 1 m² Membersihkan lapangan dan perataanTenagaPekerja 0.100 OH x Rp. 45,000.00 = Rp 4,500.00 Mandor 0.050 OH x Rp. 58,000.00 = Rp 2,900.00

Jumlah = Rp 7,400.00

SNI 2835:2008.6.1 1 m³ Galian tanah biasa sedalam 1 meterTenagaPekerja 0.750 OH x Rp. 45,000.00 = Rp. 33,750.00 Mandor 0.025 OH x Rp. 58,000.00 = Rp. 1,450.00

Jumlah = Rp 35,200.00

SNI 2835:2008.6.9 1 m³ Urugan kembali (dihitung 1/3 dari indeks pekerjaan galian)Tenaga Pekerja 0.250 OH x Rp. 45,000.00 = Rp. 11,250.00 Mandor 0.008 OH x Rp. 58,000.00 = Rp. 483.33

Jumlah = Rp. 11,733.33

SNI 2835:2008.6.10 1 m³ Memadatkan tanah (per 20 cm)Tenaga Pekerja 0.500 OH x Rp. 45,000.00 = Rp. 22,500.00 Mandor 0.050 OH x Rp. 58,000.00 = Rp. 2,900.00

Jumlah = Rp. 25,400.00

SNI 2835:2008.6.11 1 m³ Urugan pasirBahan

Pasir urug 1.200 M³ x Rp. 74,160.00 = Rp. 88,992.00 Jumlah (1) = Rp. 88,992.00

TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Mandor 0.010 OH x Rp. 58,000.00 = Rp. 580.00

Jumlah (2) = Rp. 14,080.00 Jumlah (1) + (2) = Rp. 103,072.00

SNI 2835:2008.6.15 1 m² Mengurug sirtu padat Bahan

Sirtu 1.200 M³ x Rp. 240,000.00 = Rp. 288,000.00 Jumlah (1) = Rp. 288,000.00

TenagaPekerja 0.250 Oh x Rp. 45,000.00 = Rp. 11,250.00 Mandor 0.025 Oh x Rp. 58,000.00 = Rp. 1,450.00

Jumlah (2) = Rp. 12,700.00 Jumlah (1) + (2) = Rp. 300,700.00

SNI 2835:2008.6.16 1 m³ Urugan tanah urugBahan

Tanah urug 1.200 M³ x Rp. 96,408.00 = Rp. 115,689.60 Jumlah (1) = Rp. 115,689.60

TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Mandor 0.010 OH x Rp. 58,000.00 = Rp. 580.00

Jumlah (2) = Rp. 14,080.00 Jumlah (1) + (2) = Rp. 129,769.60

Page 4: rab kantin

SNI 2835:2008.6.17 1 m³ Urugan timbunan pilihanBahan

Timbunan pilihan 1.200 M³ x Rp. 111,240.00 = Rp. 133,488.00 Jumlah (1) = Rp. 133,488.00

TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Mandor 0.010 OH x Rp. 58,000.00 = Rp. 580.00

Jumlah (2) = Rp. 14,080.00 Jumlah (1) + (2) = Rp. 147,568.00

SNI 2836:2008.6.2 1 m³ Pasang pondasi batu belah/gunung/kali, 1 Pc : 4 PpBahanBatu kali/batu belah (sungai/gunung) 1.200 M³ x Rp. 279,600.00 = Rp. 335,520.00 Semen portland 163.000 Kg x Rp. 1,480.00 = Rp. 241,240.00 Pasir pasang 0.520 M³ x Rp. 108,000.00 = Rp. 56,160.00

Jumlah (1) = Rp. 632,920.00 TenagaPekerja 1.500 OH x Rp. 45,000.00 = Rp. 67,500.00 Tukang batu 0.750 OH x Rp. 55,000.00 = Rp. 41,250.00 Kepala tukang 0.075 OH x Rp. 70,000.00 = Rp. 5,250.00 Mandor 0.075 OH x Rp. 58,000.00 = Rp. 4,350.00

Jumlah (2) = Rp. 118,350.00 Jumlah (1) +(2) = Rp. 751,270.00

SNI 2836:2008.6.9 1 m³ Pasang pondasi batu kosongBahanBatu kali 1.200 M³ x Rp. 279,600.00 = Rp. 335,520.00 Pasir urug 0.432 M³ x Rp. 74,160.00 = Rp. 32,037.12

Jumlah (1) = Rp. 367,557.12 TenagaPekerja 0.780 OH x Rp. 45,000.00 = Rp. 35,100.00 Tukang batu 0.390 OH x Rp. 55,000.00 = Rp. 21,450.00 Kepala tukang 0.039 OH x Rp. 70,000.00 = Rp. 2,730.00 Mandor 0.039 OH x Rp. 58,000.00 = Rp. 2,262.00

Jumlah (2) = Rp. 61,542.00 Jumlah (1) +(2) = Rp. 429,099.12

SNI 2836:2008.6.10 1 m³ Pasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Belah/Gunung BahanBatu kali/belah/gunung 0.480 M³ x Rp. 279,600.00 = Rp. 134,208.00 Semen Pc 194.000 Kg x Rp. 1,480.00 = Rp. 287,120.00 Pasir beton 0.312 M³ x Rp. 129,600.00 = Rp. 40,435.20 Kerikil beton 0.468 M³ x Rp. 150,000.00 = Rp. 70,200.00

Jumlah (1) = Rp. 531,963.20 TenagaPekerja 3.400 OH x Rp. 45,000.00 = Rp. 153,000.00 Tukang batu 0.850 OH x Rp. 55,000.00 = Rp. 46,750.00 Kepala tukang 0.085 OH x Rp. 70,000.00 = Rp. 5,950.00 Mandor 0.170 OH x Rp. 58,000.00 = Rp. 9,860.00

Jumlah (2) = Rp. 215,560.00 Jumlah (1) +(2) = Rp. 747,523.20

SNI 6897:2008.6.7 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps BahanBata merah 5 x 10 x 20 cm 70.000 Bh x Rp. 960.00 = Rp. 67,200.00 Semen portland 18.950 Kg x Rp. 1,480.00 = Rp. 28,046.00 Pasir pasang 0.038 M³ x Rp. 108,000.00 = Rp. 4,104.00

Jumlah (1) = Rp. 99,350.00 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 20,570.00 Jumlah (1) + (2) = Rp. 119,920.00

SNI 6897:2008.6.8 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps BahanBata merah 5 x 10 x 20 cm 70.000 Bh x Rp. 960.00 = Rp. 67,200.00 Semen portland 14.370 Kg x Rp. 1,480.00 = Rp. 21,267.60 Pasir pasang 0.040 M³ x Rp. 108,000.00 = Rp. 4,320.00

Jumlah (1) = Rp. 92,787.60 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 20,570.00 Jumlah (1) + (2) = Rp. 113,357.60

Page 5: rab kantin

SNI 6897:2008.6.9 1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps BahanBata merah 5 x 10 x 20 cm 70.000 Bh x Rp. 960.00 = Rp. 67,200.00 Semen portland 11.500 Kg x Rp. 1,480.00 = Rp. 17,020.00 Pasir pasang 0.043 M³ x Rp. 108,000.00 = Rp. 4,644.00

Jumlah (1) = Rp. 88,864.00 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 20,570.00 Jumlah (1) + (2) = Rp. 109,434.00

SNI 2837:2008.6.2 1 m² Plesteran 1 Pc : 2 Ps, tebal 15 mmBahanSemen portland 10.224 Kg x Rp. 1,480.00 = Rp. 15,131.52 Pasir pasang 0.020 M³ x Rp. 108,000.00 = Rp. 2,160.00

Jumlah (1) = Rp. 17,291.52 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.150 OH x Rp. 55,000.00 = Rp. 8,250.00 Kepala tukang 0.015 OH x Rp. 70,000.00 = Rp. 1,050.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 23,670.00 Jumlah (1) + (2) = Rp. 40,961.52

SNI 2837:2008.6.3 1 m² Plesteran 1 Pc : 3 Ps, tebal 15 mmBahanSemen portland 7.776 Kg x Rp. 1,480.00 = Rp. 11,508.48 Pasir pasang 0.023 M³ x Rp. 108,000.00 = Rp. 2,484.00

Jumlah (1) = Rp. 13,992.48 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.150 OH x Rp. 55,000.00 = Rp. 8,250.00 Kepala tukang 0.015 OH x Rp. 70,000.00 = Rp. 1,050.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 23,670.00 Jumlah (1) + (2) = Rp. 37,662.48

SNI 2837:2008.6.4 1 m² Plesteran 1 Pc : 4 Ps, tebal 15 mmBahanSemen portland 6.240 Kg x Rp. 1,480.00 = Rp. 9,235.20 Pasir pasang 0.024 M³ x Rp. 108,000.00 = Rp. 2,592.00

Jumlah (1) = Rp. 11,827.20 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.150 OH x Rp. 55,000.00 = Rp. 8,250.00 Kepala tukang 0.015 OH x Rp. 70,000.00 = Rp. 1,050.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 23,670.00 Jumlah (1) + (2) = Rp. 35,497.20

SNI 2837:2008.6.23 1 m² Plesteran ciprat 1 Pc : 2 PsBahanSemen portland 4.320 Kg x Rp. 1,480.00 = Rp. 6,393.60 Pasir pasang 0.006 M³ x Rp. 108,000.00 = Rp. 648.00

Jumlah (1) = Rp. 7,041.60 TenagaPekerja 0.300 OH x Rp. 45,000.00 = Rp. 13,500.00 Tukang batu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.015 OH x Rp. 58,000.00 = Rp. 870.00

Jumlah (2) = Rp. 20,570.00 Jumlah (1) + (2) = Rp. 27,611.60

SNI 2837:2008.6.27 1 m² Membuat acianBahanSemen portland 3.325 Kg x Rp. 1,480.00 = Rp. 4,921.00

Jumlah (1) = Rp. 4,921.00 TenagaPekerja 0.200 OH x Rp. 45,000.00 = Rp. 9,000.00 Tukang batu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.010 OH x Rp. 58,000.00 = Rp. 580.00

Jumlah (2) = Rp. 15,780.00 Jumlah (1) + (2) = Rp. 20,701.00

Page 6: rab kantin

SNI 91-0012-2007-6.66.a 1 m² Memasang Paving Block BaruBahanPasir Pasang 0.045 M³ x Rp. 108,000.00 = Rp. 4,860.00 Paving Block 40.000 Bh x Rp. 2,100.00 = Rp. 84,000.00

Jumlah (1) = Rp. 88,860.00 TenagaPekerja 0.620 Oh x Rp. 45,000.00 = Rp. 27,900.00 Tukang cat 0.350 Oh x Rp. 55,000.00 = Rp. 19,250.00 Kepala tukang 0.035 Oh x Rp. 70,000.00 = Rp. 2,450.00 Mandor 0.030 Oh x Rp. 58,000.00 = Rp. 1,740.00

Jumlah (2) = Rp. 51,340.00 Jumlah (1) + (2) = Rp. 140,200.00

SNI 91-0012-2007-6.66.b 1 m² Memasang Paving Block Lama + 30% Paving Block BaruBahanPasir Pasang 0.045 M³ x Rp. 108,000.00 = Rp. 4,860.00 Paving Block 8.000 Bh x Rp. 2,100.00 = Rp. 16,800.00

Jumlah (1) = Rp. 21,660.00 TenagaPekerja 0.620 Oh x Rp. 45,000.00 = Rp. 27,900.00 Tukang cat 0.350 Oh x Rp. 55,000.00 = Rp. 19,250.00 Kepala tukang 0.035 Oh x Rp. 70,000.00 = Rp. 2,450.00 Mandor 0.030 Oh x Rp. 58,000.00 = Rp. 1,740.00

Jumlah (2) = Rp. 51,340.00 Jumlah (1) + (2) = Rp. 73,000.00

SNI 7394:2008.6.1 1 m³ Beton mutu f'c=7,4 Mpa (K100), slump(12 ± 2) cm,w/c=0,87BahanSemen Portland 247.000 Kg x Rp. 1,480.00 = Rp. 365,560.00 Pasir Beton 0.621 M³ x Rp. 129,600.00 = Rp. 80,481.60 Kerikil beton (maksimum 30 mm) 0.740 M³ x Rp. 129,600.00 = Rp. 95,904.00 Air 215.000 ltr x Rp. 150.00 = Rp. 32,250.00

Jumlah (1) = Rp. 574,195.60 TenagaPekerja 1.650 OH x Rp. 45,000.00 = Rp. 74,250.00 Tukang batu 0.275 OH x Rp. 55,000.00 = Rp. 15,125.00 Kepala tukang 0.028 OH x Rp. 70,000.00 = Rp. 1,960.00 Mandor 0.083 OH x Rp. 58,000.00 = Rp. 4,814.00

Jumlah (2) = Rp. 96,149.00 Jumlah (1) + (2) = Rp. 670,344.60

SNI 7394:2008.6.3 1 m³ Beton mutu f'c=12,2 Mpa (K150), slump(12 ± 2) cm,w/c=0,72BahanSemen Portland 299.000 Kg x Rp. 1,480.00 = Rp. 442,520.00 Pasir Beton 0.571 M³ x Rp. 129,600.00 = Rp. 74,001.60 Kerikil beton (maksimum 30 mm) 0.753 M³ x Rp. 129,600.00 = Rp. 97,588.80 Air 215.000 ltr x Rp. 150.00 = Rp. 32,250.00

Jumlah (1) = Rp. 646,360.40 TenagaPekerja 1.650 OH x Rp. 45,000.00 = Rp. 74,250.00 Tukang batu 0.275 OH x Rp. 55,000.00 = Rp. 15,125.00 Kepala tukang 0.028 OH x Rp. 70,000.00 = Rp. 1,960.00 Mandor 0.083 OH x Rp. 58,000.00 = Rp. 4,814.00

Jumlah (2) = Rp. 96,149.00 Jumlah (1) + (2) = Rp. 742,509.40

SNI 7394:2008.6.5 1 m³ Beton mutu f'c=14,5 Mpa (K175), slump(12 ± 2) cm,w/c=0,66BahanSemen portland 326.000 Kg x Rp. 1,480.00 = Rp. 482,480.00 Pasir beton 0.543 M³ x Rp. 129,600.00 = Rp. 70,372.80 Kerikil beton (maksimum 30 mm) 0.762 M³ x Rp. 129,600.00 = Rp. 98,755.20 Air 215.000 ltr x Rp. 150.00 = Rp. 32,250.00

Jumlah (1) = Rp. 683,858.00 TenagaPekerja 1.650 OH x Rp. 45,000.00 = Rp. 74,250.00 Tukang batu 0.275 OH x Rp. 55,000.00 = Rp. 15,125.00 Kepala tukang 0.028 OH x Rp. 70,000.00 = Rp. 1,960.00 Mandor 0.083 OH x Rp. 58,000.00 = Rp. 4,814.00

Jumlah (2) = Rp. 96,149.00 Jumlah (1) + (2) = Rp. 780,007.00

SNI 7394:2008.6.17 10 Kg Pembesian dengan besi polosBahanBesi beton polos 10.500 Kg x Rp. 11,280.00 = Rp. 118,440.00 Kawat beton 0.150 Kg x Rp. 14,400.00 = Rp. 2,160.00

Jumlah (1) = Rp. 120,600.00 TenagaPekerja 0.070 OH x Rp. 45,000.00 = Rp. 3,150.00 Tukang besi 0.070 OH x Rp. 55,000.00 = Rp. 3,850.00 Kepala tukang 0.007 OH x Rp. 70,000.00 = Rp. 490.00 Mandor 0.004 OH x Rp. 58,000.00 = Rp. 232.00

Jumlah (2) = Rp. 7,722.00 Jumlah (1) + (2) = Rp. 128,322.00

Untuk 1 Kg Pembesian dengan besi Beton Polos = 1/10 x Jumlah = Rp. 12,832.20

Page 7: rab kantin

SNI 7394:2008.6.20 1 m² Memasang bekisting untuk pondasiBahanPapan/Kayu Klas III 0.040 M³ x Rp. 1,830,000.00 = Rp. 73,200.00 Paku kayu 0.300 Kg x Rp. 14,160.00 = Rp. 4,248.00 Minyak bekisting 0.100 Liter x Rp. 12,000.00 = Rp. 1,200.00

Jumlah (1) = Rp. 78,648.00 TenagaPekerja 0.520 OH x Rp. 45,000.00 = Rp. 23,400.00 Tukang kayu 0.260 OH x Rp. 55,000.00 = Rp. 14,300.00 Kepala tukang 0.026 OH x Rp. 70,000.00 = Rp. 1,820.00 Mandor 0.026 OH x Rp. 58,000.00 = Rp. 1,508.00

Jumlah (2) = Rp. 41,028.00 Jumlah (1) + (2) = Rp. 119,676.00

Untuk 3x pakai Jumlah = Rp. 39,892.00

SNI 7394:2008.6.21 1 m² Memasang bekisting untuk sloofBahanPapan/Kayu Klas III 0.045 M³ x Rp. 1,830,000.00 = Rp. 82,350.00 Paku kayu 0.300 Kg x Rp. 14,160.00 = Rp. 4,248.00 Minyak bekisting 0.100 Liter x Rp. 12,000.00 = Rp. 1,200.00

Jumlah (1) = Rp. 87,798.00 TenagaPekerja 0.520 OH x Rp. 45,000.00 = Rp. 23,400.00 Tukang kayu 0.260 OH x Rp. 55,000.00 = Rp. 14,300.00 Kepala tukang 0.026 OH x Rp. 70,000.00 = Rp. 1,820.00 Mandor 0.026 OH x Rp. 58,000.00 = Rp. 1,508.00

Jumlah (2) = Rp. 41,028.00 Jumlah (1) + (2) = Rp. 128,826.00

Untuk 3x pakai Jumlah = Rp. 42,942.00

SNI 7394:2008.6.22 1 m² Memasang bekisting untuk kolomBahanPapan/Kayu Klas III 0.040 M³ x Rp. 1,830,000.00 = Rp. 73,200.00 Paku kayu 0.400 Kg x Rp. 14,160.00 = Rp. 5,664.00 Minyak bekisting 0.200 Liter x Rp. 12,000.00 = Rp. 2,400.00 Balok kayu kelas III 0.015 M³ x Rp. 1,830,000.00 = Rp. 27,450.00 Plywood tebal 9 mm 0.350 Lbr x Rp. 162,000.00 = Rp. 56,700.00 Dolken kayu galam Ø (8-10) cm, panjang 4 m 2.000 Btg x Rp. 24,720.00 = Rp. 49,440.00

Jumlah (1) = Rp. 214,854.00 TenagaPekerja 0.660 OH x Rp. 45,000.00 = Rp. 29,700.00 Tukang kayu 0.330 OH x Rp. 55,000.00 = Rp. 18,150.00 Kepala tukang 0.033 OH x Rp. 70,000.00 = Rp. 2,310.00 Mandor 0.033 OH x Rp. 58,000.00 = Rp. 1,914.00

Jumlah (2) = Rp. 52,074.00 Jumlah (1) + (2) = Rp. 266,928.00

Untuk 3x pakai Jumlah = Rp. 88,976.00

SNI 7394:2008.6.23 1 m² Memasang bekisting untuk balokBahanPapan/Kayu Klas III 0.040 M³ x Rp. 1,830,000.00 = Rp. 73,200.00 Paku kayu 0.400 Kg x Rp. 14,160.00 = Rp. 5,664.00 Minyak bekisting 0.200 Liter x Rp. 12,000.00 = Rp. 2,400.00 Balok kayu kelas III 0.018 M³ x Rp. 1,830,000.00 = Rp. 32,940.00 Plywood tebal 9 mm 0.350 Lbr x Rp. 162,000.00 = Rp. 56,700.00 Dolken kayu galam Ø (8-10) cm, panjang 4 m 2.000 Btg x Rp. 24,720.00 = Rp. 49,440.00

Jumlah (1) = Rp. 220,344.00 TenagaPekerja 0.660 OH x Rp. 45,000.00 = Rp. 29,700.00 Tukang kayu 0.330 OH x Rp. 55,000.00 = Rp. 18,150.00 Kepala tukang 0.033 OH x Rp. 70,000.00 = Rp. 2,310.00 Mandor 0.033 OH x Rp. 58,000.00 = Rp. 1,914.00

Jumlah (2) = Rp. 52,074.00 Jumlah (1) + (2) = Rp. 272,418.00

Untuk 3x pakai Jumlah = Rp. 90,806.00

SNI 7394:2008.6.24 1 m² Memasang bekisting untuk platBahanPapan/Kayu Klas III 0.040 M³ x Rp. 1,830,000.00 = Rp. 73,200.00 Paku kayu 0.400 Kg x Rp. 14,160.00 = Rp. 5,664.00 Minyak bekisting 0.200 Liter x Rp. 12,000.00 = Rp. 2,400.00 Balok kayu kelas III 0.015 M³ x Rp. 1,830,000.00 = Rp. 27,450.00 Plywood tebal 9 mm 0.350 Lbr x Rp. 162,000.00 = Rp. 56,700.00 Dolken kayu galam Ø (8-10) cm, panjang 4 m 6.000 Btg x Rp. 24,720.00 = Rp. 148,320.00

Jumlah (1) = Rp. 313,734.00 TenagaPekerja 0.660 OH x Rp. 45,000.00 = Rp. 29,700.00 Tukang kayu 0.330 OH x Rp. 55,000.00 = Rp. 18,150.00 Kepala tukang 0.033 OH x Rp. 70,000.00 = Rp. 2,310.00 Mandor 0.033 OH x Rp. 58,000.00 = Rp. 1,914.00

Jumlah (2) = Rp. 52,074.00 Jumlah (1) + (2) = Rp. 365,808.00

Untuk 3x pakai Jumlah = Rp. 121,936.00

Page 8: rab kantin

Pekerjaan Lain-lain Untuk membongkar cetakan dan menyiram beton yang diperlukan- Pekerja 2.000 OH x Rp. 45,000.00 = Rp. 90,000.00

Jumlah = Rp. 90,000.00

Supl. SNI 7394:2008.2.b 1 m³ Beton bertulang Sloof 18/25 cmSNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 176.613 Kg x Rp. 12,832.20 = Rp. 2,266,337.62 SNI 7394:2008.6.21 - Cetakan Beton untuk Sloof 11.667 M² x Rp. 42,942.00 = Rp. 500,990.00

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 3,637,334.62

Supl. SNI 7394:2008.3.a 1 m³ Beton bertulang kolom 18x18 cmSNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 209.363 Kg x Rp. 12,832.20 = Rp. 2,686,587.41 SNI 7394:2008.6.22 - Cetakan Beton untuk kolom 13.333 M² x Rp. 88,976.00 = Rp. 1,186,346.67

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 4,742,941.08

Supl. SNI 7394:2008.3.b 1 m³ Beton bertulang kolom praktis 13x13 cmSNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 181.065 Kg x Rp. 12,832.20 = Rp. 2,323,463.43 SNI 7394:2008.6.22 - Cetakan Beton untuk kolom 15.385 M² x Rp. 88,976.00 = Rp. 1,368,861.54

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 4,562,331.97

Supl. SNI 7394:2008.4.a 1 m³ Beton bertulang ring balok 15/20 cmSNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 191.600 Kg x Rp. 12,832.20 = Rp. 2,458,649.52 SNI 7394:2008.6.23 - Cetakan Beton untuk balok 14.359 M² x Rp. 90,806.00 = Rp. 1,303,881.03

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 4,632,537.55

Supl. SNI 7394:2008.4.b 1 m³ Beton bertulang balok latei/top geuvel 13/15 cmSNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 181.065 Kg x Rp. 12,832.20 = Rp. 2,323,463.43 SNI 7394:2008.6.23 - Cetakan Beton untuk balok 15.385 M² x Rp. 90,806.00 = Rp. 1,397,015.38

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 4,590,485.82

Supl. SNI 7394:2008.5 1 m³ Beton bertulang plat SNI 7394:2008.6.5 - Beton Cor K-175 1.000 M³ x Rp. 780,007.00 = Rp. 780,007.00 SNI 7394:2008.6.17 - Pekerjaan Besi 108.500 Kg x Rp. 12,832.20 = Rp. 1,392,293.70 SNI 7394:2008.6.24 - Cetakan Beton untuk plat 13.500 M² x Rp. 121,936.00 = Rp. 1,646,136.00

- Pekerjaan Lain-lain 1.000 x Rp. 90,000.00 = Rp. 90,000.00 Jumlah = Rp. 3,908,436.70

SNI 3434:2008.6.1 Membuat dan memasang kusen pintu dan kusen jendela, Kayu kelas IIBahanKayu kelas II 1.100 M³ x Rp. 2,916,000.00 = Rp. 3,207,600.00 Paku kayu 1.250 Kg x Rp. 14,160.00 = Rp. 17,700.00 Lem kayu 1.000 Kg x Rp. 18,000.00 = Rp. 18,000.00

Jumlah (1) = Rp. 3,243,300.00 Tenaga

Pekerja 7.000 OH x Rp. 45,000.00 = Rp. 315,000.00 Tukang kayu 21.000 OH x Rp. 55,000.00 = Rp. 1,155,000.00 Kepala tukang 2.100 OH x Rp. 70,000.00 = Rp. 147,000.00 Mandor 0.350 OH x Rp. 58,000.00 = Rp. 20,300.00

Jumlah (2) = Rp. 1,637,300.00 Jumlah (1) + (2) = Rp. 4,880,600.00

SNI 3434:2008.6.29 Membuat dan memasang daun pintu panel lapis seng plat, Kayu kelas IIBahanKayu kelas II 0.040 M³ x Rp. 2,916,000.00 = Rp. 116,640.00 Lem kayu 0.500 Kg x Rp. 18,000.00 = Rp. 9,000.00 Seng plat 1.000 lbr x Rp. 108,000.00 = Rp. 108,000.00

Jumlah (1) = Rp. 233,640.00 Tenaga

Pekerja 1.000 OH x Rp. 45,000.00 = Rp. 45,000.00 Tukang kayu 3.000 OH x Rp. 55,000.00 = Rp. 165,000.00 Kepala tukang 0.300 OH x Rp. 70,000.00 = Rp. 21,000.00 Mandor 0.050 OH x Rp. 58,000.00 = Rp. 2,900.00

Jumlah (2) = Rp. 233,900.00 Jumlah (1) + (2) = Rp. 467,540.00

1 m3

1 m2

Page 9: rab kantin

Pt T-30-2000-C.6.1.2 1 bh Memasang Kunci tanam 2 slaagBahan

Kunci tanam 2 slaag 1.000 BH x Rp. 136,800.00 = Rp. 136,800.00 Jumlah (1) = Rp. 136,800.00

Tenaga

Tukang Kayu 0.500 OH x Rp. 55,000.00 = Rp. 27,500.00 Kepala Tukang 0.050 OH x Rp. 70,000.00 = Rp. 3,500.00

Jumlah (2) = Rp. 31,000.00 Jumlah (1) + (2) = Rp. 167,800.00

Pt T-30-2000-C.6.1.5 1 bh Memasang engsel pintuBahan

Engsel pintu 1.000 PSG x Rp. 30,000.00 = Rp. 30,000.00 Jumlah (1) = Rp. 30,000.00

Tenaga

Tukang Kayu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala Tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00

Jumlah (2) = Rp. 6,200.00 Jumlah (1) + (2) = Rp. 36,200.00

Pt T-30-2000-C.6.1.5 1 bh Memasang engsel JendelaBahan

Engsel Jendela 1.000 PSG x Rp. 20,400.00 = Rp. 20,400.00 Jumlah (1) = Rp. 20,400.00

Tenaga

Tukang Kayu 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala Tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00

Jumlah (2) = Rp. 6,200.00 Jumlah (1) + (2) = Rp. 26,600.00

Pt T-30-2000-C.6.2.3a Memasang kaca bening tebal 5 mmBahanKaca Tebal 5 mm 1.100 x Rp. 165,000.00 = Rp. 181,500.00

Jumlah (1) = Rp. 181,500.00 Tenaga

Pekerja 0.160 OH x Rp. 45,000.00 = Rp. 7,200.00 Tukang kayu 0.160 OH x Rp. 55,000.00 = Rp. 8,800.00 Kepala tukang 0.016 OH x Rp. 70,000.00 = Rp. 1,120.00 Mandor 0.008 OH x Rp. 58,000.00 = Rp. 464.00

Jumlah (2) = Rp. 17,584.00 Jumlah (1) + (2) = Rp. 199,084.00

SNI 03 -3436-1994 - 6.1 1 m² Memasang Atap seng Multiroof Bahan

Seng Multiroof 1.000 M2 x Rp. 75,000.00 = Rp. 75,000.00 Screw/baut Seng Multi Roof 9.000 Bh x Rp. 300.00 = Rp. 2,700.00

Jumlah (1) = Rp. 77,700.00 Tenaga

Pekerja 0.200 OH x Rp. 45,000.00 = Rp. 9,000.00 Tukang 0.100 OH x Rp. 55,000.00 = Rp. 5,500.00 Kepala Tukang 0.010 OH x Rp. 70,000.00 = Rp. 700.00 Mandor 0.001 OH x Rp. 58,000.00 = Rp. 58.00

Jumlah (2) = Rp. 15,258.00 Jumlah (1) + (2) = Rp. 92,958.00

SNI 03 -3436-1994 - 6.1 1 m1 Memasang Rabung seng Multiroof Bahan

Rabung Seng Multiroof 1.020 M1 x Rp. 30,000.00 = Rp. 30,600.00 Screw/baut Seng Multi Roof 9.000 Bh x Rp. 300.00 = Rp. 2,700.00

Jumlah (1) = Rp. 33,300.00 Tenaga

Pekerja 0.250 OH x Rp. 45,000.00 = Rp. 11,250.00 Tukang 0.150 OH x Rp. 55,000.00 = Rp. 8,250.00 Kepala Tukang 0.015 OH x Rp. 70,000.00 = Rp. 1,050.00 Mandor 0.013 OH x Rp. 58,000.00 = Rp. 754.00

Jumlah (2) = Rp. 21,304.00 Jumlah (1) + (2) = Rp. 54,604.00

1 m2

M2

Page 10: rab kantin

SNI 3434:2008 (6.13) konstruksi kuda-kuda konvensional, kayu kelas I, II, III bentang 6 meter Bahan

Balok Kayu 1.100 x Rp. 3,048,000.00 = Rp. 3,352,800.00

Besi strip tebal 5 mm 15.00 Kg x Rp. 18,500.00 = Rp. 277,500.00

Paku 12 cm 5.600 Kg x Rp. 14,160.00 = Rp. 79,296.00

Jumlah (1) = Rp. 3,709,596.00

Tenaga

Pekerja 4.000 OH x Rp. 45,000.00 = Rp. 180,000.00

Tukang 12.000 OH x Rp. 55,000.00 = Rp. 660,000.00

Kepala Tukang 1.200 OH x Rp. 70,000.00 = Rp. 84,000.00

Mandor 0.200 OH x Rp. 58,000.00 = Rp. 11,600.00

Jumlah (2) = Rp. 935,600.00

Jumlah (1) + (2) = Rp. 4,645,196.00

SNI 3434:2008 (6.15) konstruksi gordeng, kayu kelas II Bahan

Balok Kayu 1.100 x Rp. 1,830,000.00 = Rp. 2,013,000.00

Paku 12 cm 3.000 Kg x Rp. 14,160.00 = Rp. 42,480.00

Jumlah (1) = Rp. 2,055,480.00

Tenaga

Pekerja 2.400 OH x Rp. 45,000.00 = Rp. 108,000.00

Tukang 7.200 OH x Rp. 55,000.00 = Rp. 396,000.00

Kepala Tukang 0.720 OH x Rp. 70,000.00 = Rp. 50,400.00

Mandor 0.120 OH x Rp. 58,000.00 = Rp. 6,960.00

Jumlah (2) = Rp. 561,360.00

Jumlah (1) + (2) = Rp. 2,616,840.00

SNI 3434:2008 (6.21)

Bahan

Papan Kayu 1.020 x Rp. 15,000.00 = Rp. 15,300.00

Paku 12 cm 0.050 Kg x Rp. 14,160.00 = Rp. 708.00

Jumlah (1) = Rp. 16,008.00

Tenaga

Pekerja 0.100 OH x Rp. 45,000.00 = Rp. 4,500.00

Tukang 0.200 OH x Rp. 55,000.00 = Rp. 11,000.00

Kepala Tukang 0.020 OH x Rp. 70,000.00 = Rp. 1,400.00

Mandor 0.005 OH x Rp. 58,000.00 = Rp. 290.00

Jumlah (2) = Rp. 17,190.00

Jumlah (1) + (2) = Rp. 33,198.00

SNI 2839:2008.6.10 1 m' List Langit - langit Kayu profil Bahan

List kayu profil 1.100 M' x Rp. 12,000.00 = Rp. 13,200.00 Paku 0.010 Kg x Rp. 14,160.00 = Rp. 141.60

Jumlah (1) = Rp. 13,341.60 Tenaga

Pekerja 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00 Tukang kayu 0.050 Oh x Rp. 55,000.00 = Rp. 2,750.00 Kepala tukang 0.005 Oh x Rp. 70,000.00 = Rp. 350.00 Mandor 0.003 Oh x Rp. 58,000.00 = Rp. 174.00

Jumlah (2) = Rp. 5,524.00 Jumlah (1) + (2) = Rp. 18,865.60

SNI 2839:2008.6.12 1 m² Memasang Plafond tripleks tebal 4 mm + rangka kayuBahan

Kayu kelas II 0.023 M³ x Rp. 1,830,000.00 = Rp. 42,090.00 Paku biasa 2" - 5" 0.060 Kg x Rp. 14,160.00 = Rp. 849.60 Paku Tripleks 0.030 Kg x Rp. 14,160.00 = Rp. 424.80 Tripleks tebal 4 mm 0.390 Lbr x Rp. 65,000.00 = Rp. 25,350.00

Jumlah (1) = Rp. 68,714.40 Tenaga

Pekerja 0.270 Oh x Rp. 45,000.00 = Rp. 12,150.00 Tukang kayu 0.400 Oh x Rp. 55,000.00 = Rp. 22,000.00 Kepala tukang 0.040 Oh x Rp. 70,000.00 = Rp. 2,800.00 Mandor 0.0135 Oh x Rp. 58,000.00 = Rp. 783.00

Jumlah (2) = Rp. 37,733.00 Jumlah (1) + (2) = Rp. 106,447.40

1 M3

M3

1 M3

M3

1 M1 Lisplank Uk. 3 x 20 cm, kayu kelas II

M1

Page 11: rab kantin

SNI 7395:2008.6.36 1 m² Memasang Lantai Keramik 20 x 20 cm BahanKeramik 20 x 20 cm 26.500 Bh x Rp. 5,280.00 = Rp. 139,920.00 Semen PC 10.400 Kg x Rp. 1,480.00 = Rp. 15,392.00 Pasir Pasang 0.045 M³ x Rp. 108,000.00 = Rp. 4,860.00 Semen warna 1.620 Kg x Rp. 1,780.00 = Rp. 2,883.60

= Rp. 163,055.60 Tenaga

Pekerja 0.700 OH x Rp. 45,000.00 = Rp. 31,500.00 Tukang batu 0.350 OH x Rp. 55,000.00 = Rp. 19,250.00 Kepala tukang 0.035 OH x Rp. 70,000.00 = Rp. 2,450.00 Mandor 0.035 OH x Rp. 58,000.00 = Rp. 2,030.00

Jumlah (2) = Rp. 55,230.00 Jumlah (1) + (2) = Rp. 218,285.60

SNI 7395:2008.6.65 1 m² Memasang Dinding Keramik 20 x 25 cmBahanKeramik 20 x 25 cm 21.000 Bh x Rp. 6,240.00 = Rp. 131,040.00 Semen PC 9.300 Kg x Rp. 1,480.00 = Rp. 13,764.00 Pasir Pasang 0.018 M³ x Rp. 108,000.00 = Rp. 1,944.00 Semen warna 1.940 Kg x Rp. 1,780.00 = Rp. 3,453.20

= Rp. 150,201.20 Tenaga

Pekerja 0.900 OH x Rp. 45,000.00 = Rp. 40,500.00 Tukang batu 0.450 OH x Rp. 55,000.00 = Rp. 24,750.00 Kepala tukang 0.045 OH x Rp. 70,000.00 = Rp. 3,150.00 Mandor 0.045 OH x Rp. 58,000.00 = Rp. 2,610.00

Jumlah (2) = Rp. 71,010.00 Jumlah (1) + (2) = Rp. 221,211.20

SNI 7395:2008.6.64.a 1 m² Memasang Lantai Keramik 40 x 40 cm PolishedBahanKeramik 40 x 40 cm Polished 6.500 Bh x Rp. 8,400.00 = Rp. 54,600.00 Semen PC 10.000 Kg x Rp. 1,480.00 = Rp. 14,800.00 Pasir Pasang 0.045 M³ x Rp. 108,000.00 = Rp. 4,860.00 Semen warna 1.500 Kg x Rp. 1,780.00 = Rp. 2,670.00

= Rp. 76,930.00 Tenaga

Pekerja 0.700 OH x Rp. 45,000.00 = Rp. 31,500.00 Tukang batu 0.350 OH x Rp. 55,000.00 = Rp. 19,250.00 Kepala tukang 0.035 OH x Rp. 70,000.00 = Rp. 2,450.00 Mandor 0.035 OH x Rp. 58,000.00 = Rp. 2,030.00

Jumlah (2) = Rp. 55,230.00 Jumlah (1) + (2) = Rp. 132,160.00

SNI 7395:2008.6.64.b 1 m² Memasang Lantai Keramik 40 x 40 cm UnpolishedBahanKeramik 40 x 40 cm Unpolished 6.500 Bh x Rp. 8,760.00 = Rp. 56,940.00 Semen PC 10.000 Kg x Rp. 1,480.00 = Rp. 14,800.00 Pasir Pasang 0.045 M³ x Rp. 108,000.00 = Rp. 4,860.00 Semen warna 1.500 Kg x Rp. 1,780.00 = Rp. 2,670.00

= Rp. 79,270.00 Tenaga

Pekerja 0.700 OH x Rp. 45,000.00 = Rp. 31,500.00 Tukang batu 0.350 OH x Rp. 55,000.00 = Rp. 19,250.00 Kepala tukang 0.035 OH x Rp. 70,000.00 = Rp. 2,450.00 Mandor 0.035 OH x Rp. 58,000.00 = Rp. 2,030.00

Jumlah (2) = Rp. 55,230.00 Jumlah (1) + (2) = Rp. 134,500.00

Pt-T-38-2000-C.6.2 1 m² Membersihkan/mencuci cat tembok lama cara manualTenagaPekerja 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00 Mandor 0.040 Oh x Rp. 58,000.00 = Rp. 2,320.00

Jumlah = Rp. 5,920.00

Page 12: rab kantin

Pt-T-38-2000-C.6.8 1 m² Pengecatan bidang kayu baruBahanCat Menie 0.200 Kg x Rp. 17,561.50 = Rp. 3,512.30 Plamir 0.150 Kg x Rp. 16,500.00 = Rp. 2,475.00 Cat dasar 0.170 Kg x Rp. 22,000.00 = Rp. 3,740.00 Cat Kayu 0.260 Kg x Rp. 34,650.00 = Rp. 9,009.00 Kertas Pasir 0.500 Lbr x Rp. 3,690.00 = Rp. 1,845.00

Jumlah (1) = Rp. 20,581.30 TenagaPekerja 0.070 Oh x Rp. 45,000.00 = Rp. 3,150.00 Tukang cat 0.009 Oh x Rp. 55,000.00 = Rp. 495.00 Kepala tukang 0.0060 Oh x Rp. 70,000.00 = Rp. 420.00 Mandor 0.0025 Oh x Rp. 58,000.00 = Rp. 145.00

Jumlah (2) = Rp. 4,210.00 Jumlah (1) + (2) = Rp. 24,791.30

Pt-T-38-2000-C.6.14 1 m² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )BahanPlamir 0.100 Kg x Rp. 16,500.00 = Rp. 1,650.00 Cat dasar 0.120 Kg x Rp. 22,000.00 = Rp. 2,640.00 Cat Tembok 2 x 0.240 Kg x Rp. 30,800.00 = Rp. 7,392.00 Kertas Pasir 0.200 Lbr x Rp. 3,690.00 = Rp. 738.00

Jumlah (1) = Rp. 12,420.00 TenagaPekerja 0.020 Oh x Rp. 45,000.00 = Rp. 900.00 Tukang cat 0.063 Oh x Rp. 55,000.00 = Rp. 3,465.00 Kepala tukang 0.0063 Oh x Rp. 70,000.00 = Rp. 441.00 Mandor 0.0025 Oh x Rp. 58,000.00 = Rp. 145.00

Jumlah (2) = Rp. 4,951.00 Jumlah (1) + (2) = Rp. 17,371.00

Pt-T-38-2000-C.6.15 1 m² Pengecatan tembok lama (2 lapis cat penutup )BahanCat Tembok 2 x 0.240 Kg x Rp. 30,800.00 = Rp. 7,392.00 Kertas Pasir 0.200 Lbr x Rp. 3,690.00 = Rp. 738.00

Jumlah (1) = Rp. 8,130.00 TenagaPekerja 0.020 Oh x Rp. 45,000.00 = Rp. 900.00 Tukang cat 0.063 Oh x Rp. 55,000.00 = Rp. 3,465.00 Kepala tukang 0.0063 Oh x Rp. 70,000.00 = Rp. 441.00 Mandor 0.0025 Oh x Rp. 58,000.00 = Rp. 145.00

Jumlah (2) = Rp. 4,951.00 Jumlah (1) + (2) = Rp. 13,081.00

Pt-T-38-2000-C.6.16 1 m² Pengecatan Plafond ( dempul + 2 lapis cat penutup )BahanPlamir 0.100 Kg x Rp. 16,500.00 = Rp. 1,650.00 Cat Tembok 2 x 0.240 Kg x Rp. 30,800.00 = Rp. 7,392.00 Kertas Pasir 0.500 Lbr x Rp. 3,690.00 = Rp. 1,845.00

Jumlah (1) = Rp. 10,887.00 TenagaPekerja 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00 Tukang cat 0.063 Oh x Rp. 55,000.00 = Rp. 3,465.00 Kepala tukang 0.0063 Oh x Rp. 70,000.00 = Rp. 441.00 Mandor 0.004 Oh x Rp. 58,000.00 = Rp. 232.00

Jumlah (2) = Rp. 7,738.00 Jumlah (1) + (2) = Rp. 18,625.00

Singkil, 2013 Konsultan Perencana :

CV. HIKMAH CONSULTANT

HILDA FAZLIANA Direktris

Page 13: rab kantin

PERHITUNGAN VOLUME BESI

Berat Jenis Besi Tulangan Baja/Besi Luas Berat

Polos Ulir (cm2) (kg/m)

P 6 U 6 0.288 0.222

P 8 U 8 0.503 0.395

P 9 U 9 0.636 0.499

P 10 U 10 0.758 0.617

P 12 U 12 1.131 0.888

P 13 U 13 1.327 1.040

P 14 U 14 1.540 1.210

P 16 U 16 2.011 1.580

P 18 U 18 2.545 2.000

P 19 U 19 2.835 2.230

P 20 U 20 3.142 2.470

P 22 U 22 3.801 2.980

P 25 U 25 4.909 3.850

P 28 U 28 6.157 4.830

P 29 U 29 6.605 5.190

SLOOF 15 X 20 CM Tulangan Utama = 5 Ø 12 Polos BJ 0.89 Sengkang = Ø 8 - 150 Polos BJ 0.40 Luas Penampang = 0.030 m2 Selimut Beton = 2.5 cm Dalam 1 m3 Panjangnya = 33.33 m Luas Bekisting dalam 1m3 = 11.67 m2 11.67 Jumlah Sengkang = 222 Buah Panjang 1 Sengkang = 0.58 m

Berat Besi = 5 Ø 12 = 148.00 kg Berat Besi = Ø 4 - 150 = 28.61 kg Jumlah Berat = 176.61 kg

KOLOM 15 X 15 CM Tulangan Utama = 4 Ø 12 Polos BJ 0.89 Sengkang = Ø 8 - 150 Polos BJ 0.40 Luas Penampang = 0.023 m2 Selimut Beton = 3 cm Dalam 1 m3 Panjangnya = 44.44 m Luas Bekisting dalam 1m3 = 13.33 m2 13.33 Jumlah Sengkang = 296 Buah Panjang 1 Sengkang = 0.44 m

Berat Besi = 4 Ø 12 = 157.87 kg Berat Besi = Ø 8 - 150 = 51.50 kg Jumlah Berat = 209.36 kg

Page 14: rab kantin

KOLOM PRAKTIS 13 X 13 CM Tulangan Utama = 4 Ø 10 Polos BJ 0.62 Sengkang = Ø 6 - 150 Polos BJ 0.22 Luas Penampang = 0.017 m2 Selimut Beton = 2.5 cm Dalam 1 m3 Panjangnya = 59.17 m Luas Bekisting dalam 1m3 = 15.38 m2 15.38 Jumlah Sengkang = 394 Buah Panjang 1 Sengkang = 0.40 m

Berat Besi = 4 Ø 10 = 146.04 kg Berat Besi = Ø 6 - 150 = 35.03 kg Jumlah Berat = 181.07 kg

RING BALK 13 X 15 CM Tulangan Utama = 5 Ø 10 Polos BJ 0.62 Sengkang = Ø 8 - 150 Polos BJ 0.22 Luas Penampang = 0.020 m2 Selimut Beton = 2.5 cm Dalam 1 m3 Panjangnya = 51.28 m Luas Bekisting dalam 1m3 = 14.36 m2 14.36 Jumlah Sengkang = 342 Buah Panjang 1 Sengkang = 0.44 m

Berat Besi = 5 Ø 10 = 158.21 kg Berat Besi = Ø 8 - 150 = 33.39 kg Jumlah Berat = 191.60 kg

BALOK LATAI 13 X 13 CM Tulangan Utama = 4 Ø 10 Polos BJ 0.62 Sengkang = Ø 8 - 150 Polos BJ 0.22 Luas Penampang = 0.017 m2 Selimut Beton = 2.5 cm Dalam 1 m3 Panjangnya = 59.17 m Luas Bekisting dalam 1m3 = 15.38 m2 15.38 Jumlah Sengkang = 394 Buah Panjang 1 Sengkang = 0.40 m

Berat Besi = 4 Ø 10 = 146.04 kg Berat Besi = Ø 8 - 150 = 35.03 kg Jumlah Berat = 181.07 kg

Page 15: rab kantin

BERAT BESI BETON POLOS/M'

Diameter Nominal Luas Penampang Berat NominalNo. Penamaan (d) Nominal (L) per Meter

(mm) (kg/m)1 P.6 6 0.2826 0.2222 P.8 8 0.5024 0.3953 P.10 10 0.785 0.6174 P.12 12 1.1304 0.8885 P.14 14 1.5386 1.126 P.16 16 2.0096 1.587 P.19 19 2.8339 2.238 P.22 22 3.7994 2.989 P.25 25 4.9063 3.85

10 P.28 28 6.1544 4.8311 P.32 32 8.0384 6.32

Sumber SNI 07-2052-2002

(cm2)

Page 16: rab kantin

4. Sloof 15/20 cm

B = 15 cm = 0.150 M'H = 20 cm = 0.200 M'

33.333 M'Panjang Tulangan Utama = 33.333 M'Jumlah Tulangan Utama = 4 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel Tumpuan = 0.1 M'Jarak Beugel Lapangan = 0.15 M'Jumlah Beugel Tumpuan = 334.000 BhJumlah Beugel Lapangan = 223.000 BhPanjang Beugel = 0.56 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat

Tulangan Utama 33.333 4.000 0.888 118.400 KgBeugel Tumpuan 0.560 334.000 0.395 73.881 KgBeugel Lapangan 0.560 223.000 0.395 49.328 Kg

241.608

BekistingB H L Luas

0.150 0.200 33.333 13.333

Panjang Sloof/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 17: rab kantin

4. Sloof 18/25 cm

B = 18 cm = 0.180 M'H = 25 cm = 0.250 M'

22.222 M'Panjang Tulangan Utama = 22.222 M'Jumlah Tulangan Utama = 4 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel Tumpuan = 0.1 M'Jarak Beugel Lapangan = 0.15 M'Jumlah Beugel Tumpuan = 334.000 BhJumlah Beugel Lapangan = 223.000 BhPanjang Beugel = 0.72 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat

Tulangan Utama 22.222 4.000 0.888 78.933 KgBeugel Tumpuan 0.720 334.000 0.395 94.990 KgBeugel Lapangan 0.720 223.000 0.395 63.421 Kg

237.344

BekistingB H L Luas

0.180 0.250 22.222 11.111

Panjang Sloof/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 18: rab kantin

5. Kolom 20x40 cm

B = 20 cm = 0.200 M'H = 40 cm = 0.400 M'

12.500 M'Panjang Tulangan Utama = 12.500 M'Jumlah Tulangan Utama = 8 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel = 0.15 M'Jumlah Beugel = 84.000 BhPanjang Beugel = 1.06 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat SatTulangan Utama 12.500 8.000 0.888 88.800 KgBeugel 1.060 84.000 0.395 35.171 Kg

123.971

BekistingB H L Luas

0.200 0.400 12.500 15.000

Panjang Kolom/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 19: rab kantin

5. Kolom 25x25 cm

B = 25 cm = 0.250 M'H = 25 cm = 0.250 M'

16.000 M'Panjang Tulangan Utama = 16.000 M'Jumlah Tulangan Utama = 8 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel = 0.15 M'Jumlah Beugel = 84.000 BhPanjang Beugel = 0.86 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat SatTulangan Utama 16.000 8.000 0.888 113.664 KgBeugel 0.860 84.000 0.395 28.535 Kg

142.199

BekistingB H L Luas

0.250 0.250 16.000 16.000

Panjang Kolom/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 20: rab kantin

8. Kolom 13x15 cm

B = 13 cm = 0.130 M'H = 15 cm = 0.150 M'

51.282 M'Panjang Tulangan Utama = 51.282 M'Jumlah Tulangan Utama = 4 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel = 0.15 M'Jumlah Beugel = 342.000 BhPanjang Beugel = 0.42 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat SatTulangan Utama 51.282 4.000 0.888 182.154 KgBeugel 0.420 342.000 0.395 56.738 Kg

238.892

BekistingB H L Luas

0.130 0.150 51.282 13.333

Panjang Kolom/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 21: rab kantin

9. Ring Balok 13/18 cm

B = 13 cm = 0.130 M'H = 18 cm = 0.180 M'

42.735 M'Panjang Tulangan Utama = 42.735 M'Jumlah Tulangan Utama = 4 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel Tumpuan = 0.1 M'Jarak Beugel Lapangan = 0.15 M'Jumlah Beugel Tumpuan = 214.000 BhJumlah Beugel Lapangan = 143.000 BhPanjang Beugel = 0.48 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat

Tulangan Utama 42.735 4.000 0.888 151.795 KgBeugel Tumpuan 0.480 214.000 0.395 40.574 KgBeugel Lapangan 0.480 143.000 0.395 27.113 Kg

219.482

BekistingB H L Luas

0.130 0.180 42.735 15.385

Panjang Balok/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 22: rab kantin

12. Balok Praktis 13/15 cm

B = 13 cm = 0.130 M'H = 15 cm = 0.150 M'

51.282 M'Panjang Tulangan Utama = 51.282 M'Jumlah Tulangan Utama = 4 PtgDiameter Tulangan Utama 12 mmBerat Tulangan Utma/M' = 0.888 Kg/M'Jarak Beugel Tumpuan = 0.15 M'Jarak Beugel Lapangan = 0.15 M'Jumlah Beugel Tumpuan = 171.000 BhJumlah Beugel Lapangan = 171.000 BhPanjang Beugel = 0.42 M'Diameter Beugel = 8 mmBerat Tulangan Beugel/M' 0.395 Kg/M'

Berat Tulangan L Ptg Berat/m' Berat Sat

Tulangan Utama 51.282 4.000 0.888 182.154 KgBeugel Tumpuan 0.420 171.000 0.395 28.369 KgBeugel Lapangan 0.420 171.000 0.395 28.369 Kg

238.892

BekistingB H L Luas

0.130 0.150 51.282 15.385

Panjang Balok/M3 Beton =

Berat Total Tulangan/M3 = Kg/M3

M2

Page 23: rab kantin

1 6.66666713.3333310.46667

0.08 12.5130.8333

Page 24: rab kantin

No Uraian Pekerjaan Satuan Lebar (m) Tinggi (m)I. Pekerjaan Persiapan1 Pembersihan Lapangan Ls2 Pemasangan Bowplank Ls3 Administrasi dan dokumentasi Ls

II. Pekerjaan Tanah dan Pondasi1 Galian pondasi penerus M3 21 0.5 0.52 Urugan kembali bekas galian M33 Urugan tanah bawah lantai M3 4 4 0.35

1.5 1.75 0.350.8 1.1 0.35

4 Urugan Pasir bawah Lantai M3 4 4 0.15

III. Pekerjaan Ponadsi1 Mengurug Pasir Urug bawah Pondasi M3 21 0.5 0.052 Pas Batu kosong M3 21 0.5 0.13 Pas Batu Gunung M3 21 0.4 0.5

IV. Pekerjaan Beton Bertulang1 Sloof Uk. 15/20 M3 21 0.15 0.22 Kolom Uk. 15/15 M3 0.15 0.15 3.053 Kolom Praktis 13/13 M3 0.13 0.13 3.054 Ring Balok 13/15 M3 21 0.13 0.155 Balok Latai M3 3.6 0.13 0.155 Plat Dack M3 1.1 0.1 1.4

M3 1.89 0.1 1.6

V. Pekerjaan Lantai dan Dinding1 Pasangan diding 1/2 Bata 1:4 M2 13.5 3.05

2.67 50.2 1.5

2 Pasangan diding 1/2 Bata 1:4 pada tangga M23 Plesteran 1:4 M24 Plesteran 1:2 M25 Beton Rabat M3 3.91 3.91 0.056 Pas. Keramik 40x40 cm M2 3.82 3.82

1.57 1.32

7 Pas. Keramik 30x30 cm 1.2 3.1

VI. Pekerjaan Kayu- Pintu P11 Kusen Pintu M3 0.13 0.05 5

0.13 0.05 1.78

Panjang (m)

Page 25: rab kantin

Daun Pintu M2 1.056 1Kaca M2 0.43 1.78

- Jendela Kaca J11 Kusen Jendela M3 0.13 0.05 4.6

0.13 0.05 1.04

2 Daun Jendela Kaca 0.5 1.63 Kaca 0.38 1.48

- Jendela Kaca J21 Kusen Jendela M3 0.13 0.05 1.2

0.13 0.05 1.6

2 Daun Jendela Kaca 0.7 1.63 Kaca 0.58 1.48

VII. Pekerjaan Atap dan Plafond1 Konstruksi Kuda-Kuda

- Balok Gapit bawah M3 4 0.1 0.07- Balok Gapit atas M3 2.19 0.1 0.07- Balok Skor M3 0.63 0.1 0.07- Balok Sokong M3 0.95 0.1 0.07- Balok Bint M3 1.64 0.1 0.07

2 Gordeng M3 69 0.07 0.053 Atap Genteng Metal Multiroof tebal 0,25 mm M2 3.2 2.84 Rabung Seng M1 12.85 Kayu Lisplank M1 5.6 46 Rangka Plafond M2 4 4

1.5 1.757 langit - Langit Tripleks tebal 4 mm M2 4 4

1.5 1.75

VIII. Pekerjaan Elektrikal1 Pengadaan Listrik 4 Ampere2 Box Zakering 3 Lampu Philips SL 18 Watt4 Stop Kontak 6 Saklar Ganda

IX. Pekerjaan Lain - Lain1 Septic Tank2 Resapan3 Biaya Instalasi Listrik4 Biaya Instalasi Air Bersih dan Kotor5 Pengadaan Sanyo

Page 26: rab kantin

X. Pekerjaan FinishingPengecatan dinding Luar dalamPengecatan Kusen dan daun Pintu/jendela - Daun Pintu M2 0.08 3.854 1.08 - Daun Jendela M2 0.08 3.16 0.96 - Kusen Pintu M2 0.23 6.53 - Kusen Jendela M2 0.23 5.62

Penecatan LisplankPembersihan Lapangan

Page 27: rab kantin

Kuantitas Jumlah

111

5.251.755.04 1.6 0.8 16

8.26875 0.2625 0.13125 2.6252.772 0.088 0.044 2.64

16.080751.9505

0.5251.054.2

0.638 0.5492 0.10309

0.4095 1.40.0702

1 0.1541 0.3024 1.89

0.4564 213.35

27.435 2.952 7.38 3.40813.35

0.344.46

3.375 1.3 1.295 0.7878.0615

0.9752514.5924 3.82

2.072416.6648

3.72

0.03250.01157 1.6

Page 28: rab kantin

0.04407 0.044071.056 0.29061 0.7654

0.0299 0.150.00676 1.350.03666 0.21996 4.05 4.71

6 1.42566 3.3744 8.76

3500.00780.01040.0182

2 0.52322 1.7168

2 0.056 21.322 0.03066 17.922 0.00882 13.922 0.0133 9.921 0.01148 5.92

0.12026 0.36078 69

0.24154 35.84 13.76

12.8 22.822.416

2.62516

2.62518.625 17.69375

Page 29: rab kantin

6.83

0.789443.95521.6059 0.1041.3706 0.078

7.72114

Page 30: rab kantin

RENCANA ANGGARAN BIAYA (RAB)

PROGRAM : -KEGIATAN : -PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATANLOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKILINSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKILSUMBER DANA : APBKTAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN VOL. SAT. ANALISAHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)1 2 3 4 5 6 7I. PEKERJAAN PERSIAPAN1 Pekerjaan Pemasangan Bowlpank 1.00 Ls Taksir 300,000.00 300,000.00 2 Papan Nama Proyek 1.00 Unit Taksir 250,000.00 250,000.00 3 Administrasi dan dokumentasi 1.00 Ls Taksir 422,500.00 422,500.00

JUMLAH 972,500.00

II. PEKERJAAN TANAH DAN GALIAN

1 Galian pondasi penerus 5.25 SNI 2835:2008.6.1 35,200.00 184,800.00

2 Urugan kembali bekas galian 1.75 SNI 2835:2008.6.9 11,733.33 20,533.33

3 Urugan tanah bawah lantai 16.08 SNI 2835:2008.6.16 129,769.60 2,086,792.50

4 Urugan pasir bawah lantai 1.95 SNI 2835:2008.6.11 103,072.00 201,041.94

JUMLAH 2,493,167.76

III. PEKERJAAN PONDASI

1 Urugan pasir bawah Pondasi 0.53 SNI 2835:2008.6.11 103,072.00 54,112.80

2 Pas Batu kosong 1.05 SNI 2836:2008.6.9 429,099.12 450,554.08

3 Pas Batu gunung 4.20 SNI 2836:2008.6.2 751,270.00 3,155,334.00

JUMLAH 3,660,000.88

IV. PEKERJAAN BETON BERTULANG

1 Sloof Uk. 15/20 0.63 Supl. SNI 7394:2008.2.b 3,637,334.62 2,291,520.81

2 Kolom Uk. 15/15 0.55 Supl. SNI 7394:2008.3.a 4,742,941.08 2,603,874.65

3 Kolom Praktis 13/13 0.10 Supl. SNI 7394:2008.3.b 4,562,331.97 470,330.80

4 Ring Balok 13/15 0.41 Supl. SNI 7394:2008.4.a 4,632,537.55 1,897,024.12

5 Balok Latai 13/13 0.07 Supl. SNI 7394:2008.4.b 4,590,485.82 322,252.10

6 Plat Dack 0.46 Supl. SNI 7394:2008.5 3,908,436.70 1,783,810.51

JUMLAH 9,368,813.00

V. PEKERJAAN LANTAI DAN DINDING

1 Pasangan diding 1/2 Bata 1:4 44.46 SNI 6897:2008.6.9 109,434.00 4,865,435.64

2 Plesteran 1:4 78.06 SNI 2837:2008.6.4 35,497.20 2,770,964.68

3 Beton Rabat 0.98 SNI 7394:2008.6.1 670,344.60 653,753.57

4 Pasangan Keramik 40x40 cm 16.66 SNI 7395:2008.6.64.a 132,160.00 2,202,419.97

5 Pasangan Keramik 20x20 cm 3.72 SNI 7395:2008.6.36 218,285.60 812,022.43

JUMLAH 11,304,596.29

VI. PEKERJAAN KAYU1 Pintu Kaca P1

- Kusen Pintu 0.04 SNI 3434:2008.6.1 4,880,600.00 215,088.04

- Daun Pintu 0.29 SNI 3434:2008.6.29 467,540.00 135,867.12 - Engsel 4.00 Bh Pt T-30-2000-C.6.1.5 36,200.00 144,800.00 - Kunci Tanam 1.00 Bh Pt T-30-2000-C.6.1.2 167,800.00 167,800.00

- Kaca Tebal 5 mm 0.77 Pt T-30-2000-C.6.2.3a 199,084.00 152,378.89

2 Jendela Kaca J1

- Kusen 0.02 SNI 3434:2008.6.1 4,880,600.00 88,826.92

- Daun Jendela Kaca 0.52 SNI 3434:2008.6.29 467,540.00 244,616.93 - Engsel 4.00 Bh Pt T-30-2000-C.6.1.5 26,600.00 106,400.00 - Pegangan Jendela 2.00 Bh Taksir 13,200.00 26,400.00 - Grendel 2.00 Bh Taksir 12,000.00 24,000.00 - Hak angin 4.00 Bh Taksir 10,800.00 43,200.00

- Kaca Tebal 5 mm 1.72 Pt T-30-2000-C.6.2.3a 199,084.00 341,787.41

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M3

M2

M2

M3

M2

M2

M3

M2

M2

Page 31: rab kantin

NO URAIAN PEKERJAAN VOL. SAT. ANALISAHARGA JUMLAHSATUAN HARGA

(Rp.) (Rp.)1 2 3 4 5 6 73 Jendela Kaca J2

- Kusen 0.22 SNI 3434:2008.6.1 4,880,600.00 1,073,536.78

- Daun Jendela Kaca 1.43 SNI 3434:2008.6.29 467,540.00 666,525.02 - Engsel 12.00 Bh Pt T-30-2000-C.6.1.5 26,600.00 319,200.00 - Pegangan Jendela 6.00 Bh Taksir 13,200.00 79,200.00 - Grendel 6.00 Bh Taksir 12,000.00 72,000.00 - Hak angin 12.00 Bh Taksir 10,800.00 129,600.00

- Kaca Tebal 5 mm 3.37 Pt T-30-2000-C.6.2.3a 199,084.00 671,789.05

JUMLAH 4,703,016.17

VII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP

1 Konstruksi Kuda-Kuda 0.36 SNI 3434:2008 (6.13) 4,645,196.00 1,675,893.81

2 Gordeng 0.24 SNI 3434:2008 (6.15) 2,616,840.00 631,966.86

3 Atap Genteng Metal tebal 0,25 mm 35.84 SNI 03 -3436-1994 - 6.1 92,958.00 3,331,614.72

4 Rabung Seng 12.80 SNI 03 -3436-1994 - 6.1 54,604.00 698,931.20

5 Kayu Lisplank 22.40 SNI 3434:2008 (6.21) 33,198.00 743,635.20

6 Rangka dan Plafond Tripleks 17.69 SNI 2839:2008.6.12 106,447.40 1,883,453.68 7 Kubah 1.00 Bh Taksir 1,800,000.00 1,800,000.00

JUMLAH 10,765,495.48

VIII. PEKERJAAN ELEKTRIKAL1 Box Zakering 1.00 Bh Taksir 60,000.00 60,000.00 2 Lampu Hemat energi 24 Watt 4.00 Bh Taksir 42,000.00 168,000.00 3 Stop Kontak 2.00 Bh Taksir 18,000.00 36,000.00 4 Saklar Ganda 2.00 Bh Taksir 32,400.00 64,800.00

JUMLAH 328,800.00

IX. PEKERJAAN PENGECATAN DAN FINISHING

1 Pengecatan dinding Luar dalam 78.06 Pt-T-38-2000-C.6.14 17,371.00 1,356,006.32

2 Pengecatan Kusen dan daun Pintu/jendela 7.72 Pt-T-38-2000-C.6.8 24,791.30 191,417.10

3 Pengecatan Lisplank 4.48 Pt-T-38-2000-C.6.8 24,791.30 111,065.02 4 Pembersihan Lapangan 1.00 Ls Taksir 200,000.00 200,000.00

JUMLAH 1,858,488.44

JUMLAH 45,454,878.02 PPN 10 % 4,545,487.80 TOTAL 50,000,365.82 DI BULATKAN 50,000,000.00

Singkil, 2013Konsultan Perencana :

CV. HIKMAH CONSULTANT

HILDA FAZLIANADirektris

M3

M2

M2

M3

M3

M2

M1

M1

M2

M2

M2

M2

Page 32: rab kantin

RENCANA ANGGARAN BIAYA (RAB)(REKAPITULASI)

PROGRAM : -KEGIATAN : -PEKERJAAN : PEMBUATAN MUSHALLA KANTOR DINAS KESEHATANLOKASI : KECAMATAN SINGKIL KABUPATEN ACEH SINGKILINSTANSI : DINAS KESEHATAN KABUPATEN ACEH SINGKILSUMBER DANA : APBKTAHUN ANGGARAN : 2013

NO URAIAN PEKERJAANTOTAL

JUMLAH

(Rp)

I. PEKERJAAN PERSIAPAN Rp. 972,500.00 II. PEKERJAAN TANAH DAN GALIAN Rp. 2,493,167.76 III. PEKERJAAN PONDASI Rp. 3,660,000.88 IV. PEKERJAAN BETON BERTULANG Rp. 9,368,813.00 V. PEKERJAAN LANTAI DAN DINDING Rp. 11,304,596.29 VI. PEKERJAAN KAYU Rp. 4,703,016.17 VII. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp. 10,765,495.48 VIII. PEKERJAAN ELEKTRIKAL Rp. 328,800.00 IX. PEKERJAAN PENGECATAN DAN FINISHING Rp. 1,858,488.44

JUMLAH Rp. 45,454,878.02 PPN 10 % Rp. 4,545,487.80 TOTAL Rp. 50,000,365.82

DIBULATKAN Rp. 50,000,000.00

Terbilang : Lima Puluh Juta Rupiah,-

Singkil, 2013

Disetujui : Konsultan Perencana :

PPTK DINAS KESEHATAN CV. HIKMAH CONSULTANT

KABUPATEN ACEH SINGKIL

MUNAWARSYAH HILDA FAZLIANA

NIP. 19731122 199503 1 004 Direktris

Mengetahui / Menyetujui :KEPALA DINAS KESEHATAN

KABUPATEN ACEH SINGKIL

EDY WIDODO, SKM, M.KESNIP. 19670112 199103 1 004