REKAPITULASI

KEGIATAN :SUMBER DANA :TAHUN ANGGARA:LOKASI :

No. U R A I A N JUMLAH HARGABAB. ( Rp. )

I PERSYARATAN UMUM 750,000.00

II PEKERJAAN DRAINASE 114,950,402.37

VII PEKERJAAN STRUKTUR 47,935,800.00

Jumlah Harga Termasuk Keuntungan 163,636,202.37 Pajak Pertambahan Nilai (PPn)= 10% 16,363,620.24 Jumlah Harga Termasuk ppn 179,999,822.61 PEMBULATAN 179,999,000.00

Terbilang :

Bontang, Konsultan Perencana …………..

………………………… Team Leader

Page 2: PRC PARIT BESAR, FAHRI.YOYO oke

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : -

SUMBER DANA : - TAHUN ANGGARA : -

No. HARGA HARGAMATA U R A I A N SATUAN KUANTITAS SATUAN PEKERJAANPEMB. ( Rp. ) ( Rp. )

BAB I. PERSYARATAN UMUM

1,1 Papan Nama Kegiatan Lump Sum 1.00 750,000.00 750,000.00

Jumlah Harga Bab. I 750,000.00

BAB II. PEKERJAAN DRAINASE

2.1 Galian Untuk Selokan Drinase dan Meter Kubik 121.60 57,400.00 6,979,911.75 Saluran Air

2.2 Pasangan Batu dengan Mortar Meter Kubik 134.17 804,744.00 107,970,490.62

Jumlah Harga Bab. II ###

BAB VII. PEKERJAAN STRUKTUR

7.7(b) Pemancangan Cerucuk Ulin 10 x 1 Meter Panjang 538.00 89,100.00 47,935,800.00

Jumlah Harga Bab. VII 47,935,800.00

Page 3: PRC PARIT BESAR, FAHRI.YOYO oke

-

9018015

400170

Page 4: PRC PARIT BESAR, FAHRI.YOYO oke
Page 5: PRC PARIT BESAR, FAHRI.YOYO oke
Page 6: PRC PARIT BESAR, FAHRI.YOYO oke

ANALISA HARGA SATUAN

KEGIATAN :

ITEM PEMMBAYARAN : 2.1JENIS PEMBAYARAN : GALIAN UTK. SELOKAN DRAINASE DAN SALURAN AIRSATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAHNo. KOMPONEN SAT. KUANTITAS SATUAN HARGA

( Rp. ) ( Rp. )A. TENAGA

1. Pekerja Jam 4.3333 10,714.29 46,428.21 2. Mandor Jam 0.3333 14,285.71 4,761.43

JUMLAH HARGA TENAGA 51,189.64 B. BAHAN

JUMLAH HARGA BAHAN - C. PERALATAN

1. Alat Bantu Ls. 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 1,000.00

D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN ( A+B+C ) 52,189.64E. KEUNTUNGAN 10 % X D 5,218.96F. HARGA SATUAN PEKERJAAN ( D + E ) 57,400.00

Page 7: PRC PARIT BESAR, FAHRI.YOYO oke

ANALISA HARGA SATUAN

KEGIATAN :

ITEM PEMMBAYARAN : 2.2JENIS PEMBAYARAN : PASANGAN BATU DENGAN MORTARSATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAHNo. KOMPONEN SAT. KUANTITAS SATUAN HARGA

( Rp. ) ( Rp. )A. TENAGA

1. Pekerja Jam 7.5174 10,714.29 80,543.57 2. Tukang Jam 4.4691 12,857.14 57,459.86 3. Mandor Jam 0.4115 14,285.71 5,878.57

JUMLAH HARGA TENAGA 143,882.00 B. BAHAN

1. Batu Gunung M3 1.2000 190,000.00 228,000.00 2. Semen PC Kg 202.0000 1,300.00 262,600.00 3. Pasir Pasang M3 0.4527 135,000.00 61,114.50 4. Pipa PVC 1.5" M1 1.2000 8,000.00 9,600.00

JUMLAH HARGA BAHAN 561,314.50 C. PERALATAN

1. Concrete Mixer Jam 0.4016 40,000.00 16,064.00 2. Water Tanker Jam 0.0586 125,000.00 7,325.00 3. Alat Bantu Ls. 1.0000 3,000.00 3,000.00

JUMLAH HARGA PERALATAN 26,389.00

D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN ( A+B+C ) 731,585.50E. KEUNTUNGAN 10 % X D 73,158.55F. HARGA SATUAN PEKERJAAN ( D + E ) 804,744.00

Page 8: PRC PARIT BESAR, FAHRI.YOYO oke

ANALISA HARGA SATUAN

KEGIATAN :

ITEM PEMMBAYARAN : 7.7(a).JENIS PEMBAYARAN PENGADAAN & PEMANCANGAN CERUCUK ULIN 10 X 10 Cm SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAHNo. KOMPONEN SAT. KUANTITAS SATUAN HARGA

( Rp. ) ( Rp. )A TENAGA

1. Pekerja Jam 1.4000 10,714.29 15,000.00 2. Tukang Jam 0.3500 12,857.14 4,500.00 3. Mandor Jam 0.1750 14,285.71 2,500.00

JUMLAH HARGA TENAGA 22,000.00 B BAHAN

1. Balok Ulin 10 x 10 x 400 cm M3 0.0100 ### 59,000.00

JUMLAH HARGA BAHAN 59,000.00 C PERALATAN

JUMLAH HARGA PERALATAN - D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN ( A+B+C ) 81,000.00E. KEUNTUNGAN 10 % X D 8,100.00F. HARGA SATUAN PEKERJAAN ( D + E ) 89,100.00

Page 9: PRC PARIT BESAR, FAHRI.YOYO oke

(Tanpa Kalang/Sunduk)

Page 10: PRC PARIT BESAR, FAHRI.YOYO oke

DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN PERALATAN

KEGIATAN : - SUMBER DANA : - TAHUN ANGGARA : 0

No. U R A I A N SATUAN JUMLAH HARGA( Rp. )

A T E N A G A1 Pekerja Jam 10,714.29 2 Tukang Jam 12,857.14 3 Mandor Jam 14,285.71 4 Operator Jam 12,857.14 B B A H A N1 Semen PC Kg 1,300.00 2 Pasir Pasang 135,000.00 3 Batu Gunung 190,000.00 4 Balok Ulin 5,900,000.00 5 Pipa PVC 1,5" 8,000.00

C PERALATAN

1 Dump Truck Jam 175,000.00 2 Concrete Mixer Jam 40,000.00 3 Water Tanker Jam 125,000.00 4 Mesin Pancang Jam 50,000.00

M3

M3

M3

M1

Page 11: PRC PARIT BESAR, FAHRI.YOYO oke

75,000 90,000 100,000 90,000

Bontang, Konsultan Perencana …………..

………………………… Team Leader

Page 12: PRC PARIT BESAR, FAHRI.YOYO oke

BACK UP DATA

NAMA KEGIATAN : - LOKASI : - Item Pekerj: Galian tanah Biasa TAHUN ANGGARAN : - Mata Pemb: 1.1

Satuan

NO STATIONUKURAN Luas

KET.Lebar T M2M M

0 + 00 1.50 0.60 0.90 30.00 27.00

0 + 30.00 1.50 0.60 0.90 30.00 27.00

0 + 60.00 1.50 0.60 0.90 30.00 27.00

0 + 90.00 1.50 0.60 0.90 22.00 19.80

0 + 112.00 1.50 0.65 0.97 21.50 20.80

0 + 133.50

133.50 121.60 M3

Disetujui Oleh : Dibuat Oleh : Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana

………………….

……………. ……………………………Nip. ………………………… Team Leader

: M3

PANJANG STA. M1

VOLUME (L x T x P) M3

Page 13: PRC PARIT BESAR, FAHRI.YOYO oke

BACK-UP DATA

NAMA KEGIATAN : - LOKASI : - Item Pekerj. : Pas. Batu dengan Mortar TAHUN ANGGARAN : - Mata Pemb. : 2.2

Satuan

STA L1 L2 L3 L4 T.1 T.2 LUAS.1 LUAS.2 LUAS JARAK VOLUME

( M ) ( M ) ( M ) ( M ) ( M ) ( M ) ( M 2) ( M 2) TOTAL( M2 ) ( M ) ( M3 )

TYPE I

0 + 00 0.300 0.400 0.900 0.700 1.150 0.900 1.725 0.720 1.005

0 + 30.00 30.00 30.15 0.300 0.400 0.900 0.700 1.150 0.900 1.725 0.720 1.005

0 + 60.00 30.00 30.15 0.300 0.400 0.900 0.700 1.150 0.900 1.725 0.720 1.005

0 + 90.00 30.00 30.15 0.300 0.400 0.900 0.700 1.150 0.900 1.725 0.720 1.005

0 + 112.00 22.00 22.11 0.300 0.400 0.900 0.700 1.150 0.900 1.725 0.720 1.005

0 + 133.50 21.50 21.61

133.50 134.17

: M3

Page 14: PRC PARIT BESAR, FAHRI.YOYO oke

BACK-UP DATA

KEGIATAN : - LOKASI : -

ITEM PEK. : Pemanc. Cerucuk Ulin 10 x 10 x 400 SATUAN : M1

STA P STA INTERVAL LINE SISI PJ ULIN VOLUME KETERANGAN10x10(M) (M) Ea Ea (M) ( M1 )

TYPE I

0 + 0 - 0 + 30.00 30.00 1.00 30.00 2.00 2.00 120.00

0 + 30 - 0 + 60.00 30.00 1.00 30.00 2.00 2.00 120.00

0 + 60 - 0 + 90.00 30.00 1.00 30.00 2.00 2.00 120.00

0 + 90 - 0 + ### 22.00 1.00 22.00 2.00 2.00 88.00

0 + 112 - 0 + ### 21.50 1.00 22.50 2.00 2.00 90.00

133.50 538.00