DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT

TAHUN ANGGARAN 2013

KODE JENIS UPAH, BAHAN DAN SEWA ALATHARGA SATUAN

SATUAN KETERANGAN( Rp. )

UPAH

L-1 Pekerja 45,000.00 OH 6,420.00 OJ

L-2 Tukang 65,000.00 OH 9,280.00 OJ

L-3 Kepala Tukang 80,000.00 OH 11,420.00 OJ

L-4 Mandor 70,000.00 OH 10,000.00 OJ

L-5 Operator 110,000.00 OH 15,710.00 OJ

L-6 Pembantu Operator 70,000.00 OH 10,000.00 OJ

L-7 Supir 70,000.00 OH 10,000.00 OJ

L-8 Pembantu Supir 50,000.00 OH 7,140.00 OJ

L-9 Mekanik 75,000.00 OH 10,710.00 OJ

L-10 Pembantu Mekanik 60,000.00 OH 8,570.00 OJ

L-11 Kepala Pemancangan 100,000.00 OH 14,280.00 OJ

BAHAN

M-1 Air 175.00 Ltr

M-2 Aggregate Halus 195,781.78 M3

M-3 Aggregat Kasar 195,781.78 M3

M-4 Batu Belah 136,978.11 M3

M-5 Batu Kali 125,400.00 M3

M-6 Baja Tulangan Polos U24 11,500.00 Kg

M-7 Baja Tulangan Ulir U39 13,000.00 Kg

M-8 Casing (plat baja ) 150,000.00 m2

M-9 Dolken Kayu Ǿ 8-10/400 cm 20,000.00 Btg 2,000.00 m'

M-10 Kawat Beton 12,000.00 Kg

M-11 Kawat Las 40,000.00 kg

M-12 Kayu Klas III 3,200,000.00 m3

M-13 Kerikil Bersih 131,300.00 M3 97.26 /kg

M-14 Koral Beton 115,000.00 m3

M-15 Koresene 13,000.00 Ltr

M-16 Minyak Bekesting 3,300.00 Liter

M-17 Minyak Bensin 8,990.00 Liter

M-18 Minyak Solar 8,990.00 Liter

M-19 Minyak pelumas 30,000.00 Liter

M-20 Pasir Beton bersih 140,700.00 M3 100.50 /kg

M-21 Pasir Pasang 167,200.00 M3 119.43 /kg

M-22 Pasir Urug 72,000.00 M3

M-23 Plamur/Dempul Cat 25,000.00 Kg

M-24 Semen PC 40 Kg 50,000.00 Zak 1,250.00 /kg

M-25 Seng Gelombang 57,000.00 lbr

M-26 Tanah Timbun Pilihan 80,000.00 M3

M-27 Kayu Untuk Perancah 2,200,000.00 M3

M-28 Mutipleks 9 mm 105,000.00 Lembar

M-29 Paku Kayu 2" - 5" 18,000.00 Kg

M-30 Vinyl Sheetpile 18,500.00 Kg

Lhokseumawe, Februari 2013

Konsultan Perencana

CV. TIARA NAD ENGINEERING

MUHAMMAD ST

Direktur

Page 2: Daftar Harga

INFORMASI UMUM

No. U R A I A N I N F O R M A S I

1. Nama Kegiatan ……………………………………………………2. Nomor Rekening ……………………………………………………3. Pagu Anggaran ……………………………………………………4. Kabupaten / Kota ACEH TIMUR5. Propinsi ACEH

4. Lokasi pekerjaan Periksa lampiran

5. Kondisi jalan lama BAIK

6. Panjang efektif ( lihat sketsa di bawah ) 35.0

7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 2.00 + 7.00 + 2.00 ) meter

8. Lebar Rencana ( bahu + perkerasan + bahu ) ( 1.50 + 8.00 + 1.50 ) meter

9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.

10. Jangka waktu pelaksanaan pekerjaan 360 hari kalenderAtau : 12.00 bulan (Periode Pelaksanaan)

11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L = 11.00 Kilometer

Perhitungan didasarkan pada sketsa di bawah ini :

20.00 Km = a C 15.00 Km = b

A2.00 Km = c

B

Base Camp --> D

12. Jam kerja efektif dalam 1 hari 7.0 jam13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat14. Tingkat Suku Bunga Investasi Alat 12.00 %15. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung16. Kurs US $ yang berlaku 9,200 per US $

17. RINGKASAN METHODE PELAKSANAAN

a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b.

c.

d.

e. Pekerjaan Pasangan Batu dilaksanakan untuk pondasi penahan tanah dan saluran pembuangan air / irigasi

f.

g.

18. Lokasi Quarry Periksa lampiran.

19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Kilometer ( Leff = a + b )

L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

Pekerjaan Tanah dilaksanakan untuk mengupas lapisan tanah / jalan yang rusak untuk kemudian di ganti dengan lapisan / konstruksi baru. Dalam hal ini termasuk juga pekerjaan galian untuk konstruksi saluran maupun pekerjaan pengurugan kembali.

Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk pengganti lapisan tanah pada konstruksi, sehingga tercapai daya dukung tekanan yang memadai, dimana berfungsi sebagai lapisan awal pondasi dari konstruksi.

Pekerjaan Campuran Aspal Panas dilaksanakan untuk lapisan baru konstruksi jalan, di padatkan sesuai ketebalan pada spesifikasi umum

Pekerjaan Pengembalian Kondisi dilaksanakan untuk menjadikan kondisi utilitas / sarana pendukung infrastruktur lain yang ada semasa pekerjaan proyek, yaitu yang di pindahkan / relokasi untuk di kembalikan ke posisi semula.

HOME

Page 3: Daftar Harga

DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT

TAHUN ANGGARAN 2012

KODE

UPAH

L-3

L-4

L-6

L-7

L-8

L-10

BAHAN

M-2

M-7

M-9

M-10

M-12

M-16

M-17

M-20

M-21

M-23

Page 4: Daftar Harga

DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT DAFTAR BIAYA SEWA PERALATAN PER JAM KERJATAHUN ANGGARAN 2012

BIAYA

No. URAIAN KODE HP KAP. HARGA SEWA KET.

ALAT ALAT/JAM

1 ASPHALT SPRAYER E03 4.0 850.0 Liter

2 BULLDOZER 100-150 HP E04 155.0 - - 1,210,000,000 252,481.88

3 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 39,600,000 48,879.14

4 CRANE 10-15 TON E07 138.0 15.0 Ton 836,000,000 397,614.54

5 DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 265,000,000 198,446.88

6 EXCAVATOR 80-140 HP E10 133.0 0.9 M3 770,000,000 361,430.74

7 GENERATOR SET E12 180.0 135.0 KVA 140,800,000 245,785.38

8 MOTOR GRADER >100 HP E13 135.0 10,800.0 660,000,000 330,211.03

9 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 715,000,000 320,178.42

10 CONCRETE VIBRATOR E20 5.5 25.0 21,120,000 41,177.68

11 WATER PUMP 70-100 mm E22 6.0 - - 19,800,000 38,787.79

12 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 145,200,000 188,987.81

13 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 77,000,000 58,417.94

14 CONCRETE PUMP E28 100.0 8.00 M3 176,000,000 166,914.40

15 TRAILER 20 TON E29 175.0 20.00 Ton 372,900,000 316,343.02

16 WELDING SET E32 40.0 250.0 Amp 23,100,000 69,934.90

17 BORE PILE MACHINE E33 150.0 20.0 Meter 2,250,000,000 776,773.46

18 TRONTON E35 150.0 15.0 Ton 276,000,000 388,806.58

19 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 250,000,000 486,067.09

Lhokseumawe, Februari 2013

Konsultan Perencana

CV. TIARA NAD ENGINEERING

MUHAMMAD STDirektur

Page 5: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan ASPHALT MIXING PLANT E01 2. Tenaga Pw 150.0 HP 3. Kapasitas Cp 30.0 T/Jam 4. Alat a. Umur Ekonomis A 10.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam c. Harga Alat B 1,917,000,000.0 Rupiah

1

5 Kapastas tangki aspal Ca 30,000.00 liter

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 191,700,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.17698 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 203,567.19 Rupiah

W

b. Asuransi, dll = 0.002 x B F 2,556.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 206,123.19 Rupiah

C. BIAYA OPERASI PER JAM KERJA 1. Bahan Bakar = (12%-15%) x Pw x Ms H1 161,820.00 Rupiah

Bahan Bakar Pemanasan Material = 12 ltr x Ms H2 943,950.00 Rupiah Khusus AMPdan aspal (Oil Heater)Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 269,700.00

2. Pelumas = (2.5%-3%) x Pw x Mp I 135,000.00 Rupiah

3. Biaya bengkel (6.25% dan 8.75%) x B J 111,825 W

4. Biaya perbaikan (12,5 % - 17,5 %) x B K 223,650.00 RupiahW

5 Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah6 Pembantu Operator = ( 3 Orang / Jam ) x U2 M 30,000.00 Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P 1,891,655.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 2,097,778.19 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter

7 PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan8 Bahan bakar Batubara #REF! Rp/kg

Page 6: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan ASPHALT FINISHER E02 2. Tenaga Pw 72.4 HP 3. Kapasitas Cp 10.0 Ton 4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam c. Harga Alat B 310,000,000 Rupiah

5.

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 31,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24323 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 48,471.41 Rupiah

W

b. Asuransi, dll = 0.002 x B F 442.86 RupiahW

Biaya Pasti per Jam = ( E + F ) G 48,914.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 97,631.40 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 65,160.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 13,839 W

3. Perawatan dan (12,5 % - 17,5 %) x B K 38,750.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 241,090.69 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 290,004.95 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 7: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan BULLDOZER 100-150 HP E04 2. Tenaga Pw 140.0 HP 3. Kapasitas Cp - - 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 520,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 52,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 64,913.88 Rupiah

W

b. Asuransi, dll = 0.002 x B F 520.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 65,433.88 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 100,688.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 21,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 7,150 W

3. Perawatan dan (12,5 % - 17,5 %) x B K 32,500.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 187,048.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 252,481.88 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 8: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06 2. Tenaga Pw 20.0 HP 3. Kapasitas Cp 500.0 Liter 4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam c. Harga Alat B 7,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 750,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.59170 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 2,662.64 Rupiah

W

b. Asuransi, dll = 0.002 x B F 10.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 2,672.64 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 14,384.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 4,800.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 438 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 875.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 46,206.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 48,879.14 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 9: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan CRANE 10-15 TON E07 2. Tenaga Pw 138.0 HP 3. Kapasitas Cp 15.0 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 836,000,000 Rupiah

5.

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 83,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 104,361.54 Rupiah

W

b. Asuransi, dll = 0.002 x B F 836.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 105,197.54 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 124,062.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 53,820.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 36,575 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 52,250.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 292,417.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 397,614.54 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 10: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan DUMP TRUCK 3.5 TON E08 2. Tenaga Pw 100.0 HP 3. Kapasitas Cp 3.5 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 200,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 20,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 24,966.88 Rupiah

W

b. Asuransi, dll = 0.002 x B F 200.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 25,166.88 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 98,890.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 36,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 8,750 W

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,500.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 10,000.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 7,140.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 173,280.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 198,446.88 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir / Mekanik U1 10,000.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 7,140.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 11: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan EXCAVATOR 80-140 HP E10 2. Tenaga Pw 120.0 HP 3. Kapasitas Cp 0.93 M3 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 625,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 62,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 78,021.49 Rupiah

W

b. Asuransi, dll = 0.002 x B F 625.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 78,646.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 118,668.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 72,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 27,344 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 39,062.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 282,784.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 361,430.74 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 12: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan GENERATOR SET E12 2. Tenaga Pw 180.0 HP 3. Kapasitas Cp 135.0 KVA 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 123,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 12,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 15,354.63 Rupiah

W

b. Asuransi, dll = 0.002 x B F 123.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 15,477.63 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 153,729.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 37,800.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 5,381 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,687.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 230,307.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 245,785.38 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 13: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan MOTOR GRADER >100 HP E13 2. Tenaga Pw 135.0 HP 3. Kapasitas Cp 10,800.0 - 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 510,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 51,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 63,665.53 Rupiah

W

b. Asuransi, dll = 0.002 x B F 510.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 64,175.53 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 145,638.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 40,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 22,313 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 31,875.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 266,035.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 330,211.03 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 14: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15 2. Tenaga Pw 105.0 HP 3. Kapasitas Cp 1.5 M3 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 645,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 64,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 80,518.17 Rupiah

W

b. Asuransi, dll = 0.002 x B F 645.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 81,163.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 113,274.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 31,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 28,219 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 40,312.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 239,015.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 320,178.42 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 15: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16 2. Tenaga Pw 55.0 HP 3. Kapasitas Cp 8.0 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 264,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 26,400,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 32,956.28 Rupiah

W

b. Asuransi, dll = 0.002 x B F 264.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 33,220.28 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 59,334.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 41,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 11,550 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 16,500.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 154,344.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 187,564.28 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 16: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17 2. Tenaga Pw 82.0 HP 3. Kapasitas Cp 8.1 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 366,300,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 36,630,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 45,726.83 Rupiah

W

b. Asuransi, dll = 0.002 x B F 366.30 RupiahW

Biaya Pasti per Jam = ( E + F ) G 46,093.13 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 88,461.60 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 61,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 16,026 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 22,893.75 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 214,590.98 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 260,684.11 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 17: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan TIRE ROLLER 8-10 T. E18 2. Tenaga Pw 100.5 HP 3. Kapasitas Cp 9.0 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 386,100,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 38,610,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 48,198.55 Rupiah

W

b. Asuransi, dll = 0.002 x B F 386.10 RupiahW

Biaya Pasti per Jam = ( E + F ) G 48,584.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 108,419.40 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 75,375.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 16,892 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 24,131.25 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 250,527.53 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 299,112.18 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 18: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19 2. Tenaga Pw 82.0 HP 3. Kapasitas Cp 7.050 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 431,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 43,120,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 53,828.58 Rupiah

W

b. Asuransi, dll = 0.002 x B F 431.20 RupiahW

Biaya Pasti per Jam = ( E + F ) G 54,259.78 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 88,461.60 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 61,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 18,865 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 26,950.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 221,486.60 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 275,746.38 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 19: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan CONCRETE VIBRATOR E20 2. Tenaga Pw 5.5 HP 3. Kapasitas Cp 25.0 - 4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam c. Harga Alat B 18,100,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 1,810,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.32923 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 5,363.23 Rupiah

W

b. Asuransi, dll = 0.002 x B F 36.20 RupiahW

Biaya Pasti per Jam = ( E + F ) G 5,399.43 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,944.50 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 825.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,131 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 3,167.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 35,778.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 41,177.68 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 20: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan STONE CRUSHER E21 2. Tenaga Pw 220.0 HP 3. Kapasitas Cp 30.0 T/Jam 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 693,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 69,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 86,510.22 Rupiah

W

b. Asuransi, dll = 0.002 x B F 693.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 87,203.22 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 237,336.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 165,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 30,319 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 43,312.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 20,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 511,677.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 598,880.47 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 21: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan WATER PUMP 70-100 mm E22 2. Tenaga Pw 6.0 HP 3. Kapasitas Cp - - 4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 10,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 1,020,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.41635 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 1,911.04 Rupiah

W

b. Asuransi, dll = 0.002 x B F 10.20 RupiahW

Biaya Pasti per Jam = ( E + F ) G 1,921.24 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 6,472.80 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 446 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 637.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 36,866.55 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 38,787.79 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 22: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan WATER TANKER 3000-4500 L. E23 2. Tenaga Pw 100.0 HP 3. Kapasitas Cp 4,000.0 Liter 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 135,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 13,520,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 16,877.61 Rupiah

W

b. Asuransi, dll = 0.002 x B F 135.20 RupiahW

Biaya Pasti per Jam = ( E + F ) G 17,012.81 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 89,900.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 42,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 5,915 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 8,450.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 171,975.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 188,987.81 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 23: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan PEDESTRIAN ROLLER E24 2. Tenaga Pw 8.8 HP 3. Kapasitas Cp 835.000 Ton 4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 77,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 7,700,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.41635 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 14,426.49 Rupiah

W

b. Asuransi, dll = 0.002 x B F 77.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 14,503.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 7,911.20 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 2,112.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 3,369 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 4,812.50 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 43,914.45 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 58,417.94 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 24: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan CONCRETE PUMP E28 2. Tenaga Pw 100.0 HP 3. Kapasitas Cp 8.00 M3 4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 126,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 12,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24323 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 13,790.90 Rupiah

W

b. Asuransi, dll = 0.002 x B F 126.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 13,916.90 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 89,900.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 24,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 5,513 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,875.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 152,997.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 166,914.40 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 25: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan TRAILER 20 TON E29 2. Tenaga Pw 175.0 HP 3. Kapasitas Cp 20.00 Ton 4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 372,900,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 37,290,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24323 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 40,814.49 Rupiah

W

b. Asuransi, dll = 0.002 x B F 372.90 RupiahW

Biaya Pasti per Jam = ( E + F ) G 41,187.39 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 157,325.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 52,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 16,314 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 23,306.25 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 275,155.63 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 316,343.02 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 26: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan WELDING SET E32 2. Tenaga Pw 40.0 HP 3. Kapasitas Cp 250.00 Amp 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 20,100,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 2,010,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 2,509.17 Rupiah

W

b. Asuransi, dll = 0.002 x B F 20.10 RupiahW

Biaya Pasti per Jam = ( E + F ) G 2,529.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 35,960.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 879 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,256.25 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 67,405.63 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 69,934.90 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 27: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan BORE PILE MACHINE E33 2. Tenaga Pw 150.0 HP 3. Kapasitas Cp 2,000.00 Meter 4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 2,200,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 220,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24323 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 240,793.46 Rupiah

W

b. Asuransi, dll = 0.002 x B F 2,200.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 242,993.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 161,820.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 112,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 96,250 Rupiah W

3. Perawatan dan (12,5 % - 17,5 %) x B K 137,500.00 Rupiah perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 533,780.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 776,773.46 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 28: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan CONCRETE PAN MIXER E43 2. Tenaga Pw 134 HP 3. Kapasitas Cp 600.00 Liter 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam c. Harga Alat B 0 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 0 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.17698 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E - Rupiah

W

b. Asuransi, dll = 0.002 x B F - RupiahW

Biaya Pasti per Jam = ( E + F ) G - Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 144,559.20 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 100,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J - Rupiah W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 0.00 Rupiah perbaikan W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 30,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 290,769.20 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 290,769.20 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 29: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan TRUK MIXER (AGITATOR) E49 2. Tenaga Pw 220 HP 3. Kapasitas Cp 5.00 M3 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 250,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 25,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.27741 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 31,208.59 Rupiah

W

b. Asuransi, dll = 0.002 x B F 250.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 31,458.59 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 237,336.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 165,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 10,938 Rupiah W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 15,625.00 Rupiah perbaikan W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 454,608.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 486,067.09 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 30: Daftar Harga

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan TRONTON E35 2. Tenaga Pw 150.0 HP 3. Kapasitas Cp 15.0 Ton 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam c. Harga Alat B 276,000,000 Rupiah

5.

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 27,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.17698 -(1 + i)^A - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B - C ) x D E 29,308.58 Rupiah

W

b. Asuransi, dll = 0.002 x B F 368.00 RupiahW

Biaya Pasti per Jam = ( E + F ) G 29,676.58 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 161,820.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 112,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 16,100 Rupiah W

3. Perawatan dan = (12,5 % - 17,5 %) x B K 23,000.00 Rupiah perbaikan W

4. Operator = ( 1 Orang / Jam ) x U1 L 15,710.00 Rupiah 5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 30,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 359,130.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 388,806.58 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 12.00 % / Tahun 2. Upah Operator / Sopir U1 15,710.00 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,000.00 Rp./Jam 4. Bahan Bakar Bensin Mb 8,990.00 Liter 5. Bahan Bakar Solar Ms 8,990.00 Liter 6. Minyak Pelumas Mp 30,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 31: Daftar Harga

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA

No. URAIAN KO HP KAP. HARGA SEWA

DE ALAT ALAT/JAM

(di luar PPN)

1 ASPHALT MIXING PLANT E01 150.0 30.0 T/Jam 1,917,000,000 2,097,778.19

2 ASPHALT FINISHER E02 72.4 10.0 Ton 310,000,000 290,004.95

3 ASPHALT SPRAYER E03 4.0 850.0 Liter 132,000,000 71,301.84

4 BULLDOZER 100-150 HP E04 140.0 - - 520,000,000 252,481.88

5 COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 5,000.00 85,800,000 155,350.84

6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 7,500,000 48,879.14

7 CRANE 10-15 TON E07 138.0 15.0 Ton 836,000,000 397,614.54

8 DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 200,000,000 198,446.88

9 DUMP TRUCK 10 TON E09 190.0 10.0 Ton 330,000,000 449,769.85

10 EXCAVATOR 80-140 HP E10 120.0 0.9 M3 625,000,000 361,430.74

11 FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 165,000,000 411,475.92

12 GENERATOR SET E12 180.0 135.0 KVA 123,000,000 245,785.38

13 MOTOR GRADER >100 HP E13 135.0 10,800.0 10,800.00 510,000,000 330,211.03

14 TRACK LOADER 75-100 HP E14 70.0 0.8 M3 623,700,000 298,477.03

15 WHEEL LOADER 1.0-1.6 M3 E15 105.0 1.5 M3 645,000,000 320,178.42

16 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 264,000,000 187,564.28

17 TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 366,300,000 260,684.11

18 TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 386,100,000 299,112.18

19 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 431,200,000 275,746.38

20 CONCRETE VIBRATOR E20 5.5 25.0 25.00 18,100,000 41,177.68

21 STONE CRUSHER E21 220.0 30.0 T/Jam 693,000,000 598,880.47

22 WATER PUMP 70-100 mm E22 6.0 - - 10,200,000 38,787.79

23 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 135,200,000 188,987.81

24 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 77,000,000 58,417.94

25 TAMPER E25 4.7 121.00 Ton 29,150,000 51,896.84

26 JACK HAMMER E26 0.0 1,330.00 1,330.00 29,150,000 32,475.26

27 FULVI MIXER E27 345.0 2,005.00 2,005.00 159,500,000 886,904.35

28 CONCRETE PUMP E28 100.0 8.00 M3 126,000,000 166,914.40

29 TRAILER 20 TON E29 175.0 20.00 Ton 372,900,000 316,343.02

30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 122,100,000 99,767.50

31 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 1,000,000,000 471,011.57

32 WELDING SET E32 40.0 250.0 Amp 20,100,000 69,934.90

33 BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,200,000,000 776,773.46

34 ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 16,500,000 39,068.19

35 TRONTON E35 150.0 15.0 Ton 276,000,000 364,927.94

36 COLD MILLING E36 248.0 1,000.0 m 100 367,450.35

37 ROCK DRILL BREAKER E37 3.0 - - 770,000,000 276,503.23

38 COLD RECYCLER E38 900.0 2.2 M 100 1,173,193.25

39 HOT RECYCLER E39 400.0 3.0 M 100 555,292.25

40 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 100 236,030.52

41 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 70,000,000 218,905.78

42 SLIP FORM PAVER E42 105.0 2.5 M 100 190,730.66

43 CONCRETE PAN MIXER E43 134.0 600.0 Liter 100 264,953.29

44 CONCRETE BREAKER E44 290.0 20.0 m3/jam 100 419,354.03

45 ASPAHLT TANKER E45 190.0 4,000.0 liter 100 300,595.80

46 CEMENT TANKER E46 190.0 4,000.0 liter 100 274,402.40

47 CONDRETE MIXER (350) E47 20.0 350.0 liter 35,000,000 77,144.79

48 VIBRATING RAMMER E48 4.2 80.0 KG 100 45,993.51

49 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 380,000,000 397,340.81

50 BORE PILE MACHINE E50 125.0 60.0 CM 100 229,881.59

51 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 100 286,760.42

52 BLENDING EQUIPMENT E52 50.0 30.0 Ton 100 115,712.64

53 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 16,500,000 103,076.19

Page 32: Daftar Harga
Page 33: Daftar Harga

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

KET.

T x Te1 x Te2 x Fa

Page 34: Daftar Harga

T x Te1 x Te2 x Fa

Page 35: Daftar Harga

ITEM PEMBAYARAN : AGREGAT KASAR & HALUSJENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUSSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. U R A I A N KODE KOEFISIEN SATUAN KETERANGAN

I ASUMSI 1 Bahan dasar (Batu dan Pasir) diterima di lokasi Alat

Pemecah Batu (di Base Camp) 2 Kegiatan dilakukan di dalam lokasi Base Camp 3 Hasil produksi Alat Pemecah Batu : - Agregat Halus H 30.00 %

- Agregat Kasar K 70.00 % 4 Berat Isi Bahan : - Batu / Gravel D1 1.20 Ton/M3 Berongga

- Pasir D2 1.40 Ton/M3 Berongga- Batu Pecah D3 1.35 Ton/M3 Berongga

5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 125,400.00 Rp./M3- Pasir Rp2 140,700.00 Rp./M3

6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 598,880.47 Rp./Jam- Wheel Loader Rp4 320,178.42 Rp./Jam

7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 30.00 Ton/Jam- Wheel Loader Cp2 1.50 M3 Kap. Bucket

8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.85 -- Wheel Loader Fa2 0.90 -

9 Faktor Kehilangan Material Fh 1.10 - 10 Agregat Halus masih perlu dicampur dengan pasir

II METHODE PELAKSANAAN

1 Wheel Loader mengangkut batu/gravel dari tumpukandan menuangkannya ke Alat Pemecah Batu.

2 Batu/gravel dipecah dengan Alat Pemecah Batu(Stone Crusher) sehingga menghasilkan Agregat BatuPecah Kasar dan Halus.

3 Agregat Halus dicampur dengan pasir menggunakan Loader

III PERHITUNGAN

III.1. HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER

1.a. Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher Tst 1.00 Jam - Produksi Stone Crusher 1 jam = (Fa1 x Cp1) : D3 Qb 18.89 M3/Jam Batu pecah - Kebutuhan batu/gravel 1 jam = (Fa1 x Cp1) : D1 Qg 21.25 M3/Jam

1.b. Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) Ka 1.35 M3 - Waktu Siklus (Muat, Tuang, Tunggu, dll) Ts 2.00 menit - Waktu kerja W.Loader memasok gravel

= {(Qg : Ka) x Ts} : 60 menit Tw 0.52 Jam

1.c. Biaya Produksi Batu Pecah / M3= {(Tst x Rp3) + (Tw x Rp4)} : Qb Bp 40,599.28 Rp./M3

1.d. Harga Satuan Batu Pecah Produksi St.Crusher / M3= {(Qg : Qb) x Fh x Rp1} + Bp HSb 195,781.78 Rp./M3

Berlanjut

Page 36: Daftar Harga

ITEM PEMBAYARAN : AGREGAT KASAR & HALUSJENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUSSATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

Lanjutan 1

No. U R A I A N KODE KOEFISIEN SATUAN KETERANGAN

III.2. HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm( berlaku juga untuk Aggregat 20-30 mm)Agregat Kasar Produksi Stone Crusher = 70% K 70.00 %(Tertahan saringan # 4 = 4,75mm)Harga Satuan Agregat Kasar / M3 = (K x HSb) / K HSAk 195,781.78 Rupiah Di Luar PPN

III.3. HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm(Agregat Halus)

3.a. Agregat Halus Produksi Stone Crusher = 30% H 30.00 %Harga Agregat Halus Prod. Stone Crsh.= (H x HSb) / H Hs1 195,781.78 Rupiah per 1 M3

Page 37: Daftar Harga

HARGA & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

HARGA JARAKNo. U R A I A N SATUAN ROYALTY QUARRY KET.

(Rp) ( Km )

1. M01 - P a s i r Pasang M3 30,000.00 16.00 Ke Base CampM01 - P a s i r Beton M3 30,000.00 16.00 Ke Lokasi Pek.

2. M02 - Batu Kali M3 30,000.00 16.00 Ke Lokasi Pek.

3. M06 - Batu Belah/Batu Quarry Besar M3 40,000.00 16.00 Ke Lokasi Pek.

4. M07 - G r a v e l M3 30,000.00 16.00 Ke Base Camp

5. M10 - Aspal Cement (Pelabuhan) KG 25.00 Ke Base Camp

6. M16 - S i r t u M3 20,000.00 16.00 Ke Lokasi Pek.

7. M44 - Pasir Urug M3 15,000.00 10.00 Ke Lokasi Pek.

8 M08 - Tanah Timbun M3 10,000.00 0.00 Ke Lokasi Pek.

9 M09 - Material Pilihan M3 15,000.00 5.00 Ke Lokasi Pek.

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

Catatan :

Julok - Idi Rayeuk = 24 kmIdi Rayeuk - Lokasi Proyek = 2 kmTotal Sumber Quarry Julok s/d Lokasi Proyek = 26 km

Lokasi Proyek - Base Camp = 0,50 kmTotal Sumber Quarry s/d Base Camp = 18,50 km

Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 20,00 kmJarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 20,00 kmJarak Quarry Pasir ke Base Camp diperkirakan = 20,00 kmJarak Quarry Pasir ke Lokasi Proyek diperkirakan = 20,00 km

Ke Banda AcehKm 289+100

Km 292+300

Lokasi Quarry Patumbak- Gravel- Batu Kali- Batu Belah

Lokasi Quarry

ke Rantau Prapat

Base Camp

Ke MedanKm 299+000

2,00 km

PETA LOKASI QUARRYKm 295+000

3,00 km

5,00 km

Page 38: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M01a - Pasir PasangLokasi : QuarryTujuan: Base Camp

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke lokasi Base Camp L 16.00 Km4 Harga satuan pasir di Quarry RpM01 1.00 M3 30,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat volume pasir Bil 1.60 ton/m3

II. URUTAN KERJA1 Pasir digali dengan Excavator2 Excavator sekaligus memuat pasir hasil

galian ke dalam Dump Truck3 Dump Truck mengangkut pasir ke lokasi

Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 1.20 menit- Lain-lain T2 1.00 menit

Ts1 2.20 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 18.95 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 19,076.25 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 3.50 tonFaktor efisiensi alat Fa 0.90 -Kecepatan rata-rata bermuatan v1 25.00 KM/JamKecepatan rata-rata kosong v2 40.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/Q1 x Bil) T1 6.93 menit- Waktu tempuh isi = (L/v1) x 60 T2 38.40 menit- Waktu tempuh kosong = (L/v2) x 60 T3 24.00 menit- Lain-lain T4 1.00 menit

Ts2 70.33 menit

Bersambung

Page 39: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M01a - Pasir PasangLokasi : QuarryTujuan: Base Camp

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 1.68 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 118,148.09 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 167,224.34 Rupiah

Dibulatkan : M01 167,200.00 Rupiah

Page 40: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M02 - Batu KaliLokasi : QuarryTujuan: Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke Lokasi Pekerjaan L 16.00 Km4 Harga satuan batu kali di Quarry RpM02 1.00 M3 30,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat volume batu kali Bil 1.44 ton/m3

II. URUTAN KERJA1 Batu kali digali dengan Excavator2 Excavator sekaligus memuat batu kali

hasil galian ke dalam Dump Truck3 Dump Truck mengangkut batu kali ke

lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 0.75 menit- Lain-lain T2 0.50 menit

Ts1 1.25 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 27.7884 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,006.53 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 3.50 tonFaktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 5.25 menit- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit- Waktu tempuh kosong = (L/v2) x 60 T3 16.00 menit- Lain-lain T4 5.00 menit

Ts2 50.25 menit

Bersambung

Page 41: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M02 - Batu KaliLokasi : QuarryTujuan: Lokasi Pekerjaan

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 2.41 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 82,381.20 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 ) M02 125,387.73 Rupiah

Dibulatkan : M02 125,400.00 Rupiah

Page 42: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M06 - Batu BelahLokasi : QuarryTujuan: Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km4 Harga satuan batu kali di Quarry RpM06 1.00 M3 40,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 320,178.42 8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 6,420.00 9 Berat volume batu belah Bil 1.60 ton/m3

II. URUTAN KERJA1 Batu kali digali dengan Excavator2 Batu kali dibelah oleh Pekerja3 Dengan Wheel Loader batu belah dimuat

ke Dump Truck yang mengangkut batubelah ke lokasi pekerjaan

III. PERHITUNGAN

3.a EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 0.75 menit- Lain-lain T2 0.50 menit

Ts1 1.25 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 27.7884 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 13,006.53 Rupiah

3.b WHEEL LOADER (E15)Kapasitas Bucket V 1.50 M3Faktor Bucket Fb 0.75 -Faktor Efisiensi Alat Fa 0.83 -Waktu sklus Ts1- Muat T1 0.75 menit- Lain-lain T2 0.50 menit

Ts1 1.25 menitKapasitas Produksi / Jam =

V x Fb x Fa x 60 Q2 44.82 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 7,143.65 Rupiah

Bersambung

Page 43: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M06 - Batu BelahLokasi : QuarryTujuan: Lokasi Pekerjaan

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

3.c DUMP TRUCK (E09)Kapasitas bak V 3.50 tonFaktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 4.72 menit- Waktu tempuh isi = (L/v1) x 60 T2 41.68 menit- Waktu tempuh kosong = (L/v2) x 60 T3 27.79 menit- Lain-lain T4 1.00 menit

Ts2 75.19 menit

Kapasitas Produksi / Jam =V x Fa x 60 Q3 1.45 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 136,978.11 Rupiah

3.d PEKERJA

Produksi menentukan : Excavator Q1 27.7884 M3 / JamHasil galian batu / hari = Q1 x 7 Jam Qt 194.5188 M3 / 7 jamKebutuhan Pekerja P 15.00 Orang

Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01 Rp4 3,465.47 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Batu belah =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 200,593.77 Rupiah

Dibulatkan : M06 200,600.00 Rupiah

Page 44: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M07 - GravelLokasi : QuarryTujuan: Base Camp

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km4 Harga satuan Gravel di Quarry RpM07 1.00 M3 30,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat volume gravel Bil 2.20 ton/m3

II. URUTAN KERJA1 Gravel digali dengan Excavator2 Excavator sekaligus memuat gravel

hasil galian ke dalam Dump Truck3 Dump Truck mengangkut gravel ke

lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 1.20 menit- Lain-lain T2 2.00 menit

Ts1 3.20 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 13.03 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 27,747.27 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 10.00 tonFaktor efisiensi alat Fa 0.90 -Kecepatan rata-rata bermuatan v1 30.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 20.94 menit- Waktu tempuh isi = (L/v1) x 60 T2 40.00 menit- Waktu tempuh kosong = (L/v2) x 60 T3 20.00 menit- Lain-lain T4 10.00 menit

Ts2 90.94 menit

Bersambung

Page 45: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M07 - GravelLokasi : QuarryTujuan: Base Camp

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 2.70 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 73,521.77 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI BASE CAMP

Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 ) M07 131,269.04 Rupiah

Dibulatkan : M07 131,300.00 Rupiah

Page 46: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M16 - SirtuLokasi : QuarryTujuan: Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke lokasi Base Camp L 16.00 Km4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 20,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat volume sirtu Bil 1.51 ton/m3

II. URUTAN KERJA1 Sirtu digali dengan Excavator2 Excavator sekaligus memuat sirtu hasil

galian ke dalam Dump Truck3 Dump Truck mengangkut sirtu ke lokasi

Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 0.60 menit- Lain-lain T2 0.80 menit

Ts1 1.40 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 29.77 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,139.43 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 3.50 tonFaktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 4.67 menit- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit- Waktu tempuh kosong = (L/v2) x 60 T3 16.00 menit- Lain-lain T4 1.00 menit

Ts2 45.67 menit

Bersambung

Page 47: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M16 - SirtuLokasi : QuarryTujuan: Lokasi Pekerjaan

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 2.53 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 78,517.22 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 ) M16 110,656.65 Rupiah

Dibulatkan : M16 110,700.00 Rupiah

Page 48: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M44 - Pasir UrugLokasi : QuarryTujuan: Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke lokasi pekerjaan L 10.00 Km4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 15,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat volume pasir urug Bil 1.42 ton/m3

II. URUTAN KERJA1 pasir urug digali dengan Excavator2 Excavator sekaligus memuat pasir urug

hasil galian ke dalam Dump Truck3 Dump Truck mengangkut pasir urug

ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.90 -Faktor Efisiensi alat Fa 0.83 -Waktu siklus Ts1- Menggali / memuat T1 1.50 menit- Lain-lain T2 1.00 menit

Ts1 2.50 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 16.67 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 21,677.55 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 10.00 tonFaktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 30.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 25.34 menit- Waktu tempuh isi = (L/v1) x 60 T2 20.00 menit- Waktu tempuh kosong = (L/v2) x 60 T3 12.00 menit- Lain-lain T4 5.00 menit

Ts2 62.34 menit

Bersambung

Page 49: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M44 - Pasir UrugLokasi : QuarryTujuan: Lokasi Pekerjaan

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 5.63 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 35,276.62 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 71,954.17 Rupiah

Dibulatkan : M44 72,000.00 Rupiah

Page 50: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M1c- Pasir BetonLokasi : QuarryTujuan: Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI1 Menggunakan alat berat2 Kondisi Jalan : baik3 Jarak Quarry ke lokasi pekerjaan L 16 Km4 Harga satuan pasir beton di Quarry RpM44 1.00 M3 30,000.00 5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 361,430.74 6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 198,446.88 7 Berat isi volume pasir beton Bil 2.35 ton/m3

II. URUTAN KERJA1 pasir urug digali dengan Excavator2 Excavator sekaligus memuat pasir urug

hasil galian ke dalam Dump Truck3 Dump Truck mengangkut pasir urug

ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)Kapasitas Bucket V 0.93 M3Faktor Bucket Fb 0.80 -Faktor Efisiensi alat Fa 0.80 -Waktu siklus Ts1- Menggali / memuat T1 1.50 menit- Lain-lain T2 2.00 menit

Ts1 3.50 menitKap. Prod. / jam =

V x Fb x Fa x 60 Q1 10.20 M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 35,422.48 Rupiah

DUMP TRUCK (E09)Kapasitas bak V 10.00 tonFaktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 25.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/JamWaktu siklus Ts2 - Muat = (V x 60)/(Q1 x Bil) T1 25.02 menit- Waktu tempuh isi = (L/v1) x 60 T1 38.40 menit- Waktu tempuh kosong = (L/v2) x 60 T2 16.00 menit- Lain-lain T4 1.00 menit

Ts2 80.42 menit

Bersambung

Page 51: Daftar Harga

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M1c- Pasir BetonLokasi : QuarryTujuan: Lokasi Pekerjaan

Lanjutan HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60 Q2 2.64 M3 / Jam

Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 75,311.69 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 140,734.17 Rupiah

Dibulatkan : M44 140,700.00 Rupiah

Page 52: Daftar Harga

Formulir Penentuan Harga Bahan

Bahan : Semen

No Uraian KegiatanBiaya Jumlah Kombinasi

Rp/satuan Jumlah (Rp) (Rp)

1 Harga di Pabrik Rp/ton 48,000.00 48,000.00

2 Handling - - -

3 Transport ke proyek Rp/ton - -

4 Pembongkaran, gudang Rp/ton 1,250.00 1,250.00

5 Waste 5% Rp/ton 2,700.00 2,700.00

subtotal Rp/ton 51,950.00

6 Keuntungan & Overhead Rp/ton 2,597.505 % (hanya utk pekerjaanharian)

total jumlah Rp/ton 54,547.50Rp/zak 2,727.38

7 Harga Netto Rp/zak 48,000.00

8 Harga setelah ditambah Rp/zak 50,727.38