1. 1 Rangka Kuda-kuda Direncanakan :
Panjang bentang kuda-kuda = 7,5 m
Sudut kemiringan atap = 35 oJarak antar kuda-kuda
= 3 m
Rangka kuda-kuda
= Baja profil double siku sama kaki ( )
Rangka gording
= baja LLC 125 x 50 x 20 x 4,0Berat gording (q)
= 7,5 kg/m (Lihat tabel baja)
Berat penutup atap (seng)= 10 kg/m2 (PPI 1983)
Plafond + penggantung = 18 kg/m2 (PPI 1983)
Mutu baja yang digunakan= Bj 34
Tegangan dasar izin ( )= 1400 kg/m2
Modulus elastisitas baja = 2,1 x 106 kg/cm2
1.2 Peraturan yang Digunakan
Perhitungan didasarkan pada peraturan PPI 1983, SK-SNI-1991-01, PPBBI-1984, dan Struktur Beton Bertulang (Istimawan Dipohusodo)1.3 Peninjauan Pembebanan
- Pembebanan kuda-kuda
- Pembebanan tangga- Pembebanan top gevel- Pembebanan lantai BAB II
PERHITUNGAN PEMBEBANAN
2.1 Pembebanan Kuda-kuda
Tabel 2. Panjang Batang Kuda-kuda :
Nama Batang Panjang Batang (m)
B1B2B3B41,8751,8751,8751,875
V1V2V31,312,551,31
D1D23,233,23
A1A2A3A42,292,292,292,29
2.1.1 Beban Mati (WD)
1. Beban atap
Berat seng = 2 x jarak kuda-kuda x (panjang kaki kuda-kuda) x berat
penutup atap
= 2 x 3 x (6,41 ) x 10
= 385 kg
Berat plafond= jarak kuda-kuda x panjang balok bint x (berat plafond +
penggantung)
= 3 x 7,5 x 18
= 405 kg
2. Berat gording = Berat gording x jarak kuda-kuda x jumlah gording
=7,5 x 3 x 18= 405 kg
3. Berat rangka
Rangka kuda-kuda yang digunakan adalah rangka baja.
Dari perencanaan konstruksi baja, berat rangka kuda-kuda adalah :
= 125 % x Berat total profil
= 125 % x 159,9
= 199,875 kg
Beban Mati (WD)= Berat genteng + berat plafond + Berat gording + berat rangka kuda-kuda
= 385 + 405 + 405 + 199,875
= 1394.875 kg
2.1.2 Beban Hidup (WL)
Menurut PPI-1983, beban hidup diambil yang terbesar antara :
a. Beban terpusat
Beban terpusat berasal dari seorang pekerja dengan peralatannya adalah sebesar minimum 100 kg (PPI 1983 hal 13).
b. Beban air hujan
q = (40 0,8) = (40 0,8(30)) = 16 kg/m2
P = jarak kuda-kuda x panjang kaki kuda-kuda x berat air hujan
= 3 x 6,41 x 16 = 308 kg
Dari perhitungan, didapatkan beban hidup terbesar berasal dari beban air hujan yaitu : P = 308 kg
2.1.3 Kombinasi Beban
Agar struktur dan komponen memenuhi syarat ketentuannya layak dipakai terhadap berbagai terhadap bermacam-macam kombinasi beban, maka harus memenuhi ketentuan :
Wu = 1,2 WD + 1,6 WL
(SK SNI 1991 01)
Wu = 1,2 WD + 1,6 WL
= 1,2 ( 1394.875 ) + 1,6 ( 308 )
= 2166.65 kg Jadi, masing-masing tumpuan menerima beban kuda-kuda sebesar :
Wu = ( 2166.65 ) = 1083.325 kg
2.2 Pembebanan Tangga
Kemiringan tangga :
= arc tg (2/3)
= 39oPanjang tangga :
x = = 3,202.2.1 Plat Tangga
Tangga bawah sama dengan tangga atas
Direncanakan :
- Tebal plat tangga = 15 cm
- Lebar tangga = 160 cm
- Langkah datar/antrade (P)= 25 cm
- Langkah naik / optrade (T)= 20 cm
`Tebal rata-rata plat tangga :
S =
=
= 32,015 cm
Y=
Tebal rata-rata = 15 + 8= 23 cm a. Beban Mati (WD)
- Berat plat tangga (t = 23 cm)= 1,6 x 0,23 x 2400* = 883.2 kg/m
- Berat spesi (t = 2 cm)
= 1,6 x 0,02 x 2100*= 67,2 kg/m
- Berat pasir (t = 3 cm)
= 1,6 x 0,03 x 1600* = 76,8 kg/m
- Berat keramik (t = 2 cm)
= 1,6 x 0,02 x 2400* = 76,8 kg/m
WD= 1104 kg/m
* Dari tabel 2.1 (PPI 1983 hal 11) di peroleh berat sendiri bahan bangunanb. Beban Hidup (WL)
Beban hidup yang timbul pada sebuah tangga adalah sebesar 300 kg/m2 (PPI-1983 tabel 3.1) dengan koefisien reduksi 0,75 (PPI-1983 tabel 3.3).
WL = 1,6 x 300 x 0,75 = 360 kg/m
c. Kombinasi beban (WU)
Beban yang diterima oleh tangga :
WU = 1,2 WD + 1,6 WL
= 1,2 ( 104 ) + 1,6 (360)
= 700.8 kg/m2.2.2 Pembebanan Plat Bordes
Direncanakan :
Tebal plat bordes = 0,15 m
Lebar plat bordes = 1,25 m
a. Beban Mati (WD)
- Berat plat bordes (t = 15 cm) = 1,2 x 0,15 x 2400* = 432 kg/m
- Berat spesi (t = 2 cm) = 1,2 x 0,02 x 2100*= 50,4 kg/m
- Berat pasir (t = 3 cm) = 1,2 x 0,03 x 1600* = 57,6 kg/m
- Berat keramik (t = 2 cm)= 1,2 x 0,02 x 2400*= 57,6 kg/m
WD= 597,6 kg/m
* Dari tabel 2.1 (PPI 1983 hal 11) di peroleh berat sendiri bahan bangunan b. Beban Hidup (WL)
Beban hidup yang timbul pada sebuah tangga adalah sebesar 300 kg/m2 (PPI-1983 tabel 3.1) dengan koefisien reduksi 0,75 (PPI-1983 tabel 3.3).
Wu = 1,2 x 300 x 0,75 = 270 kg/mc. Kombinasi Beban (WU)
Beban total yang diterima plat bordes :
WU = 1,2 WD + 1,6 WL
= 1,2 (597,6) + 1,6 (270)
= 1149,12 kg/m2.2.3 Balok Bordes
- Berat sendiri bordes = 0,2 x 0,25 x 2400
= 120 kg/m
- Berat plat bordes = Wu = (1149,12) = 574,56 kg/mWU= 694,56 kg/m
2.3 Pembebanan Top Gevel 2.3.1 Berat dinding top gevel
Luas dinding :
A = 2 ( x tinggi x bentang kuda)
= 2 ( x 2,63 x 3,75)
= 9.863 m2 Berat dinding top gevel : Dari tabel 2.1 (PPI 1983 hal 11) di peroleh berat sendiri bahan bangunan untuk dinding pasangan bata merah (setengah batu) adalah 250 kg/ m2
P = A . q
= 9.863 x 250 = 2465.75 kg
2.3.2 Berat pengaku top gevel
- Panjang total = 2 (kaki kuda-kuda) + bentang kuda-kuda + tinggi kuda-kuda
= 2 (6,41) + 7,5 + 2,63
= 22.95 m
Berat beton bertulang = 2400 kg/m3
(PPI-1983, tabel 2.1)
Ukuran pengaku top gevel = 15/15
Berat pengaku top gevel :
P = 22.95 x 0,15 x 0,15 x 2400 = 1239.3 kg
Berat total top gevel :
P = 2465.75 + 1239.3 = 3705.05 kg
Berat equivalen / rata-rata top gevel :
q = = kg/m2.4 Pembebanan Lantai
2.4.1 Beban Mati
Direncanakan tebal plat lantai 15 cm
- Berat sendiri plat lantai = 0,15 x 2400 x 1 = 360 kg/m
- Berat spesi (t = 2 cm) = 0,02 x 2100 x 1= 42 kg/m
- Berat pasir (t = 3 cm) = 0,03 x 1600 x 1 = 48 kg/m
- Berat keramik (t = 2 cm)= 1,2 x 2400 x 1 = 57,6 kg/m- Berat plafond + penggantung = 18 x 1
= 18 kg/m
WD= 516 kg/m
2.4.2 Beban Hidup
Beban hidup yang timbul pada lantai dari sebuah asrama adalah 250 kg/m2 (PPI-1983 tabel 3.3).
WL = 250 x 0,75 x 1 = 187,5 kg/m
2.4.3 Kombinasi Beban
WU = 1,2 WD + 1,6 WL
= 1,2 (516) + 1,6 (187,5)
= 919,2 kg/m2.3.4 Distribusi beban lantai
Denah distribusi beban.
Diket : Wu = 919,2 kg/mBeban lantai didistribusikan dalam bentuk segitiga dan trapesium yang dijadikan beban merata equivalen, dengan rumus : Bentuk Segitiga
qeq = Lx Wu Bentuk Trapesium
qeq =
Tabel 2.2 Besar Pelimpahan Beban Lantai (Beban Equivalent)
TypeLx
(m)Ly
(m)qeq
(kg/m)
A
B
C
D
3,752,072,072,07
2,75-
2,75-
493,79
842,6137,44634,25
2.4 Pelimpahan Beban pada Portal
Direncanakan :Dimensi : - Balok lantai : 30/50
- Kolom atas : 40/40
- Ringbalk: 20/25
- Balok anak : 25/40Diketahui : (PPI 1983 tabel 2.1)
Berat jenis beton bertulang : 2400 kg/m3 Berat jenis bata merah : 1700 kg/m32.4.1 Portal I I (memanjang)
A. Beban terbagi rata
1. Bentang AB = BC = CD = DE = EF = FG = GH = HI= IJ = JKBerat dinding selasar = 0,15 x 1,00 x 1700 = 255 kg/m
Berat plat lantai tipe (D)= 634
= 634 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
q= 1249 kg/mB. Beban terpusat
1. P1= P11
Berat ringbalk melintang 20/25 = 0,2 x 0,25 x ( . 2) x 2400 = 120 kg
Berat plat lantai (C) = (137 x 2) = 137 kg
Berat dinding melintang = (1,00 x 0,15 x 2 x 1700) = 255 kg Berat balok lantai melintang 30/50 = 0,3 x 0,50 x ( (2)) x 2400 = 360 kg
Berat kolom atas 40/40 = 0,4 x 0,4 x 3,75x 2400 = 1440 kg
P = 2312 kg
P = 2,312 ton2. P2 = P3 = P4 = P5 = P6 = P7 = P8 = P9 = P10 Berat ringbalk melintang 20/25 = 0,2 x 0,25 x ( . 2) x 2400 = 120 kg
Berat plat lantai (C) = 2 x ( (137,44 x 2)) = 1268.5 kg
Berat balok lantai melintang 30/50 = 0,3 x 0,50 x ( (2)) x 2400 = 360 kg Berat kolom atas 40/40 = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 2194.88kg
P = =2,194 ton2.4.2 Portal II II (memanjang)
A. Beban terbagi rata
1. Bentang LM = MN = NO = OP = PQ = QR = RS = ST = TU
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 k
Berat plat lantai tipe (B) = 842,6
= 842,6kg/m
Berat plat lantai tipe (D)
= 634,25
= 634,25 kg/m
Berat balok lantai (30/50) = 0,3 x 0,50 x 2400 = 360 kg/m
q= 2793.1 kg/m
= 2,793 t/m2. Bentang UV
Berat plat lantai tipe (D)
= 634,25
= 634,25 kg/m
Berat balok lantai (30/50) = 0,3 x 0,50 x 2400 = 360 kg/m
q= 994.25 kg/m
= 0.994 tB. Beban terpusat
1. P1
Berat ringbalk melintang (20/25)= 0,20 x 0,25 x ( .4+ .2,07) x 2400 = 360 kgBerat plat lantai (A) = (493,79 x 3,75)
= 935,86 kg
Berat plat lantai (C) = (137,44 x 2,07)
= 257,7 kg
Berat dinding melintang = ((3,75x 3,75)+(1x 2,07))x0,15x1700) = 2167,5 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .4+ .2,07) x 2400 = 1080 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P= 6241,1 k= 6,24 t
2. P2 = P3 = P5 = P6 = P8 = P9Berat plat lantai (A) = 2 x (493,79 x 3,75) = 1851.7 kg
Berat plat lantai (C) = 2 x (137,44 x 2,07) = 284.51 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .3,75+ .2,07) x 2400 = 1047.6 kg Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P =4623.81 kg = 4,62 t3. P4 = P7 Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( .3,75+ .2.07) x 2400 = 349.2 kgBerat plat lantai (A) = 2 x (493,79 x 3,75)
= 1851.7 kg
Berat plat lantai (C) = 2 x (137,44 x 2,07)
= 284.51 kg
Berat dinding melintang = (3,75 x 0,15 x ( 3,75)x 1700) = 1793 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .3,75+ .2,07)x 2400 = 1047.6 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 6766.01kg
= 6,77 t 4. P10
Berat ringbalk melintang (20/25) = 0,2 x 0,25 x ( .3,75+ .2,07) x 2400 = 349.2 kg
Berat plat lantai (A) = (493,79 x 3,75)
= 925.8 kg
Berat plat lantai (C) = 2 x (137,44 x 2,07)
= 284.5 kg
Berat dinding melintang = (3,75 x 0,15 x ( 3,75)x 1700)
= 1793 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .3,75+ .2,07)x 2400= 1080 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P= 4432.5 kg
= 4,432 t5. P11
Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( .3,75+ .2,07) x 240 = 349.2 kg
Berat plat lantai (C) = (137,44 x 2,07)
= 284.51 kg
Berat dinding melintang = ((3,75x 3,75)+(1x 2,07))x0,15x1700) = 1855,7 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .3,75+ .2,07)x 2400 = 1080 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P= 5009 kg
= 5,00 t2.4.3 Portal III III (memanjang)A. Beban terbagi rata
1. Bentang WX = XY = YZ = ZA = AB = BC = CD = DE = EF
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat plat lantai tipe (B)
= 2 x 842,6
= 1685,2 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
q= 3001.45 kg/m
= 3,00 t/m2. Bentang FG
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
q= 360 kg/m
= 0,36 t/m B. Beban terpusat
1. P1 = P10
Berat ringbalk melintang (20/25) = 0,2 x 0,25 x ( .3,75+ .3,75) x 2400= 480 kgBerat plat lantai (A) = (493,79 x 3,75)
= 925,85 kg
Berat plat lantai (A) = (493,79 x 3,75)
= 925,85 kg
Berat dinding melintang = (3,75 x 0,15 x ( 3,75+ .3,75)x 1700) = 3586 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( .3,75+ .3,75)x 2400 = 1350 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 8707.7 kg
= 8,71 t
2. P2 = P3 = P5 = P6 = P8 = P9 Berat plat lantai (A)= 2 x (493,79 x 3,75)
= 1852 kg
Berat plat lantai (A)= 2 x (493,79 x 3,75)
= 1852 kg
Berat balok lantai melintang (30/50)= 0,3 x 0,50 x ( . 3,75+ . 3,75) x 2400 = 1350 kg
P = 5054 kg
= 5,05 t
3. P4 = P7Berat ringbalk melintang (20/25)= 0,2 x 0,25 x ( . 3,75+ . 3,75) x 2400 = 480 kgBerat plat lantai (A)= 2 x (493,79 x 3,75)
= 1852 kg
Berat plat lantai (A)= 2 x (493,79 x 3,75)
= 1852 kg
Berat dinding melintang= (3,75 x 0,15 x (3,75+ . 3,75)x 1700)= 3586 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( . 3,75+ . 3,75)x 2400 = 1350 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 10560 kg
= 10,56 t4. P11
Berat ringbalk melintang (20/25)= 0,2 x 0,25 x ( . 3,75+ . 3,75) x 2400= 480 kgBerat dinding melintang= (3,75 x 0,15 x (3,75+ . 3,75)x 1700) = 3586 kg
Berat balok lantai melintang (30/50) = 0,3 x 0,50 x ( . 3,75+ . 3,75)x 2400 =1350 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 6856 kg
= 6,85 t2.4.4 Portal IV IV (memanjang)
A. Beban terbagi rata
1. Bentang HI = IJ = JK = KL = LM = MN = NO = OP= PQ
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat plat lantai tipe (B)= 842,6
= 842,6 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
Berat ring balok (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
q= 2278.85 kg/m
= 2,28 t/m
2. Bentang QR
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
Berat ring balok (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
q= 1436,25 kg/m
= 1,44 t/m
B. Beban terpusat
1. P1
Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( (3,75)) x 2400 = 240 kgBerat plat lantai (A) = (493,79 x 3,75)
=925 kg
Berat dinding melintang = (3,75 x 0,15 x 3,75 x 1700) =3188 kg
Berat balok lantai melintang (30/50) = 0,30 x 0,50 x ( (3,75)) x 2400 = 675 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 199,875= 199,875 kg
P = 6670 kg
= 6,67 ton2. P2 = P3 = P5 = P6 = P8 = P9Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( (3,75)) x 2400 = 240 kgBerat plat lantai (A) = 2 x (493,79 x 3,75)
= 1852 kg
Berat balok lantai melintang (30/50) = 0,30 x 0,50 x ( (3,75)) x 2400 = 675 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 199,875 = 199,875 kg
P = 4406.86 kg
= 4,407 ton3. P4 = P7
Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( (3,75)) x 2400 = 240 kgBerat plat lantai (A) = 2 x (493,79 x 3,75)
= 1852 kg
Berat dinding melintang = (3,75 x 0,15 x 3,75 x 1700) = 3188 kg
Berat balok lantai melintang (30/50) = 0,30 x 0,50 x ( (3,75)) x 2400 = 675 kg
Berat kolom atas (40/50) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 199,875= 199,875 kg
P = 7594.88 kg
= 7,594 ton4. P10
Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( (3,75)) x 2400 = 240 kgBerat plat lantai (A) = (493,79 x 3,75)
= 926 kgBerat dinding melintang = (3,75 x 0,15 x 3,75 x 1700) = 3188 kgBerat balok lantai melintang (30/50) = 0,30 x 0,50 x ( (3,75)) x 2400 = 675 kgBerat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 199,875= 199,875 kg
P= 6668.88 kg
= 6,67 ton
5. P11
Berat ringbalk melintang (20/25) = 0,20 x 0,25 x ( (3,75)) x 2400 = 240 kgBerat dinding melintang = (3,75 x 0,15 x 3,75 x 1700) = 1793 kg
Berat balok lantai melintang (30/50) = 0,30 x 0,50 x ( (3,75)) x 2400 = 675 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 199,875= 199,875 kg
P= 4347.88 kg
= 4,35 ton2.4.5 Portal Portal A-A melintang
A. Beban terbagi rata
1. Bentang AB
Berat dinding atas
= 0,15 x 1,00 x 1700 = 255 kg/m
Berat plat lantai tipe (C)
= 137,44
= 137,44 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
q= 752.44 /m
= 0.752 t/m2. Bentang BC = CD
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat plat lantai tipe (A)= 493,79 = 493,73 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m
q= 1809.98 kg/m
= 1,809 t/m
B. Beban terpusat
1. P1
Berat kuda-kuda
= 99.9375
= 99.9375 kg
Berat ringbalk memanjang (20/25)= 0,2 x 0,25 x ( .2,75) x 2400 = 165 kgBerat plat lantai (D)= (634,25 x 2,75)
= 872.09 kg
Berat dinding memanjang= (1,00 x 0,15 x ( 2,75)x 1700)
= 350.62 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x ( 2,75)x 2400
= 495 kg
P = 1981 kg
= 1,98 t2. P2
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x ( . 2,75) x 2400 = 165 kgBerat plat lantai (D) = (634,25 x 2,75)
= 872.1kg
Berat plat lantai (B) = (842,6 x 2,75 )
= 2318 kg
Berat dinding memanjang = (3,75 x 0,15 x ( 2,75)x 1700) = 1148 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x ( . 2,75)x 2400 = 495 kg
Berat kolom atas (40/40) = (0,4 x 0,4 x 3,75 x 2400) = 1440 kg
P = 5279 kg
= 5,279 t3. P3Berat plat lantai (B) = (842,6x 2,75)
= 2318 kg
Berat plat lantai (B) = (842,6x 2,75)
= 2318 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x ( 2,75) x 2400 = 495 kg
Berat kolom atas (40/40) = (0,4 x 0,4 x 3,75 x 2400) = 1440 kg
P = 6571 kg
= 6,571 t4. P4
Berat kuda-kuda
= 99.9375 = 99.9375 kg
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x ( . 2,75) x 2400 = 165 kgBerat plat lantai (B) = (835,2 x 2,75)
= 2318 kg
Berat dinding memanjang = (3,75 x 0,15 x ( 2,75 )x 1700) = 1434,4 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x ( 2,75 ) x 2400 =495 kg Berat kolom atas (40/40) = (0,4 x 0,4 x 3,75 x 2400) = 1440 kg
P = 5952.33kg
= 5,952 t
2.4.6 Portal B B, C C, E E, F F, H H, I I melintangA. Beban terbagi rata
1. Bentang EF
Berat plat lantai tipe (C)= 137,44 + 137,44
= 274.88 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400
= 360 kg/m
q = 634.88kg/m
= 0.635 t/m2. Bentang FG = GH
Berat dinding atas
= 0,15 x 3,75 x 1700
= 956,25 kg/m Berat plat lantai tipe (A)= 493,79 + 493,79 = 987.58 kg/mBerat balok lantai (30/50) = 0,30 x 0,75 x 2400
= 360 kg/m
q= 2303.83 kg/m
= 2,303 t/mB. Beban terpusat
1. P1
Berat kuda-kuda
= 99.9375
= 99.9375 kg
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75) x 2400 = 165 kgBerat plat lantai (D) = 2 x ( (634,25 x 2,75)) = 1744.18 kg
Berat dinding memanjang = 1,00 x 0,15 x (2,75)x 1700 = 701.25 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 1080 kg
P = 3790.36 kg
= 3,790t
2. P2
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75 ) x 2400 = 165 kgBerat plat lantai (D) = 2 x ( (634,25 x 2,75 )) = 2134,41 kg
Berat plat lantai (B) = 2 x ( (842,6 x 2,75 )) = 1744.2 kg
Berat dinding memanjang = 3,75 x 0,15 x (2,75 )x 1700 = 2629.68kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75 )x 2400 = 990 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 9103.29 kg
= 9,103 t3. P3
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2134,41 kg
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2134,41 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 6698.82 kg
= 6,698 t4. P4
Berat kuda-kuda
= 99.9375
= 99.9375 kg
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75) x 2400 = 360 kgBerat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2134,41 kg
Berat dinding memanjang = 3,75 x 0,15 x (2,75)x 1700 = 2629.68 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
Berat kolom atas (40/40) = (0,4 x 0,4 x 3,75 x 2400) = 1440 kg
P = 7654.02 kg
= 7,654 t
2.4.7 Portal D D dan Portal G G (melintang)
A. Beban terbagi rata
1. Bentang IJ
Berat plat lantai tipe (C)= 2 x 842,79
= 1685.58 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 2045.58kg/m
q = 2,045 t/m2. Bentang JK = KL
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat ring balok (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
Berat plat lantai tipe (A)= 2 x 493,39
= 2035,8 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 3472,05 kg/m
q = 3,47 t/mB. Beban terpusat
1. P1
Berat kuda-kuda
= 99.9375
= 99.9375 kg
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75) x 2400 = 360 kgBerat plat lantai (D) = 2 x ( (634,25 x 2,75))
= 1744.18kg
Berat dinding memanjang = 1,00 x 0,15 x (2,75)x 1700 = 701.25 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
P = 3895.37kg
= 3,895t2. P2
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75) x 2400 = 360 kgBerat plat lantai (D) = 2 x ( (634,25 x 2,75)) = 1744.18 kg
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2317.15 kg
Berat dinding memanjang = 3,75 x 0,15 x (2,75)x 1700 = 2629.69 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 9481.02 kg
= 9,48 t3. P3
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2317.15 kg
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) = 2317.15 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 2430 kg
= 2,43 t4. P4
Berat kuda-kuda
= 99.9375
= 99.9375 kg
Berat ringbalk memanjang (20/25) = 0,2 x 0,25 x (2,75) x 2400 = 360 kgBerat plat lantai (B) = 2 x ( (835,2 x 2,75)) = 2505,6 kg
Berat dinding memanjang = 3,75 x 0,15 x (2,75)x 1700 = 2629.69 kg
Berat balok lantai memanjang (30/50) = 0,3 x 0,50 x (2,75)x 2400 = 990 kg
Berat kolom atas (40/40) = (0,4 x 0,4 x 3,75 x 2400) = 1440 kg
P = 5059.69 kg
= 5,059 t
2.4.8 Portal J J (melintang)
A. Beban terbagi rata
1. Bentang AB
Berat plat lantai tipe (C)= 2 x 137,44
= 274.88 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 634.88 kg/m
q = 0.634 t/m2. Bentang BC = CD
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m Berat ring balok (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
Berat plat lantai tipe (A)=493,79
= 493,79 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 1930.04 kg/m
q = 1,93 t/mB. Beban terpusat
1. P1
Berat plat lantai (D) = 2 x ( (634,25 x 2,75)) = 1744.18 kgBerat ringbalk memanjang (20/25) = 0,20 x 0,25 x 2,75 x 2400 = 360 kgBerat kuda-kuda= 99.9375 = 99.9375 kgBerat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat dinding memanjang = 1 x 0,15 x 2,75 x 1700 = 765 kg
Berat balok lantai memanjang (30/50)= 0,30 x 0,50 x 2,75 x 2400 = 990 kg
P = 5399.1 kg
P = 5,399 ton2. P2 Berat ringbalk memanjang (20/25) = 0,20 x 0,25 x 2,75x 2400 = 360 kgBerat plat lantai (B) = (842,6 x 2,75) = 1158.57 kgBerat plat lantai (D) = 2 x ( (634,25 x 2,75)) = 1744.18 kgBerat dinding memanjang = 3,75 x 0,15 x ( (2,75)) x 1700 =1315 kg
Berat balok lantai memanjang (30/50)= 0,30 x 0,50 x 2,75 x 2400 =1080 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 7097.75kg
P = 7,097 ton3. P3
Berat plat lantai (B) = 2 x ( (842,6 x 2,75)) =2296.8 kgBerat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat balok lantai memanjang (30/50)= 0,30 x 0,50 x ( (2,75)) x 2400 = 495 kg
P = 4231.8kg
P = 4,231 ton4. P4
Berat ringbalk memanjang (20/25) = 0,20 x 0,25 x 2,75x 2400 = 330 kgBerat plat lantai (B) = (842,6 x 2,75) = 1158.57 kg
Berat dinding memanjang = 3,75 x 0,15 x 2,75 x 1700 = 2630 kg
Berat balok lantai memanjang (30/50)= 0,30 x 0,50 x 2,75 x 2400 = 990 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 99.9375 = 99.9375 kg
P = 6648.5 kg
P = 6,648 ton2.4.9 Portal K K (melintang)
A. Beban terbagi rata
1. Bentang QR
Berat dinding atas
= 0,15 x 1,00 x 1700 = 255 kg/m
Berat plat lantai tipe (C)= 137,44
= 137,44 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 752.44 kg/m
q = 0.752 t/m2. Bentang RS = ST
Berat dinding atas
= 0,15 x 3,75 x 1700 = 956,25 kg/m
Berat ring balok (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
Berat balok lantai (30/50) = 0,30 x 0,50 x 2400 = 360 kg/m +
q= 1436,25 kg/m
q = 1,44 t/mB. Beban terpusat
1. P1
Berat plat lantai (D) = (634,25 x 2,75) = 872.094 kgBerat dinding memanjang = 1 x 0,15 x ( (2,75)) x 1700 = 382,5 kgBerat kuda-kuda = 99.9375 = 99.9375 kgBerat balok lantai memanjang (30/50) = 0,30 x 0,50 x ( (2,75)) x 2400 = 540 kg
P = 1894.53kg
P = 1,894 ton2. P2
Berat ringbalk memanjang (20/25) = 0,20 x 0,25 x ( (2,75)) x 2400 = 180 kgBerat plat lantai (D) = (614,25 x 2,75) = 1067,21kgBerat balok lantai memanjang (30/50) = 0,30 x 0,50 x ( (2,75)) x 2400= 540 kg kg Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P= 3227,21 kg
P = 3,23 ton
3. P3
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kg
P = 1440 kg
P = 1,44 ton4. P4
Berat ringbalk memanjang (20/25) = 0,20 x 0,25 x ( (2,75)) x 2400 = 165 kgBerat dinding memanjang = 3,75 x 0,15 x ( (2,75)) x 1700 =1314.9kg
Berat balok lantai memanjang (30/50)= 0,30 x 0,50 x ( (2,75)) x 2400 = 495 kg
Berat kolom atas (40/40) = 0,4 x 0,4 x 3,75 x 2400 = 1440 kgBerat kuda-kuda= 99.9375= 99.9375kg
P= 3514.83kg
P = 3,514 ton
BAB III
ANALISA STRUKTURAL
3.1 Momen Tangga Tangga dianggap terletak di atas 2 tumpuan, yaitu jepit-jepit
Diketahui : Wu = 700.8 kg/m
Panjang tangga :
X = = 3,20 m = arc tg = 39(Tangga atas direncanakan sama dengan tangga bawah jadi untuk perencanaan di ambil tangga bawah.3.1.1 Plat tangga
Diketahui : W = 700.8 kg/m
a. Tangga bagian bawah
Wu = W cos
= 700.8 cos 39(= 544,624 kg/m
M = 1/8 Wu L2
= 1/8 (700.8 ) (3,20)2
= 897.024 kgm
Momen tumpuan (Mtu)
Mtu1 = Mtu2
= 1/12 Wu L2
= 1/12 (700.8 ) (3,20)2
= 598.016 kgm
Momen lapangan (Mlap)
Mlap = M Mtu
= 897.024 598.016
= 299.01 kgm
b. Tangga bagian atas
Tangga bagian atas di rencanakan sama dengan tangga bagian bawah
Sehingga : Mlap atas = Mlap bawah = 299.008 kgm
3.1.2 Plat bordes
Momen plat bordes dihitung berdasarkan Tabel 4.2b hal 26 buku grafik dan tabel perhitungan beton bertulang SK SNI 1991 03 (jilid 4).
Rumus yang digunakan :
MLx = 0,001 . Wu . Lx2 x
MLy = 0,001 . Wu . Lx2 x
Mtx = - 0,001 . Wu . Lx2 x
Mtiy = MLy
Dimana, x : koef. Pengali
Wu = 1149,12 kg/mMLx = 0,001 . Wu . Lx2. x
x = 60
= 0,001 x 1149,12 x 1,252 x 60
= 107.73 kgm
MLy = 0,001 . Wu . Lx2. x
x = 16.5
= 0,001 x 1149,12 x 1,252 x 16.5
= 29.63 kgm
Mtx = - 0,001 . Wu . Lx2. x
x = 83
= - 0,001 x 1149,12 x 1,252 x 83
= - 149.03 kgm
Mtiy = MLx
= x 107.73
= 53.865 kgm
3.1.3 Balok bordes
Diketahui : Wu = 694,56 kg/m
Momen Statis Tertentu
M = 1/8 Wu L2 = 1/8 x 694,56 x 2,752 = 656.58 kgm
Momen Statis Tak Tentu
Mtu1 = Mtu2 = 1/12 Wu L2 = 1/12 x 694,56 x 2,752 = 437.72 kgm
MLap = M Mtu1
= 656.58 437.72
= 218.86 kgm
3.2 Momen pada Ringbalk
Rumus yang digunakan berdasarkan Gambar 7.1 Struktur Beton Bertulang (Istimawan) halaman 209.
3.2.1 Ringbalk memanjang
Berat sendiri (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
Untuk perhitungan momen, panjang bentang diambil yang maksimum.
Momen
Momen tumpuan :
M1 = M11 = 1/16 q L2 = 1/16 x 120 x 2,752 = 56.72 kgm M2 = M10 = 1/10 q L2 = 1/10 x 120 x 2,752 = 90.75 kgm
M3 = M4 = M5 = M6 = M7 = M8 = M9 = 1/11 q L2 = 1/11 x 120 x 2,752 = 82.5 kgm
Momen lapangan :
M12 = M21 = 1/14 q L2 = 1/14 x 120 x 2,752 = 64,82 kgm
M13 s/d M20 = 1/16 q L2 = 1/16 x 120 x 2,752 = 56.72 kgm
Mdesign tumpuan = 90.75 kgm
Mdesign lapangan = 64,82kgm
Bidang geser = q L = (120) (2,75) = 165 kg
3.2.2 Ringbalk melintang
Berat sendiri (20/25) = 0,20 x 0,25 x 2400 = 120 kg/m
Untuk perhitungan momen, panjang bentang diambil yang maksimum.
Momen
Momen tumpuan :
M1 = M4 = 1/16 q L2 = 1/16 x 120 x 3,752 = 105.47 kgm
M2 = M3 = 1/10 q L2 = 1/10 x 120 x 3,752 = 168.75 kgm
Momen lapangan :
M5 = M7 = 1/14 q L2 = 1/14 x 120 x 3,752 = 120,54 kgm
M6 = 1/14 q L2 = 1/16 x 120 x 3,752
= 105.47 kgm
Mdesign tumpuan = 168.75 kgm
Mdesign lapangan = 120,54kgm
Bidang geser = q L = (120) (3,75) = 225 kg
3.3 Momen pada Sloof
3.3.1 Sloof memanjang
Berat sendiri (25/40)= 0,25 x 0,40 x 2400 = 240 kg/mBerat dinding
= 0,15 x 3,75 x 1700 = 956,25 kg/m
q= 1196,25 kg/m
Untuk perhitungan momen, panjang bentang diambil yang maksimum.
Momen
A. Momen tumpuan :
M1 = M11 = 1/16 q L2 = 1/16 x 1196,25 x 2,752 = 565,42 kgm M2 = M10 = 1/10 q L2 = 1/10 x 1196,25 x 2,752 = 904,66 kgm
M3 = M4 = M5 = M6 = M7 = M8 = M9 = 1/11 q L2 = 1/11 x 1196,25 x 2,752 = 822,42 kgm
B. Momen lapangan :
M12 = M21 = 1/14 q L2 = 1/14 x 1196,25 x 2,752 = 646,19 kgm
M13=M14=M15=M16=M17=M18=M19=M20= 1/16 q L2 = 1/16 x 1196,25 x 2,752 = 565,42 kgm
Mdesign tumpuan = 904,66 kgm
Mdesign lapangan = 565,42 kgm
Bidang geser = q L = (1196,25) (2,75) = 1644.85 kg
3.3.2 Sloof Melintang
Berat sendiri (25/40)= 0,25 x 0,40 x 2400 = 240 kg/mBerat dinding
= 0,15 x 3,75 x 1700 = 956,25 kg/m
q= 1196,25 kg/m
Untuk perhitungan momen, panjang bentang diambil yang maksimum.
Momen
Momen tumpuan :
M1 = M4 = 1/16 q L2 = 1/16 x 1196,25 x 3,752 = 1051.40 kgm
M2 = M3 = 1/10 q L2 = 1/10 x 1196,25 x 3,752 = 1682.23 kgm
Momen lapangan :
M5 = M7 = 1/14 q L2 = 1/14 x 1196,25 x 3,752 = 1201.60 kgm M6 = 1/16 q L2 = 1/16 x 1196,25 x 3,752
= 1051.40 kgm Mdesign tumpuan = 1682.23 kgm
Mdesign lapangan = 1201.60 kgm
Bidang geser = q L = (1196,25) (3,75) = 2243 kg 3.4 Momen pada Plat Lantai
Momen plat lantai dihitung berdasarkan tabel 4.2.b pada buku grafik dan tabel perencanaan beton bertulang SK SNI 1991 03.
Dik : Wu = 919,2 kg/m
Tipe 1
Masing-masing x didapat dengan interpolasi :
MLx = 0,001 . Wu . Lx2. x = 0,001 x 919,2 x 2,752 x 46.5 = 323.24 kg.m
MLy = 0,001 . Wu . Lx2. x = 0,001 x 919,2 x 2,752 x 35.5 = 145,826 kg.m
Mtx = - 0,001 . Wu . Lx2. x = - 0,001 x 919,2 x 2,752 x 105 = - 517,532 kg.m
Mtx = Mlx
= x 323.24
= 161.62 kg.mMty = Mly
= x145,826
= 72.913 kg.mTipe 2
Masing-masing x didapat dengan interpolasi :
MLx = 0,001 . Wu . Lx2. x = 0,001 x 919,2 x 2,072 x 64.5 = 152,006 kg.m
MLy = 0,001 . Wu . Lx2. x = 0,001 x 919,2 x 2,072 x 32
= 55,12 kg.mMtx = - 0,001 . Wu . Lx2. x = - 0,001 x 919,2 x 2,752 x 109.5 = -517,53 kg.mMtx = Mlx
= x 152,006
= 76.003 kg.mMty = Mly
= x 55,12
= 27.56 kg.m3.5 Perhitungan Momen Portal
Perhitungan dilakukan dengan metode cross/distribusi momen, dimana metode ini dapat digunakan untuk menganalisa semua jenis balok atau kerangka kaku statis tak tentu (Chu Kia Wang, 1991).
Direncanakan : - kolom bawah : 40/40
- balok lantai : 30/50 Momen Inersia (I)
Ikolom = 1/12 bh3 = 1/12 (40) (40)3 = 213333,34 cm4
Ibalok = 1/12 bh3 = 1/12 (30) (50)3 = 312500 cm4
Ikolom = 0,683 Ibalok EIkolom= 0,683 EIbalok
Portal dipilih 1 buah portal memanjang dan 1 buah portal melintang masing-masing diambil 1 portal dengan beban maksimal.3.5.1 Portal II - II memanjang
Beban terpusat P1 P11 = 0 pada portal II - II Memanjang. Karena semua beban terpusat akan dilimpahkan pada portal melintang.
q1 = q2= q3 = q4 = q5 = q6 = q7 = q8 = q9 = 2,793 t/m
q10 = 0.994 t/ma. Angka Kekakuan (k)
BatangK
Absolut Relatif
AB = BC = CD = DE = EF = FG = GH = HI = IJ = JK
AL = BM = CN = DO = EP = FQ = GR = HS = IT = JU = KV
0,330,17
b. Faktor Distribusi (FD)
1. Titik A = Ka. Batang AB = KJ
b. Batang AL = KV
2. Titik B = C = D = E = F = G = H = I = J
a. Batang BA = CB = DC = ED = FE = GF = HG = IH = JI
b. Batang BC = CD = DE = EF = FG = GH = HI = IJ = JK
c. Batang BM = CN = DO = EP = FQ = GR = HS = IT = JU
b. Momen Primer (MF)
MFAB = MFBC = MFCD = MFDE = MFEF = MFFG = MFGH = MFHI = MFIJ = 1/12 (q1) (L2) = 1/12 (2,793) (2,75)2 = 1,760 tm
MFBA = MFCB = MFDC = MFED = MFFE = MFGF = MFHG = MFIH = MFJI = - 1,760 tm
MFJK = 1/12 (q10) (L2) = 1/12 (0.994) (2,75)2 = 0,626 tm
MFKJ = - 0,626 tm
c. Tabel Cross Portal II - II MemanjangTitikABCD
BatangA - LA - BB - AB - MB - CC - BC - NC - DD - CD - OD - E
FD0.3400.6600.3980.2050.3980.3980.2050.3980.3980.2050.398
MP0.0001.760-1.7600.0001.760-1.7600.0001.760-1.7600.0001.760
Bal-0.598-1.1620.0000.0000.0000.0000.0000.0000.0000.0000.000
Co0.0000.000-0.5810.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.2310.1190.2310.0000.0000.0000.0000.0000.000
Co0.0000.1160.0000.0000.0000.1160.0000.0000.0000.0000.000
Bal-0.039-0.0760.0000.0000.000-0.046-0.024-0.0460.0000.0000.000
Co0.0000.000-0.0380.000-0.0230.0000.0000.000-0.0230.0000.000
Bal0.0000.0000.0240.0130.0240.0000.0000.0000.0090.0050.009
Co0.0000.0120.0000.0000.0000.0120.0000.0050.0000.0000.000
Bal-0.004-0.0080.0000.0000.000-0.007-0.003-0.0070.0000.0000.000
Co0.0000.000-0.0040.000-0.0030.0000.0000.000-0.0030.000-0.001
Bal0.0000.0000.0030.0020.0030.0000.0000.0000.0020.0010.002
Co0.0000.0010.0000.0000.0000.0010.0000.0010.0000.0000.000
Bal0.000-0.0010.0000.0000.000-0.0010.000-0.0010.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Total-0.6420.642-2.1250.1331.992-1.684-0.0281.712-1.7760.0061.770
0.0000.0010.0000.000
TitikEFGH
BatangE - DE - PE - FF - EF - QF - GG - FG - RG - HH - GH - SH - I
FD0.3980.2050.3980.3980.2050.3980.3980.2050.3980.3980.2050.398
MP-1.7600.0001.760-1.7600.0001.760-1.7600.0001.760-1.7600.0001.760
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000-0.045
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0180.0090.018
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0090.0000.0000.008
Bal0.0000.0000.0000.0000.0000.000-0.004-0.002-0.004-0.003-0.002-0.003
Co0.0050.0000.0000.0000.000-0.0020.0000.000-0.002-0.0020.000-0.007
Bal-0.002-0.001-0.0020.0010.0000.0010.0010.0000.0010.0030.0020.003
Co0.0000.0000.000-0.0010.0000.0000.0000.0000.0020.0000.0000.001
Bal0.0000.0000.0000.0000.0000.000-0.0010.000-0.001-0.0010.000-0.001
Co0.0010.0000.0000.0000.0000.0000.0000.0000.0000.0000.000-0.001
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0010.0000.001
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Total-1.757-0.0011.758-1.7600.0011.759-1.763-0.0021.765-1.7440.0091.735
0.0000.0000.0000.000
TitikIJKLMNO
BatangI - HI - TI - JJ - IJ - UJ - K K - JK - VL - AM - BN - CO - D
FD0.3980.2050.3980.3980.2050.3980.6600.3400.0000.0000.0000.000
MP-1.7600.0001.760-1.7600.0000.626-0.6260.0000.0000.0000.0000.000
Bal0.0000.0000.0000.4510.2320.4510.4130.2130.0000.0000.0000.000
Co0.0000.0000.2260.0000.0000.2070.2260.000-0.2990.0000.0000.000
Bal-0.090-0.046-0.090-0.082-0.042-0.082-0.149-0.0770.0000.0000.0000.000
Co0.0000.000-0.041-0.0450.000-0.074-0.0410.0000.0000.0600.0000.000
Bal0.0160.0080.0160.0480.0240.0480.0270.0140.0000.0000.0000.000
Co0.0090.0000.0240.0080.0000.0140.0240.000-0.0200.000-0.0120.000
Bal-0.013-0.007-0.013-0.009-0.004-0.009-0.016-0.0080.0000.0000.0000.000
Co-0.0020.000-0.004-0.0070.000-0.008-0.0040.0000.0000.0060.0000.002
Bal0.0020.0010.0020.0060.0030.0060.0030.0010.0000.0000.0000.000
Co0.0020.0000.0030.0010.0000.0010.0030.000-0.0020.000-0.0020.000
Bal-0.002-0.001-0.002-0.001-0.001-0.001-0.002-0.0010.0000.0000.0000.000
Co0.0000.000-0.001-0.0010.000-0.001-0.0010.0000.0000.0010.0000.000
Bal0.0000.0000.0000.0010.0000.0010.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Total-1.837-0.0441.881-1.3900.2131.178-0.1430.143-0.3210.067-0.0140.003
0.0000.0010.000
TitikPQRSTUV
BatangP - EQ - FR - GS - HT - IU - JV - K
FD0.0000.0000.0000.0000.0000.0000.000
MP0.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.1160.106
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.000-0.023-0.021-0.038
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0050.0040.0120.007
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.000-0.001-0.001-0.003-0.002-0.004
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0010.0010.0010.001
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.000
Co0.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.000
Total-0.0010.000-0.0010.005-0.0220.1060.071
Ket : # Bal = Balance / pendistribusian = MF , (-FD) # Mtot = MF + Bal + Co
# Co = Carry Over / induksi = , ke batang lainnya (silang)d. Reaksi Statis Tertentu
RA = (q1) L = (2,793) (2,75) = 3,840 t
RB = RC = RD = RE = RF = RG = RH = RI = 2 ( (q2) L)= 2 ( (2,793) (2,75)) = 7,681 t
RJ = ( (q9) L) + ( (q10) L) = ( (2,793) (2,75)) + ( (0.994) (2,75)) = 5,313 t
RK = (q10) L = (0.994) (2,75) = 1.367 t
e. Reaksi Statis Tak Tentu
RL= RA + = 3,840 + = 3,301 t
RM= RB - + = 7,681 - + = 9,186 tRN= RC - +
= 7,681 - + = 7,690 t
RO= RD - +
= 7,681 - + = 7,676 t
RP= RE - +
= 7,681 - + = 7.677 tRQ= RF - +
= 7,681 - + = 7,683 tRR= RG - +
= 7,681 - + = 7,675 t
RS= RH - +
= 7,681 - + = 7,718 t
RT= RI - +
= 7,681 - + = 7,593 tRU= RJ - +
= 5, 901 - + = 5,346 t
RV= RK -
= 1,607 - = 1,231 t
f. Reaksi Horizontal
HA = = = -0.241 t
HB = = = 0.05 t
HC = = = -0.007 t
HD = = = 0.002 t
HE = = = - 0,0005 t
HF = = = 0,0003 t
HG = = = 0,0008 t
HH = = = 0.0035 t
HI = = = -0.0165 t
HJ = = = 0.079 t
HK= = = 0.0535 t
g. Gaya Lintang
DA = RL= 3,301t
DB-A= DA q1 L = 3,301 2,793 (2,75) = - 4,379 tDB = RM + DB-A = 9,186 4,379 = 4.807 tDC-B= DB q2 L = 4.807 - 2,793 (2,75) = - 2,874 t
DC = RN + DC-B = 7,690 2,874 = 4.816 tDD-C= DC q3 L = 4.816 - 2,793 (2,75) = - 2,864 t
DD = RO + DD-C = 7,676 2,864 = 4.812 tDE-D= DD q4 L = 4.812- 2,793 (2,75) = - 2,729 t
DE = RP + DE-D = 7.677 2,729 = 4.948 tDF-E= DE q5 L = 4.948 2,793 (2,75) = - 4,503 t
DF = RQ + DF-E = 8,591 4,503 = 4.088 tDG-F= DF q6 L = 4.088 - 2,793 (2,75) = - 3,593 t
DG = RR + DG-F = 7,675 3,593 = 4.082 tDH-G= DG q7 L = 4.082 - 2,793 (2,75) = - 3,599 t
DH = RS + DH-G = 7,718 3,599 = 4.119 tDI-H= DH q8 L = 4.119 - 2,793 (2,75) = - 3,562 tDI = RT + DI-H = 7,593 3,562= 4.031 tDJ-I= DI q9 L = 4.031 - 2,793 (2,75) = - 3,649 t
DJ = RU + DJ-I = 5,346 3,649 = 1.697 tDK-J= DJ q10 L = 1.697 0.994 (2,75) = -1.037t
DK= RV + DK-J = 1,231 1.037= 0,194 th. Momen Maksimum Portal
Batang ABRA = 3,840 t
MAB = 0.642 tm
MBA= - 2,125 tm
(Mmaks pada D=0)
=
4,379 x= 9.078 3,301x x= 1,182 m
Momen statis tertentu (M+)
M+ = RA.x .qAB.x2
= (3,840 ( 1,182)- { ( 2,793 ( 1,1822}
= 2,587 tm
Momen statis tak tertentu (M-)
M-= 2,125 + = 3,659 tm
Maka :
Mmaks= M+ - M-
= 2,587 tm 3,659 tm = -1.072 tm (tidak terjadi momen maksimum)Batang BC
RB = (2,793)(2,75) =3,840 tMBC = 1,992 tm
MCB= - 1,684 tm
(Mmaks pada D=0)
=
2,874 x= 13.81 4,807 x
x= 1,721 m
Momen statis tertentu (M+)
M+ = RB.x .qBC.x2
= (3,840 x 1,721) - { ( 2,793( 1,7212}
= 2,472 tm
Momen statis tak tertentu (M-)
M-= 1,684 + = 1,799 tm
Maka :
Mmaks= M+ - M-
= 2,472 tm 1,799 tm = 0.68 tmBatang CD
RC = (2,793)(2,75) =3,840t
MCD = 1,712 tm
MDC= - 1,776 tm
(Mmaks pada D=0)
=
2,864 x= 13,244 4,816 x
x= 1,724 m
Momen statis tertentu (M+)
M+ = RC.x .qCD.x2
= (3,840 ( 1,724) - { ( 2,793( 1,7242}
= 2,488 tm
Momen statis tak tertentu (M-)
M-= 1,776 + = 0,138 tm
Maka :
Mmaks= M+ - M-
= 2,488 tm 0,138 tm = 2,35 tm
Batang DE
RD = (2,793)(2,75) = 3,840 t
MDE = 1,770 tm
MED= - 1,757 tm
(Mmaks pada D=0)
=
2,729 x= 13.233 4,812 x
x= 1,754 m
Momen statis tertentu (M+)
M+ = RD.x .qDE.x2
= (3,840 ( 1,754) - { ( 2,793( 1,754 2}
= 2,435 tm
Momen statis tak tertentu (M-)
M-= 1,757 + = 1,827 tm
Maka :
Mmaks= M+ - M-
= 2,435 tm 1,827 tm = 0.608 tm
Batang EF
RE = 3,840 t MEF = 1,578 tm
MFE= - 1,760 tm
(Mmaks pada D=0)
=
4,503 x= 13.607 4,948 x
x= 1,437 m
Momen statis tertentu (M+)
M+ = RE .x .qEF.x2
= (3,840 ( 1,437) - { ( 3,840 ( 1,4372}
= 1,553 tm
Momen statis tak tertentu (M-)
M-= 1,760 + = 0,725 tm
Maka :
Mmaks= M+ - M-
= 1,553 tm 0,725 tm = 0.828 tm
Batang FG
RE = 3,840 t
MFG = 1,759 tm
MGF= - 1,763 tm
(Mmaks pada D=0)
=
3,593 x= 11,242 4,088x x= 1,464 m
Momen statis tertentu (M+)
M+ = RF.x .qFE.x2
= (3,840 ( 1,464) - { ( 2,793 ( 1,4642}
= 2,628 tm
Momen statis tak tertentu (M-)
M-= 1,763 + = 1,761 tm
Maka :
Mmaks= M+ - M-
= 2,628 tm 1,761 tm = 0.867 tm
Batang GH
RG = (2,793)(2,75) = 3,840 t
MGH = 1,765 tm
MHG= - 1,744 tm
(Mmaks pada D=0)
=
3,599 x= 11.226 4,082x
x= 1,461 m
Momen statis tertentu (M+)
M+ = RG.x .qGH.x2
= (3,840 ( 1, 461) - { ( 2,793 ( 1, 4612}
= 2,629 tm
Momen statis tak tertentu (M-)
M-= 1,744 + = 1,753 tm
Maka :
Mmaks= M+ - M-
= 2,629 tm 1,753 tm = 0,876 tm
Batang HIRH = (2,793)(2,75) =3,840 t
MHI = 1,735 tm
MIH= - 1,837 tm
(Mmaks pada D=0)
=
3,562 x= 11,327 4,119 x
x= 1,475 m
Momen statis tertentu (M+)
M+ = RH.x .qHI.x2
= (3,840 ( 1,475) - { ( 2,793 ( 1,4752}
= 2,625 tm
Momen statis tak tertentu (M-)
M-= 1,837 + = 1,790 tm
Maka :
Mmaks= M+ - M-
= 2,625 tm 1,790 tm = 0,835 tm Batang IJ
RI = (2,793)(2,75) = 3,840 t
MIJ = 1,881 tm
MJI= - 1,390 tm
(Mmaks pada D=0)
=
3,649 x= 11,085 4,031 x
x= 1,443 m
Momen statis tertentu (M+)
M+ = RI.x .qIJ.x2
= (3,840 ( 1,443) - { ( 2,793 ( 1,4432}
= 2,633 tm
Momen statis tak tertentu (M-)
M-= 1,390 + = 1,631 tm
Maka :
Mmaks= M+ - M-
= 2,633 tm 1,631 tm = 1,002 tm
Batang JK
RJ = (0,993)(2,75) = 1,365 t
MJK = 1,178 tm
MKJ= - 0,143 tm (Mmaks pada D=0)
=
1,037 x= 4,667 1,697 x
x= 1,707 m
Momen statis tertentu (M+)
M+ = RJ.x .qJK.x2
= (1,365 ( 1,707 ) - { ( 0,993 ( 1,707 2}
= 0,883 tm
Momen statis tak tertentu (M-)
M-= 0,143 + = 0,540 tm
Maka :
Mmaks= M+ - M-
= 0,883 tm 0,540 tm = 0,343 tm3.5.2 Portal D - D melintang
a. Angka Kekakuan (k)
Semua beban terpusat dilimpahkan pada perhitungan portal melintang, sehingga : P= P+ P
P1 = 3,895 + 6,24 = 10.135 ton
P2 = 9,48 + 4,62 = 14.1 ton
P3 = 2,43 + 6,42 = 8.85 ton
P4 = 5,059 + 6,77 = 11.829 ton
q1 = q2 = 3,47 t/m
q3 =2,045 t/m
BatangK
Absolut Relatif
AB = BCDC
AE = BF = CG = DH
0,1820,3420,116
b. Faktor Distribusi (FD)
Titik A a. Batang AB
b. Batang AE
Titik B a. Batang BA = BC
b. Batang BF
Titik C a. Batang CB
b. Batang CD
c. Batang CG
Titik D a. Batang DC
b. Batang DH
c. Momen Primer (MF)
MFAB = 1/12 (q1) (L2) = 1/12 (3,47) (3,75)2 = 4,066 tm MFBA = - 4,066 tm MFBC = 1/12 (q2) (L2) = 1/12 (3,47) (3,75)2 = 3,984 tm MFCB = - 3,984 tm MFCD = 1/12 (q3) (L2) = 1/12 (2,045) (2,0)2 = 0,682 tm MFDC = - 0,682 tmd. Tabel Cross TitikABCDHGFE
BatangAEABBABCBFCBCDCGDCDHHDGCFBEA
FD0.3890.6110.3790.3790.2410.2840.5340.1810.7470.2530.0000.0000.0000.000
MP0.0004.066-4.0663.9840.000-3.9840.6820.000-0.6820.0000.0000.0000.0000.000
Bal-1.582-2.4840.0310.0310.0200.9381.7630.5980.5090.1730.0000.0000.0000.000
CO0.0000.016-1.2420.4690.0000.0160.2550.0000.8820.0000.0860.2990.010-0.791
Bal-0.006-0.0090.2930.2930.186-0.077-0.144-0.049-0.659-0.2230.0000.0000.0000.000
CO0.0000.147-0.005-0.0380.0000.147-0.3290.000-0.0720.000-0.112-0.0240.093-0.003
Bal-0.057-0.0900.0160.0160.0100.0520.0980.0330.0540.0180.0000.0000.0000.000
CO0.0000.008-0.0450.0260.0000.0080.0270.0000.0490.0000.0090.0170.005-0.029
Bal-0.003-0.0050.0070.0070.005-0.010-0.019-0.006-0.036-0.0120.0000.0000.0000.000
CO0.0000.004-0.002-0.0050.0000.004-0.0180.000-0.0090.000-0.006-0.0030.002-0.002
Bal-0.001-0.0020.0030.0030.0020.0040.0080.0030.0070.0020.0000.0000.0000.000
CO0.0000.001-0.0010.0020.0000.0010.0040.0000.0040.0000.0010.0010.001-0.001
Bal-0.001-0.0010.0000.0000.000-0.001-0.003-0.001-0.003-0.0010.0000.0000.0000.000
CO0.0000.0000.000-0.0010.0000.000-0.0010.000-0.0010.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0010.0000.0010.0000.0000.0000.0000.000
CO0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
CO0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
CO0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
Bal0.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.0000.000
TOTAL-1.6501.650-5.0114.7870.223-2.9032.3220.5770.043-0.043-0.0210.2890.111-0.825
0000
Portal D D MelintangKet : # Bal = Balance / pendistribusian = MF , (-FD)
# Mtot = MF + Bal + Co
# Co = Carry Over / induksi = , ke batang lainnya (silang)
e. Reaksi Statis Tertentu
RA = (q1) L + P4 = (3,47) (3,75) + 11.829 = 18,335 tRB = (q1)L + P3 = (3,47)(3,75) + 8.85 = 15.356 tRC = (q2) L + (q3)L + P2 = ( (3,47)(3,75)) + ( (2,045)(2)) + 14.1 = 22,51 t
RD = (q3) L + P1 = (1,474) (2,0) + 10.135 = 11.609 t
f. Reaksi Statis Tak Tentu
RE= RA + = 18,335 + = 17.439 t
RF= RB - +
= 15.356 - + = 15.750 t
RG= RC - +
= 22,51 - + = 20.825 t
RH= RD -
= 11.609 - = 9.244 t
g. Reaksi Horizontal
HA = = = -0,619 t
HB = = = 0.084 t
HC = = = 0.217 t
HD = = = - 0,016 th. Gaya Lintang
DA = RE P4 = 17.439 11.829 = 5.61 t
DB-A= DA q1 L = 5.61 - 3,47 (3,75) = - 7,403 tDB = RF + DB-A P3 = 15.750 7,403 8.85 = -0,503 tDC-B= DB q2 L = -0,503 3,47 (3,75) = -13.515 t
DC = RG + DC-B P2 = 20.825 13.515 14.1 = - 6.79 tDD-C= DC q3 L = - 6.79 2,045(2,0) = -10.88t
DD = RH + DD-C P1 = 9.244 10.88 10.135 = 0 ti. Momen Maksimum Portal
Batang AB
RA = = 18,335 t
MAB = 1,650 tm
MBA= - 5,011 tm (Mmaks pada D=0)
=
7,403 x= 21.037 5,61x
x= 1,617 mMomen statis tertentu (M+)
M+ = (RA P4 ).x .qAB.x2
= ((18,335 11.829) ( 1,617) - { ( 3,47 ( 1,6172}
= 5,983 tm
Momen statis tak tertentu (M-)
M-= 5,011 + = 18,754 tm
Maka :Mmaks= M+ - M- = 5,983 tm 18,754 tm = 24,737 tm Batang BCRB = 15.356 t
MBC = 4,787 tm
MCB= - 2,903 tm
(Mmaks pada D=0)
=
13,515x = 1,886 0,503x
x = 0,135 mMomen statis tertentu (M+)
M+ = (RB P3 ).x .qBC.x2
= ((15.356 8.85 ) ( 0,135) - { ( 3,47 ( 0,1352}
= 0,847 tm
Momen statis tak tertentu (M-)
M-= 2,903 + = 6,927 tmMaka :
Mmaks= M+ - M-
= 0,847 tm 6,927 tm = -6.08 tm (tidak terjadi momen maks)
Batang CD
RC = 22,51 tMCD = 2,322 tm
MDC= 0,043 tm
(Mmaks pada D=0)
=
10,88 x= 13.58 6,79 x
x= 0,768 mMomen statis tertentu (M+)
M+ = (RC P2 ).x .qCD.x2
= ((22,51 14.1 ) ( 0,768) - { ( 2,045 ( 0,7682}
= 5,856 tm
Momen statis tak tertentu (M-)
M-= 0,043 + = 1,502 tm
Maka :
Mmaks= M+ - M-
= 5,856 tm 1,502 tm = 4.354 tm 3.6 Momen pada Pondasi 3.6.1 Beban normal pada pondasi
Portal II - II Memanjang
Pondasi Gaya normal padaBerat sloof (25/40)Berat dinding bawahJlh
Kolom bawah(kg)(kg)(kg)
(kg)
1RL = 33010,25 x 0,40 x 2400 x (3,75+2,75+2,0) = 10200,15 x 1700 x 4,0 x (3,75+2,75) = 33157636
2RM = 91860,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280513341
3RN = 76900,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280511845
4RO = 76760,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75+3,75) = 471813744
5RP = 76770,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280511832
6RQ = 76830,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280511838
7RR = 76750,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75+3,75) = 471813743
8RS = 77180,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280511873
9RT = 75930,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+2,75) = 280511748
10RU = 53460,25 x 0,40 x 2400 x (3,75+2,75+2,0+2,75) = 13500,15 x 1700 x 4,0 x (2,75+3,75) = 331510011
11RV = 12310,25 x 0,40 x 2400 x (3,75+2,75+2,0) = 10200,15 x 1700 x 4,0 x (3,75) = 19134164
Portal D - D Melintang
PondasiGaya normal padaBerat sloof (25/40)Berat dinding bawahJlh
Kolom bawah(kg)(kg)(kg)
(kg)
1RE - P4 = 17493 - 11829 = 56680,25 x 0,40 x 2400 x (2,75+3,75+2,75) = 11100,15 x 1700 x 4 x (2,75+3,75+3,75) = 522812006
2RF - P3 = 15750 - 8850 = 69000,25 x 0,40 x 2400 x (3,75+3,75+2,75+2,75) = 15600,15 x 1700 x 4,0 x (3,75+3,75) = 382512285
3RG - P2 = 20825 - 1410 = 194150,25 x 0,40 x 2400 x (3,75+2+2,75+2,75) = 11100,15 x 1700 x 4 x (2,75+3,75+3,75) = 522825753
4RH - P1 = 9244 - 10135 = -8910,25 x 0,40 x 2400 x (2,0+2,75+2,75) = 900-9
3.6.2 Perhitungan momen pada pondasi
Tekanan tanah izin :
= 1,4 kg/cm2 = 14 t/m2
(PPI-1983 tabel 1,1 hal 9)
Tekanan tanah efektif untuk mendukung beban total :
= - (kedalaman pondasi x rata-rata)
rata-rata = (beton + tanah)
= (2,4 + 1,7)
= 2,05 t/m3 Kedalaman pondasi direncanakan 2,0 m, sehingga :
= 14 (2,0 x 2,05) = 9,9 t/m2 Menentukan Luas Tapak (F) :
dimana, P = berat konstruksi yang harus ditahan pondasi
Direncanakan ukuran pondasi berdasarkan Pmaks = 25753 kg
m2
Ukuran B dan L pondasi = = 1,613 m 1,6 m
Tebal pondasi tapak biasanya ditentukan berdasarkan persyaratan kuat geser, Ketebalan pondasi harus mampu mendukung tegangan geser pons.
Beban di atas pondasi P
= 15149 kg
Berat sendiri stek kolom = 0,4 x 0,4 x 1,6 x 2400
= 614,4 kg Berat sendiri tapak = x 0,15 x 2400
= 306 kgBerat sendiri tapak = 1,3 x 1,3 x 0,25 x 2400
= 1014 kg
Beban total (Wu)= 17083,4 kg
ytb = t/m2 = 1,0108 kg/cm2
< 1,4 kg/cm2 (aman)
Direncanakan : Tebal pondasi (h): 400 mm
Selimut beton (s) : 50 mm
Diameter tulangan : 16 mm untuk masing-masing arah Maka, tinggi efektif (d) = 400 50 16 = 334 mm = 33,4 cm B' = lebar kolom + 2 (d) = 40 + 33,4 = 73,4 cm
Gaya geser total yang bekerja pada penampang kritis adalah :Vu = ytb (B2 B' 2) = 10,108 (1,32 0,7342) = 11,637 t = 11637 kg Kuat geser beton (Vc)
Vc =
Vc > VuUntuk :
c = Perbandingan antara sisi kolom terpanjang dan sisi kolom terpendek
(c = 1,0)
bo = keliling penampang yang terdapat tegangan geser
bo = 2.(b( + d) + 2.(a( + d)
bo = 2.(40 + 33,4) + 2.(40 + 33,4) = 293,6 cm
= 0,6 (untuk gaya geser)
Maka :
Vc = 0,6 (
Vc= 33969,81 kg > Vu = 11637 kg Pondasi memenuhi persyaratan geser
Momen pada arah a = b
Ma= ( ( b' ( c' ( .c' ( ytb) + ( b' ( c' ( .c' ( ytb)
= ( ( 40 ( 40 ( .40 ( 1,0108) + (( 40 ( 40( .40 ( 1,0108)
= 32345,6 kg.cm = 0,323456 tm
BAB IV
PENDIMENSIAN TULANGAN
Mutu bahan yang digunakan dalam perencanaan ini adalah :
Baja (fy) = 400 MPa= 4000 kg/cm2
Beton (f(c)= 30 MPa= 300 kg/cm2
Perhitungan perencanaan didasarkan pada peraturan SK SNI-T-15-1991-03.
Rumus-rumus yang digunakan : Luas tulangan pokok
As = ( b ( d(untuk tulangan tarik
As' = 0,5 As(untuk tulangan tekan
Luas tulangan pembagi
As =
Koefisien ketahanan
k =
Kontrol tegangan
fy ytb= =
( ( = 0,8
f(c= =
( ( = 0,8
untuk :
Mn = As.fy (
a =
0,85 a.b.f (c= C
As ( fy
= T
Rasio penulangan
=
- Batas maksimum rasio penulangan
maks= 0,75.b
b=
untuk :
(1 =0,65 s.d 0,85
(1 =0,85 ( untuk f(c ( 30 MPa
(1 =0,85 {(f(c 30) ( 0,08} ( untuk setiap kenaikan f(c 1 MPa dari f(c = 30 MPa
- Batas minimum rasio penulangan
min =
Tulangan geser
vu =
Vs =
As =
Av =
Eksentrisitas
Agr = b ( h
Atot = ( Agr
e =
Keterangan rumus :
a = Tinggi balok tekan persegi ekuivalen atau panjang bentang geser yaitu antara beban terpusat dan muka tumpuan (mm)
Agr= Luas penaMPang bruto (mm2)
As = Luas tulangan tarik (mm2)
As( = Luas tulangan tekan (mm2)
b = Lebar daerah tekan komponen terstruktur
d= Jarak dari serat tekan terluar ke pusat tulangan tarik atau tinggi efektif balok (mm)
h = Tebal atau tinggi total komponen struktur (mm)
e = Eksentrisitas gaya terhadap sumbu
f(c= Kuat tekan beton (MPa)
fy = Tegangan luluh baja tulangan (MPa)
Mn= Momen nominal penampang (Nm)
Mu= Momen terfaktor penampang (Nm)
Pu= Beban aksial terfaktor pada eksentrisitas yang diberikan (N) < Pnvu= Tegangan geser rencana rata-rata nominal total (MPa)
vc= Tegangan geser izin beton (MPa)
Vu = Gaya geser terfaktor maksimum(MPa)
Vc = Gaya geser izin beton (MPa)
Vs = Gaya geser izin tulangan geser (MPa)
Av= Luas penaMPang tulangan geser total (mm2)
s= Jarak spasi antar tulangan geser ke arah sejajar tulangan pokok memanjang (mm)
= Rasio penulangan tarik
= Faktor reduksi kekuatan ,
untuk :geser( = 0,6
lentur( = 0,8
4.1 Pendimensian Tangga
4.1.1 Plat tangga
Tangga bagian bawah = tangga bagian atas
Direncanakan plat tangga :
Tebal (h) = 12 cm = 120 mm Lebar (b) = 127 cm = 1270 mm
Diperkirakan diameter tulangan utama : ( 12 mm
Tebal penutup beton/selimut beton (berdasarkan buku Dasar-Dasar Perencanaan Beton Bertulang tabel.3 hal. 44) p = 20 mm
Tinggi efektif (d)= h p .(
= 120 20 .(12)
= 94 mm = 0,094 m
Dari perhitungan momen plat tangga diperoleh :
Mlap= 828,7 kg.m= 828,7 ( 104 N.mm
Mtu= 1657,39 kg.m= 1657,39 ( 104 N.mm
Pembesian pada Daerah Lapangan
- Menentukan nilai k (koefisien ketahanan) :
k = = 0,923 MPa
- Direncanakan f(c = 30 MPa, fy = 400 MPa, berdasarkan Tabel A-29 halaman 492 buku Struktur Beton Bertulang (Istimawan Dipohusodo) diperoleh nilai :
min = 0,0035
maks = 0,0244
-Dari Tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo), untuk nilai k = 0,923, diperoleh nilai yang terlalu kecil, oleh karenanya digunakan min = 0,0035
- Luas tulangan yang dibutuhkan :As = min.b.d = 0,0035 ( 1270 ( 94 = 417,8 mm2
-Berdasarkan Tabel A-5 halaman 459 buku Struktur Beton Bertulang (Istimawan Dipohusodo) dengan nilai As = 417,8 mm2, maka
digunakan tulangan : ( 12 200 (As = 565,5 mm2)
Tulangan pembagi
As = mm2Spasi maksimum < 2h (240 mm)Digunakan tulangan : ( 12 200 (As = 565,5 mm2) Pembesian pada Daerah Tumpuan
- Menentukan nilai k (koefisien ketahanan) :
k = = 1,846 MPa
- Direncanakan f(c = 30 MPa, fy = 400 MPa, berdasarkan Tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo) diperoleh nilai :
min = 0,0035
maks = 0,0244
-Dari Tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo), untuk nilai k = 0,585, dari hasil interpolasi diperoleh nilai = 0,00477
- Luas tulangan yang dibutuhkan :
As = .b.d = 0,00477 ( 1270 ( 94 = 569,4 mm2
digunakan tulangan : ( 12 150 (As = 754,0 mm2)
Tulangan pembagi
As = mm2Digunakan tulangan : ( 12 200 (As = 565,5 mm2) 4.1.2 Plat bordes
Direncanakan plat bordes :
Tebal (h) = 12 cm = 120 mm
Lebar (b) = 300 cm = 3000 mm
Diameter tulangan utama direncanakan : ( 12 mm
Tebal selimut beton (p) = 20 mm
Tinggi efektif (d)
dx= h p (= 120 20 .(12)= 94 mm
dy= h p ( (= 120 20 12 .(12)= 82 mm
Tabel 4.1. Penulangan Plat Bordes
M
hitung *)min**)***)
Mu As = .b.d Tulangan As
(kNm)(MPa)(mm2) (mm2)
MLx1.07730.0510.00010.003598712-1001131
MLy0.2960.0180.00000.003586112-1001131
Mtx1.49030.0700.00020.003598712-1001131
Mtiy0.538650.0330.00010.003586112-1001131
Ket :
*)hitung=
m =
**)Dalam perhitungan As = .b.d, jika :
hitung < min( digunakan min
hitung > min( digunakan hitung***)Tulangan yang digunakan diambil berdasarkan tabel A-5 buku Struktur Beton Bertulang (Istimawan Dipohusodo) Tulangan pembagi
Untuk tulangan pembagi, menurut SK-SNI-T-15-1991-03 adalah :
As = mm2
Dipilih tulangan : ( 12 100 (As = 1131 mm2)4.1.3 Balok bordes
Direncanakan balok bordes :
Tebal (h) = 25 cm = 250 mm
Lebar (b) = 18 cm = 180 mm
Diameter tulangan utama:( = 12 mm
Diameter tulangan sengkang:(s = 8 mm
Tebal selimut beton (p) = 40 mm
Dari perhitungan momen pada balok bordes diperoleh:
Mlap = 531,9 kg.m = 531,9 ( 104 N.mm
Mtu = 1063,8 kg.m = 1063,8 ( 104 N.mm
Tinggi efektif (d)
d = h p - (s (
= 250 40 8 .(12)
=196 mm
Pembesian pada Daerah Lapangan
- Menentukan nilai k (koefisien ketahanan) :
k = = 0,962 MPa
-Berdasarkan Tabel A-29 (untuk f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh nilai :
min = 0,0035
maks = 0,0244
-Dari Tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo), untuk nilai k = 0,962, diperoleh nilai yang sangat kecil, oleh karenanya digunakan min = 0,0035 ( < min < maks).
- Luas tulangan yang dibutuhkan :
As = min.b.d = 0,0035 ( 180 ( 196 = 123,48 mm2Berdasarkan Tabel A-4 halaman 458 buku Struktur Beton Bertulang (Istimawan Dipohusodo), maka digunakan tulangan : 2 ( 12 (As = 226,2 mm2).
Cek jarak tulangan
b = 2.(selimut beton) + 2.((sengkang) + 2.((tul. utama) + (x)
180= 2.(40) + 2.(8) + 2.(12) + (x)
x = 60 mm > 25 mm ....... (memenuhi)
Tulangan tekan
As' = 0,5 As = 0,5 ( 123,48 = 61,74 mm2
Digunakan tulangan : 2 ( 12 (As = 226,2 mm2).
Pembesian Pada Daerah Tumpuan
- Menentukan nilai k (koefisien ketahanan) :
k = = 1,923 MPa
-Berdasarkan Tabel A-29 (untuk f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh nilai :
min = 0,0035
maks = 0,0244
-Dari Tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo), untuk nilai k = 1,923, dari hasil interpolasi diperoleh nilai = 0,005004.
- Luas tulangan yang dibutuhkan :
As = .b.d = 0,005004 ( 180 ( 196 = 176,541 mm2Berdasarkan Tabel A-4 buku Struktur Beton Bertulang (Istimawan Dipohusodo), maka digunakan tulangan : 2 ( 12 (As = 226,2 mm2).
Cek jarak tulangan
b = 2.(selimut beton) + 2.((sengkang) + 2.((tul. utama) + (x)
180= 2.(40) + 2.(8) + 2.(12) + (x)
x = 60 mm > 25 mm ....... (memenuhi) Tulangan tekan
As' = 0,5 As = 0,5 ( 176,541 = 88,271 mm2
Digunakan tulangan : 2 ( 12 (As = 226,2 mm2).4.2 Pendimensian Plat Lantai
Direncanakan plat lantai :
Tebal (h) = 12 cm = 120 mm
Lebar (b) = 100 cm = 1000 mm (ditinjau per meter)
Tebal selimut beton (p) = 20 mm
Diameter tulangan utama : ( = 12 mm
Tinggi efektif (d)
dx= h p (= 120 20 .(12)= 94 mm
dy= h p ( (= 120 20 12 .(12)= 82 mm
Penulangan dari berbagi tipe plat lantai dapat dilihat pada tabel berikut ini.
Tabel 4.2. Penulangan Plat LantaiTipe 1Mhitung *)min**)***)
Mu As = .b.d Tulangan As
(kNm)(MPa)(mm2) (mm2)
MLx3.2320.4570.00120.003532912-250452.4
MLy1.45830.2710.00070.003528712-250452.4
Mtx5.1750.7320.00190.003532912-250452.4
Mtiy0.72910.1360.00030.003528712-250452.4
Tipe 2 Mhitung *)min**)***)
Mu As = .b.d Tulangan As
(kNm)(MPa)(mm2) (mm2)
MLx1.520.2150.00050.003532912-250452.4
MLy0.5510.1020.00030.003528712-250452.4
Mtx5.170.7310.00190.003532912-250452.4
Mtiy2.7560.5120.00130.003528712-250452.4
Ket :
*)hitung=
m =
**)Dalam perhitungan As = .b.d, jika :
hitung < min( digunakan min
hitung > min( digunakan hitung***)Tulangan yang digunakan diambil berdasarkan tabel A-5 buku Struktur Beton Bertulang (Istimawan Dipohusodo)
4.3 Pendimensian Balok Lantai (Portal)4.3.1 Portal memanjang
Direncanakan :
- Tebal (h) = 50 cm = 500 mm
- Lebar (b) = 30 cm = 300 mm
- Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 16 mm
- Diameter tulangan sengkang : (s = 10 mm - fy = 400 MPa
- f(c= 30 MPa
-Berdasarkan Tabel A-29 (f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh :(min= 0,0035
(maks= 0,0244
Tinggi efektif (d)
d= h p - (s (
= 500 40 10 .(16)
= 442 mm
Pembesian pada Daerah Lapangan
Mu = 1,992 t.m = 19,92 kN.m (diperoleh dari perhitungan Mmaks portal memanjang yang terbesar)
Menentukan nilai k (koefisien ketahanan)
k = = 0,424 MPa
Dari Tabel A-29, nilai ( untuk k = 0,424 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 300 ( 442
= 464,1 mm2( Digunakan tulangan 3 ( 16 (As = 603,2 mm2)
Cek jarak tulangan
x= 0,5 (2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) b)
x= 0,5 ( 2 (40) + 2 (10) + 3.(16) 300)
x = 76 mm > 30 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 464,1
= 232,05 mm2( Digunakan tulangan 2 ( 16 (As = 402,2 mm2) Pembesian pada Daerah Tumpuan
Mu = 2,592 t.m = 25,92 kN.m (diperoleh dari perhitungan momen pada tabel Cross yang terbesar dari portal memanjang)
Menentukan nilai k (koefisien ketahanan)
k = = 0,553 MPa
Dari Tabel A-29, nilai ( untuk k = 0,553 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 300 ( 442
= 464,1 mm2( Digunakan tulangan 3 ( 16 (As = 603,2 mm2)
Cek jarak tulangan
x= 0,5 (2 (selimut beton) + 2 ((sengkang) + 3.(Dtul. utama) b)
x= 0,5 ( 2 (40) + 2 (10) + 3.(16) 300)
x = 76 mm > 30 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 464,1
= 232,05 mm2( Digunakan tulangan 2 ( 16 (As = 402,2 mm2)
Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 121,047 kN
Vu = 4,503 t = 45,03 kN (Vu adalah gaya geser yang bekerja, diambil dari nilai gaya lintang maksimum pada portal memanjang).
Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :45,03 kN... (0,6) (121,047) kN
45,03 kN > 36,31 kN diperlukan tulangan geser (sengkang)
Gaya geser yang ditahan oleh sengkang (Vs)
Vs perlu = = = 45,977 kN
Kontrol VsVs = = = 242,093 kN
Karena Vs perlu < Vs, maka s (jarak sengkang) tidak boleh lebih d .
Maka :
s = = = 221 mm
Av = mm2Digunakan sengkang : (10 - 200 (As = 392,7 mm2)
4.3.2 Portal melintang Direncanakan :
- Tebal (h) = 50 cm = 500 mm
- Lebar (b) = 30 cm = 300 mm
- Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 16 mm
- Diameter tulangan sengkang : (s = 10 mm
- fy = 400 MPa
- f(c= 30 MPa
-Berdasarkan Tabel A-29 (f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh :(min= 0,0035
(maks= 0,0244
Tinggi efektif (d)
d= h p - (s (
= 500 40 10 .(16)
= 442 mm
Pembesian pada Daerah Lapangan
Mu = 1,502 t.m = 15,02 kN.m (diperoleh dari perhitungan Mmaks portal melintang yang terbesar)
Menentukan nilai k (koefisien ketahanan)
k = =0,950 MPa
Dari Tabel A-29, nilai ( untuk k = 0,950 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 300 ( 442
= 464,1 mm2( Digunakan tulangan 3 ( 16 (As = 603,2 mm2)
Cek jarak tulangan
x= 0,5 (2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) b)
x= 0,5 ( 2 (40) + 2 (10) + 3.(16) 300)
x = 76 mm > 30 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 464,1
= 232,05 mm2( Digunakan tulangan 2 ( 16 (As = 402,2 mm2)
Pembesian pada Daerah Tumpuan
Mu = 5,011 t.m = 50,11 kN.m (diperoleh dari perhitungan momen pada tabel Cross yang terbesar dari portal melintang)
Menentukan nilai k (koefisien ketahanan)
k = = 1,068 MPa Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 300 ( 442
= 464,1 mm2( Digunakan tulangan 3 ( 16 (As = 603,2 mm2)
Cek jarak tulangan
x= 0,5 (2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) b)
x= 0,5 ( 2 (40) + 2 (10) + 3.(16) 300)
x = 76 mm > 30 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 464,1
= 232,05 mm2( Digunakan tulangan 2 ( 16 (As = 402,2 mm2)
Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 121,047 kN
Vu = 10,88 t = 108,8 kN (Vu adalah gaya geser yang bekerja, diambil dari nilai gaya lintang maksimum pada portal melintang).
Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :108,8 kN... (0,6) (121,047) kN
108,8 kN > 36,31 kN diperlukan tulangan geser (sengkang) Gaya geser yang ditahan oleh sengkang (Vs)
Vs perlu = = = 60,286 kN
Kontrol VsVs = = = 242,093 kN
Karena Vs perlu < Vs, maka s (jarak sengkang) tidak boleh lebih d .
Maka :
s = = = 221 mm
Av = mm2Digunakan sengkang : (10 - 250 (As = 314,2 mm2)
4.4 Pendimensian Ring Balok Direncanakan :
- Tebal (h) = 25 cm = 250 mm
- Lebar (b) = 20 cm = 200 mm
- Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 12 mm
- Diameter tulangan sengkang : (s = 8 mm
- fy = 400 MPa
- f(c= 30 MPa
-Berdasarkan Tabel A-29 (f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh :(min= 0,0035
(maks= 0,0244 Tinggi efektif (d)
d= h p - (s (
= 250 40 8 (12)
= 196 mm
4.4.1 Ring balok memanjang
Pembesian pada Daerah Lapangan
Mu = 77,14 kg.m = 0,7714 kN.m (diperoleh dari perhitungan momen ring balok)
Menentukan nilai k (koefisien ketahanan)
k = = 0,1295 MPa
Dari Tabel A-29, nilai ( untuk k = 0,125 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 200 ( 196
= 137,2 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 2.( (tul. utama) + (x)
200= 2 (40) + 2 (8) + 2.(12) + (x)
x = 80 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 137,2
= 68,6 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Pembesian pada Daerah Tumpuan
Mu = 108 kg.m = 1,08 kN.m (diperoleh dari perhitungan momen ring balok)
Menentukan nilai k (koefisien ketahanan)
k = = 0,175 MPa
Dari Tabel A-29, nilai ( untuk k = 0,175 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035. Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 200 ( 196
= 137,2 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 2.( (tul. utama) + (x)
200= 2 (40) + 2 (8) + 2.(12) + (x)
x = 80 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 137,2
= 68,6 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2) Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 35,784 kN
Vu = 180 kg = 1,80 kN (Vu adalah gaya geser yang bekerja).
Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :1,80 kN... (0,6) (35,784) kN
1,80 kN < 10,735 kN tidak diperlukan tulangan geser (sengkang)
Namun demikian dalam perencanaan tetap digunakan sengkang sebagai pengikat tulangan utama yaitu sengkang ( 8 200 (As = 251,3 mm2).
4.4.2 Ring balok melintang
Direncanakan :
- Tebal (h) = 25 cm = 250 mm
- Lebar (b) = 20 cm = 200 mm
- Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 12 mm
-Diameter tulangan sengkang : (s = 8 mm
- fy = 400 MPa
- f(c= 30 MPa
-Berdasarkan Tabel A-29 (f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh :(min= 0,0035
(maks= 0,0244
Tinggi efektif (d)
d= h p - (s (
= 250 40 8 (12)
= 196 mm
Pembesian Pada Daerah Lapangan
Mu = 137,14 kg.m = 1,37 kN.m (diperoleh dari perhitungan momen ring balok)
Menentukan nilai k (koefisien ketahanan) N/mm2
k =
Dari Tabel A-29, nilai ( untuk k = 0,223 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035. Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 200 ( 196
= 137,2 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2) Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 2.( (tul. utama) + (x)
200= 2 (40) + 2 (8) + 2.(12) + (x)
x = 80 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 137,2
= 68,6 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Pembesian pada Daerah Tumpuan
Mu = 192 kg.m = 1,92 kN.m (diperoleh dari perhitungan momen ring balok)
Menentukan nilai k (koefisien ketahanan)
k =
Dari tabel A-29, nilai ( untuk k = 0,312 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035. Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 200 ( 196
= 137,2 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2) Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 2.( (tul. utama) + (x)
200= 2 (40) + 2 (8) + 2.(12) + (x)
x = 80 mm > 25 mm ...... (memenuhi) Tulangan tekan
As' = 0,5.As
= 0,5 ( 137,2
= 68,6 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 35,784 kN
Vu = 240 kg = 2,40 kN (Vu adalah gaya geser yang bekerja).
Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :2,40 kN... (0,6) (35,784) kN
2,40 kN < 10,735 kN tidak diperlukan tulangan geser (sengkang)
Namun demikian dalam perencanaan tetap digunakan sengkang sebagai pengikat tulangan utama yaitu sengkang ( 8 200 (As = 251,3 mm2).
4.5 Pendimensian Sloof Direncanakan :
- Tebal (h) = 40 cm = 400 mm
- Lebar (b) = 25 cm = 250 mm
- Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 12 mm
- Diameter tulangan sengkang : (s = 8 mm
- fy = 400 MPa
- f(c= 30 MPa
-Berdasarkan Tabel A-29 (f(c = 30 MPa, fy = 400 MPa) buku Struktur Beton Bertulang (Istimawan Dipohusodo), diperoleh :(min= 0,0035
(maks= 0,0244 Tinggi efektif (d)
d= h p - (s (
= 400 40 8 .(12)
= 346 mm
4.5.1 Sloof memanjang Pembesian pada Daerah Lapangan
Mu = 769,02 kg.m = 7,69 kN.m (diperoleh dari perhitungan momen sloof).
Menentukan nilai k (koefisien ketahanan)
k =
Dari Tabel A-29, nilai ( untuk k = 0,321 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 250 ( 346
= 302,75 mm2( Digunakan tulangan 3 ( 12 (As = 339,3 mm2) Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) + 2.(x)
250= 2 (40) + 2 (8) + 3.(12) + 2(x)
x = 59 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 302,75
= 151,38 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Pembesian pada Daerah tumpuan
Mu = 1076,63 kg.m = 10,76 kN.m (diperoleh dari perhitungan momen sloof)
Menentukan nilai k (koefisien ketahanan)
k =
Dari Tabel A-29, nilai ( untuk k = 0,449 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 250 ( 346
= 302,75 mm2( Digunakan tulangan 3 ( 12 (As = 339,3 mm2)
Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) + 2.(x)
250= 2 (40) + 2 (8) + 3.(12) + 2(x)
x = 59 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 302,75
= 151,38 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 78,963 kN
Vu = 1794,38 kg = 17,94 kN (Vu adalah gaya geser yang bekerja).
Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :17,94 kN... (0,6) (78,963) kN
17,94 kN < 23,689 kN tidak diperlukan tulangan geser (sengkang)
Namun demikian dalam perencanaan tetap digunakan sengkang sebagai pengikat tulangan utama yaitu sengkang (8 200.
4.5.2 Sloof melintang
Pembesian pada Daerah Lapangan
Mu = 1367,14 kg.m = 13,67 kN.m (diperoleh dari perhitungan momen sloof).
Menentukan nilai k (koefisien ketahanan)
k =
Dari Tabel A-29, nilai ( untuk k = 0,571 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035.
Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 250 ( 346
= 302,75 mm2( Digunakan tulangan 3 ( 12 (As = 339,3 mm2)
Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) + 2.(x)
250= 2 (40) + 2 (8) + 3.(12) + 2(x)
x = 59 mm > 25 mm ...... (memenuhi) Tulangan tekan
As' = 0,5.As
= 0,5 ( 302,75
= 151,38 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)
Pembesian pada Daerah tumpuan
Mu = 1914 kg.m = 19,14 kN.m (diperoleh dari perhitungan momen sloof). Menentukan nilai k (koefisien ketahanan)
k =
Dari Tabel A-29, nilai ( untuk k = 0,799 sangat kecil (( < (min < (maks), maka dalam perhitungan digunakan (min = 0,0035. Tulangan tarik yang digunakan
As = min.b.d
= 0,0035 ( 250 ( 346
= 302,75 mm2( Digunakan tulangan 3 ( 12 (As = 339,3 mm2)
Cek jarak tulangan
b = 2 (selimut beton) + 2 ((sengkang) + 3.( (tul. utama) + 2.(x)
250= 2 (40) + 2 (8) + 3.(12) + 2(x)
x = 59 mm > 25 mm ...... (memenuhi)
Tulangan tekan
As' = 0,5.As
= 0,5 ( 302,75
= 151,38 mm2( Digunakan tulangan 2 ( 12 (As = 226,2 mm2)Perhitungan Geser
Vc adalah kemampuan beton tanpa penulangan geser untuk menahan gaya geser, yang dihitung dengan :
Vc =
Vc= = 78,963 kN
Vu = 2392,5 kg = 23,92 kN (Vu adalah gaya geser yang bekerja). Pemeriksaan kebutuhan tulangan geser
Jika : Vu > Vc, maka diperlukan tulangan geser (sengkang)
Maka :23,92 kN... (0,6) (78,963) kN
23,92 kN > 23,689 kN diperlukan tulangan geser (sengkang)
Gaya geser yang ditahan oleh sengkang (Vs)
Vs perlu = = = - 39,096 kN Kontrol VsVs = = = 157,927 kN
Karena Vs perlu < Vs, maka s (jarak sengkang) tidak boleh lebih d .
Maka :
s = = = 173 mm
Av = mm2Digunakan sengkang : (8 - 200 (As = 251,3 mm2)
4.6 Pendimensian Kolom Direncanakan :
-Ukuran kolom 40/40-fy = 400 MPa
-f(c= 30 MPa
-Tebal selimut beton (p) = 40 mm
- Diameter tulangan utama : ( = 25 mm
-Diameter tulangan sengkang : (s = 10 mm
Diketahui :
-Pu = 22,859 t = 228,59 kN
-Mu = 0,167 tm = 1,67 kN.m Agr = b x h = 400 x 400 = 160000 mm2, Ditaksir rasio penulangan 1%
d dianggap sejarak 0,15 h dari tepi penampang
d = 0,15 (400) = 60 mm
d = 400 60 = 340 mm
As = As = b d = 0,01 x 400 x 340 = 1360 mm2Dicoba menggunakan tulangan 325 (As = 1472,6 mm2) pada masing-masing sisi kolom,
0,01 < 0,01083 < 0,08...............OK
Pemeriksaan Pu terhadap beban seimbang Pub:
ab = 1 cb = 0,85 x 204 = 173,4 mm
y < s, maka baja tarik sudah luluh, fs = fyPnb = 0,85 fc ab b + As fy As fy
= 0,85 (30) (173,4) (400) 10-3 = 1768,68 kN
Pnb = 0,65 (1768,68) = 1149,64 kN > Pu = 228,59 kN.............OKPeriksa kekuatan penampang:
= 991924,98 + 3634267,75 = 4626192,73 N = 4626,19 kN
Pn = 0,65 (4626,19) = 3007,0 kN > Pu = 228,59 kN
Penampang kolom memenuhi syarat.Merencanakan sengkang
Tulangan geser (sengkang) digunakan (10 dengan jarak sengkang ditentukan dari nilai terkecil dari :
16 x ( tulangan pokok memanjang= 16 x 25= 400 mm
48 x ( sengkang
= 48 x 10 = 480 mm Dimensi terkecil kolom
= 400 mmMaka digunakan tulangan geser (sengkang) : (10 400 (As =196,3 mm2)
4.7 Pendimensian Pondasi Direncanakan :
- Ukuran pondasi (b ( h): 130 x 130 cm
- Tebal pondasi (t): 400 mm
- Selimut beton (s) : 50 mm
- Diameter tulangan : 20 mm untuk masing-masing arah
Maka, tinggi efektif (d) = 400 50 (20) = 330 mm Momen pondasi :
Mu = 0,323456 KNm Perencanaan batang tulangan baja :
k =
-Dari tabel tabel A-29 buku Struktur Beton Bertulang (Istimawan Dipohusodo), nilai k terkecil = 1,3615, oleh karenanya digunakan min = 0,0035
- Luas tulangan yang dibutuhkan :
As = .b.d = 0,0035 x 1300 x 330 = 1501,5 mm2Digunakan tulangan ( 16 100 (As = 2010,6 mm2) pada masing-masing arah.
DAFTAR PUSTAKAGunawan, Rudy, Tabel Profil Konstruksi Kayu, Kanisius, Yogyakarta, 2006.Gunawan, Rudy, Tabel Profil Konstruksi Baja, Kanisius, Yogyakarta, 2006.Dipohusodo Istimawan, Struktur Beton Bertulang, PT Gramedia Pustaka Utama Jakarta,1999.