REKAPITULASI ANALISA HARGA PEKERJAAN PROYEK

TAHUN ANGGARAN 2010

NO K. Baru PEKERJAAN SATUAN

1 A 02 1 M1 PEK. PASANGAN BOUWPLANK m 27,540.00

2 A 04 1 M2 PEK. KANTOR DIREKSI m2 500,360.00

3 A 05 1 M2 PAPAN NAMA PROYEK m2 388,640.00

4 A 07 PENGUKURAN DAN PEMASANGAN PATOK m 3,015.12

5 C 01 BONGKARAN BETON BERTULANG m3 324,483.50

6 C 02 BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALAT m3 75,790.00

7 C 04 BONGKARAN DINDING BATA/BATU m3 48,675.00

8 D 01 GALIAN TANAH BIASA SEDALAM 1 M m3 35,337.50

9 D 02 GALIAN TANAH BIASA SEDALAM 2 M m3 43,807.50

10 D 03 GALIAN TANAH BIASA SEDALAM 3 M m3 52,464.50

11 D 06 GALIAN TANAH KERAS SEDALAM 1 M m3 46,992.00

12 D 08 GALIAN TANAH LUMPUR SEDALAM 1 M m3 57,007.50

13 D 10 PEMBUANGAN TANAH SEJAUH 30 M m3 15,455.00

14 D 11 PERATAAN TANAH m3 10,224.50

15 D 12 PEMADATAN TANAH m3 26,675.00

16 D 13 URUGAN PASIR m3 208,120.00

17 D 14 PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH) m3 331,466.67

18 D 15 PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN (MENGGUNAKAN BURUH) m3 168,666.67

19 D 16 PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH) m3 148,206.67

20 D 17 PEMADATAN BADAN JALAN (MENGGUNAKAN BURUH) m3 86,166.67

21 D 18 PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH) ARE 137,998.44

22 D 19 PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT) m3 52,536.00

23 D 21 PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT m3 31,103.16

24 D 22 URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT m3 228,041.66

25 D 23 PEKERJAAN URUGAN SIRTU UNTUK PONDASI m3 234,850.00

26 D 24 PEMBENTUKAN BAHU JALAN (MENGGUNAKAN BURUH) m3 116,875.00

27 D 25 PEMBENTUKAN BAHU JALAN MATERIAL SPLIT 5 - 7 (MENGGUNAKAN BURUH) m3 264,412.50

28 E 01 PEKERJAAN PONDASI BATAKO AD. 1 : 4 m3 920,068.60

29 E 05 PEKERJAAN STOOTWERK m 123,745.88

30 E 08 PASANGAN SIARAN AD. 1 : 2 m2 33,661.65

31 E 11 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER) m3 666,391.00

32 F 01 PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE) m3 695,658.33

33 F 02 PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE) m3 684,658.33

34 F 03 PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE) m3 705,558.33

35 F 04 PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE) m3 778,777.08

36 F 05 PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE) m3 830,477.08

37 F 06 PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE) m3 863,477.08

38 F 08 BETON STRUKTUR K 225 (SITE MIX) m3 858,727.67

39 G 05 1 M2 PASANGAN BATA MERAH 1 : 3 m2 94,276.60

40 G 06 1 M2 PASANGAN BATA MERAH 1 : 4 m2 82,486.76

41 I 01 PERANCAH KAYU KONSTRUKSI BETON (BEKISTING) m2 116,435.00

42 I 08 PASANG TRIPLEKS TEBAL 3 MM m2 27,470.30

43 J 03 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN m2 41,003.60

44 J 04 PLESTERAN 1 PC : 3 PS, TEBAL 15 MM m2 38,895.00

45 N 11 PENGECATAN PERMUKAAN BAJA DOWEL DENGAN MENI BESI m2 16,665.00

46 N 12 PENGECATAN PERMUKAAN BAJA GALVANIZE m2 23,122.00

47 Q 01 LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING (MENGGUNAKAN ALAT) m3 246,345.00

48 Q 02 LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI (MENGGUNAKAN BURUH) m3 284,450.83

49 Q 03 LAPIS PONDASI BAWAH KELAS C AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH) m3 263,092.50

50 Q 04 LAPIS PONDASI ATAS KELAS A AGREGAT PECAH TERSARING (MENGGUNAKAN BURUH) m3 246,345.00

51 Q 05 PASANGAN LAPIS ATB (MENGGUNAKAN ALAT) m3 1,982,307.12

52 Q 06 LABUR ASPAL DUA LAPIS (BURDA) m2 44,336.13

53 Q 07 PASANGAN LAPEN m2 76,990.00

54 Q 08 LAPIS ASPAL RESAP PELEKAT (PRIME COAT) m2 15,395.06

55 Q 09 LAPIS ASPAL PELEKAT (TACK COAT) m2 3,545.31

56 Q 10 PENGHAMPARAN LAPIS TIPIS ASPAL BETON (MENGGUNAKAN ALAT) m2 75,654.19

57 Q 11 PENGHAMPARAN LAPIS TIPIS ASPAL BETON m2 73,817.33

HARGA SAT. PEKERJAAN (Rp)

Page 2: Analisa Box Culvert

NO K. Baru PEKERJAAN SATUAN HARGA SAT.

PEKERJAAN (Rp)

58 Q 12 PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC (MENGGUNAKAN ALAT) m2 111,610.13

59 Q 13 PLASTIK BOND BREAKER m2 2,970.00

60 Q 14 1 M1 JOINT CUTTER & JOINT SEALENT m 8,974.92

61 R 14 PENULANGAN BETON (BESI ULIR) kg 16,852.00

62 R 14a PENULANGAN BETON (BESI POLOS) kg 13,015.75

63 S 08 PASANGAN CERUCUK DOLKEN m2 64,735.00

64 S 09 PASANGAN SULINGAN m2 19,357.12

65 S 12 PELUMURAN BESI DOWEL DENGAN OLI ltr 3,325.13

66 S 13 1 BUAH PASANG PVC 1" untuk DOWEL bh 4,310.74

67 S 14 1 BUAH PASANG DOP PVC 1" untuk DOWEL bh 3,399.00

68 S 15 1 M PASANG PVC 4" m 23,830.13

69 S 16 1 M1 PASANG BESI SIKU 5 CM m 21,816.67

70 K.112 PASANGAN BATU PADA PARIT (MENGGUNAKAN BURUH) m' 396,174.17

71 K.705 KONSTRUKSI PASANGAN BATU (MENGGUNAKAN BURUH) ADUKAN 1 : 5 m3 693,495.00

72 SNI-Bo BETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX) m3 712,910.51

73 SNI-PD5 PASANG PONDASI BATU BELAH 1 PC : 4 PS m3 653,802.00

- Harga Satuan Pekerjaan per triwulan akan dievaluasi

- Harga Satuan Pekerjaan belum termasuk antisipasi terhadap kenaikan BBM KEPALA DINAS BINA MARGA DAN SUMBER DAYA AIR

KOTA DEPOK

- Harga Satuan Pekerjaan sudah termasuk keuntungan 10%- Harga Satuan Pekerjaan belum termasuk PPN 10 %

Page 3: Analisa Box Culvert

DAFTAR HARGA SATUAN BAHAN/MATERIAL

TAHUN ANGGARAN 2010

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

1 Abu Batu Rp 152,000.00

2 Alat Bantu M. 170 set Rp 75,000.00 1 set @ 3 alat

3 Ampelas Halus lbr Rp 3,000.00

4 Ampelas Kasar lbr Rp 3,000.00

5 Ampelas Sedang lbr Rp 3,000.00

6 Arang Kayu kg Rp 9,240.00

7 Aspal Bitumen M. 061 kg Rp 11,000.00

8 Asphalt Liter (AC) Laston ton Rp 809,000.00

9 Asphalt Liter Emulsion ltr Rp 7,200.00

10 Asphalt Liter Lataston (HRS) ton Rp 900,000.00

11 Asphalt Liter Treated Based (ATB) ton Rp 742,000.00

12 Bahan Bakar Residu ltr Rp 4,050.00

13 Bambu dia 7 s/d 10 btg Rp 16,000.00

14 Bambu dia. 5 s/d 7 btg Rp 13,000.00

15 Bambu Gombong btg Rp 61,740.00

16 Bata BA-6-A (6 cm Abu) 1 m2= 44 Bh m2 Rp 47,900.00

17 Bata BA-6-A (6 cm Merah) 1 m2= 44 Bh m2 Rp 53,300.00

18 Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh m2 Rp 62,300.00

19 Bata BA-8-A (8 cm Abu) 1 m2= 44 Bh m2 Rp 63,900.00

20 Bata Merah Bakar Kelas I bh Rp 300.00

21 Bata Merah Bakar Kelas II bh Rp 300.00

22 Bata Merah Oven (Klingker) bh Rp 1,000.00

23 Batako Besar 8 x 20 x 30 bh Rp 2,415.00

24 Batako Kecil 8 x 10 x 20 bh Rp 1,200.00

25 Batang Kelapa btg Rp 128,700.00

26 Batu Belah 10 - 15 cm M. 020 Rp 158,000.00

27 Batu Belah Pondasi M. 020 Rp 158,000.00

28 Batu Bronjol (untuk Bronjong) Rp 131,000.00

29 Batu Cadas Besar / Sedang Rp 29,000.00

30 Batu Pecah 0,5 - 1 cm M. 026 Rp 168,000.00

31 Batu Pecah 1 - 2 cm M. 025 Rp 194,000.00

32 Batu Pecah 2 - 3 cm M. 024 Rp 189,000.00

33 Batu Pecah 3 - 5 cm M. 023 Rp 189,000.00

34 Batu Pecah 5 - 7 cm M. 022 Rp 158,000.00

35 Batu Pecah Tersaring A M. 012 Rp 158,000.00

36 Batu Pecah Tersaring B M. 012 Rp 158,000.00

37 Batu Pecah Tersaring C M. 012 Rp 158,000.00

38 Rp 175,700.00

39 Baud (untuk jembatan) M. 163 bh Rp 8,610.00

40 Besi BCR Lengkap Tiang (Tanpa Pondasi) Rp 264,000.00

41 Besi Beton U - 24 (Polos) M. 167 kg Rp 9,100.00

42 Besi Beton U - 32 KS (Ulir) kg Rp 12,200.00

43 Besi Beton Diameter 6 mm btg Rp 18,000.00

44 Besi Beton Diameter 8 mm btg Rp 40,000.00

45 Besi Beton Diameter 10 mm btg Rp 61,000.00

46 Besi Beton Diameter 12 mm btg Rp 84,000.00

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

Page 4: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

47 Besi Beton Diameter 16 mm btg Rp 163,000.00

48 Besi Beugel Kuda-kuda kg Rp 29,100.00

49 Besi Plat tebal 10 mm m² Rp 231,420.00

50 Besi Profil kg Rp 9,555.00

51 Besi Siku 3 x 30 x 30 mm ( 6 meter) btg Rp 44,000.00

52 Besi Siku 3 x 40 x 40 mm ( 6 meter) btg Rp 63,000.00

53 Besi Siku 3 x 50 x 50 mm (6 meter) btg Rp 95,000.00

54 Bilik Bambu (dengan Kulit) lbr Rp 92,505.00

55 Bilik Bambu (tanpa Kulit) lbr Rp 64,785.00

56 Blast Bit m34 kg Rp 40,000.00

57 Bensin Premium ltr Rp 4,500.00

58 Bondek lbr Rp 119,385.00

59 Box Culvert 100.100.100 (Kwalitas 1) m' (btg) Rp 2,815,000.00

60 Box Culvert 40.40.100 (Kwalitas 1) m' (btg) Rp 838,000.00

61 Box Culvert 50.50.100 (Kwalitas 1) m' (btg) Rp 964,000.00

62 Box Culvert 60.60.100 (Kwalitas 1) m' (btg) Rp 1,265,000.00

63 Box Culvert 80.80.100 (Kwalitas 1) m' (btg) Rp 2,339,000.00

64 Buis Beton dia. 100 (Kwalitas 1) bh Rp 473,000.00

65 Buis Beton dia. 20 (Kwalitas 1) bh Rp 37,000.00

66 Buis Beton dia. 30 (Kwalitas 1) bh Rp 47,000.00

67 Buis Beton dia. 40 (Kwalitas 1) bh Rp 105,000.00

68 Buis Beton dia. 50 (Kwalitas 1) bh Rp 147,000.00

69 Buis Beton dia. 60 (Kwalitas 1) bh Rp 168,000.00

70 Buis Beton dia. 80 (Kwalitas 1) bh Rp 336,000.00

71 Buis Beton dia. 90 (Kwalitas 1) bh Rp 394,000.00

72 Cansteen 10.20.40 bh Rp 4,000.00

73 Cansteen 15.25.40 bh Rp 5,000.00

74 Cansteen 20.30.60 bh Rp 7,000.00

75 Cat Besi Duco Danaglos/ICI kg Rp 89,000.00

76 Cat Besi Sieve kg Rp 49,000.00

77 Cat Bronze kg Rp 37,000.00

78 Cat Cansteen Putih 5 Kg Rp 58,000.00

79 Cat Dasar Beton Eksterior (pelapis Alkali ICI) ltr Rp 84,000.00

80 Cat Dasar Beton Interior (2 Pelapis) ltr Rp 63,000.00

81 Cat Kayu Sieve kg Rp 50,000.00

82 Cat Menie kg Rp 21,000.00

83 Cat Minyak kg Rp 8,000.00

84 Cat Tembok ICI Eksterior galon Rp 1,258,000.00

85 Cat Tembok ICI Interior galon Rp 845,000.00

86 Cat Tembok Sanlek galon Rp 58,600.00

87 Cat Tembok Vinilek galon Rp 368,000.00

88 Cat Marka m17b kg Rp 75,900.00

89 Chek Valve 1/2" bh Rp 61,740.00

90 Cover STU 100 Cm HD (Kwalitas 1) btg Rp 413,000.00

91 Cover STU 100 Cm LD (Kwalitas 1) btg Rp 320,000.00

92 Cover STU 40 Cm HD (Heavy Duty) (Kwalitas 1) btg Rp 140,000.00

93 Cover STU 40 Cm LD (Light Duty) (Kwalitas 1) btg Rp 109,000.00

94 Cover STU 50 Cm HD (Kwalitas 1) btg Rp 192,000.00

95 Cover STU 50 Cm LD (Kwalitas 1) btg Rp 139,000.00

96 Cover STU 60 Cm HD (Kwalitas 1) btg Rp 241,000.00

Page 5: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

97 Cover STU 60 Cm LD (Kwalitas 1) btg Rp 167,000.00

98 Cover STU 80 Cm HD (Kwalitas 1) btg Rp 328,000.00

99 Cover STU 80 Cm LD (Kwalitas 1) btg Rp 213,000.00

100 Deep Well dengan kelengkapannya kap. 150 liter/menit set Rp223,668,165.00

101 Dempul Duco kg Rp 25,000.00

102 Dempul Halus/Infra (Wood Filler) kg Rp 25,000.00

103 Dempul Kayu Cap Kucing kg Rp 42,000.00

104 Dempul Lilin kg Rp 5,000.00

105 Dempul Plastik kg Rp 25,000.00

106 Dempul Plitur kg Rp 5,000.00

107 Dolken 5 s/d 7 btg Rp 7,000.00

108 Dolken 7 s/d 10 btg Rp 12,000.00

109 Engsel Harmonika m Rp 32,000.00

110 Engsel Jendela Unilon pasang Rp 21,000.00

111 Engsel Patrun pasang Rp 16,000.00

112 Engsel Pintu Unilon Standard pasang Rp 26,000.00

113 Gate Walve 1/2" bh Rp 38,535.00

114 Gembok bh Rp 21,000.00

115 Gergaji Besi bh Rp 31,600.00

116 GIP Sambungan dia.1 1/2" bh Rp 18,000.00

117 GIP Sambungan dia.1 1/4" bh Rp 16,000.00

118 GIP Sambungan dia.1 3/4" bh Rp 17,500.00

119 GIP Sambungan dia.1" bh Rp 13,000.00

120 GIP Sambungan dia.1/2" bh Rp 11,000.00

121 GIP Sambungan dia.2 1/2" bh Rp 21,000.00

122 GIP Sambungan dia.2" bh Rp 19,000.00

123 GIP Sambungan dia.3" bh Rp 26,000.00

124 GIP Sambungan dia.4" bh Rp 32,000.00

125 Grafel U 20 cm m Rp 29,400.00

126 Grafel U 30 cm m Rp 39,165.00

127 Grafel U 40 cm m Rp 48,930.00

128 Grendel 15 cm bh Rp 13,000.00

129 Grendel 5 cm bh Rp 11,000.00

130 Ijuk ikat Rp 25,000.00

131 Kape Kayu bh Rp 5,100.00

132 Kape Tembok bh Rp 5,100.00

133 Kapur pasang/Kapur Tembok Rp 77,175.00

134 Karet Elastomerik bh Rp 1,370,880.00

135 Karet Elastomerik (400 x 400 x 30 mm) bh Rp 464,415.00

136 Karet Elastomerik (400 x 400 x 40 mm) bh Rp 624,330.00

137 Karet Penyambung Pipa dia. 100 cm bh Rp 198,975.00

138 Karet Penyambung Pipa dia. 60 cm bh Rp 82,425.00

139 Karet Penyambung Pipa dia. 80 cm bh Rp 121,275.00

140 Karung plastik 50 Kg bh Rp 6,195.00

141 Kawat BC (Tembaga) kg Rp 70,000.00

142 Kawat Beton M. 167 kg Rp 13,000.00

143 Kawat Bronjong M. 162 kg Rp 15,000.00

144 Kawat Harmonika 2 cm Rp 12,000.00

145 Kawat Harmonika 4 cm Rp 24,000.00

146 Kayu Bakar Rp 73,710.00

m3/kg

m2

m2

m3

Page 6: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

147 Kayu Balok Borneo Rp 2,100,000.00

148 Kayu Balok Kamper Singil Rp 5,985,000.00

149 Kayu Balok Kruing Rp 5,040,000.00

150 Kayu Balok Kamper Samarinda Rp 7,721,250.00

151 Kayu Balok Rasamala Rp 3,465,000.00

152 Kayu Kamper Singkil Rp 3,354,800.00

153 Kayu Papan Cor Borneo Rp 2,205,000.00

154 Kayu Borneo 5/7 Rp 1,470,000.00

155 Kayu Papan Kamper Singil Rp 6,195,000.00

156 Kayu Papan Kruing 2 x 20 x 4m Rp 5,145,000.00

157 Kayu Papan Kamper Samarinda Rp 5,250,000.00

158 Kayu Reng 2/3 Borneo Rp 1,103,000.00

159 Kayu Reng 2/3 Borneo Rp 1,103,000.00

160 Kayu Reng 3/4 Borneo Rp 1,103,000.00

161 Keramik 20 x 20 m2 Rp 56,000.00

162 Keramik 20 x 25 m2 Rp 40,000.00

163 Keramik 30 x 30 m2 Rp 59,000.00

164 Kunci 2 Slaag Ancor Asli bh Rp 74,600.00

165 Kunci 2 Slaag ISO bh Rp 74,600.00

166 Kunci 2 Slaag Kuda Terbang bh Rp 74,600.00

167 Kunci 2 Slaag ROYAL bh Rp 74,600.00

168 Kunci 2 Slaag Silinder SEIS Asli Type 210 s/d 226 bh Rp 229,950.00

169 Kunci 2 Slaag Silinder Utama Standard bh Rp 275,625.00

170 Kunci Gembok Besar bh Rp 79,900.00

171 Kunci KM Bulat ALFA bh Rp 47,900.00

172 Kunci KM Bulat Kualitas Biasa bh Rp 40,750.00

173 Kunci Silinder ALFA Pintu Alumunium bh Rp 257,985.00

174 Kwas 3 " bh Rp 8,000.00

175 Lempengan Rumput Gajah Rp 31,600.00

176 Lem Fox kg Rp 47,000.00

177 Lem Kuning (Aibon) kg Rp 63,000.00

178 Lem Mixed Epoxy Adhesive kg Rp 11,000.00

179 Lem Paralon bh Rp 7,000.00

180 Linggis bh Rp 53,000.00

181 Macam2 Samb. Paralon Ø 2 1/2" bh Rp 12,810.00

182 Macam2 Samb. Paralon Ø 3" bh Rp 22,575.00

183 Macam2 Samb. Paralon Ø 4" bh Rp 32,445.00

184 Macam2 Sambungan GIP Ø 1 1/4" bh Rp 11,235.00

185 Macam2 Sambungan GIP Ø 1" bh Rp 9,030.00

186 Macam2 Sambungan GIP Ø 1/2" bh Rp 4,515.00

187 Macam2 Sambungan GIP Ø 11/2" bh Rp 12,810.00

188 Macam2 Sambungan GIP Ø 13/4" bh Rp 19,005.00

189 Macam2 Sambungan GIP Ø 2 1/2" bh Rp 37,695.00

190 Macam2 Sambungan GIP Ø 2" bh Rp 26,355.00

191 Macam2 Sambungan GIP Ø 3" bh Rp 45,255.00

192 Macam2 Sambungan GIP Ø 3/4" bh Rp 5,880.00

193 Macam2 Sambungan GIP Ø 4" bh Rp 52,815.00

194 Macam2 Sambungan Paralon Ø 1 1/2" bh Rp 9,300.00

195 Macam2 Sambungan Paralon Ø 1 1/4" bh Rp 8,150.00

196 Macam2 Sambungan Paralon Ø 1 3/4" bh Rp 6,300.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

Page 7: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

197 Macam2 Sambungan Paralon Ø 1" bh Rp 4,650.00

198 Macam2 Sambungan Paralon Ø 1/2" bh Rp 2,900.00

199 Macam2 Sambungan Paralon Ø 2" bh Rp 13,350.00

200 Macam2 Sambungan Paralon Ø 3/4" bh Rp 4,050.00

201 Meni Kayu / Besi kg Rp 24,000.00

202 Minyak Cat ltr Rp 19,200.00

203 Minyak Tanah M.065 ltr Rp 13,000.00

204 Multiplek 12 mm 120 x 240 lbr Rp 137,000.00

Page 8: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

205 Multiplek 18 mm 120 x 240 lbr Rp 210,000.00

206 Multiplek 9 mm 120 x 240 lbr Rp 90,000.00

207 Mur / Baut Beam 12 x 25 mm bh Rp 2,000.00

208 Mur / Baut Blocking 16 x 30 mm bh Rp 4,000.00

209 Mur / Baut Post 16 x 48 mm bh Rp 5,000.00

210 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh Rp 5,000.00

211 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh Rp 7,000.00

212 Mur/Baut 0,25" bh Rp 2,000.00

213 Mur/Baut 0,75" bh Rp 2,000.00

214 Mur/Baut 10 cm bh Rp 5,000.00

215 Oli (Drum) Drum Rp 24,500.00

216 Pagar BRC Lengkap Tiang (Tanpa Pondasi) Rp 264,000.00

217 Pagar Panel Beton t = 2 m Rp 393,330.00

218 Paku M. 166 kg Rp 18,000.00

219 Paku Beton 2 cm s/d 5 cm kg Rp 18,000.00

220 Palu 0,5 Kg kg Rp 26,600.00

221 Papan 2/20 x 4 lbr Rp 52,400.00

222 Pasir Beton M. 041 Rp 210,000.00

223 Pasir Pasang M.042 Rp 189,000.00

224 Pasir Tras M. 041 Rp 147,000.00

225 Pasir Urug M. 040 Rp 147,000.00

226 Paving Block Natural 6 cm Rp 88,200.00

227 Paving Block Natural 8 cm Rp 102,900.00

228 Paving Block Warna 6 cm Rp 100,800.00

229 Paving Block Warna 8 cm Rp 116,550.00

230 m' Rp 512,900.00

231 Pipa Btn Brtlg Dia. 0.50 M m' Rp 331,695.00

232 Pipa Btn Brtlg Dia. 0.60 M m' Rp 467,355.00

233 Pipa Btn Brtlg Dia. 0.80 M m' Rp 810,810.00

234 Pipa Btn Brtlg Dia. 1 M m' Rp 1,282,575.00

235 Pipa GIP Medium A Ø 1 1/2" btg Rp 221,350.00

236 Pipa GIP Medium A Ø 1 1/4" btg Rp 203,850.00

237 Pipa GIP Medium A Ø 1 3/4" btg Rp 250,635.00

238 Pipa GIP Medium A Ø 1" btg Rp 137,130.00

239 Pipa GIP Medium A Ø 1/2" btg Rp 104,850.00

240 Pipa GIP Medium A Ø 2 1/2" btg Rp 412,020.00

241 Pipa GIP Medium A Ø 2" Tebal 1,8 mm btg Rp 266,805.00

242 Pipa GIP Medium A Ø 2" Tebal 2 mm btg Rp 379,890.00

243 Pipa GIP Medium A Ø 3" Tebal 2 mm btg Rp 535,185.00

244 Pipa GIP Medium A Ø 3/4" Tebal 1,8 mm btg Rp 104,850.00

245 Pipa GIP Medium A Ø 4" Tebal 1,8 mm btg Rp 660,450.00

246 Pipa GIP Medium A Ø 4" Tebal 2 mm btg Rp 1,345,995.00

247 Pipa GIP Medium A Ø 5" Tebal 1,8 mm btg Rp 804,930.00

248 Pipa GIP Medium A Ø 6" Tebal 1,8 mm btg Rp 964,110.00

249 Pipa GIP Medium A Ø 6" Tebal 2 mm btg Rp 1,366,575.00

250 Pipa GIP Medium A Ø 8" Tebal 1,8 mm btg Rp 1,284,990.00

251 Pipa PVC (Sambungan) Jenis AW 4 " TY bh Rp 239,700.00

252 Pipa PVC Maspion ABU dia 1 1/2" (AW) btg Rp 35,595.00

253 Pipa PVC Maspion ABU dia 1 1/4" (AW) btg Rp 29,715.00

254 Pipa PVC Maspion ABU dia 1" (AW) btg Rp 27,300.00

m2

m2

m3

m3

m3

m3

m2

m2

m2

m2

Tebal 1.6 mm Ø 600 mm

Page 9: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

255 Pipa PVC Maspion ABU dia 1/2" (AW) btg Rp 15,435.00

256 Pipa PVC Maspion ABU dia 2 1/2" (AW) btg Rp 47,460.00

257 Pipa PVC Maspion ABU dia 2" (AW) btg Rp 41,580.00

258 Pipa PVC Maspion ABU dia 3" (AW) btg Rp 59,325.00

259 Pipa PVC Maspion ABU dia 3/4" (AW) btg Rp 19,005.00

260 Pipa PVC Maspion ABU dia 4" (AW) btg Rp 83,055.00

261 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1/2" btg Rp 32,000.00

262 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3/4" btg Rp 39,100.00

263 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1" btg Rp 56,600.00

264 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/4" btg Rp 76,400.00

265 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/2" btg Rp 99,600.00

266 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2" btg Rp 141,500.00

267 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2 1/2" btg Rp 182,300.00

268 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3" btg Rp 277,700.00

269 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 4" btg Rp 429,400.00

270 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 5" btg Rp 562,100.00

271 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 6" btg Rp 844,000.00

272 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 8" btg Rp 1,276,400.00

273 Plamir tembok kg Rp 16,590.00

274 Plat Besi Tipis 1 mm kg Rp 10,290.00

275 Plat Strip 2 x 30 mm (6m) btg Rp 29,400.00

276 Plat Strip 3 x 30 mm (6m) btg Rp 39,165.00

277 Ply Wood 18 mm (120 x 240) lbr Rp 262,100.00

278 Plastik Bond Breaker m2 Rp 1,800.00

279 PVC (Sambungan) Ø 1 1/4" bh Rp 5,800.00

280 PVC (Sambungan) Ø 1 3/4" bh Rp 4,725.00

281 PVC (Sambungan) Ø 1" bh Rp 4,650.00

282 PVC (Sambungan) Ø 1/2" bh Rp 2,300.00

283 PVC (Sambungan) Ø 2" bh Rp 7,650.00

284 PVC (Sambungan) Ø 3/4" bh Rp 2,900.00

285 PVC (Sambungan) Ø 1 1/2" bh Rp 6,950.00

286 PVC (Sambungan) Ø 2 1/2" bh Rp 12,810.00

287 PVC (Sambungan) Ø 3" bh Rp 22,575.00

288 PVC (Sambungan) Ø 4" bh Rp 37,250.00

289 Pipa 200 CL Class 2 PC-I Dusaspun (L=2.45 m) btg Rp 218,000.00

290 Pipa 300 CL Class 2 PC-I Dusaspun btg Rp 396,000.00

291 Pipa 400 CL Class 2 PC-I Dusaspun btg Rp 590,000.00

292 Pipa 500 CL Class 2 PC-I Dusaspun btg Rp 89,000.00

293 Pipa 600 CL Class 2 PC-I Dusaspun btg Rp 1,159,000.00

294 Pipa 700 CL Class 2 PC-I Dusaspun btg Rp 1,466,000.00

295 Pipa 800 CL Class 2 PC-I Dusaspun btg Rp 1,811,000.00

296 Pipa 900 CL Class 2 PC-I Dusaspun btg Rp 2,210,000.00

297 Pipa 1000 CL Class 2 PC-I Dusaspun btg Rp 2,625,000.00

298 Pipa 1100 CL Class 2 PC-I Dusaspun btg Rp 3,294,000.00

299 Pipa 1200 CL Class 2 PC-I Dusaspun btg Rp 4,172,000.00

300 Pipa 1300 CL Class 2 PC-I Dusaspun btg Rp 4,753,000.00

301 Pipa 1400 CL Class 2 PC-I Dusaspun btg Rp 5,264,000.00

302 Pipa 1500 CL Class 2 PC-I Dusaspun btg Rp 5,808,000.00

303 Pipa 1600 CL Class 2 PC-I Dusaspun btg Rp 8,412,000.00

304 Pipa 1650 CL Class 2 PC-I Dusaspun btg Rp 6,421,000.00

Page 10: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

305 Pipa 1800 CL Class 2 PC-I Dusaspun btg Rp 7,680,000.00

306 Pipa 2000 CL Class 2 PC-I Dusaspun btg Rp 18,008,000.00

307 Pipa 2100 CL Class 2 PC-I Dusaspun (L=2.45 m) btg Rp 15,328,000.00

308 Pipa 300 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 372,000.00

Page 11: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

309 Pipa 400 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 554,000.00

310 Pipa 500 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 751,000.00

311 Pipa 600 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 1,038,000.00

312 Pipa 700 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 1,271,000.00

313 Pipa 800 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 1,550,000.00

314 Pipa 900 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 1,854,000.00

315 Pipa 1000 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 2,118,000.00

316 Pipa 1100 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 2,471,000.00

317 Pipa 1200 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 2,925,000.00

318 Pipa 1300 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 3,337,000.00

319 Pipa 1400 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 3,677,000.00

320 Pipa 1500 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 4,079,000.00

321 Pipa 1650 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 4,865,000.00

322 Pipa 1800 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 5,720,000.00

323 Pipa 2100 FJ Class 2 Dusaspun (L=2.5 m) btg Rp 8,211,000.00

324 Pipa 300 R Class L Witera (L=1.25 m) btg Rp 282,000.00

325 Pipa 400 R Class L Witera (L=1.25 m) btg Rp 413,000.00

326 Pipa 500 R Class L Witera (L=1.25 m) btg Rp 604,000.00

327 Pipa 600 R Class L Witera (L=2.5 m) btg Rp 1,423,000.00

328 Pipa 700 R Class L Witera (L=2.5 m) btg Rp 1,895,000.00

329 Pipa 800 R Class L Witera (L=2.5 m) btg Rp 2,489,000.00

330 Pipa 900 R Class L Witera (L=2.5 m) btg Rp 3,174,000.00

331 Pipa 1000 R Class L Witera (L=2.5 m) btg Rp 3,878,000.00

332 Pipa 1100 R Class L Witera (L=2.5 m) btg Rp 4,803,000.00

333 Pipa 1200 R Class L Witera (L=2.5 m) btg Rp 5,597,000.00

334 Pipa 1300 R Class L Witera (L=2.5 m) btg Rp 65,303,000.00

335 Pipa 1500 R Class L Witera (L=2.5 m) btg Rp 8,612,000.00

336 Pipa 300 NR Witera (L=1.25 m) btg Rp 277,000.00

337 Pipa 400 NR Witera (L=1.25 m) btg Rp 406,000.00

338 Pipa 500 NR Witera (L=1.25 m) btg Rp 596,000.00

339 Pipa 600 NR Witera (L=2.5 m) btg Rp 1,391,000.00

340 Pipa 700 NR Witera (L=2.5 m) btg Rp 1,853,000.00

341 Pipa 800 NR Witera (L=2.5 m) btg Rp 3,105,000.00

342 Pipa 900 NR Witera (L=2.5 m) btg Rp 3,799,000.00

343 Pipa 1000 NR Witera (L=2.5 m) btg Rp 609,000.00

344 Readymix Beton B0 Tanpa Pompa (Selang) Rp 609,000.00

345 Readymix Beton K 125, Tampa Pompa (Selang) Rp 599,000.00

346 Readymix Beton K 175, Tampa Pompa (Selang) Rp 618,000.00

347 Readymix Beton K 225, Tampa Pompa (Selang) Rp 683,000.00

348 Readymix Beton K 300, Tampa Pompa (Selang) Rp 730,000.00

349 Readymix Beton K 350, Tampa Pompa (Selang) Rp 760,000.00

350 Roll Cat Tembok bh Rp 43,155.00

351 Roll Meter 50 Meter (Bahan Plastik) bh Rp 69,900.00

352 Roll Meter 30 Meter (Bahan Plastik) bh Rp 69,900.00

353 Roll Meter 5 Meter (Bahan Plastik) bh Rp 15,435.00

354 Rumah Panel 30 x 60 cm (Kosong) unit Rp 115,710.00

355 Rumah TL In Bow / Out Bw 2 x 20 W (Kosong) bh Rp 88,200.00

356 Saklar Broco Seri Standard ( 1 Phase) bh Rp 26,000.00

357 Saklar Broco Tunggal Standard ( 1 Phase) bh Rp 20,000.00

358 Sambungan Pipa PVC Jenis AW 4 " TY bh Rp 78,015.00

m3

m3

m3

Page 12: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

359 Saringan Air Liter KM Stainless Steel bh Rp 40,750.00

360 Sekring Kas 2 Group Biasa unit Rp 127,470.00

361 Sekring Kas 3 Group Biasa unit Rp 161,385.00

362 Sekring Kas 5 Group Biasa unit Rp 339,045.00

363 Sekrup bh Rp 2,153.00

364 Sealent kg Rp 32,000.00

365 Selang Plastik untuk Water Pass dia 0,5 cm bh Rp 5,100.00

366 Semen Portland/PC (50 Kg/zak) M. 080 zak Rp 61,000.00

367 Seng Gelombang 180 x 90 x 0,5 BJLS 30 lbr Rp 63,000.00

368 Seng Plat 90 cm x 0,5 mm lbr Rp 302,000.00

369 Seng Plat BJLS 30 Lebar 60 cm lbr Rp 74,000.00

370 Seng Plat BJLS 30 Lebar 90 cm lbr Rp 23,000.00

371 Seng BJS 0.20 Gelombang 85 x 180 cm lbr Rp 47,000.00

372 Seng BJS 0.30 Gelombang 85 x 180 cm lbr Rp 65,000.00

373 Seng BJS 0.40 Gelombang 85 x 180 cm lbr Rp 98,000.00

374 Sirtu Pecah Tersaring M. 042 Rp 158,000.00

375 Solar M. 183 ltr Rp 4,500.00

376 Solatip Leideng bh Rp 2,415.00

377 Stempet / Gemuk kg Rp 19,400.00

378 Stop Kontak Broco 3 Phase (In Bow) bh Rp 111,825.00

379 Stop Kontak Broco 3 Phase (Out Bow) bh Rp 65,625.00

380 Stop Kontak Broco Standard (1 Phase) bh Rp 19,950.00

381 Stop Kontak Handle 3 Phase bh Rp 65,625.00

382 Stop Kran 1 1/2" KIT bh Rp 176,925.00

383 Stop Kran 1" KIT bh Rp 117,915.00

384 Stop Kran 2 1/2" KIT bh Rp 510,300.00

385 Stop Kran 2" KIT bh Rp 221,130.00

386 Stop Kran 3" KIT bh Rp 578,640.00

387 Stop Kran 3/4" KIT bh Rp 86,940.00

388 STU 100.100.120 Cm (Kwalitas 1) bh Rp 1,653,000.00

389 STU 100.100.120 Cm + Support (Kwalitas 1) btg Rp 2,498,950.00

390 STU 40.40.120 Cm (Kwalitas 1) btg Rp 363,000.00

391 STU 40.40.120 Cm + Support (Kwalitas 1) btg Rp 520,000.00

392 STU 40.50.120 Cm (Kwalitas 1) btg Rp 411,000.00

393 STU 40.50.120 Cm + Support (Kwalitas 1) btg Rp 586,000.00

394 STU 40.60.120 Cm (Kwalitas 1) btg Rp 457,000.00

395 STU 40.60.120 Cm + Support (Kwalitas 1) btg Rp 651,000.00

396 STU 50.50.120 Cm (Kwalitas 1) btg Rp 540,000.00

397 STU 50.50.120 Cm + Support (Kwalitas 1) btg Rp 772,000.00

398 STU 50.60.120 Cm (Kwalitas 1) btg Rp 604,000.00

399 STU 50.60.120 Cm + Support (Kwalitas 1) btg Rp 866,000.00

400 STU 50.70.120 Cm (Kwalitas 1) btg Rp 668,000.00

401 STU 50.70.120 Cm + Support (Kwalitas 1) btg Rp 953,000.00

402 STU 60.60.120 Cm (Kwalitas 1) btg Rp 641,000.00

403 STU 60.60.120 Cm + Support (Kwalitas 1) btg Rp 919,000.00

404 STU 60.70.120 Cm (Kwalitas 1) btg Rp 705,000.00

405 STU 60.70.120 Cm + Support (Kwalitas 1) btg Rp 1,006,000.00

406 STU 60.80.120 Cm (Kwalitas 1) btg Rp 768,000.00

407 STU 60.80.120 Cm + Support (Kwalitas 1) btg Rp 1,097,000.00

408 STU 80.100.120 Cm (Kwalitas 1) btg Rp 1,101,000.00

m3

Page 13: Analisa Box Culvert

NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.

409 STU 80.100.120 Cm + Support (Kwalitas 1) btg Rp 1,588,700.00

410 STU 80.80.120 Cm (Kwalitas 1) btg Rp 966,000.00

411 STU 80.80.120 Cm + Support (Kwalitas 1) btg Rp 1,400,500.00

412 Tanah Urug Rp 63,000.00

413 Tangki Air Polyetiline (Panda) TB 32 bh Rp 671,000.00

414 Tangki Air Polyetiline (Panda) TB 55 bh Rp 1,038,400.00

415 Tangki Air Polyetiline (Panda) TB 110 bh Rp 1,730,600.00

416 Teak Wood 3 mm 120 x 240 lbr Rp 110,650.00

417 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr Rp 87,350.00

418 Teak Wood 4 mm 120 x 240 lbr Rp 122,300.00

419 Teak Wood 4 mm 120 x 240 Ukuran Pintu lbr Rp 104,850.00

420 Terpal Plastik m Rp 7,000.00

421 Thinner m33 liter Rp 17,000.00

422 Timah Hitam kg Rp 18,000.00

423 Timbunan Tanah Pilihan M. 050 Rp 47,000.00

424 Triplek tb. 4 mm lbr Rp 63,000.00

425 Tripleks 3 mm 120 x 240 lbr Rp 47,000.00

426 Tripleks 4 mm 120 x 240 lbr Rp 63,000.00

427 Tripleks 4 mm 120 x 240 Ukuran Pintu lbr Rp 47,000.00

428 Tripleks 6 mm 120 x 240 lbr Rp 89,000.00

429 Tripleks 9 mm 120 x 240 lbr Rp 137,000.00

430 Triplek 12 mm lbr Rp 210,000.00

431 Triplek 15 mm lbr Rp 247,000.00

432 Triplek 18 mm lbr Rp 289,000.00

433 Tutup Pipa 1" bh Rp 3,000.00

434 Tutup Pipa 1,5" bh Rp 4,000.00

435 Tutup Pipa 2" bh Rp 4,000.00

436 Tutup Pipa 2,5" bh Rp 5,000.00

437 Tutup Pipa 3" bh Rp 5,000.00

438 Tutup Pipa 3,5" bh Rp 6,000.00

439 Tutup Pipa 4" bh Rp 6,000.00

440 Tutup Pipa 4,5" bh Rp 7,000.00

441 Tutup Pipa 5" bh Rp 7,000.00

442 Tutup Pipa 5,5" bh Rp 8,000.00

443 Tutup Pipa 6" bh Rp 9,000.00

444 Tutup Pipa 6,5" bh Rp 10,000.00

445 Tutup Pipa 7" bh Rp 11,000.00

446 Tutup Pipa 7,5" bh Rp 12,000.00

447 Tutup Pipa 8" bh Rp 13,000.00

448 Wiremesh M6 batang Rp 281,000.00

449 Wiremesh M8 batang Rp 514,000.00

m3

m3

Page 14: Analisa Box Culvert

DAFTAR HARGA SATUAN SEWA PERALATAN PER JAM KERJA

TAHUN ANGGARAN 2010

NO. ALAT KODE KAPASITAS ALAT HARGA SATUAN KETERANGAN

1 BULLDOZER E-001 110 Hp Rp 188,000.00

2 MOTOR GRADER E-010 110 Hp Rp 188,000.00

3 CRUSHER/SCR 30 T/H E-031 30 T/jam - 185 Hp Rp 249,000.00

4 SCREENING PLANT E-040 - Rp 125,000.00

5 LOADER WHEELED E-052 115.0 Hp Rp 188,000.00

6 ROLLER, 3 WHEELED E-080 6 - 8 Ton Rp 75,900.00

7 ROLLER, TANDEM E-081 6 - 8 Ton Rp 113,000.00

8 ROLLER, VIBR. SELF-P6-7T E-082 Rp 125,000.00

9 ROLLER, PNEUMATIC E-084 6 - 15 Ton Rp 156,000.00

10 ROLLER, VIBR. PED 1 TONE E-087 1 Ton Rp 63,000.00

11 TAMPER, VIBR. PLATE E-088 4 Hp Rp 38,000.00

12 CONCRETE VIBRATOR E-089 - Rp 31,000.00

13 SPRAYER, SELFPROP E-153 1,000.0 Liter Rp 112,960.66

14 ASP. SPRAYER, TOWED E-154 6.0 Ton Rp 38,000.00

15 ASP. MIXING PLANT 30 T/H E-155 30 T/jam Rp 400,000.00

16 ASPHALT FINISHER E-157 1820 mm / 30 Hp Rp 188,000.00

17 WATER TANK TRUCK E-182 4,000.0 Liter Rp 163,000.00

18 TRAILER, TOWED E-191 10.0 Ton Rp 438,000.00 Harga dasar

19 DUMP TRUCK 3.5 T E-211 3.5 Ton Rp 163,000.00

20 DUMP TRUCK 5 T E-212 5 Ton / 145 Hp Rp 188,000.00

21 FLATBED TRUCK 3.5 T E-221 3,5 Ton / 115 Hp Rp 163,000.00

22 FLATBED TRUCK WITH CRANE E-225 - Rp 313,000.00

23 CONCRETE MIXER 0.125 M3 E-251 125 Liter Rp 63,000.00 Per Hari

24 COMPRESSOR, AIR E-301 210 M3/jam Rp 81,000.00

25 PUMP, WATER (5 CM) E-341 30 M3/jam Rp 63,000.00

26 CONCRETE MIXER 0.25 M3 E-252 250 Liter Rp 38,000.00

27 CONCRETE MIXER 0.5 M3 E-253 500 Liter Rp 63,000.00

28 BLOWER E- - Rp 16,802.57

29 MESIN CUTTER CONCRETE Jam/m Rp 44,714.29

Page 15: Analisa Box Culvert

DAFTAR HARGA SATUAN UPAH PEKERJA

DINAS BINA MARGA DAN SUMBER DAYA AIR

NO KOMPONEN UPAH / HARI KETERANGAN

1 PEKERJA 40,000.00 1 ORANG/ HR/ 8 JAM

2 PEKERJA SETENGAH TERAMPIL 40,000.00 1 ORANG/ HR/ 8 JAM

3 PEKERJA TERAMPIL 50,000.00 1 ORANG/ HR/ 8 JAM

4 TUKANG GALI 40,000.00 1 ORANG/ HR/ 8 JAM

5 TUKANG BATU SETENGAH TERAMPIL 45,000.00 1 ORANG/ HR/ 8 JAM

6 TUKANG BATU TERAMPIL 50,000.00 1 ORANG/ HR/ 8 JAM

7 KEPALA TUKANG BATU 55,000.00 1 ORANG/ HR/ 8 JAM

8 TUKANG KAYU SETENGAH TERAMPIL 45,000.00 1 ORANG/ HR/ 8 JAM

9 TUKANG KAYU TERAMPIL 50,000.00 1 ORANG/ HR/ 8 JAM

10 KEPALA TUKANG KAYU 55,000.00 1 ORANG/ HR/ 8 JAM

11 TUKANG CAT / PELITUR SETENGAH TERAMPIL 45,000.00 1 ORANG/ HR/ 8 JAM

12 TUKANG CAT / PELITUR TERAMPIL 50,000.00 1 ORANG/ HR/ 8 JAM

13 KEPALA TUKANG CAT / PELITUR 55,000.00 1 ORANG/ HR/ 8 JAM

14 TUKANG BESI BETON SETENGAH TERAMPIL 45,000.00 1 ORANG/ HR/ 8 JAM

15 TUKANG BESI BETON TERAMPIL 50,000.00 1 ORANG/ HR/ 8 JAM

16 KEPALA TUKANG BESI BETON 55,000.00 1 ORANG/ HR/ 8 JAM

17 TUKANG BESI PROFIL SETENGAH TERAMPIL 60,000.00 1 ORANG/ HR/ 8 JAM

18 TUKANG BESI PROFIL TERAMPIL 65,000.00 1 ORANG/ HR/ 8 JAM

19 KEPALA TUKANG BESI PROFIL 70,000.00 1 ORANG/ HR/ 8 JAM

20 MANDOR 85,000.00 1 ORANG/ HR/ 8 JAM

21 OPERATOR ALAT BESAR 65,000.00 1 ORANG/ HR/ 8 JAM

22 PEMBANTU OPERATOR / MEKANIK 45,000.00 1 ORANG/ HR/ 8 JAM

23 SUPIR TRUK 50,000.00 1 ORANG/ HR/ 8 JAM

24 KENEK TRUK 35,000.00 1 ORANG/ HR/ 8 JAM

25 PENJAGA MALAM 50,000.00 1 ORANG/ HR/ 8 JAM

26 PETUGAS HARIAN TETAP BIDANG KEBERSIHAN, KETER 50,000.00 1 ORANG/ HR/ 8 JAM

27 PHT PEMELIHARAAN RUAS JALAN 50,000.00 1 ORANG/ HR/ 8 JAM

28 SATGAS KEBERSIHAN/PENGANGKATAN SAMPAH DI SALU 60,000.00 1 ORANG/ HR/ 8 JAM

CATATAN :

* OPERATOR YANG SUDAH BIASA DAN TRAMPIL MENGOPERASIKAN JENIS PERALATAN

UNTUK MELAYANI PEKERJAAN BERAT : BULLDOZER, MOTOR GRADER, LOADER WHEEL,

ASPHALT FINISHER, DAN LAIN- LAIN

** OPERATOR YANG MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN YANG AGAK RINGAN :

STEEL WHEELED ROLLER, STAMPER, MACHANICAL RAMMER,

MECHANICAL RAMMER CONCRETE MIXER/MESIN PENGADUK BETON

Page 16: Analisa Box Culvert

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 40 X 40 + support M' 1.00 Rp. 433,333.33 Rp. 433,333.33 Rp. 433,333.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.04 D 21 Rp. 31,103.16 Rp. 1,244.13

3 Pas. Bedding Pasir tb. 10 Cm M3 0.05 D 13 Rp. 208,120.00 Rp. 10,406.00

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Rp. 30,400.00 Rp. 30,400.00

5 Pek. Urugan Tanah Sisi U - DitCh M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 56,774.98

7 Pemberesan Lapangan Ls 1.00 Ls Rp. Rp. -

JUMLAH TOTAL : Rp. 490,108.31

PEMBULATAN Rp. 490,109.00

.

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 50 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 50 X 50 + support M' 1.00 Rp. 643,333.33 Rp. 643,333.33 Rp. 643,333.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19

3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Rp. 45,100.00 Rp. 45,100.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 74,178.24

7 Pemberesan Lapangan Ls 1.00 Ls Rp. Rp. -

JUMLAH TOTAL : Rp. 717,511.57

PEMBULATAN Rp. 717,512.00

Page 17: Analisa Box Culvert

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 60 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 60 X 60 + support M' 1.00 Ls Rp. 765,833.33 Rp. 765,833.33 Rp. 765,833.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.08 D 21 Rp. 31,103.16 Rp. 2,488.25

3 Pas. Bedding Pasir tb. 10 Cm M3 0.08 D 13 Rp. 208,120.00 Rp. 16,649.60

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 53,700.00 Rp. 53,700.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.45 D 11 Rp. 10,224.50 Rp. 4,601.03

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.45 D 21 Rp. 31,103.16 Rp. 13,996.42 Rp. 93,435.30

JUMLAH TOTAL : Rp. 859,268.63

PEMBULATAN Rp. 859,269.00

.

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 80 X 80 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 80 X 80 + support M' 1.00 Ls Rp. 1,167,083.33 Rp. 1,167,083.33 Rp. 1,167,083.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.10 D 21 Rp. 31,103.16 Rp. 3,110.32

3 Pas. Bedding Pasir tb. 10 Cm M3 0.10 D 13 Rp. 208,120.00 Rp. 20,812.00

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 81,700.00 Rp. 81,700.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.94 D 11 Rp. 10,224.50 Rp. 9,621.25

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.94 D 21 Rp. 31,103.16 Rp. 29,236.97 Rp. 146,480.54

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.

JUMLAH TOTAL : Rp. 1,313,563.87

PEMBULATAN : Rp. 1,313,564.00

.

Page 18: Analisa Box Culvert

DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 100 X 100 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 100 X 100 + support M' 1.00 Rp. 2,082,458.33 Rp. 2,082,458.33 Rp. 2,082,458.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Galian Tanah M3 2.23 D 01 Rp. 35,337.50 Rp. 78,625.94

3 Pek. Pemadatan Tanah (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01

4 Pas. Bedding Pasir tb. 10 Cm M3 0.32 D 13 Rp. 208,120.00 Rp. 66,598.40

5 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 145,800.00 Rp. 145,800.00

6 Pek. Urugan Tanah Sisi U - Ditch M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40

7 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79

JUMLAH TOTAL : Rp. 2,435,793.31

.

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 60 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 40 X 60 + support M' 1.00 Ls Rp. 542,500.00 Rp. 542,500.00 Rp. 542,500.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19

3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 38,000.00 Rp. 38,000.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,259.39

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.71 D 21 Rp. 31,103.16 Rp. 22,083.24 Rp. 83,696.03

Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. -

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 626,196.03

PEMBULATAN : Rp. 626,197.00

.

Page 19: Analisa Box Culvert

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 50 X 70 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 50 X 70 + support M' 1.00 Rp. 794,166.67 Rp. 794,166.67 Rp. 794,166.67

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19

3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 47,700.00 Rp. 47,700.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,259.39

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.71 D 21 Rp. 31,103.16 Rp. 22,083.24 Rp. 93,396.03

Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. -

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 887,562.69

PEMBULATAN : Rp. 887,563.00

.

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 70 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 60 X 70 + support M' 1.00 Ls Rp. 838,333.33 Rp. 838,333.33 Rp. 838,333.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.13 D 21 Rp. 31,103.16 Rp. 4,167.82

3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,888.08

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 50,300.00 Rp. 50,300.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.64 D 11 Rp. 10,224.50 Rp. 6,543.68

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.64 D 21 Rp. 31,103.16 Rp. 19,906.02 Rp. 110,805.61

Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. -

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 949,138.94

PEMBULATAN : Rp. 949,139.00

.

Page 20: Analisa Box Culvert

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 60 X 80 + support M' 1.00 Ls Rp. 914,166.67 Rp. 914,166.67 Rp. 914,166.67

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

2 Pek. Pemadatan Tanah (dg alat) M3 0.14 D 21 Rp. 31,103.16 Rp. 4,354.44

3 Pas. Bedding Pasir tb. 10 Cm M3 0.14 D 13 Rp. 208,120.00 Rp. 29,136.80

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 54,900.00 Rp. 54,900.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.78 D 11 Rp. 10,224.50 Rp. 7,975.11

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.78 D 21 Rp. 31,103.16 Rp. 24,260.46 Rp. 122,626.82

Buangan Tanah Sisa Galian M3 0.95 SNI-T8 Rp. - Rp. -

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 1,036,793.48

PEMBULATAN : Rp. 1,036,794.00

.

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST TANPA TUTUP, UK. 40 X 40 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 40 X 40 M' 1.00 Rp. 302,500.00 Rp. 302,500.00 Rp. 302,500.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00

Pek. Galian Tanah M3 0.61 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.05 D 21 Rp. 31,103.16 Rp. 1,555.16

3 Pas. Bedding Pasir tb. 10 Cm M3 0.05 D 13 Rp. 208,120.00 Rp. 10,406.00

4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 21,200.00 21,200.00

5 Pek. Urugan Tanah Sisi U - Ditch M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84

6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 48,386.01

Buangan Tanah Sisa Galian M3 0.61 D 10 Rp. - Rp. -

7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.

JUMLAH TOTAL : Rp. 350,886.01

PEMBULATAN Rp. 350,887.00

.

Page 21: Analisa Box Culvert

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG

U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 50 X 50 M' 1.00 Rp. 450,000.00 Rp. 450,000.00 Rp. 450,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 0.81 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,177.22 3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 14,568.40 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 31,500.00 Rp. 31,500.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.38 D 11 Rp. 10,224.50 Rp. 3,885.31 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.38 D 21 Rp. 31,103.16 Rp. 11,819.20 Rp. 65,950.13

Buangan Tanah Sisa Galian M3 0.81 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 515,950.13 PEMBULATAN Rp. 515,951.00

.

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP. UK. 60 X 60 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Dicth 60 X 60 M' 1.00 Rp. 534,166.67 Rp. 534,166.67 Rp. 534,166.67

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 1.09 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,301.63 3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 15,400.88 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 37,400.00 Rp. 37,400.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.52 D 11 Rp. 10,224.50 Rp. 5,316.74 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.52 D 21 Rp. 31,103.16 Rp. 16,173.64 Rp. 78,592.90

Buangan Tanah Sisa Galian M3 1.09 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 612,759.56 PEMBULATAN Rp. 612,760.00

Page 22: Analisa Box Culvert

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 80 X 80 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 80 X 80 M' 1.00 Ls Rp. 805,000.00 Rp. 805,000.00 Rp. 805,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00 Pek. Galian Tanah M3 1.57 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.10 D 21 Rp. 31,103.16 Rp. 3,110.32 3 Pas. Bedding Pasir tb. 10 Cm M3 0.10 D 13 Rp. 208,120.00 Rp. 20,812.00 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 56,400.00 Rp. 56,400.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.94 D 11 Rp. 10,224.50 Rp. 9,621.25 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.94 D 21 Rp. 31,103.16 Rp. 29,236.97 Rp. 121,680.54

Buangan Tanah Sisa Galian M3 1.57 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 926,680.54 PEMBULATAN Rp. 926,681.00

.

HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 100 X 100 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 100 X 100 M' 1.00 Rp. 1,377,500.00 Rp. 1,377,500.00 Rp. 1,377,500.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00 2 Pek. Galian Tanah M3 2.23 D 01 Rp. 31,075.00 Rp. 69,141.88 3 Pek. Pemadatan Tanah (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 4 Pas. Bedding Pasir tb. 10 Cm M3 0.32 D 13 Rp. 208,120.00 Rp. 66,598.40 5 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 96,500.00 Rp. 96,500.00 6 Pek. Urugan Tanah Sisi U - Ditch M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40 7 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79 Rp. 294,286.48

Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.

JUMLAH TOTAL : Rp. 1,671,786.48 PEMBULATAN : Rp. 1,671,787.00

.

Page 23: Analisa Box Culvert

DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 40 X 60 M' 1.00 Ls Rp. 380,833.33 Rp. 380,833.33 Rp. 380,833.33

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 0.75 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19 3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 26,700.00 Rp. 26,700.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,249.17 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 60,255.57

Buangan Tanah Sisa Galian M3 0.75 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.

JUMLAH TOTAL : Rp. 441,088.90 PEMBULATAN : Rp. 441,089.00

.###

JL. MARGONDA RAYA NO. 54 DEPOK

DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 50 X 70 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 50 X 70 M' 1.00 Rp. 556,666.67 Rp. 556,666.67 Rp. 556,666.67

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 0.90 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.12 D 21 Rp. 31,103.16 Rp. 3,732.38 3 Pas. Bedding Pasir tb. 10 Cm M3 0.12 D 13 Rp. 208,120.00 Rp. 25,806.88 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 39,000.00 Rp. 39,000.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.57 D 11 Rp. 10,224.50 Rp. 5,827.96 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.57 D 21 Rp. 31,103.16 Rp. 17,728.80 Rp. 94,096.03

Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.

JUMLAH TOTAL : Rp. 650,762.69 PEMBULATAN : Rp. 650,763.00

Page 24: Analisa Box Culvert

DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 60 X 70 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 60 X 70 M' 1.00 Rp. 587,500.00 Rp. 587,500.00 Rp. 587,500.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00 Pek. Galian Tanah M3 0.90 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.13 D 21 Rp. 31,103.16 Rp. 4,167.82 3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,888.08 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 41,200.00 Rp. 41,200.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.64 D 11 Rp. 10,224.50 Rp. 6,543.68 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.64 D 21 Rp. 31,103.16 Rp. 19,906.02 Rp. 101,205.61

Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 688,705.61 PEMBULATAN : Rp. 688,706.00

.

DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANGU - DITCH PRECAST TANPA TUTUP, UK. 60 X 80 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. U - Ditch 60 X 80 M' 1.00 Rp. 640,000.00 Rp. 640,000.00 Rp. 640,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 0.95 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.14 D 21 Rp. 31,103.16 Rp. 4,354.44 3 Pas. Bedding Pasir tb. 10 Cm M3 0.14 D 13 Rp. 208,120.00 Rp. 29,136.80 4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 44,800.00 Rp. 44,800.00 5 Pek. Urugan Tanah Sisi U - Ditch M3 0.78 D 11 Rp. 10,224.50 Rp. 7,975.11 6 Pek. Pemadatan Tanah Sisi U - Ditch (dg al M3 0.78 D 21 Rp. 31,103.16 Rp. 24,260.46 Rp. 112,526.82

Buangan Tanah Sisa Galian M3 0.95 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 752,526.82 PEMBULATAN : Rp. 752,527.00

Page 25: Analisa Box Culvert

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST UK. 40 X 40 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. Box Culvert 40 X 40 (heavy duty) M' 1.00 Ls Rp. 838,000.00 Rp. 838,000.00 Rp. 838,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 1.18 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,803.98 3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,070.96 4 Pek. Penempatan & Penyetelan Box Culver M' 1.00 Ls Rp. 58,700.00 Rp. 58,700.00 5 Pek. Urugan Tanah Sisi Box Culvert M3 0.20 D 11 Rp. 10,224.50 Rp. 2,044.90 6 Pek. Pemadatan Tanah Sisi Box Culvert (dg M3 0.20 D 21 Rp. 31,103.16 Rp. 6,220.63 Rp. 82,840.48

Buangan Tanah Sisa Galian M3 0.98 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 920,840.48 PEMBULATAN : Rp. 920,841.00

HARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST, UK. 50 X 50 / 1M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. Box Culvert 50 X 50 (heavy duty) M' 1.00 Ls Rp. 964,000.00 Rp. 964,000.00 Rp. 964,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 1.30 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,115.01 3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 14,152.16 4 Pek. Penempatan & Penyetelan Box Culver M' 1.00 Ls Rp. 67,500.00 Rp. 67,500.00 5 Pek. Urugan Tanah Sisi Box Culvert M3 0.40 D 11 Rp. 10,224.50 Rp. 4,089.80 6 Pek. Pemadatan Tanah Sisi Box Culvert (dg M3 0.40 D 21 Rp. 31,103.16 Rp. 12,441.26 Rp. 102,298.24

Buangan Tanah Sisa Galian M3 1.30 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 1,066,298.24 PEMBULATAN : Rp. 1,066,299.00

Page 26: Analisa Box Culvert

HARGA SATUAN PEKERJAANPEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 60 X 60 / 1M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. Box Culvert 60 X 60 (heavy duty) M' 1.00 Ls Rp. 1,265,000.00 Rp. 1,265,000.00 Rp. 1,265,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00 Pek. Galian Tanah M3 1.42 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 0.08 D 21 Rp. 31,103.16 Rp. 2,488.25 3 Pas. Bedding Pasir tb. 10 Cm M3 0.08 D 13 Rp. 208,120.00 Rp. 17,065.84 4 Pek. Penempatan & Penyetelan Box Culver M' 1.00 Ls Rp. 88,600.00 Rp. 88,600.00 5 Pek. Urugan Tanah Sisi Box Culvert M3 0.62 D 11 Rp. 10,224.50 Rp. 6,339.19 6 Pek. Pemadatan Tanah Sisi Box Culvert (dg M3 0.62 D 21 Rp. 31,103.16 Rp. 19,283.96 Rp. 135,777.24

Buangan Tanah Sisa Galian M3 1.42 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 1,400,777.24 PEMBULATAN : Rp. 1,400,778.00

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEKERJAANPEKERJAAN BOX CULVERT BETON BERTULANG PRECAST, UK. 80 X 80 / 1M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. Box Culvert 80 X 80 (heavy duty) M' 1.00 Rp. 2,339,000.00 Rp. 2,339,000.00 Rp. 2,339,000.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00 Pek. Galian Tanah M3 1.70 D 01 Rp. - Rp. -

2 Pek. Pemadatan Tanah (dg alat) M3 1.10 D 21 Rp. 31,103.16 Rp. 34,213.48 3 Pas. Bedding Pasir tb. 10 Cm M3 0.12 D 13 Rp. 208,120.00 Rp. 24,974.40 4 Pek. Penempatan & Penyetelan Box Culver M' 1.00 Ls Rp. 163,800.00 Rp. 163,800.00 5 Pek. Urugan Tanah Sisi Box Culvert M3 0.61 D 11 Rp. 10,224.50 Rp. 6,267.62 6 Pek. Pemadatan Tanah Sisi Box Culvert (dg M3 0.84 D 21 Rp. 31,103.16 Rp. 26,126.65 Rp. 257,882.15

Buangan Tanah Sisa Galian M3 1.70 D 10 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -

JUMLAH TOTAL : Rp. 2,596,882.15 PEMBULATAN : Rp. 2,596,883.00

Page 27: Analisa Box Culvert

HARGA SATUAN PEKERJAANBOX CULVERT BETON BERTULANG PRECAST, UK. 100 X 100 / 1M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

A. Supply Material

1 Keb. Box Culvert 100 X 100 (heavy duty) M' 1.00 Ls Rp. 2,854,700.00 Rp. 2,854,700.00 Rp. 2,854,700.00

B. Pemasangan Material

1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00 Pek. Galian Tanah M3 1.90 D 01 Rp. 31,075.00 Rp. 59,042.50

2 Pek. Pemadatan Tanah (dg alat) M3 1.30 D 21 Rp. 31,103.16 Rp. 40,434.11 3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,055.60 4 Pek. Penempatan & Penyetelan Box Culver M' 1.00 Ls Rp. 199,900.00 Rp. 199,900.00 5 Pek. Urugan Tanah Sisi Box Culvert M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40 6 Pek. Pemadatan Tanah Sisi Box Culvert (dg M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79 Rp. 378,525.40

Buangan Tanah Sisa Galian M3 1.90 SNI-T8 Rp. - Rp. - 7 Pemberesan Lapangan Ls 1.00 Ls Rp. 633.62 Rp. 633.62

JUMLAH TOTAL : Rp. 3,233,225.40 PEMBULATAN : Rp. 3,233,226.00

HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 40 / 1 M'

0.16666667

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

1 Cover Light Duty U - Ditch 40 M' 1.00 Rp. 181,666.67 Rp. 181,666.67 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 14,600.00 Rp. 14,600.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 196,266.67

1 Cover Heavy Duty U - Ditch 40 M' 1.00 Rp. 233,333.33 Rp. 233,333.33 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 18,700.00 Rp. 18,700.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 252,033.33

PAS . COVER LIGHT DUTY UK. 40/M' Rp. 196,266.67 PAS . COVER HEAVY DUTY UK. 40/M' Rp. 252,033.33

Page 28: Analisa Box Culvert

###

JL. MARGONDA RAYA NO. 54 DEPOK

HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 50 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

1 Cover Light Duty U - Ditch 50 M' 1.00 Rp. 231,666.67 Rp. 231,666.67 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 18,600.00 Rp. 18,600.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 250,266.67

1 Cover Heavy Duty U - Ditch 50 M' 1.00 Rp. 320,000.00 Rp. 320,000.00 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 25,600.00 Rp. 25,600.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 345,600.00

PAS . COVER LIGHT DUTY UK. 50/M' Rp. 250,266.67 PAS . COVER HEAVY DUTY UK. 50/M' Rp. 345,600.00

HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 60 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

1 Cover Light Duty U - Ditch 60 M' 1.00 Ls Rp. 278,333.33 Rp. 278,333.33 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 22,300.00 Rp. 22,300.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 300,633.33

1 Cover Heavy Duty U - Ditch 60 M' 1.00 Ls Rp. 401,666.67 Rp. 401,666.67 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 32,200.00 Rp. 32,200.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 433,866.67

PAS . COVER LIGHT DUTY UK. 60/M' Rp. 300,633.33 PAS . COVER HEAVY DUTY UK. 60/M' Rp. 433,866.67

Page 29: Analisa Box Culvert

HARGA SATUAN PEMASANGAN COVER U-DITCH PRECAST UK. 80 / 1 M'

NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL

1 Cover Light Duty U - Ditch 80 M' 1.00 Ls Rp. 355,000.00 Rp. 355,000.00 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 24,900.00 Rp. 24,900.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 379,900.00

1 Cover Heavy Duty U - Ditch 80 M' 1.00 Ls Rp. 546,666.67 Rp. 546,666.67 2 Pek. Pengukuran M' - Ls Rp. - Rp. - 3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. - 4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 38,300.00 Rp. 38,300.00 5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 584,966.67

PAS . COVER LIGHT DUTY UK. 80/M' Rp. 379,900.00 PAS . COVER HEAVY DUTY UK. 80/M' Rp. 584,966.67

Page 30: Analisa Box Culvert

DAFTAR ANALISA SATUAN PEKERJAAN

TAHUN ANGGARAN 2010

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

Dibulatkan

C 01 1 M3 BONGKARAN BETON BERTULANG

Pekerja 6.6670 oh 40,000.00 266,680.00

Mandor 0.3330 oh 85,000.00 28,305.00

Jumlah 294,985.00

Jasa 10% 29,498.50

Jumlah Total 324,483.50

Dibulatkan 324,484.00

D 01 1 M3 GALIAN TANAH BIASA SEDALAM 1 M

Pekerja 0.7500 oh 40,000.00 30,000.00

Mandor 0.0250 oh 85,000.00 2,125.00

Jumlah 32,125.00

Jasa 10% 3,212.50

Jumlah Total 35,337.50

Dibulatkan 35,338.00

D 02 1 M3 GALIAN TANAH BIASA SEDALAM 2 M

Pekerja 0.9000 oh 40,000.00 36,000.00

Mandor 0.0450 oh 85,000.00 3,825.00

Jumlah 39,825.00

Jasa 10% 3,982.50

Jumlah Total 43,807.50

Dibulatkan 43,808.00

D 03 1 M3 GALIAN TANAH BIASA SEDALAM 3 M

Pekerja 1.0500 oh 40,000.00 42,000.00

Mandor 0.0670 oh 85,000.00 5,695.00

Jumlah 47,695.00

Jasa 10% 4,769.50

Jumlah Total 52,464.50

Dibulatkan 52,465.00

Page 31: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

D 06 1 M3 GALIAN TANAH KERAS SEDALAM 1 M

Pekerja 1.0000 oh 40,000.00 40,000.00

Mandor 0.0320 oh 85,000.00 2,720.00

Jumlah 42,720.00

Jasa 10% 4,272.00

Jumlah Total 46,992.00

Dibulatkan 46,992.00

D 08 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M

Pekerja 1.2000 oh 40,000.00 48,000.00

Mandor 0.0450 oh 85,000.00 3,825.00

Jumlah 51,825.00

Jasa 10% 5,182.50

Jumlah Total 57,007.50

Dibulatkan 57,008.00

D 10 1 M3 PEMBUANGAN TANAH SEJAUH 30 M

Pekerja 0.3300 oh 40,000.00 13,200.00

Mandor 0.0100 oh 85,000.00 850.00

Jumlah 14,050.00

Jasa 10% 1,405.00

Jumlah Total 15,455.00

Dibulatkan 15,455.00

D 11 1 M3 PERATAAN TANAH

Pekerja 0.1920 oh 40,000.00 7,680.00

Mandor 0.0190 oh 85,000.00 1,615.00

Jumlah 9,295.00

Jasa 10% 929.50

Jumlah Total 10,224.50

Dibulatkan 10,225.00

D 12 1 M3 PEMADATAN TANAH (PER 20 CM)

Pekerja 0.5000 oh 40,000.00 20,000.00

Mandor 0.0500 oh 85,000.00 4,250.00

Jumlah 24,250.00

Jasa 10% 2,425.00

Jumlah Total 26,675.00

Dibulatkan 26,675.00

Page 32: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

D 13 1 M3 URUGAN PASIR

Pasir urug 1.2000 m3 147,000.00 176,400.00

Pekerja 0.3000 oh 40,000.00 12,000.00

Mandor 0.0100 oh 80,000.00 800.00

Jumlah 189,200.00

Jasa 10% 18,920.00

Jumlah Total 208,120.00

Dibulatkan 208,120.00

SNI-PD5 1 M3 PASANG PONDASI BATU BELAH 1 PC : 4 PS

Batu belah 1.2000 m3 158,000.00 189,600.00

Semen Portland 3.2600 Zak 61,000.00 198,860.00

Pasir pasang 0.5200 m3 189,000.00 98,280.00

Pekerja 1.5000 oh 40,000.00 60,000.00

Tukang Batu Terampil 0.7500 oh 50,000.00 37,500.00

Kepala Tukang 0.0750 oh 55,000.00 4,125.00

Mandor 0.0750 oh 80,000.00 6,000.00

Jumlah 594,365.00

Jasa 10% 59,436.50

Jumlah Total 653,801.50

Dibulatkan 653,802.00

E 11 1 M3 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)

Batu belah 10-15 cm 1.1000 m3 158,000.00 173,800.00

Semen Portland 3.2600 zak 61,000.00 198,860.00

Pasir pasang 0.5200 m3 189,000.00 98,280.00

Pekerja 1.5000 oh 40,000.00 60,000.00

Tukang Batu Terampil 0.6000 oh 50,000.00 30,000.00

Kepala Tukang 0.0600 oh 55,000.00 3,300.00

Mandor 0.0750 oh 80,000.00 6,000.00

Operator Concrete Mixer 0.0500 oh 65,000.00 3,250.00

Concrete Mixer 0.25m3 0.3200 jam 38,000.00 12,160.00

Waterpump 50 mm 0.3200 jam 63,000.00 20,160.00

Jumlah 605,810.00

Jasa 10% 60,581.00

Jumlah Total 666,391.00

J 04 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MM

Semen Portland 0.1555 Zak 61,000.00 9,486.72

Pasir pasang 0.0230 m3 189,000.00 4,347.00

Pekerja 0.3000 oh 40,000.00 12,000.00

Tukang Batu Terampil 0.1500 oh 50,000.00 7,500.00

Kepala Tukang 0.0150 oh 55,000.00 825.00

Mandor 0.0150 oh 80,000.00 1,200.00

Jumlah 35,358.72

Jasa 10% 3,535.87

Jumlah Total 38,894.59

Dibulatkan 38,895.00

Page 33: Analisa Box Culvert

DAFTAR ANALISA SATUAN PEKERJAAN

TAHUN ANGGARAN 2010

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

A 02 1 M1 PEK. PASANGAN BOUWPLANK Kayu Borneo Super 0.0100 m3 2,100,000.00 21,000.00

Paku 0.0380 kg 18,000.00 684.00

Ongkos Pasang 0.1550 oh 21,684.00 3,361.02

Jumlah 25,045.02

Jasa 10% 2,504.50

Jumlah Total 27,549.52

Dibulatkan 27,540.00

A 04 1 M2 PEK. KANTOR DIREKSIKayu Borneo Super 0.1000 m³ 2,100,000.00 210,000.00

Paku 0.2500 kg 18,000.00 4,500.00

Seng Glb BJLS 30 1.1000 lbr 74,000.00 81,400.00

Triplex 3 mm 0.5000 lbr 47,000.00 23,500.00

PC (50 kg) 0.1000 zak 61,000.00 6,100.00

Pasir pasang 0.2500 m³ 189,000.00 47,250.00

Bata merah Klas I 70.0000 bh 300.00 21,000.00

Peralatan 0.0200 lot 353,359.50 7,067.19

Ongkos Pasang 0.1500 ls 360,426.69 54,064.00

Jumlah 454,881.19

Jasa 10% 45,488.12

Jumlah 500,369.31

Dibulatkan 500,360.00

A 05 1 M2 PAPAN NAMA PROYEKKayu Borneo Super 0.1300 m³ 2,100,000.00 273,000.00

Paku 0.2500 kg 18,000.00 4,500.00

Cat Minyak 1.0000 ls 8,000.00 8,000.00

Penulisan 0.1250 ls 255,304.00 31,913.00

Ongkos Pasang 0.1250 ls 287,217.00 35,902.13

Jumlah 353,315.13

Jasa 10% 35,331.51

Jumlah 388,646.64

Dibulatkan 388,640.00

G 05 1 M2 PASANGAN BATA MERAH 1 : 3 Bata merah 70.0000 bh 300.00 21,000.00

P.C (50 kg) 0.4200 zak 61,000.00 25,620.00

Pasir pasang 0.0540 m³ 189,000.00 10,206.00

Pekerja setengah trampil 0.4290 org 40,000.00 17,160.00

Tk. batu setengah trampil 0.2140 org 45,000.00 9,630.00

Kep. Tukang batu 0.0210 org 55,000.00 1,155.00

Mandor 0.0110 org 85,000.00 935.00

Jumlah 85,706.00

Jasa 10% 8,570.60

Jumlah 94,276.60

G 06 1 M2 PASANGAN BATA MERAH 1 : 4 Bata merah 70.0000 bh 300.00 21,000.00

P.C (50 kg) 0.3354 zak 61,000.00 20,456.96

Pasir pasang 0.0580 m³ 189,000.00 10,962.00

Pekerja setengah trampil 0.3218 org 40,000.00 12,872.00

Tk. batu setengah trampil 0.1805 org 45,000.00 8,122.50

Kep. Tukang batu 0.0158 org 55,000.00 869.00

Mandor 0.0083 org 85,000.00 705.50

Jumlah 74,987.96

Jasa 10% 7,498.80

Jumlah 82,486.76

Page 34: Analisa Box Culvert

J 03 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN P.C (50 kg) 0.1600 zak 61,000.00 9,760.00

Pasir pasang 0.0190 m3 189,000.00 3,591.00

Pekerja setengah trampil 0.2860 oh 40,000.00 11,440.00

Tk. batu setengah trampil 0.2140 oh 45,000.00 9,630.00

Kep. Tukang batu 0.0210 oh 55,000.00 1,155.00

Mandor 0.0200 oh 85,000.00 1,700.00

Jumlah 37,276.00

Jasa 10% 3,727.60

Jumlah Total 41,003.60

E 08 1 M2 PASANGAN SIARAN AD. 1 : 2

Pasir Pasang 0.0085 m3 189,000.00 1,606.50

Semen Portland 0.1050 zak 61,000.00 6,405.00

Pekerja 0.3600 oh 40,000.00 14,400.00

Tukang Batu Terampil 0.1200 oh 50,000.00 6,000.00

Kepala Tukang 0.0120 oh 55,000.00 660.00

Mandor 0.0180 oh 85,000.00 1,530.00

Jumlah 30,601.50

Jasa 10% 3,060.15

Jumlah Total 33,661.65

C 04 1 M3 BONGKARAN DINDING BATA Pekerja 1.0000 oh 40,000.00 40,000.00

Mandor 0.0500 oh 85,000.00 4,250.00

Jumlah 44,250.00

Jasa 10% 4,425.00

Jumlah Total 48,675.00

Page 35: Analisa Box Culvert

DAFTAR ANALISA SATUAN PEKERJAAN

TAHUN ANGGARAN 2010

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

A 07 1 M' PENGUKURAN DAN PEMASANGAN PATOK

Kayu 5/7 Borneo 0.00002 m3 1,470,000.00 36.02

Cat Kayu Sieve 0.05000 kg 49,000.00 2,450.00

Tukang Kayu Setengah Terampil 0.0020 oh 45,000.00 90.00

Pekerja 0.0020 oh 40,000.00 80.00

Mandor 0.0010 oh 85,000.00 85.00

Jumlah 2,741.02

Jasa 10% 274.10

Jumlah Total 3,015.12

C 02 1 M3 BONGKARAN BETON BERTULANG DENGAN MENGGUNAKAN ALAT

Pekerja 1.3600 oh 40,000.00 54,400.00

Mandor 0.0600 oh 85,000.00 5,100.00

Operator Jack Hammer 0.0800 oh 55,000.00 4,400.00

Jack Hammer 0.2800 jam 17,857.14 5,000.00

Jumlah 68,900.00

Jasa 10% 6,890.00

Jumlah Total 75,790.00

S 08 1 M2 PASANGAN CERUCUK DOLKEN

Dolken dia. 7-10 cm 4.5000 btg 12,000.00 54,000.00

Pekerja 0.1000 oh 40,000.00 4,000.00

Mandor 0.0100 oh 85,000.00 850.00

Jumlah 58,850.00

Jasa 10% 5,885.00

Jumlah Total 64,735.00

Page 36: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

D 21 1 M3 PERATAAN TANAH DAN PEMADATAN SETIAP 20 CM DENGAN ALAT

Pekerja 0.2150 oh 40,000.00 8,600.00

Mandor 0.0690 oh 85,000.00 5,865.00

Operator Tamper 0.0430 jam 55,000.00 2,365.00

Temper Vibr Plate 0.3012 jam 38,000.00 11,445.60

Jumlah 28,275.60

Jasa 10% 2,827.56

Jumlah Total 31,103.16

D 22 1 M3 URUGAN PASIR DAN PEMADATAN SETIAP 20 CM DENGAN ALAT

Pasir urug 1.2000 m3 147,000.00 176,400.00

Pekerja 0.3000 oh 40,000.00 12,000.00

Mandor 0.0600 oh 85,000.00 5,100.00

Operator Tamper 0.0430 jam 55,000.00 2,365.00

Temper Vibr Plate 0.3012 jam 38,000.00 11,445.60

Jumlah 207,310.60

Jasa 10% 20,731.06

Jumlah Total 228,041.66

D 23 1 M3 PEKERJAAN URUGAN SIRTU UNTUK PONDASI

Sirtu Pecah Tersaring 1.1000 m3 158,000.00 173,800.00

Pekerja 0.5000 oh 40,000.00 20,000.00

Pekerja Terampil 0.4000 oh 45,000.00 18,000.00

Mandor 0.0200 oh 85,000.00 1,700.00

Jumlah 213,500.00

Jasa 10% 21,350.00

Jumlah Total 234,850.00

E 01 1 M3 PEKERJAAN PONDASI BATAKO AD. 1 : 4

Pasir Pasang 0.2790 m3 189,000.00 52,731.00

Semen Portland 2.1700 zak 61,000.00 132,370.00

Batako PSPM 130.0000 bh 2,415.00 313,950.00

Pekerja 4.5000 oh 40,000.00 180,000.00

Tukang Batu Terampil 1.5000 oh 50,000.00 75,000.00

Kepala Tukang 1.1500 oh 55,000.00 63,250.00

Mandor 0.2250 oh 85,000.00 19,125.00

Jumlah 836,426.00

Jasa 10% 83,642.60

Jumlah Total 920,068.60

Page 37: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

S 09 1 M2 PASANGAN SULINGAN

Pipa PVC dia. 2" 0.2500 btg 41,580.00 10,395.00

Ijuk 0.2500 ikat 25,000.00 6,250.00

Pekerja 0.0238 oh 40,000.00 952.38

Jumlah 17,597.38

Jasa 10% 1,759.74

Jumlah Total 19,357.12

S 11 1 M PASANGAN RAILING PIPA GALVANIS (2 BARIS)

Pipa Galvanis dia. 3" 0.3333 btg 535,185.00 178,395.00

Pekerja 0.0670 oh 40,000.00 2,680.00

Kepala Tukang 0.0067 oh 55,000.00 368.50

Jumlah 181,443.50

Jasa 10% 18,144.35

Jumlah Total 199,587.85

E 05

Dolken kayu dia. 7-10 cm 7.0000 btg 12,000.00 84,000.00

Papan Kruing 2 x 20 x 4m 3.0000 lbr 92,800.00 278,400.00

Baud 7.0000 bh 8,610.00 60,270.00

Batang Kelapa 1.0000 btg 128,700.00 128,700.00

Pekerja 1.4000 oh 40,000.00 56,000.00

Kepala Tukang 0.4200 oh 55,000.00 23,100.00

Tukang Kayu 4.2000 oh 50,000.00 210,000.00

Mandor Lapangan 0.7000 oh 85,000.00 59,500.00

Jumlah per m' 112,496.25

Jasa 10% 11,249.63

Jumlah Total 123,745.88

I 08 1 M2 PASANG TRIPLEKS TEBAL 3 MM

Tripleks tb. 3 mm 0.4000 lbr 47,000.00 18,800.00

Paku biasa 1/2" - 1" 0.0500 kg 18,000.00 900.00

Pekerja 0.0250 oh 40,000.00 1,000.00

Tukang Kayu 0.0750 oh 50,000.00 3,750.00

Kepala Tukang 0.0075 oh 55,000.00 412.50

Mandor 0.0013 oh 85,000.00 110.50

Jumlah 24,973.00

Jasa 10% 2,497.30

Jumlah Total 27,470.30

8 M PEKERJAAN STOOTWERK

Page 38: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

Q 13 PLASTIK BOND BREAKER

Plastik 1.0000 m2 1,800.00 1,800.00

Ongkos Pasang 1.0000 ls 900.00 900.00

Jumlah 2,700.00

Jasa 10% 270.00

Jumlah Total 2,970.00

Q 14 1 M1 JOINT CUTTER & JOINT SEALENT

Cutter Concrete 0.0500 Jam/m 44,714.29 2,235.71

Sealent 0.1429 kg 32,000.00 4,572.80

PEKERJA TERAMPIL 0.0080 Oh 45,000.00 360.00

PEKERJA 0.0067 Oh 40,000.00 268.00

Mandor 0.0085 Oh 85,000.00 722.50

Jumlah 8,159.01

Jasa 10% 815.90

Jumlah Total 8,974.92

S 12 PELUMURAN BESI DOWEL DENGAN OLI

Oli (Drum) 0.0500 Liter 24,500.00 1,225.00

Pekerja 0.0100 oh 40,000.00 400.00

Tukang Cat Terampil 0.0100 oh 50,000.00 500.00

Mandor 0.0062 oh 85,000.00 522.84

Alat Bantu 0.0050 set 75,000.00 375.00

Jumlah 3,022.84

Keuntungan max. 10% 302.28

Jumlah Total 3,325.13

S 13 1 BUAH PASANG PVC 1" untuk DOWEL

PVC AW 1 " 0.1200 batang 27,300.00 3,276.00

Ongkos Pasang 1.0000 ls 642.86 642.86

Jumlah 3,918.86

Jasa 10% 391.89

Jumlah Total 4,310.74

Page 39: Analisa Box Culvert

NO URAIAN VOL. SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6 = ( 3 x 5 )

S 14 1 BUAH PASANG DOP PVC 1" untuk DOWEL

Dop PVC AW 1 " 1.0000 Buah 3,000.00 3,000.00

Ongkos Pasang 1.0000 ls 90.00 90.00

Jumlah 3,090.00

Jasa 10% 309.00

Jumlah Total 3,399.00

S 15 1 M PASANG PVC 4"

Dop PVC AW 4 " 0.2500 Buah 83,055.00 20,763.75

Ongkos Pasang 1.0000 ls 900.00 900.00

Jumlah 21,663.75

Jasa 10% 2,166.38

Jumlah Total 23,830.13

DIHIT 1 M2 FINISHING GRID RIGID PAVEMENT / TROWEL BERGARIS

Buruh Lapangan Terlatih 0.0090 Oh 45,000.00 405.00

Buruh Lapangan Tak Terlatih 0.0113 Oh 35,000.00 393.75

Mandor 0.0176 Oh 80,000.00 1,411.59

Alat Bantu 0.0200 set 75,000.00 1,500.00

Jumlah 3,710.34

Jasa 10% 371.03

Jumlah Total 4,081.37

DIHIT 1 M2 CURING BETON

Buruh Lapangan Tak Terlatih 0.0200 Oh 35,000.00 700.00

Mandor 0.0036 Oh 80,000.00 288.85

Alat Bantu 0.0250 set 75,000.00 1,875.00

Jumlah 2,863.85

Jasa 10% 286.39

Jumlah Total 3,150.24

S 16 1 M1 PASANG BESI SIKU 5 CM

Besi Siku 3 x 50 x 50 mm 0.1667 m1 95,000.00 15,833.33

Ongkos Pasang 1.0000 Ls 4,000.00 4,000.00

Jumlah 19,833.33

Jasa 10% 1,983.33

Jumlah Total 21,816.67

Page 40: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam BETON NON STRUKTUR/RABAT KELAS Bo (SITE MIX) KODE

penyusunan DASK dan (MENGGUNAKAN ALAT PENGADUK BETON 250 LTR) SNI-Bo

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim material 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok

2. Beton diaduk di lokasi pekerjaan 2. Dipakai agregat pecah dan tersaring yang termurah

3. Beton dicor sampai padat 3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari

4. Adukan 1 m3 beton, dibutuhkan : semen : 247 kg/m3 ; Pasir Beton : 869 kg/m3 ;

kerikil (maksimal 3 cm) : 999 kg/m3; Air : 215 lt/m3;

5. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 3.00 3.00 85,000.00 255,000.00

2 Kepala Tukang Batu 1.00 3.00 3.00 55,000.00 165,000.00

3 Tukang Batu 3.00 3.00 9.00 50,000.00 450,000.00

4 Pekerja 19.00 3.00 57.00 40,000.00 2,280,000.00

J U M L A H I Pekerja 3,150,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Pasir Beton 17.92 17.92 210,000.00 3,763,856.25

2 Semen Portland 163.02 zak 163.02 61,000.00 9,944,220.00

3 Batu Pecah 1 - 2 cm 13.19 13.19 194,000.00 2,558,239.20

4 Alat Bantu 3.00 Set 3.00 75,000.00 225,000.00

J U M L A H I I Material 16,491,315.45

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Pengaduk Beton 250 Lt/6 HP 2.00 3.00 E.251 36.00 38,000.00 1,368,000.00

2 Pump Water 50 mm - 30 m3/Ja 1.00 3.00 E.341 6.00 63,000.00 378,000.00

J U M L A H I I I Peralatan 1,746,000.00

Total (Rp) 21,387,315.45

BETON NON STRUKTUR Bo

VOLUME : 33.00 satuan m3 Sub. Total Harga Satuan Rp. 648,100.47 Per m3

Jasa 10 % 64,810.05

Total Harga Satuan Rp. 712,910.51 Per m3

m3

m3

Page 41: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam BETON STRUKTUR K 225 (SITE MIX) KODE

penyusunan DASK dan (MENGGUNAKAN ALAT PENGADUK BETON 250 LTR) F 08

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim material 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok

2. Beton diaduk di lokasi pekerjaan 2. Dipakai agregat pecah dan tersaring yang termurah

3. Beton dicor sampai padat 3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari

4. Adukan 1 m3 beton, dibutuhkan : semen : 371 kg/m3 ; Pasir Beton : 731 kg/m3 ;

kerikil (maksimal 3 cm) : 1031 kg/m3; Air : 215 lt/m3;

5. Beton non struktur dipakai untuk dasar dan lantai kerja pondasi

6. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 3.00 3.00 85,000.00 255,000.00

2 Kepala Tukang Batu 1.00 3.00 3.00 55,000.00 165,000.00

3 Tukang Batu 3.00 3.00 9.00 50,000.00 450,000.00

4 Pekerja 19.00 3.00 57.00 40,000.00 2,280,000.00

J U M L A H I Pekerja 3,150,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Pasir Beton 14.40 14.40 210,000.00 3,023,212.50

2 Semen Portland 244.86 zak 244.86 61,000.00 14,936,460.00

3 Batu Pecah 1 - 2 cm 13.82 13.82 194,000.00 2,681,157.60

4 Alat Bantu 3.00 Set 3.00 75,000.00 225,000.00

J U M L A H I I Material 20,865,830.10

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Pengaduk Beton 250 Lt/6 HP 2.00 3.00 E.251 36.00 38,000.00 1,368,000.00

2 Pump Water 50 mm - 30 m3/Ja 1.00 3.00 E.341 6.00 63,000.00 378,000.00

J U M L A H I I I Peralatan 1,746,000.00

Total (Rp) 25,761,830.10

BETON STRUKTUR K.225

VOLUME : 33.00 satuan m3 Sub. Total Harga Satuan Rp. 780,661.52 Per m3

Jasa 10 % 78,066.15

Total Harga Satuan Rp. 858,727.67 Per m3

m3

m3

Page 42: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PASANGAN BATU PADA PARIT KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) K.112

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Galian tambahan ( 0,40 m3 / m' ) 1. Parit yang ada vol. 0,54 m3/m'

2. Buat dasar pasangan batu 2. Ukuran parit bagian dalam tebal rata-rata dinding 20 cm, tebal dasar 25 cm,

3. Buat dinding pasangan batu pada parit ber- lebar dasar 50 cm, lebar atas 90 cm dan kedalaman 60 cm.

batasan dengan jalan untuk mendukung per- 3. 50 % sisa galian dibuang dengan truck bak terbuka, sejauh 1 km.

kerasan jalan dimana perlu. 4. 50 % sisa galian dibuang di sekitar lokasi.

4. Urug kembali dan buang sisa galian. 5. Bahan-bahan dikirim ke tempat pekerjaan oleh pemasok.

6. Hasil produksi 60 m'/Hari

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor Lapangan 1.00 1.00 1.00 85,000.00 85,000.00

2 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

3 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

4 Pekerja 36.00 1.00 36.00 40,000.00 1,440,000.00

J U M L A H I Pekerja 1,610,000.00

No Material Vol. Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Konstruksi Pas. Batu (K.705) 30.00 m3 K.705 30.00 630,450.00 18,913,500.00

2 Alat Bantu 1.44 Set M.170 75,000.00 108,000.00

J U M L A H I I Material 19,021,500.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Flatbed Truck 3,5 Ton/115 HP 1.00 1.00 E.221 6.00 163,000.00 978,000.00

J U M L A H I I I Peralatan 978,000.00

Total (Rp) 21,609,500.00

PASANGAN BATU PADA PARIT

VOLUME : 60.00 satuan m' Sub. Total Harga Satuan Rp. 360,158.33 Per m'

Jasa 10 % 36,015.83

Total Harga Satuan Rp. 396,174.17 Per m'

Page 43: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam GALIAN TANAH UNTUK KONSTRUKSI KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) K.224

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia (40 m3/hari)

2. Membuang tanah galian sejauh 2. Kapasitas kerja per orang 1,3 m3/hari

30 m dari lubang galian 3. Kedalaman rata-rata galian s/d 3 m

4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja 30.00 1.00 30.00 40,000.00 1,200,000.00

J U M L A H I Pekerja 1,285,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Alat Bantu Set M.170 1.20 75,000.00 90,000.00

J U M L A H I I Material 90,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1

J U M L A H I I I Peralatan

Total (Rp) 1,375,000.00

GALIAN TANAH UNTUK KONSTRUKSI

VOLUME : 40.00 satuan m3 Sub. Total Harga Satuan Rp. 34,375.00 Per m3

Jasa 10 % 3,437.50

Total Harga Satuan Rp. 37,812.50 Per m3

Page 44: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGURUGAN DAN PEMADATAN DGN SIRTU KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 14

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Membersihkan struktur dari bahan-bahan 1. Bahan urugan dikirim ke lokasi pekerjaan oleh pemasok

organik. 2. Digunakan kerikil galian/sungai tidak tersaring yang termurah

2. Buruh mengurug bagian belakang struktur. 3. Urugan dipadatkan berlapis tebal 10 cm.

3. Memadatkan dengan tamper dan

mesin gilas bergetar.

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 3.00 1.00 3.00 50,000.00 150,000.00

3 Pekerja 10.00 1.00 10.00 40,000.00 400,000.00

J U M L A H I Pekerja 635,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Sirtu Pecah Tersaring 20.00 m3 M.042 20.00 158,000.00 3,160,000.00

2 Alat Bantu 0.40 set M.170 0.40 75,000.00 30,000.00

J U M L A H I I Material 3,190,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Vibr. Ped 1 Ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00

2 Tamp Vibr. Plate 4 HP 1.00 10.00 E.088 10.00 38,000.00 380,000.00

J U M L A H I I I Peralatan 695,000.00

Total (Rp) 4,520,000.00

PENGURUGAN DAN PEMADATAN DGN SIRTU

VOLUME : 15.00 satuan m3 Sub. Total Harga Satuan Rp. 301,333.33 Per m3

Jasa 10 % 30,133.33

Total Harga Satuan Rp. 331,466.67 Per m3

Page 45: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 15

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Membersihkan struktur dari bahan-Bahan 1. Bahan Urugan dikirim ke lokasi pekerjaan oleh pemasok

organik 2. Digunakan Tanah Pilihan

2. Buruh mengurug bagian belakang struktur 3. Urugan Dipadatkan berlapis tebal 10 cm.

3. Memadatkan dengan tamper dan

mesin gilas bergetar.

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 3.00 1.00 3.00 50,000.00 150,000.00

3 Pekerja 10.00 1.00 10.00 40,000.00 400,000.00

J U M L A H I Pekerja 635,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Timbunan Tanah Pilihan 20.00 m3 M.050 20.00 47,000.00 940,000.00

2 Alat Bantu 0.40 set M.170 0.40 75,000.00 30,000.00

J U M L A H I I Material 970,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Vibr. Ped 1 Ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00

2 Tamp Vibr. Plate 4 HP 1.00 10.00 E.088 10.00 38,000.00 380,000.00

J U M L A H I I I Peralatan 695,000.00

Total (Rp) 2,300,000.00

PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN

VOLUME : 15.00 satuan m3 Sub. Total Harga Satuan Rp. 153,333.33 Per m3

Jasa 10 % 15,333.33

Total Harga Satuan Rp. 168,666.67 Per m3

Page 46: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENIMBUNAN BADAN JALAN KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 16

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Material dihampar maksimum tebal setiap 1. Menggunakan tenaga manusia (60 m3/Hari)

lapis 20 cm 2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan -

2. Setiap lapis dipadatkan minimum 4 kali sejauh 10 km oleh Pemasok

lintasan dengan mesin gilas roda karet. 3. Harga material tergantung harga di lokasi pekerjaan

4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 2.00 1.00 2.00 85,000.00 170,000.00

2 Operator Terlatih 1.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 1.00 45,000.00 45,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 60.00 1.00 60.00 40,000.00 2,400,000.00

J U M L A H I Pekerja 2,765,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Timbunan Tanah Pilihan m3 M.050 72.00 47,000.00 3,384,000.00

2 Alat Bantu Set M.170 2.40 75,000.00 180,000.00

J U M L A H I I Material 3,564,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Pneumatic 8 - 15 ton 1.00 1.00 E.084 5.00 163,000.00 815,000.00

2 Truk Tangki Air 115 HP 1.00 1.00 E.182 5.00 188,000.00 940,000.00

J U M L A H I I I Peralatan 1,755,000.00

Total (Rp) 8,084,000.00

PENIMBUNAN BADAN JALAN

VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 134,733.33 Per m3

Jasa 10 % 13,473.33

Total Harga Satuan Rp. 148,206.67 Per m3

Page 47: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PEMADATAN BADAN JALAN KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 17

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Material dihampar maksimum tebal setiap 1. Menggunakan tenaga manusia (60 m3/hari)

lapis 20 Cm 2. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

2. Setiap lapis dipadatkan minimum 4 kali

lintasan dengan mesin gilas roda karet

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 2.00 1.00 2.00 85,000.00 170,000.00

2 Operator Terlatih 1.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 1.00 45,000.00 45,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 60.00 1.00 60.00 40,000.00 2,400,000.00

J U M L A H I Pekerja 2,765,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Alat Bantu set M.170 2.40 75,000.00 180,000.00

J U M L A H I I Material 180,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Pneumatic 8 - 15 ton 1.00 5.00 E.084 5.00 163,000.00 815,000.00

2 Truk Tangki Air 115 HP 1.00 5.00 E.182 5.00 188,000.00 940,000.00

J U M L A H I I I Peralatan 1,755,000.00

Total (Rp) 4,700,000.00

PEMADATAN BADAN JALAN

VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 78,333.33 Per m3

Jasa 10 % 7,833.33

Total Harga Satuan Rp. 86,166.67 Per m3

Page 48: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENYIAPAN TANAH DASAR KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 18

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pembentukan tanah dasar dengan tenaga 1. Menggunakan tenaga orang (8 m x 400 m/hari)

manusia 2. DAMIJA dibersihkan dari semak dan lain-lain

2. Dipadatkan dengan mesin gilas roda baja 3. Lebar dasar jalan 8 m

sampai 100 % MDD (AASHTO T99) 4. Hasil kerja menyiapkan dasar jalan 400 m/Hari

5. Kapasitas kerja 40 m2/orang hari

6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 Alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 1.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 1.00 45,000.00 45,000.00

4 Pekerja 80.00 1.00 80.00 40,000.00 3,200,000.00

J U M L A H I Pekerja 3,395,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Alat Bantu Set M.170 3.20 75,000.00 240,000.00

J U M L A H I I Material 240,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 1.00 1.00 E.080 5.00 75,900.00 379,500.00

J U M L A H I I I Peralatan 379,500.00

Total (Rp) 4,014,500.00

PENYIAPAN TANAH DASAR

VOLUME : 32.00 satuan ARE Sub. Total Harga Satuan Rp. 125,453.13 Per ARE

Jasa 10 % 12,545.31

Total Harga Satuan Rp. 137,998.44 Per ARE

Page 49: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENYIAPAN TANAH DASAR KODE

penyusunan DPAdan (MENGGUNAKAN ALAT) D 19

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. 1.

2. 2.

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 2.00 1.00 2.00 65,000.00 130,000.00

3 Pembantu Operator 2.00 1.00 2.00 45,000.00 90,000.00

4 Pekerja 4.00 1.00 4.00 40,000.00 160,000.00

J U M L A H I Pekerja 465,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Alat Bantu Set M.170 0.16 75,000.00 12,000.00

J U M L A H I I Material 12,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Motor Grader 1.00 6.00 E.010 6.00 163,000.00 978,000.00

2 Mesin Gilas 3 Roda 1.00 6.00 E.080 6.00 75,900.00 455,400.00

J U M L A H I I I Peralatan 1,433,400.00

Total (Rp) 1,910,400.00

PENYIAPAN TANAH DASAR

VOLUME : 40.00 satuan m3 Sub. Total Harga Satuan Rp. 47,760.00 Per m3

Jasa 10 % 4,776.00

Total Harga Satuan Rp. 52,536.00 Per m3

Page 50: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PEMBENTUKAN BAHU JALAN KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 24

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Material LPB yang baik dan sesuai ditimbun 1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)

sepanjang bahu jalan oleh pemasok 2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan

2. Tenaga terampil mengatur penimbunan 3. Material LPB yang termurah dikirim ke lokasi pekerjaan oleh pemasok

3. Material disebar dengan tenaga manusia 4. Pemasok menimbun material LPB sepanjang bahu jalan

4. Pemadatan dengan mesin gilas bergetar 5. Material disebar dengan tenaga manusia

yang kecil. 6. 96 m3 dihamparkan dan dipadatkan setiap hari

7. Koefisien pemadatan = 1,2

8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 3.00 1.00 3.00 85,000.00 255,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 96.00 1.00 96.00 40,000.00 3,840,000.00

J U M L A H I Pekerja 4,145,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Timbunan Tanah Pilihan m3 M.050 116.00 47,000.00 5,452,000.00

2 Alat Bantu Set M.170 3.84 75,000.00 288,000.00

J U M L A H I I Material 5,740,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Vibr. Ped 1 ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00

J U M L A H I I I Peralatan 315,000.00

Total (Rp) 10,200,000.00

PEMBENTUKAN BAHU JALAN

VOLUME : 96.00 satuan m3 Sub. Total Harga Satuan Rp. 106,250.00 Per m3

Jasa 10 % 10,625.00

Total Harga Satuan Rp. 116,875.00 Per m3

Page 51: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7) KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) D 25

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Material Split yang baik dan sesuai ditimbun 1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)

sepanjang bahu jalan oleh pemasok 2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan

2. Tenaga terampil mengatur penimbunan 3. Material Split yang termurah dikirim ke lokasi pekerjaan oleh pemasok

3. Material disebar dengan tenaga manusia 4. Pemasok menimbun material Split sepanjang bahu jalan

4. Pemadatan dengan mesin gilas bergetar 5. Material disebar dengan tenaga manusia

yang kecil. 6. 96 m3 dihamparkan dan dipadatkan setiap hari

7. Koefisien pemadatan = 1,2

8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 3.00 1.00 3.00 85,000.00 255,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 96.00 1.00 96.00 40,000.00 3,840,000.00

J U M L A H I Pekerja 4,145,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah / Split 5 - 7 m3 M. 022 116.00 158,000.00 18,328,000.00

2 Alat Bantu Set M.170 3.84 75,000.00 288,000.00

J U M L A H I I Material 18,616,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Vibr. Ped 1 ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00

J U M L A H I I I Peralatan 315,000.00

Total (Rp) 23,076,000.00

PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7)

VOLUME : 96.00 satuan m3 Sub. Total Harga Satuan Rp. 240,375.00 Per m3

Jasa 10 % 24,037.50

Total Harga Satuan Rp. 264,412.50 Per m3

Page 52: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING KODE

penyusunan DPA dan (MENGGUNAKAN ALAT) Q 01

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (150 m3/detik)

1. Bab Satuan Pekerjaan ini, Spesifikasi Jalan Kota, 2. Material ditimbun disepanjang jalan oleh pemasok

Bina Marga, Maret 1992 3. Dihampar dan dipadatkan sampai tebal padat 15 cm

2. Atau addendum yang berlaku 4. Koefisien pemadatan = 1,3

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 2.00 1.00 2.00 65,000.00 130,000.00

3 Pembantu Operator 2.00 1.00 2.00 45,000.00 90,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 6.00 1.00 6.00 40,000.00 240,000.00

J U M L A H I Pekerja 630,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah Tersaring Bergradasi C M.012 195.00 158,000.00 30,810,000.00

2 Alat Bantu Set M.170 0.24 75,000.00 18,000.00

J U M L A H I I Material 30,828,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Motor Grader 110 HP 1.00 1.00 E.010 5.00 188,000.00 940,000.00

2 Mesin Gilas 3 roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00

3 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00

J U M L A H I I I Peralatan 2,134,500.00

Total (Rp) 33,592,500.00

LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING

VOLUME : 150.00 satuan m3 Sub. Total Harga Satuan Rp. 223,950.00 Per m3

Jasa 10 % 22,395.00

Total Harga Satuan Rp. 246,345.00 Per m3

m3

Page 53: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) Q 02

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (60 m3/detik)

ditimbun disamping jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok

2. Jalan disiram air dengan truk air 3. Dihampar dengan tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat 10 cm

3. Pemadatan dalam 2 lapis dengan mesin gilas 4. Koefisien pemadatan = 1,3

baja sampai 100 % MDD 5. Dihampar dan dipadatkan 600 m2/hari

4. Grader membentuk ulang permukaan lama jala 6. Umur alat bantu rata-rata 1 bu -

dan menghampar agregat dengan tenaga manusia

5. Perapihan dengan tenaga manusia

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 2.00 1.00 2.00 85,000.00 170,000.00

2 Operator Terlatih 1.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 1.00 45,000.00 45,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 60.00 1.00 60.00 40,000.00 2,400,000.00

J U M L A H I Pekerja 2,765,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah Tersaring Bergradasi C M.012 72.00 158,000.00 11,376,000.00

2 Alat Bantu Set M.170 2.40 75,000.00 180,000.00

J U M L A H I I Material 11,556,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00

2 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00

J U M L A H I I I Peralatan 1,194,500.00

Total (Rp) 15,515,500.00

LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI

VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 258,591.67 Per m3

Jasa 10 % 25,859.17

Total Harga Satuan Rp. 284,450.83 Per m3

m3

Page 54: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS PONDASI BAWAH KELAS C AGREGAT KODE

penyusunan DPA dan PECAH TERSARING (MENGGUNAKAN BURUH) Q 03

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (60 m3/det)

ditimbun disamping jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok

2. Jalan disiram air dengan truk air 3. Dihampar dan dipadatkan sampai tebal padat 10 cm

3. Pemadatan dengan mesin gilas 4. Koefisien pemadatan 1,3

6 - 8 ton sampai 100 % MDD

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 1.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 1.00 45,000.00 45,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 33.00 1.00 33.00 40,000.00 1,320,000.00

J U M L A H I Pekerja 1,600,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah Tersaring Bergradasi C M.012 72.00 158,000.00 11,376,000.00

2 Alat Bantu Set M.170 2.40 75,000.00 180,000.00

J U M L A H I I Material 11,556,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00

2 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00

J U M L A H I I I Peralatan 1,194,500.00

Total (Rp) 14,350,500.00

LAPIS PONDASI BAWAH KELAS C AGREGAT

VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 239,175.00 Per m3

Jasa 10 % 23,917.50

Total Harga Satuan Rp. 263,092.50 Per m3

m3

Page 55: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS PONDASI ATAS KELAS A AGREGAT KODE

penyusunan DPA dan PECAH TERSARING (MENGGUNAKAN ALAT) Q 04

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (150 m3/detik)

ditimbun disamping jalan oleh pemasok 2. Material ditimbun di sepanjang jalan oleh pemasok

2. Grader menghampar agregat 3. Dihampar dan dipadatkan sampai tebal padat 10 cm

3. Jalan disiram air dengan truk air 4. Koefisien pemadatan 1,3

4. Pemadatan dengan mesin gilas

6 - 8 ton sampai 100 % MDD

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 2.00 1.00 2.00 65,000.00 130,000.00

3 Pembantu Operator 2.00 1.00 2.00 45,000.00 90,000.00

4 SUPIR TRUK 1.00 1.00 1.00 50,000.00 50,000.00

5 KENEK TRUK 1.00 1.00 1.00 35,000.00 35,000.00

6 Pekerja 6.00 1.00 6.00 40,000.00 240,000.00

J U M L A H I Pekerja 630,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah Tersaring Bergradasi A M.012 195.00 158,000.00 30,810,000.00

2 Alat Bantu Set M.170 0.24 75,000.00 18,000.00

J U M L A H I I Material 30,828,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Motor Grader 110 HP 1.00 1.00 E.010 5.00 188,000.00 940,000.00

2 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00

3 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00

J U M L A H I I I Peralatan 2,134,500.00

Total (Rp) 33,592,500.00

LAPIS PONDASI ATAS KELAS A AGREGAT

VOLUME : 150.00 satuan m3 Sub. Total Harga Satuan Rp. 223,950.00 Per m3

Jasa 10 % 22,395.00

Total Harga Satuan Rp. 246,345.00 Per m3

m3

Page 56: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PASANGAN LAPIS ATB KODE

penyusunan DPA dan (MENGGUNAKAN ALAT) Q 05

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Permukaan jalan dibersihkan dan kering 1. Menggunakan alat berat (45 m3/hari)

2. Lapis tack/pengikat aspal catback dihampar 2. Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP

@ 0,5 ltr/m2 3. ATB dihampar dan dipadatkan sampai tb. 10 cm

3. ATB dihampar dengan aspal finisher 4. BJ ATB padat 2,25 ton/m3

4. Temperatur ATB 120° C dan 5. Sesuai Spesifikasi BM No. 03/PT/B/1983 & Rev. Spesifikasi Umum Maret 1989 -

tidak kurang dari 100° C Buku 3

5. Perapihan dengan tenaga manusia 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor Lapangan 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 4 1.00 4.00 65,000.00 260,000.00

3 PEMBANTU OPERATOR / MEKANI 4.00 1.00 4.00 45,000.00 180,000.00

4 Pekerja Terampil 8.00 1.00 8.00 50,000.00 400,000.00

5 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 1,405,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Asphalt Liter Treated Based (ATB) Ton - 100.00 742,000.00 74,200,000.00

2 Pasir Beton M.041 0.60 210,000.00 126,000.00

3 Aspal Bitumen kg M.061 180.00 11,000.00 1,980,000.00

4 Minyak Tanah / Minyak Bakar lt M.065 45.00 13,000.00 585,000.00

5 Alat Bantu Set M.170 0.48 75,000.00 36,000.00

J U M L A H I I Material 76,927,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 6 - 8 Ton 5.00 1.00 E.080 5.00 75,900.00 379,500.00

2 Roller Pneumatic 8 - 15 ton 5.00 1.00 E.084 5.00 156,000.00 780,000.00

3 Mesin Penyemprot Aspal 1000 lt 3.00 1.00 E.153 3.00 112,960.66 338,881.98

4 Asphalt Finisher 1820 mm/30 HP 5.00 1.00 E.157 5.00 188,000.00 940,000.00

5 Compressor Air 210 m3/jam 4.00 1.00 E.301 4.00 81,000.00 324,000.00

J U M L A H I I I Peralatan 2,762,381.98

Total (Rp) 81,094,381.98

PASANGAN LAPIS ATB

VOLUME : 45.00 satuan m3 Sub. Total Harga Satuan Rp. 1,802,097.38 Per M3

Jasa 10 % 180,209.74

Total Harga Satuan Rp. 1,982,307.12 Per M3

m3

Page 57: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LABUR ASPAL DUA LAPIS (BURDA) KODE

penyusunan DPA dan (MENGGUNAKAN ALAT) Q 06

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Hasil kerja 600 m2/hari

1. Bab Satuan Pekerjaan ini, Spesifikasi Jalan Kota, 2. Agregat ukuran 19 mm dan 9,5 mm tersaring unit pemecah

Bina Marga, Maret 1992 3. Batu ditimbun di lokasi pekerjaan oleh pemasok

2. Atau addendum yang berlaku 4. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan binder

5. Lapis seal/penutup menggunakan aspal catback @ 1,5 kg/m2 dan 1,2 kg/m2

6. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dumptruck penghampar

@ 55 m2/m3 dan 120 m/m3

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor Lapangan 1.00 3.00 3.00 85,000.00 255,000.00

2 Operator Terlatih 2.00 3.00 6.00 65,000.00 390,000.00

3 Pembantu Operator 2.00 3.00 6.00 45,000.00 270,000.00

4 Sopir 1.00 3.00 3.00 50,000.00 150,000.00

5 Pembantu Sopir 1.00 3.00 3.00 35,000.00 105,000.00

6 Pekerja Terampil 2.00 3.00 6.00 50,000.00 300,000.00

7 Pekerja 12.00 3.00 36.00 40,000.00 1,440,000.00

J U M L A H I Pekerja 2,910,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah 1 - 2 cm m3 M.025 33.00 194,000.00 6,402,000.00

2 Batu Pecah 0,5 - 1 cm M.026 15.00 168,000.00 2,520,000.00

3 Aspal Bitumen kg M.061 4,958.00 11,000.00 54,538,000.00

4 Alat Bantu Set M.170 1.44 75,000.00 108,000.00

J U M L A H I I Material 63,568,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Pneumatic 8 - 15 ton 1.00 3.00 E.084 15.00 156,000.00 2,340,000.00

2 Asp. Sprayer Towed 2.00 3.00 E.154 30.00 38,000.00 1,140,000.00

3 Dump Truck 3 - 5 T 1.00 3.00 E.211 15.00 156,000.00 2,340,000.00

4 Blower 1.00 3.00 15.00 16,802.57 252,038.55

J U M L A H I I I Peralatan 6,072,038.55

Total (Rp) 72,550,038.55

LABUR ASPAL DUA LAPIS (BURDA)

VOLUME : 1,800.00 satuan m2 Sub. Total Harga Satuan Rp. 40,305.58 Per m2

Jasa 10 % 4,030.56

Total Harga Satuan Rp. 44,336.13 Per m2

m3

Page 58: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) Q 07

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Hamparan agregat pokok 3-5 cm 1. Permukaan jalan yang akan dilapis sudah di prime/tack coat

80 kg/m2 (20 m2/m3) 2. Menggunakan tenaga buruh

2. Digilas dan dipadatkan dengan mesin 3. Agregat pecah sesuai ukuran, siap dilokasi

gilas roda baja 6 - 8 ton 4. Tebal padat perkerasan 5 cm

3. Semprotan aspal 2,5 kg/m2 5. Faktor kehilangan agregat = 1.02

4. Hamparkan agregat pengunci 1 - 2 cm

25 kg/m2 (64 m2/m3), digilas & dipadatkan

5. Semprotan aspal 1,5 kg/m2

6. Hamparkan agregat penutup 0,5 - 1 cm

14 kg/m2 (80 m2/m3), digilas & dipadatkan

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 2.00 3.00 6.00 85,000.00 510,000.00

2 Operator Terlatih 2.00 3.00 6.00 65,000.00 390,000.00

3 Pembantu Operator 2.00 3.00 6.00 45,000.00 270,000.00

4 SUPIR TRUK 1.00 3.00 3.00 50,000.00 150,000.00

5 KENEK TRUK 1.00 3.00 3.00 35,000.00 105,000.00

6 Pekerja Terampil 2.00 3.00 6.00 50,000.00 300,000.00

7 Pekerja 66.00 3.00 198.00 40,000.00 7,920,000.00

J U M L A H I Pekerja 9,645,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Pecah 3 - 5 cm M.023 71.40 189,000.00 13,494,600.00

2 Batu Pecah 1 - 2 cm M.025 22.31 194,000.00 4,328,140.00

3 Batu Pecah 0,5 - 1 cm M.026 12.50 168,000.00 2,100,000.00

4 Aspal Bitumen Kg M.061 5,712.00 11,000.00 62,832,000.00

5 Alat Bantu Set M.170 8.16 75,000.00 612,000.00

J U M L A H I I Material 83,366,740.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 3.00 E.080 15.00 75,900.00 1,138,500.00

2 Asp. Sprayer Towed 2.00 3.00 E.154 30.00 38,000.00 1,140,000.00

3 Dump Truck 3,5 Ton - 115 Hp 1.00 3.00 E.211 15.00 163,000.00 2,445,000.00

4 Blower 1.00 3.00 15.00 16,802.57 252,038.55

J U M L A H I I I Peralatan 4,975,538.55

Total (Rp) 97,987,278.55

LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN

VOLUME : 1,400.00 satuan m2 Sub. Total Harga Satuan Rp. 69,990.91 Per m2

Jasa 10 % 6,999.09

Total Harga Satuan Rp. 76,990.00 Per m2

m3

m3

m3

Page 59: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS ASPAL RESAP PELEKAT KODE

penyusunan DPA dan (PRIME COAT) Q 08

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko (siap dilokasi)

1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah

Umum Jalan Kabupaten, Bina Marga berdasarkan berat

Maret 1992 3. Berat jenis minyak tanah 0,86

2. Tingkat Penyemprotan 1 Kg/m2 disemprot 4. Berat jenis aspal 1,03

mempergunakan mesin penyemprot aspal

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 0.50 L.061 0.50 85,000.00 42,500.00

2 Operator Terlatih 1.00 1.00 L.081 1.00 65,000.00 65,000.00

3 Pembantu Operator 1.00 1.00 L.083 1.00 45,000.00 45,000.00

4 Pekerja 4.00 1.00 L.101 4.00 40,000.00 160,000.00

J U M L A H I Pekerja 312,500.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Aspal Bitumen 510.00 kg M.061 510.00 11,000.00 5,610,000.00

2 Minyak Tanah 599.00 lt M.065 599.00 13,000.00 7,787,000.00

3 Alat Bantu 0.16 Set M.170 0.16 75,000.00 12,000.00

J U M L A H I I Material 13,409,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Asp. Sprayer Towed 200 ltr 1.00 1.00 E.154 5.00 38,000.00 190,000.00

2 Blower 1.00 1.00 5.00 16,802.57 84,012.85

J U M L A H I I I Peralatan 274,012.85

Total (Rp) 13,995,512.85

LAPIS ASPAL RESAP PELEKAT (Prime Coat)

VOLUME : 1,000.00 satuan M2 Sub. Total Harga Satuan Rp. 13,995.51 per M2

Jasa 10 % 1,399.55

Total Harga Satuan Rp. 15,395.06 per M2

Page 60: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam LAPIS ASPAL PELEKAT KODE

penyusunan DPA dan (TACK COAT) Q 09

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko (siap dilokasi)

1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25 bagian minyak tanah

Umum Jalan Kabupaten, Bina Marga berdasarkan berat

Maret 1992 3. Berat jenis minyak tanah 0,86

2. Tingkat Penyemprotan 0.2 Kg/m2 disemprot 4. Berat jenis aspal 1,03

mempergunakan mesin penyemprot aspal

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 0.50 0.50 85,000.00 42,500.00

2 Operator Terlatih 2.00 1.00 1.00 65,000.00 65,000.00

3 Pembantu Operator 2.00 1.00 1.00 45,000.00 45,000.00

4 Pekerja 4.00 1.00 2.00 40,000.00 80,000.00

J U M L A H I Pekerja 232,500.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Aspal Bitumen kg M.061 98.00 11,000.00 1,078,000.00

2 Minyak Tanah lt M.065 29.00 13,000.00 377,000.00

3 Alat Bantu Set M.170 0.08 75,000.00 6,000.00

J U M L A H I I Material 1,461,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Asp. Sprayer Towed 200 ltr 1.00 1.00 E.154 3.00 38,000.00 114,000.00

2 Compressor 210 m3/jam 1.00 1.00 E.301 1.00 75,900.00 75,900.00

3 Blower 1.00 1.00 3.00 16,802.57 50,407.71

J U M L A H I I I Peralatan 240,307.71

Total (Rp) 1,933,807.71

LAPIS ASPAL PELEKAT (Tack Coat)

VOLUME : 600.00 Satuan M2 Sub. Total Harga Satuan Rp. 3,223.01 Per M2

Jasa 10 % 322.30

Total Harga Satuan Rp. 3,545.31 Per M2

Page 61: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON KODE

penyusunan DPA dan (MENGGUNAKAN ALAT) Q 10

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat 1500 m2/hari

1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP

Umum Jalan Kabupaten, Bina Marga 3. Tebal padat rata-rata 3 cm

Maret 1992 4. BJ lataston padat 2,2 t/m3

2. Atau Addendum yang Berlaku 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 4.00 1.00 4.00 65,000.00 260,000.00

3 Pembantu Operator 4.00 1.00 4.00 45,000.00 180,000.00

4 Pekerja Terampil 8.00 1.00 8.00 50,000.00 400,000.00

5 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 1,405,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 HRS (LATASTON) Ton - 100.00 900,000.00 90,000,000.00

2 Aspal Bitumen kg M.061 600.00 11,000.00 6,600,000.00

3 Minyak Tanah lt M.065 150.00 13,000.00 1,950,000.00

4 Alat Bantu Set M.170 0.48 75,000.00 36,000.00

J U M L A H I I Material 98,586,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Tandem 6 - 10 Ton 1.00 1.00 E.081 5.00 113,000.00 565,000.00

2 Roller Pneumatic 8 - 15 ton 1.00 1.00 E.084 5.00 156,000.00 780,000.00

3 Mesin Penyemprot Aspal 1000 lt 1.00 1.00 E.153 5.00 112,960.66 564,803.30

4 Asphalt Finisher 1820 mm / 301 1.00 1.00 E.157 5.00 188,000.00 940,000.00

5 Compressor Air 210 m3/jam 1.00 1.00 E.301 4.00 81,000.00 324,000.00

J U M L A H I I I Peralatan 3,173,803.30

Total (Rp) 103,164,803.30

PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON

VOLUME : 1,500.00 satuan m2 Sub. Total Harga Satuan Rp. 68,776.54

Jasa 10 % 6,877.65

Total Harga Satuan Rp. 75,654.19

Per m2

Per m2

Page 62: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN LAPIS TIPIS ASPAL BETON KODE

penyusunan DPA dan Q 11

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat 1500 m2/hari

1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP

Umum Jalan Kabupaten, Bina Marga 3. Tebal padat rata-rata 3 cm

Maret 1992 4. BJ lataston padat 2,2 t/m3

2. Atau Addendum yang Berlaku 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 2.00 1.00 2.00 65,000.00 130,000.00

3 Pembantu Operator 2.00 1.00 2.00 45,000.00 90,000.00

4 Pekerja Terampil 8.00 1.00 8.00 50,000.00 400,000.00

5 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 1,185,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 HRS (LATASTON) Ton - 100.00 900,000.00 90,000,000.00

2 Aspal Bitumen kg M.061 600.00 11,000.00 6,600,000.00

3 Minyak Tanah lt M.065 150.00 13,000.00 1,950,000.00

4 Alat Bantu Set M.170 0.48 75,000.00 36,000.00

J U M L A H I I Material 98,586,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Roller Tandem 6 - 10 Ton 1.00 1.00 E.081 5.00 113,000.00 565,000.00

2 Roller Pneumatic 8 - 15 ton - 1.00 E.084 - 156,000.00 -

3 Mesin Penyemprot Aspal 1000 ltr - 1.00 E.153 - 112,960.66 -

4 Asphalt Finisher 1820 mm / 301 HP - 1.00 E.157 - 188,000.00 -

5 Compressor Air 210 m3/jam 1.00 1.00 E.301 4.00 81,000.00 324,000.00

J U M L A H I I I Peralatan 889,000.00

Total (Rp) 100,660,000.00

PENGHAMPARAN LAPIS TIPIS ASPAL BETON

VOLUME : 1,500.00 satuan m2 Sub. Total Harga Satuan Rp. 67,106.67

Jasa 10 % 6,710.67

Total Harga Satuan Rp. 73,817.33

Per m2

Per m2

Page 63: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC KODE

penyusunan DPA dan (MENGGUNAKAN ALAT) Q 12

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pengisian material sampai bin dari spreader 1. Menggunakan alat berat 900 m2/hari

dari pemasok 2. Aspal Concrete (Laston) dikirim kelokasi oleh pemasok dari AMP

2. Material dihampar dengan spreader dan 3. Tebal padat rata-rata 5 cm

dipadatkan dengan mesin gilas baja dan 4. BJ laston padat 2,25 t/m3

mesin gilas pneumatic roda karet 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3

6. Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Operator Terlatih 5.00 1.00 5.00 65,000.00 325,000.00

3 Pembantu Operator 5.00 1.00 5.00 45,000.00 225,000.00

4 Pekerja Terampil 10.00 1.00 10.00 50,000.00 500,000.00

5 Pekerja 15.00 1.00 15.00 40,000.00 600,000.00

J U M L A H I Pekerja 1,735,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 LASTON AC Ton 100.00 809,000.00 80,900,000.00

2 Pasir Beton m3 M.041 0.90 210,000.00 189,000.00

3 Aspal Bitumen kg M.061 360.00 11,000.00 3,960,000.00

4 Minyak Tanah / Minyak bakar lt M.065 90.00 13,000.00 1,170,000.00

5 Alat Bantu Set M.170 0.48 75,000.00 36,000.00

J U M L A H I I Material 86,255,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Mesin Gilas 3 Roda 6 - 8 ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00

2 Roller Tandem 6 - 10 Ton 1.00 1.00 E.081 5.00 113,000.00 565,000.00

3 Roller Pneumatic 8 - 15 ton 1.00 1.00 E.084 5.00 156,000.00 780,000.00

4 Mesin Penyemprot Aspal 100 ltr 1.00 1.00 E.153 3.00 112,960.66 338,881.98

5 Asphalt Finisher 1820 mm / 301 1.00 1.00 E.157 5.00 188,000.00 940,000.00

6 Compressor Air 210 m3/jam 1.00 1.00 E.301 4.00 81,000.00 324,000.00

J U M L A H I I I Peralatan 3,327,381.98

Total (Rp) 91,317,381.98

PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC

VOLUME : 900.00 satuan m2 Sub. Total Harga Satuan Rp. 101,463.76 Per m2

Jasa 10 % 10,146.38

Total Harga Satuan Rp. 111,610.13 Per m2

Page 64: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5 KODE

penyusunan DPA dan (MENGGUNAKAN BURUH) K.705

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Material ditimbun di lokasi pekerjaan 1. Dilakukan utk pekerjaan gorong-gorong, jembatan, dinding penahan tanah,

oleh pemasok dan struktur lainnya yang menggunakan konstruksi pasangan batu

2. Pekerja membawa batu belah ke tempat 2. Material-material dikirim ketempat pekerjaan oleh pemasok

tukang batu bekerja 3. Tidak termasuk galian/timbunan

3. Tukang batu memasang batu pecah dengan 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari

adukan pasir semen bambu untuk lubang drainase

5. Koefisien lepas batu = 1,2

6. Mortar strain = 50 kg/cm2

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Kepala Tukang Batu 1.00 1.00 1.00 55,000.00 55,000.00

2 TUKANG BATU TERAMPIL 4.00 1.00 4.00 50,000.00 200,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 735,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Batu Belah 10 - 15 cm M.020 6.00 158,000.00 948,000.00

2 Pasir Pasang M.042 1.00 189,000.00 189,000.00

3 Semen Portland zak M.080 18.00 61,000.00 1,098,000.00

4 Alat Bantu Set M.170 0.75 75,000.00 56,250.00

J U M L A H I I Material 2,291,250.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Pump Water 50 mm - 30 m3/Ja 1.00 1.00 E.341 2.00 63,000.00 126,000.00

J U M L A H I I I Peralatan 126,000.00

Total (Rp) 3,152,250.00

KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5

VOLUME : 5.00 satuan m3 Sub. Total Harga Satuan Rp. 630,450.00 Per m3

Jasa 10 % 63,045.00

Total Harga Satuan Rp. 693,495.00 Per m3

m3

m3

Page 65: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PERANCAH KAYU KONSTRUKSI BETON KODE

penyusunan DPA dan (BEKISTING) KAYU Kls III I 01

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Kelompok tukang kayu memotong dan membuat 1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja

acuan 2. 1/3 material dapat dipakai kembali

2. Kelompok tukang kayu membongkar acuan 3. Pengadaan bahan oleh Pemasok

setelah beton cukup kuat 4. Untuk 1 m3 beton dipakai 2 lbr plywood (120 cm x 240 cm x 1,75 cm)

3. Kelompok tukang kayu membersihkan acuan 5. Kelompok tukang kayu membongkar acuan

untuk dipakai kembali

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 KEPALA TUKANG KAYU 1.00 1.00 1.00 50,000.00 50,000.00

2 Tukang Kayu 4.00 1.00 4.00 50,000.00 200,000.00

3 Pekerja Terampil 3.00 1.00 3.00 50,000.00 150,000.00

4 Pekerja 7.00 1.00 7.00 40,000.00 280,000.00

J U M L A H I Pekerja 680,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Papan Cor Borneo M.180 0.60 2,205,000.00 1,323,000.00

2 Paku kg M.166 4.00 18,000.00 72,000.00

3 Alat Bantu Set M.170 0.56 75,000.00 42,000.00

J U M L A H I I Material 1,437,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1

J U M L A H I I I Peralatan -

Total (Rp) 2,117,000.00

BEKISTING

VOLUME : 20.00 satuan m2 Sub. Total Harga Satuan Rp. 105,850.00 Per m2

Jasa 10 % 10,585.00

Total Harga Satuan Rp. 116,435.00 Per m2

m3

Page 66: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENULANGAN BETON (BESI ULIR) KODE

penyusunan DPA dan R 14

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari

panjang yang diperlukan 2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok

2. Perakitan tulangan besi beton dan diikat 3. Penyusutan akibat pemotongan dll dianggap 1 %

dengan kawat baja 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan

5. 0,8 orang/hari memotong 200 kg batang besi beton

6. 1,0 orang/hari membengkok 200 kg batang besi beton

7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton

8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Tukang Kepala Besi Beton 1.00 1.00 1.00 55,000.00 55,000.00

3 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

4 Pekerja 3.00 1.00 3.00 40,000.00 120,000.00

J U M L A H I Pekerja 310,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Besi Beton U - 32 Kg M.167 225.00 12,200.00 2,745,000.00

2 Alat Bantu Set M.170 0.12 75,000.00 9,000.00

J U M L A H I I Material 2,754,000.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1

J U M L A H I I I Peralatan -

Total (Rp) 3,064,000.00

PENULANGAN BETON

VOLUME : 200.00 satuan kg Sub. Total Harga Satuan Rp. 15,320.00 Per kg

Jasa 10 % 1,532.00

Total Harga Satuan Rp. 16,852.00 Per kg

Page 67: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENULANGAN BETON (BETON POLOS) KODE

penyusunan DPA dan R 14a

Mengevaluasi Harga Penawaran

Propinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari

panjang yang diperlukan 2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok

2. Perakitan tulangan besi beton dan diikat 3. Penyusutan akibat pemotongan dll dianggap 1 %

dengan kawat baja 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan

5. 0,8 orang/hari memotong 200 kg batang besi beton

6. 1,0 orang/hari membengkok 200 kg batang besi beton

7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton

8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 L.061 1.00 85,000.00 85,000.00

2 Tukang Kepala Besi Beton 1.00 1.00 L.073 1.00 55,000.00 55,000.00

3 Pekerja Terampil 1.00 1.00 L.106 1.00 50,000.00 50,000.00

4 Pekerja 3.00 1.00 L.101 3.00 40,000.00 120,000.00

J U M L A H I Pekerja 310,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Besi Beton U - 24 Kg M.167 225.00 9,100.00 2,047,500.00

2 Alat Bantu Set M.170 0.12 75,000.00 9,000.00

J U M L A H I I Material 2,056,500.00

No. Peralatan Jumlah Hari Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1

J U M L A H I I I Peralatan -

Total (Rp) 2,366,500.00

PENULANGAN BETON

VOLUME : 200.00 satuan kg Sub. Total Harga Satuan Rp. 11,832.50 Per kg

Jasa 10 % 1,183.25

Total Harga Satuan Rp. 13,015.75 Per kg

Page 68: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipe ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE)

penyusunan DPA dan

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. PEKERJA Vol. Hari KodeTotal Vol. Upah Biaya

Org-hari (Rp/Org/Hari) Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

1 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

1 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja

No MATERIAL Satuan Kode Total Vol. Harga Biaya

(Rp/Unit) (Rp)

1 Beton Ready Mix Klas Bo M.041 48.00 609,000.00 29,232,000.00

2 Alat Bantu Set M.170 1.00 75,000.00 75,000.00

J U M L A H I I Material

No. PERALATAN Jumlah Jam Kerja Kode Jam Kerja Harga Biaya

(Rp/jam) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan

Total (Rp)

BETON NON STRUKTUR / RABAT KELAS Bo

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 632,416.67 Per m3

Jasa 10 % 63,241.67

Total Harga Satuan Rp. 695,658.33 Per m3

m3

Page 69: Analisa Box Culvert

KODE

F 01

Sub Total

Rp

615,000.00

Sub Total

(Rp)

29,307,000.00

Sub Total

(Rp)

434,000.00

30,356,000.00

Page 70: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE) KODE

penyusunan DPA dan F 02

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 615,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Beton Ready Mix K.125 M.041 48.00 599,000.00 28,752,000.00

2 Alat Bantu Set M.170 1.00 75,000.00 75,000.00

J U M L A H I I Material 28,827,000.00

No. Peralatan Jumlah Jam Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan 434,000.00

Total (Rp) 29,876,000.00

BETON STRUKTUR K.125

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 622,416.67 Per m3

Jasa 10 % 62,241.67

Total Harga Satuan Rp. 684,658.33 Per m3

m3

Page 71: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 175 (READY MIX CONCRETE) KODE

penyusunan DPA dan F 03

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 615,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Beton Ready Mix K.175 M.041 48.00 618,000.00 29,664,000.00

2 Alat Bantu Set M.170 1.00 75,000.00 75,000.00

J U M L A H I I Material 29,739,000.00

No. Peralatan Jumlah Jam Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan 434,000.00

Total (Rp) 30,788,000.00

BETON STRUKTUR K.175

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 641,416.67 Per m3

Jasa 10 % 64,141.67

Total Harga Satuan Rp. 705,558.33 Per m3

m3

Page 72: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 225 (READY MIX CONCRETE) KODE

penyusunan DPA dan F 04

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 615,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Beton Ready Mix K.225 M.041 48.00 683,000.00 32,784,000.00

2 Alat Bantu Set M.170 2.00 75,000.00 150,000.00

J U M L A H I I Material 32,934,000.00

No. Peralatan Jumlah Jam Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan 434,000.00

Total (Rp) 33,983,000.00

BETON STRUKTUR K.225

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 707,979.17 Per m3

Jasa 10 % 70,797.92

Total Harga Satuan Rp. 778,777.08 Per m3

m3

Page 73: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 300 (READY MIX CONCRETE) KODE

penyusunan DPA dan F 04

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 615,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Beton Ready Mix K.225 M.041 48.00 730,000.00 35,040,000.00

2 Alat Bantu Set M.170 2.00 75,000.00 150,000.00

J U M L A H I I Material 35,190,000.00

No. Peralatan Jumlah Jam Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan 434,000.00

Total (Rp) 36,239,000.00

BETON STRUKTUR K.225

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 754,979.17 Per m3

Jasa 10 % 75,497.92

Total Harga Satuan Rp. 830,477.08 Per m3

m3

Page 74: Analisa Box Culvert

Analisa Harga Satuan ini hanya dipergunak ANALISA HARGA SATUAN

sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 350 (READY MIX CONCRETE) KODE

penyusunan DPA dan F 05

Mengevaluasi Harga Penawaran

Provinsi : Kota : Disiapkan Oleh : Tanggal :

JAWA BARAT DEPOK Dec-99 #REF!

Proses : Anggapan :

1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang

2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll

3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

4. Acuan dan tulangan besi beton sudah dipasang

No. Pekerja Vol. Hari KodeTotal Vol. Upah Biaya Sub Total

Org-hari (Rp/Org/Hari) Rp Rp

1 Mandor 1.00 1.00 1.00 85,000.00 85,000.00

2 Pekerja Terampil 1.00 1.00 1.00 50,000.00 50,000.00

3 Pekerja 12.00 1.00 12.00 40,000.00 480,000.00

J U M L A H I Pekerja 615,000.00

No Material Satuan Kode Total Vol. Harga Biaya Sub Total

(Rp/Unit) (Rp) (Rp)

1 Beton Ready Mix K.350 M.041 48.00 760,000.00 36,480,000.00

2 Alat Bantu Set M.170 2.00 75,000.00 150,000.00

J U M L A H I I Material 36,630,000.00

No. Peralatan Jumlah Jam Kerja Kode Jam Kerja Harga Biaya Sub Total

(Rp/jam) (Rp) (Rp)

1 Alat Penggetar Beton 4 HP 2.00 7.00 E.089 14.00 31,000.00 434,000.00

J U M L A H I I I Peralatan 434,000.00

Total (Rp) 37,679,000.00

BETON STRUKTUR K.350

VOLUME : 48.00 satuan m3 Sub. Total Harga Satuan Rp. 784,979.17 Per m3

Jasa 10 % 78,497.92

Total Harga Satuan Rp. 863,477.08 Per m3

m3