DESAIN DINDING BASEMENT
Jenis Tanah = 1 Tanah BerbutirTinggi Basement = 8 mTebal plat Basement = 250 cmGama tanah = 1600 kg/m3Gama Water = 1000 kg/m3Sudut Gesek Dalam = 30 derajatmuka air tanah = 0.5 mBeban Merata diatas = 800 kg/m2 8 kN/mKetinggian tanah aktif = 4 mKetinggian tanah Pasif = 1.5 m
Ko = 0.5Ka = 0.3Kp = 1.0
Qdinamis = 2880.0 kg/m2 28.8 kN/m2Tekanan tanah aktif (Pa) = 4266.7 kg/m2 42.7 kN/m2Qair = 7500.0 kg/m2 75.0 kN/m2Q surcharge = 266.7 kg/m2 2.7 kN/m2Tekanan tanah Pasif (Pp) = 2442.3 kg/m3 24.4 kN/m3Q Uplift = 7500 kg/m3 75.0 kN/m3
PERHITUNGAN PLAT BASEMENT
Tebal 250 mm2Perlu Aktual
As arah x (Tumpuan) M22 603 mm2 35 kNm < 48.0 kNm OK
As arah x (Lapangan) M22 224 mm3 Mu (M11) + 10.5 kNm < 16.3 kNm OK
As arah y (Tumpuan) M11 570 mm2 35 kNm < 48.0 kNm OK
As arah y (Lapangan) M11 224 mm3 Mu (M11) + 10.5 kNm < 16.2 kNm OK
Ø Sway x 12 mmØ Sway y 12 mm
Av 113 mm2 Av 113 mm2As 6.0 bh As 6.0 bh
s 166.67 mm s 166.67 mm100 -50 100 -50
Av 113 mm2 Av 113 mm2As 2.0 bh As 2.0 bh
s 500 mm s 500 mm300 300
Jadi Gunakan Tul. Tumpuan Ø 12 -100 tebal Plat Basement Jadi Gunakan Tul. Lapangan Ø 12 -300 250 cm
Atau Wiremesh M10-150
Mu (M11) -
Mu (M11) -
Sway X Tumpuan
Sway Y Tumpuan
Sway X Lapangan
Sway Y Lapangan
DESAIN DINDING BASEMENT
Jenis Tanah = 1 Tanah BerbutirTinggi Basement = 8 mTebal plat Basement = 250 cmGama tanah = 1600 kg/m3Gama Water = 1000 kg/m3Sudut Gesek Dalam = 30 derajatmuka air tanah = 2 mBeban Merata diatas = 800 kg/m2 8 kN/mKetinggian tanah aktif = 4 m
Ko = 0.5Ka = 0.3
Tekanan tanah aktif (Pa) = 4266.7 kg/m2 42.7 kN/m2Tekanan Akibat Air = 2000.0 kg/m2 20.0 kN/m2Q surcharge (Beban Merata) = 266.7 kg/m2 2.7 kN/m2
PERHITUNGAN DINDING BASEMENT AUTOMATIC
Tebal 200 mm2As (vertikal) 564 mm2As (horizontal) 431 mm3 V Mu (M11) 24.5 kNm < 25.7 kNm OKØ Vertikal 10 mm H Mu (M22) 17.6 kNm < 18.1 kNm OKØ Horizontal 10 mm
Vertikal
Av 78.5 mm2As 8.0 bhs 125 mm
120
Horizontal
Av 78.5 mm2As 6.0 bhs 166.7 mm
150
Jadi Gunakan Tul. Vertikal Ø 10 -100 tebal Dinding Jadi Gunakan Tul. Horizontal Ø 10 -120 200 cm
Atau Wiremesh M10-200
Tinggi Galian Basement = 4 mAsumsi Diameter Soldier Pile = 800 mm
Gama Tanah = 1.55 t/m3Sudut Gesek Dalam = 30 º
Koefisien Aktif Tanah = 0.33Beban Merata = 800 kg/m2
q 1 = 266.67 kg/mq2 = 2066.67 kg/m
Asumsi Panjang Soldierpile = 12 m
Tabel Spring CalculationElev. No. kh Length Tinjau (cm) Spring
-4 kh1 0.55 50 100 2750-5 kh2 2 100 100 20000-6 kh3 3 100 100 30000-7 kh4 2.9 100 100 29000-8 kh5 2 100 100 20000-9 kh6 5 100 100 50000
-10 kh7 6 100 100 60000-11 kh8 9 100 100 90000-12 kh9 10 50 100 50000-13 kh10 0-14 kh11 0-15 kh12 0-16 kh13 0-17 kh14 0-18 kh15 0-19 kh16 0-20 kh17 0