Social Monitoring Report
Project No. 42267-031 Semi-Annual Report (October 2020 - March 2021) August 2021
INDIA: Rajasthan Secondary Towns Development Sector Project
Prepared by Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited Externally Aided Projects for the Asian Development Bank.
This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
RAJASTHAN SECONDARY TOWNS DEVELOPMENT SECTOR PROJECT
ASIAN DEVELOPMENT BANK LOAN ASSISTANCE
(LOAN NO. 3972 IND)
SEMI-ANNUAL SOCIAL SAFEGUARD MONITORING REPORT
(October 2020 to March 2021)
Prepared by Rajasthan Urban Drinking Water Sewerageand Infrastructure Corporation Limited Externally Aided Projects for the Asian DevelopmentBank.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
ABBREVIATIONS
ADB Asian Development Bank AP Affected Person ASO Assistant Safeguard Officer BPL Below Poverty Line CAPC Community Awareness Participation Consultant CBO Community Based Organization CCC Central Control Center CLC City Level Committee CPR Community Property Resources CRMC Consumer Relation Management Center DMA District Metering Area DP Displace Person EA Executing Agency FGD Focus Group Discussions FHH Female Headed Household FSTP Feacal Sludge Treatment plant GoI Government of India GoR Government of Rajasthan GRC Grievance Redressal Committee/ Grievance Redressal Cell IA Implementing Agency IP Indigenous Peoples IR Involuntary Resettlement LAA Land Acquisition Act RFCT LARR The Right to Fair Compensation and Transparency in Land
Acquisition, Rehabilitation and Resettlement Act M&E Monitoring and Evaluation NGO Non-Government Organizations NPRR National Policy on Resettlement & Rehabilitation PIU Program Implementation Unit PH Physically Handicapped PMCBC Project Management Capacity Building Consultants PMU Program Management Unit RoW Right of Way RF Resettlement Framework RP Resettlement Plan RIPP Resettlement and Indigenous Peoples Plan R&R Resettlement & Rehabilitation RUIDP Rajasthan Urban infrastructure Development Project RSTDSP Rajasthan Secondary Towns Development Sector Project SC Scheduled Caste SIA Social Impact Assessment SIP Service Improvement Plan SOT Social Outreach Team (Contractor’s Outreach team) ST Scheduled Tribe STD Sexually Transmitted Diseases SwPS Sewerage Pumping Station ToR Terms of Reference UDD Urban Development Department VC Valuation Committee
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
CONTENTS EXECUTIVE SUMMARY .................................................................................................................... I A. PROJECT BACKGROUND AND DESCRIPTION ..................................................................... 1
I. Purpose of the report .................................................................................................................. 5 II. Social safeguard categorization .................................................................................................. 5
a) Subprojects Categorization under RSTDSP ........................................................................... 6 III. Status of preparation/Updating of RPs/RIPPs ............................................................................ 6
IV. Measures to avoid and minimize involuntary resettlement impacts ............................................ 7 V. Impacts on Indigenous Peoples .................................................................................................. 9 VI. Revision and updating of RPs/RIPPs ....................................................................................... 10 VII. Strategy for implementation of RPs/RIPPS .............................................................................. 10 B. SAFEGUARDS IMPACTS ........................................................................................................ 11
(i) Types of impacts envisaged under RSTDSP ................................................................................ 13
(ii) Vulnerability Status of the Affected People/Communities: .......................................................... 14
(iii) Impacts on Indigenous People ........................................................................................................ 14
(iv) Changes in original scope of works: ............................................................................................... 15
(v) Impact minimization: ......................................................................................................................... 21
(vi) Due diligence of the areas where pipeline works are under progress ....................................... 22
(vii) Entitlement ,Assistance and Benefits ............................................................................................. 22
C. COMPENSATION AND REHABILITATION ............................................................................ 38 D. CAPACITY BUILDING ACTIVITIES......................................................................................... 38 E. PUBLIC PARTICIPATION AND CONSULTATION ................................................................. 40 I. Community & Women Participation in RSTDSP Project .......................................................... 42 II. Consultation with scheduled tribe communities in Abu Road subproject ................................. 42 F. GRIEVANCE REDRESS MECHANISM ................................................................................... 42 G. INSTITUTIONAL ARRANGEMENT ......................................................................................... 46 H. MONITORING RESULTS-FINDINGS ...................................................................................... 50 I. COMPLIANCE STATUS OF LOAN COVENANTS.................................................................. 53 J. FOLLOW UP ACTIONS,RECOMMENDATION AND DISCLOSURE ..................................... 56 APPENDIX
Appendix 1: Copy of Leaflet .......................................................................................................... 58 Appendix 1(a) : Photographs of Leaflet distribution to potential affected persons ............. 60 Appendix 2: Copy of Cut- off date Notification .......................................................................... 62 Annexure 2(a) : Photographs of cut off date displayed .......................................................... 65 Appendix 3: List of Potential affected persons ........................................................................... 67 Appendix 4: Copy of appointment to Mr.Chaganlal brother of Bhagta Ram ........................ 254 Appendix5: Due diligence of pipelaying areas. ........................................................................ 257 Appendix 6: Attendance sheet of participant ............................................................................ 285 Appendix 7: Stakeholder Consultation ...................................................................................... 288 Appendix 8: Consultation with Women beneficiaries .............................................................. 296 Appendix 9: Consultation with Scheduled tribe communities in Abu Road ......................... 300 Appendix 10: Copy of office order of PMU for follow GRM agreed with ADB ....................... 302 Appendix 11: Details of Grievances Reported upto March 2021. ........................................... 304
I | P a g e
EXECUTIVE SUMMARY
The Government of Rajasthan (GOR) has received a loan from Asian Development Bank
(ADB) for the implementation of water supply and sanitation (WSS) services in secondary
towns and heritage towns with populations between 20,000–115,0001 through a sector
loan modality. The project will invest in (i) the rehabilitation and expansion of water supply
network through a district metering approach for management of nonrevenue water (NRW)
and aiming for 24x7 water supply, (ii) the rehabilitation and expansion of sewerage network,
(iii) modernization and new construction of water supply and waste water treatment plants, as
required, (iv) construction of faecal sludge management treatment plant, and (v)
decentralized waste water management systems in the project towns. The project also aims
for wastewater reuse and a city-wide, inclusive sanitation approach to improve sanitation for
all, including below poverty line households. The project is expected to increase operational
efficiency, improve service delivery, and result in positive impact on health and quality of life
for the residents of project towns in the state.
Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited
(RUDSICO) is the Implementing Agency (IA) for the project. The Project Management Unit
(PMU) is headed by Project Director. Social Project Officer (SPO) at PMU assisted by
Safeguard Specialist-Resettlement of Project Management Capacity Building Consultant
(PMCBC) to ensure that all subprojects meet safeguard requirements as agreed in the loan
covenant and in line with this resettlement framework(RF). Project implementation
Units(PIUs) headed by Superintending Engineer/Executive Engineer for implementation of
the project. One Engineer in each PIU has been designated as safety and safeguard officer
who will be responsible for safeguard and health and safety requirements, monitoring and
compliance. PIU is supported by Social safeguard cum Gender Professional Construction
Management Supervision Consultant(CMSC) in all areas of project implementation;
implementation of Resettlement plan and safeguard monitoring and compliance.
The current report is the 1st semi-annual social safeguard monitoring report(SSMR) prepared
for the reporting period from October 2020 to March 2021. The general objective of this
Semi-annual Social Safeguard Monitoring Report(SSMR) is to assess the progress on
safeguard measures taken during the reporting period.
Draft resettlement plans (RPs) for eight subprojects2 and draft Resettlement and Indigenous
Peoples Plan(RIPP) for three subproject3 were prepared for the 11 selected project
cities/towns during the loan processing stage. Three subprojects4, where no involuntary
resettlement(IR) impacts were envisaged during initial assessment and due diligence
reports(DDRs) were prepared as per SPS, 2009. All the RPs and RIPPs prepared during the
1 The secondary towns are Class 2 and Class 3 cities not covered under previous ADB supported projects 2 Sirohi,Sardarsahar,Laxmangarh,Ratangarh,Khetri,Mandawa,Kuchaman,Ladnu. 3 Abu Road,Pratapgarh and Banswara. 4 Fatehpur,Makrana and Didwana
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
II | P a g e
loan processing stage need to be revised during implementation by CMSC. Accordingly, a
resettlement framework (RF) was also prepared to guide RSTDSP on Involuntary
Resettlement (IR) impacts during project implementation. During this reporting period, 100%
census and socio economic surveys of potential affected persons5(APs) has been
completed in 5 towns (Abu Road, Sirohi, Sardarsahar, Laxmangarh and Ratangarh) and
updating works of draft RP/RIPPs are under progress.
It is to confirm that all subprojects do not cause (i) any significant involuntary resettlement
(IR) impacts or/ and (ii) impact on indigenous people(IP). The construction of the sub-project
does not require any acquisition of land or cause permanent displacement. The locations for
the permanent site (sewerage treatment plants(STP), water treatment plants(WTP),
sewerage pumping stations, (SPS) Consumer Relation Management Centers(CRMC),
Central Control Center(CCC) etc.) have been carefully selected and proposed in the vacant
encumbrance free government land. some lands belonging to gaushala (cow shelter) trusts,
and government land classified as pasture lands have been obtained, following due
procedures required by the government.
During this reporting period, location of WTP, CRMC, CCC and Clear Water Reservoirs
(CWRs) and pump house has been changed in few subprojects as per technical
requirements. New locations which has been finalized for all the said components are vacant
government land and presently not in any use. Due diligence/field visit/transect walk were
undertaken by a team including Safeguard staff of CMSC/PMCBC, PIUs and, Project
contractors in all the new locations and it was confirmed that all the lands belongs to Urban
Local Bodies(ULB) and Public Health Engineering Department(PHED).
The main resettlement impact will be the potential reduction in the income of
vendors/hawkers operating in the right of way(RoW). As per survey of five towns, total 1671
potential APs(Abu Road-435 nos, Sirohi-336 nos, Sardarsahar-412 nos,Ratangarh-287 nos
and Laxmangarh-201 nos) were identied, among 687 are comes under vulnerable
category6.As per agreed entitlement matrix, disbursement of compensation against the
livelihood losses, Shifting/ Vulnerability Assistance, and escalation against delay in payment
as defined in RF with respect to cut off date shall be made prior to start of any civil work in
the affected areas. The sub-projects under Loan 3972-IND has been categorized as ‘B for involuntary resettlement (IR) and ‘B’7 for Indigenous People (IP) in accordance with the
ADB’s SPS 2009, which applies to this Project.
5 Presently the final alignment is being provided by the contractor DMA/Zone wise. As it was mandatory to
prepare revised RPs/RIPP including 100% socio economic survey of potential affected persons before start of civil work in the town, 100% socio economic survey was conducted for all the vendors/hawkers in both side of the road where water supply and sewerage networks pipeline are to be laid.
6 Vulnerable households comprise below poverty line households, female-headed households, households with out of school/working children, disabled person-headed household, elderly headed household, landless household, household with no legal title/tenure security, and schedule caste and scheduled tribe households.
7 Three towns Abu Road, Pratpgarh and Banswara has been declared as a scheduled area by the Government of
India. Whilst many Scheduled Tribe (ST) households residing in these three town; no longer maintain their cultural
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
III | P a g e
Up to this reporting period, Contracts for ten towns (Abu Road, Sirohi, Sardarsahar,
Laxmangarh, Ratangarh, Fatehpur, Pratapgarh, Banswara, Khetri and Mandawa have been
awarded. NTP for remaining four packages (Ladnu, Makrana, Didwana and Kuchaman) are
under progress. Pipelines of sewer and water supply network already been started in all the
awarded towns except Banswara, Khetri and Mandawa and works are executing in outskirt
and residential areas and are part of low density areas in terms of commercial activity. No
Involuntary resettlement impact was envisaged during transect walk.
Grievance Redress Mechanism (GRM) has been established under this sub-project. PIUs
with support of Construction Management Supervision Consultant(CMSC) & contractors are
entrusted with the responsibility to maintain a proper grievance register and ensure that the
grievances received during execution are recorded and resolved within the specified
timeframe. Contractor also shared toll free number with the households through their social
outreach team for lodging of complain/grievance, if any during execution of works. During the
reporting period, minor complaints from the people (housekeeping, pipeline damaged,
leakages in a new connection, etc.) were received, which have been resolved satisfactorily.
No complaints/grievances related to social safeguards were received during the reporting
period.
A series of meetings and consultations were held with the APs and other stakeholders
regarding scope of the project, entitlement options, impacts etc. at different stretches during
RP preparation. Leaflet with information about the subproject, its benefits, grievance redress
mechanism were also distributed to the households. Key Finding of consultations are: (i)
participants expressed satisfaction that there was a subproject taking care of their needs
which they have waited for 25-30 years; (ii) they raised that it is important to cover up the dug
holes properly and restore the roads after sub-project construction.
The Safeguard Specialist- Resettlement of PMCBC have been monitoring the overall social
safeguards activities and coordination among the PMU, PIUs, CMSC, contractors and local
people. The consultant visited sites during this reporting period in order to investigate
possible involuntary resettlement impacts, implementation of resettlement plan and related
social safeguards issues. PMCBC Safeguard Specialist- Resettlement provided
training/Sensitized to PIUs’/CMSC and Contractor engineers on ADB’s Policies and guidelines.
traditions and have settled amongst the non-tribal populations. The subprojects are expected to have beneficial
impacts on scheduled tribe community in these three Town- 100% of the scheduled tribe community in coverage
areas will be provided with water supply and sewerage connections.
1 | P a g e
A. PROJECT BACKGROUND AND DESCRIPTION
1. The Government of Rajasthan (GOR) has received a loan from Asian Development
Bank (ADB) for the implementation of water supply and sanitation (WSS) services in secondary
towns and heritage towns with populations between 20,000–115,0008 through a sector
loan modality. Rajasthan Secondary Towns Development Sector Project (RSTDSP), is the
fourth phase of investment projects financed by Asian Development Bank (ADB) and
implemented by the Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation
Limited-Externally Aided Projects (RUDSICO-EAP), previously known as Rajasthan Urban
Infrastructure Development Project (RUIDP).
2. The project will invest in (i) the rehabilitation and expansion of water supply network
through a district metering approach for management of nonrevenue water (NRW) and aiming
for 24x7 water supply, (ii) the rehabilitation and expansion of sewerage network, (iii)
modernization and new construction of water supply and waste water treatment plants, as
required, (iv) construction of faecal sludge management treatment plant, and (v) decentralized
waste water management systems in the project towns.
3. Project Components: The Project includes interventions in 14 towns: Abu Road,
Banswara, Didwana, Fatehpur, Khetri, Kuchaman, Ladnu, Laxmangarh, Khetri, Makrana,
Pratapgarh, Ratangarh, Sardarshahar, and Sirohi. Water supply subprojects are included in 8
towns and sanitation in 13 towns (see Table 1 and Figure 1). The project is financing
infrastructural development, in the form of construction and rehabilitation, related to water
supply and wastewater inclusive of capacity building of existing Municipal bodies. The works
proposed for 14 selected towns are depicted in Table 1(A).
4. Impact of the project, RSTDSP: The water supply improvements are expected to
benefit all, including the urban poor, by reducing water collection time from other sources, which
may be costly or unhygienic; and by minimizing earning losses from missed work due to
waterborne diseases. The project also aims for wastewater reuse and a city-wide, inclusive
sanitation approach to improve sanitation for all, including below poverty line households. Social
and community development is forming an important component of the project, involving
community mobilization; under well-organized proactive public awareness campaigns.
Table 1: Summary of Proposed Improvements in Project Towns.
Subprojects ULBs
Water supply (8
ULBs)
Abu Road, Banswara, Khetri, Kuchaman, Laxmangarh, Mandawa, Sardasahar,
Sirohi
Sanitation (13
ULBs)
Abu Road, Banswara, Didwana Fatehpur, Khetri, Kuchaman, Ladnu, Mandawa,
Makrana*, Pratapgarh*, Ratangarh*, Sardasahar, Sirohi
8 The secondary towns are Class 2 and Class 3 cities not covered under previous ADB supported projects
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
2 | P a g e
Figure 1: Location of project towns-RSTDSP
Table 1(A): Description of the subprojects
S.no Name of the
Town Type of
work Package Number
Description of the project
Project value (in
crore Rs.)
1 Abu Road
W/S
RSTDIP/ABR/01
Construction of works of water supply production and distribution network improvement with house service connections for nonrevenue water reduction and continuous water supply and providing sewer network with house connections and
263.77 W/W
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
3 | P a g e
S.no Name of the
Town Type of
work Package Number
Description of the project
Project value (in
crore Rs.)
construction of sewage treatment plant and all allied works and operation services of the entire system for 10 years at Abu-road town
2 Sirohi
W/S
Lot 1-RSTDIP/SHR/01
Construction of works of water supply production and distribution network improvement with house service connections for nonrevenue water reduction and continuous water supply and providing sewer network with house connections and construction of sewage treatment plant and all allied works and operation services of the entire system for 10 years at Sirohi town
213.92 W/W
3 Sardarshar
W/S
RSTDIP/SRD/01
Design and construction of works of water supply and providing sewer network with house sewer connections along with construction of sewage treatment plant & sewerage pumping station and all allied works and operation services of the entire system for 10 years at Sardarshahar (Churu)
196.70 W/W
4 Banswara
W/S
RSTDIP/SRD/04
Construction of works of water supply production and distribution network improvements with house service connections for nonrevenue water reduction and continuous water supply and providing sewer network with house sewer connections, along with construction of sewage treatment plant & sewerage pumping station and all allied works and operation services of the entire system for 10 years at Banswara town
320.74 W/W
5 Khetri
W/S
RSTDIP/KTR/03
Construction of works of water supply production and distribution network improvements with house service connections for nonrevenue water reduction and continuous water supply and providing sewer network with house sewer connections, and construction of sewage treatment plant and all allied works and operation services of the entire system for 10 years at Khetri (Jhunjhunu)
79.63 W/W
6 Kuchaman
W/S
RSTDIP/KMN/02
Construction of works of water supply production and distribution network improvements with house service connections for nonrevenue water reduction and continuous water supply and providing sewer
313.93 W/W
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
4 | P a g e
S.no Name of the
Town Type of
work Package Number
Description of the project
Project value (in
crore Rs.)
network with house connections, and construction of sewage treatment plant & sewage pumping station and all allied works and operation services of the entire system for 10 years at Kuchaman (Nagaur)
7 Mandawa
W/S
RSTDIP/MDW/03
Construction of works of water supply production and distribution network improvements with house service connections for nonrevenue water reduction and continuous water supply and providing sewer network with house sewer connections, and construction of sewage treatment plant, sewerage pumping station and all allied works and operation services of the entire system for 10 years at Mandawa (Jhunjhunu)
106.12 W/W
8 Ratangarh W/W RSTDIP/RTG-FTP-LXG/01-Lot 01
Construction of Sewer network with house connections, and construction of sewage treatment plant & sewage pumping station and all allied works and operation services of the system for 10 years at Ratangarh (Churu)
182.44
9 Fatehpur W/W RSTDIP/RTG-FTP-LXG/01-Lot 02
Construction of works of Sewer network with house connections, and construction of sewage treatment plant & sewage pumping station and all allied works and operation services of the system for 10 years at Fatehpur (Sikar)
114.89
10 Laxmangarh W/S RSTDIP/RTG-FTP-LXG/01-Lot 03
Construction of works of water supply distribution network improvements with house service connections for nonrevenue water reduction and continuous pressurized water supply and operation services of the entire system for 10 years at Laxmangarh (Sikar)
49.45
11 Pratapgarh W/W RSTDIP/PRT/01
Construction of Sewer system including sewerage network, sewage treatment plant, sewage pumping station and house sewer connecton along with all allied works and operation services of the entire system for 10 years at Pratapgarh
190.60
12 Ladnu W/W
RSTDIP/LDN-DID-MKN/01-Lot 01 (Lot 2-RSTDIP/LDN/01)
Construction of works of Sewer network with house connections, and construction of sewage treatment plant and all allied works and operation services of the entire system for 10 years at Ladnu (Nagaur)
174.40
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
5 | P a g e
S.no Name of the
Town Type of
work Package Number
Description of the project
Project value (in
crore Rs.)
13 Didwana W/W
RSTDIP/LDN-DID-MKN/01-Lot 02 (Lot 2-RSTDIP/DID/01)
Construction of works of Sewer network with house connections, and construction of sewage treatment plant & sewage pumping station and allied works and operation services of the entire system for 10 years at Didwana (Nagaur)
87.39
14 Makrana W/W
RSTDIP/LDN-DID-MKN/01-Lot 03 (Lot 2-RSTDIP/MKN/01)
Construction of works of Sewer network with house connections, and construction of sewage treatment plant & sewage pumping station and allied works and operation services of the entire system for 10 years at Makrana (Nagaur)
142.98
Source: Quarterly progress report (Jan-March 2021)
I. Purpose of the report
5. The purpose of the semiannual social safeguard monitoring report (SSMR) is to analyze
periodically over the total implementation period of the project to comply with the approved
involuntary resettlement (IR) documents such as resettlement plans (RP)/ Resettlement and
Indigenous Peoples Plans(RIPPs) and due diligence reports (DDRs). RSTDSP has the
responsibility to oversee the implementation and monitoring of social safeguards issues of each
subproject in the project towns. This report covers resettlement and social safeguard monitoring
results to comply with the spirit of ADB policy to ‘enhance stakeholders trust’ and ability to engage with ADB, and thereby increase the development impact (of projects) in which
disclosure of safeguard monitoring is a prominent aspect. This report covers social monitoring,
addressing all the issues related to social safeguards, with reference to the progress achieved
and the current status of the reporting period. The PMU is scheduled to provide the monitoring
report on social safeguards activities at semi-annual basis. The current report is the 1st semi-
annual social safeguard monitoring report(SSMR) prepared for the reporting period from
October 2020 to March 2021, in accordance with the ADB Safeguard Policy (SPS), 2009.
II. Social safeguard categorization
6. ADB's classification system as per ADB’s Safeguard Policy Statement (SPS) 2009 is as below: -
➢ Category A: Subprojects proposed for construction or development, will fall under
this category, if, it caused a significant involuntary resettlement impacts with a
physical displacement of 200 or more persons from their residences, or 200 or more
persons lose 10% or more of their productive or income generating assets, or more
persons or 200 or more persons experience a combination of both.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
6 | P a g e
➢ Category B: Any proposed subproject that includes involuntary resettlement impacts
but are not deemed significant considering loss of shelter/houses or productive or
income generating assets will be considered for category B.
➢ Category C: A proposed subproject that has no involuntary resettlement impact.
7. Prior to civil works implementation, all the subprojects selected for construction or
developments are screened through SIA and classified using ADB's classification system.
a) Subprojects Categorization under RSTDSP
8. The construction of the sub-projects does not require any acquisition of land or cause
permanent displacement. The locations for the permanent site (sewerage treatment plants,
water treatment plants(WTP), sewerage pumping stations(SPS), Consumer Relation
Management Centers(CRMC), Central Control Center(CCC) etc.) have been carefully selected
and proposed in the vacant encumbrance free government land while the pipelines for water
supply and sewerage will be laid within road rights-of-way (RoW). Some lands belonging to
gaushala (cow shelter) trusts, and government land classified as pasture lands have been
obtained, following due procedures required by the government. The main resettlement impact
is the potential reduction in the income of vendors/hawkers operating in the right of way(RoW).
During laying pipelines, presence of trenches, excavated soil, and machinery make access
difficult for customers to reach at that location where of vendors/hawkers are operating their
petty businesses.
9. As impacts are not significant, hence the sub-projects under Loan 3972-IND has been
categorized as ‘B for involuntary resettlement (IR) and ‘B for Indigenous People (IP) in
accordance with the ADB’s SPS 2009, which applies to this Project. Three subprojects towns
(Abu Road, Pratpgarh and Banswara) is declared as a scheduled area by the Government of
India. Whilst many Scheduled Tribe (ST) households residing in these three town; no longer
maintain their cultural traditions and have settled amongst the non-tribal populations. As these
three towns are declared scheduled area by the Government of India, therefore Indigenous
Peoples (IPs) for the purposes of this RIPPs were prepared for these three subprojects. The
subprojects are expected to have beneficial impacts on scheduled tribe community in these
three Town- 100% of the scheduled tribe community in coverage areas will be provided with
water supply and sewerage connections.
III. Status of preparation/Updating of RPs/RIPPs
10. Draft resettlement plans (RPs) for eight subprojects9 and draft Resettlement and
Indigenous Peoples Plans(RIPPs) for three subproject10 were prepared for the 11 selected
project cities/towns during the loan processing stage. Three subprojects11, where no involuntary
resettlement(IR) impacts were envisaged during initial assessment, due diligence reports were
9 Sirohi,Sardarsahar,Laxmangarh,Ratangarh,Khetri,Mandawa,Kuchaman,Ladnu. 10 Abu Road,Pratapgarh and Banswara. 11 Fatehpur,Makrana and Didwana
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
7 | P a g e
prepared as per SPS, 2009.(Details are provided in Table 2). All the RPs and RIPPs prepared
during the loan processing stage need to be revised during implementation by CMSC.
Accordingly, a resettlement framework (RF) was also prepared to guide RSTDSP on
Involuntary Resettlement (IR) impacts during project implementation.
. Table-2: Details of Social Safeguard Documents at the time of loan processing stage
S.N. Package number Name of Town and type of
projects Type of
Documents Categorization
1.
RSTDIP/RTG-FTP-LXG/01
Ratangarh Sewerage RP B
2. Fatehpur Sewerage DDR C
3. Laxamangarh Water Supply
RP B
4. RSTDIP/SRD/01 Sardarshahar Water Supply and Sewerage
RP B
5. RSTDIP/SHR-
ABR/01
Abu Road Water Supply and Sewerage
RIPP B
6. Sirohi Water Supply and Sewerage
RP B
7. RSTDIP/PRT/01 Pratapgarh Sewerage RIPP B
8. RSTDIP/BNS/04 Banswara Water Supply and Sewerage
RIPP B
9. RSTDIP/KTR/03 Khetri Water Supply and Sewerage
RP B
10. RSTDIP/LDN-DID-MKN/01
Ladnu Sewerage RP B
11. Didwana Sewerage DDR C
12. Makrana Sewerage DDR C
13. RSTDIP/KMN/02 Kuchaman Water Supply and Sewerage
RP B
14. RSTDIP/MDW/03 Mandawa Water Supply and Sewerage
RP B
Source: Agreed Resettlement Framework of RSTDSP
11. As per social impact assessment(SIA) conducted, the social impact in towns will be
generally temporary in nature affecting mobile/ambulatory vendors who are earning their
livelihood by using public land and considered non-titleholders. In addition to that during SIA it
was also noticed that under Sirohi subproject, Municipal land proposed for STP-1 (near Nehru
Nagar), was being used for farm cultivation by one family and will face permanent loss of
agricultural livelihood. Recognizing the adverse impacts (in advance) of the project and the
need to address the involuntary resettlement and other related adverse social impacts,
RUDSICO (on behalf of Govt. of Rajasthan) & ADB jointly prepared the resettlement and
rehabilitation framework consistent with applicable laws, notifications and policies that are
relevant in the context of the implementation of the project activities.
IV. Measures to avoid and minimize involuntary resettlement impacts
12. To avoid and minimize involuntary resettlement impacts, the subproject considers the
use of government land where available and right-of-way of government road for laying of all
proposed pipelines under this package. The pipelines are proposed to be laid underground
within the existing available road RoW. Contractor will also ensure that access is provided to all
households as well as shops. The Project Implementation Unit (PIU) will also ensure that all the
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
8 | P a g e
necessary rules related to safety and security of the public and residents are followed by the
contractor. The actual dates of construction schedule with respect to rush hour, festival time,
and special business days will be discussed with vendors, squatters, market committee
members, and residents, and accordingly construction activities will be planned. After laying
pipes, the lane/road will be restored to its original condition {including bitumen, cement concrete
(CC) and CC interlocking tiles as applicable}. Care is taken in the design, to ensure that
indigenous peoples/ scheduled tribe community have beneficial impacts.
13. The contractor will also be required to maintain access to shops and residences or other
buildings along pipe alignments and to institutions located close to proposed sites, and safety
through hard barricading of excavated alignments/sites. Specific provisions related to impact
avoidance, for pipe laying activities as well as construction work near schools, health centers,
Anganwadi centers (Integrated Child Development Scheme-ICDS), etc will have to be
maintained by the contractor.
14. Measures to be taken by the contractor to avoid/mitigate economic impacts include: (a)
announcement of proposed civil works in advance (to enable shop owners to stock up and
remain unaffected if goods vehicles are unable to reach them during construction), (b) provision
of planks to ensure pedestrian access; (c) careful timing of implementation to avoid peak sale
hours/days or school timings; (d) use of trenchless pipe laying technology, major civil work
during night hours especially in market areas, (e) minimizing construction period to the extent
possible; (f) assistance to mobile vendors if any present during construction, to shift nearby; (g)
signage with project details and contact details for grievance redress; (h) proper coordination of
civil works pertaining to both water supply and sewerage, such that the period of disruption
along a particular road section is minimized; and (i) proper traffic management. If any steps or
access ramps are damaged during construction, contractor will restore the same to original
condition or better. These measures are part of the contract and will be implemented with
careful monitoring by the concerned PIU.
15. The good practices will be adopted by the contractor are as below (including but not
limited to following):-
➢ Sewer pipelines will be laid in the middle of the road, and works will be executed in the
night with proper safety measures.
➢ Work will be executed on one segment at the time on one side of the road, and access
will be made available for the roadside petty businesses. Excavation will be expedited,
and walkways will be provided for access in order to avoid livelihood losses.
16. Provision of livelihood assistance for mobile/ambulatory vendors was made in the RF, in
view of disruption likely to be caused due to implementation of project activities. It was agreed
that compensation would be paid/given to the AHs for the entire period of disruption due to
implementation of different infrastructure works. The general period of impact (Water
Supply/Waste Water) of 14 days shall be considered while preparing RP. However, if the actual
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
9 | P a g e
dislocation exceeds the period taken, additional compensation for the extended period will also
be disbursed.
17. Additional assistance for vulnerable12 AHs and shifting assistance wherever applicable
is being provided to these AHs as per the Resettlement Framework. The RF already sets out
the requirements for payment, compensation, income restoration and relocation, consultation,
participation and disclosure and the grievance redress mechanism.
18. RUDSICO will ensure that any physically or economically displaced persons will be
compensated prior to commencement of civil works of subprojects where applicable, following
the approved RP/RF. However, the entitlement matrix included in the RF prepared and
approved by ADB is the basis for estimation of compensation and payment for the affected
properties and income loss to the APs/AHs and which, to be followed during preparation of
any/new RPs for the subprojects requires/involves temporary impact, land acquisition,
resettlement and rehabilitations of the affected households.
V. Impacts on Indigenous Peoples
19. Three subprojects Abu Road, Pratpgarh and Banswara are declared as a scheduled
area by the Government of India. Whilst many Scheduled Tribe (ST) households residing in
these three town; no longer maintain their cultural traditions and have settled amongst the non-
tribal populations. The project is designed to benefit 100% scheduled tribe households in the
project coverage area. House service connections for sewerage are included in project costs.
Further, to address any potential safeguards issues and ensure maximum benefits reach the
scheduled tribe households, a specific action plan for indigenous peoples is proposed for this
subproject. The action plan will carry out the following specific activities: (i) a baseline survey13
will be conducted for identification and inclusion of indigenous peoples households within the
project coverage area; (ii) proposed benefits (e.g.) to indigenous peoples households will be
shared and monitored; (iii) IEC materials, information sharing, consultations and other
activities14 stated in the CAPP will be culturally sensitive and appropriate when implemented in
the scheduled area; (iv) in case of any indigenous peoples impacts in subproject, the chief of
the tribe or a member of the tribal council as traditional arbitrator (to ensure that traditional
grievance redress systems are integrated) and an NGO working with indigenous peoples. GRC
will also ensure that grievance redress established is gender inclusive in receiving and
12 Including poor households, households headed by women, the elderly, the physically handicapped, Schedule Caste and Scheduled Tribes considered vulnerable based on the Indigenous Peoples Planning Framework (IPPF). Household is considered women headed when she is the single bread earner of the family or earn most/significant part of the income for the family.
13 Contractors will conduct connection campaigns across the project coverage area and will be responsible to ensure that IP households and localities are identified and included in the campaign. Data on exact number of scheduled tribe households can be generated from the house service connection survey (pertaining to both water supply and wastewater/sewerage) to be conducted by the project contractor prior to start of civil work. The localities where sewerage network will not laid shall be covered through FSM. Cost for such activity is already included in the contract document for the subproject.
14 CAPPC will be primarily responsible for planning implementing and monitoring the result of such activities.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
10 | P a g e
facilitating resolution of the IPs’ concerns; (v) consultations with IP households will be conducted in all subproject stages which shall help in identifying any culture-specific
requirements and traditions like avoidance of any specific festival days, and/or other activities
with cultural significance to the IP communities during civil work; and any other IP related issues
and concerns that may be of importance to the community. An end-line sample survey15 will be
conducted to document the views of IP households about subproject benefits. Such survey is in
line with subproject internal monitoring.
VI. Revision and updating of RPs/RIPPs
20. Revision/updating of RPs/RIPPs will be mandatory whenever there will be any changes
in project scope, and same will be shared with ADB for no-objection. No civil works will be start
prior to approval of no-objection from ADB.
VII. Strategy for implementation of Resettlement Plans/Resettlement and Indigenous
People Plans
21. Being Design Build and Operation (DBO) contracts, even though the DPR are being
prepared by consultants, the final design/alignment has to be provided/ prepared by the project
contractor. As per contract, contractor should have to carry out the execution activities in all
respects for that particular zones/DMAs and after completing the particular DMA/Zones,
contractor shall focus for remaining zones/DMAs on priority basis. Presently the final alignment
is being provided by the contractor DMA/Zone wise. As it was mandatory to revised RPs/RIPPs
before start of civil work, 100% socio economic survey was undertaken in Abu Road, Sirohi,
Ratangarh, Laxmangarh and Sardarsahar towns and all the vendors/hawkers in both side of the
road where water supply and sewerage networks pipeline to be laid were considered potential
affected persons. Prior to conducting inventory loss survey, project area was categorized based
on level of commercial activities/structures (high, medium and low density). As impact was
anticipated in high and medium density areas, hence 100% socio economic survey was
undertaken in high and medium density areas. After finalization of exact alignment, joint re-
confirmatory survey will be conducted by the officials of PIU, CMSC and contractor to finalize
the list of APs likely to be impacted due to civil works. During implementation, following
methodology will be followed:
22. The methodology followed for implementation of RPs is as following: Prior to the start of
work, contractors will provide the advance work plan to PIU & CMSC along with the final
alignment. After the intimation by the contractor, the joint re-confirmatory survey will be
conducted by the officials of PIU, CMSC, and contractor to finalize the list of APs likely to be
impacted due to civil works. Since at the time of survey, the exact alignment was not known, the
survey carried out all the vendors/hawkers in both side of the road likely to be impacted. While
finalizing the alignment, efforts will be made to avoid the impacts, and accordingly, the APs
present in this section will be included in the mitigated list.
15 Cost towards conducting end-line sample survey is included in the subproject budget table. Sample size may be decided by the Project in consultation with ADB.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
11 | P a g e
23. The area where the mitigation of impacts on livelihood will not possible, all the APs will
be re-validated/ verified by the Social support staff wil the help of social outreach team, and ID
cards will be disbursed to potential AP. Any potential APs will not be available during (i) Re-
verification; (ii) distribution of compensation; and (iii) construction phase, they will be treated as
“missing,” and confirmation of their absence will be obtained from the other affected
households(AHs). If any APs will show unwillingness to receive the compensation despite being
offered will be treated as “Unwilling” and their consent will be taken in writing.
24. Once the list will be finalized, Social support staff wil the help of social outreach team
will collect the details required from APs, which include the bank details and other necessary
documentation required for the transfer of compensation. Based on findings, the ASOs will
prepare the micro plans, and after approval/sanction by PIU, these micro plans will be
submitted to the treasury with required bank details for direct transfer of the compensation in
the bank account of APs through electronic clearance service/National Electronic Fund
Transfer(RTGS) payment.
25. APs will be compensated in accordance with the agreed entitlement matrix of RF. APs
will be compensated for 14 days’ disturbance as per RF, however, micro plans that will be
prepared for the project area, takes care of the real impacts on APs and it will be ensured that
all the APs will be compensated for the actual period of disturbance. If the duration of impact is
more, they will be compensated for the actual period of disturbance after due verification from
PIU. The compensation that will be recommended in the micro plan will considered the
entitlements prescribed in the RF (livelihood assistance, shifting assistance, and vulnerability
assistance), the time lags (7% inflation in survey income is provided per year) of implementation
& survey along with additional compensation with respect to minimum wage rates.
B. SAFEGUARDS IMPACTS
26. Contracts for ten towns (Abu Road, Sirohi, Sardarsahar, Laxmangarh, Ratangarh,
Fatehpur, Pratapgarh, Banswara, Khetri and Mandawa have been awarded. NTP for remaining
four packages (Ladnu, Makrana, Didwana and Kuchaman) are under progress. The physical
progress along with details of the contractor of the subprojects are provided in Table. Pipelines
of sewer and water supply network already been started in all the awarded towns except
Banswara, Khetri and Mandawa towns and works are executing in outskirt and residential areas
and are part of low density areas in terms of commercial activity. No Involuntary resettlement
impact was envisaged during transect walk. Contractor has not started any work in medium and
high density areas (identified project impacted areas during social impact assessment. (SIA).
12 | P a g e
Table 3: Status of subprojects -RSTDSP
S.no Name of the
Town Type of
work Package Number
Date of Award
Date of Completion
Name of Contractor Project value (in crore Rs.)
Progress (March 2021)
1 Abu Road W/S
RSTDIP/ABR/01 18.06.2020 21.06.2024 (1460 days)
M/s L&T Constructions 263.77 4.17 %
W/W 10.63 %
2 Sirohi W/S
Lot 1-RSTDIP/SHR/01 18.06.2020 21.06.2024 (1460 days)
M/s L&T Constructions 213.92 18.51 %
W/W 17.51 %
3 Sardarshar W/S
RSTDIP/SRD/01 15.06.2020 21.06.2023 (1095 days)
M/s L&T Constructions 196.70
14.94 %
W/W 13.57 %
4 Banswara W/S
RSTDIP/SRD/04 11.02.2021 14.02.2025 (1460 days)
M/s BIPL-SC-HP Joint Venture
320.74 0.00
W/W 0.00
5 Khetri W/S
RSTDIP/KTR/03 20.03.2021 20.03.2024 (1095 days)
M/s Lahoty- LNA(JV) 79.63 0.00
W/W 0.00
6 Kuchaman W/S
RSTDIP/KMN/02 W/W
7 Mandawa W/S
RSTDIP/MDW/03 08.03.2021 20.03.2024 (1095 days)
M/s LNA- R & B JV 106.12 0.00
W/W 0.00
8 Ratangarh W/W RSTDIP/RTG-FTP-LXG/01-Lot 01 15.06.2020 21.06.2023 (1095 days)
M/s L&T Constructions 182.44 25.02 %
9 Fatehpur W/W RSTDIP/RTG-FTP-LXG/01-Lot 02 15.06.2020 21.06.2023 (1095 days)
M/s L&T Constructions 114.89 36.59 %
10 Laxmangarh W/S RSTDIP/RTG-FTP-LXG/01-Lot 03 15.06.2020 21.06.2023 (1095 days)
M/s L&T Constructions 49.45 26.53 %
11 Pratapgarh W/W RSTDIP/PRT/01 28.10.2020 01.11.2024 (1460 days)
M/s Khilari Infrastructure
Pvt. Ltd. 190.60 8.46%
12 Ladnu W/W RSTDIP/LDN-DID-MKN/01-Lot 01
(Lot 2-RSTDIP/LDN/01)
13 Didwana W/W RSTDIP/LDN-DID-MKN/01-Lot 02
(Lot 2-RSTDIP/DID/01)
14 Makrana W/W RSTDIP/LDN-DID-MKN/01-Lot 03
(Lot 2-RSTDIP/MKN/01)
Source: QPR-March 2021
13 | P a g e
(i) Types of impacts envisaged under RSTDSP
27. For assessment of involuntary resettlement impacts in the towns joint visit and transect
walk was undertaken by the officials of PIUs, CMSC and Contractors in all the areas including
areas / along proposed alignment where pipeline will be laid and it was confirmed that laying of
main line (runk main and transmission main/feeder main) will be carried-out within the
boundaries of RoW of government roads. No commercial establishments are identified in the
stretches where transmission main/feeder main and trunk mains are proposed. Water
distribution network pipelines under water supply component will be mostly laid along the
existing RoW of the town roads, while sewer lines will be laid in the middle of the roads, as a
result there will be temporary livelihood disruption on mobile/ambulatory vendors who are
earning their livelihood by using public land and considered non-titleholders. During impact
assessment it was noticed that under Sirohi subproject, Municipal land proposed for STP-1
(near Nehru Nagar), was being used for farm cultivation by one family and will face permanent
loss of agricultural livelihood.
28. During this reporting period, 100% census and socio economic surveys of potential
affected persons16 has been completed in five towns (Abu Road, Sirohi, Sardarsahar,
Laxmangarh and Ratangarh) and revision of draft RP/RIPPs are under progress. Prior to
survey, objectives of survey were communicated to potential affected persons and leaflet
containing project scope and its impact, type of losses and compensation provision for the
losses, procedure of complaining grievances was briefed. (Leaflet and photographs are
attached in Appendix 1 and 1(a)). As impact were envisaged on non-titleholders, hence as
per resettlement framework(RF), cut-off-date for temporary impacts was communicated in the
entire affected area at the start of the census survey and also list of potential affected persons
was displayed area wise and at the same time for the entire city to prevent duplication in
identification of affected persons specifically those moving into a new area during project
planning and implementation phase. (Copy of cutoff date and Photographs of cutoff date
displayed is attached in Appendix 2 and 2(a))
29. As per Survey data out of five towns, total 1671 potential APs(Abu Road-435 nos,
Sirohi-336 nos, Sardarsahar-412 nos,Ratangarh-287 nos and Laxmangarh-201 nos) were
identified ,among them 687 are comes under vulnerable category17. Summary of potential APs
subproject wise is presented in Table 4 and socio-economic profile of potential affected
person’s subproject wise is attached in Appendix 3.
16 Presently the final alignment is being provided by the contractor DMA/Zone wise. As it was mandatory to prepare
revised RPs/RIPP including 100% socio economic survey of potential affected persons before start of civil work in the town, 100% socio economic survey was conducted for all the vendors/hawkers in both side of the road where water supply and sewerage networks pipeline are to be laid.
17 Vulnerable households comprise below poverty line households, female-headed households, households with out of school/working children, disabled person-headed household, elderly headed household, landless household, household with no legal title/tenure security, and schedule caste and scheduled tribe households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
14 | P a g e
Table 4: No. of APs reported as per socio-economic survey
Name of Town Subproject Name Type of Impact No. of APs No. of Vulnerable
APs
Abu Road Water supply and Sewerage
Temporary 435 245
Sirohi Water supply and Sewerage
Temporary 336 148
Sardarsahar Water supply and Sewerage
Temporary 412 157
Ratangarh Sewerage Temporary 287 76
Laxmangarh Water supply Temporary 201 61
Total APs 1671 687 Source: Socio-Economic Survey
(ii) Vulnerability Status of the Affected People/Communities:
30. During survey, special attention was given to collect information from the affected
households for special assistance. As per agreed Framework and ADB policy, the following
groups are categorized under vulnerable Groups. These groups include: (a) those who are
below the poverty line (BPL); (b) those who belong to scheduled castes (SC), scheduled tribes
(ST) (c) Female-headed households (FHH); (d) elderly and (e) Disabled persons. Under this
five project Total 687 Vulnerability household has been identified Details are summarized in
Table 5.
Table 5: Details of Vulnerability household
Type of Vulnerability Abu Road Sirohi Sardarsahar Ratangarh Laxmangarh
Female Headed Households 193 69 08 11 8
Schedule Caste 11 33 73 33 25
Schedule Tribes 41 17 2 0 0
Physical Disabled 0 2 0 0 0
Below poverty Line 0 22 74 32 28
Widow 0 5 0 0 0
Total 245 148 157 76 61
Source: Socio-Economic Survey
(iii) Impacts on Indigenous People
31. Based on census and socio-economic survey of Abu Road subproject, among the
affected persons facing involuntary resettlement impacts (temporary income loss), 41 persons
belong to scheduled tribe community. These persons are using the RoW for running their
livelihood through selling of fruits, garments, flowers etc. and will be impacted for temporary
period of work. During freezing of final alignment, efforts will be made by the implementing
agency to provide access for continuation for their livelihood. In case of temporary livelihood
impacts persists, additional compensation and assistances as per agreed resettlement
framework and indigenous peoples planning framework will be disbursed to them. In order to
mitigate negative impacts on ST persons, before and during the subproject design,
implementation, as well as monitoring process, the project staff will enhance the dissemination
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
15 | P a g e
of project information and conducting meaningful consultation especially with ST persons to
ensure that they get the maximum benefit from the advantage conditions brought by the
subproject and fully understand their entitlements under this RIPP. No civil works will be
allowed in sections of impact and compensation payment will be completed prior to start of civil
works. Survey works in remaining two towns (Pratapgarh and Banswara) are under progress.
32. Cosumer survey already been done by project contractor in Abu Road and Pratapgarh
and data of detailed of ST households has been collected for provide 100% House service
connections for sewerage to scheduled tribe households. Several round of consultation done
with ST households in these towns and project scope and advantages was disseminated to
them. CAPP18 consultant will developed IEC materials, and will be provide skill training,
formation of groups, linkage with livelihood scheme etc.
(iv) Changes in original scope of works:
33. During this reporting period, location of Water treatment plant (WTP), Consumer
Relation Management Center (CRMC), Central Control Centre (CCC) and Clear Water
Reservoirs (CWRs) and pump house has been changed in few subprojects as per technical
requirements. (Ref Table 5 for details of changed locations). New locations which has been
finalized for all the said components in vacant government land and presently not in any use.
Due diligence/field visit/transect walk were undertaken by a team including Safeguard staff of
CMSC/PMCBC, PIU and, Project contractor in all the new locations and it was confirmed that all
the lands belongs to ULB/PHED. Details of changed location subproject wise are presented in
below:
A. Abu Road subproject: During confirmatory survey, location of Water treatment plant
(WTP), Consumer Relation Management Center (CRMC), Central Control Centre (CCC) and
Clear Water Reservoirs (CWRs) and pump house has been changed as per technical
requirements. (Ref Table 1 for details of changed locations). New locations which has been
finalized for all the said components are vacant government land and presently not in any use.
Initially 10 MLD WTP was proposed behind ITI College, Santpur which was pasture land. Due
to delay in process of land conversion of previously identified WTP land, meeting of PIU was
held with District Collector and officials of urban local body (ULB). It was decided in the said
meeting that the land parcel (allotted to Municipality) erstwhile designated for solid waste
disposal be allotted for construction of WTP (10 MLD) and STP-6.9 MLD. Location of CWR at
Gandhi Nagar has been changed and new location has been identified in the village Kue. In
addition to that CWR of 500kL proposed earlier at PHED campus at housing board will be
constructed in the vacant and unused land in the assistant engineer (A. En) PHED office
campus in housing board. Additional land adjacent to PHED campus, Market area has been
allotted by Municipality to PHED for the construction of CWR and Pump house. The location of
Consumer Relation Management Center (CRMC) and Central Control Centre(CCC) has been
18 Cotract Award of CAPP is in process.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
16 | P a g e
changed and new location finalized in the Shantikunj Park. (Details of changed locations under
Abu Road subproject are presented in table 6)
Table 6: Components and its location
Town-Abu Road- Town-Abu Road
S.No Components Remarks Photographs
1 WTP at Santhpur ( 10 MLD)
Initially 10 MLD WTP was proposed behind ITI College, Santpur which was pasture land. Due to delay in process of land conversion of previously identified WTP land, the land near cremation building (Moksh Dham) at Santhpur is allotted for the construction of both WTP (10 MLD) and STP (6.9 MLD). District Administration already given direction to the officials of Revenue department and Municipality for searching new solid waste disposal site. Municipality already provided confirmation in this regard.
2 CWR at Gandhi Nagar
Previously proposed in the existing PHED campus, Gandhi Nagar. Land within the existing premises was not enough as decided during measurement by DBO contractor. New land identified in village Kue. Land identified in the village Kue is vacant and unused land of Urban Improvement Trust (UIT) .NoC obtained from UIT.
3 CWR of 500kL proposed earlier at PHED campus at housing board
CWR of 500 KL was proposed earlier in PHED campus at housing board. As per discussion with PHED new land proposed in A.En PHED campus, Housing Board. Vacant and unused land in the A. En PHED office campus in housing board is available in the campus. Land is under the possession of PHED.
4 CWR at Market Area
Adjacent land belongs to Municipality also allotted to PHED for the said works. Land is vacant.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
17 | P a g e
Town-Abu Road- Town-Abu Road
S.No Components Remarks Photographs
5 Consumer Relation Management Center (CRMC) and Central Control Centre
New location finalized in the Shantikunj Park. Land is completely vacant and Municipality have the ownership of this land.
Source: Monthly progress report of Contractor, December 2020
B. Sirohi subproject: Clear water reservoir (CWR) proposed earlier at existing Public Health
and Engineering Department (PHED) Campus, Sardulpura has been dropped from scope of
works and CWR at existing PHED Campus, Rampura has been shifted in existing PHED
Campus, Kalka Ji. Hence the capacity of CWR proposed in Kalkaji HW has been increased
from 580 KL to 1450KL. In addition to that intake of 3.9 MLD at Kalka ji Dam has also been
dropped/curtailed from the scope of works. The land availability within existing Angor
Headworks was not enough for the construction of WTP, CWR, Pump house and allied works,
hence additional land (pasture land) adjacent to the existing Angor Headworks has been
allotted by District Collector. Two Ground Level Storage Reservoir(GLSR) also proposed under
this subproject for which land identification is still under progress. Changes done during SIP
stages is presented in Table 7.
Table 7: Details of works that has been dropped /added from scope of works
S.No Name of work Remark
1
CWR & PH- Existing PHED
Campus, Sardulpura
Dropped
2 Intake-1- kalkaji Dropped
3 WTP, CWR Pump
house- PHED Headwork, Angore
Additional land (pasture land) adjacent to the existing Angor Headworks has been allotted by District Collector as per Rajasthan land reforms act 1963 and as compensatory measure, the collector has allotted equivalent land area in Angore village. Land is completely vacant and is not being used for grazing purpose.
4 CWR & PH-
Existing PHED Campus, Rampura
Shifted to Existing PHED Campus, Kalka Ji. Land is under the possession of PHED.Unused land is available in the campus for the said work.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
18 | P a g e
S.No Name of work Remark
5 GLSR- Bhatkhera Land still not identified
6 GLSR- Tankria Land still not identified
Source: Monthly progress report of Contractor, December 2020
C. Sardarsahar Subproject: Location of clear water reservoir(CWR) has been slightly
changed. Earlier location was finalized right side of main building of public health engineering
department(PHED). PHED allotted new land for CWR, consumer relation management
centre(CRMC) Central control centre(CCC) and Master control centre(MCC) behind main
building of PHED office. In addition to that one additional CRMC building has also considered
under this subproject. Location for CRMC building has been finalized in the campus of fire
station, which are under the possession of Municipality. Changes done during SIP stages is
presented in Table 8.
Table 8: Proposed subproject components
Town-Sardarsahar
S. No
Components Remarks Photographs
Water Supply
1. Construction of CWR - 2400 kL and clear water pump house – 35 m * 10 m Consumer Relation Management Centre, Master Control centre and Central Control Centre- Hanumangarh Road within Public Health Engineering Department (PHED - Head Works)
Lands belongs to PHED. vacant land is available in then existing PHED campus for the said works
.
2. CRMC-2 - Fire station office campus
Land is under the possession of Municipality. Presently scrapped materilas are kept this site which will be disposed somewhere as confirmed by municipality.
Source: Monthly progress report of Contractor, December 2020
D. Ratangarh Subproject: The location of consumer relation management centre(CRMC)
which was earlier proposed in the premises of sewage pumping station(SPS) near bharat
sanchar nigam limited(BSNL) office has been changed after assessment of site feasibility by the
design built operator(DBO) contractor. New location has been finalized in the premises of
Municipality. Municipality have an ownership of this land. Changes done during SIP stages is
presented in Table 9.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
19 | P a g e
Table 9: Proposed Subproject Components
S. No
Components Details Photographs
1 Consumer relation management centre
One Consumer Relation Management Centres (CRMC) will be constructed in the same premises where SPS-1 is proposed, while second CRMC will be constructed in the Municipality office premises, which was earlier proposed near BSNL office. vacant land is available in Municipality campus for the said work.
Source: Detailed Project Report/BOQ, Ratangarh, 2020
E. Laxmangarh Subproject: The location of one consumer relation management
centre(CRMC) and Master Control Centre(MCC) which was earlier proposed in the Bad ke
Balaji Public Health Engineering Department (PHED) premises has been changed after
assessment of site feasibility by the Design Built Operator(DBO) contractor. New location has
been finalized in the premises of Executive Engineer(EE), PHED office premises. Changes
done during SIP stages is presented in Table 10.
Table 10: Proposed Subproject Components
S.No. Components Details Photographs
1 Master control centre and consumer relation management centre
1 no of Master control centre and CRMC will be constructed in EE, PHED office premises (Previously proposed in Badd ke balaji PHED campus) while second CRMC will be constructed in A. En campus. vacant land is available for the construction of CRMC and MCC in EE,PHED office premises.
Source: Monthly progress report of Contractor, December 2020
F. Fatehpur Subproject: During DPR and initial design stage, Consumer Relation
Management Center (CRMC)-was proposed in the SPS campus, behind Dholi Sati
temple. After mobilization of project contractor and detailed measurement survey, new
land for Consumer Relation Management Center (CRMC) is identified in the campus of
Municipality. During site visit, it was revealed that vacant land is available within the
premises of Municipality and land is in the possession of Municipality. In the proposed
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
20 | P a g e
site, one Consumer Relation Management Center already been constructed under
UIDSSMT project. Changes done during SIP stages is presented in Table 11.
Table 11 : Proposed Subproject Components
S.No. Components Details Photographs
1 consumer relation management centre
Initially it was decided that consumer relation management centre will be constructed within proposed SPS, behind Dholi sati Temple. As per suggestion of project contractor after assessment of site feasibility, Municipal body has been provided new land within premises of Municipal office. Land is free and under the possession of Municipality.
G. Pratapgarh Subproject: At the time of DPR preparation, STP (7 MLD) and treated effluent
reuse works including construction of TEER, TESR and EPS was proposed near Mukti Dham,
while SPS (7 MLD) was proposed near Bhatpura Gate. Both the lands were under the
jurisdiction and ownership of Nagar Palika (Municipal Body). During confirmatory survey and as
required by DBO contractor, STP and SPS location has been changed and new locations of
STP has been finalized near Kila Road while location of SPS has been identified near Jain
Gausala. Both the lands are under the jurisdiction and ownership of Nagar Palika (Municipal
Body). In addition to that One manhole with pumping (MWP) has been proposed in Zone 1 for
transportation of flow to Zone 2 Gravity Main. This is a small pumping station of 0. 10 MLD
capacity has also proposed under this subproject to avoid the deeper sewer. Land has been
identified by the local body at the bank of Nallah in Manpur. Changes done during SIP stages is
presented in Table 12.
Table 12: Proposed Subproject Components
S.No. Components Details Photographs
1 STP-7 MLD STP location has been changed and new locations of STP has been finalized near Kila Road. Nagar Palika (Municipal Body have the ownership of this land.
2 SPS-7 MLD Location of SPS has
been identified near Jain Gaushala. Lands is under the jurisdiction and ownership of Nagar Palika (Municipal Body).
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
21 | P a g e
S.No. Components Details Photographs
3 One manhole with pumping (MWP) 0. 10 MLD
Land has been identified by the local body at the bank of Nallah in Manpur and land is under the possession of Municipality.
(v) Impact minimization:
34. Under Sirohi subproject, Municipal land proposed for STP-1 (near Nehru Nagar), was
being used for farm cultivation by one family and will face permanent loss of agricultural
livelihood. To avoid impact on seasonal crops, site was handed over to the contractor in lean
season when no crops was ploughing by one affected family. Thus loss of seasonal crops was
avoided.
Site was used for farm cultivation Allotted the site in lean season
35. For provide benefits to the family,
one member of that family have been
engaged as a watchmen and monthly
payment ₹ 8000 is being paid to them by the project contractor. In addition to that
skill training will also provide to that family
under this subproject effort will be made to
link that AHs from govt welfare scheme.
Letter of appointment of a family member
is attached in Appendix 4.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
22 | P a g e
(vi) Due diligence of the areas where pipeline works are under progress
36. The contract of Abu road and Sirohi was awarded on 18.06.2020 and Sardarsahar,
Laxmangarh, Fatehpur and Ratangarh awarded on 15.06.2020. Contract of Pratapgarh
awarded on 28.10.2020. Approval has been given to the contractor for laying of pipeline and
allied works in mostly residential situated in the outskirts of the town. No physical works started
in the permanent sites designated for construction of subproject components other than pipe
laying (WTP, STP, SPS, CRMC, MCC, CCC and CWR).
37. Due diligence/field visit/transect walk were undertaken by a team including Safeguard
staff of CMSC/PMCBC, PIU and, Project contractor in all the areas where pipeline works has
been laid or to be laid. It was envisaged that all the areas where pipeline works were allowed
are mostly residential and outskirt areas of the town and are part of low density areas in terms
of commercial activity. No Involuntary resettlement impact was envisaged during transect walk.
Social outreach team of the project contractor provided advance information to the households
prior to pipe laying works and works are being executed after incorporating the suggestion from
households, if any. Summary of pipe laying works are presented in Table 13 and details of the
road, dia of pipeline along with photographs of the roads provided in Appendix 5.
Table 13: Status of pipelines works as on March 2021
S.no Name of the Town
Type of
work
Date of Award
Progress (March 2021)
Name of Zone where
pipeline works are
under progress
Remarks
No Involuntary resettlement impact was envisaged during transect walk. Social outreach team of the project contractor provided advance information to the households prior to pipe laying works.
1 Abu Road W/S
18.06.2020 4.17 %
W/W 10.63 % Zone-2
2 Sirohi W/S
18.06.2020 18.51 % Zone-6
W/W 17.51 % Zone-2
3 Sardarshar W/S
15.06.2020 14.94 %
Zone 4
W/W 13.57 % Zone 3&4
4 Ratangarh W/W 15.06.2020 25.02 % Zone 1,2
and 5
5 Fatehpur W/W 15.06.2020 36.59 % Zone 3
6 Laxmangarh W/S 15.06.2020 26.53 % Zone 7&8
7 Pratapgarh W/W 28.10.2020 8.46%
Source: Monthly progress Report-May 2021
(vii) Entitlement, Assistance and Benefits
38. All affected persons who are identified in the sub-project areas on the cut-off date will be
entitled to compensation for their loss, and rehabilitation measures (as outlined in the
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
23 | P a g e
entitlement matrix19 below table 14) sufficient to assist them to improve or at least maintain their
pre project living standards, income-earning capacity and production levels. Affected persons
will be provided 30 days’ advance notice to ensure no or minimal disruption in livelihood. If
required, they will also be assisted to temporarily shift for continued economic activity. For
example, they will be assisted to shift to the other side of the road where there is no
construction. Ensuring there is no income or access loss during sub-project construction is the
responsibility of contractors. Vulnerable APs will be given priority in project construction
employment and provided with additional special assistance for income restoration support.
Compensation and assistance to APs will be made prior to possession of land/assets (if any)
and prior to the start of civil works in particular stretch.
19 As design and drawings are still under process,all types of impacts and their entitlement provision kept in table 14.
24 | P a g e
Table 14: Entitlement Matrix20
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
1 Loss of private land
Agricultural land, a homestead land or vacant plot
Legal titleholders/ traditional titleholders
• Compensation at replacement value (as per RFCTLARRA, 2013) or land-for-land where feasible If land-for-land is offered, titles will be in the name of original landowners. Joint titles in the name of husband and wife will be offered in the case of married affected persons
• Fees, taxes, and other charges related to replacement land (applicable to all parcels of replacement land, which totals the equivalent area of land acquired, if parcels of non-contiguous land are bought due to the unavailability of one contiguous parcel).
• One-time resettlement allowance of ₹50,000 per affected family
• One of the options from: (i) job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) one-time payment of ₹500,000 per family; (iii) annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• All displaced familiese will receive both: (i) one time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. Schedules Castes/Scheduled Tribes from scheduled areas will receive additional ₹50,000
• Fees, taxes, and other charges should be completed within a year of compensation payment and for land of equivalent size.
•
• Vulnerable households will be identified during the census.
•
• New land registrations and titles should be completed prior to project closure/completion.
The Valuation Committee will determine replacement value as per the procedures outlined in the subsequent sections of this document. PMU will ensure provision of notice. CMSC23 with support of DBO contractor and CAPPC will verify the extent of impacts through a 100% survey of affected persons, determine assistance, and identify vulnerable households.
20 All entitlements in rupees (other than those provided under RFCTLARRA) will be adjusted for inflation till the year of compensation payment.
21 Transportation costs, monthly subsistence allowance and resettlement costs are not incremental. For example, if an affected household loses land, shelter and commercial business in one lot, the family will get each of these allowances only once.
22 For design, build and operate (DBO) contracts, the DBO contractor undertakes design tasks.
23 CMSC may hire services of any agency/NGO for verification survey, census/socio-economic survey, DMS survey as part of their contract provisions.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
25 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
towards the same
• All affected familiesf will receive: (i) compensation for damage to land/quality of land (if any) sustained by reason of severing land proposed for acquisition or adjoining lands from/to affected land; calculated from the date of preliminary notification till the date of final award; (ii) Bonafide; resulting from diminution of the profits of the land between the time of the publication of the Declaration for taking possession of land and the time of the Collector's taking actual possession of the land; and (iii) Compensation incidental to such change if affected landowner is compelled to change his place of residence or business due to proposed land acquisition
• Notice to harvest standing seasonal crops and compensation in item 6.
• Additional compensation for vulnerable householdsg (item 7).
1-a Loss of private land
Agricultural land, homestead land or vacant plot
Tenants and leaseholders (whether having written tenancy/lease documents or not)
• Compensation for rental deposit or unexpired lease.
• One-time resettlement allowance of ₹50,000 per affected family
• One of the options from: (i) Job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) One-time payment of ₹500,000 per family; (iii) Annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. Scheduled Castes/Scheduled Tribes from scheduled areas will receive additional ₹50,000 towards the same
• Land owners will reimburse tenants and leaseholders land rental deposit or unexpired lease
•
• Vulnerable households will be identified during the census.
CMSC will confirm land rental and ensure tenants and leaseholders receive reimbursement for land rental deposit or unexpired lease, and report to PIU/PMU. PIU to initiate and PMU to ensure provision of notice.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
26 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
• All affected families will receive: (i) Compensation for damage to land/quality of land (if any) sustained by reason of severing land proposed for acquisition or adjoining lands from/to affected land; calculated from the date of preliminary notification till the date of final award; (ii) Bonafide; resulting from diminution of the profits of the land between the time of the publication of the Declaration for taking possession of land and the time of the Collector's taking actual possession of the land; and (iii) Compensation incidental to such change if affected landowner is compelled to change his place of residence or business due to proposed land acquisition
• Notice to harvest standing seasonal crops and compensation in item 6.
• Additional compensation for vulnerable households (item 7).
1-b Loss of private land
Agricultural land
Sharecroppers • Notice to harvest standing seasonal crops and compensation in item 6.
• One-time Resettlement allowance of ₹50,000 per affected family
• One of the options from: (i) Job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) One-time payment of ₹500,000 per family; (iii) Annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• All affected families will receive: (i) Compensation for
• Harvesting prior to acquisition will be accommodated to the extent possible.
•
• Work schedule will avoid harvest season.
•
• Vulnerable households will be identified during the census.
PIU to initiate and PMU to ensure provision of notice. CMSC will identify vulnerable households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
27 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
damage to land/quality of land (if any) sustained by reason of severing land proposed for acquisition or adjoining lands from/to affected land; calculated from the date of preliminary notification till the date of final award; (ii) Bonafide; resulting from diminution of the profits of the land between the time of the publication of the Declaration for taking possession of land and the time of the Collector's taking actual possession of the land; and (iii) Compensation incidental to such change if affected landowner is compelled to change his place of residence or business due to proposed land acquisition
• Additional compensation for vulnerable households. 1-c Loss of
private land Agricultural land, homestead land or vacant plot
Encroachers and Squatters
• 60 days’ advance notice to shift from encroached land.
• Notice to harvest standing seasonal crops and compensation in item 6.
• One of the options from: (i) Job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) One-time payment of ₹500,000 per family; (iii) Annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• One-time Resettlement allowance of ₹50,000 per affected family, if dependent on the affected land for minimum three years.
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• Additional compensation for vulnerable households.
• Vulnerable households will be identified during the census.
PIU to initiate and PMU to ensure provision of notice. CMSC will identify vulnerable households.
2 Loss of Vacant plot, Leaseholders • Reimbursement of unexpired lease. • Vulnerable households PIU to initiate and PMU to
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
28 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
Government land
Agricultural land, homestead land
• One-time Resettlement allowance of ₹50,000 per affected family
• One of the options from: (i) Job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) One-time payment of ₹500,000 per family; (iii) Annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• All affected families will receive: (i) Compensation for damage to land/quality of land (if any) sustained by reason of severing land proposed for acquisition or adjoining lands from/to affected land; calculated from the date of preliminary notification till the date of final award; (ii) Bonafide; resulting from diminution of the profits of the land between the time of the publication of the Declaration for taking possession of land and the time of the Collector's taking actual possession of the land; and (iii) Compensation incidental to such change if affected landowner is compelled to change his place of residence or business due to proposed land acquisition
•
• Additional compensation for vulnerable households.
• Notice to harvest standing seasonal crops and compensation in item 6.
• Additional compensation for vulnerable households.
will be identified during the census.
ensure provision of notice. CMSC will identify vulnerable households.
2-a Loss of Government
Vacant plot, Agricultural
Non-titleholders
• 60 days’ advance notice to shift from encroached land.
• Vulnerable households will be identified during
PIU to initiate and PMU to ensure provision of notice.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
29 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
land land, homestead land, RoW of road
• Notice to harvest standing seasonal crops and compensation in item 6.
• One-time Resettlement allowance of ₹50,000 per affected family, if dependent on the affected land for minimum three years.
• If residing for three years prior to acquisition, One of the option from: (i) Job for at least one member of the affected family in project which has created impact or in similar such other project; (ii) One-time payment of ₹500,000 per family; (iii) Annuity policy that shall not pay less than ₹2,000 per month per family for 20 years with appropriate indexation to the Consumer Price Index for Agricultural Labourers.
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• Additional compensation for vulnerable households.
the census. CMSC will identify vulnerable households.
3 Loss of residential structure
Residential structure and other assetsi
Legal titleholders
• Replacement cost of the structure and other assets (or part of the structure and other assets, if remainder is viable) without any depreciation value applied.
• If house lost in rural areas, constructed house as per Indira Awas Yojana specifications. If in urban area, house of minimum 50 square meters (m2). plinth area. This benefit should be extended irrespective of title if the affected family is residing in affected area for continuously at least for three years prior to issue of notification. In urban area if family is not willing to accept the constructed house then shall get one-time financial assistance of at least ₹150,000. In rural areas, the actual cost of house construction shall be offered in such cases.
• Fees, taxes, and other charges related to
• Vulnerable households will be identified during the census.
Valuation committee will verify replacement value. CMSC will verify the extent of impacts through a 100% survey of affected households determine assistance, verify and identify vulnerable households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
30 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
replacement structure.
• Right to salvage materials from structure and other assets with no deductions from replacement value.
• One-time resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. Scheduled Castes/Scheduled Tribes from scheduled areas will receive additional ₹50,000 towards the same
• Additional compensation for vulnerable households. 3-a Loss of
residential structure
Residential structure and other assets
Tenants and leaseholders
• Replacement value of the structure and other assets (or part of the structure and other assets, if remainder is viable) constructed by the affected person.
• If residing for minimum three years prior to acquisition, if house lost in rural areas, constructed house as per Indira Awas Yojana specifications. If in urban area, house of minimum 50 m2. plinth area. This benefit should be extended irrespective of title if the affected family is residing in affected area for continuously at least for three years prior to issue of notification. In urban area if family is not willing to accept the constructed house then shall get one-time financial assistance of at least ₹150,000. In rural areas, the actual cost of house construction shall be offered in such cases.
• Fees, taxes, and other charges related to replacement structure.
• Compensation for rental deposit or unexpired lease.
• Right to salvage materials (of the portion constructed by affected person) from structure and other assets with no deductions from replacement value.
• Additional compensation for vulnerable households.
• Land/structure owners will reimburse tenants and leaseholders rental deposit or unexpired lease.
•
• Vulnerable households will be identified during the census.
•
Valuation committee will verify replacement value. CMSC will verify the extent of impacts through 100% surveys of affected households determine assistance, verify and identify vulnerable households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
31 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
• One-time resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 per month for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same.
3-b Loss of residential structure
Residential structure and other assets
Non-titleholders
• Replacement value of the structure and other assets (or part of the structure and other assets, if remainder is viable) constructed by the affected person.
• Right to salvage materials from structure and other assets with no deductions from replacement value.
• If residing for minimum three years prior to acquisition, if house lost in rural areas, constructed house as per Indira Awas Yojana specifications. If in urban area, house of minimum 50 m2. plinth area. This benefit should be extended irrespective of title if the affected family is residing in affected area for continuously at least for three years prior to issue of notification. In urban area if family is not willing to accept the constructed house then shall get one-time financial assistance of at least ₹150,000. In rural areas, the actual cost of house construction shall be offered in such cases.
• Fees, taxes, and other charges related to replacement structure.
• One-time Resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 per month for one year (total ₹36,000) from the date of award. Scheduled Castes/Scheduled
• Vulnerable households will be identified during the census.
PIU with support of CMSC will verify the extent of impacts through a 100% survey of affected households determine assistance, verify and identify vulnerable households. PMU/PMCBC will provide supervisory guidance.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
32 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
Tribes from scheduled areas will receive additional ₹50,000 towards the same
• Additional compensation for vulnerable households.
4 Loss of commercial structure
Commercial structure and other assetsj
Legal titleholders
• Replacement value of the structure and other assets (or part of the structure and other assets, if remainder is viable).
• Fees, taxes, and other charges related to replacement structure.
• Right to salvage materials from structure and other assets with no deductions from replacement value.
• One-time resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 per month for one year (total ₹36,000) from the date of award. Scheduled Castes/Scheduled Tribes from scheduled areas will receive additional ₹50,000 towards the same
• Additional compensation for vulnerable households.
• One-time financial assistance of minimum ₹25,000 or as decided by the appropriate government, whichever is higher.
• Vulnerable households will be identified during the census.
Valuation committee will determine replacement value. CMSC will verify the extent of impacts through a 100% survey of affected households determine assistance, verify and identify vulnerable households.
4-a Loss of commercial structure
Commercial structure and other assets
Tenants and leaseholders
• Replacement value of the structure and other assets (or part of the structure and other assets, if remainder is viable) constructed by the affected person.
• Compensation for rental deposit or unexpired lease.
• Right to salvage materials from structure and other assets with no deductions from replacement value.
• Additional compensation for vulnerable households.
• One-time Resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of
• Land/structure owners will reimburse tenants and leaseholders land rental deposit or unexpired lease.
•
• Vulnerable households will be identified during the census.
Valuation committee will determine replacement value. CMSC will verify the extent of impacts through a 100% survey of affected households determine assistance, verify and identify vulnerable households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
33 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• If residing for minimum three years prior to acquisition, One-time financial assistance of minimum ₹25,000 or as decided by the appropriate government, whichever is higher.
4-b Loss of commercial structure
Commercial structure and other assets
Non-titleholders
• Replacement value of the structure and other assets (or part of the structure and other assets, if remainder is viable) constructed by the affected person.
• Right to salvage materials from structure and other assets with no deductions from replacement value.
• Additional compensation for vulnerable households.
• One-time Resettlement allowance of ₹50,000 per affected family
• All displaced families will receive both: (i) One time Shifting assistance of ₹50,000 towards transport costs etc.; and (ii) monthly Subsistence allowance of ₹3,000 for one year (total ₹36,000) from the date of award. SC/ST from scheduled areas will receive additional ₹50,000 towards the same
• If residing for minimum three years prior to acquisition, One-time financial assistance of minimum ₹25,000 or as decided by the appropriate government, whichever is higher.
• Vulnerable households will be identified during the census.
CMSC will verify the extent of impacts through 100% surveys of affected households determine assistance, verify and identify vulnerable households. PIU and PMU to supervise and guide
5 Loss of livelihood
Livelihood Legal titleholder/ tenant/leaseholder/non-titled/employee of commercial structure, farmer/agricultural worker
• Subsistence allowance of ₹3,000 per month for a period of one year from the date of award (Total ₹36,000). Scheduled Castes/Schedule Tribes families from scheduled areas will receive additional ₹50,000
• One-time financial assistance of minimum ₹25,000 or as decided by the appropriate government, whichever is higher.
• Transitional allowance.k
• Income restoration and training.l
• Vulnerable households will be identified during the census.
CMSC will verify the extent of impacts through a 100% survey of affected households determine assistance, verify and identify vulnerable households.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
34 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
• Additional compensation for vulnerable households.
• Consideration for project employment.
6 Loss of trees and crops
Standing trees and crops
Legal titleholder/ tenant/leaseholder/sharecropper/non-titled affected person
• Notice to harvest standing/seasonal crops and compensation for crops (or share of crop for sharecroppers) based on an annual crop cycle at market value. For seasonal crops notice should be given at least 6 months in advance.
• If timely notice cannot be provided, compensation for standing crop (or share of crop for sharecroppers) at market value
• Compensation for trees based on timber value at market price, and compensation for perennial crops and fruit trees at annual net product market value multiplied by remaining productive years; to be determined in consultation with the Forest Department for timber trees and the Horticulture Department for other trees/crops.
• Harvesting prior to acquisition will be accommodated to the extent possible.
• Work schedules will avoid harvest season.
•
• Market value of trees/crops has to be determined.
PIU to initiate PMU to ensure provision of notice. Valuation Committee will undertake valuation of standing crops, perennial crops and trees, and finalize compensation rates in consultation with affected persons.
7 Impacts on vulnerable affected personsm
All impacts Vulnerable affected personsn
• Land: Further to item 1, in case of total loss of land, and a total dependency on agriculture, land-for-land compensation. Titles will be in the name of original occupants. Joint titles in the name of husband and wife will be offered in the case of married affected persons.
• Government land: Further to Item 2, provision for skills training for displaced affected persons.
• Residential structure: Further to Item 3, in case of total loss of structure, additional shifting allowance shall be paid.24 Scheduled Castes and Scheduled Tribes affected persons shall receive other additional benefits as mentioned in item 3.o
• Commercial structure: Further to item 4, in case of total loss of business, support to reestablish business for vulnerable households which shall
• Vulnerable households will be identified during the census.
•
CMSC will verify the extent of impacts through 100% surveys of AHs and determine assistance, verify and identify vulnerable households. PIU and CMSC will monitor and ensure this entitlement
24 The additional shifting allowance for vulnerable households shall not be less than 20 percent of the value of shifting allowance mentioned under item 3 of this EM.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
35 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
include assistance for purchase of income generating assets and initial capital of ₹40,000. Additional shifting allowance shall be paid.25 Scheduled Castes and Scheduled Tribes affected persons shall receive other additional benefits as mentioned in item 4.
• Livelihood: Vulnerable households will be given priority in project construction employment and provided with income restoration support. For permanent loss of livelihoods, affected persons will be provided skill training.
• Vulnerable persons will receive additional 3 months of assistance based on minimum wage rates.
• Vulnerable persons/businesses will receive ₹9,000 as one-time assistance under temporary impacts.
8 Temporary loss of landp
Land temporarily required for subproject construction
Legal titleholders, non-titled affected persons
• Provision of rent for period of occupation for legal titleholders (and also for non-titled of attached to proposed land from minimum three years prior to temporary acquisition)q
• Compensation for assets lost at replacement value, and trees and crop loss in accordance with item 6.
• Restoration of land to previous or better qualityr
• 30 days advance notice regarding construction activities, including duration and type of disruption.
• Assessment of impacts if any on structures, assets, crops and trees due to temporary occupation.
•
• Site restoration.
•
• Contractor’s actions to ensure there is no income/access loss consistent with the initial environmental examination. This includes: leaving spaces for access between mounds of soil, providing
Valuation Committee will determine rental value and duration of construction survey and consultation with affected persons. A pre-subproject photograph to be made by the CMSC. PMU will ensure compensation is paid prior to site being taken-over by contractor. Contractor will be responsible for site restoration.
25 The additional shifting allowance for vulnerable households shall not be less than 20 percent of the value of shifting allowance mentioned under item 4 of this EM.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
36 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
walkways and metal sheets to maintain access across trenches for people and vehicles where required, increased workforces to finish work in areas with impacts on access, timing of works to reduce disruption during business hours, phased construction schedule and working one segment at a time and one side of the road at a time.
9 Temporary disruption of livelihood
Legal titleholders, non-titled affected persons
• 30 days advance notice regarding construction activities, including duration and type of disruption.
• • Cash assistance based on the minimum wage/average earnings per month for the loss of income/livelihood for the period of disruption Contractor’s actions to ensure there is no income/access loss consistent with the environmental management plan (EMP)/initial environmental examination (IEE).s
• • Assistance to vendors/hawkers to temporarily shift for continued economic activity (₹1,500 as one time assistance)t
• • For construction activities involving unavoidable livelihood disruption, compensation for lost income or a transitional allowance will be paid as per average daily income arrived at from census and socio-economic survey or as per applicable minimum wage, whichever is greater. This assistance shall be
• Identification of alternative temporary sites to continue economic activity.
•
• Contractor’s actions to ensure there is no income/access loss consistent with the initial environmental examination. This includes: leaving spaces for access between mounds of soil, providing walkways and metal sheets to maintain access across trenches for people and vehicles where required, increased workforces to finish work in areas with impacts on access, timing
Valuation Committee will determine income lost. Contractors will perform actions to minimize income/access loss.
Rajasthan Secondary Towns Development Sector Project Semiannual Social Monitoring Report
37 | P a g e
No. Type of
Loss Applicatio
n
Definition of Entitled Person Compensation Policy21 Implementation Issues22 Responsible Agency
paid for a minimum of 14 days or the actual period of disruption, whichever is higher.
of works to reduce disruption during business hours, phased construction schedule and working one segment at a time and one side of the road at a time.
10 Loss and temporary impacts on common resources
Common resources
Communities • Replacement or restoration of the affected community facilities – including public water stand posts, public utility posts, temples, shrines, etc.
- PMU and PIU through Contractor.
11 Any other loss not identified
- - • Unanticipated involuntary impacts will be documented and mitigated based on ADB’s Safeguard Policy (SPS), 2009.
- CMSC/CAPPC will ascertain the nature and extent of such loss. PMU will finalize the entitlements in line with ADB’s SPS, 2009.
j
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
38 | P a g e
C. COMPENSATION AND REHABILITATION
39. APs will be provided 30 days advance notice to ensure no or minimal disruption in
livelihood. In accordance with the RF, provisions are made for APs in the Resettlement Budget
for livelihood assistance, shifting assistance and assistance for vulnerable AP wherever
applicable. If AP’s daily income is less than Minimum Wages (at the time of disbursement) as
per Government of Rajasthan Minimum Wages Act, then Compensation rate has to be
calculated on the basis of minimum wage (unskilled labour), which is Rs.225/- (August 2020,
new proposal of rates is under consideration). The daily wage has been calculated on this
basis. As a good practice/ past learning of RUIDP, an inflation of 7% (Flat) will be paid to APs
(after a delay of 1 Year) to cover the time lag of survey and final implementation. Vulnerable
APs will be given priority in project construction employment
40. All the APs will be compensated in accordance with the agreed entitlement matrix of
RF/RPs/RIPPs. APs will be compensated for 14 days’ disturbance as per RF however, if the
duration of impact will more they will be compensated for the entire period of disturbance after
due verification from PIU. The shifting assistance(₹ 1500) will also be provided to
kiosks/Vendors and additional assistance ((₹ 9000) will be provided to vulnerable group identified under the subprojects.
41. If any structure gets temporarily affected, then also the contractor would re-establish that
particular structure after the project is over. Besides this assistance, for access, ramps would be
provided in front of residences and shops to provide required access to people and also the
mobile vendors would be assisted in shifting to nearby area or to the opposite side of the road
when construction in that particular stretch would take place. The loss of frontage/ structures if
any would be borne by the contractor and this has been included in the contractor’s TOR.
42. Ensuring there is no income or access loss during sub-project construction is the
responsibility of contractors. Consistent with the initial environmental examination, contractors
will ensure: leaving spaces for access between mounds of soil, providing walkways and metal
sheets to maintain access across trenches for people and vehicles where required, increased
workforces to finish work in areas with impacts on access, timing of works to reduce disruption
during business hours, phased construction schedule and working one segment at a time and
one side of the road at a time.
D. CAPACITY BUILDING ACTIVITIES
43. In order to develop capacity of the PIUs engineers, contractors’ officials and other related stakeholders on compliance of social safeguards, Safeguard Specialist-Resettlement of
PMCBC are frequently arranging for consultations and training activities. The training
programs have been organized during the reporting period at site offices. Training/Orientation
program with Project Contractor, CMSC Engineer, Safeguard team of CMSC and Social
Outreach team of contractor was held in the PIUs offices and requirement of Safeguard issues
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
39 | P a g e
during project implementation was deliberated in details.(i) Introduction to SPS 2009(ii)
Introduction to Agreed Resettlement Framework(iii) Type of Impact envisaged and Mitigation
Measures (iv) Resettlement Plan and its components (v)Contractor’s role in minimization of involuntary resettlement during finalization of design and during execution (vi) Requirement of
updating Resettlement plans (RP) by CMSC and requirement of contractor to intimate about
final scope/alignment/change of scope and mitigation plan for congested areas including liaison
with concerned department(vii) Requirement of 100% Socio Economic Survey as per finalized
alignment / scope(viii) Grievance Redress Mechanism/Grievance Redress Committee /City
Level Committee(ix) Requirement of Coordination between the agencies involved in execution
works.
44. It was deliberated that RP implementation is contractual obligation. It is the
responsibility of CMSC to update draft RP after incorporating final impacts and budget.
Contractor will facilitate Social Safeguard Person of CMSC for conducting detailed socio
economic survey. Being a Design Build Operate contract, the final design/alignment will be
provided/ re-confirmed by the contractor. It was also informed that (i) The work should be
executed in planned/ phased manner so that temporary inconvenience is avoided (ii) Assess to
the households to be maintained during laying of pipeline. (iii) Access to CPRs to be
maintained. (iv) Natural Drains should not be disturbed (as far as possible) (v) Advance
intimation need to be provided to the household prior to start of pipe laying works. Details of
training are presented in Table 15 and list of Participant are attached in Appendix 6)
Table 15: Status of training and capacity building activities Oct –March 2021
Name of Town
Date of venue
Topic discussed
Participant
Number of Participant
s
Photographs
M F T
Ratangarh 18.12.2020 (Contractor Office)
Requirement of social safeguard during project implementation
PIU /CMSC /Contractor
17 1 18
Laxmangarh
23.12.2020 (PIU office)
Requirement of social safeguard during project implementation
PIU /CMSC /Contractor
8 2 10
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
40 | P a g e
Name of Town
Date of venue
Topic discussed
Participant
Number of Participant
s
Photographs
M F T
Fatehpur 15.12.2020
Requirement of social safeguard during project implementation
PIU /CMSC /Contractor
17 1 18
Sardarsahar
24.12.2020 (Contractor Office)
Requirement of social safeguard during project implementation
PIU /CMSC /Contractor
25 3 28
Sirohi 22.02.202
1 (Contractor Office
Requirement of social safeguard during project implementation
PIU /CMSC /Contrcator
12 3 15
Abu Road
24.02.2021 (PIU office)
Requirement of social safeguard during project implementation
PIU /CMSC /Contractor
21 5 26
E. PUBLIC PARTICIPATION AND CONSULTATION
45. A series of meetings and consultations were held with the potential APs and other
stakeholders regarding scope of the project, entitlement options, impacts etc. at different
stretches during RPs/RIPPs preparation. Key Finding of consultations are: (i) participants
expressed satisfaction that there was a subproject taking care of their needs which they have
waited for 25-30 years; (ii) they are not hesitant to move or shift if necessary to accommodate
the work; (iii) they are willing to provide labor for the subproject; and (iv) they raised that during
pipe laying works proper barricading should be done at site and it will be required to cover up
the dug holes properly and restore the roads after sub-project construction. Prior to start of
inventory loss survey, leaflet with information about the subproject, its benefits, grievance
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
41 | P a g e
redress mechanism were also distributed to the potential affected persons as well as
households.
46. Door to door consultation with public was held and importance of Water Metering,
property connection, Water conservation issues was discussed and need for their support was
conversed. Advance intimation about works plan was conveyed to households.
47. The consultation was held very close to the area where work is currently ongoing and
was attended by people of the surrounding areas. Social support staff, Social outreach team
and representatives from contractors also participated in the events and interacted with the
people.
48. A total of 43 consultation meetings were held during this reporting period where 274
participants (148 males and 113 female) attended in the meetings. The following Table 16
shows the consultation meetings held during Oct- 2020 March 2021 under five packages of
RSTDSP. Details of the attendance and photographs of the meetings are attached in Appendix
7
Table-16: Consultation Meetings Held during Oct 2020 – March 2021
S.no Town Consultations Participants Female Male
1 Consultation with Schedule Tribes 2 14 11 03
2 Consultation with women members 8 54 41 00
3 Stake holder Consultation, Abu-road 6 39 18 21
4 Stake holder Consultation, Ratangarh 5 31 04 27
5 Stake holder Consultation, Sirohi 6 42 17 25
6 Stake holder Consultation, Sardarshar 6 38 10 28
7 Stake holder Consultation, Laxmangarh
5 28 8 20
8 Stake holder Consultation, Fatehpur 5 28 4 24
Total 43 274 113 148 Source: Monthly progress report of RSTDSP
49. People are very much willing to extend their cooperation as the project will provide much
needed potable water and sewerage facilities. It was conveyed that some relatively adverse
issues such as water supply quantity and quality will be hampered during physical work once
the civil work will be started. It was also deliberated to the households that temporally access
issues may be arise during laying of pipeline, although mitigation measures will be taken by
contractors as per site specific Environmental Monitoring Plan (EMP).
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
42 | P a g e
I. Community & Women Participation in RSTDSP Project
50. Throughout each phase of subproject and especially during RP preparation, women’s participation is being ensured through a gender participation to determine the project’s possible impacts on women. It is found that majority of women in the project area are involved in
household work. During discussion, women pointed out that each urban infrastructure
development project mainly water supply, waste water etc. will provide better health and
hygiene, access to health services, higher levels of education, economic opportunities, and
social interactions. During this reporting about 54 women are sensitized and empowered.
Extensive consultation and sensitization program will be conducted by CAPP Consultant.
Details of the attendance and photographs of the meetings are attached in Appendix 8
II. Consultation with scheduled tribe communities in Abu Road subproject
51. Consultation with Scheduled tribes communities in Abu Road was also held by CMSC
Safeguard support and social outreach team of contractor. During meeting they were briefed
about the technical details of project and project implementation cycle; project benefits as well
as adverse impacts envisaged during construction; environmental and social safeguards,
gender inclusion, community participation aspects built into the project etc. The issues like,
awareness and extent of the project and development components, benefits of project, traffic
disruptions and impacts on livelihood. It was conveyed that 100% House service connections
for sewerage and potable water will be provided to scheduled tribe households free of cost
under this project. CAPPC, will design and conduct a public awareness campaign which shall
target all citizens including scheduled tribe communities during project implementation. A
consultation and participation consultant will be mobilized for preparation and implementation of
community. Prior to statrt of pipeline works, Advance intimation about works plan was conveyed
to households and project leaflet was distributed to them. Details of the attendance and
photographs of the meetings are attached in Appendix 9.
F. GRIEVANCE REDRESS MECHANISM
52. To ensure that the grievances of the APs are heard and resolved in a timely manner, the
GRM has been established to receive, evaluate, and facilitate the resolution of affected
persons’ concerns, complaints, and grievances about the social and environmental performance at project level.
53. The grievance redress mechanism (GRM) has been established for the project, which
has the following approach and procedure (Figure 2)
➢ In case the AP has any complaint or grievance, he/she is free to lodge his/her complaint to the contractors, PIU executive engineer /assistant engineer designated as SSO (social and environment), CMSC (safeguard staff) and CAPPC, who can can immediately resolve issues on-site, in consultation with each other and will be required to do so within 7 days of receipt of a complaint/grievance. If required, city level
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
43 | P a g e
monitoring committee (CLMC)26 will be involved in resolution of grievances at the 1st level;
➢ In case the AP’s grievance is not redressed at PIU level, will be brought to the notice of
Zonal PIU headed by Additional Chief Engineer (ACE). The ACE at zonal PIU will resolve the grievance within 7 days of receipt of compliant/grievance in discussion with the assistant safeguard officer (ASO), field level PIU, CMSC, CAPPC and the contractor;
➢ All the grievances that are not addressed by Zonal PIU within 7 days of receipt will be brought to the notice of the PMU. Depending on the nature of grievance, the Project Officer (Social/Environment) at PMU will resolve the grievance within 15 days of receipt of grievance with necessary coordination of Zonal PIU and CMSC and guidance/instruction of additional project director (APD-PMU).
➢ Grievances not redressed through this process within/at the project level within stipulated time period will be referred to the CLC/grievance redress committee (GRC), which has been set up.27 In its role as a GRC, the CLC will meet whenever there is an urgent, pending grievance. Other grievances can be discussed during its regular meetings. Zonal PIU will inform the CLC regarding any grievances required to be resolved urgently. The GRC will resolve the grievance within 15 days of receiving the complaint. In case of any indigenous peoples impacts in subprojects, the CLC/GRC must have representation of the affected indigenous people community, the chief of the tribe or a member of the tribal council as traditional arbitrator (to ensure that traditional grievance redress systems are integrated) and an NGO working with indigenous people groups. GRC will also ensure that grievance mechanism established is gender inclusive in receiving and facilitating resolution of the IPs’ concerns.
54. Besides the GRM of the Project, the state has an online grievance monitoring system
known as Rajasthan Sampark Portal. The APs can also lodge their complaints online at
http://sampark.rajasthan.gov.in/index.aspx.
55. The project GRM notwithstanding, an aggrieved person shall have access to the
country's legal system at any stage and accessing the country's legal system can run parallel to
accessing the GRM and is not dependent on the negative outcome of the GRM. In case of
26 The CLMC has been formed at the town/city level for planning and monitoring of work, resolve issues related to departmental coordination etc. It is headed by Commissioner/Executive Officer ULB (Chairman) and city engineer of public health engineering department (PHED), public works department (PWD) and head of PIU acting as Member Secretary.
27 City Level Committee (CLC)/grievance redress committees (GRCs) has been constituted for each town/city under the Chairmanship of District Collector to provide overall subproject guidance and “to sort out issues and remove hindrances, if any”. CLC formed at city-level/district level with members composed of: District Collector as Chairperson, and following as members: ULB Commissioner/Mayor/Chairman; Deputy Mayor/Vice Chairman ULB; Chairman / Secretary Urban Improvement Trust (UIT); Head of Zonal/field level PIU as Member Secretary; one representative each from relevant government departments as appropriate (PWD/PHED/Town Planning Department etc.). All CLCs in their role as GRCs will have at least one-woman member/chairperson. In addition, for project-related grievances, representatives of affected persons, community-based organizations (CBOs), and eminent citizens will be invited as observers in GRC meetings. The concerned Member of Parliament (MP) and Member of Legislative Assembly are also part of the CLC.
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
44 | P a g e
grievance related to land acquisition, resettlement and rehabilitation, the affected persons will
have to approach a legal body/court specially proposed under the RFCTLARRA, 2013.28
56. People who are, or may in the future be, adversely affected by the project may submit
complaints to ADB’s Accountability Mechanism. The Accountability Mechanism provides an independent forum and process whereby people adversely affected by ADB-assisted projects
can voice, and seek a resolution of their problems, as well as report alleged violations of ADB’s operational policies and procedures. Before submitting a complaint to the Accountability
Mechanism, affected people should make an effort in good faith to solve their problems by
working with the concerned ADB operations department. Only after doing that, and if they are
still dissatisfied, should they approach the Accountability Mechanism.29
57. A toll-free number has also displayed by the contractor in a different location for lodge
the grievances. Details of toll freee numbers of each project towns are presented in Table 17.
Table 17: Toll free number in each project towns
Town Toll-free number
Abu Road Still not taken
Sirohi Still not taken Sardarsahar 1800-833-0036 Ratangarh 1890-555-4587 Laxmangarh 8905-555-4584 Fatehpur 1890-555-4589 Pratapgarh Still not taken
Banswara Still not taken
Source: Monthly progress report.
a) Record-keeping
58. PIUs, Contractor, and CMSC have been entrusted with the responsibility to maintain a
proper register of the grievance (if any) which will be endorsed by all agencies involved in
implementation. GRC registers are in place at the towns.
(b) Costs
59. Contractors are required to be allocated budget for pamphlets and billboards as part of
the EMP. Costs involved in resolving the complaints (meetings, consultations, communication
and reporting/information dissemination) will be borne by the concerned PIU at town level while
costs related to escalated grievances will be met by the PMU. Cost estimates for grievance
redress are included in resettlement cost estimates.
28 The Authority admits grievance only with reference to the Land Acquisition and R&R issues under the RFCTLARRA, 2013.
29 Accountability Mechanism. http://www.adb.org/Accountability-Mechanism/default.asp.
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
45 | P a g e
60. Office order of PMU also issued to all PIUs/CMSC to follow the grievance redress
mechanism(Copy of order is attached in Appendix 10).
61. During the reporting period, minor complaints from the people (housekeeping, pipeline
damaged, leakages in a new connection, etc.) were received, which have been resolved
satisfactorily. No complaints/grievances related to social safeguards were received during the
reporting period. Details of Grievances reported during this period is attached in Appendix
Table 18: Summary of Grievances October to March
Town January February March
Grievance Resolved Grievance Resolved
Grievance Resolved
Fatehpur 2 2 4 4 0 0
Laxmangarh 0 0 9 9 5 5
Ratangarh 2 2 7 7 9 9
Sardarshar 13 13 30 30 24 24
Abu-road 0 0 0 0 20 20
Sirohi 6 6 12 12 8 8
Total 23 23 62 62 66 66
Source: Monthly Progress Report, March 2021
Figure 2: Grievance Redress Mechanism-RSTDSP
Note: APD = additional project director, ASO = assistant safeguards officer, CAPPC = community awareness and public participation consultant, CMSC = construction management and supervision consultants, CLC = city level committee, CLMC = city level monitoring committee, GRC = grievance redress committee, PIU = project implementation unit, PMU = program management unit, PMCBC = project management and capacity building consultant
Project Level GRM
Field / PIU level
Responsible: PIU, CMSC, Contractor,
CAPPC. Involve CLMC as required
Zonal PIU Level
Responsible: Additional Chief Engineer
(Zonal PIU), ASO, CMSC
PMU Level
Responsible: APD (PMU), Project
Officer (Social/Environment), PMCBC
Affected person
Project-level
GRM
Court of Law
CLC/GRC
Not
addressed
Yes
(maximum 7 days) Grievance
redressed and
record keeping
Grievance
redressed and
record keeping
Grievance
redressed and
record keeping
Yes
(maximum 7 days)
Yes
(maximum 15 days)
Not
addressed
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
46 | P a g e
G. INSTITUTIONAL ARRANGEMENT
62. The Local Self Government Department (LSGD), Government of Rajasthan (GOR) is
the executing agency (EA) of the Project, responsible for overall strategic approvals, guidance,
and monitoring of the project. Rajasthan Urban Drinking Water Sewerage and Infrastructure
Corporation Limited (RUDSICO) is the Implementing Agency (IA) for the project. The Project
Management Unit (PMU) is housed in the Externally Aided Projects division of RUDSICO
(RUDSICO – EAP). PMU is headed by Project Director and assisted by experienced officers
from engineer and finance services are responsible for the implementation of the project. Social
Project Officer (SPO) at PMU assisted by Safeguard Specialist-Resettlement of Project
Management Capacity Building Consultant(PMCBC) to ensure that all subprojects meet
safeguard requirements as agreed in the loan covenant and in line with this RF. Two Zone
office at Jodhpur and Jaipur headed by an Additional Chief Engineer(ACE) has been well
established for monitoring of PIUs. Each zonal office has one dedicated safeguard officer
responsible for compliance monitoring and reporting on social, gender and environmental
safeguard issues. Project implementation Unit(PIU) is well established in each subproject towns
headed by Superintending Engineer/Executive Engineer for implementation of the project. One
Engineer in each PIU has been designated as safety and safeguard officer who will be
responsible for safeguard and health and safety requirements, monitoring and compliance. PIU
is supported by CMSC in all areas of project implementation; implementation of Resettlement
plan and safeguard monitoring and compliance. Deployment Status of Social Safeguards
officials during the Reporting Period is presented in Table 19 and details of Nodal officers at
PIUs level is presented in Table 20.
Figure 3: Organization Structure
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
47 | P a g e
Figure 4: Safeguard and GESI action plan implementation arrangement
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
48 | P a g e
Table 19: Deployment Status of Social Safeguards officials during the Reporting Period
Sl.No.
Name of Institution
Name of Officials
Designation Position Filled In
Remarks
1 PMU Kalyan Mandawaria
Project Officer-Social
Yes-Regular
2 PMU Mukesh Kumar Saini
Assistant Project Officer-Social
Yes-Regular
3 PIUs-Town Nodal Officer-Social at each town
Yes-Regular Assistant Executive or Junior Executive of respective PIU look after the safeguard issues.(Details are given in table..)
4 PMCBC Jyoti Dhari Singh Safeguard Specialist-
Resettlement
Yes-Intermittent
5 PMCBC Bhupendra Kaushik
Social Support Staff Yes-Regular
6 CMSC-1 - Safeguard Specialist-
Resettlement
Position vacant
7 CMSC-1 Social Support Staff Position vacant
8 CMSC-2 Sajjal Srivastava Social cum Gender Professional
Yes-Regular
9 CMSC-2 Indira Chouhan Social Support Staff Yes-Regular Assigned areas-Abu Road and Sirohi
11 CMSC-2 Amit Bhardwaj Social Support Staff Yes-Regular Assigned areas-Ratangarh,Sardarsahar,Laxmangarh and Fatehpur
63. At each PIU, one engineer has been designated as a nodal officer is responsible for day
to day monitoring of the environmental management plan (EMP) and implementation of RP.
Nodal officers of PIU are assisting PMU SPO in the implementation of the social safeguards at
the PIU level. The PIUs are responsible for the implementation of the RPs/RIPPS. PIUs will
undertake internal monitoring and supervision and record observations throughout the project
period to ensure that the safeguards and mitigation measures are provided as intended.
Table 20: Mobilization of Nodal officers at PIUs level
S.N. Name Designation Organisation
1. Sh. Hari Babu (EE) SSO, PIU, Laxmangarh PIU, Laxmangarh
2. Mr. Deepak Mandan A.E SSO, PIU, Ratangarh PIU, Ratangarh
3. Mr. Dinesh Fogat J.E SSO, PIU, Sardarshahar PIU, Sardarshahar
4. Mr. Surendra Godra J.E SSO, PIU, Fatehpur PIU, Fatehpur
5. Mr. Ashok Kadwasara, AE SSO, PIU, Sirohi
PIU, Sirohi
6. Mr. Sunil Kumar Bishnoi A.E SSO, PIU, Abu Road
PIU, Abu Road
7. Mr. Prabhulal Bhabor, AE
SSO, PIU, Banswara PIU, Banswara
8. Mr. Madan Lohar, JE SSO, PIU, Pratapgarh PIU, Pratapgarh
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
49 | P a g e
64. For monitoring of the implementation of RPs, Social Safeguard Staff for project town will
be appointed by CMSC, are working under the supervision and guidance of CMSC. and
PMCBC Social Safeguard Professional. The task of Social Safeguard Staff assigned is as
follows:
➢ To communicate closely with identified (identified through census survey conducted for
RPs/RIPPs. potential APs and provide them timely information of construction schedule,
distribute identification cards, educate them on their entitlements under the RPs/RIPPs
and RF, shifting APs during civil work execution inappropriate manner without
hampering their income or assets;
➢ Assist affected persons (APs) in (i) In opening bank accounts (if not already available
with APs), disbursement of compensation livelihood losses and resettlement assistance
(as per provisions of RF) and ensure that APs obtain their full entitlements under the
RPs (ii) Organize consultation and discussion meetings with the APs the community
leaders and other stakeholders throughout RP preparation and implementation phases
(iii) To organize consultation and discussion meetings with the APs, the community and
other stakeholders throughout RP implementation phases with proper documentation
(iv) Ensure disbursement of compensation against livelihood losses, resettlement
assistance (vulnerable assistance, shifting assistance, structure losses assistance,
crops/trees losses assistance) as per entitlement matrix (v) Disclosure of RP, Cut of
date in vernacular language at public places & project affected persons and preparation
of internal RP implementation monitoring reports (vi) Distribution of one-month advance
notice, to in affected areas that on the following date the civil works will be started in
following areas and timely shifting of squatters and encroachers from temporary impact
zone during construction if required (vii) Registering grievances of APs (the grievance
redress mechanism (GRM) already established) and assist to PIU in resolving
grievances at PIU level or GRM level (viii) Assist the APs in the redress of grievances
through the Grievance Redress mechanism established as part of the RP/RIPP, and
make the APs aware of GRM at several levels (ix) Assist APs in getting benefits from
various government development programs particularly for income restoration/
generation.
65. Social Outreach Team (SOT) has been mobilized in project towns for supporting the
Social Safeguard Staff of CMSC in the implementation of RP and community awareness
activities. Status of SoT in subproject wise is given table 21.
Table 21: Present Status of SOT
Town/ SOT Head Staff Deployed in SOT
Abu Road 0 01
Sirohi 0 02
Sardarsahar 01 05
Ratangarh 01 03
Laxmangarh 01 01
Fatehpur 01 02
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
50 | P a g e
Town/ SOT Head Staff Deployed in SOT
Pratapgarh 0 02
Banswara 0 00
H. MONITORING RESULTS-FINDINGS
66. The project monitoring using specific indicators e.g. number of days for which
compensation paid versus number of actual days of disruption; number of vulnerable
households provided vulnerable assistance; number of grievances registered versus resolved
and unresolved grievances; compensations cost versus payments made and so on to get
overall understanding about the current status. In addition, compensation and payments of
all types of impacts and losses; progress of additional compensation to vulnerable
persons; types of training and number of participants; employment opportunities available and
availed by affected persons; employment opportunities available and availed by vulnerable
groups; status of consultations and redress of grievances; status of inclusion and participation,
particularly affected vulnerable groups; social safeguard concerns in construction sites;
status and dates of disclosure of RPs. During the reporting period (October 2020 –March 2021)
No complaints/grievances related to social safeguards were received. social safeguards
activities have been carried in the period that illustrated the following Table 22
Table-22: Status of Monitoring of the Sub-projects (October 2020 –March 2021)
S. N.
Resettlement Plan Activities
Status Remarks
A. Pre-Construction Activities and Resettlement Plan Activities
1 Approval of final Resettlement Plan by ADB prior to contract award
100% socio-economic survey of potential affected persons has already been undertaken in Abu Road, Sirohi, Laxmangarh, Ratangarh and Sardarsahar towns subprojects. RPs/RIPPs updating works are under progress. Survey works are under progress in Pratapgarh town while hiring for NGO for conducting socio-economic survey in Banswara, Khetri and Mandawa is initiated by CMSC
Contract of 10 towns already been awarded but no physical works has been executed in potential impacted areas.
2 Disclosure of final Resettlement Plan on ADB and EA websites
Updated RPs/RIPPs will be disclosed in ADB and EA website after obtaining no-objection from ADB.
RPs and RIPPs updating works are under progress.
3 Circulation of summary Resettlement Plan in local languages to all stakeholders
Summary of RF and entitlement provision for losses was circulated to potential affected persons before starting of survey.
summary of Resettlement Plans will be developed in vernacular languages and same will be circulated to all stakeholders.
Resettlement Plan Implementation
1 Grievance Redress Mechanism established at different levels
Grievance Redress Mechanism has been well established at different levels.
Office order of PMU issued on dated 18.12.2020. A toll-free number has also displayed by the contractors in a different location for lodge the grievances
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
51 | P a g e
S. N.
Resettlement Plan Activities
Status Remarks
2 Entitlements and grievance redress procedure disclosed
Entitlement provision for losses process for lodging grievances has been circulated in project towns.
3 Finalization of list of affected persons, vulnerable affected persons and compensation due
List of potential affected persons along with vulnerability status has been finalized in Abu Road, Sirohi, Sardarsahar, Laxmangarh and Ratangarh town.
Physical works yet to be started in identified impacted areas in project towns.
4 Finalization of list of roads for full or partial closure; mitigation measures proposed and implemented (with photographic documentation)
Presently not available. Design and drawings are under progress.
5 Number of days roads were closed (full and partial closure)
Presently not available. Design and drawings are under progress.
6 Affected persons received entitlements as per EM in RP
During this reporting period, no compensation has been disbursed to affected persons.
Physical works yet to be started in identified impacted areas in project towns.
7 Payment of compensation, allowances and assistance (No. of affected persons)
During this reporting period, no compensation has been disbursed to affected persons.
Physical works yet to be started in identified impacted areas in project towns.
8 Additional assistance (project-related construction jobs, if willing and able) for vulnerable households given (No. of vulnerable affected persons assisted)
During this reporting period, no compensation has been disbursed to affected persons.
Physical works yet to be started in identified impacted areas in project towns.
9 Grievances No. of grievances registered No. of grievances redressed Outstanding complaints Disclosure of grievance redress statistics
No. of grievances registered-66 No. of grievances redressed-66 Outstanding complaints-0
No complaints/grievances related to social safeguards were received during the reporting period.
10 Consultation, participation and disclosure as per Plan
Yes consultation, participation, and disclosure have been taken place as per plan
C. Monitoring
11 Survey on satisfaction levels of affected persons with Resettlement Plan implementation completed
Presently not required. Physical works yet to be started in identified impacted areas in project towns.
D. Labor
12 Implementation of all statutory provisions on labor like health, safety, welfare, sanitation, and working conditions by Contractors. Ensuring no child labour used
Being complied in accordance with EMP
13 Equal pay for equal work for men and women
Being complied in accordance with GAP
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
52 | P a g e
67. Status of Labour at Site: Regular site visit to Project towns (Where physical works
has been started) are being conducted by the Safeguard team of CMSC and PMCBC and it is
observed that most of the workers are from Jharkhand, Bihar, Bengal, Chhattisgarh etc.
Contractor has already provided labor camp with all basic facilities (Water Supply, Electricity
and Sewerage). Regular Inspection is carried out at the contractor’s work site to keep a check
on child labor, health & safety provisions etc. Till date, there is no case of child laborer found at
the construction site. Interaction with laborer during site inspection is carried out to understand
their health and safety measures, no such issues have been encountered so far. Contractor is
maintaining Attendance Register, Grievance Register, Wage register etc. Due to covid
pandemic, frequent sensitization program, regular medical checkup, vaccination of project
labour are being done by contractors and regular monitoring is being done by PIUs.
Training for safety at site Vaccination drive started at Sardarshahar project
Vaccination drive started at Sardarshahar project
Mobile van health check camp at every workplace for workmen.
68. Contractors at Sardarsahar have a separate Corporate Social Responsibilities
(CSR) program and various activities are being organized by the contractors with due
consultation of PIU team. The goal of CSR activities is to encourage a positive impact through
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
53 | P a g e
its activities on the environment, consumers, employees, communities, stakeholders and all
other members of the public sphere. Under the CSR activities - International Yoga Day" and
World Environment Day was organized by L&T at Sardarsahar. The objective of this program
was to facilitating education and healthcare.
Iinternational Yoga Day" World Environment Day
I. COMPLIANCE STATUS OF LOAN COVENANTS
69. The covenants to the loan agreement with ADB require that implementation of the
project that “projects are designed, constructed, operated and maintained in accordance with ADB’s Safeguard Policy Statements (2009) and agreed between the Borrower and ADB.” Covenants written into the loan agreement that are related to social safeguards are laid in Table
23. These refer to actions that have been compiled satisfactory during the reporting period.
Table 23: Status of Loan Covenants
Covenant Status of Compliance
Implementation Arrangements 1. The Borrower, the State and the EA shall ensure that the Project is implemented in accordance with the detailed arrangements set forth in the PAM. Any subsequent change to the PAM shall become effective only after approval of such change by the Borrower, the State, EA and ADB. In the event of any discrepancy between the PAM and this Loan Agreement, the provisions of this Loan Agreement shall prevail.
Noted.
2. (a) The Borrower shall ensure or cause the EA to ensure, towards smooth implementation of the Project, that grievances if any from stakeholders, relating to Project implementation or use of funds under the Project are addressed effectively and efficiently.
Being Complied. For the development of pamphlets and billboards (containing contact number of person) where grievances can be lodge) that will be displayed at site are considered under EMP. Costs involved in resolving the complaints (meetings, consultations, communication and reporting/information dissemination) will be borne by the concerned PIU at town level while costs related to escalated grievances will be met by
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
54 | P a g e
Covenant Status of Compliance
the PMU. Office order of GRC issued on 18.12.2020 and well established in the towns. The GRM is progressively functioning in all the Town.
2 (b) The Borrower shall ensure or cause the State and EA to ensure compliance with all the requirements and obligations in their part as included in this Loan Agreement and the Project Agreement to meet the objectives of the Project in a timely and efficient manner.
Will be complied
3. The Borrower shall ensure or cause the EA to ensure that its PMU, Zonal Project Offices, and its PIUs within the Project ULBs, employ sufficient staff including increasing the number of adequate staff as included in the PAM, with relevant expertise in the fields of project management, financial management, engineering, procurement, operations and management, and environmental and social safeguards implementation. The EA will ensure that the PMU, Zonal Offices, and the PIUs housed in the Project ULBs, are equipped with the necessary staff, office space, facilities, equipment, support staff and management information systems for the entire duration of the Project and thereafter.
Complied/Being Complied.
4. The Borrower shall ensure or cause the EA to ensure that towards smooth implementation of the Project, grievances if any from stakeholders relating to the Project implementation or use of funds are addressed effectively and efficiently.
Costs involved in resolving the complaints (meetings, consultations, communication and reporting/information dissemination) will be borne by the concerned PIU at town level while costs related to escalated grievances will be met by the PMU.
Office order of GRC issued on 18.12.2020 and well established in project towns. The GRM is progressively functioning in all the Town.
Land Acquisition and Involuntary Resettlement The Borrower shall ensure or cause the EA to ensure that all land and all rights-of-way required for each Subproject are made available to the Works contractor in accordance with the schedule agreed under the related Works contract and all land acquisition and resettlement activities are implemented in compliance with (a) all applicable laws and regulations of the Borrower and the State relating to land acquisition and involuntary resettlement; (b) the Involuntary Resettlement Safeguards; (c) the RF; and (d) all measures
Land acquisition is not required as all construction work are proposed in government land identified and already provided by line department. Some lands belonging to gaushala (cow shelter) trusts, and government land classified as pasture lands have been obtained, following due procedures required by the government. Involuntary resettlement impacts are confined to mainly temporary loss of livelihood due to temporarily displacement from the location of business of mobile vendor or due to loss of access to shops, temporary in nature.
Without limiting the application of the Involuntary Resettlement Safeguards, the RF or the RP/RIPP as applicable, the Borrower shall ensure or cause the EA to ensure that no
Noted. Will be complied.
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
55 | P a g e
Covenant Status of Compliance
physical or economic displacement takes place in connection with any Subproject until: (a) compensation and other entitlements have been provided to affected people on the related Works contract/section thereof in accordance with the relevant RP/RIPP as applicable; and (b) a comprehensive income and livelihood restoration program has been established in accordance with the relevant RP/RIPP as applicable.
Indigenous Peoples The Borrower shall ensure or cause the EA to ensure that the preparation, design, construction, implementation and operation of the Subprojects and Project facilities comply with (a) all applicable laws and regulations of the Borrower and the State relating to indigenous peoples; (b) the Indigenous Peoples Safeguards; (c) the IPPF; and (d) all measures and requirements set forth in the relevant RIPP if any as required, and any corrective or preventative actions set forth in a Safeguards Monitoring Report. No Category A subprojects will be financed under the Project..
Noted. Will be complied.
Notwithstanding the stipulation that no Category A Subprojects under environment, involuntary resettlement or indigenous people, will be financed under the Project, in the unforeseen situation of change in categorization of a Subproject that is under implementation, to Category A, the Borrower shall ensure or cause the EA to ensure, in consultation with ADB that such Subproject shall be completed in full compliance of the ADB Safeguard Policy requirements and applicable laws and regulations of the Borrower and the State.
Human and Financial Resources to Implement Safeguards Requirements The Borrower shall ensure or cause the EA to ensure that all necessary budgetary and human resources to fully implement the EMPs, the RPs and any RIPPs (as applicable) are made available on a timely basis.
Noted. Will be complied.R&R head will be allotted and will be share with PIUs for timely disbursement of compensation.
Safeguards – Related Provisions in Bidding Documents and Works Contracts (a) The Borrower shall ensure or cause the EA to ensure that all bidding documents and contracts for Works contain provisions that require contractors to:
Noted. Will be complied
(b) comply with the measures and requirements relevant to the contractor set forth in the IEE, the EMP, the RP(s) and any RIPP, if any (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set out in a Safeguards Monitoring Report;
© make available a budget for all such environmental and social measures;
(d) provide the EA with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, the RP/RIPP (as applicable);
(e) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and
(f) fully reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
56 | P a g e
Covenant Status of Compliance
completion of construction.
Safeguards Monitoring and Reporting
(a)The Borrower shall ensure or cause the EA to ensure the following: (a) submit semi-annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;
Noted. Will be complied
(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEEs, the EMPs, the RPs or any RIPP (as applicable), promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and
(c) report any breach of compliance with the measures and requirements set forth in the relevant EMP, the RP or RIPP (as applicable) promptly after becoming aware of the breach.
J. FOLLOW UP ACTIONS, RECOMMENDATION AND DISCLOSURE
70. During reporting period (October 2020 to March 2021), ten civil work contracts (Abu
Road, Sirohi, Sardarsahar, Laxmangarh, Ratangarh, Fatehpur, Pratapgarh, Banswara, Khetri
and Mandawa have been awarded. NTP for remaining four packages (Ladnu, Makrana,
Didwana and Kuchaman) are under progress. Pipe laying work is mainly taking in low density
and outskirt areas in six project towns (Abu Road, Sirohi, Sardarsahar, Laxmangarh, Ratangarh
and Fatehpur). No pipe laying works has been started in identified impacted areas in that six
towns and no one has been impacted, hence no disbursement of compensation has been made
during this reporting period.
71. The following Table 24 shows the issues and recommendations that are expected to be
accomplished by the PIUs under RSTDSP. CMSC and contractors with the support of
PMCBC and PMU to perform the activities from April 2021 to September 2021.
Recommendations and further actions or items to focus on for the upcoming monitoring period.
It also includes lessons learned for improvement for future safeguards monitoring activities.
Table-24: Issues and Recommendations
Activity/Key Issues Recommended Action Responsibility Action Taken Till September 2021
Updating draft RPs/RIPPs for all the awarded towns
Census and socio-economic survey has already been completed in 5 towns (Abu Road, Sirohi, Ratangarh, Laxmangarh and Sardarsahar) and for rest of town, Census and socio-economic survey will be undertaken. In addition to that consultation meetings, photograph, collect of secondary data will be taken or collected.
CMSC-1&2/ Contractors /PIUs
All the draft RPs/RIPPs will be updated and same will be submitted to ADB.
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
57 | P a g e
Activity/Key Issues Recommended Action Responsibility Action Taken Till September 2021
Land allotment
Sardarsahar A memorandum of agreement between GVM Trust and Municipality for construction of STP-3 in GVM Trust land.
PIU/Municipal Council/ GVM/ PMU
Site will be allotted to contractor after signing of MoU between GVM and MC and copy of MoU will be reported to ADB through SMR.
Land transfer documents from IGNP to Nagar Palika for construction of SPS-2,
PIU/Municipal Council/PMU
Site will be allotted to contractor after transfer of land and copy of MoU will be reported to ADB through SMR.
Fatehpur Municipality will purchase or provided Land for proposed SPS near Fatima Masjid and same will be available PIU for SPS
PIU/Municipal Council/PMU
If land will be purchased third party validation will be done ,copy of negotiated settlement along with witness of third party will be reported to ADB through SMR.
Implementation of RP All the approved RPs need to be implemented before starting civil work
CMSC-1&2/ Contrcators/ /PIUs
Approved RPs /RIPPs will be implemented before starting civil work.
Collect data and visit to monitor of the social safeguard activities at field level
Social Safeguard Professional of CMSC/ PMCBC
PIUs/PMU Social Safeguard Professional of CMSC 1&2 will be mobilized.
Conduct and participate coordination meeting/ training on social safeguards at PIUs level
Coordination meeting/ training on social safeguards at PIUs level
CMSC-1&2/ Contracators /PIUs/PMCBC
Meetings on safeguards and updating RPs/RIPPs will be conducted at PIUs and CMSC site offices at regular basis.
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
58 | P a g e
Appendix Copy of distributed to potential affected persons
Copy of Leaflet
Rajasthan Urban Sector Development Program Semi Annual Social Monitoring Report
59 | P a g e
Transcript
Name of the Project- Abu-road Water supply and Sewerage works
Objectives of the Project - A project is going to start in your city/town for providing drinking water and sewerage facilities and participation of all residents is required for success of the project. Under the project, pure drinking water shall be provided as per daily basis with sufficient amount in entire city and sewerage facility shall be improved in entire city and the city shall be considered as clean city.
Water supply 1. Complete utilization of present capacities and improvement in production and distribution system as
where possible.
2. Distribution of drinking water shall be improved.
Sewerage Works 1. Sewerage treatment plant shall be constructed
2. Implementation of program for ensuring qualitative improvement in environment and effective and large
sewerage system shall be established. All drainages and waste water shall be linked with sewerage
system.
Project components and proposal of reforms
Drinking water program 1. Pipeline laying works for water transmission and distribution (195 Km new pipeline)
2. Construction of water treatment plant with capacity of 10 MLD
3. Maintenance of water ponds (construction and refurbishment)
4. Zone wise bulk meter system for controlling wastage of drinking water
5. House connection with meter (New connections 12800)
Sewerage works 1. Laying of sewerage network (105 Km)
2. Sewerage treatment Plant with capacity of 6.9 and 2.5 MLD
3. Construction of sewerage pumping stations
Project Cost (expected)- 236.77 crore
Short term effects during the proposed construction-
Some Street and mobile vendors are engaged in their livelihood tat road site and they may be affected at temporary basis during the proposed construction and may be displaced at other place. If any loss of business or livelihood is envisaged, shall be considered as affected person and compensated as per ADB/GOR parameters. For this purpose, survey work is going to start from February 2nd,2021 and your cooperation is expected.
60 | P a g e
Appendix 1(a) : Photographs of Leaflet distribution to potential affected persons
Town-Abu Road
Town-Sirohi
Town-Sardarsahar
62 | P a g e
Appendix 2: Copy of Cut- off date Notification
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
Y.
Z.
AA.
BB.
CC.
DD.
EE.
FF.
GG.
HH.
II.
JJ.
KK.
64 | P a g e
Transcript
Name of the Project- Water Supply Works, Laxmangarh
Objectives of the Project -
Water supply 3. Complete utilization of present capacities and improvement in production and distribution system
as and where possible.
4. Distribution of drinking water shall be improved.
Project components and proposal of reforms
Water supply 6. Pipeline laying works for water distribution
7. Zone wise bulk meter system for controlling wastage of drinking water
8. House connection with meter
Project Cost (expected) - 41.54 crore
Short term effects during the proposed construction
Some street and mobile vendors are engaged in road side business. Pipe will be laid in such road/s sides and they may be affected temporarily during the proposed construction and may have to move at other place. If any loss of business or livelihood is envisaged, shall be considered as affected person and compensated as per ADB/GOR parameters.
Entitlement provision ➢ Temporary disruption of livelihood-( Legal titleholders, non-titled APs)- Cash assistance
based on the minimum wage/average earnings per month for the loss of income/livelihood for the
period of disruption. Assistance to vendors/hawkers to temporarily shift for continued economic
activity (₹ 1,500 as one-time assistances.
➢ Impacts on vulnerable affected persons (Temporary impacts)- Vulnerable/Poor AHs- Livelihood. Vulnerable households will be given priority in project construction employment and provided with income restoration support. Vulnerable persons/businesses will receive ₹ 9,000 as one-time assistances under temporary impacts.
Those who were not present during survey concluded on 28.02.2021, opportunity is being given to submit their details latest on 7th March 2021, in the PIU office so their name can be included in the list of affected persons.
Executive Engineer
PIU, Laxmangarh,
Behind Krishna temple
65 | P a g e
Annexure 2(a) : Photographs of cut-off date displayed
Town-Abu Road
Town-Laxmangarh
Town-Sirohi
67 | P a g e
Appendix 3: List of Potential affected persons
A. Abu Road subproject
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
1 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Ramila
Mani Lal
Saini
SC Left 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
2 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Dilip Daya Lal
OBC
Left 300 300 NTH
Owned
Joint 12 7 6 Fruit and vegetable
vendor
3 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Jeenu
Kishor Das
OBC
Left 350 350 NTH
Owned
Joint 8 5 3 FHH Fruit and vegetable
vendor
4 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kamlesh
Purushottam
OBC
Left 200 225 NTH
Owned
Nuclear
4 2 2 Fruit and vegetable
vendor
5 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Panku
Chaganlal
OBC
left 250 250 NTH
Owned
Joint 7 4 3 Fruit and vegetable
vendor
6 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Aasha
Lodhi
Ram singh
OBC
left 350 350 NTH
Owned
Joint 2 1 1 FHH Fruit and vegetable
vendor
7 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Geeta Ben
Suresh Das
OBC
left 300 300 NTH
Owned
Joint 10 5 5 FHH Fruit and vegetable
vendor
68 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
8 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Guru kuma
r
Ganpath
OBC
Left 350 350 NTH
Owned
Joint 6 3 3 Fruit and vegetable
vendor
9 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Babli Rabta OBC
left 200 225 NTH
Owned
Joint 9 8 1 FHH Fruit and vegetable
vendor
10 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Premi Roma OBC
Left 300 300 NTH
Owned
Nuclear
7 3 4 FHH Fruit and vegetable
vendor
11 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kamla
Lodhi
Hari lal OBC
Left 200 225 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
12 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Santosh
Purushottam
OBC
Left 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
13 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Dibadi
Ragho OBC
Left 300 300 NTH
Owned
Nuclear
8 2 6 FHH Fruit and vegetable
vendor
14 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Motibai
Hanuman
OBC
Left 350 350 NTH
Owned
Nuclear
5 4 1 Fruit and vegetable
vendor
15 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Urmila
Pankaj GEN
Left 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
69 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
16 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Parav Ganesh OBC
Left 300 300 NTH
Owned
Joint 7 3 4 Fruit and vegetable
vendor
17 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Reeta
Mohan lal
GEN
Left 150 225 NTH
Owned
Nuclear
4 3 1 FHH Fruit and vegetable
vendor
18 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Manoj
Saini
Kanahiya lal
OBC
Left 350 350 NTH
Owned
Nuclear
3 1 2 Fruit and vegetable
vendor
19 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Rajesh
Kumar
Soma ji OBC
Left 350 350 NTH
Owned
Nuclear
4 2 2 Fruit and vegetable
vendor
20 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Vidya devi
Prema JI
GEN
Left 250 250 NTH
Owned
Joint 10 3 7 FHH Fruit and vegetable
vendor
21 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Sheela
Ramkishor
GEN
Left 300 300 NTH
Owned
Nuclear
3 2 1 FHH Fruit and vegetable
vendor
22 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Meera
Rita OBC
Left 300 300 NTH
Owned
Nuclear
6 5 1 FHH Fruit and vegetable
vendor
70 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
23 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Pemi Deva OBC
Left 200 225 NTH
Owned
Joint 9 5 4 FHH Fruit and vegetable
vendor
24 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Pinki Ravi GEN
Left 300 300 NTH
Owned
Joint 7 2 5 FHH Fruit and vegetable
vendor
25 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Keli Kalo OBC
Left 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
26 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kamla
Prabu OBC
Left 250 250 NTH
Owned
Nuclear
4 1 3 FHH Fruit and vegetable
vendor
27 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Vishal
Kumar
Magan lal
OBC
Left 350 350 NTH
Owned
Joint 9 5 4 Fruit and vegetable
vendor
28 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Sita devi
Mangi lal
OBC
Left 350 350 NTH
Owned
Nuclear
4 2 2 FHH Fruit and vegetable
vendor
29 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Sita devi
Bhima ram
OBC
Left 350 350 NTH
Owned
Nuclear
5 3 2 Fruit and vegetable
vendor
30 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Prema ram
OBC
Left 350 350 NTH
Owned
Nuclear
6 3 3 Fruit and vegetable
vendor
71 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
31 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Bhima ram
Babulal OBC
Left 300 300 NTH
Owned
Joint 6 3 3 Fruit and vegetable
vendor
32 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Vikas Ganeshlal
GEN
Left 350 350 NTH
Owned
Joint 8 3 5 Fruit and vegetable
vendor
33 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Bhagwati
Dalpath Puri
GEN
Left 300 300 NTH
Owned
Nuclear
4 2 2 FHH Fruit and vegetable
vendor
34 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kailash
Kumar
Maganlal
OBC
Left 350 350 NTH
Owned
Joint 9 5 4 Fruit and vegetable
vendor
35 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kalpana
Bhagwan Das
GEN
Left 350 350 NTH
Owned
Joint 5 4 1 FHH Fruit and vegetable
vendor
36 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Saji Ben
Khosa ram
OBC
Left 300 300 NTH
Owned
Joint 12 6 6 FHH Fruit and vegetable
vendor
37 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Leeja Madan OBC
Left 200 225 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
38 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Prakash
Ramlal OBC
Left 350 350 NTH
Owned
Nuclear
5 2 3 Fruit and vegetable
vendor
72 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
39 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Gopilal
Natha OBC
Left 350 350 NTH
Owned
Nuclear
5 2 3 Fruit and vegetable
vendor
40 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Dharmi
devi
Gulab GEN
Left 150 225 NTH
Owned
Nuclear
4 3 1 FHH Fruit and vegetable
vendor
41 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kanhaiyala
l Wagri
Ishwar lal
ST Left 350 350 NTH
Owned
Joint 5 2 3 ST Fruit and vegetable
vendor
42 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Ramesh
Arjun OBC
Left 150 225 NTH
Owned
Joint 8 2 6 Fruit and vegetable
vendor
43 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Chunki
Chela OBC
Left 100 225 NTH
Owned
Nuclear
7 3 4 Fruit and vegetable
vendor
44 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Pankaj
Nana OBC
Left 350 350 NTH
Owned
Nuclear
7 4 3 Fruit and vegetable
vendor
45 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Amra Fakiraj OBC
Left 200 225 NTH
Owned
Joint 6 3 3 Fruit and vegetable
vendor
46 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Layik Ahme
d
Allaudin
OBC
Left 200 225 NTH
Owned
Nuclear
6 3 3 Fruit and vegetable
vendor
73 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
47 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kaniya
Deva
Mularam
OBC
Left 350 350 NTH
Owned
Nuclear
1 0 1 Fruit and vegetable
vendor
48 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Samshad
Khan
Suniel Khan
OBC
Left 350 350 NTH
Owned
Joint 6 2 4 Fruit and vegetable
vendor
49 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Roopa ram
Narayan lal
OBC
Left 300 300 NTH
Owned
Nuclear
4 1 3 Fruit and vegetable
vendor
50 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Dharmi
Dinesh Kumar
OBC
Left 350 350 NTH
Owned
Nuclear
5 2 3 FHH Fruit and vegetable
vendor
51 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kala Tejaji OBC
Left 300 300 NTH
Owned
Joint 6 2 4 Fruit and vegetable
vendor
52 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Meena
Amar Singh
GEN
Left 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
53 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Thavni
Devaram
OBC
Left 300 300 NTH
Owned
Joint 5 2 3 FHH Fruit and vegetable
vendor
54 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Kalu Devaram
OBC
Left 350 350 NTH
Owned
Joint 10 4 6 Fruit and vegetable
vendor
74 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
55 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Manoj
Kumar
Ramesh
Kumar
GEN
Left 300 300 NTH
Owned
Joint 8 5 3 Fruit and vegetable
vendor
56 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Pankaj
Babulal OBC
Left 300 300 NTH
Owned
Nuclear
3 2 1 Fruit and vegetable
vendor
57 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Anita Saini
Govind Saini
OBC
Left 300 300 NTH
Owned
Joint 2 1 1 FHH Fruit and vegetable
vendor
58 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Fooli Paghu OBC
Left 300 300 NTH
Owned
Joint 6 4 2 FHH Fruit and vegetable
vendor
59 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Vimla Saini
Kanhaiya lal
OBC
Left 350 350 NTH
Owned
Nuclear
2 1 1 FHH Fruit and vegetable
vendor
60 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Leela Mali
Devi lal OBC
Left 300 300 NTH
Owned
Nuclear
5 4 1 FHH Fruit and vegetable
vendor
61 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Fati Jhuma OBC
Left 300 300 NTH
Owned
Joint 7 5 2 FHH Fruit and vegetable
vendor
62 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Mansi
Dhena OBC
Left 300 300 NTH
Owned
Nuclear
8 3 5 FHH Fruit and vegetable
vendor
75 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
63 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
kishan
Kalu ram
OBC
Left 350 350 NTH
Owned
Joint 15 6 9 Fruit and vegetable
vendor
64 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Leela ben
Jhetha lal
OBC
Left 350 350 NTH
Owned
Joint 7 3 4 FHH Fruit and vegetable
vendor
65 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Devi Chaman lal
OBC
Left 300 300 NTH
Owned
Nuclear
2 1 1 FHH Fruit and vegetable
vendor
66 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Faghnu
Bhikho OBC
Left 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
67 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Dariya
Fool ji OBC
Left 300 300 NTH
Owned
Joint 5 2 3 Fruit and vegetable
vendor
68 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Leela Devi
Maava ji
OBC
Left 300 300 NTH
Owned
Joint 6 4 2 FHH Fruit and vegetable
vendor
69 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Geli Lakhma
OBC
Left 300 300 NTH
Owned
Joint 7 3 4 FHH Fruit and vegetable
vendor
70 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Bhuri Harda OBC
Left 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and vegetable
vendor
76 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
71 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Mamta
Sukha ram
OBC
Left 300 300 NTH
Owned
Joint 4 3 1 FHH Fruit and vegetable
vendor
72 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Ayurevedic
Hospital
Devi Bhava OBC
Left 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and vegetable
vendor
73 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Banda Bai
Chotu lal
OBC
RIGHT 200 225 NTH
Owned
Nuclear
6 1 5 FHH Fruit and vegetable
vendor
74 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Rajesh
Lodha
Aasha ram
OBC
RIGHT 350 350 NTH
Owned
Nuclear
4 2 2 Fruit and vegetable
vendor
75 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Prakash
Lodha
Bheem Singh
OBC
RIGHT 350 350 NTH
Owned
Nuclear
6 4 2 Fruit and vegetable
vendor
76 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Chote lal
Chota lal
OBC
RIGHT 350 350 NTH
Owned
Nuclear
6 1 5 Fruit and vegetable
vendor
77 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Ramila
Vinod Kumar
OBC
RIGHT 350 350 NTH
Owned
Nuclear
6 3 3 FHH Fruit and vegetable
vendor
78 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pankaj
Kumar
Mohan lal
OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and vegetable
vendor
77 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
79 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Shankar lal
Bhela ram
SC RIGHT 200 225 NTH
Owned
Nuclear
7 3 4 SC Fruit and vegetable
vendor
80 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Deepak
Bhawar SC RIGHT 350 350 NTH
Owned
Nuclear
6 3 3 SC Fruit and vegetable
vendor
81 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pinki Kheta ram
OBC
RIGHT 300 300 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
82 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bunty Jagdish OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and vegetable
vendor
83 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Lali Soma ST RIGHT 300 300 NTH
Owned
Joint 4 3 1 FHH Fruit and vegetable
vendor
84 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Gajri Shankar
ST RIGHT 300 300 NTH
Owned
Joint 8 5 3 FHH Fruit and vegetable
vendor
85 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bheema
Meetha ST RIGHT 300 300 NTH
Owned
Joint 5 2 3 ST Fruit and vegetable
vendor
86 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sanjay
Saini
Mani lal OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Fruit and vegetable
vendor
78 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
87 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Thavara
Ratna ST RIGHT 300 300 NTH
Owned
Joint 3 2 1 ST Fruit and vegetable
vendor
88 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
meeta Bai
Dhita ram
ST RIGHT 200 225 NTH
Owned
Nuclear
7 3 4 FHH Fruit and vegetable
vendor
89 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Ashok
Kumar
Bhera SC RIGHT 300 300 NTH
Owned
Joint 5 4 1 SC Fruit and vegetable
vendor
90 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Mevi Shankar lal
ST RIGHT 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
91 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Gujri Pappu ram
ST RIGHT 200 225 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
92 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Devi Dhuliya ST RIGHT 300 300 NTH
Owned
Joint 8 4 4 FHH Fruit and vegetable
vendor
93 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sumi Meva ST RIGHT 350 350 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
94 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Geeta
lala ST RIGHT 300 300 NTH
Owned
Joint 15 11 4 FHH Fruit and vegetable
vendor
79 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
95 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Jamna
Ravta Ram
ST RIGHT 300 300 NTH
Owned
Nuclear
6 2 4 FHH Fruit and vegetable
vendor
96 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sandhu lal
Bheru das
OBC
RIGHT 300 300 NTH
Owned
Nuclear
3 2 2 Fruit and vegetable
vendor
97 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Satish
Ashok Kumar
ST RIGHT 350 350 NTH
Owned
Joint 5 3 2 ST Fruit and vegetable
vendor
98 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bhura ram
Dhana ram
ST RIGHT 300 300 NTH
Owned
Joint 5 4 1 ST Fruit and vegetable
vendor
99 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Paturi Ganesh ST RIGHT 350 350 NTH
Owned
Joint 3 3 0 FHH Fruit and vegetable
vendor
100 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Jawan
Chatra ST RIGHT 300 300 NTH
Owned
Joint 3 1 2 ST Fruit and vegetable
vendor
101 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Paru Devi
Kanha Ram
ST RIGHT 300 300 NTH
Owned
Joint 11 6 5 FHH Fruit and vegetable
vendor
102 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Hirki Sona ST RIGHT 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
80 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
103 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Leela Gorak nath
ST RIGHT 300 300 NTH
Owned
Joint 4 3 1 FHH Fruit and vegetable
vendor
104 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dinesh
Narayan ji
OBC
RIGHT 300 300 NTH
Owned
Joint 3 1 2 Fruit and vegetable
vendor
105 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Kishan
Narayan ji
OBC
RIGHT 350 350 NTH
Owned
Joint 4 1 3 Fruit and vegetable
vendor
106 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Raski Varda ram
ST RIGHT 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
107 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sameera
Kela ST RIGHT 300 300 NTH
Owned
Joint 8 3 5 FHH Fruit and vegetable
vendor
108 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Mala ram
Babu ST RIGHT 300 300 NTH
Owned
Joint 7 4 3 ST Fruit and vegetable
vendor
109 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dhani Jhuma ST RIGHT 350 350 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
110 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Babli Roma ST RIGHT 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
81 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
111 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bhiki Mohan lal
ST RIGHT 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and vegetable
vendor
112 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Runga
Nana ji ST RIGHT 300 300 NTH
Owned
Joint 8 6 2 FHH Fruit and vegetable
vendor
113 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bhavri
Shankar
ST RIGHT 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and vegetable
vendor
114 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Ashok
Kumar
Chanaram
ST RIGHT 300 300 NTH
Owned
Joint 4 3 1 ST Fruit and vegetable
vendor
115 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Khem chan
d
OBC
RIGHT 300 300 NTH
Owned
Nuclear
3 2 1 Fruit and vegetable
vendor
116 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Anki Khatra ST RIGHT 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
117 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
maya Devi
Dinesh Kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and vegetable
vendor
118 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pushpa
Devi
Nathu Singh
OBC
RIGHT 300 300 NTH
Owned
Joint 5 1 4 FHH Fruit and vegetable
vendor
82 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
119 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Madhu
Devi
Satya Naraya
n
OBC
RIGHT 300 300 NTH
Owned
Joint 4 3 1 FHH Fruit and vegetable
vendor
120 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pushpa
Devi
Mukesh OBC
RIGHT 300 300 NTH
Owned
Joint 3 1 2 FHH Fruit and vegetable
vendor
121 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Vinay Kuma
r
Naveen Kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 9 5 4 Fruit and vegetable
vendor
122 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sailesh
manshali
OBC
RIGHT 300 300 NTH
Owned
Joint 4 2 2 Fruit and vegetable
vendor
123 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Bhawar lal
Manshali
OBC
RIGHT 300 300 NTH
Owned
Joint 6 3 3 Fruit and vegetable
vendor
124 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Meera
Deeta ram
ST RIGHT 300 300 NTH
Owned
Joint 4 1 3 FHH Fruit and vegetable
vendor
125 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Mapi Bai
Raju OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
126 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dhavara
Ratna ST RIGHT 300 300 NTH
Owned
Joint 8 3 5 FHH Fruit and vegetable
vendor
83 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
127 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Munni
Heera lal
SC RIGHT 300 300 NTH
Owned
Joint 3 1 2 FHH Fruit and vegetable
vendor
128 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Manish
Purushottam
OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and vegetable
vendor
129 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Fula Bhopa Ram
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 Fruit and vegetable
vendor
130 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sakiya
Ramesh
SC RIGHT 300 300 NTH
Owned
Nuclear
3 1 2 FHH Fruit and vegetable
vendor
131 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Geeta
Mukesh OBC
RIGHT 300 300 NTH
Owned
Joint 6 1 5 FHH Fruit and vegetable
vendor
132 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Premlata
Raju ram
SC RIGHT 300 300 NTH
Owned
Joint 7 3 4 FHH Fruit and vegetable
vendor
133 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pinki Bharat SC RIGHT 300 300 NTH
Owned
Joint 4 1 3 FHH Fruit and vegetable
vendor
134 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Ravi Kuma
r
Vijay Singh
OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Fruit and vegetable
vendor
84 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
135 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sita Ratan SC RIGHT 300 300 NTH
Owned
Nuclear
5 3 2 FHH Fruit and vegetable
vendor
136 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Kanta Ramesh
SC RIGHT 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
137 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Nonu Jagaram
SC RIGHT 300 300 NTH
Owned
Joint 7 3 4 SC Fruit and vegetable
vendor
138 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Jamna
Rama SC RIGHT 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
139 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Devi Babulal ST RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 FHH Fruit and vegetable
vendor
140 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Lala Bhela JI
ST RIGHT 300 300 NTH
Owned
Joint 16 10 6 ST Fruit and vegetable
vendor
141 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Jamna
Puna ram
ST RIGHT 300 300 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
142 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Sita ram
Kanhaiya lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 Fruit and vegetable
vendor
85 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
143 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Rajiv Khemchand
OBC
RIGHT 200 225 NTH
Owned
Nuclear
5 3 2 Fruit and vegetable
vendor
144 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Rupa ram
Badha ram
ST RIGHT 300 300 NTH
Owned
Joint 6 4 2 ST Fruit and vegetable
vendor
145 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Kali devi
Wala garasiy
a
ST RIGHT 200 225 NTH
Owned
Joint 7 3 4 FHH Fruit and vegetable
vendor
146 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Mana ram
Ladu ram
ST RIGHT 300 300 NTH
Owned
Joint 6 2 4 ST Fruit and vegetable
vendor
147 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Lala ram
Rama ST RIGHT 250 250 NTH
Owned
Joint 9 5 4 ST Fruit and vegetable
vendor
148 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Khemchan
d
Rajiv ST RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 ST Fruit and vegetable
vendor
149 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Laasi Lasa ram
ST RIGHT 300 300 NTH
Owned
Joint 6 4 2 FHH Fruit and vegetable
vendor
150 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Meetha
ram
Sava ST RIGHT 350 350 NTH
Owned
Joint 9 4 5 ST Fruit and vegetable
vendor
86 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
151 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
kamla
Ram nivas
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 1 3 FHH Fruit and vegetable
vendor
152 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Vidya devi
Prema ram
OBC
RIGHT 300 300 NTH
Owned
Joint 4 2 2 Fruit and vegetable
vendor
153 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Gudi Bai
Ratan lal
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 FHH Fruit and vegetable
vendor
154 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Banku
Chagan lal
ST RIGHT 200 225 NTH
Owned
Joint 7 3 4 FHH Fruit and vegetable
vendor
155 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Famla
Prabhu lal
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 FHH Fruit and vegetable
vendor
156 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pushpa
devi
Jagdish ST RIGHT 300 300 NTH
Owned
Nuclear
3 3 0 FHH Fruit and vegetable
vendor
157 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Premi Deva ST RIGHT 300 300 NTH
Owned
Joint 10 6 4 FHH Fruit and vegetable
vendor
158 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Parvati
Om prakas
h
OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
87 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
159 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Kalu ram
Bheru lal
SC RIGHT 350 350 NTH
Owned
Nuclear
3 1 2 SC Fruit and vegetable
vendor
160 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Kanta Shaila ST RIGHT 300 300 NTH
Owned
Joint 7 2 5 FHH Fruit and vegetable
vendor
161 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Hanja Prabhu lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 FHH Fruit and vegetable
vendor
162 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Man roop
Gehna Ram
OBC
RIGHT 300 300 NTH
Owned
Nuclear
7 4 3 FHH Fruit and vegetable
vendor
163 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Leela Lakhma
ST RIGHT 300 300 NTH
Owned
Joint 5 1 4 FHH Fruit and vegetable
vendor
164 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Lala Khatra ST RIGHT 300 300 NTH
Owned
Joint 15 8 7 FHH Fruit and vegetable
vendor
165 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Lakshmi
Ganga ram
ST RIGHT 350 350 NTH
Owned
Joint 6 2 4 FHH Fruit and vegetable
vendor
166 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Pappu ram
Meva ram
St RIGHT 350 350 NTH
Owned
Joint 7 3 4 ST Fruit and vegetable
vendor
88 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
167 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Babli Bhuta ram
ST RIGHT 300 300 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
168 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dharmi
Kanha ST RIGHT 300 300 NTH
Owned
Joint 24 13 11 FHH Fruit and vegetable
vendor
169 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dhuli Bai
Babu ST RIGHT 300 300 NTH
Owned
Joint 7 4 3 FHH Fruit and vegetable
vendor
170 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Rashmi
Babu ST RIGHT 300 300 NTH
Owned
Joint 7 7 0 FHH Fruit and vegetable
vendor
171 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Reetu
Bhera ram
ST RIGHT 300 300 NTH
Owned
Joint 8 6 2 FHH Fruit and vegetable
vendor
172 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Ramila
Vinod Kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 3 1 2 FHH Fruit and vegetable
vendor
173 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Gajri Rupa ST RIGHT 300 300 NTH
Owned
Joint 10 5 5 FHH Fruit and vegetable
vendor
174 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Savli Bhura ST RIGHT 300 300 NTH
Owned
Joint 9 5 4 FHH Fruit and vegetable
vendor
89 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
175 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
kali Devi
Karma ST RIGHT 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
176 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Meena
Shaila ST RIGHT 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and vegetable
vendor
177 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Gajra Mana ST RIGHT 350 350 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
178 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Dharmi
Kara ST RIGHT 350 350 NTH
Owned
Joint 6 6 0 FHH Fruit and vegetable
vendor
179 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Savi Dhana ram
ST RIGHT 300 300 NTH
Owned
Joint 8 3 5 FHH Fruit and vegetable
vendor
180 Sabji Mandi - Aburoad
Sabji Mandi- Aburoa
d
Sabji Mandi
Menu Kalu ST RIGHT 300 300 NTH
Owned
Joint 8 4 4 FHH Fruit and vegetable
vendor
181 Bus stand road
Bus stand
Railway
station Road
Pinki Santosh
kumar
FHH Left 350 350 NTH
Owned
Nuclear
8 4 4 FHH Fruit and vegetable
vendor
182 Bus stand road
Bus stand
Railway
station Road
Manu bhai
Deepak kumar
OBC
Left 250 250 NTH
Owned
Joint 5 3 2 Flowers
90 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
183 Bus stand road
Bus stand
Railway
station Road
Bharti devi
Bhikha ram
FHH Left 150 225 NTH
Owned
Joint 4 2 2 FHH Readymade garments
184 Bus stand road
Bus stand
Railway
station Road
Dhagla ram
Rajesh OBC
Left 150 225 NTH
Owned
Joint 8 2 6 Cosmetic
185 Bus stand road
Bus stand
Railway
station Road
Kishor
kumar
Mangla OBC
Left 300 300 NTH
Owned
Nuclear
4 2 2 Readymade garments
186 Bus stand road
Bus stand
Railway
station Road
Satiya
Ramesh
FHH Left 150 225 NTH
Owned
Joint 7 1 6 FHH Fruit and vegetable
vendor
187 Bus stand road
Bus stand
Railway
station Road
Aabid khan
OBC
Left 350 350 NTH
Owned
Joint 7 3 4 Snacks
188 Bus stand road
Bus stand
Railway
station Road
Radha
Babla FHH Left 200 225 NTH
Owned
Joint 5 3 2 FHH Fruit and vegetable
vendor
189 Bus stand road
Bus stand
Railway
station Road
Kalu Nathu Lal
OBC
Left 350 350 NTH
Owned
Joint 6 2 4 Fruit and vegetable
vendor
190 Bus stand road
Bus stand
Railway
station Road
Sangeeta
FHH Left 200 225 NTH
Owned
Nuclear
6 1 5 FHH Fruit and vegetable
vendor
91 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
191 Bus stand road
Bus stand
Railway
station Road
Bhawar lal
Pana OBC
Left 200 225 NTH
Owned
Nuclear
6 3 3 Small hotel(dhaba
)
192 Bus stand road
Bus stand
Railway
station Road
Khema ram
Darga OBC
Left 350 350 NTH
Owned
Joint 10 5 5 Small hotel(dhaba
)
193 Bus stand road
Bus stand
Railway
station Road
Sumit Kuma
r
Suresh OBC
Left 350 350 NTH
Owned
Joint 11 3 8 Fruit and vegetable
vendor
194 Bus stand road
Bus stand
Railway
station Road
Anil kuma
r
Narayan lal
OBC
Left 350 350 NTH
Owned
Joint 6 3 3 Fruit and vegetable
vendor
195 Bus stand road
Bus stand
Railway
station Road
Tulsi ram
Aarfu OBC
Left 200 225 NTH
Owned
Nuclear
2 1 1 Cigarette/Pan stall
196 Bus stand road
Bus stand
Railway
station Road
Ganesha ram
Darga OBC
Left 350 350 NTH
Owned
Joint 6 4 2 Snacks
197 Bus stand road
Bus stand
Railway
station Road
Vasudev
Vasant Mal
OBC
Left 400 400 NTH
Owned
Nuclear
8 3 5 Small hotel(dhaba
)
198 Bus stand road
Bus stand
Railway
station Road
Amit Raja OBC
Left 350 350 NTH
Owned
Nuclear
6 4 2 Fruit and vegetable
vendor
92 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
199 Bus stand road
Bus stand
Railway
station Road
Heera lal
Nanda ram
OBC
Left 200 225 NTH
Owned
Joint 6 2 4 Sweets
200 Bus stand road
Bus stand
Railway
station Road
Pukhraj
Urja OBC
Left 350 350 NTH
Owned
Nuclear
6 1 5 Tea stall
201 Bus stand road
Bus stand
Railway
station Road
Lalit kuma
r
Doolta ram
OBC
Left 350 350 NTH
Owned
Nuclear
4 2 2 Fruit and vegetable
vendor
202 Bus stand road
Bus stand
Railway
station Road
Sanju Ram marath
OBC
Left 350 350 NTH
Owned
Joint 4 2 2 Welding
203 Bus stand road
Bus stand
Railway
station Road
Bhera ram
Dida ram
OBC
Left 350 350 NTH
Owned
Joint 9 4 5 Fruit and vegetable
vendor
204 Bus stand road
Bus stand
Railway
station Road
Alkesh
Rohit OBC
Left 300 300 NTH
Owned
Joint 8 4 4 Cigarette/Pan stall
205 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Manoj
kumar
Aashu lal
OBC
Left 400 400 NTH
Owned
Joint 4 2 2 Small hotel(dhaba
)
206 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Mamta
Kishor ST Left 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
93 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
207 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Hindu ram
Kashna ST Right 300 300 NTH
Owned
Joint 4 3 1 ST Fruit and Vegetable
Vendor
208 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Kailash
mali
Kota ram
OBC
Left 350 350 NTH
Owned
Joint 6 3 3 Sweets
209 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Jawan
Jassa OBC
Left 300 300 NTH
Owned
Joint 5 3 2 Snacks
210 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Sobat singh
Ram chandr
a
ST Left 350 350 NTH
Owned
Nuclear
6 3 3 ST Cobbler
211 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Vikram
Suresh ST Left 350 350 NTH
Owned
Nuclear
2 1 1 ST Tailoring
212 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Ganesh
ram
Chotu ram
OBC
Left 200 225 NTH
Owned
Nuclear
3 2 1 Plastic
213 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Salim saha
Safi saha
OBC
Left 350 350 NTH
Owned
Joint 9 2 7 Snacks
214 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Arjun singh
Kanhaiya
SC RIGHT 300 300 NTH
Owned
Joint 6 4 2 SC Tailoring
215 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Arvind
bageri
Vinay OBC
Left 350 350 NTH
Owned
Nuclear
5 2 3 Fruit and Vegetable
Vendor
216 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Bhawar
Pukhraj OBC
Left 350 350 NTH
Owned
Joint 5 2 3 Snacks
94 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
217 Ambe maa
mandir
Ambe maa
mandir
Macchi Market
Raju bager
i
Gopal ST Left 350 350 NTH
Owned
Nuclear
5 3 2 ST Fruit and Vegetable
Vendor
218 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
kala Lala OBC
RIGHT 300 300 NTH
Owned
Joint 11 7 4 Fruit and Vegetable
Vendor
219 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Manju
Kishan OBC
RIGHT 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
220 Sadar Bazar
Sadar Bazar
Sadar Bazar
Lakshmi devi
Dashrath
FHH RIGHT 350 350 NTH
Owned
Joint 5 3 2 FHH Fruit and Vegetable
Vendor
221 Sadar Bazar
Sadar Bazar
Sadar Bazar
Rajendra
Jethalal FHH RIGHT 300 300 NTH
Owned
Nuclear
3 2 1 FHH Fruit and Vegetable
Vendor
222 Sadar Bazar
Sadar Bazar
Sadar Bazar
Govind
Mansa ram
OBC
RIGHT 250 250 NTH
Owned
Nuclear
4 3 1 Fruit and Vegetable
Vendor
223 Sadar Bazar
Sadar Bazar
Sadar Bazar
gopal ram
Azeri lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
6 2 4 Sweets
224 Sadar Bazar
Sadar Bazar
Sadar Bazar
raju Ramesh
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 2 3 Fruit and Vegetable
Vendor
225 Sadar Bazar
Sadar Bazar
Sadar Bazar
Dinesh
kumar
Chandra
kumar
OBC
RIGHT 350 350 NTH
Owned
Nuclear
2 1 1 Fruit and Vegetable
Vendor
226 Sadar Bazar
Sadar Bazar
Sadar Bazar
Rekhaa
Babulal FHH RIGHT 350 350 NTH
Owned
Nuclear
3 1 2 FHH Fruit and Vegetable
Vendor
227 Sadar Bazar
Sadar Bazar
Sadar Bazar
Aanu Suresh Kumar
FHH RIGHT 350 350 NTH
Owned
Nuclear
2 1 1 FHH Others/Farmer
95 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
228 Sadar Bazar
Sadar Bazar
Sadar Bazar
Seema
Kanhaiya lal
FHH RIGHT 300 300 NTH
Owned
Joint 5 2 3 FHH Fruit and Vegetable
Vendor
229 Sadar Bazar
Sadar Bazar
Sadar Bazar
Bhagvati
Dev FHH RIGHT 350 350 NTH
Owned
Joint 9 6 3 FHH Redymade garments
230 Sadar Bazar
Sadar Bazar
Sadar Bazar
Chandni
Sharavan
FHH RIGHT 350 350 NTH
Owned
Joint 7 4 3 FHH General store
231 Sadar Bazar
Sadar Bazar
Sadar Bazar
Anil Ratan OBC
RIGHT 200 225 NTH
Owned
Joint 9 4 5 General store
232 Sadar Bazar
Sadar Bazar
Sadar Bazar
Dilip Kuma
r
Deva chand
OBC
RIGHT 350 350 NTH
Owned
Nuclear
5 3 2 Redymade garments
233 Sadar Bazar
Sadar Bazar
Sadar Bazar
Vimla Deva ram
FHH RIGHT 300 300 NTH
Owned
Nuclear
5 2 3 FHH Cosmetic
234 Sadar Bazar
Sadar Bazar
Sadar Bazar
Manju
Narayan
FHH RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 FHH Cosmetic
235 Sadar Bazar
Sadar Bazar
Sadar Bazar
Jitendra
Govind lal
OBC
RIGHT 200 225 NTH
Owned
Joint 4 2 2 Others/Farmer
236 Sadar Bazar
Sadar Bazar
Sadar Bazar
Rajendra
Waqta OBC
RIGHT 350 350 NTH
Owned
Nuclear
3 2 1 Cobbler
237 Sadar Bazar
Sadar Bazar
Sadar Bazar
Shiv ram
Pukhraj OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 3 1 Plastic
238 Sadar Bazar
Sadar Bazar
Sadar Bazar
Durgesh
Rajendra
Jumar
OBC
RIGHT 300 300 NTH
Owned
Nuclear
3 2 1 Redymade garments
239 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Mishrilal
Bal Mukun
d
OBC
RIGHT 300 300 NTH
Owned
Joint 6 4 2 Plastic
240 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Prahlad
Bharat das
OBC
RIGHT 200 225 NTH
Owned
Nuclear
1 1 0 Others/Farmer
241 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Savli OBC
RIGHT 200 225 NTH
Owned
Nuclear
1 0 1 Cosmetic
96 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
242 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Popat Bhai
Phool singh
OBC
LEFT 350 350 NTH
Owned
Joint 9 5 4 Cigratte/Pan Stall
243 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Mahendra Singh
Phool Singh
OBC
LEFT 350 350 NTH
Owned
Nuclear
4 3 1 Redymade garments
244 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Bhawan
Banjara
Dinesh ST LEFT 350 350 NTH
Owned
Joint 12 7 5 ST General store
245 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Dharmend
ra
Gopal Das
OBC
LEFT 350 350 NTH
Owned
Joint 4 3 1 Redymade garments
246 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Jamuna
Behna JI
FHH LEFT 200 225 NTH
Owned
Nuclear
4 0 4 FHH General store
247 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Santosh
FHH LEFT 100 225 NTH
Owned
Nuclear
7 5 2 FHH General store
248 Sadar Bazaar
Sadar Bazaar
Sadar Bazaar
Bhagwan
Kaalsa OBC
LEFT 200 225 NTH
Owned
Nuclear
2 1 1 General store
249 Bus stand
Bus stand
Sirohi Road
Madhu
Gopal OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 3 0 FHH Fruit and Vegetable
Vendor
250 Bus stand
Bus stand
Sirohi Road
Ishwar lal Sharma
Tulsi ram
GEN
RIGHT 200 225 NTH
Owned
Nuclear
1 1 0 Other/Farmer
251 Bus stand
Bus stand
Sirohi Road
Kalu ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 2 0 Other/Farmer
97 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
252 Bus stand
Bus stand
Sirohi Road
Lala ram
Somshiva
OBC
RIGHT 300 300 NTH
Owned
Joint 2 1 1 Fruit and Vegetable
Vendor
253 Bus stand
Bus stand
Sirohi Road
Bhagta ram
Ji
Bhawar lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 2 3 Sweets
254 Bus stand
Bus stand
Sirohi Road
Jagdish
Dinesh OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Fruit and Vegetable
Vendor
255 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Dines
h Kuma
r
Jetharam
OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 2 1 Fruit and Vegetable
Vendor
256 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Mohan lal
Jitendra
Kumar
OBC
RIGHT 200 225 NTH
Owned
Joint 5 3 2 Flowers
257 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Inder singh
Nar singh
OBC
RIGHT 300 300 NTH
Owned
Joint 3 1 2 Snacks
258 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Puran lal
Brij nandan
OBC
RIGHT 350 350 NTH
Owned
Joint 6 3 3 Snacks
259 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Swami
Prasad
Aanshu Rathod
OBC
RIGHT 200 225 NTH
Owned
Joint 5 2 3 Snacks
260 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medic
Ram Bush
an
Gheraj OBC
RIGHT 200 225 NTH
Owned
Joint 4 3 1 Snacks
98 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
al Gali
261 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Dalpat pui
Pratap Puri
OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Snacks
262 Fruit Gali
Fruit Gali
Fruit Gali
Sonu Vinod Kumar
OBC
LEFT 300 300 NTH
Owned
Joint 5 3 2 Fruit and Vegetable
Vendor
263 Fruit Gali
Fruit Gali
Fruit Gali
Hansa
Vinod OBC
LEFT 300 300 NTH
Owned
Joint 5 3 2 FHH Fruit and Vegetable
Vendor
264 Fruit Gali
Fruit Gali
Fruit Gali
Geeta
Bacchu lal
OBC
LEFT 300 300 NTH
Owned
Joint 4 2 2 FHH Fruit and Vegetable
Vendor
265 Fruit Gali
Fruit Gali
Fruit Gali
Dharmses
h
Rati lal OBC
LEFT 350 350 NTH
Owned
Joint 4 3 1 Fruit and Vegetable
Vendor
266 Fruit Gali
Fruit Gali
Fruit Gali
Kali Gajendra
ST LEFT 300 300 NTH
Owned
Joint 4 3 1 FHH Fruit and Vegetable
Vendor
267 Fruit Gali
Fruit Gali
Fruit Gali
Dilip OBC
LEFT 300 300 NTH
Owned
Joint 4 2 2 Fruit and Vegetable
Vendor
268 Fruit Gali
Fruit Gali
Fruit Gali
Mohan lal
Daulat ram
OBC
LEFT 300 300 NTH
Owned
Joint 19 9 10 Fruit and Vegetable
Vendor
269 Fruit Gali
Fruit Gali
Fruit Gali
Dhaniya
Bansi lal
OBC
LEFT 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
99 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
270 Fruit Gali
Fruit Gali
Fruit Gali
Praveen
Ramesh
Chand
OBC
LEFT 350 350 NTH
Owned
Joint 9 4 5 Fruit and Vegetable
Vendor
271 Fruit Gali
Fruit Gali
Fruit Gali
Raja Murli lal OBC
LEFT 300 300 NTH
Owned
Joint 4 2 2 Fruit and Vegetable
Vendor
272 Fruit Gali
Fruit Gali
Fruit Gali
Devi Babulal SC LEFT 300 300 NTH
Owned
Joint 7 4 3 FHH Fruit and Vegetable
Vendor
273 Fruit Gali
Fruit Gali
Fruit Gali
Sarda ben
Umma shanka
r
SC LEFT 300 300 NTH
Owned
Joint 7 3 4 FHH Fruit and Vegetable
Vendor
274 Fruit Gali
Fruit Gali
Fruit Gali
Daura
Phata ST LEFT 300 300 NTH
Owned
Joint 13 8 5 FHH Fruit and Vegetable
Vendor
275 Fruit Gali
Fruit Gali
Fruit Gali
Ashwin
Hem chandr
a
OBC
LEFT 300 300 NTH
Owned
Joint 4 3 1 Redymade garments
276 Fruit Gali
Fruit Gali
Fruit Gali
Suraj Kuma
r
Ramesh
OBC
LEFT 350 350 NTH
Owned
Nuclear
4 2 2 Fruit and Vegetable
Vendor
277 Fruit Gali
Fruit Gali
Fruit Gali
Vishnu
Wagri
Ramesh
ST LEFT 350 350 NTH
Owned
Joint 7 4 3 ST Fruit and Vegetable
Vendor
278 Fruit Gali
Fruit Gali
Fruit Gali
Gopal
Sukharam
ST LEFT 350 350 NTH
Owned
Nuclear
7 3 4 ST Fruit and Vegetable
Vendor
279 Fruit Gali
Fruit Gali
Fruit Gali
Mukesh
Kumar
SC LEFT 350 350 NTH
Owned
Nuclear
5 2 3 SC Snacks
100 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
280 Fruit Gali
Fruit Gali
Fruit Gali
Tilak Kuma
r
Amrat Lal
ST RIGHT 350 350 NTH
Owned
Nuclear
5 2 3 ST Fruit and Vegetable
Vendor
281 Fruit Gali
Fruit Gali
Fruit Gali
Pawan
Ram marath
ST RIGHT 350 350 NTH
Owned
Joint 5 4 1 ST Fruit and Vegetable
Vendor
282 Fruit Gali
Fruit Gali
Fruit Gali
Aashish
Kuamr
OBC
RIGHT 350 350 NTH
Owned
Joint 6 3 3 Fruit and Vegetable
Vendor
283 Fruit Gali
Fruit Gali
Fruit Gali
Kanhaiya lal
Daulat ram
OBC
LEFT 350 350 NTH
Owned
Nuclear
6 4 2 Fruit and Vegetable
Vendor
284 Fruit Gali
Fruit Gali
Fruit Gali
Paresh
Kumar
Kishan lal
OBC
LEFT 350 350 NTH
Owned
Nuclear
4 3 1 Fruit and Vegetable
Vendor
285 Fruit Gali
Fruit Gali
Fruit Gali
Kishan lal
OBC
LEFT 350 350 NTH
Owned
Nuclear
6 3 3 Fruit and Vegetable
Vendor
286 Fruit Gali
Fruit Gali
Fruit Gali
Nand lal
Jumman lal
OBC
LEFT 350 350 NTH
Owned
Joint 5 3 2 Fruit and Vegetable
Vendor
287 Manpur Manpur Bus stand
Shiv Narayan
Chagan OBC
LEFT 350 350 NTH
Rented
Nuclear
2 1 1 Snacks
288 Manpur Manpur Bus stand
Motiram
Paras ram
OBC
LEFT 350 350 NTH
Owned
Joint 8 4 4 Fruit and Vegetable
Vendor
101 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
289 Manpur Manpur Bus stand
Hero Harish chandr
a
OBC
LEFT 300 300 NTH
Owned
Nuclear
4 2 2 Sweets
290 Manpur Manpur Bus stand
Kailash
Rupa OBC
LEFT 100 225 NTH
Owned
Nuclear
5 3 2 Cigarette/Pan stall
291 Manpur Manpur Bus stand
Naresh
Kumar
Deva ram
OBC
LEFT 300 300 NTH
Owned
Joint 5 3 2 Snacks
292 Manpur Manpur Bus stand
Janaram
Bhikha OBC
LEFT 200 225 NTH
Owned
Nuclear
8 4 4 Snacks
293 Manpur Manpur Bus stand
Amar lal
Bhikha ram
OBC
LEFT 250 250 NTH
Owned
Nuclear
4 2 2 Cigarette/Pan stall
294 Manpur Manpur Bus stand
Bhawar
Heera OBC
LEFT 350 350 NTH
Owned
Joint 20 10 10 Snacks
295 Manpur Manpur Bus stand
Mangla
ram
Babu lal
OBC
LEFT 300 300 NTH
Owned
Joint 3 2 1 Cigarette/Pan stall
296 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Rasid Habib
Habib SC RIGHT 350 350 NTH
Owned
Nuclear
4 2 2 SC Flowers
297 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Nandu
Bhai
Sohal Lal
ST RIGHT 350 350 NTH
Owned
Joint 8 5 3 ST Snacks
298 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Lakhma
Tara OBC
RIGHT 350 350 NTH
Owned
Joint 8 3 5 FHH Others/Farmer
102 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
299 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Jeevi Heera ram
OBC
RIGHT 300 300 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
300 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Jagaram
Dunga ji
OBC
RIGHT 300 300 NTH
Owned
Joint 6 4 2 Fruit and Vegetable
Vendor
301 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Tek chan
d
Buraram
SC RIGHT 300 300 NTH
Owned
Joint 6 4 2 SC Fruit and Vegetable
Vendor
302 Manpur Chaurah,Aburoa
Manpur Chaura
ha
Reodar Road
Sukti Devi
Magan lal
SC RIGHT 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor 303 Manpur
Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Jagdish
kumar
Rana Ji SC RIGHT 350 350 NTH
Owned
Joint 8 4 4 SC Fruit and Vegetable
Vendor
304 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Pavni Bheraeam
SC RIGHT 350 350 NTH
Owned
Nuclear
8 2 6 FHH Fruit and Vegetable
Vendor
305 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Paru Devi
Gaja ram
SC RIGHT 350 350 NTH
Owned
Joint 24 21 3 FHH Fruit and Vegetable
Vendor
306 Manpur Chaurah,Aburoa
d
Manpur Chaura
ha
Reodar Road
Harish
Ganesh Ram
ST RIGHT 350 350 NTH
Owned
Joint 6 3 3 ST Tea stall
307 Kailash Medical
Kailash Medical
Kailash
Manoy
Kusshan
OBC
LEFT 200 225 NTH
Owned
Nuclear
2 2 0 Redymade garments
103 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
Gali gali Medical Gali
Chand
308 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Mayur
Prajapati
Suresh OBC
LEFT 350 350 NTH
Owned
Joint 12 3 9 Fruit and Vegetable
Vendor
309 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
Ram santo
sh
Kanhaiya lal
OBC
LEFT 350 350 NTH
Owned
Nuclear
4 2 2 Redymade garments
310 Kailash Medical
Gali
Kailash Medical
gali
Kailash
Medical Gali
bhagwan Das
Jetha ram
OBC
LEFT 200 225 NTH
Owned
Joint 4 2 2 Redymade garments
311 Sabji Mandi
Sabji Mandi
Sabji Mandi
Santosh
Sharma
Kanhaiya lal
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 FHH Fruit and Vegetable
Vendor
312 Sabji Mandi
Sabji Mandi
Sabji Mandi
Thaveri
Teja ST RIGHT 300 300 NTH
Owned
Joint 5 2 3 FHH Fruit and Vegetable
Vendor
313 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ravi Kuma
r
Duri chand
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 1 3 Fruit and Vegetable
Vendor
314 Sabji Mandi
Sabji Mandi
Sabji Mandi
Dinesh
Bhikha lal
ST RIGHT 200 225 NTH
Owned
Nuclear
3 1 2 ST Fruit and Vegetable
Vendor
315 Sabji Mandi
Sabji Mandi
Sabji Mandi
Teeja Narayan lal
OBC
RIGHT 300 300 NTH
Owned
Joint 5 1 4 FHH Fruit and Vegetable
Vendor
316 Sabji Mandi
Sabji Mandi
Sabji Mandi
Suresh
Kuma
Ramesh lal
ST RIGHT 200 225 NTH
Owned
Nuclear
16 8 8 ST Fruit and Vegetable
Vendor
104 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
r
317 Sabji Mandi
Sabji Mandi
Sabji Mandi
Lakshmi Devi
Gulab chand
ST RIGHT 300 300 NTH
Owned
Joint 5 4 1 FHH Fruit and Vegetable
Vendor
318 Sabji Mandi
Sabji Mandi
Sabji Mandi
Lalit Kuam
r
Daulat Ram
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 1 3 Fruit and Vegetable
Vendor
319 Sabji Mandi
Sabji Mandi
Sabji Mandi
Heera lal
Nand lal
OBC
RIGHT 100 225 NTH
Owned
Nuclear
6 2 4 Tea stall
320 Sabji Mandi
Sabji Mandi
Sabji Mandi
Govind
Kumar
Deen dayal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
11 2 9 Fruit and Vegetable
Vendor
321 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rupa ram
Moti ram
ST RIGHT 200 225 NTH
Owned
Nuclear
20 10 10 ST Fruit and Vegetable
Vendor
322 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kamla
Babulal ST RIGHT 200 225 NTH
Owned
Nuclear
3 0 3 FHH Fruit and Vegetable
Vendor
323 Sabji Mandi
Sabji Mandi
Sabji Mandi
Mohan
Nathu ram
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 3 2 Fruit and Vegetable
Vendor
324 Sabji Mandi
Sabji Mandi
Sabji Mandi
Pampuri
Deva ram
ST RIGHT 350 350 NTH
Owned
Joint 7 3 4 FHH Fruit and Vegetable
Vendor
325 Sabji Mandi
Sabji Mandi
Sabji Mandi
Sukhi Heera Ram
ST RIGHT 200 225 NTH
Owned
Nuclear
7 4 3 FHH Fruit and Vegetable
Vendor
105 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
326 Sabji Mandi
Sabji Mandi
Sabji Mandi
Savtri Kiran Kumar
ST RIGHT 200 225 NTH
Owned
Nuclear
5 2 3 FHH Fruit and Vegetable
Vendor
327 Sabji Mandi
Sabji Mandi
Sabji Mandi
Badaram
Bhawar lal
ST RIGHT 350 350 NTH
Owned
Joint 5 2 3 ST Fruit and Vegetable
Vendor
328 Sabji Mandi
Sabji Mandi
Sabji Mandi
Phulki
Pappu ST RIGHT 100 225 NTH
Owned
Nuclear
6 3 3 FHH Fruit and Vegetable
Vendor
329 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kaluram,
Hajari ram
ST RIGHT 350 350 NTH
Owned
Nuclear
4 2 2 ST Electronics
330 Sabji Mandi
Sabji Mandi
Sabji Mandi
Indra Bhata ST RIGHT 100 225 NTH
Owned
Nuclear
6 3 3 FHH Fruit and Vegetable
Vendor
331 Sabji Mandi
Sabji Mandi
Sabji Mandi
Madhu
Gopal lal
ST RIGHT 300 300 NTH
Owned
Nuclear
3 1 2 FHH Fruit and Vegetable
Vendor
332 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rekha
Kalidas OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 1 2 FHH Fruit and Vegetable
Vendor
333 Sabji Mandi
Sabji Mandi
Sabji Mandi
Parvati
Ganesh lal
OBC
RIGHT 350 350 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
334 Sabji Mandi
Sabji Mandi
Sabji Mandi
Lali bai
Gova ram
ST RIGHT 200 225 NTH
Owned
Nuclear
8 4 4 FHH Fruit and Vegetable
Vendor
335 Sabji Mandi
Sabji Mandi
Sabji Mandi
Chalki
Goma ram
ST RIGHT 300 300 NTH
Owned
Joint 11 7 4 FHH Fruit and Vegetable
Vendor
336 Sabji Mandi
Sabji Mandi
Sabji Mandi
Champa
Velaram
ST RIGHT 200 225 NTH
Owned
Nuclear
6 3 3 FHH Fruit and Vegetable
Vendor
106 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
337 Sabji Mandi
Sabji Mandi
Sabji Mandi
Javitri Mohan lal
OBC
RIGHT 350 350 NTH
Owned
Joint 2 1 1 FHH Fruit and Vegetable
Vendor
338 Sabji Mandi
Sabji Mandi
Sabji Mandi
Champa
Mava ST RIGHT 200 225 NTH
Owned
Joint 9 3 6 FHH Fruit and Vegetable
Vendor
339 Sabji Mandi
Sabji Mandi
Sabji Mandi
Salim saha
Safisha OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 1 2 Fruit and Vegetable
Vendor
340 Sabji Mandi
Sabji Mandi
Sabji Mandi
Sakri ben
Pighla ram
ST RIGHT 350 350 NTH
Owned
Nuclear
6 3 3 FHH Fruit and Vegetable
Vendor
341 Sabji Mandi
Sabji Mandi
Sabji Mandi
Gabri Shankar lal
ST RIGHT 135 225 NTH
Owned
Nuclear
8 2 6 FHH Fruit and Vegetable
Vendor
342 Sabji Mandi
Sabji Mandi
Sabji Mandi
Meena
Chela ST RIGHT 350 350 NTH
Owned
Joint 5 2 3 FHH Fruit and Vegetable
Vendor
343 Sabji Mandi
Sabji Mandi
Sabji Mandi
Shanti bai
Phula ram
ST RIGHT 350 350 NTH
Owned
Nuclear
2 1 1 FHH Fruit and Vegetable
Vendor
344 Sabji Mandi
Sabji Mandi
Sabji Mandi
Dhulki
Baburam
ST RIGHT 200 225 NTH
Owned
Nuclear
5 1 4 FHH Fruit and Vegetable
Vendor
345 Sabji Mandi
Sabji Mandi
Sabji Mandi
Prakash
chand
Ram lal OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and Vegetable
Vendor
346 Sabji Mandi
Sabji Mandi
Sabji Mandi
Bhawar lal
Amra ram
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 2 2 Fruit and Vegetable
Vendor
107 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
347 Sabji Mandi
Sabji Mandi
Sabji Mandi
Daili Ramesh
Chand
OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 1 2 FHH Fruit and Vegetable
Vendor
348 Sabji Mandi
Sabji Mandi
Sabji Mandi
Dalpat
Pratap OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 Cosmetics
349 Sabji Mandi
Sabji Mandi
Sabji Mandi
Puran lal
Brajnandan
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 3 2 Snacks
350 Sabji Mandi
Sabji Mandi
Sabji Mandi
Wali Prabhuram
OBC
RIGHT 350 350 NTH
Owned
Nuclear
2 1 1 FHH Fruit and Vegetable
Vendor
351 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ranka
Raja ji ST RIGHT 300 300 NTH
Owned
Joint 9 4 5 FHH Fruit and Vegetable
Vendor
352 Sabji Mandi
Sabji Mandi
Sabji Mandi
Sumli Meva ST RIGHT 200 225 NTH
Owned
Nuclear
6 3 3 FHH Fruit and Vegetable
Vendor
353 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ramesh
Kumar
Arjun singh
OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and Vegetable
Vendor
354 Sabji Mandi
Sabji Mandi
Sabji Mandi
Mayur
Suresh Kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 Fruit and Vegetable
Vendor
355 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kesari
Shankar ram
ST RIGHT 300 300 NTH
Owned
Joint 5 3 2 ST Fruit and Vegetable
Vendor
356 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rakesh
Lal Singh
OBC
RIGHT 350 350 NTH
Owned
Nuclear
4 3 1 Fruit and Vegetable
Vendor
357 Sabji Mandi
Sabji Mandi
Sabji Mandi
Hitendra
Munna lal
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 2 0 Fruit and Vegetable
Vendor
108 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
358 Sabji Mandi
Sabji Mandi
Sabji Mandi
Hansa
Chote lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 3 2 FHH Fruit and Vegetable
Vendor
359 Sabji Mandi
Sabji Mandi
Sabji Mandi
Virendra
Ramesh
kumar
OBC
RIGHT 300 300 NTH
Owned
Nuclear
3 1 2 Fruit and Vegetable
Vendor
360 Sabji Mandi
Sabji Mandi
Sabji Mandi
Balulal
Ram lal OBC
RIGHT 350 350 NTH
Owned
Joint 6 2 4 Fruit and Vegetable
Vendor
361 Sabji Mandi
Sabji Mandi
Sabji Mandi
Manoj
Kumar
Lkhemchand
OBC
RIGHT 300 300 NTH
Owned
Joint 3 2 1 Fruit and Vegetable
Vendor
362 Sabji Mandi
Sabji Mandi
Sabji Mandi
Madan lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 2 3 FHH Fruit and Vegetable
Vendor
363 Sabji Mandi
Sabji Mandi
Sabji Mandi
Babu lal
Babu lal
OBC
RIGHT 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and Vegetable
Vendor
364 Sabji Mandi
Sabji Mandi
Sabji Mandi
Bhanwar lal
OBC
RIGHT 300 300 NTH
Owned
Joint 6 4 2 Fruit and Vegetable
Vendor
365 Sabji Mandi
Sabji Mandi
Sabji Mandi
Dita ram
ST RIGHT 300 300 NTH
Owned
Joint 6 2 4 FHH Fruit and Vegetable
Vendor
366 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kasua
Kasua ST RIGHT 300 300 NTH
Owned
Joint 3 2 1 ST Fruit and Vegetable
Vendor
367 Sabji Mandi
Sabji Mandi
Sabji Mandi
Raja Murli OBC
RIGHT 300 300 NTH
Owned
Joint 4 2 2 Fruit and Vegetable
Vendor
109 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
368 Sabji Mandi
Sabji Mandi
Sabji Mandi
Suresh das
OBC
RIGHT 300 300 NTH
Owned
Joint 5 4 1 FHH Fruit and Vegetable
Vendor
369 Sabji Mandi
Sabji Mandi
Sabji Mandi
Jagdish
OBC
RIGHT 300 300 NTH
Owned
Joint 4 1 3 Fruit and Vegetable
Vendor
370 Sabji Mandi
Sabji Mandi
Sabji Mandi
Nenu ben
HiraLal OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 FHH Fruit and Vegetable
Vendor
371 Sabji Mandi
Sabji Mandi
Sabji Mandi
Prakash
kumar
OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 Fruit and Vegetable
Vendor
372 Sabji Mandi
Sabji Mandi
Sabji Mandi
Harish
chand
OBC
RIGHT 300 300 NTH
Owned
Joint 4 2 2 Fruit and Vegetable
Vendor
373 Sabji Mandi
Sabji Mandi
Sabji Mandi
Deva ram
Kapura ram
ST RIGHT 300 300 NTH
Owned
Joint 5 3 2 ST Snacks
374 Sabji Mandi
Sabji Mandi
Sabji Mandi
Sohan lal
Mohan lal
OBC
RIGHT 350 350 NTH
Owned
Joint 9 3 6 Fruit and Vegetable
Vendor
375 Sabji Mandi
Sabji Mandi
Sabji Mandi
Indara
devi
Rmesh kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 5 4 1 FHH Fruit and Vegetable
Vendor
376 Sabji Mandi
Sabji Mandi
Sabji Mandi
Navali
Bhawa lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 FHH Fruit and Vegetable
Vendor
377 Sabji Mandi
Sabji Mandi
Sabji Mandi
Hirki Chuna ram
ST RIGHT 300 300 NTH
Owned
Nuclear
3 2 1 FHH Fruit and Vegetable
Vendor
110 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
378 Sabji Mandi
Sabji Mandi
Sabji Mandi
Meva chand
ST RIGHT 300 300 NTH
Owned
Joint 4 2 2 ST Fruit and Vegetable
Vendor
379 Sabji Mandi
Sabji Mandi
Sabji Mandi
Som khan
Dilawar khan
OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Fruit and Vegetable
Vendor
380 Sabji Mandi
Sabji Mandi
Sabji Mandi
Lasa Shaja OBC
RIGHT 300 300 NTH
Owned
Joint 7 3 4 FHH Fruit and Vegetable
Vendor
381 Sabji Mandi
Sabji Mandi
Sabji Mandi
Indra devi
Ramesh
kumar
OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 4 1 FHH Fruit and Vegetable
Vendor
382 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rakesh
Sukh lal
OBC
RIGHT 300 300 NTH
Owned
Joint 9 5 4 Fruit and Vegetable
Vendor
383 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kishan lal
Narayan lal
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 Fruit and Vegetable
Vendor
384 Sabji Mandi
Sabji Mandi
Sabji Mandi
Gabri Goma ram
OBC
RIGHT 200 225 NTH
Owned
Joint 6 3 3 FHH Fruit and Vegetable
Vendor
385 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rakesh
kumar
Lal singh
OBC
RIGHT 300 300 NTH
Owned
Joint 5 3 2 Fruit and Vegetable
Vendor
386 Sabji Mandi
Sabji Mandi
Sabji Mandi
Raju Chotte lal
OBC
RIGHT 300 300 NTH
Owned
Joint 5 2 3 Fruit and Vegetable
Vendor
387 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Bhda ji
Masra ji OBC
RIGHT 350 350 NTH
Owned
Joint 16 9 7 Tea stall
111 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
388 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Narendra
Lal ji OBC
RIGHT 300 300 NTH
Owned
Joint 6 3 3 Readymade garments
389 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Pankaj
Ganga parsad
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 2 0 Readymade garments
390 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Ravi Bharat OBC
RIGHT 300 300 NTH
Owned
Nuclear
5 3 2 Readymade garments
391 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Shivpal
Lal bhadur
pal
OBC
RIGHT 350 350 NTH
Owned
Joint 6 2 4 Readymade garments
392 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Dariya
Kanti ST RIGHT 300 300 NTH
Owned
Nuclear
2 1 1 ST Readymade garments
393 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Alaudin
Jafrudin
OBC
RIGHT 200 225 NTH
Owned
Joint 4 2 2 Readymade garments
394 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Parveen
Shanti lal
SC RIGHT 300 300 NTH
Owned
Joint 7 4 3 FHH Readymade garments
395 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Rakesh
Rajnarayan
OBC
RIGHT 200 225 NTH
Owned
Nuclear
1 1 0 Readymade garments
112 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
396 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Pushpa
Ram bhvan
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 3 1 FHH Readymade garments
397 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Ratan lal
Khanya lal
OBC
RIGHT 200 225 NTH
Owned
Nuclear
1 1 0 Readymade garments
398 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Dinesh sha
Chander sha
OBC
RIGHT 300 300 NTH
Owned
Nuclear
7 5 2 Readymade garments
399 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Sumit arya
Hansraj arya
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 Readymade garments
400 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Bhila ram
Dharma ji
OBC
RIGHT 200 225 NTH
Owned
Joint 9 4 5 Readymade garments
401 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Shadev
ram
Janardhan ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 1 2 Readymade garments
402 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Sanjay
parihar
Amrat lal
parihar
ST RIGHT 200 225 NTH
Owned
Nuclear
5 4 1 ST Readymade garments
403 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Rekha
Deva OBC
RIGHT 100 225 NTH
Owned
Nuclear
5 1 4 FHH Readymade garments
113 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
404 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Om parka
sh
Manejar
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 1 1 Readymade garments
405 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Chanda
Parkash
pandey
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 FHH Readymade garments
406 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Kapur
Hindu ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
6 1 5 Readymade garments
407 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Narayan
Raja ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 Readymade garments
408 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Rani Karan singh
OBC
RIGHT 200 225 NTH
Owned
Nuclear
6 3 3 FHH Readymade garments
409 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Nand lal
Hira lal OBC
RIGHT 200 225 NTH
Owned
Nuclear
1 1 0 Readymade garments
410 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Pushpa
Om parkas
h
OBC
RIGHT 200 225 NTH
Owned
Nuclear
3 2 1 FHH Readymade garments
411 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Sugna
Ashu ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 1 1 FHH Readymade garments
114 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
412 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Ashu ram
Hadu ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 1 1 Readymade garments
413 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Praga ram
Hindu ram
SC RIGHT 300 300 NTH
Owned
Joint 16 11 5 SC Readymade garments
414 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Shavan
Parkash
pandey
OBC
RIGHT 300 300 NTH
Owned
Nuclear
1 1 0 Readymade garments
415 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Shakuntla
Bancy lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 3 1 FHH Readymade garments
416 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Rahul Lekhu chagan
ST RIGHT 300 300 NTH
Owned
Joint 5 3 2 ST Readymade garments
417 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Mata parid
a
OBC
RIGHT 300 300 NTH
Owned
Nuclear
1 0 1 FHH Readymade garments
418 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Ashok
Ratan lal
OBC
RIGHT 300 300 NTH
Owned
Nuclear
4 2 2 Kirana shop
419 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Madhu
Bhggu ST RIGHT 300 300 NTH
Owned
Nuclear
4 3 1 FHH Fruit and Vegetable
Vendor
115 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
420 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Kalpna
Kirsna singh
OBC
RIGHT 200 225 NTH
Owned
Nuclear
2 1 1 FHH Fruit and Vegetable
Vendor
421 Bharma kumari
Gate 1 bharma kumari
Bombay
super market
Narayan
Kesha ST RIGHT 300 300 NTH
Owned
Joint 6 3 3 ST Fruit and Vegetable
Vendor
422 Sabji Mandi
Sabji Mandi
Sabji Mandi
Santosh
sharma
Kanhaiya lal
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 2 2 FHH Fruit and Vegetable
Vendor
423 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ravi kuma
r
Naresh kumar
OBC
RIGHT 300 300 NTH
Owned
Joint 9 5 4 Fruit and Vegetable
Vendor
424 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rakesh
kumar
Moti ram
OBC
RIGHT 300 300 NTH
Owned
Joint 3 2 1 Foot wear
425 Sabji Mandi
Sabji Mandi
Sabji Mandi
govind ram
Mansa ram
OBC
RIGHT 200 225 NTH
Owned
Nuclear
4 3 1 Fruit and Vegetable
Vendor
426 Sabji Mandi
Sabji Mandi
Sabji Mandi
Rohit kuma
r
Dasharat
ST LEFT 200 225 NTH
Owned
Joint 4 2 2 ST Fruit and Vegetable
Vendor
427 Sabji Mandi
Sabji Mandi
Sabji Mandi
Nandkisho
r chohan
Ram banara
s
OBC
LEFT 100 225 NTH
Owned
Nuclear
3 2 1 Fruit and Vegetable
Vendor
428 Sabji Mandi
Sabji Mandi
Sabji Mandi
Kamal
kuma
Moti ram
OBC
LEFT 300 300 NTH
Owned
Joint 4 2 2 Foot wear
116 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me in
R
s.
Daily i
nco
me a
s
per
min
imu
m
wag
es
Tit
le H
old
er
Str
eu
ctu
re
OW
NE
D o
r R
en
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
milly
m
em
bers
Male
Mem
bers
Fem
ail
Mem
be
rs
Vu
lnera
ble
Bu
sin
es
s
r
429 Sabji Mandi
Sabji Mandi
Sabji Mandi
Sohan lal
OBC
LEFT 100 225 NTH
Owned
Joint 6 3 3 Snacks
430 Sabji Mandi
Sabji Mandi
Sabji Mandi
Yogesh
Prabhu dayal
OBC
LEFT 300 300 NTH
Owned
Nuclear
3 2 1 Redymade garments
431 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ramhet
nishad
Ram krishn
OBC
LEFT 300 300 NTH
Owned
Nuclear
1 1 0 Redymade garments
432 Sabji Mandi
Sabji Mandi
Sabji Mandi
Manish
seni
Bhagwan das
OBC
LEFT 300 300 NTH
Owned
Joint 7 5 2 Snacks
433 Sabji Mandi
Sabji Mandi
Sabji Mandi
Ratan
seni
Ram lal OBC
LEFT 300 300 NTH
Owned
Joint 7 5 2 Snacks
434 Sabji Mandi
Sabji Mandi
Sabji Mandi
Nagin Nagin OBC
LEFT 200 225 NTH
Owned
Nuclear
5 1 4 Key store
435 Sabji Mandi
Sabji Mandi
Sabji Mandi
Badha ram
Mani lal ST LEFT 350 350 NTH
Owned
Joint 6 2 4 ST Redymade garments
Source: Socio-Economic Survey Feb 2021
117 | P a g e
B. Sirohi Subproject S
.No
.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
1 New bus
stand road
New bus
stand
Private bus stand
Laluram
Jeparam SC Left 300 300 No Road Side Squatter
Nuclear
4 2 2 SC Cobbler
2 New bus
stand road
New bus
stand
Private bus stand
Devendra
kumar
Rata SC Right 350 350 No Road Side Squatter
Nuclear
5 2 3 SC Fruit and
Vegitable
3 New bus
stand road
New bus
stand
Private bus stand
Amrit lal
Anara OBC Right 320 320 No Thadi
Nuclear
2 1 1 Flowers
4 New bus
stand road
New bus
stand
Private bus stand
Meena Kanti lal sagarvan
shi
OBC Right 300 300 No Thadi
Nuclear
3 6 2 WHH Flowers
5 New bus
stand road
New bus
stand
Private bus stand
Radha devi
Amrit lal Rawal
OBC Right 250 250 No Thadi
Nuclear
3 1 2 WHH Fruit and
Vegitable
6 New bus
stand road
New bus
stand
Private bus stand
Bhimashank
ar
Bhimashankar
OBC Right 300 300 No Thadi
Nuclear
6 3 3 Fruit and
Vegitable
7 New bus
stand road
New bus
stand
Private bus stand
Amrit lal dabi
Amrit lal dabi
GEN Right 350 350 No Thadi
Nuclear
7 3 4 Snacks
8 New bus
stand road
New bus
stand
Private bus stand
Maga ram mali
Maga ram mali
OBC Right 300 300 No Thadi
Nuclear
6 2 4 Fruit and
Vegitable
118 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
9 New bus
stand road
New bus
stand
Private bus stand
Mohammed aslam
Mohammed aslam
MBC Right 200 225 No Thela
Nuclear
3 2 1 Snacks
10 New bus
stand road
New bus
stand
Private bus stand
Abdul ali
Abdul ali MBC Right 350 350 No Road Side Squatter
Nuclear
3 2 1 Tea Stall
11 New bus
stand road
New bus
stand
Private bus stand
Deva ram mali
Deva ram mali
GEN Right 400 400 No Thela
Nuclear
5 3 2 Fruit and
Vegitable
12 New bus
stand road
New bus
stand
Private bus stand
Uka ram
Uka ram OBC Right 400 400 No Thela
Nuclear
5 3 2 Fruit and
Vegitable
13 New bus
stand road
New bus
stand
Private bus stand
Teja ram mali
Teja ram mali
OBC Right 350 350 No Thadi
Nuclear
4 2 2 Tea Stall
14 New bus
stand road
New bus
stand
Private bus stand
Inder mali
Inder mali
OBC Right 400 400 No Thela
Nuclear
5 2 3 Tea Stall
15 New bus
stand road
New bus
stand
Private bus stand
Chunni lal mali
Chunni lal mali
OBC Right 400 400 No Thadi
Nuclear
5 3 2 Tea Stall
16 New bus
stand road
New bus
stand
Private bus stand
Magaram mali
Magaram mali
OBC Right 350 350 No Thela
Nuclear
4 3 1 Tea Stall
17 New bus
New bus
Private bus stand
Parbhu D
Parbhu D OBC Right 350 350 No Thela
Nuclear
4 2 2 Street Vendo
119 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
stand road
stand r
18 New bus
stand road
New bus
stand
Private bus stand
Maga ram
Maga ram
GEN Right 300 300 No Thadi
Nuclear
2 2 0 Tea Stall
19 New bus
stand road
New bus
stand
Private bus stand
Punma ram
Punma ram
OBC Right 200 225 No Thela
Nuclear
2 1 1 Handicapt
Pan/Cigrate
20 New bus
stand road
New bus
stand
Private bus stand
Nava ram
Nava ram OBC Right 250 250 No Thadi
Joint 8 5 3 Tea Stall
21 New bus
stand road
New bus
stand
Private bus stand
Moda ram
Moda ram
SC Right 300 300 No Thela
Nuclear
5 2 3 SC Cobbler
22 New bus
stand road
New bus
stand
Private bus stand
Bhuba ram
Bhuba ram
OBC Right 350 350 No Thela
Nuclear
5 3 2 Tea Stall
23 New bus
stand road
New bus
stand
Private bus stand
Sankar lal
Sankar lal
OBC Right 400 400 No Thela
Nuclear
3 2 1 Snacks
24 Bombay
guest house
New bus
stand
Kamal tower
Natha ram
Natha ram
OBC Right 350 350 No Thadi
Nuclear
4 2 2 Snacks
25 Bombay
guest house
New bus
stand
Kamal tower
Kapura ram
Kapura ram
OBC Right 350 350 No Thela
Nuclear
5 4 1 Fruit and
Vegitable
120 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
26 Bombay
guest house
New bus
stand
Kamal tower
Mohan lal
Mohan lal OBC Right 400 400 No Thela
Nuclear
2 1 1 Fruit and
Vegitable
27 Bombay
guest house
New bus
stand
Kamal tower
Bhagwan das
Bhagwan das
OBC Right 250 250 No Thela
Nuclear
5 4 1 Snacks
28 Bombay
guest house
New bus
stand
Kamal tower
Hansha ram mali
Hansha ram mali
OBC Right 350 350 No Thadi
Nuclear
3 2 1 Handicapt
Flowers
29 Bombay
guest house
New bus
stand
Kamal tower
Pukhraj
Pukhraj OBC Right 350 350 No Thadi
Nuclear
3 1 2 Foot-wear
30 Bombay
guest house
New bus
stand
Kamal tower
Abdul hafiz
Abdul hafiz
MBC Right 300 300 No Thadi
Nuclear
6 4 2 Fruit and
Vegitable
31 Bombay
guest house
New bus
stand
Kamal tower
Amrit lal
Amrit lal OBC Left 350 350 No Thela
Nuclear
4 2 2 General
Store
32 Bombay
guest house
New bus
stand
Kamal tower
Bacchu ram
Bacchu ram
SC Left 400 400 No Thela
Nuclear
7 4 3 SC General
Store
33 Bombay
guest house
New bus
stand
Kamal tower
Mohan lal
gawariya
Mohan lal gawariya
OBC Left 250 250 No Thela
Nuclear
6 3 3 WHH Cosmetics
34 Bombay
New bus
Kamal tower
Dana ram
Dana ram
OBC Left 300 300 No Thela
Nuclear
7 2 5 WHH Cosmetics
121 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
guest house
stand
35 Bombay
guest house
New bus
stand
Kamal tower
Kamlesh
kumar
Kamlesh kumar
OBC Left 350 350 No Road Side Squatter
Nuclear
5 2 3 WHH Cosmetics
36 Bombay
guest house
New bus
stand
Kamal tower
Laxman
kumar
Laxman kumar
OBC Left 400 400 No Thela
Nuclear
3 2 1 WHH Plastic
37 Bombay
guest house
New bus
stand
Kamal tower
Hira lal Hira lal OBC Left 400 400 No Thela
Nuclear
5 1 4 WHH Dishes
and Crokri
38 Bombay
guest house
New bus
stand
Kamal tower
Ramesh
kumar
Ramesh kumar
OBC Left 400 400 No Thela
Nuclear
5 3 2 WHH Dishes
and Crokri
39 Bombay
guest house
New bus
stand
Kamal tower
Rajesh Rajesh SC Left 400 400 No Road Side Squatter
Nuclear
7 4 3 SC Redymade
Garments
40 Bombay
guest house
New bus
stand
Kamal tower
Chunni lal
Chunni lal
OBC Left 300 300 No Thela
Nuclear
5 4 1 Redymade
Garments
41 Bombay
guest house
New bus
stand
Kamal tower
Ram niwas
Ram niwas
OBC Left 350 350 No Road Side Squatter
Nuclear
6 4 2 Snacks
42 Bombay
guest house
New bus
stand
Kamal tower
Bhikha ram mali
Bhikha ram mali
OBC Left 350 350 No Thela
Nuclear
5 4 1 Sweets
122 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
43 Bombay
guest house
New bus
stand
Kamal tower
Jagta Jagta OBC Left 350 350 No Thela
Nuclear
4 2 2 Fruit and
Vegitable
44 Bombay
guest house
New bus
stand
Kamal tower
Mangla ram
Mangla ram
OBC Right 400 400 No Thela
Nuclear
5 3 2 WHH Cosmetics
45 Bombay
guest house
New bus
stand
Kamal tower
Pukhraj
Pukhraj OBC Right 300 300 No Thela
Nuclear
4 2 2 WHH Fruit and
Vegitable
46 Bombay
guest house
New bus
stand
Kamal tower
Hansha ram mali
Hansha ram mali
OBC Right 350 350 no Thela
Nuclear
3 0 3 WHH Fruit and
Vegitable
47 Bombay
guest house
New bus
stand
Kamal tower
Natha Natha OBC Right 300 300 no Thela
Nuclear
3 2 1 Fruit and
Vegitable
48 Bombay
guest house
New bus
stand
Kamal tower
Puna Puna OBC Right 300 300 no Thela
Nuclear
4 2 2 Fruit and
Vegitable
49 Bombay
guest house
New bus
stand
Kamal tower
Seva ram
Seva ram SC Right 400 400 no Thela
Nuclear
4 3 1 SC Cobbler
50 Bombay
guest house
New bus
stand
Kamal tower
Neeta devi
Prakash kumar
OBC Left 400 400 NO Thela
Nuclear
5 2 3 WHH Cosmetics
51 Bombay
New bus
Kamal tower
Puran singh
Kashi ram
OBC Right 350 350 no Thadi
Joint 9 3 6 Snacks
123 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
guest house
stand
52 Bombay
guest house
New bus
stand
Kamal tower
gopal kumar
ratan lal OBC Right 400 400 no Thela
Nuclear
4 3 1 Fruit and
Vegitable
53 Bombay
guest house
New bus
stand
Kamal tower
Amrit lal
Babu lal OBC Right 400 400 no Thela
Nuclear
4 2 2 Snacks
54 Bombay
guest house
New bus
stand
Kamal tower
Jagdish mali
Babu lal OBC Left 400 400 no Thela
Nuclear
4 2 2 Flowers
55 Bombay
guest house
New bus
stand
Kamal tower
Ram lakhan
Kashi ram
OBC Right 350 350 no Thela
Nuclear
4 2 2 Snacks
56 Bombay
guest house
New bus
stand
Kamal tower
Raj kapoor
Gaya din OBC Left 350 350 no Thela
Nuclear
5 3 2 Snacks
57 Bombay
guest house
New bus
stand
Kamal tower
Parvati Mohan das
OBC Left 400 400 no Road Side Squatter
Nuclear
2 1 1 WHH Foot-wear
58 Bombay
guest house
New bus
stand
Kamal tower
Mota ram
Thana ram
OBC Left 400 400 no Road Side Squatter
Nuclear
3 2 1 Fruit and
Vegitable
59 Bombay
guest house
New bus
stand
Kamal tower
Anjana Ganpat lal
OBC Left 350 350 no Road Side Squatter
Joint 8 5 3 WHH Cosmetics
124 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
60 Bombay
guest house
New bus
stand
Kamal tower
Ganpat lal
Badri narayan
OBC Left 200 225 no Thela
Joint 8 5 3 Cosmetics
61 Bombay
guest house
New bus
stand
Kamal tower
Parbhu ram
Oba ram OBC Right 350 350 no Thela
Nuclear
5 4 1 Fruit and
Vegitable
62 Bombay
guest house
New bus
stand
Kamal tower
Manju devi
Shanti lal OBC Left 400 400 no Road Side Squatter
Nuclear
5 3 2 WHH Fruit and
Vegitable
63 Bombay
guest house
New bus
stand
Kamal tower
Mohan lal
Bhuba OBC Left 400 400 no Road Side Squatter
Nuclear
5 3 2 Tea Stall
64 Bombay
guest house
New bus
stand
Kamal tower
Ganesha ram
Vagta OBC Left 200 225 no Road Side Squatter
Nuclear
4 2 2 Tea Stall
65 Bombay
guest house
New bus
stand
Kamal tower
Mahendra mali
Narayan lal
OBC Left 350 350 no Thela
Nuclear
7 3 4 Fruit and
Vegitable
66 Bombay
guest house
New bus
stand
Kamal tower
Pradeep
Govind OBC Right 400 400 no Thela
Nuclear
4 2 2 Flowers
67 Bombay
guest house
New bus
stand
Kamal tower
Babu lal
Aaidaan OBC Left 350 350 no Thela
Nuclear
4 3 1 Snacks
68 Rajmata dharms
Kamal tower
Baba ramdev
Jaswant
Gopal ram
OBC Right 400 400 no Thela
Nuclear
7 3 4 Flowers
125 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
hala hotel
69 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Shankar lal
Bhika ram
OBC Left 150 225 no Thela
Nuclear
6 2 4 Snacks
70 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Radha devi
Tarun kumar
OBC Right 300 300 no Road Side Squatter
Nuclear
5 2 3 WHH Cosmetics
71 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Dhana ram
Magan lal mali
OBC Right 300 300 no Thela
Nuclear
5 3 2 Snacks
72 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Champat lal
Champa lal teli
OBC Right 300 300 no Thela
Nuclear
4 2 2 Snacks
73 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Darmi Kesa ram OBC Right 400 400 no Road Side Squatter
Nuclear
5 2 3 WHH Potter
74 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Parkesh
kumar
Parkesh kumar
OBC Right 150 225 no Thela
Nuclear
5 3 2 WHH Potter
75 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Dharma mali
Dharma mali
OBC Right 350 350 no Thela
Nuclear
4 3 1 Snacks
76 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Samrtha
Samrtha OBC Right 400 400 no Thela
Nuclear
4 3 1 Snacks
77 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Kanti lal
Kanti lal OBC Right 300 300 no Thela
Nuclear
5 4 1 WHH Fruit and
Vegitable
78 Rajmata dharms
Kamal tower
Baba ramdev
Dharm singh
Dharm singh
GEN Right 300 300 no Thela
Nuclear
6 2 4 BPL Fruit and
126 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
hala hotel Vegitable
79 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Sukh ram
Sukh ram OBC Right 400 400 no Thela
Nuclear
6 2 4 Snacks
80 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Goma Goma OBC Right 300 300 no Thela
Nuclear
5 2 3 Fruit and
Vegitable
81 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Nirma devi
Kana ram mali
OBC Right 400 400 no Thela
Nuclear
7 2 5 WHH Fruit and
Vegitable
82 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Sukh ram
Aajudhi OBC Right 350 350 no Thela
Nuclear
4 1 3 Snacks
83 Rajmata dharms
hala
Kamal tower
Baba ramdev
hotel
Shyam bihari
Raja ram prajapat
OBC Right 400 400 no Thela
Nuclear
5 3 2 Snacks
84 Kamal tower
Kamal tower
Jail road Sharda devi
Bharat kumar mali
OBC Right 350 350 no Thela
Nuclear
4 3 1 WHH Snacks
85 Kamal tower
Kamal tower
Jail road Monu rathore
Ram niwas
OBC Right 350 350 no Thela
Nuclear
6 4 2 Flowers
86 Kamal tower
Kamal tower
Jail road Narayan lal
Sarupa OBC Right 400 400 no Thadi
Nuclear
7 4 3 BPL Flowers
87 Kamal tower
Kamal tower
Jail road Darmi devi
Madan lal SC Right 350 350 no Thadi
Nuclear
6 3 3 WHH Cobbler
88 Kamal tower
Kamal tower
Jail road Mahendra
kumar
Kheta ram
OBC Right 400 400 no Thela
Nuclear
5 2 3 Pan/Cigrate
89 Kamal tower
Kamal tower
Jail road Mukesh
kumar
Karan raj SC Right 350 350 no Thela
Nuclear
4 3 1 SC Snacks
127 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
90 Kamal tower
Kamal tower
Jail road Praveen
kumar
Ram lal ST Right 300 300 no Thadi
Nuclear
3 2 1 ST General
Store
91 Kamal tower
Kamal tower
Jail road Vidhya devi
Mancha ram
OBC Right 300 300 no Thadi
Nuclear
5 3 2 WHH Fruit and
Vegitable
92 Kamal tower
Kamal tower
Jail road Mancha ram
Bhuba ram
OBC Right 300 300 no Thadi
Nuclear
5 2 3 Fruit and
Vegitable
93 Kamal tower
Kamal tower
Jail road Magan singh
Prem singh
GEN Right 350 350 no Thela
Nuclear
6 4 2 BPL Snacks
94 Kamal tower
Kamal tower
Jail road Dinesh kumar
Choga ram
OBC Right 400 400 no Road Side Sqatt
er
Nuclear
4 3 1 Cosmetics
95 Kamal tower
Kamal tower
Jail road Pratap ram
Hansa lakhara
OBC Left 350 350 no Road Side Sqatt
er
Nuclear
5 3 2 Cosmetics
96 Kamal tower
Kamal tower
Jail road Hansa ram
Shankar lal
SC Left 350 350 no Road Side Sqatt
er
Nuclear
5 2 3 SC Plastic
97 Kamal tower
Kamal tower
Jail road Lakshman
Babu naai
OBC Left 400 400 no Road Side Sqatt
er
Nuclear
6 2 4 Barber
98 Kamal tower
Kamal tower
Jail road Tulsa ram
Saka ram OBC Right 400 400 no Road Side Sqatt
er
Nuclear
7 4 3 Redymade
Garments
128 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
99 Kamal tower
Kamal tower
Jail road Naina ram
Daya SC Right 350 350 no Road Side Sqatt
er
Joint 10 6 4 SC Pan/Cigrate
100 Kamal tower
Kamal tower
Jail road Abdul rajaak
Abdul ajij MBC Right 350 350 nO Road Side Sqatt
er
Nuclear
5 2 3 Street Vendo
r
101 Kamal tower
Kamal tower
Jail road Prakash
meghwal
Dala ram SC Left 350 350 no Road Side Sqatt
er
Nuclear
7 3 4 SC Fruit and
Vegitable
102 Kamal tower
Kamal tower
Jail road Ganesh ram
Jeevan ram
OBC Left 400 400 no Road Side Sqatt
er
Nuclear
4 3 1 Cosmetics
103 Kamal tower
Kamal tower
Jail road Maksud khan
Vashir khan
MBC Right 350 350 no Road Side Sqatt
er
Nuclear
3 1 2 Vehicle
Reparing
104 Kamal tower
Kamal tower
Jail road Pinta devi
Bharat kumar
OBC Left 400 400 no Thadi
Nuclear
5 1 4 WHH Plastic
105 Kamal tower
Kamal tower
Jail road Suresh kumar
Babu lal OBC Right 350 350 no Thadi
Nuclear
4 3 1 BPL Flowers
106 Kamal tower
Kamal tower
Jail road Lakshaman
lal
Narayan lal
OBC Right 400 400 no Thadi
Nuclear
4 3 1 Snacks
107 Kamal tower
Kamal tower
Jail road Uki bai OBC Right 400 400 no Thadi
Nuclear
1 2 1 WHH Fruit and
Vegitable
108 Kamal tower
Kamal tower
Jail road Avtaar singh
Hajur singh
GEN Left 400 400 no Thadi
Nuclear
5 2 3 Key Store
129 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
109 Kamal tower
Kamal tower
Jail road Naina ram
dewasi
Rupa ram
OBC Right 350 350 no Thadi
Joint 8 5 3 Redymade
Garments
110 Kamal tower
Kamal tower
Jail road Bhagwat
singh
Bheru singh
GEN Right 400 400 no Thela
Nuclear
5 2 3 Snacks
111 Kamal tower
Kamal tower
Jail road narebdra
kumar
Pratap ram
OBC Right 350 350 no Thadi
Nuclear
6 4 2 Fruit and
Vegitable
112 Kamal tower
Kamal tower
Jail road Varju devi
Late sama ram
SC Right 350 350 no Thadi
Nuclear
2 2 Widow
Flowers
113 Kamal tower
Kamal tower
Jail road Kamlesh
kumar
Choga ram
SC Left 350 350 no Thadi
Nuclear
4 3 1 SC Cosmetics
114 Kamal tower
Kamal tower
Jail road Santosh devi
Faaga ram
SC Right 350 350 no Thadi
Nuclear
6 3 3 WHH Fruit and
Vegitable
115 Kamal tower
Kamal tower
Jail road Bhagu devi
Mohan OBC Left 300 300 no Thadi
Nuclear
5 2 3 WHH Fruit and
Vegitable
116 Kamal tower
Kamal tower
Jail road Shobha
Late ashok kumar
SC Left 350 350 no Thadi
Nuclear
5 3 2 Widow
Cosmetics
117 Kamal tower
Kamal tower
Jail road Bharti devi
Govind lal
OBC Right 300 300 no Thadi
Nuclear
5 3 2 WHH Fruit and
Vegitable
118 Kamal tower
Kamal tower
Jail road Rukma devi
Bhagawan ram
OBC Right 300 300 no Thadi
Nuclear
3 2 1 WHH Fruit and
130 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
Vegitable
119 Sarjava gate
Sarjava gate
Charbhuja mandir
Mukesh
kumar mali
Bhawar lal mali
OBC Left 300 300 no Thadi
Nuclear
3 1 2 Fruit and
Vegitable
120 Sarjava gate
Sarjava gate
Charbhuja mandir
Savita Avtaar singh lohar
OBC Left 250 250 no Thadi
Nuclear
5 2 3 WHH Key Store
121 Sarjava gate
Sarjava gate
Charbhuja mandir
Megh raj
Prag OBC Left 350 350 no Thadi
Nuclear
3 2 1 Plastic
122 Sarjava gate
Sarjava gate
Charbhuja mandir
Suraj kumar
Ram lal SC Left 300 300 no Thadi
Nuclear
4 1 3 SC Fruit and
Vegitable
123 Sarjava gate
Sarjava gate
Charbhuja mandir
Jashoda
devi
Govind ram
ST Left 300 300 no Thadi
Nuclear
3 2 1 WHH Fruit and
Vegitable
124 Sarjava gate
Sarjava gate
Charbhuja mandir
Rustam
khan
Abdul khan
MBC Right 300 300 no Thadi
Nuclear
5 3 2 General
Store
125 Sarjava gate
Sarjava gate
Charbhuja mandir
Ramu singh
Kabere lal
kushwah
OBC Right 350 350 no Thadi
Nuclear
4 2 2 Snacks
126 Sarjava gate
Sarjava gate
Charbhuja mandir
Hemlata
Sampat OBC Left 350 350 no Thela
Nuclear
4 2 2 WHH Fruit and
Vegitable
127 Sarjava gate
Sarjava gate
Charbhuja mandir
Chandra
kishor
Bhima shankar
GEN Right 350 350 no Thela
Nuclear
5 2 3 Snacks
128 Sarjava gate
Sarjava gate
Charbhuja mandir
Hira lal Bhima shankar
GEN Right 350 350 no Thela
Nuclear
4 2 2 BPL Fruit and
131 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
Vegitable
129 Sarjava gate
Sarjava gate
Charbhuja mandir
Nirmala devi
Late Prahalad
OBC Right 300 300 no Thela
Nuclear
4 2 2 Widow
Fruit and
Vegitable
130 Sarjava gate
Sarjava gate
Charbhuja mandir
Imran Barkhat ali
MBC Right 400 400 no Thela
Nuclear
2 1 1 Fruit and
Vegitable
131 Sarjava gate
Sarjava gate
Charbhuja mandir
Shokat ali
Barkhat ali
MBC Right 400 400 no Thela
Nuclear
3 1 2 Street Vendo
r
132 Sarjava gate
Sarjava gate
Charbhuja mandir
Dhanna ram
Lasa ram ST Right 300 300 no Thela
Nuclear
7 4 3 ST Flowers
133 Sarjava gate
Sarjava gate
Charbhuja mandir
Shankar lal
Chunni lal
OBC Left 350 350 no Thadi
Nuclear
2 1 1 Fruit and
Vegitable
134 Sarjava gate
Sarjava gate
Charbhuja mandir
Fuli devi
Choga ram mali
OBC Left 350 350 no Thadi
Joint 8 3 5 WHH Fruit and
Vegitable
135 Sarjava gate
Sarjava gate
Charbhuja mandir
Choga ram
Ram lal mali
OBC Left 350 350 no Road Side Squatter
Joint 8 3 5 Fruit and
Vegitable
136 Sarjava gate
Sarjava gate
Charbhuja mandir
Kanchan
devi
Late shanti lal
SC Left 300 300 no Road Side Squatter
Nuclear
2 1 1 Widow
Fruit and
Vegitable
137 Sarjava gate
Sarjava gate
Charbhuja mandir
Bharat mali
Dhanna ram bhil
ST Right 350 350 no Road Side Squa
Nuclear
7 4 3 ST Tea Stall
132 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
tter
138 Sarjava gate
Sarjava gate
Charbhuja mandir
Punam ben
Bhima ram
OBC Right 350 350 no Road Side Squatter
Nuclear
4 2 2 WHH Fruit and
Vegitable
139 Sarjava gate
Sarjava gate
Charbhuja mandir
Bhawar lal
Sama OBC Right 350 350 no Road Side Squatter
Nuclear
6 4 2 Fruit and
Vegitable
140 Sarjava gate
Sarjava gate
Charbhuja mandir
Akhilesh
Ashok kumar
SC Left 300 300 no Road Side Squatter
Nuclear
6 2 4 SC Fruit and
Vegitable
141 Sarjava gate
Sarjava gate
Charbhuja mandir
Bundu khan
Fateh mohham
ad
MBC Right 300 300 no Road Side Squatter
Nuclear
5 2 3 BPL Fruit and
Vegitable
142 Sarjava gate
Sarjava gate
Charbhuja mandir
Prakash
kumar
Chunni lal
OBC Right 350 350 no Road Side Squatter
Nuclear
5 4 1 Cosmetics
143 Sarjava gate
Sarjava gate
Charbhuja mandir
Bhera ram
Dola ram OBC Right 350 350 no Road Side Squatter
Nuclear
2 1 1 Fruit and
Vegitable
144 Sarjava gate
Sarjava gate
Charbhuja mandir
Ashok kumar
Daya shankar
GEN Left 300 300 no Road Side Squatter
Nuclear
3 2 1 Snacks
145 Sarjava gate
Sarjava gate
Charbhuja mandir
Nava ram
Rama ram
ST Left 200 225 no Road Side Squatter
Nuclear
7 3 4 ST Flowers
133 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
146 Sarjava gate
Sarjava gate
Charbhuja mandir
Teja ram
Tara ram SC Right 350 350 no Thadi
Nuclear
2 1 1 SC Fruit and
Vegitable
147 Sarjava gate
Sarjava gate
Charbhuja mandir
Ganesh ram
Kesa ram SC Right 350 350 no Thadi
Nuclear
5 2 3 SC Fruit and
Vegitable
148 Sarjava gate
Sarjava gate
Charbhuja mandir
Prakash
kumar
Bhika ram
OBC Right 400 400 no Thadi
Nuclear
4 3 1 Fruit and
Vegitable
149 Sarjava gate
Sarjava gate
Charbhuja mandir
Ashok kumar
Uka ram OBC Left 300 300 no Thadi
Nuclear
4 3 1 Fruit and
Vegitable
150 Sarjava gate
Sarjava gate
Charbhuja mandir
Manoj kumar
Jagdish rathore
OBC Right 350 350 no Thadi
Nuclear
7 3 4 Snacks
151 Sarjava gate
Sarjava gate
Charbhuja mandir
Deepak
kumar
Mohan lal OBC Right 350 350 no Thadi
Nuclear
4 3 1 Flowers
152 Sarjava gate
Sarjava gate
Charbhuja mandir
Gopal ram
Soma ram
OBC Right 400 400 no Thadi
Nuclear
4 2 2 Fruit and
Vegitable
153 Sarjava gate
Sarjava gate
Charbhuja mandir
Vimla devi
Late saka ram
SC Right 200 225 no Thadi
Nuclear
3 2 1 Widow
Fruit and
Vegitable
154 Sarjava gate
Sarjava gate
Charbhuja mandir
Mahendra
kumar
Leela ram
OBC Right 350 350 no Thadi
Nuclear
5 2 3 Fruit and
Vegitable
134 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
155 Sarjava gate
Sarjava gate
Charbhuja mandir
Mohhmad aarif
Sattar ahmad
MBC Right 200 225 no Road Side Squatter
Nuclear
6 3 3 Fruit and
Vegitable
156 Sarjava gate
Sarjava gate
Charbhuja mandir
Rajendra
kumar
Laccha ram
ST Right 300 300 no Thadi
Nuclear
7 4 3 ST Fruit and
Vegitable
157 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Babu lal
Lala ram OBC Left 350 350 no Thadi
Nuclear
6 4 2 BPL Cobbler
158 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Nand kumar
Daya shankar
GEN Right 400 400 no Road Side Squatter
Nuclear
4 3 1 Snacks
159 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Prakash
kumar
Vajiga ram
SC Right 350 350 no Thadi
Nuclear
2 1 1 SC Fruit and
Vegitable
160 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Mukesh
kumar
Babu lal SC Right 350 350 no Thadi
Nuclear
1 1 0 SC Street Vendo
r
161 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Laxmi devi
Prakash kumar
OBC Right 300 300 no Thadi
Nuclear
5 4 1 WHH Cosmetics
162 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Ashok kumar
Babu lal SC Right 350 350 no Thadi
Nuclear
6 4 2 SC Fruit and
Vegitable
163 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Devi Balwant SC Right 350 350 no Thadi
Nuclear
5 3 2 WHH Cosmetics
135 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
164 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Geeta devi
Tola ram OBC Right 300 300 no Thadi
Nuclear
3 2 1 WHH Fruit and
Vegitable
165 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Mamta devi
Mohan lal OBC Right 300 300 no Thadi
Nuclear
4 3 1 WHH Fruit and
Vegitable
166 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Puri devi
Hira lal OBC Right 300 300 no Thadi
Nuclear
4 3 1 WHH Fruit and
Vegitable
167 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Chagani devi
Pukhraj mali
OBC Right 300 300 no Thadi
Nuclear
4 2 2 WHH Fruit and
Vegitable
168 Charbhuja
mandir
Charbhuja
mandir
Iskon plaza
Pawani
Kanhaiya lal
OBC Right 300 300 no Thadi
Nuclear
5 3 2 WHH Fruit and
Vegitable
169 Palace road
Bagghi khann
a
Ahinsa circle
Babu lal
Galba ram
SC Right 350 350 no Thadi
Nuclear
6 3 3 SC Redymade
Garments
170 Palace road
Bagghi khann
a
Ahinsa circle
Dinesh kumar
Sukhraj OBC Right 350 350 no Thadi
Nuclear
5 4 1 Snacks
171 Palace road
Bagghi khann
a
Ahinsa circle
Ismail khan
Fateh maohmm
ad
MBC Right 350 350 no Thadi
Nuclear
2 1 1 Vehicle
Reparing
172 Palace road
Bagghi khann
a
Ahinsa circle
Firoj Najir mmohm
mad
MBC Right 350 350 no Thadi
Nuclear
4 2 2 BPL Snacks
136 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
173 Palace road
Bagghi khann
a
Ahinsa circle
Mohan lal
Paramsukh
OBC Right 400 400 no Thadi
Nuclear
2 1 1 Snacks
174 Palace road
Bagghi khann
a
Ahinsa circle
Jeta ram
Bhika garasiya
ST 350 350 no Thadi
Nuclear
4 2 2 ST Snacks
175 Palace road
Bagghi khann
a
Ahinsa circle
Krishna
kumar
Jiva ram OBC Right 400 400 400 Thadi
Nuclear
5 2 3 BPL Tea Stall
176 Palace road
Bagghi khann
a
Ahinsa circle
Mancha ram
Ukaa ram OBC Right 200 225 no Thadi
Nuclear
5 4 1 Snacks
177 Palace road
Bagghi khann
a
Ahinsa circle
Tulsi ram
Dhanba ram
OBC Right 400 400 no Thadi
Nuclear
6 5 1 BPL Snacks
178 Palace road
Bagghi khann
a
Ahinsa circle
Ummed mal
Lakhma ram
OBC Right 350 350 no Thadi
Nuclear
4 2 2 Snacks
179 Palace road
Bagghi khann
a
Ahinsa circle
Savita Sava ram SC Right 300 300 no Thadi
Nuclear
4 2 2 WHH Fruit and
Vegitable
180 Palace road
Bagghi khann
a
Ahinsa circle
Ashok kumar
Vena ram SC 300 300 no Thadi
Nuclear
6 3 3 SC Plastic
181 Palace road
Bagghi khann
a
Ahinsa circle
Sita Natha mali
OBC Right 350 350 no Thadi
Nuclear
2 1 1 WHH Fruit and
Vegitable
182 Palace road
Bagghi khann
a
Ahinsa circle
Hapa ram
Poma bhil
ST Right 300 300 no Thadi
Joint 12 5 7 ST Fruit and
Vegitable
183 Palace Bagghi Ahinsa Hakma Kachuaa OBC Left 300 300 no Thad Nuclea 5 4 1 Fruit
137 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
road khanna
circle ram mali
i r and Vegita
ble
184 Palace road
Bagghi khann
a
Ahinsa circle
Mang i lal
Prema ram
SC Right 350 350 no Thadi
Nuclear
4 2 2 SC Redymade
Garments
185 Palace road
Bagghi khann
a
Ahinsa circle
Dinesh kumar
Uka ram OBC Right 350 350 no Thadi
Nuclear
6 4 2 Snacks
186 Palace road
Bagghi khann
a
Ahinsa circle
Suresh Uka ram OBC Left 350 350 no Thela
Nuclear
4 3 1 Snacks
187 Palace road
Bagghi khann
a
Ahinsa circle
Ramesh
kumar
Chamna ram
OBC Left 300 300 no Thadi
Nuclear
5 3 2 Fruit and
Vegitable
188 Palace road
Bagghi khann
a
Ahinsa circle
Ramesh
kumar
Oba mali OBC Left 400 400 no Road Side Squatter
Nuclear
5 3 2 Fruit and
Vegitable
189 Palace road
Bagghi khann
a
Ahinsa circle
Pukhraj
Suja ram OBC Left 200 225 no Road Side Squatter
Nuclear
4 3 1 Fruit and
Vegitable
190 Palace road
Bagghi khann
a
Ahinsa circle
Umesh rawal
Mula ram GEN Right 350 350 no Road Side Squatter
Nuclear
4 2 2 Snacks
191 Palace road
Bagghi khann
a
Ahinsa circle
Rajendra
kumar
Sukhraj OBC Right 350 350 no Thadi
Nuclear
5 4 1 Street Vendo
r
138 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
192 Palace road
Bagghi khann
a
Ahinsa circle
Manju devi
Ashok kumar
SC Right 400 400 no Road Side Squatter
Nuclear
5 1 4 WHH Cosmetics
193 Palace road
Bagghi khann
a
Ahinsa circle
Ratan lal
Shankar lal
OBC Right 400 400 no Road Side Squatter
Nuclear
5 3 2 Tea Stall
194 Palace road
Bagghi khann
a
Ahinsa circle
Bhima ram
Samartha OBC Right 350 350 no Road Side Squatter
Nuclear
4 2 2 General
Store
195 Palace road
Bagghi khann
a
Ahinsa circle
Ishwar singh
Maan singh
GEN Right 300 300 no Road Side Squatter
Nuclear
4 3 1 Tea Stall
196 Palace road
Bagghi khann
a
Ahinsa circle
Ramesh mali
Darga ram
OBC Right 300 300 no Road Side Squatter
Nuclear
5 3 2 Tea Stall
197 Palace road
Bagghi khann
a
Ahinsa circle
Ram niwas
Ram kishan
SC Right 350 350 no Road Side Squatter
Nuclear
5 4 1 SC Sweets
198 Palace road
Bagghi khann
a
Ahinsa circle
Himanshu
Lal singh SC Right 300 300 no Road Side Squatter
Nuclear
5 3 2 SC Snacks
199 Palace road
Bagghi khann
a
Ahinsa circle
Santosh devi
Bhima ram
OBC Right 300 300 no Thadi
Nuclear
4 2 2 WHH Redymade
Garments
139 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
200 Palace road
Bagghi khann
a
Ahinsa circle
Shankar lal
Sama ram
OBC Right 350 350 no Road Side Squatter
Nuclear
4 2 2 Pan/Cigrate
201 Palace road
Bagghi khann
a
Ahinsa circle
Vishram
singh
Gopal ram
ST Right 400 400 no Thadi
Nuclear
4 3 1 ST Snacks
202 Palace road
Bagghi khann
a
Ahinsa circle
Shankar lal
Manna lal SC Right 350 350 no Thadi
Nuclear
4 3 1 SC Snacks
203 Palace road
Bagghi khann
a
Ahinsa circle
Altaf husain
Mohammad husain
MBC Right 300 300 no Thadi
Nuclear
5 3 2 BPL Tea Stall
204 Palace road
Bagghi khann
a
Ahinsa circle
Javana ram
Saka ram OBC Right 350 350 no Thadi
Nuclear
4 2 2 Snacks
205 Palace road
Bagghi khann
a
Ahinsa circle
Sandip kumar
Jayanti lal
GEN Right 300 300 no Road Side Squatter
Nuclear
5 2 3 Snacks
206 Palace road
Bagghi khann
a
Ahinsa circle
Jitendra
singh
Mohan singh
GEN Right 350 350 no Road Side Squatter
Nuclear
3 1 2 Tea Stall
207 Palace road
Bagghi khann
a
Ahinsa circle
Saka ram
Lala ram OBC Right 300 300 no Road Side Squatter
Nuclear
3 2 1 Fruit and
Vegitable
208 Palace road
Bagghi khann
a
Ahinsa circle
Kheta ram
Nava ram OBC Right 300 300 no Road Side Squatter
Nuclear
4 3 1 Tea Stall
140 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
209 Palace road
Bagghi khann
a
Ahinsa circle
Ram prakas
h
Ram singh
OBC Right 350 350 no Road Side Squatter
Nuclear
5 4 1 Snacks
210 Palace road
Bagghi khann
a
Ahinsa circle
Mangi lal
Ratan lal OBC Right 300 300 no Thadi
Nuclear
5 2 3 Fruit and
Vegitable
211 Palace road
Bagghi khann
a
Ahinsa circle
Magni devi
Kishan lal SC Right 300 300 no Thadi
Nuclear
2 1 1 WHH Tea Stall
212 Palace road
Bagghi khann
a
Ahinsa circle
Kallu Mata din SC Right 350 350 no Road Side Squatter
Nuclear
7 2 5 SC Snacks
213 Palace road
Bagghi khann
a
Ahinsa circle
Ashok kumar
Saka ram SC Right 400 400 no Thadi
Nuclear
5 1 4 SC Fruit and
Vegitable
214 Palace road
Bagghi khann
a
Ahinsa circle
Kanti lal
Uka ram OBC Right 350 350 no Road Side Squatter
Nuclear
6 4 2 Tea Stall
215 Palace road
Bagghi khann
a
Ahinsa circle
Sabal singh
Badam singh
GEN Right 400 400 no Road Side Squatter
Nuclear
2 1 1 Snacks
216 Palace road
Bagghi khann
a
Ahinsa circle
Istiya shah
Sakhtar shah
GEN Right 350 350 no Thadi
Nuclear
4 2 2 WHH Tea Stall
217 Palace road
Bagghi khann
a
Ahinsa circle
Kamla devi
Narayan lal
OBC Right 200 225 no Road Side Squatter
Nuclear
7 4 3 WHH Fruit and
Vegitable
141 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
218 Palace road
Bagghi khann
a
Ahinsa circle
Ganga devi
Magan lal mali
ST Right 200 225 no Road Side Squatter
Nuclear
3 2 1 WHH Fruit and
Vegitable
219 Palace road
Bagghi khann
a
Ahinsa circle
Chatra ram
Deva mali
OBC Right 300 300 no Thadi
Nuclear
4 2 2 Flowers
220 Palace road
Bagghi khann
a
Ahinsa circle
Neetu kumari
Hema ram
SC Right 350 350 no Thadi
Nuclear
3 1 2 WHH Flowers
221 Palace road
Bagghi khann
a
Ahinsa circle
Rameshwar
Prithivi raj
OBC Right 350 350 no Thadi
Nuclear
4 2 2 Snacks
222 Palace road
Bagghi khann
a
Ahinsa circle
Deepak
kumar
bhawar lal mali
OBC Right 400 400 no Road Side Squatter
Nuclear
4 2 2 Snacks
223 Palace road
Bagghi khann
a
Ahinsa circle
Mehboob ali
Mohammad ali
MBC Left 350 350 no Road Side Squatter
Nuclear
3 1 2 BPL Foot-wear
224 Palace road
Bagghi khann
a
Ahinsa circle
Sultan khan
Kamal khan
MBC Right 300 300 no Road Side Squatter
Nuclear
5 2 3 BPL Vehicle
Reparing
225 Palace road
Bagghi khann
a
Ahinsa circle
Haji mohammad
Mashrukhan
MBC Right 350 350 no Road Side Squatter
Nuclear
6 3 3 BPL Snacks
226 Palace road
Bagghi khann
a
Ahinsa circle
Samir khan
Haji mohamm
ad
MBC Left 350 350 no Road Side Squatter
Nuclear
6 3 3 BPL Snacks
142 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
227 Palace road
Bagghi khann
a
Ahinsa circle
Natavar lal
Javan mal
OBC Right 350 350 no Road Side Squatter
Joint 8 3 5 Snacks
228 Palace road
Bagghi khann
a
Ahinsa circle
Farukh khan
Ismail khan
MBC Right 400 400 no Road Side Squatter
Nuclear
6 3 3 BPL Snacks
229 Palace road
Bagghi khann
a
Ahinsa circle
Pekali bai
Rama ram
ST Right 350 350 no Road Side Squatter
Nuclear
2 1 1 WHH Fruit and
Vegitable
230 Sadar bajar
New bus
stand
Ambedkar circle
Mula ram
Chopa ram
OBC Right 350 350 no Road Side Squatter
Nuclear
6 3 3 Tea Stall
231 Sadar bajar
New bus
stand
Ambedkar circle
Paraga ram
Sopa OBC Right 300 300 no Road Side Squatter
Nuclear
6 3 3 BPL Tea Stall
232 Sadar bajar
New bus
stand
Ambedkar circle
Amrit lal
rawal
Nava ram GEN Right 300 300 no Road Side Squatter
Joint 8 4 4 General
Store
233 Sadar bajar
New bus
stand
Ambedkar circle
Bhuri devi
Sardar SC Right 200 225 no Road Side Squatter
Nuclear
5 1 4 WHH Cobbler
234 Sadar bajar
New bus
stand
Ambedkar circle
Ikramuddin
Shamsuddin
MBC Right 200 225 no Road Side Squatter
Nuclear
4 2 2 BPL Snacks
235 Sadar bajar
New bus
Bedhynath colony
Poma ram
Jarja sargara
ST Right 150 225 no Thadi
Nuclear
5 3 2 ST Pan/Cigrate
143 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
stand
236 Sadar bajar
New bus
stand
Bedhynath colony
Karmi ram
Samartha dewasi
OBC Right 300 300 no Thadi
Nuclear
5 2 3 Tea Stall
237 Sadar bajar
New bus
stand
Bedhynath colony
Girdhari lal
Mangi lal OBC Right 350 350 no Thadi
Nuclear
5 3 2 Snacks
238 Sadar bajar
New bus
stand
Bedhynath colony
Karan singh
Sopat singh
GEN Right 300 300 no Road Side Squatter
Joint 8 5 3 Snacks
239 Sadar bajar
New bus
stand
Bedhynath colony
Ramesh
singh
Sopat singh
OBC Right 250 250 no Road Side Squatter
Nuclear
4 2 2 Snacks
240 Sadar bajar
New bus
stand
Bedhynath colony
Bharat kumar
Dharma OBC Right 300 300 no Road Side Squatter
Nuclear
4 3 1 Fruit and
Vegitable
241 Sadar bajar
New bus
stand
Bedhynath colony
Shankar lal
Hidu ram meena
ST Right 300 300 no Road Side Squatter
Nuclear
3 2 1 ST Snacks
242 Sadar bajar
New bus
stand
Bedhynath colony
Visa ram
Bhura ram
ST Right 300 300 no Road Side Squatter
Nuclear
5 3 2 ST Snacks
243 Sadar bajar
New bus
stand
Bedhynath colony
Akhtar shaikh
Nasiruddin
MBC Right 300 300 no Road Side Squatter
Nuclear
3 2 1 Snacks
244 Sadar bajar
New bus
stand
Bedhynath colony
Babi bai
Mula ram OBC Right 300 300 no Road Side Squa
Nuclear
2 1 1 WHH Fruit and
Vegita
144 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
tter ble
245 Sadar bajar
New bus
stand
Bedhynath colony
Tara ram
Bhika mali
OBC Right 300 300 no Road Side Squatter
Nuclear
4 2 2 Fruit and
Vegitable
246 Sadar bajar
New bus
stand
Bedhynath colony
Sanwar ali
Mohammad ali
MBC Right 200 225 no Road Side Squatter
Nuclear
5 1 4 Vehicle
Reparing
247 Sadar bajar
New bus
stand
Bedhynath colony
Suresh maraj
Amrit lal GEN Right 350 350 no Road Side Squatter
Nuclear
5 3 2 Tea Stall
248 Sadar bajar
New bus
stand
Bedhynath colony
Hemant
kumar
Shankar lal
OBC Right 200 225 no Thela
Nuclear
4 2 2 Snacks
249 Sadar bajar
New bus
stand
Bedhynath colony
Lal singh
Ranchod singh
OBC Right 300 300 no Thadi
Nuclear
4 2 2 Tea Stall
250 Palace road
Ahinsa circle
ke pas
Jail road Dinesh kushw
aha
Ovari kushwah
a
OBC Right 350 350 no Thadi
Nuclear
4 2 2 Snacks
251 Palace road
Ahinsa circle
ke pas
Jail road Jhala ram
Mitha lal SC Right 350 350 no Thadi
Nuclear
4 2 2 SC Snacks
252 Palace road
Ahinsa circle
ke pas
Jail road Ratan lal jat
Shiv lal jat
OBC Right 350 350 no Road Side Squatter
Nuclear
6 3 3 Snacks
253 Sadar bajar
New bus
stand
Sampurnanand colony
Kalyan singh
Banti ram GEN Right 300 300 no Thadi
Nuclear
4 2 2 Snacks
145 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
254 Sadar bajar
New bus
stand
Sampurnanand colony
Vivek Awadh kishor
OBC Right 350 350 no Thadi
Nuclear
4 3 1 Snacks
255 Sadar bajar
New bus
stand
Sampurnanand colony
Narayan lal
Nava ram OBC Right 300 300 no Thadi
Nuclear
3 2 2 Fruit and
Vegitable
256 Sadar bajar
New bus
stand
Sampurnanand colony
Sanjay kumar
Ramesh kumar
OBC Right 300 300 no Thadi
Nuclear
2 1 1 General
Store
257 Sadar bajar
New bus
stand
Sampurnanand colony
Ramesh
kumar
Samartha OBC Right 200 225 no Thadi
Nuclear
4 3 1 Snacks
258 Sadar bajar
New bus
stand
Sampurnanand colony
Ashok kumar
Chunni lal
OBC Right 350 350 no Road Side Squatter
Nuclear
5 3 2 Snacks
259 Sadar bajar
New bus
stand
Sampurnanand colony
Harji Pokat ji OBC Right 200 225 no Thadi
Nuclear
4 2 2 Street Vendo
r
260 Anadara road
Anadara
circle
Sampurnanand colony
Babu lal
Amra ram bavri
SC Left 350 350 no Road Side Squatter
Nuclear
3 2 1 SC Snacks
261 Anadara road
Anadara
circle
Sampurnanand colony
Talsa ram
Vala ram ST Right 300 300 no Road Side Squatter
Nuclear
7 3 4 ST Fruit and
Vegitable
262 Anadara road
Anadara
circle
Sampurnanand colony
Jepa ram
Jetha ram
ST Right 350 350 no Road Side Squatter
Joint 8 2 6 ST Snacks
263 Anadara road
Anadara
Sampurnanand
Kishan lal
Ram bharose
GEN Right 350 350 no Road Side
Nuclear
4 3 1 Snacks
146 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
circle colony singh Squatter
264 Anadara road
Anadara
circle
Sampurnanand colony
Parwati
Maga ram
OBC Right 350 350 no Thadi
Nuclear
7 2 5 WHH Fruit and
Vegitable
265 Anadara road
Anadara
circle
Sampurnanand colony
Gaurav
Din dayal vaishnav
OBC Right 350 350 no Thadi
Nuclear
4 3 1 Snacks
266 Anadara road
Anadara
circle
Sampurnanand colony
Kashimuddi
n
Abdul salam
MBC Right 350 350 no Thadi
Nuclear
5 2 3 Snacks
267 Anadara road
Anadara
circle
Sampurnanand colony
Kanahaiya lal
Bhagwan lal teli
OBC Right 350 350 no Thadi
Nuclear
5 3 2 BPL Snacks
268 Anadara road
Anadara
circle
Sampurnanand colony
Jagdish
Gori lal teli
OBC Right 350 350 no Road Side Squatter
Nuclear
5 4 1 Snacks
269 Anadara road
Anadara
circle
Sampurnanand colony
Arjun mali
Dipa ram OBC Right 350 350 no Road Side Squatter
Nuclear
4 2 2 Pan/Cigrate
270 Anadara road
Anadara
circle
Sampurnanand colony
Durga devi
Vela ram OBC Right 350 350 no Road Side Squatter
Nuclear
5 2 3 WHH Snacks
271 Anadara road
Anadara
circle
Sampurnanand colony
Maga ram
Teja ram OBC Left 350 350 no Road Side Squatter
Nuclear
7 2 5 Fruit and
Vegitable
272 Anadara road
Anadara
circle
Sampurnanand colony
Bhera ram
Ganesha ram mali
OBC Left 350 350 no Road Side Squa
Nuclear
7 3 4 Fruit and
Vegita
147 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
tter ble
273 Anadara road
Anadara
circle
Sampurnanand colony
Jayanti lal
Dharma ram
OBC Right 350 350 no Thadi
Nuclear
4 3 1 Fruit and
Vegitable
274 Anadara road
Anadara
circle
Sampurnanand colony
Deva ram
Bhika ram
OBC Left 350 350 no Thadi
Nuclear
4 3 1 BPL Street Vendo
r
275 Anadara road
Anadara
circle
Sampurnanand colony
Suraj kumar
Shankar ram
SC Left 300 300 no Thadi
Nuclear
5 3 2 SC Potter
276 Anadara road
Anadara
circle
Sampurnanand colony
Darja ram
Rama OBC Left 350 350 no Thadi
Nuclear
6 3 3 Tea Stall
277 Anadara road
Anadara
circle
Sampurnanand colony
Ramesh
kumar mali
Tara ram OBC Right 350 350 no Thadi
Nuclear
6 4 2 Snacks
278 Anadara road
Anadara
circle
Sampurnanand colony
Punam singh
Dharam singh
GEN Right 350 350 no Thadi
Nuclear
3 2 1 WHH Snacks
279 Anadara road
Anadara
circle
Sampurnanand colony
Naresh
kumar
Paramsukh
kushwah
OBC Right 200 225 no Thadi
Nuclear
6 3 3 Snacks
280 Anadara road
Anadara
circle
Sampurnanand colony
Vela ram
Samartha OBC Right 300 300 no Thadi
Nuclear
5 2 3 Tea Stall
281 Anadara road
Anadara
circle
Sampurnanand colony
Rajesh mali
Vaja ram OBC Right 350 350 no Thadi
Nuclear
2 1 1 Fruit and
Vegitable
282 Anadara road
Anadara
Sampurnanand
Mul das
Hira das OBC Right 300 300 no Thadi
Nuclear
5 2 3 Tea Stall
148 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
circle colony
283 Teen batti
choraha
Teen batti
choraha
Post office sirohi
Shaitan
gosawami
Kalu gosawam
i
OBC Left 300 300 no Thadi
Nuclear
5 2 3 Tea Stall
284 Teen batti
choraha
Teen batti
choraha
Post office sirohi
Mukesh
kumar
Nar singh das
OBC Left 350 350 no Thadi
Nuclear
4 2 2 Snacks
285 Teen batti
choraha
Teen batti
choraha
Post office sirohi
Neeraj kumar
Balveer singh
OBC Right 350 350 no Thadi
Nuclear
6 4 2 Snacks
286 Teen batti
choraha
Teen batti
choraha
Post office sirohi
Suresh rawal
Mohan lal GEN Left 300 300 no Thadi
Nuclear
5 3 2 Tea Stall
287 Teen batti
choraha
Teen batti
choraha
Post office sirohi
Manju Gopal ram
SC Left 300 300 no Thadi
Nuclear
5 3 2 WHH Potter
288 Goyali road
Goyali circle
Hawai patti
Ratan lal
Raja ram OBC Left 350 350 no Thadi
Nuclear
6 2 4 Snacks
289 Goyali road
Goyali circle
Hawai patti
Arvind kumar
Bhagwan das
OBC Left 300 300 no Thadi
Nuclear
6 4 2 Snacks
290 Goyali road
Goyali circle
Hawai patti
Gopal ram
Pawa mali
OBC Left 350 350 no Thadi
Nuclear
5 3 2 Snacks
291 Goyali road
Goyali circle
Hawai patti
Mohammad Salaud
inn
Najir mohamm
ad
MBC Left 400 400 no Thadi
Nuclear
4 2 2 Snacks
292 Goyali road
Goyali circle
Hawai patti
Lakhan
Bhagwan kushwah
OBC Right 300 300 no Thadi
Nuclear
6 4 2 Snacks
149 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
kushwah
293 Goyali road
Goyali circle
Hawai patti
Geeta Rameshbhil
ST Right 300 300 no Thadi
Nuclear
5 4 1 WHH Fruit and
Vegitable
294 Goyali road
Goyali circle
Hawai patti
Manju devi
Ada ram OBC Left 300 300 no Thadi
Nuclear
5 3 2 WHH Fruit and
Vegitable
295 Goyali road
Goyali circle
Hawai patti
Ada ram mali
Raja ram mali
OBC Left 300 300 no Thadi
Nuclear
5 3 2 Fruit and
Vegitable
296 Goyali road
Goyali circle
Hawai patti
Prakash
ghanchi
Uka ram OBC Right 350 350 no Thadi
Nuclear
5 3 2 Snacks
297 Goyali road
Goyali circle
Hawai patti
Oba ram
Dayalal OBC Left 350 350 no Thadi
Joint 8 5 2 Tea Stall
298 Goyali road
Goyali circle
Hawai patti
Gopal rana
Dhana ram
ST Left 200 225 no Thadi
Nuclear
6 3 3 ST Flowers
299 Goyali road
Goyali circle
Hawai patti
Indra kumar
Amara ram
SC Right 300 300 no Thadi
Nuclear
7 3 4 SC Snacks
300 Goyali road
Goyali circle
Hawai patti
Bharat kumar
Dhanna ram bhil
SC Left 350 350 no Thadi
Nuclear
5 4 1 SC Tea Stall
301 Goyali road
Goyali circle
Hawai patti
Govind Ratan lal ST Left 350 350 no Thadi
Nuclear
6 4 2 ST Fruit and
Vegitable
302 Sadar bajar
New bus
stand
Sadar bajar
Kanti lal
Ganesha OBC Left 350 350 NO Thadi
Nuclear
3 2 1 Snacks
150 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
303 Sadar bajar
New bus
stand
Sadar bajar
Mangi lal
Vena ram OBC Left 350 350 NO Thadi
Nuclear
5 2 3 BPL Fruit and
Vegitable
304 Sadar bajar
New bus
stand
Sadar bajar
Mani Prakash OBC Right 300 300 NO Road Side Squarter
Nuclear
4 3 1 WHH Cosmetics
305 Sadar bajar
New bus
stand
Sadar bajar
Joshna
Vijay ram OBC Right 350 350 NO Road Side Squarter
Nuclear
6 4 2 WHH Cosmetics
306 Sadar bajar
New bus
stand
Sadar bajar
Prakash
kumar
Pukhraj GEN Right 400 400 N0 Thadi
Nuclear
4 3 1 BPL Tea Stall
307 Sadar bajar
New bus
stand
Sadar bajar
Amit Bacchu ram
SC Left 350 350 NO Thadi
Nuclear
4 3 1 SC Redymade
Garments
308 Sadar bajar
New bus
stand
Sadar bajar
Praveen
Himmat GEN Left 400 400 NO Thadi
Nuclear
4 3 1 Fruit and
Vegitable
309 Sadar bajar
New bus
stand
Sadar bajar
Ram lal
Sava ram OBC Right 300 300 NO Thadi
Nuclear
6 4 2 Redymade
Garments
310 Sadar bajar
New bus
stand
Sadar bajar
Nirmal kumar
Shankar lal
OBC Left 350 350 NO Thadi
Nuclear
6 4 2 Snacks
311 Sadar bajar
New bus
stand
Sadar bajar
Pushpa
Prakash OBC Right 400 400 NO Road Side Squarter
Nuclear
7 3 4 WHH Fruit and
Vegitable
151 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
312 Sadar bajar
New bus
stand
Sadar bajar
Dhiraj kumar
Balbeer singh
SC Right 350 350 NO Thadi
Nuclear
6 4 2 SC Snacks
313 Sadar bajar
New bus
stand
Sadar bajar
Shiv Singh
Lalu ram OBC Left 400 400 NO Thadi
Joint 8 4 4 Snacks
314 Sadar bajar
New bus
stand
Sadar bajar
Laxmi Kanth
Babu lal OBC Right 300 300 NO Road Side Squarter
Nuclear
3 2 1 Pan/Cigrate
315 Sadar bajar
New bus
stand
Sadar bajar
Aruna Jitu OBC Left 300 300 NO Thela
Nuclear
5 1 4 WHH Redymade
Garments
316 Krishnapuri
Maa mandir
, Krishnapuri
Adarsh nagar road
Prabha ram mali
Chunni lal mali
OBC Right 300 300 NO Thela
Nuclear
4 3 1 Flowers
317 Bhilon ka bass, Sindrath
Maa mandir
, Krishnapuri
Adarsh nagar road
Darja ram
rebari
Deepa ST Right 350 350 NO Thadi
Nuclear
6 4 2 ST Tea Stall
318 Shastri nagar road
Maa mandir
, Krishnapuri
Adarsh nagar road
Mohan bhura mali
Bhura mali
OBC Right 350 350 NO Thela
Nuclear
4 3 1 Flowers
319 Purana bus
stand, Tankariya, gali-
Palace road, Near
Hospital
Adarsh nagar road
Balram bheel
Bhala ram
bheel
ST Left 350 350 NO Thela
Nuclear
7 4 3 ST Fruit and
Vegitable
152 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
7
320 South, meghwa
l bas, Bus
stand
HDFC Bank
Adarsh nagar road
Mohammad ishakh
Mohammad umar
MBC Right 400 400 NO Thela
Nuclear
4 2 2 Meat Shop
321 Amar nagar,
Krishnapuri
Amar nagar, Krishnapuri
Sarneshwer road,
Krishnapuri
Anand kumar kushw
aha
Jeevan lal
kushwaha
OBC Left 350 350 NO Thela
Nuclear
5 3 2 Snacks
322 Amar nagar,
Krishnapuri
Amar nagar, Krishnapuri
Sarneshwer road,
Krishnapuri
Tara devi
jingar
Pona ram jingar
SC Right 350 350 NO Thela
Nuclear
6 2 4 WHH Pan/Cigrate
323 Subhash nagar, Krishna
puri
Subhash
nagar, Krishnapuri
Sarneshwer road,
Krishnapuri
Posi devi
Babu lal OBC Right 400 400 NO Thela
Joint 8 3 5 WHH Fruit and
Vegitable
324 Main wada, Eidgah road,
Krishnapuri
Main wada, Eidgah road, Krishnapuri
Krishnapuri
Mubaraq ali
Mohabbat ali
MBC Left 350 350 NO Road Side Squarter
Nuclear
6 2 4 Potter
325 Main wada, Eidgah road,
Krishnapuri
Main wada, Eidgah road, Krishnapuri
Krishnapuri
Shahnaaj
bano
Sanwer ali
MBC Left 350 350 NO Thela
Nuclear
5 1 4 WHH Fruit and
Vegitable
153 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
326 Krishnapuri
Krishnapuri
Krishnapuri
Santoh devi
Kuldeep kumar mali
OBC Right 350 350 NO Thela
Nuclear
5 3 2 WHH Fruit and
Vegitable
327 Krishnapuri
Krishnapuri
Krishnapuri
Chagan lal
ganchi
Pappa ram
ganchi
OBC Right 400 400 NO Thela
Nuclear
4 2 2 Fruit and
Vegitable
328 Krishnapuri
Krishnapuri
Krishnapuri
Magani devi
Chagan lal ganchi
OBC Right 350 350 NO Thela
Nuclear
4 2 2 WHH Fruit and
Vegitable
329 Vivekanand
school ke pass
Vivekanand
school ke
pass
Jhoori road,
Vivekanand school
Guljar ali
Habeeb khan
MBC Left 400 400 NO Thela
Nuclear
5 2 3 Meat Shop
330 Jhoori road, Near
Vivekanand
school
Jhoori road, Near
Vivekanand
school
Jhoori road,
Vivekanand school
Jaffar khan
Ganni khan
MBC Left 400 400 NO Thela
Nuclear
4 2 2 Meat Shop
331 Sipahiyon ka
mohalla, Near
purana cinema
hall
Sipahiyon ka mohall
a, Near
purana cinema hall
Sipahiyon ka
mohalla, Near
purana cinema
hall
Mohammad Rafiq
Abdul majid
kureshi
MBC Left 400 400 NO Thela
Nuclear
3 2 1 Fruit and
Vegitable
332 Jhalara masjid ke pass
Jhalara
masjid
Jhalara masjid ke
pass
Abdul kayum
Mohammad
ibrahim
MBC Left 400 400 NO Thela
Nuclear
4 2 2 Fruit and
Vegita
154 | P a g e
S.N
o.
Nam
e o
f th
e
Str
etc
h
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
Inco
me a
s
per
Tit
le
Ho
lder
Typ
e o
f L
oss
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Bu
sin
es
s
ke pass
ali ble
333 Jhalara masjid ke pass
Jhalara
masjid ke
pass
Jhalara masjid ke
pass
Mohammad sohail khan
Jumman khan
MBC Left 400 400 NO Thela
Nuclear
5 2 3 Fruit and
Vegitable
334 Main wada, Eidgah road,
Krishnapuri
Main wada, Eidgah road, Krishnapuri
Main wada, Eidgah road,
Krishnapuri
Mahbub ali
Mohabbat ali
MBC Left 350 350 NO Road Side Squarter
Nuclear
5 2 3 Potter
335 Jama masjid, Palace road
Jama masjid
, Palace road
Jama masjid, Palace road
Subhan khan
Jamal khan
MBC Right 350 350 NO Thela
Nuclear
3 1 2 Snacks
336 Main wada, Eidgah road,
Krishnapuri
Main wada, Eidgah road, Krishnapuri
Main wada, Eidgah road,
Krishnapuri
Kavita patel
Champat patel
OBC Right 400 400 NO Thadi
Nuclear
4 3 1 WHH Cosmetics
Source-Socio-economic survey Feb 2021
155 | P a g e
C. Sardarsahar
S
.no
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
1 SDM Aawas Ke Pas
Police Chowki
Dinesh Kumar Swami
Ramkumar Swami
OBC
Left 250 250 No Owned
Joint 7 3 4 Reparing
2 SDM Aawas Ke Pas
Police Chowki
Hiralal Bhojak
Ramlal Bhojak
OBC
Left 200 225 No Owned
Nuclear
4 2 2 BPL
Tea Shop
3 SDM Aawas Ke Pas
Police Chowki
Mohamad Aasif
Rahishudin SC Left 500 500 No Owned
Nuclear
2 1 1 Footwear
4 SDM Aawas Ke Pas
Police Chowki
Imran Ali Dhobi
Ali Shekh SC Left 200 225 No Owned
Nuclear
6 4 2 SC Footwear
5 SDM Aawas Ke Pas
Police Chowki
Laxman Banjara
Ramswaroop
SC Left 200 225 No Owned
Joint 7 5 2 SC Redemade Cloth
s
6 SDM Aawas Ke Pas
Police Chowki
Shera Ram
Chhaju Ram OBC
Left 200 225 No Owned
Nuclear
6 4 2 Tea Shop
7 SDM Aawas Ke Pas
Police Chowki
Vikaram Rav
Kumbharam Rav
OBC
Left 200 225 No Owned
Nuclear
4 1 3 BPL
Flower
Shop
8 SDM Aawas Ke Pas
Police Chowki
Gogaram Nai
Sampat Mal OBC
Left 200 225 No Owned
Joint 7 4 3 Barber
Shop
9 SDM Aawas Ke Pas
Police Chowki
Lalchand Saini
Bhanwar lal OBC
Left 200 225 No Owned
Nuclear
5 3 2 General
Sotre
10 SDM Aawas Ke Pas
Police Chowki
Satya narayan
Saini
Gokul chand GEN
Left 500 500 No Owned
Joint 10 7 3 BPL
General
Sotre
11 SDM Aawas
Police Chowki
Vinod Das Biyyar Das OBC
Left 200 225 No Owned
Nuclear
4 2 2 Tea Shop
156 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Ke Pas
12 SDM Aawas Ke Pas
Police Chowki
Bajarang Lal
Indar chand OBC
Left 250 250 No Owned
Nuclear
4 2 2 Tea Shop
13 SDM Aawas Ke Pas
Police Chowki
Gulab Kaswah
Satram Kaswah
GEN
Left 200 225 No Owned
Nuclear
5 3 2 Sancks
14 SDM Aawas Ke Pas
Police Chowki
Pawan Upadhyay
a
Radhesyam Upadhyay
GEN
Left 300 300 No Owned
Joint 12 5 7 Sancks
15 SDM Aawas Ke Pas
Police Chowki
Lakhan Saini
Dhan Singh Saini
OBC
Left 200 225 No Owned
Nuclear
6 2 4 Sancks
16 SDM Aawas Ke Pas
Police Chowki
Rameshwar Singh
Nathu Singh GEN
Left 500 500 No Owned
Nuclear
6 3 3 Tea Shop
17 SDM Aawas Ke Pas
Police Chowki
Ramlal Banwari
Puran Chand
SC Left 200 225 No Owned
Joint 24 16 8 SC Sancks
18 SDM Aawas Ke Pas
Police Chowki
Jaswant Singh Kewat
Ram prakash Kewat
SC Left 300 300 No Owned
Joint 16 11 5 SC Sancks
19 SDM Aawas Ke Pas
Police Chowki
Ram nadan Pareek
Govind Ram GEN
Left 300 300 No Owned
Nuclear
5 2 3 Plastic
Item
20 SDM Aawas Ke Pas
Police Chowki
Kamal Saini
Lalchand Saini
OBC
Left 500 500 No Owned
Nuclear
2 1 1 Snacks
21 SDM Aawas Ke Pas
Police Chowki
Sonu Kevat
Ramprakash OBC
Left 200 225 No Owned
Joint 12 6 6 BPL
Snacks
22 SDM Aawas Ke Pas
Police Chowki
Laxaman Rajput
Banwari
Bhagawan Das Banwari
SC Left 500 500 No Owned
Joint 10 5 5 SC Redemade Cloth
157 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
s
23 SDM Aawas Ke Pas
Police Chowki
Mayadevi Rajput
Banwari
Bhagwan Das Rajput
Banwari
SC Left 200 225 No Owned
Nuclear
5 3 2 WHH
Redemade Cloth
s
24 SDM Aawas Ke Pas
Police Chowki
Prama ram
Sarta Ram OBC
Left 200 225 No Owned
Joint 7 2 5 General
Sotre
25 SDM Aawas Ke Pas
Police Chowki
Kheta Ram Jat
Shishapal OBC
Left 200 225 No Owned
Nuclear
6 4 2 General
Sotre 26 SDM
Aawas Ke Pas
Police Chowki
Raju Ranjit OBC
Left 300 300 No Owned
Joint 10 5 5 BPL
Redemade Cloth
s
27 SDM Aawas Ke Pas
Police Chowki
Madan Lal Sohan Lal OBC
Left 250 250 No Owned
Nuclear
6 3 3 BPL
Barber
Shop
28 SDM Aawas Ke Pas
Police Chowki
Dulichand Lahor
Malaram SC Left 300 300 No Owned
Nuclear
5 3 2 SC Iron Item
29 SDM Aawas Ke Pas
Police Chowki
Dinesh Kumar Sharma
Bhagwana Ram
GEN
Left 400 400 No Owned
Joint 10 6 4 BPL
Tea Shop
30 SDM Aawas Ke Pas
Police Chowki
Ajay Ranjit GEN
Left 500 500 No Owned
Joint 10 5 5 General
Sotre
31 SDM Aawas Ke Pas
Police Chowki
Dayal Chand Rajput
Banwari
Amar Singh GEN
Left 500 500 No Owned
Nuclear
2 1 1 Redemade Cloth
s
32 SDM Aawas
Police Chowki
Magar Singh
Puranchand GEN
Left 300 300 No Owned
Nuclear
4 1 3 Redemade
158 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Ke Pas Cloths
33 SDM Aawas Ke Pas
Police Chowki
Basanti Saini
Ramdhan Saini
OBC
Left 200 225 No Owned
Nuclear
3 2 1 WHH
Plastic
Item
34 SDM Aawas Ke Pas
Police Chowki
Manoj Saini
Harilal Saini OBC
Left 500 500 No Owned
Nuclear
3 1 2 BPL
General
Sotre
35 SDM Aawas Ke Pas
Police Chowki
Badal Laxaman Das
OBC
Left 200 225 No Owned
Joint 7 3 4 BPL
Redemade Cloth
s
36 SDM Aawas Ke Pas
Police Chowki
Rajan Bisayati
Nathu Bisayati
OBC
Left 200 225 No Owned
Nuclear
3 2 1 General
Sotre
37 SDM Aawas Ke Pas
Police Chowki
Dalchand Hanumana Ram
OBC
Left 500 450 No Owned
Nuclear
4 2 2 General
Sotre
38 SDM Aawas Ke Pas
Police Chowki
Kaif Gori Satar Gori OBC
Left 450 450 No Owned
Nuclear
5 3 2 Plastic
Item
39 SDM Aawas Ke Pas
Police Chowki
Sunil Lohar
Ishawar Lohar
SC Left 200 225 No Owned
Joint 8 5 3 SC Iron Item
40 SDM Aawas Ke Pas
Police Chowki
Ishawar Ram
Sagar Ram Lohar
SC Left 200 225 No Owned
Joint 8 5 3 SC Iron Item
41 SDM Aawas Ke Pas
Police Chowki
Premi Devi
Ranjit OBC
Left 500 500 No Owned
Joint 10 5 5 WHH
Redemade Cloth
s
42 SDM Aawas Ke Pas
Police Chowki
Kanaram Prajapat
Kunanoji OBC
Right 200 225 No Owned
Joint 8 4 4 Fruit and
Vegetable
159 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
43 SDM Aawas Ke Pas
Police Chowki
Kishan Lal Lohar
Surja Ram SC Right 300 300 No Owned
Joint 10 6 4 SC Iron Item
44 SDM Aawas Ke Pas
Police Chowki
Mubarik Gori
Salim Gori SC Right 200 225 No Owned
Nuclear
6 4 2 SC Plastic
Item
45 SDM Aawas Ke Pas
Police Chowki
Ravi Saini Kishan Lal OBC
Right 200 225 No Owned
Nuclear
5 1 4 Fruit and
Vegetable
46 SDM Aawas Ke Pas
Police Chowki
Sagar Lohar
Bucharam SC Right 300 300 No Owned
Nuclear
5 2 3 SC Iron Item
47 SDM Aawas Ke Pas
Police Chowki
Bhanwar Lal Nayak
Mohan Ram Nayak
SC Right 500 500 No Owned
Joint 10 4 6 SC Fruit and
Vegetable
48 Police Chowki
Roadways Bus Stand
Bhagwana Ram Parik
Dana Ram Parik
GEN
Right 300 300 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
49 Police Chowki
Roadways Bus Stand
Pawan Sewak
Mohan Lal Sewak
GEN
Right 200 225 No Owned
Nuclear
4 1 3 General
Sotre
50 Police Chowki
Roadways Bus Stand
Mahavir Saran
Mukharam OBC
Right 200 225 No Owned
Nuclear
6 3 3 Tea Shop
51 Police Chowki
Roadways Bus Stand
Dindayal Meghawal
Mohanram Meghawl
SC Left 300 300 No Owned
Nuclear
5 3 2 SC General
Sotre
52 Police Chowki
Roadways Bus Stand
Shishapal Jat
Mularam Jat OBC
Right 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
160 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
53 Police Chowki
Roadways Bus Stand
Mahendra Saini
Mavir Prasad Saini
OBC
Left 500 500 No Owned
Joint 13 7 6 Electronic Item
54 Police Chowki
Roadways Bus Stand
Kisha Raj Meghwal
Biru Ram Meghwal
SC Left 400 400 No Owned
Nuclear
6 3 3 SC Flower
Shop
55 Police Chowki
Roadways Bus Stand
Jyoti Chohan
Magar Singh GEN
Left 200 225 No Owned
Nuclear
4 1 3 WHH
Electronic Item
56 Police Chowki
Roadways Bus Stand
Sundar Lohar
Ishawar Lohar
SC Left 200 225 No Owned
Joint 8 5 3 SC Plastic
Item
57 Police Chowki
Roadways Bus Stand
Sushil Rav Kamal Rav GEN
Left 300 300 No Owned
Joint 16 12 4 BPL
Plastic
Item
58 Police Chowki
Roadways Bus Stand
Mohamad Asalam
Mohmad Salim
OBC
Right 300 300 No Owned
Joint 8 5 3 Fruit and
Vegetable
59 Police Chowki
Roadways Bus Stand
Mohamad Javed Gori
Ibrahim Javed Gori
SC Right 300 300 No Owned
Nuclear
4 2 2 SC Plastic
Item
60 Police Chowki
Roadways Bus Stand
Vikarm Bhojak
Mohan Lal OBC
Right 500 500 No Owned
Joint 11 6 5 BPL
General
Sotre
61 Police Chowki
Roadways Bus Stand
Chhagan Lal Nai
Sohan Lal Nai
OBC
Right 200 225 No Owned
Nuclear
6 4 2 BPL
Fruit and
Vegetable
62 Police Chowki
Roadways Bus Stand
Kheta Ram
Prajapat
Nathu Ram Ptrajapat
OBC
Right 200 225 No Owned
Joint 8 7 1 Fruit and
Vegetable
63 Police Chowki
Roadways Bus
Dindayal Bhat
Kamal Ji Bhat
SC Left 300 300 No Owned
Joint 17 13 4 SC Snacks
161 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Stand
64 Police Chowki
Roadways Bus Stand
Kesharam Mohan Lal OBC
Left 200 225 No Owned
Joint 11 8 3 Snacks
65 Police Chowki
Roadways Bus Stand
Sabji Parosh
Munshi OBC
Right 200 225 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
66 Police Chowki
Roadways Bus Stand
Mohammad Akabar
Hakam Ali OBC
Right 200 225 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
67 Police Chowki
Roadways Bus Stand
Mahbub Gori
Gulam Gori OBC
Right 200 225 No Owned
Nuclear
5 2 3 Plastic
Item
68 Police Chowki
Roadways Bus Stand
Rajendra Sharma
Bhagwana Ram
Sharma
GEN
Right 200 225 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
69 Police Chowki
Roadways Bus Stand
Mohan Swami
Hariram Das OBC
Right 200 225 No Owned
Joint 15 8 7 Fruit and
Vegetable
70 Police Chowki
Roadways Bus Stand
Satpal Puran Chand
OBC
Right 200 225 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
71 Roadways Bus
Stand Ke Saamane
Garh Gandhi Chowk
Shivaratan Saini
Sitaram Saini
OBC
Left 300 300 No Owned
Joint 7 5 2 Fruit and
Vegetable
162 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
72 Roadways Bus
Stand Ke Saamane
Garh Gandhi Chowk
Radhesyam
Gori Shanklar
Saini
OBC
Right 300 300 No Owned
Joint 20 10 10 Fruit and
Vegetable
73 Roadways Bus
Stand Ke Saamane
Garh Gandhi Chowk
Santosh Sharma
Shivbhagwan Sharma
GEN
Left 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
74 Roadways Bus
Stand Ke Saamane
Garh Gandhi Chowk
Sitaram Mali
Sagar Mal Mali
OBC
Left 200 225 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
75 Roadways Bus
Stand Ke Saamane
Garh Gandhi Chowk
Pukh Raj Durga Prasad
OBC
Right 200 225 No Owned
Joint 11 5 6 Pickle
Shop
76 Arjun Club Bus Stend Ke
Pas
Garh Gandhi Chowk
Santosh Kumar
Bhanwar Lal OBC
Left 300 300 No Owned
Nuclear
4 2 2 BPL
Tea Shop
77 Rajbala Kuaa
Railway Station Road
Keshar Mula Ram Prajapat
OBC
Right 400 400 No Owned
Joint 8 6 2 WHH
Porter
78 Rajbala Kuaa
Railway Station Road
Santosh Raju OBC
Left 300 300 No Owned
Nuclear
3 1 2 WHH
Porter
79 Rajbala Kuaa
Railway Station Road
Ram Kumar Saini
Vinod Kumar Saini
OBC
Left 300 300 No Owned
Nuclear
3 1 2 Snacks
80 Rajbala Kuaa
Railway Station Road
Rafik Sadik SC Left 300 300 No Owned
Joint 12 6 6 SC Fruit and
Vegetable
81 Rajbala Kuaa
Railway Station
Kishan Lal Chodhari
Mala Ram Chaodhari
GEN
Left 300 300 No Owned
Joint 7 3 4 Tea Shop
163 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Road
82 Gandhi Chowk
Railway Station Road
Prakash Walmiki
Tipa Ram SC Right 200 225 No Owned
Nuclear
5 3 2 SC Cobbler
83 Gandhi Chowk
Railway Station Road
Sharwan Walmiki
Bega Ram SC Right 200 225 No Owned
Nuclear
2 1 1 SC Cobbler
84 Grah Ke Saamane
Railway Station Road
Manak Chand
Tak
Bajarang Rak
OBC
Right 300 300 No Owned
Joint 7 3 4 Cobbler
85 Gandhi Chowk
Railway Station Road
Bajarang Walmiki
Budha Ram SC Right 200 225 No Owned
Joint 7 4 3 SC Fruit and
Vegetable
86 Dak Gali Ke Pas Main
Market
Railway Station Road
Ranvir Mali
Sita Ram Saini
OBC
Right 200 225 No Owned
Nuclear
3 1 2 Snacks
87 Dak Gali Ke Pas Main
Market
Railway Station Road
Jaan Mohamad
Babulal Sabji Farosh
SC Right 300 300 No Owned
Joint 15 9 6 SC Fruit and
Vegetable
88 Ghantaghar Ke Paas
Railway Station Road
Ashok Swami
Omprakash Swami
OBC
Right 200 225 No Owned
Nuclear
3 2 1 Snacks
89 Ghantaghar Ke Paas Obc Bank
Railway Station Road
Mukesh Swami
Bhera Ram Swami
OBC
Right 300 300 No Owned
Nuclear
4 1 3 Snacks
164 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
90 Stayanarayan Ji
Ka Mandir Ke Pas
Munti Kui
Railway Station Road
Raju Prithviraj OBC
Left 200 225 No Owned
Joint 12 9 3 Flower
Shop
91 Stayanarayan Ji
Ka Mandir Ke Pas
Munti Kui
Railway Station Road
Bhanwar Lal
Sharama
Tulsi Ram Sharma
GEN
Left 300 300 No Owned
Nuclear
5 3 2 Snacks
92 Govt. Hospital Ke Pas
Railway Patari
Vinod Sharma
Mali Ram Sharma
GEN
Right 300 300 No Owned
Joint 10 4 6 BPL
Tea Shop
93 Bijali Ghar Ke
Pas Relway Station Road
Railway Patari
Babulal Mali
Suraja Ram Mali
OBC
Right 500 500 No Owned
Joint 7 6 1 Tea Shop
94 Bijali Ghar Ke
Pas Relway Station Road
Railway Patari
Suraj Mal Sharma
Laxmi Narayan
GEN
Right 200 225 No Owned
Joint 9 3 6 BPL
Tea Shop
95 Relway Station Ke Pas
Railway Patari
Mohamad Ayub
Mohamad Jafar
SC Right 300 300 No Owned
Joint 8 5 3 SC Fruit and
Vegetable
165 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
96 Relway Station Ke Pas
Railway Patari
Mustdin Babudin SC Left 200 225 No Owned
Nuclear
6 3 3 SC Fruit and
Vegetable
97 Relway Station Ke Pas
Railway Patari
Rafik Astali OBC
Right 200 225 No Owned
Joint 20 12 8 Redemade Cloth
s
98 Relway Station Ke Pas
Railway Patari
Mohamad Shokin
Nijamudin OBC
Left 300 300 No Owned
Joint 7 5 2 Fruit and
Vegetable
99 Relway Station
Ke Road
Railway Patari
Jitendra Mali
Sita Ram Mali
OBC
Left 200 225 No Owned
Joint 12 7 5 BPL
Fancy and Bang
le
100
Relway Station Ke Pas
Railway Patari
Shrikishan Shankar Lal Mali
OBC
Left 200 225 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
101
Relway Station Ke Pas
Railway Patari
Indar chand
Sharma
Mohan Lal Sharma
GEN
Left 200 225 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
102
Relway Station Ke Pas
Railway Patari
Ranjit Bhat
Chuni Lal Bhat
SC Right 200 225 No Owned
Nuclear
6 3 3 SC Pickle
Shop
103
Relway Station Ke Pas
Railway Patari
Imaran Bal Mohamad
SC Right 300 300 No Owned
Joint 25 15 10 SC Fruit and
Vegetable
104
Relway Station Ke Pas
Railway Patari
Nadim Bal Mohamad
OBC
Right 300 300 No Owned
Joint 25 15 10 BPL
Fruit and
Vege
166 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
table
105
Relway Station Ke Pas
Railway Patari
Ram Gopal Mali
Laxmi Narayan
OBC
Right 300 300 No Owned
Joint 8 5 3 Fruit and
Vegetable
106
Relway Station Road
Railway Patari
Lal Chand Nath
Kannath OBC
Right 300 300 No Owned
Joint 10 6 4 Fruit and
Vegetable
107
Relway Station Road
Railway Patari
Nand Lal Sanwar Mal Saini
OBC
Right 200 225 No Owned
Joint 10 7 3 Fancy and Bang
le
108
Relwayy Station Road
Railway Patari
Gita Mohan Lal OBC
Left 200 225 No Owned
Nuclear
6 3 3 WHH
Porter
109
Relway Station Road
Railway Patari
Shankar Lal
Lixaman Ram
OBC
Right 300 300 No Owned
Nuclear
5 1 4 Fruit and
Vegetable
110
Relway Station Road
Railway Patari
Abadul Rajjak
Yashin Khan
OBC
Right 300 300 No Owned
Nuclear
6 2 4 Fruit and
Vegetable
111
Relway Station Road
Railway Patari
Gopal Saini
Sita Ram Saini
OBC
Right 500 500 No Owned
Joint 15 10 5 Fruit and
Vegetable
112
Relway Station Road
Railway Patari
Shiva Lal Norang Lal OBC
Left 300 300 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
167 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
113
Relway Station Road
Railway Patari
Shankar Lal Saini
Laxmi Narayan
Saini
OBC
Left 300 300 No Owned
Joint 9 6 3 BPL
Fruit and
Vegetable
114
Relway Station Road
Railway Patari
Jethi Devi Bhanwar Lal Kumhar
OBC
Right 200 225 No Owned
Nuclear
2 1 1 WHH
Porter
115
Relway Satition Road
Railway Patari
Jitendra Sharma
Gajanand Sharma
GEN
Left 200 225 No Owned
Nuclear
6 3 3 BPL
Redemade Cloth
s
116
Relway Satition Road
Railway Patari
Jayprakash Mali
Budha Am Mali
OBC
Left 450 450 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
117
Relway Station Road
Railway Patari
Subhash Mali
Budha Ram Mali
OBC
Left 300 300 No Owned
Joint 7 2 5 Fruit and
Vegetable
118
Ralway Station Road
Railway Patari
Prem Kumar
Budha Ram OBC
Left 300 300 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
119
Relway Satition Road
Railway Patari
Bhanwar Lal
Chuna Ram OBC
Right 200 225 No Owned
Joint 9 2 7 Cobbler
120
Relway Station Road
Railway Patari
Rahul Jagdish Saini
OBC
Left 300 300 No Owned
Joint 10 5 5 Fruit and
Vegetable
121
Relway Satition Road
Railway Patari
Niranjan Mali
Girdhari Mali OBC
Right 200 225 No Owned
Nuclear
4 1 3 Fruit and
Vegetable
168 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
122
Relway Station Road
Railway Patari
Chandra pal Mali
Harnarayan Mali
OBC
Right 200 225 No Owned
Joint 10 7 3 Snacks
123
Relway Satition Road
Railway Patari
Jamil Ibrahim OBC
Right 300 300 No Owned
Joint 28 18 10 Fruit and
Vegetable
124
Relway Station Road
Railway Patari
Rukama Mali
Bajarang Lal Mali
OBC
Right 300 300 No Owned
Joint 9 5 4 Snacks
125
Relway Satition Road
Railway Patari
Sonu Saini Bajarng Lal Saini
OBC
Right 300 300 No Owned
Joint 9 5 4 BPL
Fruit and
Vegetable
126
Relway Station Road
Railway Patari
Gopal Saini
Pokharmal Saini
OBC
Left 300 300 No Owned
Joint 19 5 14 BPL
Fruit and
Vegetable
127
Relway Station Ke Pas
Railway Patari
Avinash Dedaraj Sharma
GEN
Left 200 225 No Owned
Nuclear
5 4 1 Snacks
128
Relway Station Ke Pas
Railway Patari
Mohamad Aasif
Lal Mohamad
OBC
Left 200 225 No Owned
Joint 9 5 4 Fruit and
Vegetable
129
Relway Satition Ke Pas
Railway Patari
Sohel Liyakat Ali OBC
Left 200 225 No Owned
Joint 10 5 5 Fruit and
Vegetable
130
Relway Station
Ke Pchhe
Railway Patari
Noparam Saini
Kunnna Ram
OBC
Left 200 225 No Owned
Joint 7 4 3 Fruit and
Vegetable
169 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
131
Relway Station Ke Pas
Railway Patari
Hariprasad Misar
Brajmohan Misar
OBC
Left 200 225 No Owned
Nuclear
4 1 3 Snacks
132
Relwayy Station
Ke Piche
Railway Patari
Ajit Saya Ibrahim Saya
OBC
Left 300 300 No Owned
Joint 12 8 4 Fruit and
Vegetable
133
Relway Station
Ke Piche
Railway Patari
Asok Kumar Saini
Luna Ram Saini
OBC
Right 200 225 No Owned
Joint 7 2 5 Fruit and
Vegetable
134
Relway Station
Ke Piche
Railway Patari
Imran Bundu Khan OBC
Left 200 225 No Owned
Joint 10 7 3 Snacks
135
Relway Station
Ke Piche
Railway Patari
Chanadraprakash Pareek
Tiku Ram Pareek
GEN
Left 200 225 No Owned
Nuclear
6 3 3 Jadi Buti
136
Relway Station
Ke Piche
Railway Patari
Sita Ram Rajpurohit
Rawat Singh Rajpurohit
GEN
Left 200 225 No Owned
Nuclear
3 2 1 Snacks
137
Relway Station
Ke Piche
Railway Patari
Mohammad Yasin
Mohamad Alidin
SC Left 300 300 No Owned
Joint 8 2 6 SC Fruit and
Vegetable
138
Relway Station Ke Pas
Railway Patari
Mahendra Nath
Madan Nath OBC
Left 300 300 No Owned
Joint 7 4 3 BPL
Fruit and
Vegetable
139
Relway Station
Ke Piche
Railway Patari
Manhohar Swami
Keilash Swami
OBC
Left 300 300 No Owned
Joint 8 2 6 Fruit and
Vegetable
140
Relwayy Station Ke Pas
Railway Patari
Lal Chand Swami
Shankar Lal Swami
OBC
Left 300 300 No Owned
Nuclear
4 3 1 Fruit and
Vege
170 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
table
141
Relway Station Ke Pas
Railway Patari
Birabal Ram
Sanwar Mal Raw
GEN
Left 200 225 No Owned
Joint 8 5 3 General
Sotre
142
Relway Station Ke Pas
Railway Patari
Manoj Chotiya
Ghansyam Chotiya
GEN
Left 200 225 No Owned
Nuclear
5 2 3 Redemade Cloth
s
143
Police Thane Ke Pas
Railway Patari
Vinod Mali Ramchandra Mali
OBC
Left 200 225 No Owned
Nuclear
4 3 1 General
Sotre
144
Relwayy Station Ke Pas
Railway Patari
Mohamad Salim
Ajimudin OBC
Left 300 300 No Owned
Joint 8 5 3 Fruit and
Vegetable
145
Elwayy Station Ke Pas
Railway Patari
Suresh Nath
Lal Nath OBC
Left 300 300 No Owned
Joint 15 11 4 Fruit and
Vegetable
146
Elwayy Station Ke Pas
Railway Patari
Jeshnath Birabal Nath OBC
Left 300 300 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
147
Relway Station Ke Pas
Railway Patari
Kuldip Joshi
Kishan Joshi GEN
Right 200 225 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
148
Relway Station Ke Pas
Railway Patari
Munshi Sabji
Farosh
Kuldeep Mal OBC
Right 300 300 No Owned
Joint 7 3 4 Fruit and
Vegetable
149
Rajbala Kuaa
Railway Patari
Dhanraj Walmiki
Ramchandra Walmiki
SC Right 200 225 No Owned
Nuclear
6 2 4 SC Cobbler
171 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
150
Kachcha Bus
Stand Ke Andar
Ghantaghar
Parmeshwar Lal
Laluram SC Right 400 400 No Owned
Nuclear
8 3 5 SC Cobbler
151
Kachcha Bus
Stand Ke Andar
Ghantaghar
Hetaram Saini
Panna Lal Saini
OBC
Left 500 500 No Owned
Nuclear
5 3 2 General
Sotre
152
Kachcha Bus
Stand Ke Andar
Ghantaghar
Ranjit Ram
Panna Lal OBC
Right 500 500 No Owned
Joint 10 6 4 BPL
Fruit and
Vegetable
153
Kachcha Bus
Stand Ke Andar
Ghantaghar
Bhagawan Ram
Tiloka Ram Mali
OBC
Right 300 300 No Owned
Joint 7 4 3 Fruit and
Vegetable
154
Kachcha Bus
Stand Ke Andar
Ghantaghar
Ram Ratan Mali
Sagar Mali OBC
Right 400 400 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
155
Kachcha Bus
Stand Ke Pas
Ghantaghar
Khalid Isak OBC
Right 500 500 No Owned
Nuclear
3 2 1 Fruit and
Vegetable
156
Kachcha Bus
Stand Ke Pas
Ghantaghar
Bhagavati Prasad
Bhanwar Lal Pareek
GEN
Right 300 300 No Owned
Joint 7 5 2 Fruit and
Vegetable
157
Kachcha Bus
Stand Ke Pas
Ghantaghar
Ram chandra
Mangal Chandra
OBC
Right 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
158
Kachcha Bus
Ghantaghar
Khadim Lal Mohamad
OBC
Right 500 500 No Owned
Joint 7 4 3 Fruit and
172 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Stand Ke Pas
Vegetable
159
Kachcha Bus
Stand Ke Pas
Ghantaghar
Navab Jamanudin OBC
Right 300 300 No Owned
Joint 10 6 4 Fruit and
Vegetable
160
Kachcha Bus
Stand Ke Pas
Ghantaghar
Nandram Sharma
Jagdish Prasad
GEN
Right 300 300 No Owned
Joint 13 3 10 Fruit and
Vegetable
161
Kachcha Bus
Stand Ke Pas
Ghantaghar
Harijan Meena
Barij Mohan Meena
ST Right 300 300 No Owned
Joint 11 6 5 ST Fruit and
Vegetable
162
Kachcha Bus
Stand Ke Pas
Ghantaghar
Manoj Kumar Bhat
Aanad Bhat SC Right 300 300 No Owned
Nuclear
5 3 2 SC Fruit and
Vegetable
163
Kachcha Bus
Stand Ke Pas
Ghantaghar
Bajarng Sharama
Jagdish Prasad
OBC
Right 300 300 No Owned
Joint 13 3 10 BPL
Fruit and
Vegetable
164
Kachcha Bus
Stand Ke Pas
Ghantaghar
Hansaraj Bhat
Aannad Bhat
SC Right 300 300 No Owned
Nuclear
6 2 4 SC Fruit and
Vegetable
165
Kachcha Bus
Stand Ke Pas
Ghantaghar
Suresh Meena
Barij Mohan Meena
ST Right 300 300 No Owned
Joint 11 6 5 ST Fruit and
Vegetable
166
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sharwan Prajapat
Navartan Prajapat
OBC
Right 300 300 No Owned
Nuclear
5 3 2 BPL
Fruit and
Vegetable
173 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
167
Kachcha Bus
Stand Ke Pas
Ghantaghar
Jitendra Rav
Mirchand Rav
OBC
Right 250 250 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
168
Kachcha Bus
Stand Ke Pas
Ghantaghar
Omprakash
Phusharam OBC
Right 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
169
Kachcha Bus
Stand Ke Pas
Ghantaghar
Phusa Ram
Hajari Ram OBC
Left 300 300 No Owned
Nuclear
2 1 1 Fruit and
Vegetable
170
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vimal Kumar
Sitaram OBC
Right 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
171
Kachcha Bus
Stand Ke Pas
Ghantaghar
Damodar Saini
Subhash Chandra
Saini
OBC
Left 300 300 No Owned
Joint 7 5 2 BPL
Fruit and
Vegetable
172
Kachcha Bus
Stand Ke Pas
Ghantaghar
Rafik Teli Asalam Khan
OBC
Left 300 300 No Owned
Joint 8 5 3 Fruit and
Vegetable
173
Kachcha Bus
Stand Ke Pas
Ghantaghar
Babulal Aamir OBC
Left 300 300 No Owned
Nuclear
5 3 2 BPL
Fruit and
Vegetable
174
Kachcha Bus
Stand Ke Pas
Ghantaghar
Suresh Kumar
Sajjan Lal Joshi
GEN
Left 200 225 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
175
Kachcha Bus
Stand Ke
Ghantaghar
Akabar Jamal OBC
Left 300 300 No Owned
Joint 9 4 5 Fruit and
Vege
174 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
176
Kachcha Bus
Stand Ke Pas
Ghantaghar
Bajarang Jat
Panna Lal Jat
OBC
Left 200 225 No Owned
Joint 10 2 8 Fruit and
Vegetable
177
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sanwar Mal Jat
Panna Lal Jat
OBC
Left 300 300 No Owned
Joint 10 5 5 Fruit and
Vegetable
178
Kachcha Bus
Stand Ke Pas
Ghantaghar
Ramesh Sanwar Mal OBC
Left 200 225 No Owned
Nuclear
3 1 2 BPL
Fruit and
Vegetable
179
Kachcha Bus
Stand Ke Pas
Ghantaghar
Shakil Ushaman SC Left 300 300 No Owned
Joint 8 6 2 SC Fruit and
Vegetable
180
Kachcha Bus
Stand Ke Pas
Ghantaghar
Arun Teli Ali Teli SC Left 300 300 No Owned
Nuclear
6 3 3 SC Fruit and
Vegetable
181
Kachcha Bus
Stand Ke Pas
Ghantaghar
Thakur Ram
Prajapat
Ganesha Ram
Prajapat
OBC
Left 500 500 No Owned
Nuclear
4 3 1 BPL
Fruit and
Vegetable
182
Kachcha Bus
Stand Ke Pas
Ghantaghar
Santosh Kumar Chotiya
Sita Ram Chotiya
OBC
Left 300 300 No Owned
Joint 18 13 5 Fruit and
Vegetable
183
Kachcha Bus
Stand Ke Pas
Ghantaghar
Naresh Sharma
Sitaram GEN
Left 300 300 No Owned
Nuclear
3 2 1 Fruit and
Vegetable
175 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
184
Kachcha Bus
Stand Ke Pas
Ghantaghar
Shankar Lal Bhat
Sampat Lal Bhat
SC Left 500 500 No Owned
Nuclear
6 4 2 SC Fruit and
Vegetable
185
Kachcha Bus
Stand Ke Pas
Ghantaghar
Chen Roop Mali
Kishan Lal Mali
OBC
Left 450 450 No Owned
Joint 7 5 2 BPL
Fruit and
Vegetable
186
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sampat Ram Mali
Purana Ram Mali
OBC
Left 500 500 No Owned
Nuclear
6 2 4 BPL
Fruit and
Vegetable
187
Kachcha Bus
Stand Ke Pas
Ghantaghar
Irfan Rajak OBC
Left 200 225 No Owned
Joint 8 4 4 Fruit and
Vegetable
188
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vishanu Shiv Lal Bhat
SC Left 200 225 No Owned
Joint 7 5 2 SC Fruit and
Vegetable
189
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mohamad Ayub
Isamail OBC
Left 300 300 No Owned
Joint 10 8 2 Fruit and
Vegetable
190
Kachcha Bus
Stand Ke Pas
Ghantaghar
Kishor Kumar Bhat
Ram Gopat Bhat
SC Left 500 500 No Owned
Nuclear
4 3 1 SC Fruit and
Vegetable
191
Kachcha Bus
Stand Ke Pas
Ghantaghar
Salim Aamin OBC
Left 200 225 No Owned
Joint 7 4 3 BPL
Fruit and
Vegetable
192
Kachcha Bus
Stand Ke
Ghantaghar
Bajaranag Lal Saini
Mahavir Prasad
OBC
Left 200 225 No Owned
Nuclear
3 2 1 BPL
Fruit and
Vege
176 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
193
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mohamad Astafa
Asmad Mustfa
OBC
Left 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
194
Kachcha Bus
Stand Ke Pas
Ghantaghar
Aasakarn Chhagan Lal
OBC
Left 300 300 No Owned
Joint 8 3 5 Fruit and
Vegetable
195
Kachcha Bus
Stand Ke Pas
Ghantaghar
Kaluram Sharma
Kanha Ram Sharma
GEN
Left 200 225 No Owned
Nuclear
4 2 2 BPL
Fruit and
Vegetable
196
Kachcha Bus
Stand Ke Pas
Ghantaghar
Ramswaroop Pareek
Kalu Ram GEN
Left 200 225 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
197
Kachcha Bus
Stand Ke Pas
Ghantaghar
Jatir Sawant Kha OBC
Left 300 300 No Owned
Nuclear
3 2 1 Fruit and
Vegetable
198
Sabji Mandi
Ghantaghar
Mohamad Aamir
Mohamad Ali
OBC
Left 300 300 No Owned
Joint 7 4 3 BPL
Fruit and
Vegetable
199
Sabji Mandi
Ghantaghar
Syamlal Pareek
Ladu Ram GEN
Left 300 300 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
200
Sabji Mandi
Ghantaghar
Mahbub Salim GEN
Left 200 225 No Owned
Joint 14 6 8 Fruit and
Vegetable
177 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
201
Sabji Mandi
Ghantaghar
Prameshawar Lal
Mahavir Prasad Mali
OBC
Left 200 225 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
202
Sabji Mandi
Ghantaghar
Rasid Asalam GEN
Left 200 225 No Owned
Joint 8 5 3 Fruit and
Vegetable
203
Sabji Mandi
Ghantaghar
Banwarilal Jori
Bajarang Lal OBC
Left 200 225 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
204
Sabji Mandi
Ghantaghar
Gori Shankar
Saini
Mangtu Ram
Sharma
GEN
Left 300 300 No Owned
Nuclear
4 3 1 BPL
Fruit and
Vegetable
205
Sabji Mandi
Ghantaghar
Sunil Saini Satyanarayan Saini
OBC
Left 200 225 No Owned
Joint 8 5 3 Fruit and
Vegetable
206
Sabji Mandi
Ghantaghar
Sharuk Kha
Aamin OBC
Left 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
207
Sabji Mandi
Ghantaghar
Hadaman Sharma
Deeparam GEN
Left 300 300 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
208
Sabji Mandi
Ghantaghar
Ramlal Mali
Kalu Ram Mali
OBC
Left 300 300 No Owned
Nuclear
6 2 4 Fruit and
Vegetable
209
Sabji Mandi
Ghantaghar
Nand Lal Sharama
Keshar Dev Saini
OBC
Left 300 300 No Owned
Joint 7 3 4 Fruit and
Vege
178 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
table
210
Sabji Mandi
Ghantaghar
Gularam Dungar Ram OBC
Left 300 300 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
211
Sabji Mandi
Ghantaghar
Bhanwar Lal Bhat
Hanumana Ram
SC Left 200 225 No Owned
Joint 9 6 3 SC Fruit and
Vegetable
212
Sabji Mandi
Ghantaghar
Dayashankar Rav
Shiv Lal OBC
Left 200 225 No Owned
Joint 5 2 3 Fruit and
Vegetable
213
Sabji Mandi
Ghantaghar
Bhanwar Gusai
Mohangar OBC
Left 300 300 No Owned
Nuclear
6 3 3 General
Sotre
214
Sabji Mandi
Ghantaghar
Hetaram Sharama
Mangu Ram GEN
Left 300 300 No Owned
Nuclear
6 2 4 Tea Shop
215
Sabji Mandi
Ghantaghar
Shankar Lal Swami
Sohan Daas OBC
Left 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
216
Sabji Mandi
Ghantaghar
Mohamad Abdul
Amin OBC
Left 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
217
Sabji Mandi
Ghantaghar
Mohamad Aadil
Salim OBC
Left 200 225 No Owned
Joint 7 4 3 BPL
Fruit and
Vegetable
218
Sabji Mandi
Ghantaghar
Lekharam Jat
Nanu Ram Jat
OBC
Left 200 225 No Owned
Nuclear
3 1 2 Fruit and
Vegetable
179 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
219
Sabji Mandi
Ghantaghar
Milapachand Mali
Amarchand OBC
Left 200 225 No Owned
Nuclear
5 3 2 Tea Shop
220
Sabji Mandi
Ghantaghar
Ramniwas Swami
Tulasi Das Swami
OBC
Left 300 300 No Owned
Nuclear
6 3 3 Tea Shop
221
Sabji Mandi
Ghantaghar
Mahavir Prasad Swami
Hadsiram OBC
Right 300 300 No Owned
Nuclear
5 2 3 Redemade Cloth
s
222
Sabji Mandi
Ghantaghar
Mankachand
Vijay Mali OBC
Left 300 300 No Owned
Joint 7 4 3 Fancy and Bang
le
223
Sabji Mandi
Ghantaghar
Nand Lal Mali
Lunaram OBC
Left 300 300 No Owned
Nuclear
4 2 2 BPL
Tea Shop
224
Sabji Mandi
Ghantaghar
Bhanwar Lal
Hadmana Ram
Sharma
GEN
Left 300 300 No Owned
Joint 7 3 4 Tea Shop
225
Sabji Mandi
Ghantaghar
Bhagirath Mina
Rawat Mal Mali
OBC
Left 200 225 No Owned
Nuclear
6 3 3 BPL
Tea Shop
226
Sabji Mandi
Ghantaghar
Dharmachand
Prajapat
Kularam OBC
Left 300 300 No Owned
Joint 10 3 7 BPL
Tea Shop
227
Sabji Mandi
Ghantaghar
Chandan Mal Bhat
Ramtan SC Left 300 300 No Owned
Joint 7 2 5 SC Redemade Cloth
s
228
Sabji Mandi
Ghantaghar
Bajarng Lal Bhat
Mangilal SC Left 300 300 No Owned
Nuclear
5 4 1 SC Footwear
229
Sabji Mandi
Ghantaghar
Mohanlal Prajapat
Aasaram Prajapat
OBC
Left 200 225 No Owned
Joint 8 4 4 Dishes
230
Sabji Mandi
Ghantaghar
Subhash Sharma
Rajkumar Sharma
GEN
Left 200 225 No Owned
Nuclear
5 2 3 BPL
Redemade Cloth
180 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
s
231
Sabji Mandi
Ghantaghar
Gorishanakar Nai
Nagarmal OBC
Left 300 300 No Owned
Joint 8 2 6 General
Sotre
232
Sabji Mandi
Ghantaghar
Soyal Isak OBC
Right 300 300 No Owned
Joint 7 3 4 BPL
Fruit and
Vegetable
233
Sabji Mandi
Ghantaghar
Salim Shekh
Babu Kha OBC
Right 200 225 No Owned
Joint 8 5 3 Fruit and
Vegetable
234
Sabji Mandi
Ghantaghar
Kesaram Mali
Omprakash Mali
OBC
Right 300 300 No Owned
Nuclear
4 2 2 Redemade Cloth
s
235
Sabji Mandi
Ghantaghar
Manaram Jat
Kishanlal Jat OBC
Right 300 300 No Owned
Joint 7 4 3 Fruit and
Vegetable
236
Sabji Mandi
Ghantaghar
Prabhudayal Sharma
Ramowatar Sharma
GEN
Right 300 300 No Owned
Nuclear
5 4 1 Redemade Cloth
s
237
Kachcha Bus
Stand Ke Pas
Ghantaghar
Rajesh Mali
Pannalal Mali
OBC
Right 200 225 No Owned
Nuclear
5 3 2 BPL
Fruit and
Vegetable
238
Kachcha Bus
Stand Ke Pas
Ghantaghar
Dayashankar
Mahrshi
Hiralal Mahrshi
OBC
Right 400 400 No Owned
Joint 9 6 3 Redemade Cloth
s
239
Kachcha Bus
Ghantaghar
Pradeep Singh
Hanuman Singh
GEN
Right 300 300 No Owned
Nuclear
5 4 1 Redemade
181 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Stand Ke Pas
Cloths
240
Kachcha Bus
Stand Ke Pas
Ghantaghar
Kesararam Bhambu
Aaduram OBC
Right 200 225 No Owned
Nuclear
5 3 2 Tea Shop
241
Kachcha Bus
Stand Ke Pas
Ghantaghar
Deepachandra Saini
Bhagawana Ram
OBC
Right 200 225 No Owned
Nuclear
5 4 1 BPL
Fruit and
Vegetable
242
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Kumbharam Mali
Mala Ram Saini
OBC
Left 300 300 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
243
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Suresh Kumar Mali
Jaychand Lal
OBC
Left 200 225 No Owned
Joint 9 2 7 Fruit and
Vegetable
244
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Raghuveer Mali
Laduram Mali
OBC
Left 300 300 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
245
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sunil Mali Keilash Chand Mali
OBC
Left 300 300 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
246
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Ulasachand Mali
Bhgawana Ram Mali
OBC
Left 200 225 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
247
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Kalu Ram Mali
Jaychand Mali
OBC
Left 300 300 No Owned
Nuclear
5 4 1 Fruit and
Vegetable
182 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
248
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sanwar Mal Mali
Raghuveer Mali
OBC
Left 200 225 No Owned
Nuclear
5 4 1 Fruit and
Vegetable
249
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sabir Sarwar OBC
Left 300 300 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
250
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sarwar Sabji Frosh
Guljar OBC
Left 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
251
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Govind Pareek
Tola Ram Pareek
GEN
Left 200 225 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
252
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Chunni Lal Jat
Suraja Ram OBC
Left 200 225 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
253
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Lalit Rav Birajichand OBC
Left 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
254
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Kanharam Mali
Sia Ram Mali
OBC
Left 200 225 No Owned
Nuclear
6 4 2 BPL
Fruit and
Vegetable
255
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Surendra Rav
Birajichand Rav
OBC
Left 300 300 No Owned
Joint 11 8 3 Fruit and
Vegetable
256
Ghantaghar Sabji Mandi Ke
Kachcha Bus
Stand
Sukhdev Prajapat
Hiralal OBC
Left 200 225 No Owned
Nuclear
6 2 4 Ice cream/Jui
183 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas ce
257
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Biraji Chand
Rav
Sultna Ram Rav
OBC
Left 300 300 No Owned
Joint 12 7 5 Fruit and
Vegetable
258
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Umed Kumar
Mahavir Bhat
SC Right 500 500 No Owned
Joint 11 8 3 SC Pickle
Shop
259
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Javed
Babulal OBC
Right 300 300 No Owned
Joint 12 4 8 BPL
Fruit and
Vegetable
260
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Ankit Mali Jagdish Prasad
OBC
Right 200 225 No Owned
Joint 7 3 4 Fruit and
Vegetable
261
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Aabid
Mohaamad Babu
OBC
Right 300 300 No Owned
Joint 14 6 8 Fruit and
Vegetable
262
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Anawar
Ajija Bkas OBC
Right 300 300 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
263
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Akatar
Anwar Ali OBC
Right 300 300 No Owned
Nuclear
5 1 4 Fruit and
Vegetable
264
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Menudin Mohamad Isak
OBC
Left 200 225 No Owned
Joint 7 3 4 Fruit and
Vegetable
184 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
265
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Aakash Mali
Talure OBC
Right 400 400 No Owned
Nuclear
3 2 1 Mudi wala
266
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Rajuram Mali
Mohan Ram Mali
OBC
Right 200 225 No Owned
Nuclear
6 5 1 Fruit and
Vegetable
267
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Khetaram Mali
Shankar Lal Mali
OBC
Right 200 225 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
268
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohan Lal Tanwar
Munga Ram Tanwar
SC Right 200 225 No Owned
Nuclear
4 2 2 SC Fruit and
Vegetable
269
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Ramowatar Tak
Ram Ratn Tak
OBC
Right 300 300 No Owned
Joint 15 4 11 BPL
Fruit and
Vegetable
270
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Prakash Saini
Manak Chand Saini
OBC
Right 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
271
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sikandar Rain
Isamail OBC
Right 200 225 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
272
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Syamlal Mali
Laxminarayan Mali
OBC
Right 400 400 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
273
Ghantaghar Sabji Mandi Ke
Kachcha Bus
Stand
Ramchandra Saini
Shankar Lal Saini
OBC
Right 300 300 No Owned
Nuclear
5 2 3 Fruit and
Vege
185 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
274
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Hanuman Prasad Saini
Shankar Lal Mali
OBC
Right 400 400 No Owned
Joint 7 3 4 Fruit and
Vegetable
275
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Roshan Liladhar
Jahur Din Lildhar
OBC
Right 300 300 No Owned
Joint 7 4 3 BPL
Fruit and
Vegetable
276
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Musatlk Mohamad Hanif
OBC
Right 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
277
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Jaychand Mali
Ramuram OBC
Right 200 225 No Owned
Nuclear
4 1 3 Fruit and
Vegetable
278
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Nur Mohamad
Mandan Sabji Frosh
OBC
Left 200 225 No Owned
Joint 11 7 4 Fruit and
Vegetable
279
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Chhotulal Bhojak
Chandan Mal
GEN
Left 200 225 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
280
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Liyakat
Lal Mohamad
OBC
Left 200 225 No Owned
Nuclear
6 2 4 Fruit and
Vegetable
281
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Jamal Din Shakur Ali OBC
Left 200 225 No Owned
Joint 17 8 9 BPL
Fruit and
Vegetable
186 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
282
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Ramchandar Mali
Jagnaram Mali
OBC
Left 250 250 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
283
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Talib Mohamad Isab Bhati
OBC
Left 200 225 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
284
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Nandlal Mali
Ramtaan Saini
OBC
Left 300 300 No Owned
Nuclear
6 2 4 Fruit and
Vegetable
285
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Rajkumar Prajapat
Gopal Ram Prajapat
OBC
Left 200 225 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
286
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Tofik
Riyakat Ali OBC
Left 200 225 No Owned
Joint 7 3 4 Fruit and
Vegetable
287
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Kailash Saini
Ramratn Saini
SC Left 300 300 No Owned
Nuclear
4 2 2 SC Fruit and
Vegetable
288
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Shri Krishan
Mali
Shankar Lal Mali
OBC
Left 200 225 No Owned
Joint 7 3 4 Fruit and
Vegetable
289
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Kasam Rain
Guljar Rain OBC
Left 200 225 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
290
Ghantaghar Sabji Mandi Ke
Kachcha Bus
Stand
Hakam Sabji Frose
Guljar OBC
Left 200 225 No Owned
Nuclear
5 3 2 Fruit and
Vege
187 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
291
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Aadil
Mohamad Babu
OBC
Right 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
292
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Alisar
Mohamad Babu
OBC
Right 200 225 No Owned
Nuclear
5 1 4 Fruit and
Vegetable
293
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Rafik
Mohamad Rafik
OBC
Right 300 300 No Owned
Joint 8 4 4 Fruit and
Vegetable
294
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Deelip Mali
Banwari Lal OBC
Right 400 400 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
295
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Faruk Chhotu OBC
Right 300 300 No Owned
Joint 16 12 4 Fruit and
Vegetable
296
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Sajid
Mohamad Asalam
SC Right 400 400 No Owned
Nuclear
5 3 2 SC Fruit and
Vegetable
297
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Akaram Rangrej
Mohamad Asalm
SC Right 300 300 No Owned
Nuclear
4 2 2 SC Fruit and
Vegetable
298
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Noshayad Ali
Aamin OBC
Right 400 400 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
188 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
299
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Balchand Swami
Hadmanmal Swami
OBC
Right 300 300 No Owned
Nuclear
5 3 2 BPL
Snacks
300
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Akaram
Mohamad Chhotu
OBC
Right 200 225 No Owned
Nuclear
4 1 3 Fruit and
Vegetable
301
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Jafar Husain
Nur Mohamad
OBC
Right 400 400 No Owned
Nuclear
2 1 1 Fruit and
Vegetable
302
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Nyunas Ahamad
Jafar Ali SC Right 200 225 No Owned
Joint 7 5 2 SC Footwear
303
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Sarwesh Rathode
Chotu Lal GEN
Right 200 225 No Owned
Nuclear
5 2 3 Fancy and Bang
le
304
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Radhesyam Saini
Radhesayam Saini
OBC
Left 400 400 No Owned
Nuclear
6 4 2 Snacks
305
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Jadurdin Niwariya
Kulada OBC
Left 300 300 No Owned
Joint 10 4 6 General
Sotre
306
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Asalam
Mohamad Khadar
OBC
Left 400 400 No Owned
Joint 9 6 3 BPL
Fruit and
Vegetable
189 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
307
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Megharaj Sindhi
Prahalad Sindhi
GEN
Left 300 300 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
308
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Sadam
Mohamad Sadid
OBC
Left 400 400 No Owned
Joint 8 5 3 Fruit and
Vegetable
309
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mohamad Mamdin
Mohamad Nathu
OBC
Left 400 400 No Owned
Joint 9 4 5 Fruit and
Vegetable
310
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Aadil Chohan
Saraj Choan OBC
Left 400 400 No Owned
Nuclear
6 5 1 Fruit and
Vegetable
311
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mahavir Mali
Rameshawar Lal
OBC
Left 300 300 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
312
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Vinod Mali Jayachand Mali
OBC
Left 400 400 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
313
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Shiv Shankar
Gori Shankar
OBC
Left 500 500 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
314
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Babulal Saini
Sanwar Mal Saini
OBC
Right 400 400 No Owned
Nuclear
5 3 2 BPL
Snacks
315
Ghantaghar Sabji Mandi Ke
Kachcha Bus
Stand
Gorishankar Saini
Sanwarmal Saini
OBC
Right 300 300 No Owned
Nuclear
5 3 2 Snacks
190 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas
316
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Gowardhan Luhar
Khayali Ram Luhar
SC Right 300 300 No Owned
Nuclear
2 1 1 SC Tea Shop
317
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Lal Mohamad
Mohamad Baksa
OBC
Right 300 300 No Owned
Nuclear
4 3 1 BPL
Snacks
318
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Ramswaroop Saini
Mulchand Saini
OBC
Right 200 225 No Owned
Nuclear
5 3 2 Ice cream/Jui
ce
319
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Murlidhar Pareek
Kanheya Lal GEN
Left 400 400 No Owned
Nuclear
6 3 3 Tea Shop
320
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Shankarlal Pareek
Sohan Lal Pareek
GEN
Right 400 400 No Owned
Nuclear
6 4 2 BPL
Tea Shop
321
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Dhanaram Prajapat
Dhanram Prajapat
OBC
Left 400 400 No Owned
Nuclear
5 2 3 Snacks
322
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mo.Rafik Mo. Rafik OBC
Left 500 500 No Owned
Joint 17 9 8 Fruit and
Vegetable
323
Kachcha Bus
Stand Ke Pas
Ghantaghar
Lalchand Saini
Bhagwana Ram
OBC
Right 300 300 No Owned
Nuclear
5 4 1 BPL
Fruit and
Vegetable
191 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
324
Kachcha Bus
Stand Ke Pas
Ghantaghar
Gurupratap Bhat
Sabdsharan Bhat
SC Right 400 400 No Owned
Nuclear
6 4 2 SC Fruit and
Vegetable
325
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sabdsharn Bhat
Sabdsharan Bhat
SC Right 200 225 No Owned
Nuclear
6 4 2 SC Fruit and
Vegetable
326
Kachcha Bus
Stand Ke Pas
Ghantaghar
Pawan Bhat
Pawan Bhat SC Right 400 400 No Owned
Nuclear
5 4 1 SC Fruit and
Vegetable
327
Kachcha Bus
Stand Ke Pas
Ghantaghar
Bhojraj Sharn
Bhojraj Sharan
OBC
Right 300 300 No Owned
Joint 7 2 5 Fruit and
Vegetable
328
Kachcha Bus
Stand Ke Pas
Ghantaghar
Chandrprakash Saini
Chandrprakash Saini
OBC
Right 400 400 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
329
Kachcha Bus
Stand Ke Pas
Ghantaghar
Deepak Bhaat
Pitram Bhat SC Right 300 300 No Owned
Nuclear
6 3 3 SC Fruit and
Vegetable
330
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vinod Mali Rajesh Kumar Mali
OBC
Right 400 400 No Owned
Nuclear
6 4 2 Fruit and
Vegetable
331
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Faruk Mo. Faruk OBC
Left 300 300 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
332
Kachcha Bus
Stand Ke
Ghantaghar
Raj Kumar Puniya
Parma Ram OBC
Left 300 300 No Owned
Nuclear
6 3 3 Fruit and
Vege
192 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
333
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vinod Mali Savar Mali Mali
OBC
Left 300 300 No Owned
Nuclear
5 3 2 BPL
Fruit and
Vegetable
334
Kachcha Bus
Stand Ke Pas
Ghantaghar
Uusman Talli
Alli Tali SC Left 200 225 No Owned
Joint 7 5 2 SC Fruit and
Vegetable
335
Kachcha Bus
Stand Ke Pas
Ghantaghar
Parmeshwar Lal
Aasha Ram Nayak
SC Left 400 400 No Owned
Nuclear
6 3 3 SC Fruit and
Vegetable
336
Kachcha Bus
Stand Ke Pas
Ghantaghar
Lila Ram Bhaat
Jagdish Prasad
SC Right 300 300 No Owned
Nuclear
4 3 1 SC Fruit and
Vegetable
337
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Ieslam
Aamin Malu OBC
Left 300 300 No Owned
Joint 10 4 6 Fruit and
Vegetable
338
Kachcha Bus
Stand Ke Pas
Ghantaghar
Rajesh Kumar Pareek
Rajesh Pareek
GEN
Left 400 400 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
339
Kachcha Bus
Stand Ke Pas
Ghantaghar
Ramlal Mali
Ramlal Mali OBC
Left 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
340
Kachcha Bus
Stand Ke Pas
Ghantaghar
Shivbhagwan Bhat
Shivbhagwan Bhat
SC Left 400 400 No Owned
Nuclear
5 2 3 SC Fruit and
Vegetable
193 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
341
Kachcha Bus
Stand Ke Pas
Ghantaghar
Pemaram Mali
Pemaram Mali
OBC
Left 400 400 No Owned
Nuclear
5 4 1 Fruit and
Vegetable
342
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Sadham
Babu Kunjda
OBC
Left 300 300 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
343
Kachcha Bus
Stand Ke Pas
Ghantaghar
Ramdev Agrwal
Ramdev Agrwal
GEN
Left 500 500 No Owned
Nuclear
6 3 3 Fruit and
Vegetable
344
Kachcha Bus
Stand Ke Pas
Ghantaghar
Chandrapal
Bhanwar Lal OBC
Left 200 225 No Owned
Joint 10 5 5 Fruit and
Vegetable
345
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vinod Kumar Bhat
Ramgopal Bhat
SC Right 400 400 No Owned
Nuclear
5 3 2 SC Fruit and
Vegetable
346
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Akaram
Jamaluddin OBC
Right 500 500 No Owned
Joint 18 13 5 Fruit and
Vegetable
347
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Akaram
Mo. Akbar OBC
Right 300 300 No Owned
Joint 9 4 5 Fruit and
Vegetable
348
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Navab Lal Mohamad
OBC
Right 400 400 No Owned
Joint 15 11 4 Fruit and
Vegetable
349
Kachcha Bus
Stand Ke
Ghantaghar
Vijay Kumar
Vijay Kumar OBC
Right 300 300 No Owned
Joint 7 6 1 Fruit and
Vege
194 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
350
Kachcha Bus
Stand Ke Pas
Ghantaghar
Taj Mohamad
Taj Mohamad
OBC
Left 400 400 No Owned
Joint 7 2 5 BPL
Fruit and
Vegetable
351
Kachcha Bus
Stand Ke Pas
Ghantaghar
Rojitash Manoj Bhat SC Left 300 300 No Owned
Nuclear
5 3 2 SC Fruit and
Vegetable
352
Kachcha Bus
Stand Ke Pas
Ghantaghar
Budhmal Bhat
Sohanlal SC Right 300 300 No Owned
Joint 7 2 5 SC Fruit and
Vegetable
353
Kachcha Bus
Stand Ke Pas
Ghantaghar
Umasankar Saini
Sitaram Saini
OBC
Left 300 300 No Owned
Nuclear
3 2 1 BPL
Fruit and
Vegetable
354
Kachcha Bus
Stand Ke Pas
Ghantaghar
Jagdish Aacharye
Magna Ram OBC
Left 400 400 No Owned
Nuclear
6 3 3 BPL
Fruit and
Vegetable
355
Kachcha Bus
Stand Ke Pas
Ghantaghar
Gorisankar Sharma
Mohanlal GEN
Left 500 500 No Owned
Nuclear
4 3 1 Fruit and
Vegetable
356
Kachcha Bus
Stand Ke Pas
Ghantaghar
Soyab Amin Teli SC Right 400 400 No Owned
Nuclear
4 3 1 SC Fruit and
Vegetable
357
Kachcha Bus
Stand Ke Pas
Ghantaghar
Mo. Anvar Mo. Aamin OBC
Left 200 225 No Owned
Nuclear
3 1 2 Fruit and
Vegetable
195 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
358
Kachcha Bus
Stand Ke Pas
Ghantaghar
Pravin Bhat
Pitram Bhat SC Left 400 400 No Owned
Joint 8 4 4 SC Fruit and
Vegetable
359
Kachcha Bus
Stand Ke Pas
Ghantaghar
Vishnu Valmiki
Sumermal SC Right 150 225 No Owned
Nuclear
5 2 3 SC Cobbler
360
Kachcha Bus
Stand Ke Pas
Ghantaghar
Hadmanram
Taruram OBC
Right 150 225 No Owned
Joint 7 5 2 BPL
Cobbler
361
Kachcha Bus
Stand Ke Pas
Ghantaghar
Shri Krishan
Jaichand OBC
Right 200 225 No Owned
Joint 8 5 3 Cobbler
362
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sampat Valmiki
Rajkaran SC Right 150 225 No Owned
Nuclear
5 4 1 SC Cobbler
363
Kachcha Bus
Stand Ke Pas
Ghantaghar
Kalu Harijan
Sampat OBC
Left 150 225 No Owned
Joint 7 5 2 Cobbler
364
Kachcha Bus
Stand Ke Pas
Ghantaghar
Jagu Harijan
Virjilal SC Left 150 225 No Owned
Nuclear
6 2 4 SC Cobbler
365
Kachcha Bus
Stand Ke Pas
Ghantaghar
Anil Saini Balaprashad OBC
Left 150 225 No Owned
Nuclear
3 2 1 Cobbler
266
Kachcha Bus
Stand Ke
Ghantaghar
Madanlal Sohanlal OBC
Right 300 300 No Owned
Nuclear
5 3 2 Fruit and
Vege
196 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
367
Kachcha Bus
Stand Ke Pas
Ghantaghar
Kamalesh Swami
Jaichand OBC
Right 300 300 No Owned
Joint 7 3 4 BPL
Fruit and
Vegetable
368
Kachcha Bus
Stand Ke Pas
Ghantaghar
Sitaram Mali
Pawankumar
OBC
Left 200 225 No Owned
Nuclear
3 2 1 Tea Shop
369
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Dharmendra Valmiki
Rajkumar SC Left 200 225 No Owned
Nuclear
2 2 0 SC Cobbler
370
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Avdhesh Babu
Shriram Babu
OBC
Right 300 300 No Owned
Nuclear
5 3 2 Snacks
371
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Birjesh Chouhan
Ajay Chouhan
OBC
Right 200 225 No Owned
Nuclear
6 6 0 Snacks
372
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Rajkumar Sharma
Bhanvarlal Sharma
GEN
Left 300 300 No Owned
Nuclear
5 4 1 BPL
Snacks
373
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Laxman Saini
Subhkaran Saini
OBC
Left 300 300 No Owned
Nuclear
5 2 3 Tea Shop
374
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Subhkaran Dhanshuk Ray
OBC
Left 300 300 No Owned
Nuclear
5 3 2 Tea Shop
197 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
375
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Chotulal Joshi
Bajarang Lal GEN
Right 400 400 No Owned
Joint 7 2 5 Tea Shop
376
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Dayal Singh
Hanuman Singh
GEN
Right 300 300 No Owned
Nuclear
4 2 2 Tea Shop
377
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Bajrang Lal
Prajapat
Nathuram OBC
Right 300 300 No Owned
Nuclear
6 2 4 Ice cream/Jui
ce
378
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Rajkumar Valmiki
Mohanlal SC Right 200 225 No Owned
Joint 6 3 3 SC Cobbler
379
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mo. Salim Mo. Dildar OBC
Left 400 400 No Owned
Joint 12 7 5 BPL
Fruit and
Vegetable
380
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Nanu Mohamad
Hajimuddin OBC
Right 400 400 No Owned
Nuclear
6 5 1 BPL
Fruit and
Vegetable
381
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Mo. Samir Khan
Nanu Mohamad
OBC
Right 400 400 No Owned
Nuclear
6 5 1 Fruit and
Vegetable
382
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Gopal Nath
Sikandar SC Right 300 300 No Owned
Nuclear
5 2 3 SC Snacks
198 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
383
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Vahid Mo. Rafik OBC
Left 400 400 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
384
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Pirulal Mohamad
Lal Mohamad
OBC
Left 300 300 No Owned
Joint 8 5 3 BPL
Fruit and
Vegetable
385
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Aarif Babulal OBC
Left 300 300 No Owned
Nuclear
5 4 1 Redemade Cloth
s
386
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Gangaram Gopiram OBC
Right 200 225 No Owned
Nuclear
6 4 2 Plastic
Item
387
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Chandraprakash
Sankarlal OBC
Left 300 300 No Owned
Nuclear
2 1 1 Fruit and
Vegetable
388
Ghantaghar Sabji Mandi Ke
Pas
Kachcha Bus
Stand
Amit Gupta
Rajkumar Gupta
GEN
Right 300 300 No Owned
Nuclear
3 1 2 Fruit and
Vegetable
389
Kachcha Bus
Stand Ke Pas
Police Chowki
Mo. Sakil Mo. Aslam OBC
Left 200 225 No Owned
Joint 8 4 4 Fruit and
Vegetable
390
Kachcha Bus
Stand Ke Pas
Police Chowki
Mo. Navab Mo. Sadik OBC
Left 400 400 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
391
Kachcha Bus
Stand Ke
Police Chowki
Maniram Nayak
Aasharam Nayak
SC Left 400 400 No Owned
Nuclear
5 3 2 SC Fruit and
Vege
199 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
392
Kachcha Bus
Stand Ke Pas
Police Chowki
Renvtaram Nayak
Dularam Nayak
SC Right 300 300 No Owned
Joint 8 3 5 SC Fruit and
Vegetable
393
Kachcha Bus
Stand Ke Pas
Police Chowki
Champalal Rupalal OBC
Left 400 400 No Owned
Nuclear
4 2 2 BPL
Fruit and
Vegetable
394
Kachcha Bus
Stand Ke Pas
Police Chowki
Omprakash Bhat
Ramchandra Bhat
SC Left 400 400 No Owned
Joint 7 4 3 SC Fruit and
Vegetable
395
Kachcha Bus
Stand Ke Pas
Police Chowki
Sharuk Khan
Piru Khan OBC
Left 400 400 No Owned
Nuclear
8 4 4 BPL
Fruit and
Vegetable
396
Kachcha Bus
Stand Ke Pas
Police Chowki
Shispal Harpat Ram OBC
Left 400 400 No Owned
Joint 8 5 3 Fruit and
Vegetable
397
Kachcha Bus
Stand Ke Pas
Police Chowki
Syamlal Jagdish Prasad
OBC
Right 400 400 No Owned
Joint 7 5 2 Fruit and
Vegetable
398
Kachcha Bus
Stand Ke Pas
Police Chowki
Sarif Salim OBC
Left 300 300 No Owned
Joint 10 5 5 Fruit and
Vegetable
399
Kachcha Bus
Stand Ke Pas
Police Chowki
Pramod Bhat
Mahendra Bhat
SC Right 400 400 No Owned
Nuclear
5 3 2 SC Ice cream/Jui
ce
200 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
400
Kachcha Bus
Stand Ke Pas
Police Chowki
Amil Bhat Bahadur Bhat
SC Right 300 300 No Owned
Nuclear
5 3 2 SC Fruit and
Vegetable
401
Kachcha Bus
Stand Ke Pas
Police Chowki
Jiwana Ram
Nayak
Ramuram SC Right 300 300 No Owned
Joint 7 2 5 SC Fruit and
Vegetable
402
Kachcha Bus
Stand Ke Pas
Police Chowki
Sadam Husain
Ismail Khan OBC
Left 350 350 No Owned
Nuclear
5 2 3 Fruit and
Vegetable
403
Kachcha Bus
Stand Ke Pas
Police Chowki
Rafik Teli Ali Mohmad Teli
OBC
Right 250 250 No Owned
Joint 8 5 3 Fruit and
Vegetable
404
Kachcha Bus
Stand Ke Pas
Police Chowki
Mhavir Prasad
Champalal Bhat
SC Right 300 300 No Owned
Nuclear
6 3 3 SC Fruit and
Vegetable
405
Kachcha Bus
Stand Ke Pas
Police Chowki
Surendra Kumar
Ndrachand Saini
OBC
Left 200 225 No Owned
Joint 9 4 5 Fruit and
Vegetable
406
Kachcha Bus
Stand Ke Pas
Police Chowki
Poonam Chand Saini
Ratanlal Saini
OBC
Left 300 300 No Owned
Joint 7 4 3 Fruit and
Vegetable
407
Kachcha Bus
Stand Ke Pas
Police Chowki
Makbul Nijamudin OBC
Left 350 350 No Owned
Nuclear
5 3 2 Fruit and
Vegetable
408
Kachcha Bus
Stand Ke
Police Chowki
Mohamad Akaram
Sabjifrosh
Makabul SC Left 250 250 No Owned
Joint 8 5 3 SC Fruit and
Vege
201 | P a g e
S.n
o
Sta
rt
Po
int
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f F
ath
er
or
Hu
sb
an
d
cast
Pla
ce o
f A
P L
eft
/ R
igh
t
Daily
Inco
me in
R
s.
Daily
inco
me a
s
per
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
OW
NE
D
or
Ren
ted
Typ
e o
f fa
mily
(N/J
)
No
. O
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
bl
e
Typ
e o
f o
ccu
pati
on
Pas table
409
Kachcha Bus
Stand Ke Pas
Police Chowki
Amir Khan Raju OBC
Left 200 225 No Owned
Joint 9 5 4 Fruit and
Vegetable
410
Kachcha Bus
Stand Ke Pas
Police Chowki
Jagdish Mali
Bhanwar Mali
OBC
Left 300 300 No Owned
Nuclear
4 2 2 Fruit and
Vegetable
411
Kachcha Bus
Stand Ke Pas
Police Chowki
Syamsundar Sharma
Gorishankar Sharma
GEN
Left 350 350 No Owned
Nuclear
3 2 1 Fruit and
Vegetable
412
Kachcha Bus
Stand Ke Pas
Police Chowki
Manoj Kumar
Shibhagwan Sharma
GEN
Left 200 225 No Owned
Joint 10 5 5 Fruit and
Vegetable
Source: Socio-economic survey Feb 2021
202 | P a g e
D. Ratangarh
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
1 Station road Jariyandevi
bhawan Mahipal Sanshi
Sayar Ram SC Right 300 300 No Owned Nuclear
4 3 1 SC Cobble
r
2 Station road Ashok stambh
Bhism Mali
Babu Lal Mali
OBC Right 250 250 No Owned Joint 8 3 5
Fruit and
vegetable
vendor
3 Station road Ashok stambh
Nand Kishor
Nagar Mal OBC left 400 400 No Owned Nuclear
5 3 2 Kirana shop
4 Station road Janana
hospital ke samne
Om Prakas
h Choudh
ary
Baga Ram Choudhary
OBC left 300 300 No Owned Nuclear
5 3 2 Toy
Shop
5 Station road Gandhi bal school ke
pas Shahid Shahid GEN Right 300 300 No Owned
Nuclear
6 3 3
Readymade
Garments
6 Station road Janana
hospital ke samne
Mukesh Kumar
Ramesvar Lal
GEN Right 250 250 No Owned Nuclear
3 2 1
Fruit and
vegetable
vendor
7 Station road Janana
hospital ke samne
Sikandar
Askar Ali GEN left 250 250 No Owned Joint 8 7 1
Fruit and
vegetable
vendor
8 Station road Janana
hospital ke samne
Shiv Bhagwa
n Bhima Ram GEN left 300 300 No Owned
Nuclear
5 4 1 Toy
Shop
203 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
9 Station road Janana
hospital ke samne
Imran Lildhar
Madan Mohammad
GEN Right 350 350 No Owned Nuclear
5 4 1 BPL
Repairing
shop
10 Station road Station road Gita Devi
Ramu ram SC Right 300 300 No Owned Nuclear
4 2 2 FHH
Cobbler
11 Janana
hospital ke samne
Ashok stambh
Lala Ram
Lildhar Ramu ram OBC Right 400 400 No Owned
Nuclear
7 3 4 BPL
Fancy store
12 Janana
hospital ke samne
Ashok stambh
Aadil Lala Ram
Lildhar OBC Right 300 300 No Owned
Nuclear
7 3 4
Fruit and
vegetable
vendor
13 Ambedakar bhawan ke
pas
Ashok stambh
Navin Meghw
al Rajendra SC Right 500 500 No Owned
Nuclear
6 3 3 SC
Fruit and
vegetable
vendor
14 Janana
hospital ke samne
Ashok stambh
Krishna Lal
Mohan Lal SC left 400 400 No Owned Nuclear
5 3 2 SC
Readymade
Garments
15 Janana
hospital ke samne
Ashok stambh
Umesh Sharma
Banvari Lal GEN left 400 400 No Owned Nuclear
5 3 2 Plastic
16 Jadiya
bhawan ke pas
Ashok stambh
Pushkar
Doula Ram OBC left 500 500 No Owned Nuclear
4 3 1 Blanke
ts
17 Bus stand
ke pas Ashok stambh
Laxman Saini
Gori Sankar
OBC left 500 500 No Owned Nuclear
6 4 2 Hotel/Dhaba
18 Bus stand
ke pas Ashok stambh
Bajrang Lal
Ram Kumar
OBC left 300 300 No Owned Nuclear
4 1 3 Snacks
19 Bus stand
ke pas Ashok stambh
Amit Bharga
Navratan OBC left 400 400 No Owned Nuclear
6 4 2 Kirana shop
204 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
v
20 Bus stand
ke pas Ashok stambh
Pankaj Swami
Shri Ram OBC left 250 250 No Owned Nuclear
6 2 4 Kirana shop
21 Bus stand
ke pas Ashok stambh
Mukesh Swami
Shri Ram OBC left 300 300 No Owned Nuclear
5 1 4 Kirana shop
22 Bus stand
ke pas Ashok stambh
Kanahiya Lal
Purna Mal GEN left 500 500 No Owned Nuclear
4 2 2 BPL
Tea Stall
23 Sangam choraha
Ashok stambh
Kali Devi
Gopal SC Right 400 400 No Owned Joint 13 6 7 FHH
Kirana shop
24 Bus stand
ke pas Ashok stambh
Richpal Mali
Hadmana Ram
OBC Right 300 300 No Owned Nuclear
5 2 3
Fruit and
vegetable
vendor
25 Police choki
ke pas Ashok stambh
Imran Khan
Abdul Majid GEN left 250 250 No Owned Nuclear
5 2 3 BPL
Fruit and
vegetable
vendor
26 Bus stand
ke pas Ashok stambh
Jakir Husen
Mohammad Husen
GEN left 300 300 No Owned Joint 13 7 6
Fruit and
vegetable
vendor
27 PNB Bank
ke pas Ashok stambh
Ram Avtar Saini
Kulda Ram OBC Right 350 350 No Owned Nuclear
5 2 3
Fruit and
vegetable
vendor
28 PNB Bank
ke pas Ashok stambh
Imran Chotu GEN Right 300 300 No Owned Joint 20 13 7 BPL
Fruit and
vegetable
205 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
vendor
29 PNB Bank
ke pas Ashok stambh
Pramesvar Lal
Mali
Madan Lal Mali
OBC left 300 300 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
30 Police choki
ke pas Ashok stambh
Dalip Sindhi
Chand Mal OBC left 300 300 No Owned Nuclear
5 1 4
Fruit and
vegetable
vendor
31 PNB Bank
ke pas Ashok stambh
Ramjan Abdul Majid GEN Right 300 300 No Owned Nuclear
5 2 3 BPL
Fruit and
vegetable
vendor
32 Agrasen
bhawan ke pas
Ashok stambh
Ram Chandr
a
Magna Ram
OBC Right 350 350 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
33 PNB Bank
ke pas Ashok stambh
Doulat Ram
Shayam Lal Mali
OBC Right 300 300 No Owned Joint 8 5 3
Fruit and
vegetable
vendor
34 PNB Bank
ke pas Ashok stambh
Raghavndra
Mishra
Vishnu Nath
GEN Right 300 300 No Owned Nuclear
5 3 2 Toy
Shop
35 Agrasen
bhawan ke pas
Ashok stambh
Mohamad
Husen
Abdul Hamid
GEN Right 300 300 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
206 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
36 Agrasen
bhawan ke pas
Ashok stambh
Prem Ginvari
ya Tej Pal SC left 300 300 No Owned
Nuclear
7 4 3 SC
Fruit and
vegetable
vendor
37 Ved school
ke pas Ashok stambh
Pooja Ginvari
ya Ram Niwas SC left 300 300 No Owned Joint 10 5 5
FHH
Fancy store
38 Ved school
ke pas Ashok stambh
Radhesyam Saini
Dwarka Prashad
Saini OBC left 250 250 No Owned
Nuclear
5 2 3
Readymade
Garments
39 Ved school
ke pas Ashok stambh
Sharda Devi
Vijaypal Ginvariya
SC left 400 400 No Owned Nuclear
5 4 1 FHH
Fancy store
40 Ved school
ke pas Ashok stambh
Golu Gujrati
Manoj Ginvariya
SC left 300 300 No Owned Nuclear
6 3 3 SC Fancy store
41 Ved school
ke pas Ashok stambh
Arun Stasriya
Moti Lal GEN left 300 300 No Owned Nuclear
6 3 3 Tea Stall
42 Ashok stambh
Ashok stambh
Lala Ram
Nayak
Shobha Ram
SC left 300 300 No Owned Nuclear
3 1 2 SC Fancy store
43 Ashok stambh
Pooja market
Sultan Mohammad
Muslim GEN left 350 350 No Owned
Nuclear
4 2 2 Fancy store
44 Ashok stambh
Pooja market
Mohammad
Isteyar Hishar GEN left 400 400 No Owned
Nuclear
6 3 3
Readymade
Garments
45 Ashok stambh
Pooja market
Mohammad Jakir
Mohammad Aadim
GEN Right 250 250 No Owned Joint 18 10 8 BPL
Fruit and
vegetable
vendor
46 Ashok stambh
Pooja market
Mohammad
Altab Husen
GEN Right 300 300 No Owned Nuclear
7 2 5 Fruit and
207 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
Javed vegetable
vendor
47 Ashok stambh
Pooja market
Gorav Sindhi
Mohan Lal GEN left 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
48 Ashok stambh
Pooja market
Madan Lal
Jodha Ram OBC left 300 300 No Owned Nuclear
7 5 2
Fruit and
vegetable
vendor
49 Ashok stambh
Pooja market
Kishor Singh
Thakur Das GEN Right 300 300 No Owned Joint 11 9 2
Fruit and
vegetable
vendor
50 SBI Bank ke
paas Pooja market
Nand Lal
Redar Mansukh SC Right 300 300 No Owned
Nuclear
6 4 2 SC Footwe
ar
51 SBI Bank ke
paas Pooja market
Anvar Jafar
Husen GEN left 250 250 No Owned
Nuclear
4 2 2
Fruit and
vegetable
vendor
52 SBI Bank ke
paas Pooja market
Imran Lildhar
Yashil GEN left 300 300 No Owned Nuclear
1 1 0
Fruit and
vegetable
vendor
53 Pooja market
Pooja market
Prem Chand
Girdhari Lal OBC Right 300 300 No Owned Nuclear
3 2 1 BPL
Tea Stall
208 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
54 Shyam
medical ke samne
Pooja market
Arjun Baniya
Nand Kishor
GEN Right 200 225 No Owned Nuclear
7 3 4 BPL
Toy Shop
55 Hanuman store ke samne
Pooja market
Bhagvan Singh
Gokul Singh
Bidawat OBC Right 250 250 No Owned
Nuclear
6 3 3 BPL
Fancy store
56 Agrasen
bhawan ke pas
Ashok stambh
Chand Devi
Sabe Ram Banjara
SC Right 250 250 No Owned Joint 12 2 10 FHH
Kirana shop
57 Raghunath
school Ashok stambh
Setha Ram
Ram Lal SC Right 300 300 No Owned Joint 12 2 10 SC Kirana shop
58 Sabji mandi Ashok stambh
Vishnu Dutt
Sukh Dev GEN left 200 225 No Owned Nuclear
5 2 3 Tea Stall
59 PNB Bank
ke pas Ashok stambh
Dharmendra
Dhan Raj Saini
OBC left 500 500 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
60 Bus stand
ke pas Ashok stambh
Iklab Chotu GEN left 300 300 No Owned Joint 20 10 10 BPL
Fruit and
vegetable
vendor
61 Police choki
ke pas Ashok stambh
Sarif Matkad GEN left 300 300 No Owned Joint 10 2 8
Fruit and
vegetable
vendor
62 Bus stand
ke pas Ashok stambh
Manoj Dubbe
Hari Mal GEN left 250 250 No Owned Nuclear
4 1 3 Toy
Shop
63 Police choki
ke pas Ashok stambh
Prem Kumar
Shyam Lal OBC left 300 300 No Owned Joint 9 4 5
Fruit and
vegetable
209 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
vendor
64 Hanuman store ke samne
Pooja market
Mufid Manktu OBC left 300 300 No Owned Joint 8 4 4
Fruit and
vegetable
vendor
65 Agrasen
bhawan ke pas
Ashok stambh
Nand Lal
kanahiya Lal
OBC left 250 250 No Owned Nuclear
5 3 2 Tea Stall
66 Bus stand
ke pas Ashok stambh
Sampat Sharma
Navrang GEN left 200 225 No Owned Nuclear
4 1 3 Tea Stall
67 Bus stand
ke pas Ashok stambh
Mohit Sharma
Kishn Chand
GEN left 300 300 No Owned Nuclear
4 1 3 Dishes
h
68 Bus stand link road
Chhotha puliya
Ravindra
Sharma
Govind Prasad
GEN left 400 400 No Owned Nuclear
5 2 3 Tea Stall
69 Bus stand link road
Chhotha puliya
Ram Kishan Sharma
Govind Prasad
GEN Right 250 250 No Owned Nuclear
5 2 3 Tea Stall
70 Bus stand link road
Chhotha puliya
Ramkumar
Luhar
Bhagwan Ram
SC Right 300 300 No Owned Nuclear
5 3 2 SC Tea Stall
71 Bus stand link road
Chhotha puliya
Shanti Prasha
d
Bhagwan Ram
GEN Right 400 400 No Owned Joint 8 2 6 BPL
Snacks
72 Raghunath
school Chhotha
puliya
Suraj Chouha
n
Munshi Ram
SC Right 400 400 No Owned Nuclear
5 3 2 SC Hotel/Dhaba
73 Bus stand link road
Chhotha puliya
Kalu Ram Luhar
Bhagwan Ram
SC Right 400 400 No Owned Nuclear
4 2 2 SC Hotel/Dhaba
74 Bus stand link road
Chhotha puliya
Prahlad Swami
Nagar Mal OBC Right 250 250 No Owned Nuclear
6 3 3 Snacks
210 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
75 Bus stand link road
Chhotha puliya
Raj Kumar Pachlgi
ya
Chiranji Lal GEN Right 300 300 No Owned Nuclear
4 3 1 Tea Stall
76 Bus stand link road
Chhotha puliya
Birbal Prajapa
t
Ganesh Ram
OBC Right 300 300 No Owned Nuclear
5 3 2 BPL
Snacks
77 Bus stand link road
Chhotha puliya
Rakesh Luhar
Rajendra SC left 400 400 No Owned Nuclear
3 2 1 SC Hotel/Dhaba
78 Bus stand link road
Chhotha puliya
Devi Lal Luhar
Bhagwan Ram
SC left 400 400 No Owned Nuclear
3 1 2 SC Kirana shop
79 Bus stand link road
Chhotha puliya
Mumtaj Madan Khan
OBC Right 300 300 No Owned Nuclear
6 2 4 FHH
Fruit and
vegetable
vendor
80 Bus stand link road
Chhotha puliya
Mani P. Sharma
Parmeshvar Lal
GEN Right 500 500 No Owned Nuclear
5 3 2 Tea Stall
81 Bus stand link road
Chhotha puliya
Jafar Khan
Madan Khan
GEN left 350 350 No Owned Nuclear
7 3 4 Snacks
82 India public school ke
samne
Chhotha puliya
Ikram Jasukant OBC left 400 400 No Owned Nuclear
5 4 1 Repairi
ng shop
83 Bus stand link road
Chhotha puliya
Sankar Swami
Sukha Ram OBC Right 300 300 No Owned Joint 10 8 2 Tea Stall
84 Bus stand link road
Chhotha puliya
Hari Ram
Manak Chand
OBC Right 300 300 No Owned Nuclear
5 3 2 Snacks
85 Bus stand link road
Chhotha puliya
Girdhari Prajapa
t
Nathu Prjapat
OBC Right 400 400 No Owned Nuclear
6 3 3 Snacks
86 Bus stand link road
Chhotha puliya
Govind Saini
Laxman Saini
OBC Right 300 300 No Owned Nuclear
4 3 1 BPL
Snacks
87 Bus stand link road
Chhotha puliya
Bhanvar Lal
Hari Ram OBC Right 250 250 No Owned Nuclear
5 4 1 Tea Stall
211 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
Kateva
88 Bus stand link road
Chhotha puliya
Raj Kumar Bharga
v
Samudyan OBC left 400 400 No Owned Joint 8 4 4
Readymade
Garments
89 Bus stand link road
Chhotha puliya
Santi Haritwal
Gordhan GEN left 300 300 No Owned Nuclear
4 2 2 FHH
Tea Stall
90 Bus stand link road
Chhotha puliya
Aadesh Sharma
Chandra Prakash
GEN left 300 300 No Owned Nuclear
5 3 2 BPL
Snacks
91 Bus stand link road
Chhotha puliya
Dasrath Gola
Kishtura Ram
GEN left 300 300 No Owned Nuclear
4 2 2 BPL
Barber
92 Bus stand link road
Chhotha puliya
Bajrang Lal
Bega Ram OBC left 350 350 No Owned Nuclear
6 2 4 Tea Stall
93 Bus stand
ke pas Chhotha
puliya Vikash
Mahrshi Lal Chand OBC left 300 300 No Owned
Nuclear
6 3 3 Tea Stall
94 Bus stand
ke pas Chhotha
puliya
Renwat Prajapa
t
Laxman Ram
OBC left 250 250 No Owned Joint 8 5 3
Readymade
Garments
95 Bus stand link road
Chhotha puliya
Ajay Lal Chand OBC left 400 400 No Owned Nuclear
6 3 3 BPL
Tea Stall
96 Bus stand link road
Chhotha puliya
Kailash Chandr
a Ram Avtar GEN left 300 300 No Owned
Nuclear
5 1 4 Tea Stall
97 Bus stand link road
Chhotha puliya
Rajendra Luhar
Babu Lal SC left 300 300 No Owned Nuclear
3 2 1 SC Juice/i
ce cream
98 Bus stand link road
Chhotha puliya
Manak Mali
Hanuman OBC left 250 250 No Owned Nuclear
5 3 2 Snacks
99 Bus stand link road
Chhotha puliya
Pramod Prajapa
t
Bhanwar Lal
OBC Right 250 250 No Owned Nuclear
5 3 2 BPL
Fancy store
212 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
100 Bus stand link road
Chhotha puliya
Dhanraj Prajapa
t Bhima Ram OBC Right 300 300 No Owned
Nuclear
6 2 4
Readymade
Garments
101 Bus stand link road
Chhotha puliya
Ramvtar
Sharma Suraj Mal GEN left 200 225 No Owned
Nuclear
6 4 2 Fancy store
102 Bus stand link road
Chhotha puliya
Mohamad
Ayub Abdul Majid GEN left 350 350 No Owned
Nuclear
7 4 3 BPL
Repairing
shop
103 Bus stand link road
Chhotha puliya
Abdul Lafur
Ladu Khan GEN Right 400 400 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
104 Bus stand link road
Chhotha puliya
Kasham Ali
Mohammad Baksh
GEN Right 300 300 No Owned Joint 13 9 4 BPL
Fancy store
105 Bus stand link road
Chhotha puliya
Rakesh Saini
Chandra Gupt
OBC left 400 400 No Owned Nuclear
5 3 2 Hotel/Dhaba
106 Bus stand link road
Chhotha puliya
Imran Aayub GEN left 400 400 No Owned Joint 9 5 4 BPL
Kirana shop
107 Bus stand link road
Chhotha puliya
Mohammad Rafik
Ramjaan GEN Right 250 250 No Owned Nuclear
4 2 2 Fancy store
108 Bus stand link road
Chhotha puliya
Kana Ram Jat
Uma Ram Jat
OBC Right 300 300 No Owned Nuclear
5 2 3 Tea Stall
109 Bus stand link road
Chhotha puliya
Madan Singh
Amar Singh GEN Right 300 300 No Owned Nuclear
2 1 1 Snacks
110 Bus stand link road
Chhotha puliya
Hira Lal Sita Lal OBC Right 250 250 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
213 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
111 Bus stand link road
Chhotha puliya
Madan Swami
Tiku Ram OBC Right 400 400 No Owned Joint 12 6 6 Tea Stall
112 Bus stand link road
Chhotha puliya
Sivsankar Mali
Om Prakash
OBC left 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
113 Bus stand link road
Chhotha puliya
Kalu Ram Mali
Shayam Lal OBC left 300 300 No Owned Nuclear
4 1 3 Tea Stall
114 Bus stand link road
Chhotha puliya
Anil Gadvan
iya
Badal Singh
SC left 250 250 No Owned Joint 9 3 6 SC Flower
s
115 Bus stand
ke pas Ashok stambh
Shankar Lal
Ram Chandra
GEN left 250 250 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
116 Rajput
chatwala ke paas
Ashok stambh
Pappu Ram
Sanshi
Bhanvari Lal
SC left 400 400 No Owned Nuclear
6 4 2 SC Cobble
r
117 Bus stend
ke pas Ashok stambh
Gopi Banjara
Fika Ram SC left 300 300 No Owned Joint 9 4 5 SC
Fruit and
vegetable
vendor
118 Police choki
ke pas Ashok stambh
Sita Devi
Bhenru Ram
OBC left 200 225 No Owned Joint 9 7 2 FHH
Fruit and
vegetable
vendor
119 Bus stand
ke pas Ashok stambh
Abdul Nasir
Nijamuddin GEN left 250 250 No Owned Nuclear
6 3 3 BPL
Fruit and
vegetable
214 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
vendor
120 Bus stand
ke pas Ashok stambh
Imran Altab GEN left 250 250 No Owned Nuclear
6 4 2 BPL
Fruit and
vegetable
vendor
121 Bus stand
ke pas Ashok stambh
Rakesh Lilghar OBC Right 300 300 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
122 Bus stand
ke pas Ashok stambh
Subhas Chandr
a
Dungr Mal Saini
OBC Right 300 300 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
123 Bus stand
ke pas Ashok stambh
Rafid Khedin GEN left 300 300 No Owned Joint 11 6 5 BPL
Fruit and
vegetable
vendor
124 Bus stand
ke pas Ashok stambh
Manish Gahlot
Mangal Chand
OBC left 250 250 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
125 Police choki
ke pas Ashok stambh
Jafar Gori
Pir Baksh GEN Right 400 400 No Owned Joint 15 6 9
Fruit and
vegetable
vendor
126 Sabji mandi Ashok stambh
Murari Swami
Bajrang Lal OBC Right 300 300 No Owned Nuclear
6 4 2 Fruit and
vegeta
215 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
ble vendor
127 Police choki ke pichhe
Ashok stambh
Dungrmal Mali
Surja Ram OBC left 300 300 No Owned Joint 10 7 3
Fruit and
vegetable
vendor
128 Police choki ke pichhe
Ashok stambh
Nathu Khan
Ashraf Khan
GEN left 250 250 No Owned Nuclear
7 3 4
Fruit and
vegetable
vendor
129 Police choki ke pichhe
Ashok stambh
Sushil Kama
Manoj Kumar
OBC Right 250 250 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
130 Police choki ke pichhe
Ashok stambh
Ser Moham
ad
Mohammad Satim
GEN Right 300 300 No Owned Joint 8 4 4
Fruit and
vegetable
vendor
131 Police choki ke pichhe
Ashok stambh
Mahaveer
Singh Narayan GEN Right 300 300 No Owned
Nuclear
7 3 4 BPL
Fruit and
vegetable
vendor
132 Police choki ke pichhe
Ashok stambh
Kishan Lal
Sharma
Ram Chandra
GEN Right 300 300 No Owned Nuclear
7 3 4 BPL
Fruit and
vegetable
vendor
133 Police choki ke pichhe
Ashok stambh
Suresh Mali
Bhanvar Lal
OBC Right 300 300 No Owned Nuclear
7 4 3 Fruit and
vegeta
216 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
ble vendor
134 Police choki ke pichhe
Ashok stambh
Suresh Baniya
Brij Mohan GEN left 300 300 No Owned Nuclear
4 2 2 BPL
Fruit and
vegetable
vendor
135 ICICI Bank
ke pas Ashok stambh
Ikramuddin
Gulab Nasbu
GEN left 350 350 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
136 ICICI Bank
ke pas Ashok stambh
Tugna Ram
Pema Ram Jat
OBC left 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
137 Police choki ke pichhe
Ashok stambh
Sanjay Murark
a Dungar Mal OBC left 300 300 No Owned Joint 10 6 4
Fruit and
vegetable
vendor
138 Prajapati
bhawan ke pichhe
Ashok stambh
Sohanlal
Swami Syam Lal OBC left 300 300 No Owned Joint 10 6 4
Fruit and
vegetable
vendor
139 Bus stand
ke pas Ashok stambh
Lachha Banjara
Vanshi SC left 350 350 No Owned Nuclear
5 4 1 SC
Fruit and
vegetable
vendor
140 Ghantaghar
ke pas Ashok stambh
Ghansyam
Prahlad Swami
OBC left 300 300 No Owned Joint 10 8 2 Hotel/Dhaba
217 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
141 Ghantaghar
ke pas Ganesh mandir
Ashlam Lilghar
Usman Gani
GEN left 300 300 No Owned Joint 11 7 4 BPL
Snacks
142 Ghantaghar
ke pas Ganesh mandir
Abdul Rajak
Ahmad Baksh
GEN left 250 250 No Owned Nuclear
5 3 2 Fancy store
143 Ghantaghar
ke pas Ganesh mandir
Anvar Sekh
Shokat Sekh
GEN Right 350 350 No Owned Nuclear
7 2 5
Fruit and
vegetable
vendor
144 Ghantaghar
ke pas Ganesh mandir
Ramsvarup Saini
Indra Chand
OBC Right 300 300 No Owned Nuclear
6 5 1
Readymade
Garments
145 Ghantaghar
ke pas Ganesh mandir
Sankarlal
Bavari Chunni Lal SC left 400 400 No Owned
Nuclear
5 2 3 SC
Fruit and
vegetable
vendor
146 Ghantaghar
ke pas Ganesh mandir
Altaf Lildhar
Roshan GEN left 200 225 No Owned Joint 10 6 4 BPL
Fruit and
vegetable
vendor
147 Ghantaghar
ke pas Ganesh mandir
Vinod Sharma
Ramesvar Lal
GEN Right 250 250 No Owned Nuclear
6 5 1
Fruit and
vegetable
vendor
148 Ghantaghar
ke pas Ganesh mandir
Syamsundar Mani
Pema Ram OBC Right 300 300 No Owned Joint 15 7 8
Readymade
Garments
218 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
149
Chandra mama
jewelary ke pas
Ganesh mandir
Lalchand Mali
Pema Ram OBC left 300 300 No Owned Nuclear
5 4 1 Footwe
ar
150
Chandra mama
jewelary ke pas
Ganesh mandir
Roshan Lilghar
Mohammad Bnarash
GEN left 250 250 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
151 Ganesh
mandir ke pas
Ganesh mandir
Samir Jailani Seekh
GEN Right 250 250 No Owned Nuclear
4 2 2 Footwe
ar
152
Chandra mama
jewelary ke pas
Ganesh mandir
Jamil Lal
Mohammad GEN Right 250 250 No Owned
Nuclear
4 2 2
Fruit and
vegetable
vendor
153 Ganuman
pustakalyya ke pas
Ganesh mandir
Kanvar Ali
Fakruddin GEN Right 250 250 No Owned Joint 11 6 5
Readymade
Garments
154 Ganuman
pustakalyya ke pas
Ganesh mandir
Mohammad Ishak
Ramjan GEN Right 300 300 No Owned Nuclear
6 3 3 BPL
Fancy store
155 Ganuman
pustakalyya ke pas
Ganesh mandir
Imran Muslim GEN Right 200 225 No Owned Nuclear
7 1 6 Fancy store
156 Ganesh
mandir ke pas
Ganesh mandir
Aarif Sadeek GEN left 300 300 No Owned Joint 13 4 9
Fruit and
vegetable
vendor
219 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
157 Chotiya
restaurent ke pas
Ganesh mandir
Iliyash Mohammad
Barid GEN left 400 400 No Owned
Nuclear
5 3 2 Fancy store
158 Chotiya
restaurent ke pas
Ganesh mandir
Mohammad
Sakeen Sikandar GEN left 400 400 No Owned
Nuclear
7 1 6 Fancy store
159 Chotiya
restaurent ke pas
Ganesh mandir
Habib Babulal Rinne
OBC left 300 300 No Owned Nuclear
7 4 3
Fruit and
vegetable
vendor
160 Chohan e-
mitra ke pas Ganesh mandir
Idrish Bisayti
Nashari OBC left 400 400 No Owned Nuclear
4 2 2 Fancy store
161 Chohan e-
mitra ke pas Ganesh mandir
Budhnath
Bhanvar Nath
OBC left 400 400 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
162 Chohan e-
mitra ke pas Ganesh mandir
Keshari Nath
Bhanvar Nath
OBC left 300 300 No Owned Nuclear
7 2 5
Readymade
Garments
163 Ratangarh jewalry ke
pas
Ganesh mandir
Ramjan Bisayati
Abash GEN left 300 300 No Owned Nuclear
4 1 3 Fancy store
164 Ganesh
mandir ke pas
Ganesh mandir
Devendra
Khabad Dash
OBC left 300 300 No Owned Nuclear
5 1 4
Fruit and
vegetable
vendor
165 Ratangarh jewalry ke
pas
Ganesh mandir
Rasheed
Munshi GEN Right 250 250 No Owned Nuclear
4 2 2 Fancy store
220 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
166 Ganesh
mandir ke pichhe
Ganesh mandir
Sanker Singh
Bhenru Singh
OBC Right 300 300 No Owned Nuclear
7 3 4
Fruit and
vegetable
vendor
167 Ganesh
mandir ke pichhe
Ganesh mandir
Salim Solanki
Mohammad Husain
GEN left 300 300 No Owned Nuclear
6 2 4
Fruit and
vegetable
vendor
168 Ganesh
mandir ke pichhe
Ganesh mandir
Punma Chand Saini
Keshar Dev OBC left 250 250 No Owned Nuclear
6 5 1
Fruit and
vegetable
vendor
169 Ganesh
mandir ke pichhe
Ganesh mandir
Hanuman mali
Sanvar Mal OBC Right 200 225 No Owned Nuclear
5 2 3
Fruit and
vegetable
vendor
170 Ganesh
mandir ke pichhe
Ganesh mandir
Rafik Lal
Mohamad OBC Right 350 350 No Owned
Nuclear
4 3 1
Fruit and
vegetable
vendor
171 Bajoriya
School ke samne
Ganesh mandir
Ganesh Prajapa
t
Shiv Prashad
OBC left 300 300 No Owned Nuclear
4 2 2 Pan/Cigarette
172 Powar
house Road Ramchandra
park Jairam Swami
Girdhari Lal OBC left 250 250 No Owned Nuclear
6 3 3 Pan/Cigarette
173 Garh
choraha ke pas
Ramchandra park
Dinesh Meghw
al Durga Ram SC Right 300 300 No Owned
Nuclear
4 2 2 SC
Fruit and
vegetable
vendor
221 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
174 Garh
choraha ke pas
Ramchandra park
Dindayal
Swami Deva Ram OBC Right 300 300 No Owned
Nuclear
6 4 2
Fruit and
vegetable
vendor
175 Garh
choraha ke pas
Ramchandra park
Jafar Sadeek
Mohammad GEN Right 300 300 No Owned
Nuclear
7 3 4
Fruit and
vegetable
vendor
176 Garh
choraha ke pas
Ramchandra park
Kailash Indra
Chand GEN Right 250 250 No Owned Joint 8 4 4
Fruit and
vegetable
vendor
177
Hanuman balika
school ke pas
Ramchandra park
Ganesh Saini
Duli Chand GEN Right 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
178 Garh
choraha ke pas
Ramchandra park
Dindayal
Rajbohra
Ramesvar Lal
GEN left 450 450 No Owned Joint 11 6 5
Fruit and
vegetable
vendor
179
Hanuman balika
school ke pas
Ramchandra park
Sateesh Saini
Mangal Chand
OBC left 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
180 Laxminath Mandir ke
samne
Ramchandra park
Ramjan Ali
Ismile GEN left 400 400 No Owned Nuclear
7 3 4 Fancy store
222 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
181 Laxminath Mandir ke
samne
Ramchandra park
Nathu Ram Mali
Ladu Ram OBC left 400 400 No Owned Nuclear
7 4 3 Snacks
182 Laxminath Mandir ke
pas
Ramchandra park
Ramkumar Saini
Lala Ram Saini
OBC left 350 350 No Owned Joint 8 5 3
Fruit and
vegetable
vendor
183 Ajitsariya
Bhawan ke pas
Ramchandra park
Bijuram Meghw
al Sita Ram SC left 300 300 No Owned Joint 11 6 5 SC
Fancy store
184 Ajitsariya
Bhawan ke pas
Ramchandra park
Kamal Agrawal
Nand Kishor
GEN left 400 400 No Owned Nuclear
5 3 2 BPL
Kirana shop
185 Ramchandra Park ke pas
Ramchandra park
Ram Chandr Redar
Nanu Ram SC left 350 350 No Owned Nuclear
3 2 1 SC
Fruit and
vegetable
vendor
186 Ramchandra Park ke pas
Ramchandra park
Muslim Yasheen GEN left 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
187 Ramchandra Park ke pas
Ramchandra park
Vinod Sharma
Banvari Lal GEN left 400 400 No Owned Nuclear
5 3 2 Kirana shop
188 Vyayam Shala
Ramchandra park
Todaram Jat
Bega Ram OBC left 350 350 No Owned Nuclear
4 1 3 Tea Stall
189 Vyayam Shala
Ramchandra park
Punma Chand Mali
Maveer Prashad
OBC Right 300 300 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
190 Vyayam Ramchandra Vikram Mohan GEN Right 300 300 No Owned Nucl 4 2 2 Tea
223 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
Shala park Rajpurohit
Singh ear Stall
191 IPS Acedmi Ramchandra
park
Lunaram
Khatik
Keshra Ram
SC Right 300 300 No Owned Nuclear
4 2 2 SC Tea Stall
192 Ramchandra Park ke pas
Ramchandra park
Ashok Sindiya
Thakur Dash
SC Right 300 300 No Owned Joint 10 7 3 SC
Fruit and
vegetable
vendor
193 Ramchandra Park ke pas
Ramchandra park
Gordhan
Prajapat
Mohan Ram
OBC Right 400 400 No Owned Joint 8 3 5 Potter
194 Sdavart
Dhrmada Socity
Ramchandra park
Babulal Lilghar
Sumanddin GEN Right 300 300 No Owned Joint 10 3 7
Fruit and
vegetable
vendor
195 India post
pyment bank Ramchandra
park Shokat
Ali Alimuddin GEN Right 300 300 No Owned
Nuclear
5 2 3 Fancy store
196 India post
pyment bank Ramchandra
park
Pawan Raj
Bohara Hira Lal GEN Right 400 400 No Owned
Nuclear
6 3 3
Fruit and
vegetable
vendor
197 Mehndipur
balaji Chungi naka
Pawan Mehata
r Ram Lal SC left 300 300 No Owned
Nuclear
4 2 2 SC Footwe
ar
198 Mehndipur
balaji Chungi naka
Sukhdev
Meghwal
Mangla Ram
SC left 300 300 No Owned Nuclear
4 3 1 SC
Fruit and
vegetable
vendor
224 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
199 Mehndipur
balaji Chungi naka
Papulal Bharga
v
Hanuman Prasad
OBC Right 400 400 No Owned Nuclear
6 4 2
Fruit and
vegetable
vendor
200 Mehndipur
balaji Chungi naka
Om Prakas
h Prajapa
ti
Indra Chand
OBC Right 300 300 No Owned Nuclear
6 4 2
Fruit and
vegetable
vendor
201 Dhanuka
Dharmshala Chungi naka
Ser Khan
Kasham Ali GEN left 400 400 No Owned Nuclear
7 5 2
Fruit and
vegetable
vendor
202 Dhanuka
Dharmshala Chungi naka
Rahul Saini
Banvari Lal OBC left 300 300 No Owned Joint 8 4 4 Snacks
203 Dhanuka
Dharmshala Chungi naka
Sankarlal Mali
Biruram Mali
OBC Right 400 400 No Owned Nuclear
7 4 3 Snacks
204 Dhanuka
Dharmshala Chungi naka
Dharmendra
Prahlad OBC left 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
205 Dhanuka
Dharmshala Chungi naka
Bablu Mali
Jhargadi OBC Right 300 300 No Owned Nuclear
4 2 2 Snacks
206 Ghantaghar
ke pas Chungi naka
Manalal Mali
Chothu Ram
OBC Right 350 350 No Owned Nuclear
7 4 3
Fruit and
vegetable
vendor
207 Dhanuka
Dharmshala Chungi naka
Sanjay Sharma
Dwarka Prasad
GEN Right 400 400 No Owned Nuclear
6 3 3 Snacks
225 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
208 Dhanuka
Dharmshala Chungi naka
Narayan
Prashad
Som Dutt OBC left 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
209 Surya
Cinema ke pas
Chungi naka Aaskar
an Dharad
Hari Nandan
GEN left 400 400 No Owned Nuclear
5 3 2 Dishes
h
210 Surya
Cinema ke pas
Chungi naka Dinesh Kama
Narayan Prashad
GEN left 300 300 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
211 Surya
Cinema ke pas
Chungi naka Sanvar
mal Mali
Nathu Ram OBC left 300 300 No Owned Joint 8 4 4
Fruit and
vegetable
vendor
212 Surya
Cinema ke pas
Chungi naka Maniram Mali
Som Dutt OBC left 200 225 No Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
213 Surya
Cinema ke pas
Chungi naka Kalu
Bhargav
Hadmaan OBC left 450 450 No Owned Nuclear
5 2 3 Snacks
214 Chungi
choki ke pas Chungi naka
Shiv Panvar
Mahaveer Prasad
GEN left 400 400 No Owned Nuclear
7 3 4 Tea Stall
215 Chungi
choki ke pas Chungi naka
Jamil Baksh
Nabbi Baksh
GEN left 300 300 No Owned Joint 10 6 4
Fruit and
vegetable
vendor
226 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
216 Chungi
choki ke pas Chungi naka Shahid Riyakat GEN left 450 450 No Owned
Nuclear
5 3 2 Snacks
217 Chungi
choki ke pas Chungi naka
Bhagirath Mal
Sharma
Indra Chand
GEN left 300 300 No Owned Nuclear
3 1 2
Fruit and
vegetable
vendor
218 Chungi
choki ke pas Chungi naka
Babu Lal
Prajapat
Kulda Ram OBC left 300 300 No Owned Nuclear
6 3 3 Snacks
219 Chungi
choki ke pas Chungi naka
Sitaram Prajapa
t
Lichhma Ram
OBC Right 200 225 No Owned Nuclear
2 1 1
Fruit and
vegetable
vendor
220 Chungi
choki ke pas Chungi naka
Sanvar Mal
Swami
Indra Chand
OBC Right 300 300 No Owned Nuclear
5 3 2 Snacks
221 Chungi
choki ke pas Chungi naka
Roshan Ali
Suleman GEN left 400 400 No Owned Nuclear
5 4 1 Snacks
222 Chungi
choki ke pas Chungi naka Imran
Khushi Mohammad
GEN left 400 400 No Owned Nuclear
3 2 1 Fancy store
223 Satynarayan
mandir ke pas
Power house road
Mangi Lal
Prajapat
Kishan Ram
OBC Right 300 300 No Owned Joint 8 3 5
Fruit and
vegetable
vendor
224 Satynarayan
mandir ke pas
Power house road
Salim Sadeek GEN Right 300 300 No Owned Joint 10 3 7
Fruit and
vegetable
vendor
227 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
225 Satynarayan
mandir ke pas
Power house road
Bhagirath Saini
Shiv Bhagwan
OBC left 300 300 No Owned Nuclear
3 1 2
Fruit and
vegetable
vendor
226 Satynarayan
mandir ke pas
Power house road
Vishnu Mali
Mohan Lal OBC left 300 300 No Owned Nuclear
6 2 4
Fruit and
vegetable
vendor
227 Satynarayan
mandir ke pas
Power house road
Sivam Mali
Jashkaran OBC Right 400 400 No Owned Joint 12 6 6
Fruit and
vegetable
vendor
228 JB Market Power
house road
Karni Ram Mali
Sobha Ram OBC Right 300 300 No Owned Joint 8 3 5
Fruit and
vegetable
vendor
229 JB Market Power
house road Prahlad
Mali Chimna
Ram OBC Right 400 400 No Owned Joint 8 3 5
Fruit and
vegetable
vendor
230 JB Market Power
house road
Babu Lal
Saini
Sita Ram Saini
OBC Right 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
231 JB Market Power
house road Gita Devi
Sita Ram Saini
OBC Right 300 300 No Owned Nuclear
2 1 1 FHH
Fruit and
vegetable
vendor
228 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
232 JB Market Power
house road Shabee
r Aamil GEN left 350 350 No Owned
Nuclear
5 2 3
Fruit and
vegetable
vendor
233 JB Market Power
house road Babu Lal
Chimna Ram
OBC left 300 300 No Owned Nuclear
6 2 4
Fruit and
vegetable
vendor
234 JB Market Power
house road
Hari Ram
Chouhan
Gordhan SC left 400 400 No Owned Nuclear
3 1 2 SC
Fruit and
vegetable
vendor
235 JB Market Power
house road Mangtu
Rine Imamuddin GEN left 300 300 No Owned Joint 11 5 6
Fruit and
vegetable
vendor
236 Ramdev
mandir, sabji mandi
Power house road
Mangi Lal
Kamad
Ram Chandra
SC left 400 400 No Owned Joint 8 4 4 SC Repairi
ng shop
237 Bank of
India ke pas Power
house road
Pramesvar
Bhojak
Kanahiya Lal
GEN left 300 300 No Owned Nuclear
4 3 1 Tea Stall
238 Bank of
India ke pas Power
house road
Prakash
Bhojak Panna Lal GEN left 300 300 No Owned Joint 8 6 2
Tea Stall
239 Bank of
India ke pas Power
house road Ashpat Bano
Sataar OBC left 450 450 No Owned Joint 13 7 6 FHH
Fruit and
vegetable
vendor
229 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
240 Nagar palika
ke pas Jail ke pas
Kaliu Mangal
hara Bhola Ram GEN left 400 400 No Owned
Nuclear
5 3 2 Snacks
241 Nagar palika
ke pas Jail ke pas
Vijay Bharga
v Piru Lal OBC Right 400 400 No Owned
Nuclear
2 1 1 Pan/Cigarette
242 Nagar palika
ke pas Jail ke pas
Subhash Mali
Bhanva Lal OBC Right 450 450 No Owned Nuclear
4 2 2 Snacks
243 Nagar palika
ke pas Jail ke pas
Sokeen Lilghar
Gani Mohammad
GEN left 400 400 No Owned Nuclear
4 2 2 Snacks
244 Nagar palika
ke pas Jail ke pas
Jitendra Bharga
v
Bhanvar Lal
GEN left 300 300 No Owned Nuclear
5 2 3 Fancy store
245 Nagar palika
ke pas Jail ke pas
Babu Lal
Lilghar
Lal Mohammad
GEN Right 200 225 No Owned Joint 9 2 7 Snacks
246 Prajapati Bhawan
Jail ke pas Om
Prakash
Mohan Lal OBC Right 400 400 No Owned Nuclear
6 4 2
Fruit and
vegetable
vendor
247 Prajapati Bhawan
Jail ke pas Pawan Sharma
Dvarka Prashad
GEN left 400 400 No Owned Nuclear
4 3 1
Fruit and
vegetable
vendor
248 poliya,
Luharo ki gali
Jail ke pas Sunil Saini
Bhanvar Lal
OBC left 300 300 No Owned Nuclear
6 4 2
Fruit and
vegetable
vendor
249 Puliya,
Luharo ki gali
Jail ke pas Kanha Ram
Solnki
Bhanwar Lal
OBC Right 300 300 No Owned Joint 8 5 3
Fruit and
vegetable
230 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
vendor
250 Puliya,
Luharo ki gali
Jail ke pas Jagdish Solanki
Dungar Mal OBC Right 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
251 Puliya,
Luharo ki gali
Jail ke pas Laxmi
Narayan Mali
Keshra Ram
OBC Right 300 300 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
252 Puliya,
Luharo ki gali
Jail ke pas Ganesh Solanki
Jagdish Prasad
OBC Right 300 300 No Owned Nuclear
5 3 2 Flower
s
253 Puliya,
Luharo ki gali
Jail ke pas Pramesvar Lal
Bajrang Lal Mali
OBC Right 400 400 No Owned Nuclear
5 2 3
Readymade
Garments
254 Puliya,
Luharo ki gali
Jail ke pas Arjun
Lal Mali Bajrang Lal OBC left 400 400 No Owned
Nuclear
4 2 2
Readymade
Garments
255 Puliya,
Luharo ki gali
Jail ke pas Hari Ram
Harijan Ghish Raj SC left 400 400 No Owned Joint 9 5 4 SC
Pan/Cigarette
256 Nagar palika
ke pas Jail ke pas
Dinesh Shrama
Jagdish Prasad
GEN left 300 300 No Owned Nuclear
4 2 2 Tea Stall
257 Nagar palika
ke pas Jail ke pas
Jagu Luhar
Mohan Luhar
SC left 400 400 No Owned Nuclear
5 2 3 SC Snacks
258 Nagar palika
ke pas Jail ke pas
Nanu Prajapa
t
Govind Ram
OBC left 300 300 No Owned Nuclear
4 2 2 Snacks
231 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
259 Nagar palika
ke pas Jail ke pas
Chhagan Lal
Shyam Lal OBC left 200 225 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
260 Nagar palika
ke pas Jail ke pas
Kishan Lal
Swami Jashraj OBC left 350 350 No Owned
Nuclear
6 4 2 Tea Stall
261 Nagar palika
ke pas Jail ke pas
Mahendra
Singh Chiranjiv GEN left 400 400 No Owned
Nuclear
6 2 4 Tea Stall
262 Ganga ram
Hospital Road
Jail ke pas Rakesh Sharma
Sankar Lal GEN left 400 400 No Owned Nuclear
4 2 2 Tea Stall
263 Ganga ram
Hospital Road
Jail ke pas Bajrang Lal Nai
Budha Ram OBC Right 300 300 No Owned Nuclear
2 1 1 Pan/Cigarette
264 Bus stend link road
Chhotha puliya
Krishan Nayak
Pappu Ram SC Right 400 400 No Owned Nuclear
4 2 2 SC Flower
s
265 Ghantaghar
ke pas Ashok stambh
Kanhaiya Lal
Nayak Sugna Ram SC left 300 300 No Owned
Nuclear
6 3 3 SC Flower
s
266 PNB Bank
ke pas Ashok stambh
Ashagar
Sateek GEN left 200 225 No Owned Nuclear
6 3 3
Fruit and
vegetable
vendor
267 Raghunath
school station road
Ashok stambh
Banti Mali
Hariram Mali
OBC Right 300 300 No Owned Nuclear
4 4 0 Snacks
268 Raghunath
school station road
Staion road Satyanarayan
Nai Ravat Mal OBC Right 400 400 No Owned
Nuclear
6 2 4 Barber
232 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
269 Raghunath
school station road
Staion road Naraya
n Agrawal
Badha Ram OBC left 400 400 No Owned Nuclear
6 1 5
Readymade
Garments
270 Bus stend
ke pas Staion road
Saroj Kanwar
Jaman Singh
GEN left 300 300 No Owned Nuclear
7 2 5 FHH
Fruit and
vegetable
vendor
271 Ramchandra Park ke pas
Bus stand Mahavir Prasad Saini
Durgadat Mali
OBC Right 400 400 No Owned Nuclear
5 3 2
Fruit and
vegetable
vendor
272 Jail ke pas Ramchandra
park
Bhanwar Lal
Swami
Shankar Lal Swami
OBC Right 300 300 No Owned Joint 12 7 5 Juice/i
ce cream
273 Bus stand
ke pas Jail ke pas
Babu Lal
Shankar Lal Swami
OBC Right 200 225 No Owned Joint 12 7 5 Juice/i
ce cream
274 Jadiya devi kuye ke pas
Bus stand
Rajkumar
Kashyap
Munna Lal OBC Right 500 500 No Owned Joint 8 4 4 Snacks
275 Ramchandra Park ke pas
Ramchandra park
Vinod Mali
Narayyan Prasad
OBC Right 400 400 No Owned Nuclear
5 2 3 Snacks
276 Agrasen
bhawan ke pas
Ramchandra park
Rajkumar Mali
Sanwar Mal Mali
OBC left 400 400 No Owned Joint 8 4 4 Snacks
277 Agrasen
bhawan ke pas
Ashok stambh
Raj Kumar Mali
Hari Ram Mali
OBC left 500 500 No Owned Nuclear
5 3 2 Snacks
278 Agrasen
bhawan ke Ashok stambh
Nanu Ram
Daulat Ram Jat
OBC left 400 400 No Owned Joint 8 2 6 Snacks
233 | P a g e
S.N
o.
Sta
rt
Po
int
En
d
Po
int
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/ F
ath
er
Cast
Pla
ce o
f A
P L
eft
/ R
igh
t D
aily
Inco
me
in R
s.
Daily
inco
me
as p
er
min
mu
m
Tit
le
Ho
lder
Str
uctu
re
Ow
ned
o
r R
en
ted
Typ
e o
f fa
mily
(N/J
) N
o. o
f fa
mily
mem
bers
Male
M
em
be
rs
Fem
ale
M
em
be
rs
Vu
lnera
ble
Bu
sin
es
s
pas
279 Ashok stambh
Ashok stambh
Santosh
Swami
Tirlok Chand
OBC left 300 300 No Owned Nuclear
4 2 2 Snacks
280 Ashok stambh
Ghantaghar Rakesh Megha
wal Unkar Ram SC left 200 225 No Owned
Nuclear
7 4 3 SC Juice/i
ce cream
281 Ashok stambh
Ghantaghar Pawan Sihal
Ram Chandra
Sihal GEN left 400 400 No Owned Joint 10 6 4 Snacks
282 Ashok stambh
Ghantaghar Bajarag Singh
Lal Singh GEN left 400 400 No Owned Joint 8 2 6 Juice/i
ce cream
283 India public
school ke samne
Ghantaghar
Satya Naraya
n Prajapa
t
Subhash Prajapat
OBC left 250 250 No Owned Nuclear
5 2 3 Pan/Cigarette
284 Bus stand link road
Link road Yogesh Kumar
Jugal Kishor
OBC Right 250 250 No Owned Nuclear
3 2 1 Fancy store
285 Raghunath
school station road
Ashok stambh
Mustak Ishak GEN left 300 300 no Owned Nuclear
5 3 2 Snacks
286 Bus stand
ke pas Ghantaghar
Bhagavat
Prasad Dev Prasad OBC left 350 350 no Owned
Nuclear
4 1 3 BPL
Fruit and
vegetable
vendor
287 Ren basera
ke pas Ashok stambh
Ram Swaroo
p Agrawal
Baldev GEN left 300 300 no Owned Nuclear
4 2 2
Fruit and
vegetable
vendor
Source: Socio-economic survey,Jan 2021
234 | P a g e
E. Laxmangarh
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
1 Murali Manohar Mandir
Chopat Bazar
Girdhari kachwal
Mahavir parsad
OBC Left 300 300 NO owned Nuclear 5 2 3 BPL
Snacks
2 Murali Manohar Mandir
Chopat Bazar
Islamudeen
Jabar OBC Left 350 350 NO owned Nuclear 5 1 4 Snacks
3 Murali Manohar Mandir
Chopat Bazar
Mubarik Iqbal SC Left 300 300 NO owned Nuclear 4 3 1 SC Fruit and Vegetable
4 Murali Manohar Mandir
Chopat Bazar
Ayub Abdul Rehman
SC Left 400 400 NO owned Nuclear 5 3 2 SC Fruit and Vegetable
5 Murali Manohar Mandir
Chopat Bazar
Saddim Rangrag
e
Jabar SC Left 350 350 NO owned Joint 11 6 5 SC Fruit and Vegetable
6 Murali Manohar Mandir
Chopat Bazar
Sajid Anwar OBC Right 300 300 NO owned Joint 14 11 3 Fruit and Vegetable
7 Murali Manohar Mandir
Chopat Bazar
Shabir Iqbal OBC Right 400 400 NO owned Nuclear 5 3 2 Fruit and Vegetable
8 Murali Manohar Mandir
Chopat Bazar
Santram Kushwah
a
Ramcharan
OBC Right 450 450 NO owned Joint 10 4 6 Snacks
9 Dhawaniyo ka
Mandir
Chopat Bazar
Vishnu choudhar
y
Nathmal choudha
ry
OBC Right 350 350 NO owned Nuclear 2 2 0 Kirana Shop
10 Murali Manohar Mandir
Chopat Bazar
Adil Jabar GEN Left 300 300 NO owned Nuclear 5 2 3 Kirana Shop
235 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
11 Murali Manohar Mandir
Chopat Bazar
Prem Sitaram OBC Left 300 300 NO owned Nuclear 3 2 1 BPL
Snacks
12 Murali Manohar Mandir
Chopat Bazar
Girdhari Hiraram mali
OBC Right 400 400 NO owned Nuclear 4 2 2 Fruit and Vegetable
13 Murali Manohar Mandir
Chopat Bazar
Vikash Choturam singh
OBC Left 350 350 NO owned Nuclear 5 3 2 Snacks
14 Murali Manohar Mandir
Chopat Bazar
Rafiq Liyakat ali
OBC Right 350 350 NO owned Nuclear 4 2 2 Readymade
garments
15 Murali Manohar Mandir
Chopat Bazar
Ramniranjan saini
Dwarikadish
OBC Left 400 400 NO owned Joint 7 4 3 Snacks
16 Murali Manohar Mandir
Chopat Bazar
Shyam sunder
Pyarelal GEN Right 400 400 NO owned Nuclear 6 3 3 Fruit and Vegetable
17 Murali Manohar Mandir
Chopat Bazar
Mohmad modin
Moinuudeen
SC Left 300 300 NO owned Joint 7 4 3 SC Fancy Store
18 Murali Manohar Mandir
Chopat Bazar
Babulal Jiwanram
GEN Right 350 350 NO owned Nuclear 6 2 4 Snacks
19 Murali Manohar Mandir
Chopat Bazar
Nabzudeen
Fakrudeen
GEN Right 350 350 NO owned Nuclear 6 3 3 Fruit and Vegetable
20 Chopat Bazar
Ghantaghar
Babulal Dhansiram
OBC Left 300 300 NO owned Nuclear 4 3 1 Fruit and Vegetable
21 Chopat Bazar
Ghantaghar
Mohhmad
Mohammad
manjur
OBC Left 400 400 NO owned Nuclear 6 2 4 Snacks
236 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
22 Chopat Bazar
Ghantaghar
Sharwan saini
Ramavtar saini
GEN Left 400 400 NO owned Joint 11 3 8 Snacks
23 Chopat Bazar
Ghantaghar
Sandeep Rajkumar tailor
GEN Left 350 350 NO owned Nuclear 6 3 3 Fruit and Vegetable
24 Chopat Bazar
Ghantaghar
Ramjeet jadhaw
Dhankul jadhaw
OBC Right 350 350 NO owned Joint 11 8 3 BPL
Fruit and Vegetable
25 Chopat Bazar
Ghantaghar
Mohammad amir
Jakir OBC Right 300 300 NO owned Nuclear 9 5 4 Fruit and Vegetable
26 Chopat Bazar
Ghantaghar
Sandeep saini
Rukmanand saini
OBC Right 350 350 NO owned Nuclear 4 3 1 Fruit and Vegetable
27 Chopat Bazar
Ghantaghar
Rakesh Ramavtar saini
OBC Right 300 300 NO owned Joint 10 7 3 Fruit and Vegetable
28 Chopat Bazar
Ghantaghar
Javed Basir SC Right 400 400 NO owned Joint 11 3 8 SC Fruit and Vegetable
29 Chopat Bazar
Ghantaghar
Sunil saini
Bajranglal saini
GEN Left 400 400 NO owned Joint 10 7 3 Fruit and Vegetable
30 Chopat Bazar
Ghantaghar
Boyal chouhan
Harun chouhan
GEN Left 450 450 NO owned Nuclear 6 2 4 Fruit and Vegetable
31 Chopat Bazar
Ghantaghar
Manoharlal saini
Bhojuram saini
OBC Right 350 350 NO owned Nuclear 4 2 2 Fruit and Vegetable
32 Chopat Bazar
Ghantaghar
Saddam husain
Mohhmad
hussain
GEN Right 300 300 NO owned Joint 8 6 2 Fruit and Vegetable
33 Chopat Bazar
Ghantaghar
Nadim Deen mohhm
ad
OBC Right 350 350 NO owned Nuclear 4 3 1 Fruit and Vegetable
34 Chopat Bazar
Ghantaghar
Mohhmad munsi
Deen mohhm
ad
OBC Right 350 350 NO owned Nuclear 5 4 1 Fruit and Vegetable
35 Chopat Bazar
Ghantaghar
Ishaq Ismail OBC Left 300 300 NO owned Joint 17 7 10 Fruit and Vegetable
237 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
36 Chopat Bazar
Ghantaghar
Moohmad yakub
Mammudeen
OBC Right 400 400 NO owned Joint 17 9 8 Fruit and Vegetable
37 Chopat Bazar
Ghantaghar
Moohmad arif
Moohmad
Mammudeen
OBC Right 400 400 NO owned Joint 17 9 8 Fruit and Vegetable
38 Chopat Bazar
Ghantaghar
Mukesh Mahendra
kumar saini
OBC Right 300 300 NO owned Joint 7 3 4 Snacks
39 Chopat Bazar
Ghantaghar
Dinesh saini
Kanhiyalal saini
OBC Left 350 350 NO owned Joint 8 3 5 Snacks
40 Chopat Bazar
Ghantaghar
Moohmad Sajid
Moohmad
manjur
SC Left 350 350 NO owned Nuclear 5 2 3 SC Fruit and Vegetable
41 Chopat Bazar
Ghantaghar
Moohmad jafar
Taj Moohm
ad
OBC Left 300 300 NO owned Nuclear 6 3 3 Fruit and Vegetable
42 Chopat Bazar
Ghantaghar
Akhilesh tanwar
Rajendra tanwar
OBC Right 350 350 NO owned Joint 9 5 4 BPL
Fruit and Vegetable
43 Chopat Bazar
Ghantaghar
Sahil Iqbal OBC Right 350 350 NO owned Joint 11 6 5 Fruit and Vegetable
44 Chopat Bazar
Ghantaghar
Narendra mali
Vishwanath mali
OBC Right 350 350 NO owned Nuclear 6 3 3 BPL
Fruit and Vegetable
45 Chopat Bazar
Ghantaghar
Eliyash Razaq OBC Right 400 400 NO owned Nuclear 6 3 3 Fruit and Vegetable
46 Chopat Bazar
Ghantaghar
Babulala rangraze
Makan OBC Right 400 400 NO owned Joint 8 4 4 Fruit and Vegetable
47 Chopat Bazar
Ghantaghar
Iqbal Amir muslim
OBC Right 300 300 NO owned Joint 10 2 8 Fruit and Vegetable
238 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
48 Chopat Bazar
Ghantaghar
Rajiv kasayb
Chotelal GEN Right 350 350 NO owned Joint 7 2 5 BPL
Fruit and Vegetable
49 Chopat Bazar
Ghantaghar
Mohhmad ashib
Iqbaludden
OBC Right 300 300 NO owned Nuclear 5 2 3 Fruit and Vegetable
50 Ghantaghar ke Paas
Ghantaghar
Atharuman
Atharuman
OBC Right 350 350 NO owned Nuclear 5 2 3 Fruit and Vegetable
51 Axis Bank ke
Paas
Ghantaghar
Jahagir Ramzaan
OBC Right 400 400 NO owned Nuclear 6 4 2 Pan/Cigerette
52 Kabutariyo ke
Kuwe ke Paas
Ghantaghar
Shaylendra
kushwaha
Darshen kushwa
ha
GEN Right 450 450 NO owned Nuclear 4 2 2 BPL
Snacks
53 Ghantaghar ke Paas
Ghantaghar
Shyam sunder saini
Sukhdev
OBC Left 450 450 NO owned Nuclear 4 3 1 Snacks
54 Ghantaghar ke Paas
Ghantaghar
Shivam raikbar
Devanaath
singh
GEN Left 400 400 NO owned Nuclear 6 4 2 Snacks
55 Ghantaghar ke Paas
Ghantaghar
Mukesh kumar saini
Vijay kumar saini
OBC Left 300 300 NO owned Joint 9 7 2 Snacks
56 Axis Bank ke
Paas
Ghantaghar
Parkash Rajulal GEN Right 350 350 NO owned Nuclear 5 4 1 Snacks
57 Ghantaghar ke Paas
Ghantaghar
Kuldeep Satarram
OBC Right 350 350 NO owned Nuclear 5 3 2 Snacks
58 Ghantaghar ke Paas
Ghantaghar
Rihan choapdar
Salim chopdar
OBC Left 300 300 NO owned Joint 10 2 8 BPL
Fruit and Vegetable
239 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
59 Ghantaghar ke Paas
Ghantaghar
Arman ali Ali husan
SC Left 400 400 NO owned Joint 11 6 5 SC Snacks
60 Nyama Bazar
Todi College Road
Mohhmad Javed
Asam ali SC Right 400 400 NO owned Nuclear 2 1 1 SC Fruit and Vegetable
61 Nyama Bazar
Todi College Road
Javed Safi mohhm
ad
OBC Left 300 300 NO owned Joint 12 6 6 Fruit and Vegetable
62 Nyama Bazar
Todi College Road
Hukam singh
Pappu singh
GEN Right 350 350 NO owned Joint 11 7 4 Plastic Item
63 Nyama Bazar
Todi College Road
Tinku Pappu singh
GEN Right 350 350 NO owned Nuclear 5 3 2 Plastic Item
64 Nyama Bazar
Todi College Road
Saahrukh Nishar ahhmad
OBC Left 400 400 NO owned Joint 9 5 4 Fruit and Vegetable
65 Nyama Bazar
Todi College Road
Mohhmad ishfaq
Mohhmad yusuf
OBC Left 400 400 NO owned Nuclear 5 2 3 Fruit and Vegetable
66 Nyama Bazar
Todi College Road
Abbvas kazi
Bashir kazi
OBC Right 350 350 NO owned Nuclear 5 3 2 Fruit and Vegetable
67 Nyama Bazar
Todi College Road
Sikander Mangtudeen
SC Right 350 350 NO owned Joint 8 4 4 SC Fruit and Vegetable
68 Nyama Bazar
Todi College Road
Gulaab Abdul thekeda
ar
SC Left 300 300 NO owned Joint 9 6 3 SC Fruit and Vegetable
240 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
69 Nyama Bazar
Todi College Road
Nashir Mohhmad salim
SC Left 300 300 NO owned Joint 12 6 6 SC Fruit and Vegetable
70 Nyama Bazar
Todi College Road
Ramzaan rangreez
a
Hussain rangree
za
SC Left 400 400 NO owned Joint 7 4 3 SC Seasonal Snacks
71 Nyama Bazar
Todi College Road
Ali sher Ajay khan
OBC Right 450 450 NO owned Nuclear 5 3 2 Kirana Item
72 Nyama Bazar
Todi College Road
Nilu kshwaah
Uddal singh
GEN Left 450 450 NO owned Nuclear 3 2 1 Snacks
73 Nyama Bazar
Todi College Road
Aktaar lilgarh
Mohhmad
lilgarh
OBC Right 400 400 NO owned Joint 7 4 3 Seasonal Snacks
74 Nyama Bazar
Todi College Road
Manoj Chotelal Kashya
p
GEN Left 300 300 NO owned Nuclear 4 3 1 Kirana Item
75 Nyama Bazar
Todi College Road
Billala pathan
Mohhmad iqbal
OBC Left 350 350 NO owned Nuclear 5 3 2 Fancy Store
76 Nyama Bazar
Todi College Road
Mohhmad salim
Mohhmad
santaar
OBC Left 350 350 NO owned Nuclear 6 4 2 Fruit and Vegetable
77 Nyama Bazar
Todi College Road
Asif Mohhmad
Hussain
OBC Left 350 350 NO owned Nuclear 4 2 2 Fancy Store
78 Nyama Bazar
Todi College
Prabhudayal
Devlal GEN Right 300 300 NO owned Nuclear 4 3 1 Snacks
241 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
Road
79 Nyama Bazar
Todi College Road
Deepak kashwah
Uddal singh
GEN Right 400 400 NO owned Nuclear 4 3 1 BPL
Snacks
80 Nyama Bazar
Todi College Road
Nagermal
Rameshwarlal
OBC Right 400 400 NO owned Nuclear 4 3 1 BPL
Readymade
garments
81 Nyama Bazar
Todi College Road
Mahboob ali
chopdar
Ismile chopdar
OBC Right 300 300 NO owned Nuclear 2 1 1 Fruit and Vegetable
82 Todi College Road
Ganesh
Mandir
Salim rangrez
Pirbaksh
SC Right 350 350 NO owned Nuclear 5 2 3 SC Fruit and Vegetable
83 Todi College Road
Ganesh
Mandir
Lal jibraham
Hari kishor
SC Left 300 300 NO owned Nuclear 5 3 2 SC Snacks
84 Todi College Road
Ganesh
Mandir
Vakil mirasi
Ghlashi mirasi
SC Right 350 350 NO owned Joint 20 10 10 SC Fancy Store
85 Ganesh Mandir ke Paas
Ghantaghar
Mohhmad jabal
Ushmaan gani
OBC Right 350 350 NO owned Nuclear 4 2 2 BPL
Fruit and Vegetable
86 Ganesh Mandir ke Paas
Ghantaghar
Mohhmad esaddi
Sarfudden khan
OBC Left 400 400 NO owned Joint 10 7 3 Fruit and Vegetable
87 Ganesh Mandir ke Paas
Ghantaghar
Mohhmad Ali
Nizzamudeen
OBC Left 350 350 NO owned Nuclear 4 2 2 Fruit and Vegetable
88 Ganesh Mandir ke Paas
Ghantaghar
Eliyash Babusalam
SC Left 300 300 NO owned Nuclear 4 1 3 SC Foot-wear
242 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
89 Ganesh Mandir ke Paas
Ghantaghar
Chitramal Shanker bhargaw
OBC Left 350 350 NO owned Joint 15 9 6 Snacks
90 Ganesh Mandir ke Paas
Ghantaghar
Rampal dayma
Sukharam
OBC Left 350 350 NO owned Nuclear 4 1 3 Snacks
91 Ganesh Mandir ke Paas
Ghantaghar
Kamla Luhar
Jhabarmal
SC Left 400 400 NO owned Nuclear 6 1 5 FHH
Iron shop
92 Ganesh Mandir ke Paas
Ghantaghar
Sharwani luhar
Mishraram
SC Left 450 450 NO owned Nuclear 4 2 FHH
Iron shop
93 Ganesh Mandir ke Paas
Ghantaghar
Love kush
Kalusingh
GEN Right 450 450 NO owned Nuclear 5 2 3 Snacks
94 Ganesh Mandir ke Paas
Ghantaghar
Fazul muslim
Ahmad bharbuj
ha
OBC Right 400 400 NO owned Joint 7 1 6 Seasonal Snacks
95 Ganesh Mandir ke Paas
Ghantaghar
Rakesh saini
Jugal saini
OBC Right 400 400 NO owned Nuclear 5 4 1 Seasonal Snacks
96 Ganesh Mandir ke Paas
Ghantaghar
Sharwan kumar
Gagadhar
bhargaw
OBC Right 350 350 NO owned Joint 7 2 5 Seasonal Snacks
97 Ganesh Mandir ke Paas
Ghantaghar
Deewan kewet
Hari singh kewat
GEN Right 350 350 NO owned Joint 7 2 5 Snacks
98 Ganesh Mandir ke Paas
Ghantaghar
Hari prshad
Damoder
kumawat
OBC Right 300 300 NO owned Nuclear 6 3 3 Snacks
243 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
99 Ganesh Mandir ke Paas
Ghantaghar
Adil Kastam OBC Right 350 350 NO owned Nuclear 5 2 3 Foot-wear
100 Ganesh Mandir ke Paas
Ghantaghar
Yogesh saini
Budhkaran
OBC Right 400 400 NO owned Joint 7 2 5 BPL
Snacks
101 Ganesh Mandir ke Paas
Ghantaghar
Hariram jat
Balveer singh jat
OBC Right 400 400 NO owned Joint 7 2 5 Snacks
102 Ganesh Mandir ke Paas
Ghantaghar
Arif teli Jamaal OBC Right 300 300 NO owned Nuclear 5 3 2 Fruit and Vegetable
103 Ganesh Mandir ke Paas
Ghantaghar
Warid Farookh OBC Right 350 350 NO owned Joint 18 10 8 Fruit and Vegetable
104 Ganesh Mandir ke Paas
Ghantaghar
Mohammad
Asslam
Rahmaan
OBC Right 350 350 NO owned Nuclear 6 2 4 Fruit and Vegetable
105 Ganesh Mandir ke Paas
Ghantaghar
Rakesh patwa
Gyarshilal
OBC Right 400 400 NO owned Nuclear 6 4 2 Flowers
106 Ganesh Mandir ke Paas
Ghantaghar
Salim Lilghar
Safrudeen
OBC Right 450 450 NO owned Joint 8 4 4 Fruit and Vegetable
107 Ganesh Mandir ke Paas
Ghantaghar
Mohhmad iqbal
Khalil mohhm
ad
OBC Left 400 400 NO owned Joint 8 5 3 Fancy Store
108 Ganesh Mandir ke Paas
Ghantaghar
Ajaaz Sikendra ali
OBC Left 400 400 NO owned Nuclear 5 3 2 Foot-wear
244 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
109 Ganesh Mandir ke Paas
Ghantaghar
Abdul pathan
Harun pathan
OBC Left 300 300 NO owned Joint 8 5 3 Snacks
110 Ganesh Mandir ke Paas
Ghantaghar
Bidami luhar
Mohanr
am
SC Right 350 350 NO owned Joint 8 3 5 FHH
Iron shop
111 Ganesh Mandir ke Paas
Ghantaghar
Tajmel pathan
Mohammad
Rizwan
SC Left 300 300 NO owned Nuclear 6 3 3 SC Snacks
112 Ganesh Mandir ke Paas
Ghantaghar
Mohammad abrar
mohammad sarif
SC Left 350 350 NO owned Nuclear 4 1 3 SC Fancy Store
113 Ghantaghar Sabji
Mandi
By Paas Dipo
Omparkash saini
Radheshyam saini
OBC Right 400 400 NO owned Nuclear 5 2 3 Fruit and Vegetable
114 Ghantaghar Sabji
Mandi
By Paas Dipo
Suresh mali
Omparkash
OBC Right 450 450 NO owned Nuclear 6 3 3 Fruit and Vegetable
115 Ghantaghar Sabji
Mandi
By Paas Dipo
Parmeshwer saini
Tarachand saini
OBC Right 300 300 NO owned Nuclear 5 4 1 BPL
Fruit and Vegetable
116 Ghantaghar Sabji
Mandi
By Paas Dipo
Savitri saini
Jwala prshad
OBC Left 350 350 NO owned Nuclear 6 2 4 FHH
Fruit and Vegetable
117 Ghantaghar Sabji
Mandi
By Paas Dipo
Bula devi Dhanaram
OBC Right 300 300 NO owned Nuclear 6 4 2 FHH
Fruit and Vegetable
118 Ghantaghar Sabji
Mandi
By Paas Dipo
Santosh devi
Ramniwas
OBC Left 350 350 NO owned Joint 7 3 4 FHH
Fruit and Vegetable
119 Ghantaghar Sabji
Mandi
By Paas Dipo
Mukesh saini
Rameshwer
OBC Left 300 300 NO owned Nuclear 5 2 3 Fruit and Vegetable
245 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
120 Ghantaghar Sabji
Mandi
By Paas Dipo
Prem saini
Kailash saini
OBC Left 350 350 NO owned Nuclear 6 4 2 Fruit and Vegetable
121 Ghantaghar Sabji
Mandi
By Paas Dipo
Salim Ibrahim OBC Left 300 300 NO owned Nuclear 5 2 3 Fruit and Vegetable
122 Ghantaghar Sabji
Mandi
By Paas Dipo
Mahesh kumar
Shyam sunder saini
OBC Right 400 400 NO owned Nuclear 5 2 3 Fruit and Vegetable
123 Ghantaghar Sabji
Mandi
By Paas Dipo
Ramavtar
bharghav
Mirjpal OBC Left 400 400 NO owned Nuclear 5 3 2 BPL
Seasonal Snacks
124 Ghantaghar Sabji
Mandi
By Paas Dipo
Sushil saini
Mahadev saini
OBC Left 350 350 NO owned Nuclear 4 3 1 BPL
Seasonal Snacks
125 Ghantaghar Sabji
Mandi
By Paas Dipo
Darshen kuswaha
Deshraaj
kushbaahar
GEN Left 350 350 NO owned Nuclear 4 2 2 Snacks
126 Ghantaghar Sabji
Mandi
By Paas Dipo
Jakir Bhavansh
SC Left 300 300 NO owned Joint 12 7 5 SC Fruit and Vegetable
127 Ghantaghar Sabji
Mandi
By Paas Dipo
Rafiq rangreez
Naanu rangree
z
SC Left 300 300 NO owned Nuclear 4 2 2 SC Bamboo Stool
(Muddha)
128 Ghantaghar Sabji
Mandi
By Paas Dipo
Jayid Ali kureshi
SC Left 350 350 NO owned Nuclear 6 4 2 SC Snacks
129 By Paas Dipo ke
Paas
Islamiya kuwe
ke Paas
Sarif raayin
Abdul OBC Left 350 350 NO owned Joint 7 3 4 Fruit and Vegetable
246 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
130 By Paas Dipo ke
Paas
Modi College
Harishanker
Kanswa
Tulsiram kanswa
GEN Left 300 300 NO owned Joint 7 4 3 Snacks
131 By Paas Dipo ke
Paas
Modi College
Chand Noor mohhm
ad
OBC Left 400 400 NO owned Nuclear 6 3 3 Fruit and Vegetable
132 By Paas Dipo ke
Paas
Modi College
Rakesh saini
Bhanwarlal saini
OBC Left 400 400 NO owned Nuclear 4 1 3 Juice shop
133 By Paas Dipo ke
Paas
Modi College
Hukam ali
Rustam OBC Left 450 450 NO owned Nuclear 5 3 2 Egg seller
134 By Paas Dipo ke
Paas
Modi College
Manoj Sanwermal
OBC Left 300 300 NO owned Nuclear 4 3 1 Hotel/Dhaba
135 By Paas Dipo ke
Paas
Modi College
Mohhmad amin
Manir OBC Left 350 350 NO owned Nuclear 6 2 4 Egg seller
136 By Paas Dipo ke
Paas
Modi College
Rajendra Sitaram OBC Left 350 350 NO owned Nuclear 6 4 2 Snacks
137 By Paas Dipo ke
Paas
Modi College
Amit Dev singh
GEN Left 300 300 NO owned Joint 7 3 4 Snacks
138 By Paas Dipo ke
Paas
Modi College
Vinod saini
Vishwaram ji
OBC Right 400 400 NO owned Nuclear 4 2 2 Tea Stall
139 By Paas Dipo ke
Paas
Modi College
Lokendra Shiee vijesh
OBC Left 400 400 NO owned Nuclear 4 4 0 Snacks
140 By Paas Dipo ke
Paas
Modi College
Manish kumar
Kaluram OBC Right 450 450 NO owned Nuclear 2 1 1 Snacks
247 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
141 Modi College ke Paas
By Paas Road
Deepak bagham
Kasiram OBC left 350 350 No owned Joint 7 3 4 Snacks
142 Modi College ke Paas
By Paas Road
kamlesh jat
Sukhi OBC Left 400 400 no owned Joint 8 2 6 Fruit and Vegetable
143 Modi College ke Paas
By Paas Road
Rajendra kumar
Rameshwar jat
OBC Left 300 300 No owned Joint 8 5 3 Juice shop
144 Modi College ke Paas
By Paas Road
Kamlesh sharma
Ramavtar
sharma
GEN Left 350 350 No owned Nuclear 6 3 3 BPL
Juice shop
145 Modi College ke Paas
By Paas Road
Balwan dhawak
Nanuram
dhawak
OBC Left 400 400 No owned Nuclear 1 1 0 BPL
Juice shop
146 Modi College ke Paas
By Paas Road
Radhesyam saini
Bhagawana ram
saini
OBC Left 350 350 No owned Nuclear 4 3 1 BPL
Snacks
147 Modi College ke Paas
By Paas Road
Pawan kumar
Megh lal sharma
GEN Right 300 300 No owned Nuclear 5 3 2 Snacks
148 Modi College ke Paas
By Paas Road
Karan singh
Baburam rajput
GEN Right 350 350 No owned Nuclear 6 5 1 Snacks
149 Modi College
Link Road
By Paas Road
Ramswaroop jat
Laxaman ram
OBC Right 400 400 No owned Nuclear 6 2 4 Kirana Shop
150 Modi College
Link Road
By Paas Road
Bhanwar lal
Sultan gunaniy
a
OBC Right 450 450 No owned Nuclear 5 2 3 Fruit and Vegetable
248 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
151 Modi College
Link Road
By Paas Road
Siraj shankhal
a
Abdul rajak
OBC Right 350 350 No owned Nuclear 6 3 3 Readymade
garments
152 Modi College
Link Road
By Paas Road
Sandeep sharma
Karan singh
sharama
GEN Right 400 400 No owned Nuclear 4 2 2 BPL
Snacks
153 Modi College
Link Road
By Paas Road
Govind saini
Mahaveer
prasad
OBC Right 350 350 No owned Nuclear 5 3 2 Fruit and Vegetable
154 Modi College
Link Road
By Paas Road
Sukhachen
Mohan lal
khatik
SC Right 250 250 No owned Nuclear 6 3 3 SC Fruit and Vegetable
155 Modi College
Link Road
By Paas Road
Karan khatik
Babulal SC Right 300 300 No owned Nuclear 6 4 2 SC Fruit and Vegetable
156 Aadharsh Vidhya Mandir
By Paas Road
Nandkishor saini
Nathmal saini
OBC Right 350 350 No owned Nuclear 6 4 2 Snacks
157 Chiraniyo ka
Khurra
By Paas Road
Sonu kuswaha
Krishna ram
GEN Left 250 250 No owned Nuclear 4 2 2 BPL
Snacks
158 Modi College
Link Road
By Paas Road
Kailash saini
Keshar dev
OBC Left 300 300 No owned Joint 10 6 4 Ice-cream
159 Purani Eidgah
By Paas
Samir Salim gori
OBC Left 400 400 No owned Joint 10 3 7 BPL
Snacks
249 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
Masjid Road
160 Purani Eidgah Masjid
By Paas Road
Ratani kumahar
Omparkash
OBC Left 200 225 No owned Joint 7 4 3 FHH
Potter
161 Todi College
By Paas Road
Rajkumar saini
Ginnilal OBC Right 200 225 No owned Nuclear 5 3 2 Fruit and Vegetable
162 Todi College
By Paas Road
Santosh Hariram prajapat
OBC Right 200 225 No owned Nuclear 5 3 2 FHH
Potter
163 By Paas Road
Purana Bus
Stand
Suresh jat
Amabalal jat
OBC Left 450 450 No owned Nuclear 5 3 2 Ice-cream
164 By Paas Road
Purana Bus
Stand
Safil khan
Abdul OBC Right 200 225 NO owned Joint 7 2 5 Fancy Store
165 By Paas Road
Purana Bus
Stand
Punash Babu bisti
OBC Right 400 400 no owned Joint 8 5 3 Fruit and Vegetable
166 By Paas Road
Purana Bus
Stand
Babu bisti
Najir OBC Right 200 225 NO owned Joint 8 5 3 Fruit and Vegetable
167 By Paas Road
Purana Bus
Stand
Ranjit bhasakar
Sharwan kumar
OBC Right 300 300 NO owned Nuclear 5 3 2 Fruit and Vegetable
168 By Paas Road
Purana Bus
Stand
Vijay pal jat
Rameshawar jat
OBC Left 400 400 NO owned Nuclear 4 3 1 BPL
Fruit and Vegetable
169 By Paas Road
Purana Bus
Stand
Pappuram
bhsakar
Sharwan
bhasaka
OBC Right 300 300 NO owned Nuclear 4 2 2 Fruit and Vegetable
250 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
r
170 By Paas Road
Purana Bus
Stand
Salman bisti
Babu najir
OBC Right 450 450 NO owned Joint 8 5 3 BPL
Fruit and Vegetable
171 By Paas Road
Purana Bus
Stand
Mohamad abbas
Abdul latif
khokhar
OBC Right 400 400 NO owned Joint 8 5 3 Fruit and Vegetable
172 By Paas Road
Purana Bus
Stand
Ramratan sharma
Kajodi mal
GEN Right 200 225 NO owned Nuclear 6 2 4 Kirana Shop
173 By Paas Road
Purana Bus
Stand
Mohamad rasid
Mehbub OBC Right 400 400 NO owned Nuclear 5 2 3 BPL
Fruit and Vegetable
174 By Paas Road
Purana Bus
Stand
Salman khan
Manir khan
OBC Right 200 225 NO owned Joint 10 7 3 Reparing
175 By Paas Road
Purana Bus
Stand
Vishanu saini
Purshotam saini
OBC Right 300 300 NO owned Nuclear 5 3 2 Juice shop
176 By Paas Road
Purana Bus
Stand
Manoj saini
Ridamal saini
OBC Right 450 450 NO owned Joint 15 11 4 Juice shop
177 By Paas Road
Purana Bus
Stand
Kishan lal jat
Shankar lal jat
OBC Right 450 450 NO owned Joint 7 2 5 Ice-cream
178 By Paas Road
Purana Bus
Stand
Vimal saini
Janardan saini
OBC Left 350 350 NO owned Nuclear 5 3 2 Juice shop
251 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
179 Purani Tahsil Police Choki
Todi College Road
Ramjeewan
walmiki
Bila ram SC Right 200 225 NO owned Nuclear 5 2 3 SC Cobbler
180 Purana Bus
Stand
Todi College Road
Pawan kumar
Jaidev bhargav
OBC Left 300 300 NO owned Nuclear 5 4 1 Book stall
181 Purana Bus
Stand
Todi College Road
Aabid Husain OBC Left 200 225 NO owned Joint 10 6 4 Kirana Shop
182 Purana Bus
Stand
Todi College Road
Sajid Husaini lilaghar
OBC Left 200 225 NO owned Joint 10 6 4 Pan/Cigerette
183 Purana Bus
Stand
Todi College Road
Mujamadin
Akthar husain
SC Left 300 300 NO owned Joint 25 18 7 SC Fruit and Vegetable
184 Purana Bus
Stand
Todi College Road
Jahangir Lal moham
ad
OBC Left 400 400 NO owned Nuclear 5 3 2 Fruit and Vegetable
185 Purana Bus
Stand
Todi College Road
Mohammad Faruk
Riyashi khokhar
OBC Left 400 400 NO owned Joint 7 3 4 Fruit and Vegetable
186 Purana Bus
Stand
Todi College Road
Firoz lilaghar
Nabi sher
OBC Left 300 300 NO owned Nuclear 4 2 2 Fruit and Vegetable
187 Purana Bus
Stand
Todi College Road
Lala ram chopadar
Nabibaksh
chopadar
OBC Right 200 225 NO owned Nuclear 4 2 2 Fruit and Vegetable
188 Purana Bus
Stand
Todi College Road
Nanuram saini
Balu ram saini
OBC Left 200 225 NO owned Nuclear 2 1 1 Snacks
252 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
189 Purana Bus
Stand
Todi College Road
Jagdish gujar god
Radhesyam
GEN Left 200 225 NO owned Nuclear 5 3 2 BPL
Sweet shop
190 Purana Bus
Stand
Todi College Road
Prakashchand
sharma
Pawan sharma
GEN Left 400 400 NO owned Nuclear 6 2 4 Sweet shop
191 Purana Bus
Stand
Todi College Road
Manoj sharma
Pawan sharma
GEN Left 300 300 NO owned Nuclear 6 3 3 Sweet shop
192 Purana Bus
Stand
Todi College Road
Madan lal
sharma
Laxmi naryan
GEN Right 200 225 NO owned Nuclear 4 1 3 BPL
Cattle food
193 Purana Bus
Stand
Todi College Road
Kailash sharma
Suraj mal
sharma
GEN Right 400 400 NO owned Joint 7 3 4 Snacks
194 Purana Bus
Stand
Todi College Road
Kamlesh bhargav
Gopal bhargav
GEN Left 200 225 NO owned Nuclear 4 3 1 Snacks
195 Purana Bus
Stand
Todi College Road
Pramod swami
Deendayal
swami
OBC Left 200 225 NO owned Joint 7 4 3 Redemade garments
196 Purana Bus
Stand
Todi College Road
Vikas sharma
Mahesh sharma
GEN Left 250 250 NO owned Nuclear 7 4 3 Tea Stall
197 Purana Bus
Stand
Todi College Road
Gangadhar singh
Noranga jat
OBC Right 200 225 NO owned Nuclear 4 2 2 Tea Stall
198 Purana Bus
Stand
Todi College Road
Naresh saini
Girdhari lal saini
OBC Left 300 300 NO owned Joint 7 4 3 Juice shop
199 Purana Bus
Stand
Todi College Road
Kashi ram saini
Nath mal saini
OBC Right 300 300 NO owned Joint 7 4 3 BPL
Kirana Shop
253 | P a g e
S.N
o.
Sta
rt P
oin
t
En
d P
oin
t
Nam
e o
f th
e
Aff
ecte
d
Pers
on
Nam
e o
f H
usb
an
d/
Fath
er
Cast
Pla
ce o
f A
P
Left
/ R
igh
t
Daily I
nco
me
in R
s.
Daily i
nco
me
as p
er
min
mu
m
wag
es
T
itle
Ho
lder
Str
uctu
re
Ow
ned
or
Ren
ted
Typ
e o
f fa
mily
(N
/J)
No
. O
f fa
mily
mem
bers
Male
Mem
bers
Fem
ale
M
em
be
rs
Vu
lnera
ble
Typ
e o
f B
usin
es
s
200 Purana Bus
Stand
Todi College Road
Shankar lal saini
Nath mal saini
OBC Right 200 225 NO owned Joint 7 2 5 BPL
Tea Stall
201 Purana Bus
Stand
Todi College Road
Jagadish saini
Nath mal saini
OBC Left 300 300 NO owned Joint 9 5 4 Juice shop
Source: Socio-economic survey Feb 2021
257 | P a g e
Appendix5: Due diligence of pipelaying areas.
Zone Number
Name of areas
covered under this
zone
Total length in km
Total Pipeline
laid in km
Width of road in (Mtr)
Dia proposed sewerage (waste
water) in (mm)
Depth of the
trench
Width of the
trench
Type of road
Photograph of the Area
Zone-2 Dimond Colony
1500 240 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-2 Dimond Colony, Talheti
1300 230 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-2
Akrabhata Housing Board Colony
1500 310 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
258 | P a g e
Zone-2 Shivam Colony Lane-1
1100 190 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC / Katcha
Zone-2
Akrabhata Housing Board
Colony-2
900 80 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT
Zone-2
Dimond Colony near
Dimond House
1250 150 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-2
Dimond Colony near
Trauma Centre
1050 170 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC / Katcha
259 | P a g e
Zone-2
Lane 2D-Rajasthan Housing Board
1300 230 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC / Katcha
Zone-2 Shivam Colony Lane-2
900 210 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone-2 Manpur Housing Board
1400 270 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC / Katcha
260 | P a g e
Town - Sirohi (Waste Water)
Zone Number
Name of areas
covered under zone
Total length in
mtr
Total Pipeline laid
in mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water) in (mm)
Depth of the trench
Width of the
trench Type of road
Photograph of the Area
Zone-2 Bhandrakar
Nagar 1,500 420 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. CC/Katcha
Zone-2 Swaroop
Nagar 1,300 350 3 to 4
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-2 Mahakal Nagar
1,500 190 3 to 4
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT/CC
261 | P a g e
Zone-2
MH 93B To
MH 98 Bhadrankar
Nagar
900 280 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. CC
Zone-2
MH 87 To
MH 317 Bhadrankar
Nagar
1,100 270 9 to 10
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. CC
Zone-2
MH 94 To
MH 96 Bhadrankar
Nagar
1,150 350 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. CC
Zone-2
MH 61 To
MH 62 Bhadrankar
Nagar
1,200 340 7 to 8
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. CC
262 | P a g e
Town - Sirohi (Water Supply)
Zone Number
Name of areas covered under
zone
Total length in
mtr
Total Pipeline
laid in mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water)
in (mm)
Depth of the trench
Width of the trench
Type of road
Photograph of the Area
Zone-6 Swaroop Nagar 1,400 350 3 to 4
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone-6
MH 93B To
MH 98 Bhadrankar
Nagar
1,300 410 6 to 7
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone-6
MH 87 To
MH 317 Bhadrankar
Nagar
1,100 220 9 to 10
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone-6
MH 94 To
MH 96 Bhadrankar
Nagar
950 250 6 to 7
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
263 | P a g e
Zone-6
MH 61To
MH 62Bhadrankar
Nagar
1,200 340 7 to 8
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone-6
Z6232 To
Z62036 Mahakal Nagar
1,100 460 4 to 5
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone-6
MH 0012 To
MH 0040 Mahakal Nagar
1,450 210 4 to 5
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone-6
MH 0047 To
MH 0049 Mahakal Nagar
1,300 290 5 to 6
HDPE- 75, 90, 110, 125, 140, 160 HDPE-200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
264 | P a g e
Town - Sardarshahar (Waste Water)
Zone Number
Name of zone and name of
areas covered
under this zone
Total length in
mtr
Total Pipeline
laid in mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water)
in (mm)
Depth of the trench
Width of the trench
Type of road
Photograph of the Area
Zone-4 Kayamkhani
Masid 2000 580 7 to 8
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/ CC
Zone-4 Ramgarhbas 2200 650 5 to 6
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-3 BT Road 1500 340 7 to 8
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
265 | P a g e
Zone-3 BT Road 1300 190 8 to 9
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/ CC
Zone-3 Ram Nagar 1300 260 7 to 8
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/ CC
Zone-3 Ram Nagar 900 190 6 to 7
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
Zone-3 Balaji Ki
Tanki 1000 320 7 to 8
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
Katcha
266 | P a g e
Zone-3 Balaji Ki
Tanki 950 170 7 to 8
DWC-200,250,300;
RCC 350; HDPE
315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
267 | P a g e
Town - Sardarshahar (Water Supply)
Zone Number
Name of zone and name of
areas covered
under this zone
Total length in
km
Total Pipeline
laid in km
Width of road in (Mtr)
Dia proposed
water supply in
(mm)
Depth of the trench
Width of the trench
Type of road Photograph of the Area
Zone 4 Meena well
area 1050 250 6 to 7
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
BT/ CC
Zone 4 Meena well
area 1,200 220 5 to 6
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Zone 4 DMA 4B 900 160 6 to 7
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
BT/ CC
Zone 4 DMA - 4B Deshraj Ji
Ki Gali 900 320 5 to 6
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
268 | P a g e
Zone 4
DMA - 4B Kamal
Pujari Ki Gali
1,200 190 4 to5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B Joshi Gali
1,200 300 4 to5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B Saini Gali
1,150 240 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B
Pandit Gali 900 280 4 to5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B Laju Ji Ki
Gali 1000 200 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
269 | P a g e
Zone 4 DMA - 4B Omji Saini
Ki Gali 950 260 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4B Kundan Product
Gali
1080 270 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B JP Pareek
KI Gali 1200 320 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B Jeevan
Mali Ki Gali 1280 190 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4B Dularam Khati Ki
Gali
900 270 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
270 | P a g e
Zone 4
DMA - 4B Malolia Gali 2 MBJK
1250 380 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4B Maalji
Choudhary Ki Gali
1100 450 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4B Hanuman Choudhary
Ki Gali
900 190 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B
Kamal Kant Old Street
1200 420 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4B Pinch Gali
850 350 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
271 | P a g e
Zone 4
DMA - 4B Keshra
Ram Ji Ki Gali
1150 240 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4E Madhu Bhawan Street
950 180 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4 DMA - 4E Laal Tuti
Area North 1050 200 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4E Street
opposite Madhu Bhawan
1100 300 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
Zone 4
DMA - 4E Street
opposite Jangalwa Bhawan
1220 120 3 to 4
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
272 | P a g e
Zone 1 Ramgarbas 1500 340 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC / Katcha
Zone 1 Ramgarbas 1800 430 4 to 5
HDPE- 75, 90, 110,
125, 140, 160 HDPE-
200, 250 &315 mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
CC
273 | P a g e
Town - Laxmangarh (Water Supply)
Zone Number
Name of areas
covered under zone
Total length in
mtr
Total Pipeline laid in
mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water) in
(mm)
Depth of the
trench
Width of the trench
Type of road
Photos
Zone 7 Ganga Colony
1,200 290 8 to 9
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
BT,CC
Zone 7 Near
Power house
1,100 160 8 to 9
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone 7 Nayak Colony
1,500 240 8 to 9
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone 7 Badh Ke
Balaji 900 320 5 to 6
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
274 | P a g e
Zone 7 Near
Badh Ke Balaji
1,400 190 7 to 8
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone 7 Near
maidan 1,100 400 7 to 8
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone 8 Near
Shyam Mandir
1,400 340 5 to 6
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
Zone-8 Near
Hospital 1,300 280 8 to 9
HDPE- 75, 90, 110, 125,
140, 160 HDPE-200, 250 &315
mm
1.00 to 1.50 Mtr.
0.50 to 0.75 Mtr.
Katcha
275 | P a g e
Town - Ratangarh (Waste Water)
Zone Number
Name of areas
covered under zone
Total length in mtr
Total Pipeline
laid in mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water) in (mm)
Depth of the trench
Width of the trench
Type of road
Photos
Zone-1 Loco Colony 900 250 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr.
BT,CC
Zone-1 Gogamedi
Colony 800 200 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-1 Area of
Ward no. 14 600 150 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
276 | P a g e
Zone-1 Bhartiyon ki
Dhani 500 200 3 to 4
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-1
Area of Ward no. 16
Near Jat Chatrawas
800 350 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-1 Area Near
BSNL office 900 120 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-1 Near
Makdinath School
700 170 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
277 | P a g e
Zone-2 Choudhary well area
1,300 300 6 to 7 DWC-
200,250,300; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-2 Makki Colony
900 400 5 to 6 DWC-
200,250,300; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-2 Panchayat
Samiti 1100 250 4 to 5
DWC-200,250,300;
HDPE 250,400 1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT,CC
Zone-5 Ramchandra
Park 800 220 5 to 6
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-5 Panditpura 1300 180 4 to 5
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
278 | P a g e
Zone-5 Rini well
area 1100 200 4 to 5
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone-5 Near Bank of Baroda
900 160 6 to 7
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone -1 Gavariya
Basti 1000 300 4 to 5
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone -1 Gorishariya
Basti 800 120 5 to 6
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
279 | P a g e
Zone -2 Gogamandi 900 160 5 to 6
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. Katcha
Zone -2 Near Nehru
Stadium 850 180 5 to 6
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone -1 Adarsh Nagar
950 140 6 to 7
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
Zone -5 Near Power
House 1100 220 4 to 5
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr.
BT,CC
Zone -5 Dayal Nagar 1200 250 5 to 6
DWC-200,250,300;
RCC 350; HDPE 250,400
1.5 to 2.0 mtr. 0.75 to 1
mtr. BT,CC
280 | P a g e
Town-Fatehpur (Waste Water)
Zone Number
Name of areas
covered under zone
Total length in
mtr
Total Pipeline
laid in mtr
Width of road in (Mtr)
Dia proposed sewerage
(waste water) in (mm)
Depth of the
trench
Width of the
trench
Type of road
Photos
Zone-3 Krishna Colony
1200 400 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
Zone-3 Chamaria
Colony 1500 700 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
Zone-3 Ambedkar
Nagar 1100 350 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
Zone-3 Loharon Ka
Mohalla 850 300 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
281 | P a g e
Zone-3 Laxminath
Nagar 1300 450 7 to 8
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone-3 Sonaron Ka
Mohalla/Taliyo ka mohalla
1300 380 7 to 8
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone-3 Mominpura
Mohalla 1200 300 4 to 5
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone 3 Near
Ambedkar Nagar
800 120 7 to 8
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
Zone 3 Near
Navalgarh Pulia
700 100 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone 3 900 150 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
282 | P a g e
Zone 3 700 50 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
Zone 3 900 150 5 to 6
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
CC
Zone 3 1100 250 6 to 7
DWC-200,250,300;
RCC 350; HDPE 315,400
1.5 to 2.0 mtr.
0.75 to 1 mtr.
BT/CC
288 | P a g e
Appendix 7: Stakeholder Consultation
Town Name
of Area
Date of Consultatio
ns
No. of Participants Topic Discussed Outcome Photographs
Total Male Female
Abu-road
.
Diamond
Colony, Talheti, Zone-2,
Abu-road
November 23rd, 2020
04 02 02
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations. Three tier grievance mechanisms and its process was briefed with participants. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and sewerage connections. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town People are happy and understand direct benefits along with latent benefits of the project.
Shantikunj,
Zone-3 Abu-road
December 24th, 2020
06 04 02
Advance information about the project, process of logging complaints and grievance and that’s mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Construction of Consumer Relation Management Centre (CRMC) bulling is proposed at vacant land of Nagar Palika. It was informed by participants that proposed land is possession of municipality and people were showing their interest for knowing the role and function of CMRC. Grievance mechanism and process of logging the complaints also briefed with participants and People are not satisfied with present water supply and sewerage facilities in the town and are willing to pay for improved services. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and
289 | P a g e
Town Name
of Area
Date of Consultatio
ns
No. of Participants Topic Discussed Outcome Photographs
Total Male Female
sewerage connections.
Ratangarh
Pachi Ki Chakki, Zone-7, Ratanga
rh
February 17th, 2021
05 05 00
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations. Three tier grievance mechanisms and its process was briefed with participants. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and sewerage connections. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town People are happy and understand direct benefits along with latent benefits of the project.
Kanji Guest House, Zone-3, Ratanga
rh
January 7th, 2021
06 06 00
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work is proposed in the area and it was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. Three tier grievance mechanisms and its process was briefed with participants. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and sewerage connections. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town People are happy and understand direct
290 | P a g e
Town Name
of Area
Date of Consultatio
ns
No. of Participants Topic Discussed Outcome Photographs
Total Male Female
benefits along with latent benefits of the project.
Ratangar
h
08 06 02
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work is proposed in the area and it was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. Three tier grievance mechanisms and its process was briefed with participants. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and sewerage connections. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town People are happy and understand direct benefits along with latent benefits of the project.
Near Ginani Pond, Zone-
2, Ratangarh
December 18th, 2021
04 04 00
Advance information about the project, process of logging complaints and grievance and that’s mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Construction of Sewage Pumping Station (SPS) is proposed at vacant land of near Ginani pond. It was informed by participants that proposed construction is placed nearby a water pond and the land is possession of municipality. Grievance mechanism and process of logging the complaints is also briefed with participants. People are not satisfied with present water supply and sewerage facilities in the town and are willing to pay for improved services. People are supportive of the project and indicated their willingness to participate in the project to make it successful and are willing to pay for the improved quality of water and sewerage connections.
291 | P a g e
Ratangar
h
Near Makdinath
School, Zone-1
Ratangarh
December 18th, 2021
08 06 02
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
Sirohi
Swaroop Nagar,
Rebari bas, Zone-6, Sirohi
January 6th, 2021
09 06 03
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
292 | P a g e
Sirohi
Raj colony, Palace
Road, Sirohi
March 13th, 2021
06 03 03
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
Sardarsah
ar
Ram Nagar, Ward-1,
Sardarshar
December 24th, 2020
07 05 02
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
293 | P a g e
Sardarsah
ar
Near Chipa Dharmshal,
DMA-4B Sardarshar
March 25th, 2021
07 06 01
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
Near Duggad Public
School, DMA-4D
Sardarshar
January 21st, 2021
05 04 01
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
294 | P a g e
Laxmangar
h
Near Power house, Zone-1,
Laxmangarh
February 15th, 2021
05 04 01
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
Nayak Mohalla, Zone-1,
Laxmangarh
March 15th, 2021
06 03 03
Advance information about the project, process of logging complaints and grievance and its mechanism under the project. Present status and access of Water Supply and Waste Water in the town and other concerned issues and challenges. Willingness of local public to pay for improved services.
Pipeline laying work has been executed in the area and people are supportive of the project and indicated their willingness to participate in the project to make it successful and It was informed by the participants that a pamphlet of advance information is distributed and door to door consultation is also held with nearby habitations/residents. People are not satisfied with present water supply and sewerage services, water is provided by PHED but its intermittent on alternate days and sewerage facility is not structured in the town Three tier grievance mechanisms and its process was briefed with participants. People are happy and understand direct benefits along with latent benefits of the project and showing their willingness to pay for the improved quality of water and sewerage services.
296 | P a g e
Appendix 8: Consultation with Women beneficiaries
S.No Name of
Area
Date of Consultatio
ns
No. of Participants
Topic Discussed Outcome Photographs Total Male Fe
male
Sardarsahar
Peecha Bas, DMA-
3D, Sardarsha
r
February 7th, 2021
06 02 04
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
Fatehpur
Ambedka Nagar, Zone-2,
Fatehpur
February 9th, 2021
08 04 04
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
297 | P a g e
S.No Name of
Area
Date of Consultatio
ns
No. of Participants
Topic Discussed Outcome Photographs Total Male Fe
male
Ratangar
h
Panditpur, Zone-4,
Ratangarh
February 18th, 2021
06 00 06
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
Abu Roa
d
H. G. High School road,
Zone-2, Abu-road
March 12th, 2021
05 00 05
Socio-economic status of community, present status of water supply and sewerage system, prior information about the project, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
Abu-road town comes in schedule tribe area and It was informed by women, that men and women both are involved in livelihood activities i.e. agriculture, livestock breeding and farming. Door to door interaction is held and a pamphlet for proposed construction is given in entire town. Drinking water is provided by PHED but it’s very limited and not sufficient as per requirement. Sewerage facility is not available in the town, some households have their own septic tank and soak pits and some are practicing open defecation. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are showing the willingness to pay for improved water supply and sewerage services.
298 | P a g e
S.No Name of
Area
Date of Consultatio
ns
No. of Participants
Topic Discussed Outcome Photographs Total Male Fe
male
Sirohi
Nehru Nagar
Ward No-1 Sirohi
March 19th, 2021
06 02 04
Socio-economic status of community, present status of water supply and sewerage system, prior information about the project, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
Abu-road town comes in schedule tribe area and It was informed by women, that men and women both are involved in livelihood activities i.e. agriculture, livestock breeding and farming. Door to door interaction is held and a pamphlet for proposed construction is given in entire town. Drinking water is provided by PHED but it’s very limited and not sufficient as per requirement. Sewerage facility is not available in the town, some households have their own septic tank and soak pits and some are practicing open defecation. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are showing the willingness to pay for improved water supply and sewerage services.
Laxmangarh
Harijan Mohalla, Zone-8,
Laxmangarh
March 23rd, 2021
07 01 06
Present status of water supply and sewerage system, prior information about the project, Socio-economic status of community, Grievance redressal mechanism under the project. and other project components under RSTDSP and can those benefit to the community
It was informed by women that a pamphlet of advance information of proposed construction is given to local public. Presently drinking water is provided by public health engineering department (PHED) but water supply is intermittent on alternate days. No structured sewerage facility is available in the town and most of households have their own septic tank and soak pits for sewage waste. Three tier grievance mechanism and process of logging complaints is also briefed with participants. Local people are happy and are willing to pay for improved water supply and sewerage services in entire town.
300 | P a g e
Appendix 9: Consultation with Scheduled tribe communities in Abu Road
S.No Name of
Area
Date of Consultatio
ns
No. of Participants Topic Discussed Outcome Photographs Total Male Femal
e
1.
Danvav Area,
Zone-2, Abu-road
January 21st, 2021
06 00 06
Prior information about the project, Grievance redressal mechanism and it’s process, Socio-economic status of community people, present Status of Water Supply and Waste Water in the town it’s access to people, Willingness to pay for improved services, Other project components under RSTDSP and those benefits to the community
Public consultations organized with schedule tribe community in Abu-road town. It was informed that people are engaged in agriculture and livestock breeding works and some are involve in daily wages or labour works. A pamphlet for prior information is distributed and door to door interaction is held in the town. People are concerned about the poor supply (intermittent on alternate days) of water supply and unstructured sewerage facility in the town. Grievance mechanism and process of logging complaints is also briefed with participants. People are happy with proposed execution, especially women are much excited for individual and 24*7 water connection. People are showing their willingness to pay for improved services of water supply and sewerage.
2.
Ganesh Mandir Area,
Zone-2, Abu-road
February 27th, 2021
08 03 05
Prior information about the project, Grievance redressal mechanism and it’s process, Socio-economic status of community people, present Status of Water Supply and Waste Water in the town it’s access to people, Willingness to pay for improved services, Other project components under RSTDSP and those benefits to the community
Public consultations organized with schedule tribe community in Abu-road town. It was informed that people are engaged in agriculture, livestock breeding and selling milk and some are involve in daily wages or labour works. People were complaining for present water supply and sewerage facilities, water supply is intermittent on alternate days and sewerage facility is not structured. A pamphlet for prior information is distributed and door to door interaction is held in entire town. Grievance mechanism and its process is also briefed. People are happy with proposed execution, especially women are much excited for individual and 24*7 water connection. People are showing their willingness to pay for improved services of water supply and sewerage.
302 | P a g e
Appendix 10: Copy of office order of PMU for follow grievance mechanism
agreed with ADB
304 | P a g e
Appendix 11: Details of Grievances Reported upto March 2021.
Status of grievance/complaints received and resolved:
Fatehpur (06 Grievances)
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
05 01
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
04 01 - - - - - - - 01 - -
Laxmangarh (14 Grievances)
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
14
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
13 01 - - - - - - - - - -
Ratangarh (18 Grievances)
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
11 07 01
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
10 01 - - 07 - - - 01 - - -
Sirohi (26 Grievances)
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
10 04 12
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
10 - - - 04 - - - 12 - - -
Abu-road (20 Grievances)
305 | P a g e
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
05 15
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
05 - - - 15 - - - - - - -
Sardarshar (67 Grievances)
Existing Pipeline and cable damage
Road restoration and house keeping
Others
Number of Grievances received
51 13 03
Rectified in Days
1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending 1-3 4-7 8-15 Pending
Nos. of grievances in days
18 28 05 - 09 - 04 - 02 01 - -
Detail of Grievance received and resolved:
Town: Fatehpur
S.no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 22 Jan, 2021 24 Jan, 2021 Damage of Water Pipe Line
Mr. Amit Kumar, Nawalgarh Puliya, ward-44
9636434956 Resolved
2 24 Jan, 2021 26 Jan, 2021 Damage of Water Pipe Line
Mr. Adil Ansari, Luharo ka Mohalla Ward-52,
9785227586 Resolved
3 07 Feb, 2021 09 Feb, 2021 Damage of Water Pipe Line
Mrs. Anita Kesan, Bhargav ka chowk
9929763805 Resolved
4 11 Feb, 2021 15 Feb, 2021 Chamber is not fitting proper
Mr. Shiv Kumar, Triveni Bhawan ke Samne
9001972656 Resolved
5 11 Feb, 2021 15 Feb, 2021
Water supply line damage
Mr. Shiv Kumar, Triveni Bhawan ke Samne
9351397251 Resolved
6 13 Feb, 2021 16 Feb, 2021
Water supply line damage
Mrs. Maya Devi, Kumharo ka Mohalla, Ward 55
Resolved
Town: Abu-Road
S. no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 10 Mar, 2021 12 Mar, 2021 Water pipe line leakage
Mr. Mitlesh gupta Resolved
2 10 Mar, 2021 12 Mar, 2021 Water pipe line leakage
Mrs. Savita Devi Resolved
3 11 Mar, 2021 14 Mar, 2021 Water pipe line leakage
Mr. Mohit Kumar Resolved
4 11 Mar, 2021 13 Mar, 2021 Water pipe line Mr. Kala Ram Resolved
306 | P a g e
leakage
5 11 Mar, 2021 13 Mar, 2021 House Keeping related issue
Mr. Ashok yadav Resolved
6 13 Mar, 2021 15 Mar, 2021 Water pipe line leakage
Ms. Mamta Devi Resolved
7 13 Mar, 2021 14 Mar, 2021 House Keeping related issue
Ms. Annu Kumari Resolved
8 15 Mar, 2021 16 Mar, 2021 House Keeping related issue
Mr. Bhrat kumar Resolved
9 15 Mar, 2021 16 Mar, 2021 House Keeping related issue
Mr. Tara Chand Resolved
10 16 Mar, 2021 17 Mar, 2021 House Keeping related issue
Mr. Indarjeet Resolved
11 16 Mar, 2021 18 Mar, 2021 House Keeping related issue
Mr. Parveen Singh Resolved
12 17 Mar, 2021 18 Mar, 2021 House Keeping related issue
Mr. Jasvant singh Resolved
13 18 Mar, 2021 19 Mar, 2021 House Keeping related issue
Mr. Amar Patel Resolved
14 18 Mar, 2021 20 Mar, 2021 House Keeping related issue
Mr. Arjun Kumar Resolved
15 19 Mar, 2021 21 Mar, 2021 House Keeping related issue
Ms. Sonam Singh Resolved
16 23 Mar, 2021 25 Mar, 2021 House Keeping related issue
Mr. Bhawar singh Resolved
17 24 Mar, 2021 26 Mar, 2021 House Keeping related issue
Mr. Sonu Kumar Resolved
18 24 Mar, 2021 26 Mar, 2021 House Keeping related issue
Ms. Jyoti Kumari Resolved
19 26 Mar, 2021 28 Mar, 2021 House Keeping related issue
Mr. Ramesh Kumar Resolved
20 30 Mar, 2021 01 Apr, 2021 House Keeping related issue
Ms. Guddi Devi Resolved
Town: Laxmangarh
S. no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 02 Feb, 2021 04 Feb, 2021 Water line leakage
Mr. Jeewan Ram , Near Vidhya Bharti school, Zone -7
9024277805 Resolved
2 03 Feb, 2021 05Feb, 2021 Water line leakage
Mr. Mahendra, Ganpati Hotel ke Samne, Hanuman Nagar, Zone-7
9465606488 Resolved
3 06 Feb, 2021 08 Feb, 2021 Water line leakage
Mr. Shisram, Near Modi College, Zone-7
9829218861 Resolved
4 08 Feb, 2021 10 Feb, 2021 Water line leakage
Mr. Vikash, Near Bhagirath Hostel, Hanuman Nagar, Zone-7
6350102272 Resolved
5 09 Feb, 2021 12 Feb, 2021 Water line leakage
Naresh Sharma, Near Government Hospital, Zone-8
9784270133 Resolved
6 19 Feb, 2021 22 Feb, 2021 Water line leakage
Ms. Punam, near Panday ki Bhagichi
6376701440 Resolved
7 26 Feb, 2021 28 Feb, 2021 Water line leakage
Mr. Sita ram, Near Gas Agency
9772173854 Resolved
307 | P a g e
8 26 Feb, 2021 28 Feb, 2021 Water line leakage
Mr. Radhey shyam, Near Mahaveer Bhawan
9413858384 Resolved
9 26 Feb, 2021 01 Mar, 2021 Water line leakage
Mr. Sudheer Kumar, Near Mahaveer Bhawan
9783606259 Resolved
10 04 Mar, 2021 07 Mar, 2021 Water pipe line leakage
Mr. Gori Shankar, Near Adarsh Shcool
8209711647 Resolved
11 04 Mar, 2021 08 Mar, 2021 Water pipe line leakage
Mr. Shankar Lal, Bad Ke Balaji ke Piche
9460930639 Resolved
12 08 Mar, 2021 11 Mar, 2021 Water pipe line leakage
Mr. Aman Sharma, Bad ke Balaji ke Piche
8239927907 Resolved
13 22 Mar, 2021 25 Mar, 2021 Water pipe line leakage
Mr. Parmeshwar, Shiv Colony
9414038538 Resolved
14 25 Mar, 2021 28 Mar, 2021 Water pipe line leakage
Mr. Mukesh Sharma, Hanuman Nagar
9929969156 Resolved
Town: Sirohi
S. no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 07 Jan, 2021 10 Jan, 2021 Damage Water connection
Ms. Teeja Devi Ms. Maangi Devi
Resolved
2 08 Jan, 2021 09 Jan, 2021 Damage water connection & House Keeping
Mrs. Suraj Kanwar Resolved
3 11 Jan, 2021 14 Jan, 2021 Pipe line Damage house keeping
Ms. Lata Mewada Ms. Heena Dutta Ms. Geeta Devi
Resolved
4 13 Jan, 2021 15 Jan, 2021 Damage Water pipe line connection
Ms. Maina Devi Ms. Kamla Devi
Resolved
5 15 Jan, 2021 17 Jan, 2021 House Keeping related issues
Ms. Shushila devi Ms. Rinku Saini
Resolved
6 19 Jan, 2021 22 Jan, 2021 House Keeping related issues
Mr. Chhunni Lal Mr. Amrit Bhawar Ms. Kamla Ben
Resolved
7 22 Feb, 2021 23 Feb, 2021 Water Connection
Mr. Hemant Kumar, Sirohi
946106426 Resolved
8 22 Feb, 2021 24 Feb, 2021 Water Connection
Mr. Harish kumar, Sirohi
9887847691 Resolved
9 22 Feb, 2021 24 Feb, 2021 Water Connection
Mrs. Indira Devi , Sirohi
7665784292 Resolved
10 23 Feb, 2021 24 Feb, 2021 Water Connection
Mr. Vada Ram, Sirohi
7611069860 Resolved
11 23 Feb, 2021 25 Feb, 2021 Water Connection
Mr. Bhavesh Kumar, Sirohi
7014349002 Resolved
12 23 Feb, 2021 25 Feb, 2021 Water Connection
Mr. Hitendra Singh, Sirohi
8094459341 Resolved
13 23 Feb, 2021 25 Feb, 2021 Water Connection
Mr. Sudhir Kumar Saxena, Sirohi
8079007858 Resolved
14 23 Feb, 2021 25 Feb, 2021 Water Connection
Mr. Poonam Singh, Sirohi
9461453118 Resolved
15 24 Feb, 2021 26 Feb, 2021 Water Connection
Mr. Chandrabhan , Sirohi
9352900833 Resolved
308 | P a g e
16 24 Feb, 2021 27 Feb, 2021 Water Connection
Mr. Madan Lal Saini, Sirohi
9521105962 Resolved
17 24 Feb, 2021 26 Feb, 2021 Water Connection
Mr. Shanti Lal, Sirohi
9414275617 Resolved
18 24 Feb, 2021 25 Feb, 2021 Water Connection
Mr. Lokendra Singh, Sirohi
7073334559 Resolved
19 15 Mar, 2021 17 Mar, 2021 Water pipe line leakage
Mr. Jayada Khan, Sirohi
Resolved
20 18 Mar, 2021 21 Mar, 2021 Water pipe line leakage
Mr. Jayada Khan, Sirohi
Resolved
21 20 Mar, 2021 22 Mar, 2021 Water pipe line leakage and House Keeping
Mr. Dharmendra, Sirohi
Resolved
22 22 Mar, 2021 23 Mar, 2021 Water pipe line leakage
Dr. Shudhir Saxena, Sirohi
Resolved
23 25 Mar, 2021 27 Mar, 2021 Water pipe line leakage
Mrs. Seema Kumari, Sirohi
Resolved
24 27 Mar, 2021 29 Mar, 2021 House Keeping related issues
Mr. Magan Lal, Sirohi
Resolved
25 30 Mar, 2021 01 Apr, 2021 House Keeping related issues
Mr. Ashok Kumar, Sirohi
Resolved
26 31 Mar, 2021 02 Apr, 2021 Water pipe line leakage
Mr. Rahul Kumar, Sirohi
Resolved
Town: Sardarshar
S. no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 02 Jan, 2021 03 Jan, 2021 Existing water pipe line leakage
Mr. Pawan Kumar Sharma, Choutiya Gali
9982604349 Resolved
2 04 Jan, 2021 07 Jan, 2021 Existing water pipe line leakage
Mr. Lekhram Godhara, Near Bal Vidhya Mandir School, Ward no-9,
Problem was not Related To L&T Work
Resolved
3 06 Jan, 2021 07 Jan, 2021 Existing Water Pipe Line Leakage
Mr. Ramavtar Sharma, Behind MBJK Building
9460605437 Resolved
4 06 Jan, 2021 07 Jan, 2021 Existing Water Pipe line leakage
Mr. Shyam Lal, Opposite Jim Gali
7358807802 Resolved
5 06 Jan, 2021 09 Jan, 2021 Sewer Pit Damage
Mr. Vinod Kumar, Purwa Gali
9660143218 Resolved
6 08 Jan, 2021 25 Jan, 2021 Existing water pipe line leakage
Mr. Pintu Nai, Opposite Luhar wada Gali
8005949071 Resolved
7 11 Jan, 2021 27 Jan, 2021 Water Connection Not Properly Repaired
Mr. Akbar Khan, Near Kayamkhani Masjid
9982241010 Resolved
8 13 Jan, 2021 22 Jan, 2021 Existing water pipe line leakage
Mr. Om.Prakash Soni, Behind Shyam Mandir
8875097650 Resolved
9 18 Jan, 2021 19 Jan, 2021 Existing water pipe line leakage
Mr. Gangaram Saini, Soni Gali, Ward no- 13
8766647850 Resolved
10 26 Jan, 2021 27 Jan, 2021 Existing water pipe line
Mr.Ramawtar Sharma, Kundan
9460605437 Resolved
309 | P a g e
leakage Product, Ward no-16,
11 29 Jan, 2021 30 Jan, 2021 Existing water pipe line leakage
Mr. Indra Chand Prajapat, Prajapati Chowk, Ward no -9,
9610162839 Resolved
12 30 Jan, 2021 31 Jan, 2021 Existing water pipe line leakage
Mr. Vijay Singh Baidh , Near UCO Bank ward no-27
9982341426 Resolved
13 30 Jan, 2021 15 Feb, 2021 Water pipe line leakage
Mr. Dilip Shastri Lal, Ward No-14
9983931802 Resolved
14 01 Feb, 2021 04 Feb, 2021 Existing water line leakage
Mr. Rakesh Bhojak, ward no-11
9982759590 Resolved
15 01 Feb, 2021 04 Feb, 2021 Existing water line leakage
Mr. Mool Chand, Near Kids School
9610669091 Resolved
16 01 Feb, 2021 04 Feb, 2021 Existing water line leakage
Mr. Ganesh Chand, Near Taal Mandir
8118896931 Resolved
17 04 Feb, 2021 06 Feb, 2021 Existing water line leakage
Mr. Vineet Kumar, Near Santoshi Mata Temple
8562094011 Resolved
18 06 Feb, 2021 07 Feb, 2021 Existing water line leakage
Mr.jatanlal dugar, Behind Pandia Chakki
9899395841 Resolved
19 06 Feb, 2021 07 Feb, 2021 Existing water line leakage
Mr. Jatan Sharan, Near Santosi Mata Temple
9521146469 Resolved
20 06 Feb, 2021 08 Feb, 2021 Water Connection Not Properly Repaired
Ms. Rameswari Devi, Near Natoliya Mall
8504882346 Resolved
21 10 Feb, 2021 11 Feb, 2021 House Keeping
Mr. Jatan Lal Dungar, Near Advocate Manak Baati House
9899395841 Resolved
22 10 Feb, 2021 11 Feb, 2021 Pit Refilling Pending
Mr. Gangaram Saini, Champa Chowk, Ward 17
8766647850 Resolved
23 11 Feb, 2021 12 Feb, 2021 Existing water pipe line leakage
Mr. Raj Kumar Mali, Near Raj Service Centre
9529501056 Resolved
24 12 Feb, 2021 14 Feb, 2021 Existing water pipe line leakage
Mr. Maghraj, Ward no-12
9529501056 Resolved
25 12 Feb, 2021 13 Feb, 2021 Pit Refilling Pending
Mr. Shiv Ratan Josi, Ward no- 09
9367664562 Resolved
26 12 Feb, 2021 13 Feb, 2021 Water pipe line leakage
Mr. Hari Prasad, Ward no- 09
7627099920 Resolved
27 13 Feb, 2021 14 Feb, 2021 Water pipe line leakage
Mr. Riddh Karn Darji, Ward no-08
9529177532 Resolved
28 14 Feb, 2021 16 Feb, 2021 Water pipe line leakage
Mr. Budhmal Soni, Ward no- 12
9828175410 Resolved
29 15 Feb, 2021 19 Feb, 2021 Sewer pit Damage
Mr. Moolchand , Ward no- 09
9610669091 Resolved
30 16 Feb, 2021 18 Feb, 2021 Water pipe line leakage
Mr. Sitaram Bhati, Ward no-06
9024355522 Resolved
31 16 Feb, 2021 27 Feb, 2021 Water pipe line leakage
Mr. Bhankrlal, Ward no-08
9950353424 Resolved
32 17 Feb, 2021 20 Feb, 2021 Water pipe line leakage
Mr. Shyam Sharma, Ward no-26
9772464957 Resolved
310 | P a g e
33 17 Feb, 2021 20 Feb, 2021 Water pipe line leakage
Mr. Yakub Ali, Ward no-27
9649754041 Resolved
34 18 Feb, 2021 21 Feb, 2021 House Keeping Pending
Mr. Kundalmal Soni, Near Advocate Manak Baati House
9828175410 Resolved
35 18 Feb, 2021 21 Feb, 2021 Water pipe line leakage
Mr. Raju Nath, Near Amardaan school
8094903860 Resolved
36 20 Feb, 2021 23 Feb, 2021 Water pipe line leakage
Mr. Rakesh Saini, Ward no-06
9660691588 Resolved
37 20 Feb, 2021 23 Feb, 2021 Water pipe line leakage
Mr. Vikash Soni, Ward no-06
9079004114 Resolved
38 22 Feb, 2021 06 April, 2021 Water pipe line leakage
Mr. Rajander Soni, Ward no-46
9610889858 Resolved
39 22 Feb, 2021 26 Feb, 2021 Water pipe line leakage
Mr. Vinod Soni, Ward no-27
9772546425 Resolved
40 23 Feb, 2021 25 Feb, 2021 Water pipe line leakage
Mr. Dhanraj Sathia, Ward no- 29
9928716192 Resolved
41 23 Feb, 2021 4 April, 2021 Water pipe line leakage
Mr. Om Prakesh Soni, Wardno-13
8875097650 Resolved
42 26 Feb, 2021 27 Feb, 2021 Water pipe line leakage
Mr. Babu lal Pajapat, Ward no- 11
Resolved
43 26 Feb, 2021 28 Feb, 2021 Water pipe line leakage
Mr. Dinesh, Ward no-40
8233233723 Resolved
44 01 Mar, 2021 03 Mar, 2021 Water line leakage
Mr. Shiv Kumar, Near Manju Mata Mandir
Resolved
45 01 Mar, 2021 04 Mar, 2021 Water line leakage and house keeping
Mr. Vikash Sani, Ward no-20
Resolved
46 02 Mar, 2021 03 Mar, 2021 Water line leakage and house keeping
Mrs. Anita Devi, Ward no. 23
Resolved
47 03 Mar, 2021 05 Mar, 2021 Water line leakage
Mr. Mukesh, Near Surya Mandir, Ward No. 24
Resolved
48 04 Mar, 2021 05 Mar, 2021 Pit was not Covered with Barricades
Mr. Mukesh, Near Surya Mandir, Ward No. 24
Resolved
49 04 Mar, 2021 05 Mar, 2021 House Keeping pending
Mr. Arjun Singh, Ward no-05
Resolved
50 05 Mar, 2021 06 Mar, 2021 House Keeping pending
Mr. Rakesh Saini, Ward no-06
Resolved
51 05 Mar, 2021 08 Mar, 2021 Road Restoration
Mr. Jagdish Prashad, Ward no-05
Resolved
52 05 Mar, 2021 08 Mar, 2021 Water line leakage
Mr. Shankar Lal, Ward no-08
Resolved
53 06 Mar, 2021 07 Mar, 2021 Water line leakage
Mr. Jagdish Kumar, Ward no-07
Resolved
54 07 Mar, 2021 09 Mar, 2021 Water line leakage
Mr. Bhanwar Lal, Ward no-08
Resolved
55 07 Mar, 2021 09 Mar, 2021 Water line leakage
Mr. Kamal Sharma, Shyam Mandir, Ward no. 8,
Resolved
56 08 Mar, 2021 09 Mar, 2021 Existing pipe line leakage
Mr. Kamal Sharma , Ward no- 10
Resolved
311 | P a g e
57 12 Mar, 2021 14 Mar, 2021 Water line leakage and house keeping
Mr. Indoriya, Ward no-27
Resolved
58 13 Mar, 2021 16 Mar, 2021 Issue related to pipe laying
Mr. Ramdhan Jagir, Ward no-07
Resolved
59 16 Mar, 2021 18 Mar, 2021 House Keeping pending
Mr. Pawan Jain, Ward no-20
Resolved
60 18 Mar, 2021 20 Mar, 2021 House Keeping pending
Mr. Sayar Solanki, Ward no. 08, Near Shyam Mandir
7665537413 Resolved
60 18 Mar, 2021 20 Mar, 2021 Water line leakage
Mr. Subhash, Near Old Police Station, Ward no. 08,
Resolved
62 20 Mar, 2021 24 Mar, 2021 House Keeping pending
Mr. Madan Ojha, Ward no-47
7340608689 Resolved
63 22 Mar, 2021 25 Mar, 2021 House Keeping pending
Mr. Mukesh Kumar, Ram Nagar, Ward no-02,
9983307936 Resolved
64 22 Mar, 2021 25 Mar, 2021 House Connections are Pending
Mr. Ram Niwash Sharma, Ward no-02
8094832837 Resolved
65 25 Mar, 2021 27 Mar, 2021 House Keeping pending
Mr. Arjun Sani, Ward no- 13
6376386742 Resolved
66 25 Mar, 2021 27 Mar, 2021 House Keeping pending
Mr. Jagdish Kumar, Ward no- 08
7014738013 Resolved
67 25 Mar, 2021 30 Mar, 2021 Road Restoration
Mr. Ramavatar Sharma, Ward no- 17
9460605437 Resolved
Town: Ratangarh
S. no
Complaint Date
Resolved Date
Description of the Issue
Issue/Complaint record from
Contact Status of complaints
1 16 Jan, 2021 18 Jan, 2021 House Water line leakage
Mr. Rakesh Sharma, Zone no-3
941423406 Resolved
2 17 Jan, 2021 22 Jan, 2021 House Water line leakage
Mr. Sushil Poddar, Poddar Tradding, Near Hanuman Temple, Zone no-5
935208633 Resolved
3 02 Feb, 2021 05 Feb, 2021 Road Excavated without proper restoration
Mr. Raamkriskna Patil, Pandit Pura, Zone-0 5
8432141438 Resolved
4 04 Feb, 2021 07 Feb, 2021 Water line leakage
Mr. Chagan Lal, Bhartiyo ki Dhani, Ward no-18
8302538972 Resolved
5 05 Feb, 2021 08Feb, 2021 Telephone cable Damage
Mr. Mukesh Dhadwal , Ward no-18
9416010322 Resolved
6 09 Feb, 2021 11 Feb, 2021 The strip outside the house is broken
Mr. Sawarmal Prajapat, loco colony, Ward no-18
7737510349 Resolved
7 09 Feb, 2021 11 Feb, 2021 The roof of the house was broken
Mr. Chagan lal Prajapat, Ward no-18
9950819702 Resolved
8 25 Feb, 2021 26 Feb, 2021 Water line leakage
Mr. Mohommad Shokad, Ward no-22
8952912043 Resolved
9 25 Feb, 2021 27 Feb, 2021 Water line Mr. Hasan khan, 7014440159 Resolved
312 | P a g e
leakage Railway Colony, Ward no-22
10 01 Mar, 2021 04 Mar, 2021 House Keeping related issue
Mr. Kumawat, Tailor Shorp, Ward No-19
9784476612 Resolved
11 02 Mar, 2021 03 Mar, 2021 House Connection Problem
Mr. Sita Ram, Ward no-19
9079307800 Resolved
12 10 Mar, 2021 12 Mar, 2021 Water line leakage
Mr. Shyam Sundar, Ward No-02
6376831683 Resolved
13 12 Mar, 2021 15 Mar, 2021 BSNL Cable Damage
Mr. Gopal Dutt Sharma, Ward no-03
9351779617 Resolved
14 18 Mar, 2021 20 Mar, 2021 Road Drainage Damage
Mr. Bhera Lal, Ward no-20
9983632816 Resolved
15 19 Mar, 2021 22 Mar, 2021 Water line leakage
Mr. Radhey Shyam, Zone-1
9664006432 Resolved
16 20 Mar, 2021 23 Mar, 2021 House Connection Problem
Mr. Bajrang Lal, Ganesh Dhora
9828330378 Resolved
17 23 Mar, 2021 25 Mar, 2021 Water line leakage Damage
Mr. Kamal Kumar Nai, Ward No-31
7424893451 Resolved
18 25 Mar, 2021 27 Mar, 2021 Water line leakage
Mr. Madhu Devi, Ward no-31
9261734122 Resolved