DEUTSCHE KABEL AG TASCHKENT DEUTSCHE KABEL AG TASCHKENT (DKG) November 2015, Tashkent On successful activities of «Falk Porsche Technik GmbH» in Uzbekistan

Transcript of Master Template 2002 - Duwirat.de

DEUTSCHE KABEL AG TASCHKENT

Integration intoglobal markets

DEUTSCHE KABEL AG TASCHKENT (DKG)

November 2015, Tashkent

On successful activities of «Falk Porsche Technik GmbH» in Uzbekistan

Integration intoglobal markets

2

DEUTSCHE KABEL AG TASCHKENT

History and development of the Company

1949 2000 2005 2016

Elaboration of cable products, Steel ropes, new cables as per DIN / EN Standards, Delivery to Europe

1949 1999 2004 2007 2010 2012 2016

2004 2011

Steel wire, Steel Strips for cotton bales, Steel reinforcement В500С, Pre-stressed wire, Metal-ware, Eco-panels, Net constructions

Establishment of cable factory in

Tashkent to cover needs of the Ministry of

Defense, USSR

Implementation of ISO

9001:2000

Engineering of oxygen free

copper casting as per EN 13602

standards

Membership in VDE, OA Receiving of

СЕ mark

Modernization of cable production,

Integration and export to the European market

Production of geo-textile and synthetic ropes from PET bottles

Establishment of Uzbek-German JV

“Deutsche Kabel AG Taschkent”

(DKG)

2017

About company

Projects implemented

Development strategy

Key priorities

Deusche Pfandsysteme

German market development

Integration intoglobal markets

3

DEUTSCHE KABEL AG TASCHKENT

1998

2000 2011Traditional nomenclature

New products

Sales and Export volume increment dynamics, Engineering of new products

1998 2002About company

Projects implemented

Development strategy

Key priorities

Выступающий
Заметки для презентации
готово

Integration intoglobal markets

4

DEUTSCHE KABEL AG TASCHKENT

Projects implemented(Engineering of new production)

Power lines, shield wire and self-insulated wires

Steel wire and steel wire products

Oxygen free copper casting as per VDE standard

3 D panels Net constructions for waterworks

Steel reinforcement B500Сas per DIN 488 standard

Import replacement up to USD 40 mln. since 2011

Annual currency savingsUp to 10 mln.USD Export potential exceeding

100 mln. USD/per year

10% raw material saving Production capacity –350 sq.m per year

Currency savings Over 15 mln.USD

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

5

DEUTSCHE KABEL AG TASCHKENT

Economic impact of Steel strap production for the needs of «Uzpahtasanoat» (Cotton industry)

Currency savings in amount of 8,4 mln.USD per year

Produced as per European technologyPatent№ FAP 00227 dd 23.03.2005

Steel strips are produced as per DIN 17223 standard

0

5000

10000

15000

20000

2005 2006 2007 2009 2014

Th

.to

ns

About company

Projects implemented

Development strategy

Key priorities

--- Import --- DKG

Integration intoglobal markets

6

DEUTSCHE KABEL AG TASCHKENT

Steel wire production - Economic impact

As per customs statistics, import volume was reduced from $ 26,7 to 19,1 (making 7,6 mln.USD – composing 28,5%)

due to engineering of new production

35316,5

29671

12756

26700

20771

6460

2769

1093312657

0

5000

10000

15000

20000

25000

30000

35000

40000

2006 г. 2007 г. 2008 г.

In tons In Thousand USD Import contents of DKG

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

7

DEUTSCHE KABEL AG TASCHKENT

Предлагаемая модельсистемы депозита и сбора

Production and supply of products vide tenders Integration into global market

VL-500 кVTalimarjan PP– Sogdiana substation

Supply of cable and steel products as per DIN standard, including for solar collectors

Предлагаемая модельсистемы депозита и сбора

Production of PET straps,Geo-textile and synthetic thread from PET Bottles

In collaboration with the Ministry of Economics of Germany (GIZ)

Предлагаемая модельсистемы депозита и сбора

Ecological engineer solution on the basis of new construction materials

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

8

DEUTSCHE KABEL AG TASCHKENT

Condition of PET Bottles recycling in Uzbekistan

32,9 th.tons per year for amount of$36,4 mln.

Production of high quality Cotton type synthetic fiber

PET granules and preformsAbout company

Projects implemented

Development strategy

Key priorities

Выступающий
Заметки для презентации
Надо проверить там стат на 2009 г

Integration intoglobal markets

9

DEUTSCHE KABEL AG TASCHKENT

Raw materials

Preis / Kosten Price

Local raw material base

CopperOwn copper

casting

Qualified man power

Available energy resources

Developed infrastructure

Almalyk mining and smelting enterprise, Uzbekistan

Financial resources

For achievement of aimed tasks and engineering of new high technological products

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

10

DEUTSCHE KABEL AG TASCHKENT

Low-cost and stable electro-energy

Qualified man-power

Available energy resource

Local raw material base

Financial resources

Own copper casting

• 1 кWt/h = 6 Cents (167,40/2692)(5 times cheaper than in Germany)

• Energy independence

• No emergency shutdowns

Price

About company

Projects implemented

Development strategy

Key priorities

Developed infrastructure

Integration intoglobal markets

11

DEUTSCHE KABEL AG TASCHKENT

Qualified man-power

Own copper casting

Qualified man-power

Available energy resources

Local raw-material base

FinancialresourcesPrice

- Average salary of a specialist is lower than in Europe

- 100% of population has secondary education

- Permanent qualification

- Own education center

- Сollaboration with Tashkent State Technical University and Tashkent College of Information Technologies

About company

Projects implemented

Development strategy

Key priorities

Developed infrastructure

Integration intoglobal markets

12

DEUTSCHE KABEL AG TASCHKENT

Support by the Government of Uzbekistan.

Own copper casting

Дavailable energy resources

Modern technologies

Дешевое сырье

Финансовые ресурсыЦена

Low-cost man-power

Encouragements in the country

- Privileges under the Programme of localization- Privileged crediting- First hand raw material- Other privileges- Encouragement of export oriented

and import-replacing production

Products made in Uzbekistan are not subject to import taxes in CIS countries

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

13

DEUTSCHE KABEL AG TASCHKENT

State Programme of Production Localization. Implementation of investment programmes.

DKG participates in State Programme of localization since 2006.

Over 20 projects implemented under the Programme;

For the last 5 years :- Localized products sales volume made over 305,0 billion soums;

- Economic impact from import replacement – over 63 billion soums;

Company has availed noticeable privileges from the Government for efficient implementation of these programmes.

Assets, availed from the Programme of Localization are directed into enhancement of production and purchase of raw material.

In 2015 expected volume of localized production would make 43 billion soums.

For the last 5 years implemented investment projects exceeded 150 mln.USD;

About company

Projects implemented

Development strategy

Key priorities

Integration intoglobal markets

14

DEUTSCHE KABEL AG TASCHKENT