Following stations of PSTCL shall be commissioned in next 6 ...

17
Owner Following stations of PSTCL shall be commissioned in next 6 Months: Name of s/s Voltage Level (KV) Likely date of Energization Telemetry in order Agency Responsible Network is likely to be ready by Other Information PSTCL Dhuri (Addl.500MVA T/F) 400/220 30.06.2017 Yes PSTCL Already Existing Hoshiarpur (UG from 132kV) 220/66 30.06.2017 No Already Existing Kanjli(Addl.1x100MVA T/F) 30.09.2017 Yes Already Existing Nurmehal(Aug - 20MVA 66/11KV T/F) 30.06.2017 No Already Existing Ladhowal (1x160MVA T/F) 30.09.2017 No Already Existing Bhawanigarh(UG from 132kV) 30.06.2017 No Already Existing TalwandiBhai ( Addl.1x100MVA T/F) 30.06.2017 No Already Existing Sarna (Addl.1x100MVA T/F) 30.09.2017 Yes Already Existing Mahilpur (Addl. 100MVA T/F) 30.06.2017 Yes Already Existing Dharamkot(Addl.100MVA 220/66KV T/F to replace 50 MVA, 132/66KV T/F) 30.06.2017 Yes Already Existing BaghaPurana(Addl.100MVA T/F) 30.06.2017 Yes Already Existing DeraBassi ( Addl.1x100MVA T/F) 31.12.2017 Yes Already Existing Kartarpur(Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F) 31.12.2017 Yes Already Existing Verpal(Addl.100MVA 220/66KV T/F to replace 50 MVA, 132/66KV T/F) 31.12.2017 Yes Already Existing Amloh(Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F) 31.12.2017 No Already Existing Mansa (Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F) 31.12.2017 Yes Already Existing Ghulal (Aug - 2*20 MVA 66/11KV T/Fs to replace 1*20 MVA 132/11KV & 1*10/12.5 MVA 132/11KV T/Fs) 31.12.2017 No Already Existing GT Road Mall Mandi Amritsar (Aug - 2*50 MVA 132/66KV T/Fs to replace 50 MVA, 132/66KV T/F) 132/66 31.08.2017 No Already Existing Power Colony Amritsar (Addl. 1x50MVA 132/66KV T/F) 30.09.2017 No Already Existing

Transcript of Following stations of PSTCL shall be commissioned in next 6 ...

Owner

Following stations of PSTCL shall be commissioned in next 6 Months: Name of s/s Voltage

Level (KV) Likely date of Energization

Telemetry in order

Agency Responsible

Network is likely to be ready by

Other Information

PSTCL

Dhuri (Addl.500MVA T/F) 400/220 30.06.2017 Yes

PSTCL

Already Existing

Hoshiarpur (UG from 132kV)

220/66

30.06.2017 No Already Existing Kanjli(Addl.1x100MVA T/F) 30.09.2017 Yes Already Existing Nurmehal(Aug - 20MVA 66/11KV T/F) 30.06.2017 No Already Existing

Ladhowal (1x160MVA T/F) 30.09.2017 No Already Existing

Bhawanigarh(UG from 132kV) 30.06.2017 No Already Existing

TalwandiBhai ( Addl.1x100MVA T/F) 30.06.2017 No Already Existing

Sarna (Addl.1x100MVA T/F) 30.09.2017 Yes Already Existing

Mahilpur (Addl. 100MVA T/F) 30.06.2017 Yes Already Existing

Dharamkot(Addl.100MVA 220/66KV T/F to replace 50 MVA, 132/66KV T/F)

30.06.2017 Yes Already Existing

BaghaPurana(Addl.100MVA T/F) 30.06.2017 Yes Already Existing

DeraBassi ( Addl.1x100MVA T/F) 31.12.2017 Yes Already Existing

Kartarpur(Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F)

31.12.2017 Yes Already Existing

Verpal(Addl.100MVA 220/66KV T/F to replace 50 MVA, 132/66KV T/F)

31.12.2017 Yes Already Existing

Amloh(Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F)

31.12.2017 No

Already Existing

Mansa (Addl.160MVA 220/66KV T/F to replace 100 MVA, 220/66KV T/F)

31.12.2017 Yes

Already Existing

Ghulal (Aug - 2*20 MVA 66/11KV T/Fs to replace 1*20 MVA 132/11KV & 1*10/12.5 MVA 132/11KV T/Fs)

31.12.2017 No

Already Existing

GT Road Mall Mandi Amritsar (Aug - 2*50 MVA 132/66KV T/Fs to replace 50 MVA, 132/66KV T/F) 132/66

31.08.2017 No Already Existing

Power Colony Amritsar (Addl. 1x50MVA 132/66KV T/F) 30.09.2017 No Already Existing

1NORTHERN REGIONAL SYSTEM

STRENGTHENING SCHEME - XVI

400KV D/C KISHENPUR - NEW WANPOH

LINEMay'17

2NORTHERN REGION SYSTEM

STRENGTHENING SCHEME -XXXII

PROVISION OF 7X105 MVA 400/220KV

ICTs AT PARBATI PS (Banala)Jun'17

3 SVCs in NR

300/-200 MVAR SVC at New Wanpoh Sub

Station Jul'17

4WR - NR Trans. Corridor for IPP's

in Chhattisgarh

400KV D/C Kurukshetra - Jind line (Q)Jul'17

5 NRSS -XXXIV

315 MVA ICT at 400/220KV Kaithal Sub

station Jul'17

6NORTHERN REGIONAL SYSTEM

STRENGTHENING SCHEME - XXIV

400KV D/C DULHASTI - KISHENPUR LINE

(QUAD) SINGLE CKT STRUNG.Jul'17

7 Kishanganga HEP220KV D/C Kishanganga - Amargarh line

Oct'17

8Augemtation of Tramformation

Capacity Part-B3x105 MVA ICT at HAMIRUPR S/STN. Oct'17

9NR-WR Champa Kurukshetra

HVDC Interconnector800 kV HVDC Pole-II at Kurukshetra Jun'17

10

NORTHERN REGIONAL SYSTEM

STRENGTHENING SCHEME -

XXXIA

400/ 220 kV Sub-station at Kala Amb Jul'17

LILO of 400 kV Karcham Abdullapur D/C at

Kala Amb. 2X 3X 105 MVA ICTs, 2 X 80 MVAr

Bus Reactors & 400 kV FSC (40%).

RemarksAnt. Compln.

LIST OF ASSETS TO BE COMMISSIONED IN NEXT SIX MONTHS IN POWERGRID, NR-2

Sl. No. Name of the Project Name of the Trans line/ Substation

NORTHERN REGION - II

STATUS OF SUB-STATIONS/GENERATING STATIONS LIKELY TO BE COMMISSIONED IN NEXT 6 MONTHS Report submitted in the month of--April'2017 S.NO Name of Name of the Likely date of Whether Name of the Whether Any other

the Utility/ Station/ Engergization arrangements Agency Down relevant Owner Voltage Level for telemetry responsible below information

availability for down network from date of below likely to be energization network ready along have been execution with S/stn made(Y/N) ( YES/NO)

1 PGCIL Ajmer Aug'2017 Yes PGCIL Yes Shall be 765/400kv connect

ed to existing 400/220 kv SIS of RRVPN

2 PGCIL Chittorgarh Aug'2017 Yes PGCIL Yes -DO-765/400kv

Status of Sub-Stations/Generating Stations Likely to be commissioned in next six months

5, No. OWNER NAME OF SUB·STATION VOlTAGE LEVEl

(kV) LIKElY DATE Of ENERGISATION

1 I UPPTCL IDankaur 132 AFr-17 2 I UPPTCl IChhata 220 Apr-17 3 UPPTCL IBiCnpUri 132 May-17 4 UPPTCl Gabhana 132 M~y-17

5 I UPPTCl IGwahor Road 132 May-17 6 I UPPTCl Ualalabad 132 May-17 7 I UPPTCl IKankarkhera-1i 132. May-17

8 I UPPTCL I Marti 220 May-17 9 I UPPTCl IAmroha 220 May-17

10 I UPPTCl IHapur 220 I __ May-17

AllARANGEMENTS FOR

TElEMATORY FROM DATE

OF ENERGISATLON HAVE

BEEN MADE [YIN)

Y Y Y Y Y Y Y

Y Y Y

Report Submitted in the month of Apr, 17 AGENCY WHETHER DOWN BELOW

RESPONSIBLE FOR NETWORK LS LIKELY TO BE ANV OTHER RELEAVENT

EXECUTING DOWN READY ALONG WITH SUB- INFORMATION

BELOW NETWORK STATlON{Y/N)

UPPT(L Y UPPTCL Y UPPTCL Y UPPTCL Y UPPTCl Y UPPTCL Y UPPTCl Y UPPTCl Y UPPTCL Y UPPTCl Y

;'i'(lf,;jtlf;u~ptct:~~~l&ra\~~~:~;;ff'5il~:!(;!ifi.:;~"','!f#:W~3'1~~~4QO,:,;[~'1 ~:;,."t;;*'i~KM'aY~H~'~!if." 1 ;fi "',>~ H',/ ,y ;~;;",a:;ti:';;::1 :;1".\~iJPIITCC~~~;H~",;,;,¥:!,lJ _~(.~ic;;" '::' i~1 .";;;¥j!!,,C:.';;,ti,,~.::::,) ";;-;1t~' ·:12 ;'~, I /'UPPJCti:ii..1 Banda'fqJ',~;~~';~::'i~i~;'t,·",:t.~:¥/~f:;h~'i:J~(400';;: fi§l :~~,~" 3t:t~:,MaY~~F" '.'. :;J.;'~ C':,'''' _ ' .'.' .y' "'~I. ".:':"MpPJ(;lt;:~'\";f '~~f:;;;;:~/':·.' 'icy, " ,: I '·""":1,'~·~~f ,;'''t*'r::<'''''l? 13 I UPPTCL I Bindwal Jairajpur 132 Jun-17 Y UPPTCL Y 14 I UPPTCL lJari 132 Jun-17 Y 15 I UPPTCL IBhopa 132 Juo-17 Y 16 ~ U PPTCl I Harsia 132 Jun-17 Y 17 I UPPTCL Ilalpur 132 Jun-17 Y

18 I UPPTCl IPilibhit 220 Jun-17 Y 19 I UPPTCl IBarabanki 220 Jun-17 Y 20 I UPPTCL IAzamgarh~1I 220 Jun-17 Y

;' 21i,~ 1:;h',:UPPTCF1:IMath~~'l~%·,~i[~~*P.;,~~;~~I~~AOO;~'1~;.~"~:iY2iJUI'1~17\'~;,~;',_<l1d1~+i,~1.~~y~~~;'· .. 22 'I ,'.UPPTCltIN,8iaa'se'c~:i:48~:';(:"o':· ·'U,~>\ ":2i;(;f]"1:',;:jl400~'f;;~1 r!l':D~2~ ';i :1un~i7;:;~'''::'~'':,J .' ':t:'Ff~~~\;Y';"';"~;~L ~j .

';;23~1·'·'··'UPPTCL'fi, I AtaUr.,"iei··~i~';:;i;'t);,'.:!<" ;-;;~~';r;j::>i'i'~f::.l-~'~'i400'·'i·:irl~'i·;~'~·;"'~Jiffi-:'17~j:<; ':~""'I :,:;:-,,;:,;:~, <y,~ :':1" ", " " , ,;24;' I ~,UP-PTCL Iindrap:uram:.! "_,._,_,, _ .":<';:.j <;;.y '400, '"I , .. .Juii~17 ........ -'~ y., "',25 i l\i.(JPPTCL:,INehta'(jd~~U;i-,~< " :':""';\f'iWf.; 1';'>""400 x .,;+': .. i"; '~Jlm..;lT '~i!~'t.;. I.:"';,y Li;,': ' .... '

26 I UPPTCL IHapur 765 Jun-17 Y 27 I UPPTCl Talgram 132 jul-17 Y 28 I UPPTCl Bhoor-II 132 Jul-17 Y 29 I UPPTCL Payagpur 132 Jul-17 Y 30 I UPPTCL Nawabganj 132 1ul-17 Y 31 i UPPTCL Sikandra 220 Jul-17 Y 32 I UPPTCl Bhadaura 220 lul-17 Y 33 I UPPTCL Neebkarori 220 lul-17 Y 34 UPPTCL Musafirkhana 132 Aug-17 Y 35 UPPTCl Kanpur Road 220 Aug-17 Y 36 UPPTCl Raja Ka Talab 220 AUg-17 Y 37 UPPTCl Dasna 400 Au~-17 Y 38 UPPTCL 13ansi 220 Sep-17- _ Y

UPPTCl y

UPPTCl Y UPPTCl Y UPPTCL Y UPPTCl Y UPPTCl Y UPPTCL Y

')' '-'tU PPTGt:~~:,1 ~~Li~:~;·~~t,Yir;~~;~'~;: ," ·1 ;;'-·1ii21f'),Jt,;,r,:;~'('~;t'~t.~;i!:11 . 'UPPTCl:~i,~~I\ifiif}~~~::,'-f;;r: Y 'u'- • r·; ~~~;P;;:;:,,>Ii';'';:'> "'::+it '·'UPPTCI:·-,t+I'!i:':H·:;, Yi' ': ",

UPPTC[:~·.·( "f .•... : ,:Y'

;UPPTCl" ,,:f." ,;;'. , ',' :,.,:;:>::c' .. Y,<" ". ' ;...:.::

UPPTCl y

UPPTCl Y UPPTCl Y UPPTCL Y UPPTCL Y UPPTCl Y UPPTCl Y UPPTCl Y UPPTCL Y UPPTCl Y LiPPTCl y

UPPTCl Y UPPTCl Y 'Inn."', V

! . _;~. :.. . ~\ •. ~~.~. rf"

·:r:~···

()

::.: ; ~ ". '::,

~ \(77' ____ .~

---. i 1

NRPC OCC Meeting: Substations likely to be commissioned in next 6 months in Haryana (220KV & above)

Sr.

No.

Owner Name of Substation Voltage level Likely date of

energization

All

arrangements

for telemetry

from date of

energization

have been

made (Y/N)

Agency

responsible

for

executing

down-below

network

Whether

down-below

network is

likely to be

ready along

with sub-

station?

(Y/N)

Status of Down below Network/

Any other relevant information

1 HVPNL 22 KV GIS S/Stn. Sec-20,

Gurgaon 3x100 MVA,

220/66 KV T/F

220/66 KV 31.05.2017 N HVPNL Yes 66KV S/Stn Ph-IV, Gurgaon,

Sec-23A, DLF Q Block,

Ambience, Ph-I and 66KV HLF

feeder

2 HVPNL 22 KV GIS S/Stn. Sec-57,

Gurgaon 1x100 MVA,

220/66 KV T/F, 1x100MVA,

220/33KV T/F

220/66 KV 31.07.2017 N HVPNL No 66KV S/Stn Sec-45 Gurgaon,

Sec-51, DMRC feeder

3 HVPNL 220 KV GIS S/Stn. Sec-33,

Gurgaon

220/66 KV 30.06.2017 N HVPNL Yes 66KV S/Stn Sec-34 Gurgaon,

Sec-10A, Sec-38 Gurgaon.

4 HVPNL 220 KV GIS S/Stn.

Panchgaon

220/66 KV 31.07.2017 N HVPNL Yes 66 KV S/Stn. Jamalpur

5 HVPNL 220 KV S/s Meerpur Kurali

(Palwal)

220/66 KV 30.06.2017 N HVPNL Yes 66 kV Hodal, 66 kV Alawalpur,

220 kV Palwal

6 HVPNL 220 KV S/Stn. Rozka Meo

(Palwal)

220/66 KV 31.12.2017 N HVPNL Yes 66 kV Sohna,

Existing 33 KV S/Stn. Aterna

will be shifted.1 no. 33 KV S/Stn. by HUDA is

ready for energization and 5 no.

33 KV S/Stn. by UHBVNL are

7 YesHVPNL RGEC Sonepat 220 KV जून-17 Yes UHBVNL

8 HVPNL Sector-6 Sonepat 220 KV मई-17 Yes UHBVNL Yes 3 no. 33 KV S/Stns. by UHBVNL

are under construction.

132 KV lines from Barhi –

Murthal S/C and Barhi –

Gannaur D/C are ready.

11 KV Network for 2 x 16/20

MVA, 132/11 KV T/F is already

existing.

10 HVPNL 220 KV Sector–32 220 KV 30.06.2017 Yes M/s IKE

Electric Pvt.

Ltd. JV M/s

Ethos Power

Pvt. Ltd.

Yes

(except

termination

of 66 KV

lines)

11 HVPNL 220 kV Pinjore 220 KV 30.06.2017 Yes M/s IKE

Electric Pvt.

Ltd. JV M/s

Ethos Power

Pvt. Ltd.

Yes

9 HVPNL Barhi 220 KV मई-17 Yes HVPNL /

UHBVNL

Yes

List of substations to be commissioned by in the next 6 Months

PGCIL STATUS OF SUB-STATIONS LIKELY TO BE COMMISSIONED IN NEXT 6 MONTHS Report submitted in the month of--Sept'2016 S.NO Name of Name of the Likely date of Whether Name of the Whether Any other

the Utility/ Station/ Engergization arrangements Agency Down relevant Owner Voltage Level for telemetry

' responsible below information

availability for down network from date of below likely to be energization network ready along have been execution with S/stn made(Y/N) (YES/NO)

1 PGCIL Dehradun Nov' 2016 Yes PTCUL YES 400/220kv

2 PGCIL Ajmer Mar'2017 Yes RRVPNL YES 765/400kv

3 PGCIL Chittorgarh Mar'2017 Yes RRVPNL YES 765/400kv

4 PGCIL Orai GIS Mar'2017 Yes UPPCL YES 765/400kv

5 PGCIL Aligarh GIS Mar'2017 Yes UPPCL YES 765/400kv

...

507 ', ~ '~ - o~~m~ _ 1)1~1/:! QICI'l 1~5 C5Fllll ~Tar 3fft'5 ~15<-fl ... { (~~q;r~)

POWER GRID CORPORATION OF INDIA LIMITED Gii~ !liooL"11IH O'i OL 1989GOI038121 (A Government of India Enterprises)

---------·· -· \Jifffit ~-m ~mll ~<111 : Northern Region-Ill Regional Head Quarter

i'llf~~ : 12. xfl'll l:rctN ll'Ft. ~ - 226 001 (\1.~.) . ~l:f : 0522-2205155 ~-l)c;{ : rhq,[email protected] Office: 12, Rana Pratap Marg, Lucknow- 226 001 (U.P.): Tel: 0522-2205155 E-Mail: [email protected]

·--~~. ~-----·--·-------------------------------

\;

~4 ~/Ref. No.:

Ref: NR-III/ AMINRPC/ dt.27.02.2017

To,

~E(O), NRPC, 18/A, Saheed Jeet Singh Marg, Katwaria Sarai, New Delhi-11 0016

Subject: List of elements of POWERGRID in NR-III, expected to be commissioned in next six months.

Dear Sir, As discussed in last !32th OCC meeting list of the elements of POWER GRID in NR-III, expected to be commissioned in next six months is as below-

S.N. Element Expected schedule of

commissioning 1 800kV HVDC Champa - Kurukshetra line March'17 2 Shifting of 3X110 MVAr Reactors from Sasaram to Varanasi S/S March'17. 3 Spare 765/400 KV, 500 MVA ICTs at Agra & Fatehpur S/S April'17. 4 400 KV D/C Lucknow - Kanpur TL April'17 5 400 KV D/C Allahabad - Kanpur TL June'17. 6 Augmentation of transformation capacity at Mainpuri June'17. 7 Ll LO of 220 KV S/C Agra- Bharatpur TL at Agra June'17. 8 400 KV S/C Singrauli - Allahabad TL Sep'17. 9 765kV Orai- Aligarh TL, 765kV LILO lines, 400kV D/C Orai- Sep'17.

Orai TL including 765/400 kV Orai GIS and 765 kV Aligarh GIS

Thanking you, Yours faithfully,

.

I

I

~l:r--

\~\ ' \' .v ~

r \-.....,· _,, f

t\. > '-"" \ \;

,.

(D.KUSHW AHA) Asst.GM(AM),NR-III

-l-

~ ~ : ifr-9, w ~tel'\<f\~1'1cl ~. q;eql~lll mnf, ~ ~-110016 Registered Office: 8-9, Kutub Institutional Area,Katwaria Sarai, New Delhi 110016

IN FO <Z_f(),... \\ 0 ~ pROff\ \)IT fA ~A~ ILJ"t€)(.- 2_ ~~"'m'"''~""'''-

v,--._._-= -~----~·· ·-··-···~·~ .. ~-

Stahts of Su !ikdy to tornnlj~.s H Next li HiHh:'. ,.-m~··~·-------··-""""""'""'''""'~'' __ _

.':>iah': \.iHamkhand OY,.,...,_,,_.,.,._-, .. ,.. ··-· ...• ~-="""w·•"•=~"'"~··~~~~"' .... --~-~~---"-'"''"~~~---~······

~'rl<•Hth: ·- } ... f ·:; . ._~---··---....--·

Ov, n;;r Power 'itMi\lllb:,li 111 ( iun of l 1!l<ll'£!ldr:md

l imikd . ---

l'lJmc of Sub~Stationi Lin~: 220 K \!GIS ~ub:;tmioll lll' lltJnm\ain, Delmtduil

>-·

Vo!tag<: level 2:::0/3~ 1\V

'

Likely date ofenergizHti·•n 30.06.2017

' i\ll Arrangements tor telemetry from date of Provision is mudc in c:ontra<.:t agreement f(H·

energization have been made (Y/N): construction of Substmion

Ag.::ncy rcsposible for executing down-below Uttarakhand Pow·er Corporation Limited for 33 K V

nei\'ll1rk: feeders

\Vhether down-belo\v network is likely to be YES

ready along with Sub-Station? (Y/Nl

Any other relevam infrcl!lwtion construction of substation is in progress . Present Physical progress is 45%

Status of the d .1wnstrcam nct\vorl\. of the PO\\'ERGI~ID Substation State : lJttanlkhand Month : ~" · ,,t.o r :r

Name of the PGCIL Subst:l!ion Dehmdon 400/220 K V

Whether down below Ji," c·lk is likely to be Yl::s

fready along \Vith Sulh' I

All /\rrangements for tekuidry from date of YES

cnergization have beeHIIl<~d~.: (Y !N ):

Likely date of Energizali• >~l Alrendy ~.mt·rgized from 220 KV Substatio11 (PlCUL) · Ddlrudun on dmcd 12/01/2017.

220 I< V D!C Cfwin Zebra) Line fi'om 220 KV S/s (PTCUL) Dehradun to 400 KV S/s Sherpur(PGCJL)

Any other inJh)mation Dehrndun will be put on commercial usc after

encrg,it:ation or 400/220 K V Substmion PGCIL which is exp~:c t~d b) 31/0 l /20 17,

'"7"

~ J--... ,

/"t ~ .,., \ <'·! ~.,

'· !" l; '

@ ANNE)<UR£- B

Expected GSS from 1.1.2017 to June, 2017 S.No. Name of scheme MVA Expected Target month of completion

400KV '

1 Bhadla 1500 March'2017

220KV :

I 1 Bhawani mandi 100 March'2017

2 Amberi 100 March'2017

3 Jhalamand 100 April'2017

- --

1

C:\Users\RRVPNL\Desktop\OCC wef JAN 17\0CC 131 ST\Expected achievement 220 and above Rajendra

sirGSS

G)

A~-.L • Appendi• o1

LIST OF RVPN SUB-STARTIONS CONNECTED WITH PGCIL transmission system (As on 31 DEC 2016)

Nam. of PGCIL '$ Tran•folmatlon Connected RVPN GSS Alsoclated feeder Stataus as on 31 Dec 2016 S.NO. 785 and 400 GSS Capacity (MVA)

A 785 kV GSS (Under c:onatructlonl

1 Chhitorgam 2x1500MVA 400 kV GSS Chhltorgam 400 kV DIC line (Quad Moose) Ullder construction by PGCIL

2 Ajmer 2x1500WA 400 kl/ GSS Ajmer 400 kl/ 0/C lne (Quad Moose) Under construction by PGCIL

3 llikaner 2x1500 MVA 400 kV GSS Blkaner 400 kV SIC line (Quad Moose) Under construclion by PGCIL '

400 kV GSS Bhadla 400 kl/ SIC ine (Quad Moose) Under construction by PGCIL

.. Bhadta 3x1500MVA+ 400 kl/ GSS Shadla 400 kV 0/C line (Quad Moose) Undlw construction by PGCil 3x500WA

5 Fatehgam lnlillly orfy 400 kV No Interconnections wiCh RI/PN GSS - -

B MIG kV GSS (Exla1lngl

220 kl/ GSS Kukas 220 kl/ S/C line ExlsUgn Qne

220 kl/ GSS Kunda Kl Ohanl 220 kV SIC lne Exlltlgn fine

1 Bani 2ll315 + ht500 MVA 220 kV GSS lrdra Gandhi Nagar 220 kV SIC lne Emtlgn Ina 220 kV GSS Bagru 220 kV SIC Ina Exlsllgn ftne

220 kV GSS Dausa 220 kl/ 0/C line Existlgn line

220 kl/ GSS Bhiwadi 220 kl/ SIC line Existlgn Una

2 llhiwadi 3x315MI/A 220 kl/ GSS Khlshkhera 220 kV 2xSIC line EJdstlgn Nne 220 kV GSS Naamrana 220 kV SIC line Eldstlgn Nne

220 kl/ GSS Bhlnmal 220 kV 2xSIC line EJdstlgn line 220 kl/ GSS Sanchore 220 kV SIC line Existign Hne

220 kV GSS Sirohl 220 kV SIC line Exlsllgn Nne 3 Bhklmal 2x315MI/A 220 kl/ GSS Sayta 220 kl/ 0/C line

Line won: has been complied OOt 220 kV bay wor11:s at 400 kV GSS Bhnma! are not ready.

220 kl/ GSS Kankroll 220 kl/ 2xS/C line ExtsUgn nne

.. l<.wlkroll 3x315MI/A 220 kV GSS Dalla~ 220 kV SIC line Existign line

220ki/GSSBhlwara 220 kl/ SIC line Emllgntlne

KTPS Generationg S'flftchyald 400 kV D/C KTPS-Kota(PG) lne (Charged at 220 kV) Exlsllgn line

5 Kola 2x315MVA 220 kl/ GSS Mandalgarh 220 kl/ SIC line Existtgn line

220 kl/ GSS Duni 220 kl/ SIC line Exlstlgn line 400 kV GSS Ratangarh 220 kl/ 0/C Une Existtgn Nne

220 kV GSS Sikar 220 kl/ D/C line Emtlgn Nne

6 Slk&r 2x315MVA Construction work ottine is in

220 kl/ GSS Nawalgarh 220 kV SIC line progress and lkety to be completed by FY 2017-18

220 kl/ GSS KolpUtll 220 kl/ SIC line Existlgn lne 220 kl/ GSS Manolwpl6 220 kl/ SIC ine Existlgn Ina

7 Kolpulli 2x315MVA 220 kl/ 0/C Bansur 220 kl/ OIC line line won: has bean complied but due to telemetering issues line has not put on load.

220 kV GSS Neemrana 220 kl/ SIC Nne Existtgn Nne

220 kl/ GSS Khushkhera 220 kV SIC lne Exlstlgn Wne 8 Naamrana 1x315 + 1JC500 MilA 220 kl/ OIC Behror 220 kV 0/C Hne

Une work has been complied but due to telemetering issues line has not put on load.

220 kl/ GSS Chaksu 220 kv SIC line Exlstign Wne

9 Jalpor(Soo.4h) 2xSOOMVA 220 kl/ GSS Duni 220 kl/ SIC ine Eldstlgn 1ne

220 kV GSS Sez(J_.,.,) 220 kl/ SIC ine EJdstlgn line

220 kl/ GSS Goner 220 kV SIC line Exlstlgn line

220 kV DIC Vatika 220 kl/ 0/C line Line won: has bean complied J but due to telemetenng iSsues ftne has not put on load.

Total 7355MVA

~

ciD An.-~-2-

Expected GSSs from 1.1.2017 to June, 2017

S.No. Name of scheme MVA Expected Tarcet month of completion

400KV

1 Bhadla 1500 31.05.2017

220KV '

1 Bhawani mandi 100 30.04.2017

2 Amberi 100 30.06.2017

- - --- -- ---- --- L__

Expected lines from 1.1.2017 to June, 2017

S.No. Tran5mlsslon Line Name CKm Expected month of completion

Rajasthan Vldyut Prasaran Nigam

ltd.(RVPNll 400KV

1 400 KV 0/C Bhilwara TPS- Ajmer line 320 Feb'17

2 400 KV 0/C Chittorgarh • Bhilwara line 99 Mar'17

3 400 KV D/C Bhadla-Bikaner 379 March.,17

Total400kV 798

220KV

1 220KV D/C Ajmer- Jethana line 120 Feb'l7

2 220 KV 0/C Lne from PGCIL'S 400/220 KV 54 March.,l7 Neemrana(PG) to 6ehror

' 3 220KV D/C Jaipur South(PG)· Vatika( 155.68 56 March.,l7

ckM)

4 220 kV D/C line from jaipur (North)· 80 March.,17 Manoharpur upto LJLO point of 220 kV S/C VKIA- Kukas at Jaipur (Nortij

5 220 kV S/C Modak- Bhawanimandi line 41 March.,17 (37.647 8/C+ 2.397 D/C km) i

6 LILO of 220 kV S/C Kankroli (PG)-Debari line 30 March.,l7 at Arnberi (Turnkey) (30.294 ckM)

7 LILO OF ONE CKTOF U/C 220KV D/C 33 March.,17 RAMGARH GTPS-DECHU AT 220KV GSS AMARASAGAR

8 220KV D/C JODHPUR(new)- JHALAMAND 40 March.,17

9 220KV D/C JODHPUR(new) • BARLI, 92 March.,17

10 220KV D/C CHATRAIL • RAMGARH, 90 March.,l7

11 220 KV D/C PS NO.l/BAJJU- BHADLA, 67 March.,J.7 I

Total220kV 703

I ---- --

b

C:\Users\RRVPNL\Desktop\Expected achievement up to June., 2016- CopySubstatlons

NRPC OCC Meeting: Substations likely to be commissioned in next 6 months in Haryana (220KV & above)

Sr. Owner Name of Substation Voltage level Likely date of All Agency Whether Status of Down below Network/ No. energization arrangements responsible down-below Any other relevant information

for telemetry for network is from date of executing likely to be energization down-below ready along have been made network with sub-(Y/N) station?

(Y/N)

1 HVPNL 22 KV GIS SIStn. Sec-20, 220166 KV 31.03.2017 N HVPNL Yes 66KV SIStn Ph-IV, Gurgaon, Sec Gurgaon 3x100 MVA, 220166 23A, DLF Q Block, Ambience, Ph-KVTIF I and 66KV HLF feeder

2 HVPNL 22 KV GIS SIStn. Sec-57, 220166 KV 31.07.2017 N HVPNL No 66KV SIStn Sec-45 Gurgaon, Gurgaon lxlOO MVA, 220166 Sec-51, DMRC feeder KV T IF, lxlOOMVA, 220I33KVTIF

3 HVPNL 220 KV GIS SIStn. Sec-33, 220166 KV 30.04.2017 N HVPNL Yes 66KV SIStn Sec-34 Gurgaon, Gurgaon · Sec-lOA, Sec-38 Gurgaon.

4 HVPNL 220 KV GIS SIStn. 220166 KV 30.06.2017 N HVPNL Yes 66 KV SIStn. Jamalpur Panchgaon

5 HVPNL 220 KV SIs Meerpur Kurali 220166 KV 30.04.2017 N HVPNL Yes 66 kV Hodal, 66 kV Alawalpur, (Palwal) 220 kV Palwal

6 HVPNL 220 KV SIStn. Rozka Meo 220166 KV 31.12.2017 N HVPNL Yes 66 kV Sohna, (Palwal)

7 HVPNL RGEC Sonepat 220 KV Jun-17 Yes UHBVNL Yes Existing 33 KV S I Stn. Aterna will be shifted. 1 no. 33 KV S I Stn. by HUDA is ready for energization and 5 no.

·-/ '

8 HVPNL Sector-6 Sonepat 220 KV Apr-17 Yes UHBVNL Yes 3 no. 33 KV S/Stns. by UHBVNL are under construction.

9 HVPNL Bar hi 220 KV Apr-17 Yes HVPNL I Yes 132 KV lines from Barhi-UHBVNL Murthal S/C and Barhi-

Gannaur D/C are ready.

11 KV Network for 2 x 16/20 MVA, 132/11 KV T fF is already existing.

10 HVPNL 220 KV Sector-32 220 KV 30.06.2017 Yes M/s IKE Yes Electric Pvt. (except Ltd. JV M/s termination of Ethos Power 66 KV lines) Pvt. Ltd.

11 HVPNL 220 kV Pinjore 220 KV 30.06.2017 Yes M/s IKE Yes Electric Pvt. Ltd. JV M/s Ethos Power Pvt. Ltd.

---------- -----------

~

UPPTCL

Sr. Owner Name of Substation Voltage level Likely date of All arrangements Agency Whether down-No. energization for telemetry from responsible below network

date of for executing is likely to be energization have down-below ready along been made (Y/N) network with sub-

station? (Y/N)

1 UPPTCL 220KV Rania 220/66 KV 2.2017 y UPPTCL Yes

2 UPPTCL 220KV 220/66 KV 2.2017 y UPPTCL Yes Chandausi

3 UPPTCL 400KV Mathura 400/220KV 2.2017 y UPPTCL Yes

4 UPPTCL 400KV Agra 400/220KV 2.2017 y UPPTCL Yes South

5 UPPTCL 400KV Banda 400/220KV 2.2017 y UPPTCL Yes

6 UPPTCL 220KV.Hapur 220/66 KV 3.2017 y UPPTCL Yes

7 UPPTCL 220KV Pilibhit 220/66 KV 3.2017 y UPPTCL Yes

8 UPPTCL 220KV Sikandra 220/66 KV 3.2017 y UPPTCL Yes Kanpur Dehat

9 UPPTCL 220KV Marti 220/66 KV 4.2017 y UPPTCL Yes

i 10 UPPTCL 220KV 220/66 KV 4.2017 y UPPTCL Yes Barabanki

11 UPPTCL 220KV Bansi 220/66 KV 4.2017 y UPPTCL Yes

12 UPPTCL 220KV Kanpur 220/66 KV 5.2017 y UPPTCL Yes Road GIS

13 UPPTCL 220KV Sarh 220/66 KV 5.2017 y UPPTCL Yes I

14 UPPTCL 220KV 220/66 KV 5.2017 y UPPTCL Yes Neebkarori

I

15 UPPTCL 220KV Bhadura 220/66 KV 6.2017 y UPPTCL Yes Ghazipur.

16 UPPTCL 220KV 220/66 KV 6.2017 y UPPTCL Yes Azamgarh-II

17 UPPTCL 220KV 220/66 KV 6.2017 y UPPTCL Yes Raja ka Talab

18 UPPTCL 220KV 220/66 KV 7.2017 y UPPTCL Yes Amroha

19 UPPTCL 220KV 220/66 KV 7.2017 y UPPTCL Yes Pahari

- L__ ·-·--- -

\o

Following stations of PSTCL shall be commissioned in next 6 Months: Owner Name ofs/s Voltage Likely date of Energization Telemetry in Agency Network is likely Other

. Level order Responsible to be ready by Information

(KV)

Rajpura (2"a SOOMVA T/F) 31.03.2017 Yes Already Existing

400/220 Dhuri (Addl. SOOMVA T/F) 31.03.2017 Yes Already Existing

Hoshiarpur (UG from 132kV) 31.05.2017 No Already Existing

Kanjli (Addl.1x100MVA T/F) 31.05.2017 Yes Already Existing

Nurmehal (Aug- 20MVA 66/11KV T/F) 31.03.2017 No Already Existing

Bhari (U/G from 66KV) 31.03.2017 No Already Existing

Bhawanigarh (U/G from 66kV) 31.05.2017 No Already Existing

Ladhowal (lx160MVA T/F) 31.05.2017 No Already Existing

PSTCL Talwandi Bhai ( Addl.lx100MVA T/F) 220/66

31.05.2017 No PSTCL Already Existing

Ablowal (Addi.100MVA T/F) 31.03.2017 Yes Already Existing

Sarna (Addl.1x100MVA T/F) 30.06.2017 No Already Existing

Mahilpur (Addl. 100MVA T/F) 30.06.2017 Yes Already Existing

Bagha Purana (Addi.100MVA T/F) 30.06.2017 Yes Already Existing

Dharamkot (Addl. 100MVA 220/66KV T/F to 30.06.2017 Already Existing

replace 50 MVA, 132/66KV T/F) Yes

GT Road Mall Mandi Amritsar 132/66

31.03.2017 Already Existing

(Aug- 2*50 MVA 132/66KV T/Fs) No

\\