• IN THE HIGH COURT OF BOMBAY AT GOA
PORVORIM GOA
Suo Motu Writ Petition No. 2 of 2007
... Petitioner
Versus
State of Goa through Chief Secretary and others ... Respondents
AFFIDAVIT ON BEHALF OF THE GOA STATE
POLLUTION CONTROL BOARD
I, Dr. Shamila Monteiro, daughter of Shri. Augusto
Monteiro, aged about 50 years, Indian National, residing at
H.No.5, Uttam Darshan, opp. Sai Baba Temple, Kadamba
Plateau, Chimbel, Tiswadi-Goa, do hereby on solemn
affirmation state and submit as under:
• 1. I state that I am the Member Secretary of the Goa
State Pollution Control Board, and the Respondent
no.2 herein. I state that I have been authorised to file
the present Affidavit on behalf of the Respondent no.2.
2. I state that vide order dated16/02/2022, passed in the
present matter this Hon. Court was pleased to direct
the Respondent Board to file affidavits of Status
Report/Compliance/Verification with regard to
compliance by ULBs with the Respondent Boards
directions issued to them in terms of the SWM Rules
2016.
3. In this regard I state that the Respondent Board on
receipt of affidavits claiming compliance with the
Boards Directions as filed by all the Municipal Councils
and the CCP, has conducted site inspections of the said
ULBs, in order to verify the claims of having complied
with the Boards directions.
Annexed herewith and marked as EXHIBIT-A
colly is a copy of the compilation of Reports of
• Inspection conducted by the Board Officials in
this regard.
4. I state that the Reports of the inspection as aforestated
indicates that the CCP and the Municipal Councils of
Bicholim, Mapusa, Valpoi, Quepem and Sanquelim
have complied with the Respondent Boards directions
dated 19/07/2021 and 02/09/2021 as issued under the
SWM Rules 2016; while the Municipal Councils of
Cuncolim, Curchorem, Canacona, Mormugao, Ponda,
Sanguern, Pernem and Margao have failed to comply !
with the said directions.
5. I state that in this regard the Board proposes to issue
further directions to the defaulting Municipalities to
submit Bank Guarantees so as to ensure compliance
with the Boards directions within a stipulated time
period.
• 6. I state that whatever has been stated herein
above is based on the records available in the
office of the Respondent Board to which I have
access and I believe the same to be true and
correct.
Solemnly affirmed at Panaji Goa
On this day of March, 2022
iE>oEJafle(l)''N E,,N T Goa State Po\\ution"tont! .. u •
Identified by me:
• Goa State Pollution Control Board
Saligao, Goa
INSPECTION REPORT
VF,RIFICATION OF COMPLIANCic TO SOLID WASTE MANAGEMENT RULES (SWMR)2016
Ref's Office Order no: 8/37/21-PCBffech/18556/Tcch/20074 dated 23/02/2022
As directed vide order referred above, the undersigned official of the Board, Mr. Devcsh Gholkar (Jr. Env. Engineer) carried out a site inspection of the solid waste management facilities of the Bicholim Municipal Council on 25/02/2022. Mr. Rajesh Fadte (Municipal Engineer-III) was present during the site inspection. The observations made with regards to the directions issued by the Goa State Pollution Control Board, the reply submitted by the unit and the present status/observations made are tabulated in the following table: r,c;-···r·-~---- --~--·---· · Sr. Direction issued by Observations made during No. the Board inspection dated 30/11/2021
·····1----------- --~----·-··-~y----- - 1. Take immediate . 1. As observed during 1. As observed during I steps to enhance the I inspection installation of inspection instailation of I · 1· ·1 · -
1
1 compostrng ncr mes inorder lo ensure
· effective treatment I 2, of biodegradable waste generated by the council within a period of 3 months.
Observations made during inspection dated 25/02/2022
2.
3.
I L.
Submit a detailed compliance report/status report on the compliance by the Municipal Council with Rule
i 15 of the SWMR ' 2016 within a period of 7 days from the date of receipt of this directions.
Submit a Bank Guarantee of Rs.2 lakhs with a validity ·1·
period of 6 months , to the Board within a period of 7 days from the date of
Bio methanation plant was under progress. Council is dealing with I 2. Windrows Composting in well scientifically manner and also screening of activity was during the inspection.
Complied
observed compost
operational time of
Bio mcthanation plant was under progress, Council is dealing with Windrows Composting in well scientifically manner and also observed screening of compost activity · was operational during the time of inspection.
Complied
Council has submitted- ·1. Council luisu'bmitle'J. Bailk1
Bank Guarantee of Rs. 2 Guarantee of Rs. 2 lakhs. The lakhs vide l.JTR no. Board bas refunded the Bank N42]277023372 dated Guarantee as the Council has 04/10/2021.
Complied
complied as per inspection report dated 30/11/2021. Complied
____ _]_ ---- ----·-----'----·~- ··-------J Pagel of2
• Goa State Pollution Control Board Sa!igao, Goa
I I receipt of this
direction towards I ensuring compliance of the above measures w.hhin the stipulated time period.
'
~litional Observations : i
i) With regards to the directions bearing no. 8/28/S/2 I-PCBfrECH/1579 I dated 01/12/2011, the Council has repaired the Weigh Ill'idge, which has iustallcd at MRF site and same was in operational during inspection.
ii) Council has applied for renewal of Authorization of MRF facility vide application no. '/032614 with the Board
iii) Council has obtained Consent to Establish for Installation of Bio Methanation Plant of capacity 5TPD.
iv) Council has applied for CTE for operation/processing of Dry Waste (Non Biodegradable waste) and Solid waste (Biodegradable waste) vide application no. 1101391 Presently online status of the application shows that 'Payment not initialized from Council'.
v) As observed during inspection Council has complied with the SCN issued by the Board.
vi) Council has submitted Bank Guarantee of Rs. 2 lakhs vide UTR no. N42 I 277023372 dated 04/10/2021.
,1/ DeveslJ Gholkar
Junior Environmental Engineer
Page2of2
• Curcflorem Cocora Municipal Counc/1_/nspection Report 08.03.2022
INSPECTION REPORT
Subject: Compliance to Hon'ble High Court in Suo Motu Writ Petition No. 2/2007
lnsp. Order No.: 8/37/21-PCB/Tech/18556/Tech/20929 dated 07.03.2022
~-- Sr. No. Description Details ----·-- -~·· -- 1 Name of Municipal Council Curchorem Cacora Municipal Council
2 Date of Inspection 08.03.2022
3. Name of official present: Shri. Dhiraj Sawant (Municipal Inspector) ----'-··--
Sr. Direction issued by the Board on Observations made during Inspection on No. 19/07/2021 08.03.2022 . . 1. Ensure that all the composting Composting units located at sy.no 168,
units installed by the Council are Kha rgateghatl-Cacora were operational. made fully operational/ functional Leachate collection tank is provided to collect
within a period of 3 months from leachate generated. lt was observed that waste
the date of receipt of this direction. collected from market area is treated in
composting pits. '
The municipality has installed 0.STPQ capacity
Bio- Methanation plant in the market areasame
is in operation. However only waste from
vegetable market is treated and Bio-
methanation plant is operating at much lower
capacity.
Partial compliance to directions issued. -- - 2. Ensure that the dumping of Shri. Gajanan Kamat (Engineer-GWMC) was
unsegregated mixed waste at the present at site wherein 100 TPD Solid Waste
waste treatment site l.e. is Management Facility is being setup. It was currently handed over to Goa informed that the dumping of waste is along the
Waste Management Corporation approach road to site. It was informed that
(GWMC) for the construction and dumping of waste is undertaken by Curchorem L-- .. ··--
Page 1 of 1 Goa State Pollution Control Board
• Curcborem Cacora Municipal Counci/_/nspection Report 08.03.2022
·------r . -.-, establishment of the 100 TPD Cacora Municipal Council, Sanguem Municipal
common waste treatment facility at Council, Xe!dem Village Panchayat and Assolda
Curchorem Cacora is stopped with Village Panchayat.
immediate effect and that the Waste dumped along the approach road to 100
existing dump waste is cleared/ TPD SWMF at Cacora was observed.
remediated in an environmentally GWMC official informed that remediation of
sound manner, within a period of 3 waste which is dumped outside the acquired
months land will be undertaken after the 100 TPD SWMF
is commissioned.
It was also informed that security personnel will
be deployed at the entrance gate.
Not complying to the directions
3. Submit a detailed compliance/ The Municipal Council vide letter dated
status report on the compliance by 03/09/2021 has submitted report of compliance
the Municipal Council with Rule 15 to rule 15 of Solid waste management.
of the SWMR 2016 within a period Waste collected from vegetable market Is
of 7 days from the date of receipt treated in composting pits and Bio-methanation
of these directions. plant. Segregated Dry waste collected in sent to
Baling Facility of GWMC at Kakoda IDC.
Municipality is not treating all the waste
collected.
Complied to the directions of submitting the
·-=----.,-,c-c:-1~--:--:--c-- . I Submit a Bank Guarantee of Rs.2 Municipal Council had transferred amount of Rs
lakhs with a validity period of 6 2 lakhs to Board account by NEFT/RTGS towards
months to the Board within a bank guarantee amount. The same is forfeited
period of 7 days from the date of by Board considering the non-compliance
receipt of this direction towards observed during the inspection conducted on
ensuring compliance of the above 27/10/2021.
4.
status report.
measures within the stipulated
I time period.
Page 2of2 Goo State Pollution Control Board
• Curchorem Cocora Municipal Counci/_/nspection Report 08.03.2022
Recommendations:
1. \/Vaste from residential units should be collected in segregated manner only.
2. All the wet waste generated from the restaurants and residential units should be treated
if1 0.5 TPD Bio-methanation plant and the composting units.
3. All the dry waste generated should be sent to Baling facility of GWMC at Kakoda !DC.
4. Dumping of waste in open at Sy. No. 165 at Khargateghati-Cacora should be discontinued.
5. The waste dumped at Khargateghati-Cacora should be remediated.
6. Municipality shall direct all the commercial establishments to obtain Consent to Operate
from Board.
Name of the Inspecting Officials:
i i~///. w· 5hr ~r Borkar
Senior Laboratory Assistant
{py Shri. Shashank Dessai
Junior Environmental Engineer
Page3of3 Goa State Pollution Control Board
• INSPECTION REPORT
Subject: Compliance to Hon'ble High Court in Suo Motu Writ Petition No. 2/2007 lnsp. Order No.: 8/37/21-PCB/Tech/18556/Tech/20074 dated 23.02.2022
------~ ----- '""""··-·---·--·····---··--·-·---------- - ---- Sr. No. Description Details -------- -··--·-- 1 Name-of Municipal Council Canacona Municipal Council
2 Date of Inspection 24.02.2022
,···s;Toirection issued by the Bo~rd on I Observations during inspection on No.:_j__ 19/07/2021 24/02/2022
I----- Take -i·m-~-e-d i-at-e-;t·~·p·;·--t~···-~-fo-. a-, r--;~di-L-eg_a_c_y_w_;_,t_e_d ~-m ps·-a_t_D_h __ u_m_a_n_e_s-it_e"_o_f
dispose off the wet waste dumped Municipality are not cleared. Screening Machinery to undertake remediation is brought at site and it was informed that remediation works are undertaken by GWMC and same shall be commenced in March 2022 and will be completed by May 2022. Municipality has set up STPD capacity Bio Methanation Plant at waste management site at Survey No. 93/2, Dhumane Canacona. Wet waste collected will be treated in the Bio-methanation plant. Bio-methanation plant was in operation. Partial Comp!Iance to Direction issued
1
2 I Take immediate steps to stop flow No leachate formation was observed from of leachate from unsegregated the waste dumps during the visit. waste into the open at the waste Some waste dumps were covered with
outside the shed at the waste treatment plant at Dhumane in environmentally sound manner within period of three month
treatment plant at Dhumane ... ------ ------------- :rr----- Provide and operate adequate Municipality has set up s·11-'U capacity Bio-
composting facility to t-eat the Methanat!on Plant at waste management biodegradable waste generated site of Municipality. Wet waste collected by
3
tarpaulin. Partial Compliance to Direction issued
---
from the council Municipality will be treated in the Bio methanation plant. Compliance to Directions issued.
Page 1 of3
• -·--_...-· -·-----------· 4 Take immediate steps to clear black The identified black spots are cleared by
spots observed during the site Municipality. inspection Compliance to Directions Issued.
5 Take immediate steps to enhance Municipality collects wet and dry waste collection of non biodegradable separately by door to door waste collection waste mechanism. It was informed that the
• recyclable waste generated in most of the commercial establishments such as shacks, Restaurants etc is sold to rag pickers and thus quantum of dry waste collected is I proportionally less. I Instructions are given to Municipality to register/ authorise the informal sector and .. maintain the data. Partial Compliance to Directions issued.
6 Submit a detailed compliance Municipality has submitted the compliance report/status report on the report of rule 15 of the SWMR 2016. compliance by the Municipal Council with Rule 15 of the SWMR 2016 within a period of 7 days from
I-----· the date of receipt of this directions.
------ - -·- 7 Submit a Bank Guarantee of Rs. 2 Municipality had submitted Bank Guarantee
lakhs with a validity period of 6 of Rs. 2,00,000/- dated 05/10/2021. months to the Board within a period GSPCB forfeited the Bank Guarantee of 7 days from the date of receipt of submitted on 31/11/2021, since Canacona
I this direction towards ensuring Municipal Council had not fulfilled the compliance of the above measures conditions laid down by GS PCB.
I within the stipulated time period. L
Recommendations:
1. The existing waste dumps at Sy.No.93/2, Dhumane-Canacona should be
remediated and the remediated fractions should be disposed by
GWMC/Munlcipality of prior to monsoon.
2. All the exposed waste dumps or any recovered fractions dump should be
covered with tarpaulin before monsoon. Adequate measures should be taken to
ensure that there is no leachate generation.
Page 2 of 3
• 3. The STPD Biomethanation plant set up at Dhumane site should be operated and
~II the wet waste generated .should be treated on daily basis in scientific manner
and no waste shall be dumped in open.
4. Tipping floor area of bio-methanation plant should be provided with proper shed
and no waste shall be handled in open.
5. Solid-liquid separator and proper d!gestate drying facility should be constructed
to recover solids from digestate/effluent generated from Bio-methanation plant
and compost shall be produced.
6. The un-utilized/non-recycled waste water/effluent generated from Bio
methanation plant should be disposed in nearest Government STP.
1. Should ensure that the black spots do not reoccur and should place a mechanism
to penalize the habitual offenders.
8. Installation of weighbridge should be completed within a month's period and
daily records of waste received and treated should be maintained.
9. Awareness programs should be undertaken periodically and waste should be
collected in segregated manner.
10. The informal sector shall be authorized/registered and the data of waste handled
should be maintained.
11. Mechanism should be put in place to collect and store E-waste and Domestic
Hazardous waste.
(pj~~ Shas~4D,essai (JEE)
Page3of3
• Goa Slate Pollution Control Board Saligao, Goa
INSPECTION REPORT
VERlFICA TION OF COMPLIANCE TO TIIE DIRECTIONS ISSUED BY THE GOA STATE POLLUTION CONTROL BOARD
llef: Office Order no: 8/37/21-PCllffecb/19367/ dated 08/02/2022
As directed vrde order referred above, the undersigned official of the Board, Mr. Rohan Nagvekar (Asst. Env. Engineer} and Samir Borkar (SLA) carried out a site mspection of the solid waste management facilities of the Corporation of the city of Panaji (CCP) on 09/02/2022 .As per Honble High court order dated 12/01/2022 that the GSPCB shall take into consideration the afores;id affidavit and report the court on next date oflisting.
Mr Nagesh Ta/aulikar (Municipal Engineer) and Mr. Dylan Fernandes were present during present during the site mspecnon,
Sr. No II ' I I ' ' i ' I j j __J 2
Directions Observations made during 09/02/2022
waste
Improve and!· l. Al the time of inspection MRF facility was in operation enhanc.e the 2. The CCP has 3 nos. of Bailing machines and 3 conveyor belts a1 collecuon [ MRF site. CCP has installed new bailing machine of capacity 500 mechanism of Non- I Kg/h Biodegradable I r. .
3. Door to door collection is carried out by the CCP mall the wards 4. The CCP has installed Litter Bins at all the public places within their jurisdiction. COMPLIED
I I
Additional facility for treatment of wet waste is required
1. The Corporation of the city of Panaji has installed Bio-Digestor
Plants at Goa Reserve Police HQ Altinho (Capacity-150 Kgs/day),
Government Polytechnic A!tinho (Capacity-150 Kgs/day) and near
CCP garage (Capacity-300 Kgs/day), The Bio-digestors were in
I operation at the time of inspection. CCP is also in the process of mstalling Bio-Digester Plants at 8 different locations within their jurisdiction.
2. Further CCP has exisung composting units at 80 residential
!
!
l I 13 The CCP has provided composting facility of 3.0 TPD at market .l area to 1ceat the wet waste generated within the market area.
---
complexes of which some of the composting units were m operation at the time of inspection.
Page 1 of3
• Goa Stale Pollution Control Board
Saligao, Goa 1-~ -------~-----,:;--------- ------------------------------- : ) I 4 CCP has composting facility of approx. capacity 5.0 TPD near · , i I I l i the Heera Petro! Pump. I I I
I 1 5. As informed by CCP representative, approx 15.0 TPD of wet
waste is transported to GWMC site at saligao for treatment.
6 CCP 1s in process of installing static aeration systems for existing
composter units .
7. CCP is in process of utilising existing composting units at D1vJa
circle .
I " ' - I ! ' I I I I I ' , L _ I 3 I Submit a detailed I j compliance/ status ) j report on the j i compliance b)~ the
; Municipal Council 1 with Rule ! 5 of the SWMR 2016 within a penod of? days from the date of receipt of these directions. I
~
I
Since approx 15.0 TPD of wet waste of CCP is transported to
GWMC site at saligao for treatment. CCP is presently complying to direction wrt to wet waste disposa.l,
CCP has submitted detailed compliance status/reJ)Ort on - thJ compliance with Rule 15 of the Solid Waste Manager:nent Rules 2016 COMPLCED.
Submit a Bank ,
1
Guarantee of Rs.2 lakhs with a
I validity period of 6 I months to the I Board within a I penod of7 days j fro~ the ~at~ of
I receipt ot this , direction towards I ensunng j compliance of the ! above measures ! within the
L U~r_i~_~::.~~.~.~~------_i_-·------------~-----~----·--------
As per direction dated 02/09/202 l CCP was directed to Submit a Bank Guarantee of Rs.2 lakhs with a validity period of 6 months to the Boa.rd within a period of 7 days from the date of receipt of th.is I direction towards ensuring compliance of the above measures within I
! the stipulated time period. 1 However CCP has submitted bank Guarantee ofRs.2 lakhs to Board I on 01/12/2021-
! J Page 2 of3
' • Goa State Pollution Control Board Saligao, Goa
JliCOMMENDATIONS: ~
CCP is transporting approx. lSTP.D of wet waste to solid waste treatment plant
of G\VMC at saligao for treatment. CCP is presently complying to direction with
respect to wet waste disposal,
2. The CCP should ensure that all the composting units located at different locations should be made operational
(SL.A)
Roha~
(Asst. Environmental Engineer)
•
Page3of3
• INSPECTION REPORT
VERIFICATION OF COMPLIANCE TO THE DIRECTIONS ISSUED BY THE GOA STATE POLLUTION CONTROL BOARD
Ref: Office Order no: 8/37/21-PCB/Tech/18556/Tcch/20074 dated 23/02/2022
As directed vide order referred above, the undersigned officials of the Board, Mr. Samir Borkar(SLA) & Mr.Siddhant Prabbu Dcssai (Jr. Env. Engineer) carried out a site inspection of the solid waste management facilities of the Cuncolim Municipal Council (CMC) 011 23/02/2022 for verification of compliance to Solid Waste Management Rules (S WMR) 2016.Mr. Vinay Dessai(ME-11), Mr.Dilkush Gaonkar (Municipal Engineer-JI!), were present during the site. inspection .
.. ----------- --·------ ----- 1~·-1 Direction · issued by No.
----------- ---- UJJVI J'LIA NCE TO THE- DIRECTIONS ISSUED DY rue BOARD:
the Bonni l 9/07/2021
I I
Observations during on I inspection on 30/11/2021
Upgrade the composting facilities installed by the municipal council so as to ensure effective treatment of the waste within a period or 3 months.
---~---------·-·--·-
The wet waste received at the WASte facility is
----·- ~-- Observations during inspection OJI 23/02/2022
management i
treated by I windrow composting method. Floor of the shed wherein the composting is carried out is in dilapidated condition and has to be repaired on urgent basis. It was observed that the waste is not collected in the segregated manner and plastic waste was also observed composting
windrow
in the piles of
,___ . - . --------· •
•
The wet waste received at the waste management facility is .
1 treated by windrow composting method. · Floor of the shed wherein the windrow composting is carried out is yet to be repaired
• Council carries out door to door collection thrnugh agency.
• It was observed that the waste is not collected in the segregated manner.
• Municipality is in process of instailation of 500Kg/day biogas plant for treating the wet waste through GSUDA
windrows. Wet waste and dry waste is handled in same shed. The Municipality has constructed another shed adjacent to the existing shed, however the same is I NOT COM})]AED not utilized. Municipality has requested GSUDA for installation of 500Kg/day -------- "~-
Page1of4
• ,-r------i -- biogas plant for treating the wet waste by
. biomethanation process in order to upgrade the wet waste treatment facility.
r-- NOT COMPLIED 2 l Ensure operation of Municipality has cleared Municipality has cleared the I
leachate collection the waste around the waste around the leachate tank installed by the leachate collection tank. collection tank. However it was council within 3 However it was observed observed that the tank was months. that the tank was filled filled with leachate. Leachate
with leachate, which / collection tank is open to sky.
3
indicates that leachate is not disposed periodically. Leachate collection tank is open to sky, thereby ullowing the monsoon run onhain water to enter the J NOT COMJ>LIED leachate collection tank, NOT COMPLIED
Ensure up gradation The municipality hi1s The municipality bas and operation of the constructed shed having constructed shed having area of material recovery area of about 525sqmts for about 525 sqmts for setting up facility in order to setting up MRF facility. MRF facility. At the time of ensure effective However the same is not inspection MRF was in operation within a .• ,
period of 3 months.
4 immediately stop the dumping of mixed waste outside the shed and the leachate collection tank
utilized <1s Electrical supply is not provided for the new shed constructed. Weigh bridge ts not installed so <1s to record the quantum ofdai!y waste received and disposed. The existing landfill at the site is to be repaired and put in operation. NOT COMPLIED / COMPLIED
operation
During the inspection dumping of fresh waste in open was not observed. However the non biodegradable waste bales were stored in open. There exist waste dumps
council _and ensure J besides the waste L L.:_~~--~xistingJ ~
1 __J
installed by the
During the inspectio11 Mixed waste was dumped outside the shed . And it was observed that the RDF were stored in open.
NOT COMPLIED
Page 2 of4
• clumped waste these location
at I management facility. be Remediation of the waste
removed and I dumps is not undertaken. disposed off in an NOT COMPLIED scientific sound manner within period of 3 months.
5 Submit a detailed I Municipa!ity has compliance submitted the compliance report/status report report of rule 15 of the 011 the compliance by SWMR. 2016. the Municipal It was observed during the Council with Rule .15 inspection that of the SWMR 20 J 6 municipality is not within a period of 7 complying with the all the days from the date of provisions of the rule 15 of receipt of this the S'A'M:R, 2016. directions.
Municipality has submitted the compliance report of rule 15 of the SWMR 2016. COMPLIED
~-) Submit
receipt direction
a Guarantee of
Bank Rs.2
lakhs with a validity period of 6 months 10 the Board within a period or 7 days from the date of
of this towards
Municipality has submitted Bank Guarantee of Rs. 2 lakhs. The Bank Guarantee is valid upto 03/04/2022.
Municipality has submitted Bank Guarantee of Rs. 2 lakhs .. The Bank Guarantee submitted by the CMC has been forfeited by the board for the Non Compliances observed during previous inspection dated 3011 l/2021.
ensuring compliance of the above measures within the stipulated time period. ~=-'--'c-c~-~~ --'--· _j ..J
Additonal Observations:
l .Munic!palHy is in process of installation of 500Kg/day biogas plant for treating the wet waste by biogas process through GSUDA
2.Jnstal!ation of weigh bridge was under progress.
3.Remcdiation of Legacy waste through GWMC was in process.
4.Incinerator has been installed for disposal of sanitary waste.
5. Council carries out door to door collection through agency.
Page3of4
•
• Recommendation~
I. Flom of the siled for windrows composting is required to be repaired on urgent basis.
2. Municipality should expedite the process lo set up 500 Kg/day Biogus plant for treating wet waste on urgent basis.
3. Measures should be undertaken to restrict the monsoon runoff entering the leachate
collection tank and dispose off the leachate periodically.
4. Installation of weighbridge should be completed immediately and daily records of
waste received and treated should be maintained.
5. The municipality has to establish waste deposition centers for domestic hazardous waste.
6. The existing landfill ell the site is to be repaired and put in operation.
(~/· Mr.Sam i r"Borkar(SLA)
.. " ,tib- .~ ,r1·
Mr.Siddhl'l.~t Prabhu Dessai (JEE)
Page4of4
• INSPECTION REPORT
VERJJ11CATION OF COMPLIANCE TO THE DIRECTIONS ISSUED BY THE GOA STATE POLLUTION CONTROL BOARD
Ref: Office Order no: 8/37/21-PCB/Tcch/18556/Tcch/20074 dated 23/02/2022
As directed vide order referred above, the undersigned officials of the Board, Mr. Samir Borkar (SLA) &Mr.Siddhant Prabhu Dessai (Jr. Env. Engineer) carried out a site inspection of the solid waste nrnnagcmcnt facilities of the Mapusa Municipal Council (MMC) on 24/02/2022 fer verification of compliance to Solid Waste Management Rules (SWMR) 20l6.Prasha11l Narvekar/Mg-H), Mr.Nadecm Sheikh (ME-111), Mr. Sangeeta Satardekar (ME-JIJ),Shubh Arnonkar(ME-JJI) were present during the site inspection.
Sc.
No
Directions dater
1 Ensure that the c
ins ta lied by the C
fully operational
within a period o
from the date of
directions
2 Provide adequat
..... , __ -· _________ , .. ___ 02/09/202 l Observations mndc on Observations made on
30111/2021 24102/2022 rnposting units Composting facility is 1. Composting )tmcil are made operational at Assagao facility at functional site. Decentralised Assagao site was three months composting facility is in operational. eceipt of this operational at only four 2. Decentralised
locations out of the total composting six within the municipal facility were area. operational at Additional 5 TPD only four biomethanation plant at locations out of Cucheiim Site is under the total six trials and yet to be made within the fully operational. jurisdiction
I NOT COMPLIED municipal area. ' !
3. 5 TPD bio
methanatlon plant
at Cuchelfm Site
was in operation
at the time of inspection
COMPLIED e size leachate The leachate collection The leachate collection
···---- ·--·--· Page 1 of 3
• collection tank at centralized tank IS repaired and tank has been repaired composting facility at Assagao appears to be adequate COMPLIED
for the collection of
leachate.COMPLIED MTXed waste dumpe-d outside-i'he ·----- --·~ 3 Mixed waste is observed No mixed waste . observed outside the shed shed should be disposed In a outside the sbed at at Assagao site . scientific manner. Assagao site wet waste of mix.ed
waste is being disposed
NOT COMPLIED using windrows composting COMPLIED -- 4 The new shed of mechanised The new MRf- at The new Miff at
MRF construction at Cunchelim Cunchelim is yet to be Cunchelim was 111
village Bardez should be made made operational operation during operational for proper segregation NOT COMPLIED inspection . end treatment of dry waste COMPLIED
5 RDF stored outside the shed RDF is yet to be disposed RDF has been disposed should be disposed on priority NOT COMPLIED COMPLIED
6 Submit a detailed co1i;j;TI~"-··- The Municipal Council Municipality has /stutus report on the compliance has submitted submitted the compliance
by the Municipal Council with compliance report with report of rule 15 of the SWMR2016.
Rule 15 of the SWM Rules 2016 regards to status of COMPLIED within a period of7 days from the material recovery date of receipt of this Direction facility, biomethanation
plant, bio gas plant,
incinerator, authorisation
and consent of the facility,
Point wise compliance to
Rule 15 is not submitted.
NOT COMPLIEU 7 Submit a BG of Rs. 2 Lakhs with The Municipal Council Municipality has
a validity of 6 months to the transferred an amount of submitted Bank
Board within the period of7 days Guarantee of Rs. 2 lakhs. Rs, 2 Iakhs only to the The Bank Guarantee
from the date of receipt of this Boards account on submitted by the MMC - ----- ·-·--· ----
Page2of3
• direction towards ensuring
compliance of the above
measures within the stipulated
time period.
has been forfeited by the board for the Non Compliances observed during previous inspection dated 30/11/2021 ·~-------~ ----~
04/10/2021.
COMPLIED
Additonal observations:
1. Composting facility at Assagao site was in operational.
2. Designated Black Spots have been beautified.Copy of the photographs is enclosed 3. However clumping is still going on in few black spots which are cleared on daily basis
by MMC. Waste collected from the block spots usually consists of mixed waste. 4. Linering of waste was observed in some places near city roads and drains.
Remediation of Legacy Waste was in progress. 6. Incinerator for disposal of Sanitary waste has been installed at Cuchelim Site but is
yet to be made operational. 7. Installation & Commissioning of Weighbridge has been cornp!cted at Cuchelim Site.
Rccom rncndations:
1 _ Council should ensure that the black spots do not reoccur and should place a mechanism to penalize the habitual offenders.
~;/. Mr.Sartiir Borkar(SLA) Mr.Siddhant Prabhu Dessai (JEE)
Page 3 of 3
• Margoa Municipal Counc/f_fnspection Report
09.03.2022
Subject: Compliance to Hon'ble High Court in Suo Motu Writ Petition No. 2/2007
INSPECT/ON REPORT
lnsp. Order No.: 8/37/21-PCB/Tech/18556/Tech/20929 dated 07.03.2022
Sr. No. Description
Details 1 Name of Municipal Council Margao Municipal Council
2 Date of Inspection 09.03.2022
3. Name of offlc!a/ present: Shri. Vined Kotharkar (JE)
~ Sr. Directions issued by Board on
Observations made during Inspection on No 19/07/2021
09/03/2022 1 Apply for Renewal of consent to
Unit has not applied Consent to operate operate Under the Air act, water act
Renewal which was valld t/11 20/06/2020 and hazardous waste Authorization
Which was valid tlll 20/06/2020 and Directions are not complied
solid waste Authorization under solid
waste management Rule 2016 2
To stop the dumping of wet waste Waste ls dumped outside the waste
outside the shed and to shift wet processing shed at Sonsoddo-Margao.
waste in proper covered area within 7 Directions are not complied
days from date of directions 3 to shift Unsegregated waste stored
Fresh waste dumped outside the waste outside the shed all along the landfill
processing shed at Sonsoddo-Margao, site leachate collectron tank , plant
besides the Landfill is not cleared. side and solid waste bailing stations
Directions are not complied in open in air in covered shed and
disposed In proper scientific manner in Within next month date of directions
--. Page 1 9t _~ ·-
• 4
To repair/replace sheets of the plant Roof of the waste processing shed at
where vermi composting Is carried Sonsoddo·Margao Is not repaired, out Dfrect/ons are not complied
- 5 To dismantle External water pump External water Pump has been installed at fcacheate co!lection tank
dJsmantled,
Directions were complied 6 To dispose Bio medical waste through Margao Municipal Council has disposed
scJentlfic manner following covld·19 the Bio med/cal waste.
guide!lnes issued by central pollution Dfrectlons were compiled
control Board. 7 To cover the remaining part of legacy
Legacy Dumps were covered With Dump and install GI sheet were tarpaunn and GJ sheet were installed compound wall is Not Available where compound wall was damaged, /damaged Directions were complied
8 To collect the /eacheate generated In It was Informed that leachate collected In
leachate corlection tank and transport leachate collection tank is transported to to PWO STP at Nave/Jm Govt. STP at Navelim for treatment.
Directions are complied 9 To stop the waste water from the Present season being dry period there are
dump flowing in the storm water no rains and thus there is no run off.
drains by constructlng or connecting Directiohs were complied
to the leachate collection tank 10 Submit the compliance report with Oetaf!ed comp/fance/status report was regard to the above directions wfthfn submitted
a period of 7 days to this office Directions were complied 11
Submit a detailed compliance/status Detailed compliance/ status report on the report on the compliance by comp/lance by municipal council with rule
munlcipal councJI with rule 15 of the 15 of the SWMR 2016 was submitted.
SWMR 2016 within the a period of 7 Directions issued were complied
Margoa Munfclpr:rf Counc/Unspectlon Report
09.03.2022
Pag~ ~ .o(~---
Goo State Pollution Control Board
• days from the date of receipt of this directions
12 Submit the Bank Gaurantee of Rs S
Municipality has earlier submitted Bank lakhs With a validity period of 6 guarantee of 2 lakhs and the same was month to the Board within a period forfeited by Board considering the non,
of 7 days from the date of receipt of complfance during previous inspection. this direction towards ensuring Municipality has submitted fresh Bank compliance of the above measure Guarantee of Rs. S Lakhs.
within the stipulated time period Directions are comp/led
Margoo Municipal Counc{l_fnspectlon Report
09.03.2022
Additional Observations:
1. Wet waste transported at Sonsoddo waste treatment facility Is dumped inside the shed and proper windrow composting Is not followed.
2. The shed at Sonsoddo site Is full with the untreated wet/mix waste dumped as waste Is not being treated in proper scientific manner.
3. Overhead crane and screening machinery Installed at Sonsoddo shed were not in operation.
4. The waste dumped behind the office building at Sonsoddo had caught fire on 04/03/2022.
The new shed constructed for undertaking baling of dry waste had also caught fire and one baling machine has got damaged.
S. Baling of dry waste is presently undertaken at decentralized dry waste handling site behind Office building of Margao Municipal Councll,
6. Remediation of legacy waste dump at Sonsoddo had not commenced post monsoon. Disposal of RDF recovered from remediation activity had commenced.
7. Unsegregated waste Is dumped besides the landfill at Sonsoddo site and around the leachate collection tank.
Paga }_pf9
• 8. The leach;:ite collection tank is at lower level then immediate surrounding area and thus
there is possibility that monsoon runoff may enter the leachate collection tank.
Maryao Munlcipo/ Counclf_Jnspcctio11 Report 09.03.2022
9. 5TPD Bio-methanation plant installed near SGPDA market was not operation during the time
of inspection. It was informed that only waste from vegetable market about 400-500 kg is
treated in the bio-methanation plant. Plant is not operated at its optimum capacity.
10. Waste from residential units is not collected in segregated manner.
11. It was informed that the re-occurring black spots along the Margao bypass read from Arlem
Circle to Rawanfond Circle and other lacatJons are cleared by Municipality on daily basis.
Photographs:
Fig 1. Waste dumped at waste processinK§hed at Sonsoddo-Mar£ao
P,1r,e 4 of 9 Goa Sl'ate Pollution Control Board
• Morgoo Municipa/CounciLlnspection Report
09.03.2022
Fig 2. Screening machinery at waste processing shed at Sonsoddo-Margao not in use
•,i;i!,, "<~ ._,.,..,..._w,_1,·&,.. .J..
fi_[_3. BalinJL mac~es at waste processing shed at Sonsoddo-Margao
Page5af9
Goo State Po/h1tion Control Board
• Morgao Municipal Coundl_Jnspcction Report
09.03.2022
:i':t+•:.l'it".l',:;:.~_,,1111!/~t~'.Nt. .. ,..,, Fig S. Waste dumped on Le<ichate collection tank at Sonsoddo-Ma_r~g_a_o __
Page fi of 9 Goa State Pollution Control Boord
• Mmgoo Mu11fcipal Council_/11Spcction Reoort
09.03,2022
Fi~ 6. Damag~_~aling machine due to fire incident at Sonsoddo site
'>.
Fig 7. Feeding svstem of STPD Biornethanation plant at SGPDA not in operation.
Goo Stale Pollmiou Control Boord
• Morgao Municipal Councf/_lnspection Report
09.03,2022
Recommendations:
L Municfpality should conduct awareness programs on segregation of waste at source and
should collect waste from res!dences only in segregated manner.
2. S~TPD Blo-methanatlon plant near SGPDA market should be operated at optimum capacity.
Municipality should provide 5 ton wet waste to the plant on daily basis and maintain daily of
waste treated, blogas generated, compost generated, liquid digestate disposed etc.
3. Roof of waste processing shed at Sonsoddo should be repaired prior to monsoon.
4. Machinery installed at Sonsoddo waste processing shed such as cranes, screening machines
should be overhauled and put in operation lmmedJately.
5. Wet waste received at Sonsoddo facllity should be treated scientlflcally by windrow
composting on daily basis.
6. The waste dumped inside the waste processing shed at Sonsoddo should be screened and
disposed off prior to monsoon so as to make sufflc!ent free area available inside the shed for
treatment of wet waste during the monsoon period.
7. The dry waste dumped near the Landfill at Sonsoddo should be cleared on priority as it
possesses fire hazard and should be cleared prior to monsoon,
8. Municipality should construct or identify a shed of about 500 sq mtrs before monsoon for
undertaking baling of dry waste, so as to avoid handling of any waste in open.
9. Necessary measures should be taken by the Municipality to ensure that monsoon n,moff do
not enter the leachate collection tank at Sonsoddo slte. Leachate collected in tank should be
transported to Govt STP at Navelim on regular basis.
10. Margao Municipal Council may write to Margao Police Station and Fatorda Police Station to
keep vigil and identify the habitual offenders dumping waste along roadside thereby creating
blackspots.
Goa State Po/Jut/on Control Board
• Margoa Municipal Cauncll_lnspect/on Report
09.03.2022
11. Remediation of legacy waste at Sonsoddo-Margao should be completed at the earliest and
RDF stacked on site should be disposed. The dump should be covered prior to monsoon.
12. Margao Municipal Council has failed to establish proper mechanism to collect, treat and
dispose all the solid waste generated wfthln their jurisdiction in proper scientific manner
over the years. Margao Municipal Council shall suspend Issuance of new Construction
Licences and Occupancy Certificates to multi dwellJng projects of S resldentlal units and
above, till proper waste handllng and treatment mechanism is put In place and all the
waste collected is treated in scientific manner on dally basis.
Name of the Inspecting Officials:
\\v/ Shri. saJ~orkar
Senior laboratory Assistant
()P Shri. Shashank Dessai
Junior Environmental Engineer
Page 9 of 9 Goo Stole Pollution Control Board
• INSPECTION REPORT
VE:'~IFICATION OF COMPLIANCE TO THE SOLID WASTE MANAGEMENT RULES (SWMR) 2016
Ref: Office Order no: 8/37/21-PCB/Tcch/18556/Tech/20074 dated 23/02/2022
As directed vide order referred above, the undersigned officials of the Board, Mr. Samir Bo rkar(SLA) & Siddhant Prabhu Dessai (Jr. Env. Engineer) carried out a site inspection of the sol id waste management facilities of the Mormugao Municipal Council (MMC) on 23/02/2022 for verification of compliance to Solid Waste Management Rules (SWMR) 2016.Mr. Vipul Manlolker (Municipal Engrneer-1.!I), was present during the site inspection.
!-"""-- I C001pi;;,\~c;;-((;-u;odi1cctio~isofii1e Hon" High Court whether mm;icipality has setup/instalJed composting facility for treatment of wet waste:-
·------·
Sr. j Directions Observations/Present No / Status dated on --- " 30/11/2021 . -- / 1 '!Ensure that the Unsegregated Mixed I / unsegregated/mixed Wsste dumped not treated ' I Waste dumped within in scientific manner. As
the premises of Solid approx. ! STPD wet waste · waste treatment plan1 at collected is dumped as Headland sada is legacy dump within Cleared and disposed off MSW Site on daily basis. " " II I m cnvironmcnta y
i I sound manner within <l / NOT COMPLIED period of 3 months
2 Take immediate Steps to stop littering within the jurisdiction of Municipal council
obs erva ti o ns/Presen t dated on 23/02/2022
Status
-. .. ·----;--Unsegregated Mixed
Waste dumped is not treated in scientific manner.
• As Municipality has not provided Adequate Composting Facility,
• Wet waste collected 1s dumped within MSW Site on daily basis.
Councilhas started spot fines through POS Deployed a dedicated supervisor to vigil for any littering within the /" t jurisdiction of Municipal council. COMPLIED COMPLIED ····---·-· -·------···-------------- -·--·---- --·-· ---".
3 Take ir111m::dimc Steps !o 5 Black spots have been Municipal council clears the clear Black spots identified. Municipal Black spots on daily basis. located within the council clear the Black Council also keep vigil by
,---· spots on the daily basis. carrying out inspections in th0 council J Council else keep vigil by All the wards. At some black
carrying out inspections spots Transfer stations beautified in the All the wards. At and have been constructed,
L. __J~~~---- / some blacks ots Transfer ----J
NOT COMPLIED Council has started spot fines through POS Deployed a dedicated supervisor to vigil for any littering within the jurisdiction of Municipal council.
e r-·---·---,---------·----,- statiofilbeautified and
have been constructed. YET TO COMPLY 4
5
Ta_kc immediate Steps I Council carrie_s out door Counc~J carries out door to door to improve and enhance to door collect,on through collect,on through agency. waste collection agency. Require to Require to Enhance waste mechanism within the Enhance waste collection. collection.
PARTIALLY COMPLIED
NOT COMPLIED
Sub111i1 a detailed compliance/status report on the compliance by municipal counci-l with rule 15 of the SWMR 2016 within the a period of 7 days from the date of receipt of this
directions COMPLIED COMPLIED ·1-·-·1 Submit the Bank Council has submitted Council has submitted Bank -,-, ..
Guarantee of Rs 2 Lnkhs Bank guarantee of 2 guarantee of 2 Lakhs. with a validity period of Lakhs. The Bank Guarantee submitted 6 month to the Board by the MMC has been forfeited within a period of 7 days by the board for the Non from the elate of receipt Compliances observed dnring of this direction towards previous inspection dated ensuring compliance of 30/I 112021. the nbovc mcast1rc within the stipulated
6
jurisdiction of Municipal
council -··---~--_j COMPLI_FeD COMPLIED __ . _ -j Take immediate Steps t~ / Unit has not provided • Municipality has not Upgrade and effoctivcJy I Adequate Composting provided Adeqnate operate the composting I Facility. Treatment Compesting Facility. Units installed by the / facility and capacity is Treatment facility and council inadequate, as collection capacity is inadequate, as
capacity is 20TPD and Municipality collects trcatm.ent Capacity is 5 approx 20TPD of wet TPD. waste and present
treatment Capacity is 5 TPD.
• Council is process of installation of 2 Biomcthanation plants of 5 TPO each and construction of shed for windrows composting .
NOT COMPLIED Detailed compliance/status report on the compliance by municipal council with rule 15 of the SWMR 2016 has been submitted.
Detailed compliance/status report on the compliance by municipal council with rule I 5 of the SWMR 2016 has been submitted.
L I time period
- . ----J---------'-------------.J COMPLIED
2 IP ,1 g,·
e At!dilional Ohservntion.1;: -~
iJ Municipal council clears the Black spots on daily basis. Council also keeps vigil by cc1rry1ng out inspections in aJJ the wards.
ii) Municipal council has no! installed Weigh Bridge.
iii) Municipal council has installed 5TPD Biogas plant at MWS Site & the same was in operation .
1v) Unit has applied for Consent to Establish for installation of two Bio Methanation plants of 5 TPD each rt! MWS Site.
v) MRF was in operation
viJ Construction of Additional shed for windrows composting was in progress vii) Presently municipality treats only 5 TPD waste daily and generation of wet waste is
around appox 20 TPD,umreated wet waste is dumped as Legacy Dump. viii) As informed approx. 7000rn2 of fresh Legacy dump created at the site. ix) Waste Rcmcdiated through GWMC is dumped at site in approx. I 5000m2 area.
Rccommcndatio9_s_:.
I. Present Composting Facility is insufficient for treating wet waste and the Council needs to take immediate Steps to Upgrade and effectively operate the composting focility.
2. Council has to expedite the process of installation of two Bio Mcthanation plants of 5 TPD each & setting up of additional shed for windrow composting on urgent basis at MWS site
3. Council needs to ensure that the Unsegregated Mixed Waste dumped at MSW site is treated in a scientific manner.
4. Installation ofwe,ghbridgc should be completed immediately and daily records of waste received and treated should be roaintaincc.
.\. The municipality has to establisJ1 waste deposition centers for domestic hazardous waste.
6. Council should ensure that the black spots do not reoccur and should place a mechanism to penalize the habitual offenders.
~/
Mr.Samir Borkar (SLA)
·~ / ',,
I . I ;, /_,.=,- · -·
I;,;~,.:;.-- ~:---- ::--,- -. ., Mr.S-iddh,mt Prabhu Dcssai (JEE)
• VERIFICATION OF COMPLIANCE TO SOLID WASTE MANAGEMENT RULES 2016
INSPECTION llEPOUT
~l';----T Dcscl'iption - .. . Ref: 8/37/2 I-PCBrrcch/18556/I'ech/21880 dated 17/03/2022
3
--------------,--,_, Name of the Muuicipafity/Corp, ··-·----,--------------, 2 D<1lc of Inspection
Personnel present for inspection
~------------
- ·-~ --- --··------------------ .. ---·-·-- Vcrific~tion evidence/ status ., •.........•........ ___________
,, .,,,.,.,_,........ ·- -··--
-rarion Perncm Municipal Council ------------ 21/03/2022
Mr. 111omas Braganza (JE) ----
r:1- ·------------·-···--·-1-·--·---------------------- ~- -- Directions dated 02/09/2021 Observatious made 011 / Observatiou, made on · 0
·-1 --,The mixed waste duniped near lT~ixed waste has J The mixed waste has
a scientific manner
30/11/2021 21/03/202!
the landfill should be disposed in I been segregated and I been segregated and
disposed accordfogly.
Wet waste is composted / Wet waste is composted m the
disposed accordingly.
windrow/ in
composting while the dry composting while the dry
waste is disposed through waste is disposed through
material recovery facility material recovery facility
COMPLIED COMPLIED
the windrow
L I ---~----,---,---1 r 2 I Submit a detailed Compliance report to the Compliance report to ci1e compliance/status report on the Rule I 5 of the SWMR Rule 15 of the SWMR
compliance by the municipal 2016 submitted vide 2016 submitted vide
council with Rule 15 of the I letter dated 16/09/202 I. I letter dated 16/09/202 I. SWMR 20 l 6 within a period of 7 However, during the site COMPLIEI> days from the date of receipt of · these directions
inspection. it was observed that the Municipal Council has not complied with
-.-__J ,___ -------------~--------------1
regards to establishment
of domestic hazardous
waste collection centres
Page 1 of3
• r--,-- and waste collection of
dry waste (60 kgs/day)
vis a vis the population
(5021 persons) appears to
be inadequate
NOT COMPLIED
' '-·---·--------·---------- ' Submit a Bank Guarantee of Rs. 2 The Municipal Council The Municipal Council
lakhs with a validity pe,·iod of six transferred an amount of transferred an amount of months to the Board within th!'! ~ ..
period of7 days from the date of
receipt of these Directions towards
ensuring compliance to the above
measures within the stipulated time period
Rs. 2 Jakhs only to the I Rs. 2 lakhs only to the Boards
Vide
account 07/10/2021.
letter
on I Bqards account 011.
07/10/202!.
dated / Bank 04//0/2021 Gaurentee
Municipal Council had J Municipalty was
the / submitted by
sought time up
I l/10/2021 for
submission of the Bank I during the J compliance
Guarantee
to I forfeited due to non
observed
previous inspection report.
/COMPLIED ~,---------1
Note : Considering minimum per capita waste generation of 200 grms/person/day due to rural setup, the estimated waste generation should be approx. l 000 kgs/day as against the present total waste collection of600 kgs/day. Also, the dry fraction should be approx 45% (450 · kgs/day) as against the present collection of60 kgs/day.
Additional observation:
1. Wet waste is treated through Windrow composting facility .leachate is connected to leachate collection tank.
2. Pernem municipal council has established the domestic hazardous waste Collection Centres at KTC Bus stand pernem and solid waste management plant tuem
3. MRF was in operation, Segregation and Bailing of Dry waste was in progress. 4. Municipal council area predominantly consist of rural area major part of wet waste
generated is disposed by household within premises,
5. It also appear that dry waste from household/commercial units sell recyclable item to ragpicker/kabadiwafas
Page2 of3
• 6. Large quantity of mixed was observed near the landfill site of Pernem municipal As informed by municipality official same is indentified as legacy waste and municipality is in the process of bio remediation legacy waste dumped near the landfill site through GWMC
.Recommendations:
J.. The legacy waste dump at landfill site of Pernern municipal council should be remediated.
1)r-. Shri. Samir Borkar
Senior laboratory Assistant
Page3of3
• VER!FICAT!ON OF COMPLIANCE TO THE D!RECT!ONS ISSUED llY THE GOA
STATE POLLUTION CONTROL BOARD
INSPECTION REPORT
Goa S1a1e Pollution Control Boord Sa!igao, Goa
Ref: Office Order no: 8/37/21-PCB/Tcch/18556/Tcch/20074 dated 23/02/2022
As directed vide order rcforrcd above, the undersigned officials of the Board, Mr. S,1mir Borlrnr (SLA) & Siddhant Prabhu Dessai (Jr. Env. Engineer) carried out a site inspectkrn of the solid waste n1a1rngemc,n facilities of the Ponda Municipal Council (PMC) on 24/02/2022 for vcrificmion of compliance to Solid Waste Management Rules (SWMR) 2016. Mr.Uday Dessai (Municipal Enginecr-lI), Mr. Sannm Naik (ME-III) were present during ihe sire inspection.
Sr. Dh-cctions Observations made during Observations mode during
No 30/11/202! 24/0212022 ·-·--:----,,--J I Provide composting PMC is yet to comply with regards • Presently wet waste is I facility treatment of tn expanding the existing shed and treated through windrow
/
. wet waste installation of the additional hio- composting ope,ation of methanation plants same was found NOT COMPLTED unsatisfacto,y.
1 I • PMC is io process of setting up of 1.5 TPD Bio methanantion plant and Additional 5 TPD Bio methanation plant is in the process of being setup through GSUDA at Keriyan Khandepar.
NOT COMPLIED 2 Provide adequate size Work of construction of the Constmction of the additional
of leachate collection additio1111! leachate collection tank leachate collection tank hes been tank is in progress. completed.
I NOT COMPLIED COMPLIED 3 ·-Mi~·ed~;istc -ch;-m;;;d-NO mix waste ~s observed ···--1cN~o-rn~ix-w-,,-,-c-w_a_s_o~b-se-,,-.v-e~d----j
I outside lhc shed should dumped in the open dumped in the open be disposed in a COMPLIED COMPLIED scientific mariner
4 MRF should be The construction of the additional -Existing shed for MRF has been enhanced in the shed has been completed as extended and Baling machine, exi
sting shed. observed at the time of inspection. conveyor has been installed in the
shed for segregation, At the ume of inspection segregation of dry waste was in progress. PARTLY COMPLIED COMPLIED ~-~---------'----------------L===~~------~
Pagelof3
• ~5 iNewly co,astructed The PMC is yet to obtain consent The PMC representatives have MRF shed al solid to operate from the Board for the informed that newly constructed
new material recovery facility shed will be utilized for storage or NOT COMPLillD work management related
works,As The newly constructed shed is located away from the existing shed and is not suitable for segregation of dry waste.
Goa State Pollution Con/i·ol Board Saligao, Goa
waste treatment plant at Keriyan Khandepar by Ponda Council
Municipal should be put
in operation for proper segregation of dry waste
rz--tRDF stored outside th~·' Tbe RDF stored is partly covered. The RDF stored outside the shed shed should be However RDF is yet to be is partly covered and the disposed on priority disposed. construction of additional shed for
NOT COMPLIED the storage ofRDF was in progress. PARTLY COMPLIED
17---i Submit a detailed j No compliariCCSllbmitted --··1 PM.Chas subm.itted compliance/ status report un the compliance by the Municipal Council with Rule l 5 of the SWMR 2016 within a period of 7 days from the date of' receipt of these
compliance/status report to the board on 13.12.2021
NOT COMPLmD
directions. COMPLIED 8 I Submit a Bank Municipal council has submitted Municipality has submitted Bank Guarantee of Rs.2 bank guarantee Guarantee of Rs. 2 lakhs.
lakhs with a validity The Bank Guarantee submitted by period of 6 months to
the Board within a the PMC has been forfeited by the period of 7 days from board for the Non Compliances the date of receipt of observed during previous this direction towards COMPLIED inspection dated 30/11/2021 ensuring compliance of the above measures within the stipulated time period. ---·--·--··--'-------- ---'- -------- _j
Page2 of3
• ADDITIONAL 08SERV i\TIONS:
Goa Stale Pollution Control Board Sa!igao, Goa
I. Windrows Coniposti11g was not caJTicd out in a scientific manner. 2. PMC is in process of construction of shed for stornge of RDF . 1. MRF was in operation
<I Out of1he 2 Dcce111rali~ed Composting Facilities only I was in operation, 5. lnstu/Jmion of weigh bridge was under progress. 6. Incinerator has been instil/led for disposal of sanitary waste. 7. Installation of l .5TPD Bio-rncthanation plant is under progress. 8. Black spots in the jurisdiction of PMC are cleared on daily basis. 9. The PMC ;s yet to obta;n Approval from the Board for the new matedal recovery facility
ll.ECOMMENDATlONS:
I. The Councd is required to comply with respect to treatment of wet waste as present windrow composting treatment facility operaiion was nor found to be satisfactory.
2. Expcdire lhe installation of' bio-methanation plant of' 1.5 TPD and additional 5 TPD bio-111c.t/rnnation plim( 011 urgent bnsis
3. The council is required lo obtain approval of the Board for the MRF shed. 4. The Counclt i, required tu dispose RDF stored as per the D;reetions issued by the Board.
5. The nnmk;pality has to establish waste deposition centers for domestic hazardous waste
6. Ccuncf should ensure that the black spots do not reoccur and should place a mechanism to penalize the habitual offenders .
I\ ,
4~ M S.. . B k ·-·LA· r. anur or ar (:::i - )
Mr.Siddhant Prabnu Dessai (JEE)
Page 3 of 3
• Quepem Municipal Counci/_/nspection Report 08.03.2022
INSPECTION REPORT
svbject: Compliance to Hon'ble High Court in Suo Motu Writ Petition No. 2/2007
lrrsp. Order No.: 8/37/21-PCB/Tech/18556/Tech/20929 dated 07.03.2022
~-·---- sr. No. Description Details
1 Name of Municipal Council Quepem Municipal Council
2 Date of Inspection 08.03.2022
3. Name of official present: Shri. Nitin Kotharkar (Municipal Engineer)
Sr. Direction issued by the Board Observations made during inspection on
No. 19/07/2021 08/03/2022
1. The mixed waste and the wet The waste dumped outside the shed is cleared. waste found dumped outside the Directions are complied
shed of the solid waste treatment
plant is required to be cleared
and disposed off in an
environmentally sound manner
within a period of 3 months.
2. The existing composting facilities Dry waste collected is sorted in MRF shed, installed by the council area recyclables are sold and non-recyclable dry waste
required to be enhanced. is baled and sent to Cement Plants for co-
processing. Municipality has installed 500 kg capacity bio-methanation plant to treat wet waste collected. Wet waste collected is also
treated by windrow composting. The leachate
generated from windrow composting is collected
in leachate collection tank and same is sprayed
over the windrows for maintaining moisture
content.
Directions are complied
Page 1 of 1 Goo Sate Pollution Control Board
'
• Quepem Municipal Counci/_/nspection Report 08.03.2022
3. Submit a detailed compliance Municipality has submitted detailed compliance
/status report on the compliance /status report on the compliance by the municipal
by the municipal council with council with Rule 15 of the SWMR 2016
Rule 15 of the SWMR 2016 within Dry waste collected ls sorted in MRF shed,
a period of 7 days from the dated recyclables are sold and non-recyclable dry waste of receipt of these directions. is baled and sent to Cement Plants for co
processing, Wet waste collected is treated by
windrow composting and through blo
methanation plant.
~-j Submit a bank guarantee of Rs 2 Municipality had submitted Bank Guarantee of Rs I !akhs with a validity period of 6 2 lakhs and same was forfeited by Board for non·
months to the Board within a compliance observed during inspection
period of 7 days from the date of conducted on 27.10.2021
this direction towards ensuring
Directions are complied
compliance of the above
measures within the stipulated
time period
Recommendations:
1. Municipalitv shall commission the weighbridge installed on site and maintain
records of daily waste received and processed.
2. Municipality shall utilize the bio-rnethanattnn plant installed to its optimum
capacity and maintain records of daily waste treated and biogas generated.
3. Municipaljty shall direct all the commercial establishments to obtain Consent to Operate from Board.
Name of the Inspecting Officials:
!~ . ~- . ,V" Shr~amir Borkar
Senior Laboratory Assistant
()~ Shri. Shashank Dessai
Junior Environmental Engineer
Page 2 of 2 Goa Sate Pollution Control Board
• Songuem Municipal Council_lnspection Report
08.03.2022
INSPECTION REPORT
subject: Compliance to Hon'ble High Court In Suo Motu Writ Petition No. 2/2007
tnso. Order No.: 8/37/21-PCB/Tech/18556/Tech/20929 dated 07.03.2022
Sr. No. Description Details -- 1 Name of Municipal Council Sanguem Municipal Council -----~- 2 Date of Inspection 08.03.2022
3. Name of official present: Shri. Su has Fa!desai {Municipal Engineer)
Sr. Directions Issued by Board on Observations made during inspection on No. 19/07/2021 08.03.2022 1. The Composting facllities Composting units at the waste management site
should be made operational of Municipality at Khairikattem-Sanguem were . immediately. operational.
Municipality has set up 0.5 TPDBlo·Methanation
plant at Khairikattem Sanguem and same was in
operation dllring inspection.
It was informed that wet waste generated is
mainly disposed of by the generators in their
gardens.
complying to the directions. 2. The non-biodegradable waste The council is collecting dry waste and sorting and
collection system of the Council bailing is carried out at MRF shed facility at has to be improved. Khairikattem. MRF was in operation during
Inspections Records are being maintained.
complying to the directions. 3 Immediate steps should be No black spots were observed within the
taken to stop littering and to Municipal Council jurisdiction at the time of clear the black spots within the inspection.
jurisdiction of the Council. Complying to the directions.
Pagelofl Goo State Pollution Contra/ Board
• Sanguem Municipal Counclf_fnspection Report 08.03.2022
- 4 The garbage disposal site at Work of cleaning the site at Gunjimol has
Gunjimol should be utilized for commenced. Municipality informed that all waste environmentally sound collected will be sent to upcoming lOOTPD SWMF
treatment of solid waste. at Cacora after it is commissioned.
Directions are not complied. 5 Submit a detailed compliance/ The Municipal Council vide letter dated
status report on the compliance 09/09/2021 has submitted report of compliance by the Municipal Council with to rule 15 of Solid waste management. Rule 15 of the SWMR 2016 Municipality is not treating al! the waste collected, within a period of 7 days from Complied to the directions of submitting the the date of receipt of these status report.
directions.
6 6, Submit a Bank Guarantee of The Municipal had submitted Bank Guarantee of
Rs.2 lakhs with a validity period Rs. 2 Lakhs and Board has forfeited the same of 6 months to the Board within considering the non-compliance observed during a period of 7 days from the date inspection conducted on 27.10.2021. of receipt of this direction
towards ensuring compliance of
the above measures within the
stipulated time period.
Additional observation :
Inspection team had visited the site of upcoming lOOTPD SWMF at Cacora for inspecting
the composting units of Curchorem-Cacora Municipal Council. It was observed that waste
is been dumped along the approach road to the site. Shri. Gajanan Kamat (Engineer
GWMC) was present at site wherein 100 TPD Solid Waste Management Facility is being
setup. It was informed that dumping of waste is undertaken by Curchorem Cacora
Municipal Council, Sanguem Municipal Council, Xeldem Village Panchayat and Assolda
Village Panchayat and GWMC has written to the local bodies to discontinue with the
dumping of waste at the site.
Page 2 of 2 Goa State Pollution Control Board
• Songuem Municipal Counci/_lnspection Report 08.03.2022
Recommendations:
1. Waste from residential units should be collected in segregated manner only.
2. All the wet waste generated from the restaurants and residential units should be treated
in 0.5 TPD Bio-methanation plant and the composting units.
3. Municipality should' construct a shed of about 500 sq mtrs for proper handling of dry
waste at Gunjirnol site or at any suitable site.
4. Dumping of waste in open at Sy. No. 165 at Khargateghati-Cacora should be discontinued.
5. Municipality shall direct all the commercial establishments to obtain Consent to Operate
from Board.
Name of the Inspecting Officials:
~
,, /
Shrf arrur orkar Senior Laboratory Assistant
Ct.y Shri. Shashank Dessai
Junior Environmental Engineer
Page 3 of 3 Goa State Pollution Control Board
• Goo St:,u Pofl:.itlf>II C.ont:n:J Board
Sal/goo. Goa
INSPECnos REPORT
VEJUf!CATI0,'1 OP CO)'lPLIA'<CI: TO SOLID WASTE M,\NACl;)fl:1'oT RULES S\VMRJ2016
Rd: Orr.cc Onln no: 8J37/21-l'CHtrcd1/18556fl"ect1n0-07.& d:uc.d 2JJ02/l012
,h directed vrdc order referred 3bQ\'C, the undcr)igned of'llclal of the Boord. Mr. Dcvcsh Ciholl-.ur Ur. l.nv. l-nglnccr) carried out a site inspection or tho solid waste managcmeur focili1it·5, of 1he Snnquelim Municipal Counell on lS/0212022. r-.•lr. Subash Mhnlshckar (~·lunic1ptil Engineer-II) nnd Mr. Rajeah F:1.d1c (Munlclpat Englnecr-Ilf) was present during the sttc inspection. The observations rmdc with rcg.ird.s to the directions issued hy the Goe S!l1h: f'\iUullon Control Board, the reply ~1.1bmiltcd by the LNJit and the present stams'observaticns m.atki arc rabuiated in the (o!towing 1.ablt~
Sc. No...
i Dtreettoe Lf.-sucd by the Board d::a1ctl 19,"0i/2021
Ob.sc.n111ion.s rnad.e during Iespection dated 30111./2021
Obfc.f'\·atl.oos made during ltup«tion d.11ed l.'lllll/20ll
I. T eke !:mn~di;1tc 'llq>\ l . The Council bas repaired I , The' CouflCll 11.u repaired to ensure thii! Leachate; the pipeline connectlng the plpcli:nc c.Qnnecting Oou-,n~ ICUhc cornros1 to Leachate collection ,o l_.,(:u:i:rou:. collection
. stared " the waste umk and C0lt1p<1Slin'1, mnk i\Jld cornpcsting i treauncnr fo.:;Hii)' ofthe arce. nrca. I council is ~OPJX:(l 2. Tbc council has made 11 2. 111~ council bas tnadc a
provision towards from provlsion towards front ! I side ensuring that. no sld• eiuurlng thar no
I Leachate con flow Lc~ch1uc can flow I towards front side and 1ow·urd~ front side and I • diverted the same into dh·tttro the semc i.nto Lcacbate i;ttllect.ion tank, 1..ach:uc coHC"Oion mnk.
l Coruplicd Complitd
~2. Take- ~ntdialt Stc-p:s fT:""'·.,s observed durln·i I L tQ 1.-:sui.bh.~!, ii f:K"i!lt> • in.!lp- •. -cuon Council is
II for tre,£1.t.'me-rn ctf ere dcnlin; ·wf:h Wfodmw.s . degradable ,~1s.1t Composting in well gene:rt1tcd by your scientifically mnrmer b)' Council within ri period making stnull heaps or of3 months windrows composting.
2. The council has kepi the l 2.
As ebserved during lnst!(ttio-n Council ti de~,tina \\•lth Windrow·.s C0mpoS1i,ng In well sc.lc.n11Ji00Hy rnunner by mokln~ srnnll heaps of windrows composting. Screcntng activity for
old compost outside the ecmpcsr w:i..-s observed shed for drying purpose workit\a. at site. und 4$ informed b~ J. As i11fortT1cd by
_____ 'l,tunicipnl rcpr-c:scnurnvc }.·1u11!dp:,I repn:scntativc:
PJ.g:t' 1 o! 4
• Goo Swu: r,,;l!uthm Cor.m,l BooYri S.aligao., Goa
---·-J~1t once it dries liPi11 the council has proposed ""· j win be get screened. 10 Install Bio
J 3. As lafunned by mcthunaticn Plara of 1 M\.mkip.al rep-eseotative j e.ap.'lclty 5TPD.
tbe council has pro~ m iru.t.:lU - mo ii Complied me-thMati.cn f)f,'tn'o\ of C,1?,Ki1~· STPD. !
1 P11rtinU}' Complied I 1· '-,---' ---- .,· -;--:,,c-.,-.,,..,-:,,:c;,--- ' 3. / Eflsu-r~ tha1-·1hc RDP Tt~~- counclt hRs I. The balled RDF stored J stored outside tht shed transported boiled RDF Outside ihc shed has been I installed by the councl! of quantity approx. 32 rranspcncd b)' the ! I is disposed err in "" T<>11es ~" 25/1112021 to Coencrl 10 \/'".:""""' !' 1 I e1w1ronmcn1~nr ~Jl)d i Vesavadass C®Icnt Cement Factory; \ ) manner \\ h.hin .'i i fn;;truy, Karn&aka ;,nd Kn:ma11s.ka. I
mcmbs. ev 005Cp:~ durirre remainin; CompHHI }
\v1.t'5 l;:ION::d 1
shed. n1e I tn!!p,t."CI ion. bailed RDF outside the: council has forwarded vehicle requisition to GWMC for transportation of rcmnlning RDP.
~(ll Complied
7--Eruure th:ll~,h;j 1, I .cecsese t:'OUCC'l inn i tank '.nsttiHcd !:r) the 1 courx 1.t rs n_m~ I
. operauoeel ,v1rh1n f ' . 1 three mon!~S. [ I 1 i i2. ' I I I
'
TuC ·cO\mcif tms rep:i.~1 t. ,t.- _,,..,..\!_ .,..,, .••......• : ..• t, I ;_µa: ,,~,......... ,-..... ......, ••••••.••.•.•• , i-
t-0 Leacbate col kcd.rm t tank and oomposting, 1
' ;1rea and the Le::1-dune · collection 1:mk was in oncretion. lhc council has made u !2. prevision towards front side cns!irmg tb-a1 no LenelUt1:e can now towards front side acd diverted the ~'ile foto L.ei1:thatc- colk-ction t.1.nk
The Council f'..u re.paired ·th: plpc H.r.c connecting u, Le'ach:.11:e, cotl~ti\on. lMk :tnd composting nrett and the Lc~_eb:A,1e ocllecrion tnnk was in opcretlon, the counci t has made a prov1sion towards front stde ensurllig tbat t10 l..ca.cb®:· can Oow tow.tr:ds front. .side and. d.h'«."J'ttd the same into luc-trak collection tank.
i l Comr,Hcd I Co1opl1t1:tl ._L ~ L.,._ ._ ----'
P,1ge2of4
• Goo S1t:lil PollllliOll CcmJtol ll(J(Jrd Sal/g-,o, Goo
< - ~~bm11 ~ d~U~i~-d--~ Ruic (iJ} is panUlfl) I The. Council t\.J..s made al ccmpbance c-ornplied i\1R.F (ncHitr detalted submiuion u, rcpcrt/struus repcn 01) lnstnlled is Ml h.w!ni; iht compllence to Ruic 1 the ccmpliencc by the adequate space und 15 oru1e SW~·l Rules O.li Municipal Councll focUity operating n~ rcr sought with Ruic 15 of rhe requirements as observed S\VMR 2016 within A during the time of period of -; dJyf from inspection. the dae of ~c-ipi of I there directions. I Partially UlmpJlrd
Compiled
6 Gueneuee or ih. !
I lakhs "ith a ,al!dn~ period of 6 mo1Hh:, to I
J the Board within a I ! period of 7 devs from the dale of receipt nf !ni:s direction {O',!,~Md$ ensuring comcueree of the above
Buuk Guarantee of Rs. 2 tekhs \'tdc UTR no. Sl31N52127838670!J dntcd OSII0/2021.
Complied
O.a.nk Guarantee o( Rs. 2 lakhs vidc tJfR no, S0IN521278J86708 dated 051 I 012021. The Bank Guarantee
.w.b.mii:ted by the Cowidl bas been forfeited by t~ Boord for non
\vilhin lhe l j t!mc period.
I l 1,_ ,_c_l _,. , .,_ ...J
measures I s11polar.:-i1 ·
compliances during inspection )(l/111202 L
observed' previous
dated
Additinnal Observauoes :
iJ The bailed RDf smrcd ouuidc the shed has bc:-c·n transported by the Council to Vasnvadara Cement Fnc,tory. Kamatake.
Ii} Council has ccnrplctcd the Installation of Weighing Bridge M MRF she. iii) Screening activity for compost was observed work.Ing nt site during hepecttcu. h) Council h:.!- 3pplit"d fr.,r renevcul of Authorb:i:11011 of MRF redli1y vlde
application no !032952 wn.h ihe Board. '\ i Council !us apptkrl fo,. CTE for opemtionfpmo.es1lng 1Jf Dr)• Wll.'110 {Non
81otkgrod.i.bk wa.\lr) ond Solid waste (Bh;de~bie wa ... ~c) vide .applic:ilion rm. 1 l0\09!. Pr"t-knlt) onllne status of the 11pplit:.11ion ,,shcv,.vs that 'P11yment not Initialized frorn Council'
vi) Ihc Council ho.: n l:111dn!I she, which is pres-cntly not in use. ,•ii) Council has set up MRF fooility and is well nu,1l1tQ.cd by Municipal Council. viti) The Council has repaired the pipeline connecting to Leachate collection rank o.rid
~---~sting i:irn_,_·-------------·----------~
• Gou Stat~ Pofl11lfo11 Control Boan/ Saligao-, Goa
"l n'IC council bas made a flro,·iSIOO towards f"r(mi- s..-ide ensuring th:u. oo Leachate can no" towards from side ami di~-ertcd I.he: same Into Lcadt2.tt ccllection tank, Countil ha,; submutcd &11k Goaramee of R$, 2 lakhs vtdc LITR no. SBIN52 i 2 7RJ8670S dtncd 05/J 0/2021.
··----- ·.;.-· ~~--"-· ---·------------------------------~
Devesh Oholker Junior Environmental Engineer
Page 4 o.f,
• 1~\'SPECflON RF:PORI
VERIFICATION OF COMPLIANCE TO sor.rn WASTE MANAGEMENT RULES (SWMJ'!)l0J6
Ref: Office Order no: 8/J7/2J-PCB1Tcch/J8556/fcch/20074 dated 23/0212022
Goa Storr: f'ullution Comr-o/ Board Sa!igao, Goa
.-\s direcred vide order referred above, the undersigned offrcinJ of the Board, Mr. Dtvc,I, Gholkar (Jr. Env. Engineer) c;orricd out a site inspection of tl,e solid wn.src m,1nag,m,n1 facilities of the Valpoi Municipal Council on 2Si02/2022. Mr. Jaycsh Kalangutkar (Municip;il Eogiocc,-IIJJ «us present duriog the site iospcction. The obscrvniions made ,,i1h regards 10 the dirce1ions issued by the Goa State Pollution Control Board, the ,cply submiuc(I by tbc unit and the present s1a1uslobscrva1ions mt,dc ere lllbnloted i11 1hc following table:
- 1: Direction issued by/ Oh'.crvaH0115 . made Obscn•arions made. during the Iloard dated during mspectton dntcd inspcclion dated 2S/02f2022 02/09/202 J 30/11/202 I
I. ! The compost stored_ f L The additional
I. The additional extension ' / omside the shed of, extension of the shed is of the shed is compleced I / :solid waste trnatmcnt f yc.·1 w be carried out. and in use by rhc Council. plant should be kcpr 2. The compost is still 2. The compost is s!ored in ! inside the shed
' stored in the open. the ndditionnl shed, I I 1
Not Complied Complied I 2.
i Lcac!1atc collection I I. The Council hns I. The Council has tank should be covered I commenced e.~enva1ion
coastructcd new lcachaic 10 avoid leachate for construction of the colle.c!ion tank rmd Same flowing oursidc !cach,1tc: collection was in opcra1fooar during tank. inspection.
Not Complied Complied 3. / Black Spots should be fl. During insp,cctton both
I. During inspection both the J cleared ; the locations were locations were visited ~·isitcd along wi1h along with Council
I Council "cpresentanvc. representative. The
I
The Council ha.s Council has cleared the I
I ctcercc the waste dumped at the said
I \"Va.SIC
dumped l.!I d1e said site, sire. I
I Complied Complied I 4. / Submic a detailed I. The Council bas not I. The Council has made :, co111p!fr1nc-e/ St:1tu~ medc • dc!ailcd derailed submission lo the.
Pa.ge 1 of 3
• MutHL1p,1I with Ruic
Council I~ of the
SWMR 201(> ,•.ithin :i 2, i period of 7 days frnm : I the date of receipt 1.1f f these directions
Goa Stat.: Pollution Comroi Board Sallgao, Goa
submission to the., compliance to Rule ! 5 , of the sw1 .•. 1 Rutcs as I .sought. j2. The solid was1c.
1·
scgrc·gation and disposal, windrow· system and bicdigestor
compliance to Rule 15 of the S\VM Rules on . lOiOl/2022. I The solid waste segregation and disposal. ! windrow system and r biodlgestor were in t operation at the MSW I Site. f were in operation at the
I. I MSW Sile. [Complied
I ~.----..,, l Not Complied L [ Submit a _ Bnmk l. Counc-i~ hits subrnrucd 11. Cou·-11-,"1:-hc-,-,d~-,-u,-~m-.,.it-,cd-. "I ! Gu<irant,;;:c of ~~,2 Bank Guarantee of Rs. B,ank Guarantee pl Rs. 2 f / lakhs with a validity '2 [akhs dated lakhs dated 07/J0/20-2i. · I period of e-momhs to I 07/l-0/2021. The Bank Guarantee i the Beard within .i . . submincd by the C6unci1 I period of 7 days from ! Comphctl has been forfeited by the ) the date of receipt of! Board for non I this direction towards l compliances observed j ensuring compliance of/ during previous inspection ,1 the above measures I dared 30/tl/2021, within the stipulated
I I time period ·" I . ' '--~' - _,_, ,__ _.,
5.
/ Additional Ob.sen a lions ; I
i) The Council has completed the insraltation of Weighing Bridge .~1 l\fRF site. ii) The Council has constructed new leachate collection tank and same was in
operational during inspection. iii) As observed during inspection Council is dealing with Windrows Composting· £n
well scientifically manner by making small heaps of windrows composting. The Bio culture chemical has been sprayed on the said wet waste. as to avoid smell und odour.
iv) Manual screening of compost activity was operational du-ring the time of inspect ion.
v) The Council has installed Bio digester of Capacity 500kg/duy. vi) The Council has cleared 1he black spot at 2. locations. \'1i\ ·1 he C0111Kil has 3 landfill site. which is presently not in use, \'iiiJ Council htu not ouraincd Couscnr of Board for operation/processing of Dry
Wesrc (Non FJiodcgr:idl!blc WilS.H.:) end Wet waste (Biodcgnldtiblc waste} ix) Council hus. ripp!ied for renewal of Authoriz;ition (If MRF facility ..,idc
Page2of3
• ~ .~Ii! Pollution Corurol Boord Soll;:,oo, Goa
eppfication no. t ! .S?.l-13 whh the 803.rd. "-) Council has suhmlned U:mk Guarantee ofR.s. 2 la~h.s d!m:d 07/10/2021.
Recummcndnticns
i) The Council muy be directed to obtnin Consent of Ooord for operation/processing of Dry Waste {Ncn Ofoclcgmdablc waste) and Wc1 waste (Biodegradable wnste).
--;,,P·Y bev~,h Oholknr
Junlor Environmental Engineer
P'°"~ l of J