PERSIAPAN I NO 1 2 3 UPAH KERJA KUALIFIKASI Helper Pipe Fitter 2 Pengatur Mekanik Jumlah II MATERIAL NO KUALIFIKASI Jumlah III SEWA ALAT KERJA NO KUALIFIKASI 1 mob/demob scaffolding (kontainer 20ft) QTY 56 56 28 SATUAN HARGA SATUAN HRS 57,000 68,000 82,500

QTY

SATUAN HARGA SATUAN

QTY

SATUAN HARGA SATUAN

Jumlah

21

97,500,000

PEKERJAAN I UPAH KERJA Helper(44 harix200 orgx14 H) Scaffold SV(44 hari orgx8 orgx14H) Safety Man(44 hari orgx8 orgx14H) Jumlah II MATERIAL 1 Scaffolding 123,200 4,928 4,928 68,000 82,500 75,000

1

lot

#########

Mobil Truk Mobil Pick Up Jumlah

2 1

44 unithari 44 unithari

1,350,000 650,000

1 SUB JUMLAH 3,192,000 3,808,000 2,310,000 9,310,000

SUB JUMLAH

SUB JUMLAH

2,047,500,000

8,377,600,000 406,560,000 369,600,000 9,153,760,000

2,389,695,000

118,800,000 28,600,000 147,400,000

FALSE

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011 HARGA SATUAN (RP) NO URAIAN KEGIATAN -1 Pek. Persiapan 2 Pek. Pasang dan Bongkar Scaffolding VOL SATUAN UPAH 9,310,000 ########

1 lot 1 lot

BPP II, area HCC dan HSC, 2011 HARGA SATUAN (RP) MATERIAL ALAT ######## ######## JUMLAH HARGA (RP) MATERIAL ALAT ######## ########

UPAH

9,310,000 ########

SUB JUMLAH 2,056,810,000 11,543,455,000

13,600,265,000

PERSIAPAN I NO 1 2 3 UPAH KERJA KUALIFIKASI Helper Pipe Fitter 2 Pengatur Mekanik Jumlah II MATERIAL NO KUALIFIKASI Jumlah III SEWA ALAT KERJA NO KUALIFIKASI 1 mob/demob scaffolding (kontainer 20ft) QTY 56 56 28 SATUAN HRS

QTY

SATUAN

QTY

SATUAN

Jumlah

21

PEKERJAAN 1 UPAH KERJA Helper(44 harix200 orgx14 H) Scaffold SV(44 hari orgx8 orgx14H) Safety Man(44 hari orgx8 orgx14H) Jumlah 2 MATERIAL 1 Scaffolding 123,200 4,928 4,928

1

lot

Mobil Truk Mobil Pick Up Jumlah

2 1

44 unithari 44 unithari

1 HARGA SATUAN SUB JUMLAH 36,500,000

HARGA SATUAN

SUB JUMLAH

HARGA SATUAN

SUB JUMLAH

105,242,381

2,210,090,000

39,000 61,000 45,000

4,804,800,000 300,608,000 221,760,000 5,327,168,000

###########

###########

1,350,000 650,000

118,800,000 28,600,000 147,400,000

PROYEK PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, area HCC dan HSC, 2011 HARGA SATUAN (RP) MATERIAL

NO URAIAN KEGIATAN -1 Pek. Persiapan

VOL

SATUAN

UPAH

1 lot 1 lot

36,500,000 ######## ########

2 Pek. Pasang dan Bongkar Scaffolding

dan HSC, 2011 JUMLAH HARGA (RP) MATERIAL SUB JUMLAH 2,246,590,000 5,474,568,000

SATUAN (RP) ALAT ######## 147,400,000 UPAH

ALAT

36,500,000 ######## ########

######## 147,400,000

7,721,158,000

REKAPITULASI HARGA PENAWARAN PROYEK / PEKERJAAN : Pek. Scaffolding dalam rangka T/A Kilang BPP II, Area HCC dan

A B C D E F G H I

UPAH KERJA KESELURUHAN MATERIAL SEWA PERALATAN SUB JUMLAH ( A + B + C ) KEUNTUNGAN DAN RESIKO JAMSOSTEK TANDA PENGENAL & ID CARD JUMLAH KESELURUHAN DIBULATKAN

ng BPP II, Area HCC dan HSC, Tahun 2011.