Universitas 17 Agustus 1945 Surabaya (UNTAG)repository.untag-sby.ac.id/728/2/ABSTRAK.pdf · 2018....
Transcript of Universitas 17 Agustus 1945 Surabaya (UNTAG)repository.untag-sby.ac.id/728/2/ABSTRAK.pdf · 2018....
PENYEIMBANGAN LINI PROSES PRODUKSI
SEAT COVER MENGGUNAKAN METODE RPW
DAN SIMULASI ARENA
Oleh:
Ahmad Syaiful Sulun
NBI: 1411406419
PROGRAM STUDI TEKNIK INDUSTRI
FAKULTS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA
2018
iii
TUGAS AKHIR
PENYEIMBANGAN LINI PROSES PRODUKSI SEAT COVER
MENGGUNAKAN METODE RPW DAN SIMULASI ARENA
Untuk memperoleh Gelar Sarjana
Strata Satu (S1) dalam Ilmu Teknik Industri
Pada Program Studi Teknik Industri
Fakultas Teknik
Universitas 17 Agustus 1945 Surabaya
Oleh:
Ahmad Syaiful Sulun
NBI: 1411406419
PROGRAM STUDI TEKNIK INDUSTRI
FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA
2018
v
LEMBAR PENGESAHAN TUGAS AKHIR
Nama : Ahmad Syaiful Sulun
NBI : 1411406419
Program Studi : Teknik Industri
Judul Tugas Akhir : Penyeimbangan Lini Proses Produksi Seat Cover
Menggunakan Metode RPW dan Simulasi Arena
Tugas Akhir ini telah disetujui
Tanggal, 3 Juli 2018
Oleh
Pembimbing
Ir. Asmungi, M.T.
NPP: 20410.96.044
Dekan
Fakultas Teknik
Dr. Ir. H. Sajiyo, M.Kes. IPM.
NPP: 20410.90.0187
Ketua Program Studi
Teknik Indsutri
Ir. Tjahjo Purtomo, M.M.
NPP: 20410.90.0196
(Halaman ini sengaja dikosongkan)
vii
LEMBAR PERNYATAAN ORIGINALITAS
TUGAS AKHIR
Saya yang bertanda tangan di bawah ini:
Nama : Ahmad Syaiful Sulun
NBI : 1411406419
Program Studi : Teknik Industri
Menyatakan bahwa isi sebagian maupun keseluruhan Tugas Akhir saya yang
berjudul:
PENYEIMBANGAN LINI PROSES PRODUKSI SEAT COVER
MENGGUNAKAN METODE RPW DAN SIMULASI ARENA
Adalah benar-benar hasil karya intelektual mandiri, diselesaikan tanpa
menggunakan bahan-bahan yang tidak diizinkan, dan bukan merupakan karya pihak
lain yang saya akui sebagai karya sendiri.
Semua referensi yang dikutip maupun dirujuk telah ditulis secara lengkap pada
daftar pustaka. Apabila ternyata pernyataan ini tidak benar, saya bersedia menerima
sanksi sesuai peraturan yang berlaku.
Surabaya, 3 Agustus 2018
Yang membuat pernyataan
Ahmad Syaiful Sulun
(halaman ini sengaja dikosongkan)
ix
KATA PENGANTAR
Puji syukur dan terima kasih penulis ucapkan atas kehadirat Allah Yang Maha
Esa yang telah banyak memberikan nikmat sehat dan nikmat ilmu sehingga penulis
mampu menyelesaikan penelitian ini yang berjudul:
PENYEIMBANGAN LINI PROSES PRODUKSI SEAT COVER
MENGGUNAKAN METODE RPW DAN SIMULASI ARENA
Semoga penelitian ini dapat memberikan manfaat bagi pembaca. Terima kasih
penulis ucapkan kepada pihak-pihak yang telah membantu dalam penyelesaian
penelitian ini, khususnya:
1. Ibu yang telah banyak memberikan perhatian serta dukungan baik dalam doa dan
semangat.
2. Ir. Asmungi, MT selaku dosen pembimbing yang telah memberi anyak ilmu dan
bimbingan.
3. Teman-teman angkatan S1 tahun 2014 yang selalu memberi dukungan.
Surabaya, 3 Juli 2018
Penulis
(Halaman ini sengaja dikosongkan)
xi
ABSTRAK
PENYEIMBANGAN LINI PROSES PRODUKSI SEAT COVER
MENGGUNAKAN METODE RPW DAN SIMULASI ARENA
CV. Sumber Jaya Sakti adalah salah satu produsen seat cover dan karpet yang
bekerja sama dengan beberapa dealer otomotif roda empat dan beberapa Rent Car
yang berada di wilayah Jawa Timur. Pada proses produksi seat cover dan karpet
terdapat beberapa proses dengan tenaga manusia sebagai operator di setiap stasiun
kerjanya. Selama proses produksinya, perusahaan tersebut sering mengalami
keterlambatan pemenuhan order yang tepat waktu disebabkan oleh adanya
penumpukan bahan baku di dalam proses produksinya dengan kata lain telah terjadi
ketidakseimbangan lintasan produksinya. Dari hasil perhitungan waktu baku dalam
proses produksi seat cover dan karpet didapatkan masing-masing selama 199.05 menit
dan 94.81 menit. Line balancing dilakukan untuk mengurangi balance delay yang
terjadi pada lini produksi seat cover. Dengan menggunakan metode ranked position
weight didapatkan jumlah stasiun yang lebih optimal dibandingkan dengan kondisi
awal yaitu dari 5 stasiun menjadi 3 stasiun. Efisiensi lini yang tercapai pada kondisi
line balancing sebesar 67.66%. Hal yang sama juga dilakukan untuk mengurangi
balance delay yang terjadi pada lini produksi karpet. Dengan menggunakan metode
ranked position weight didapatkan jumlah stasiun yang lebih optimal dibandingkan
dengan kondisi awal yaitu dari 5 stasiun menjadi 3 stasiun. Efisiensi lini yang tercapai
pada kondisi line balancing sebesar 64.56%. Pada penelitian ini simulasi dilakukan
dikarenakan nilai balance delay dan terdapat idle time pada metode line balancing
dirasa masih relatif besar. Simulasi telah dilakukan dengan tiga kondisi antara lain
kondisi awal, skenario perbaikan 1, dan skenario perbaikan 2. Dari hasil simulasi
ketiga kondisi tersebut, skenario perbaikan 2 yang memiliki hasil paling optimal
dikarenakan jumlah order yang masuk dapat terpenuhi seluruhnya.
Kata kunci : Line Balancing, Rank Position Weight (RPW), Simulasi Arena
(Halaman ini sengaja dikosongkan)
xiii
ABSTRACT
LINE BALANCING SEAT COVER PRODUCTION USING RPW
METHOD AND ARENA SIMULATION
CV. Sumber Jaya Sakti is one of the seat covers and carpets manufacturer
that cooperates with several automotive dealers and some of Rent Car in East Java.
In the production process seat cover and carpet there are several processes with
human power as an operator in each work station. During the production process, the
company often experienced delay in order fulfillment in time due to the accumulation
of raw materials in the production process in other words there has been an imbalance
trajectory of production. From the calculation of raw time in the production process
seat cover and carpet got respectively for 199.05 minutes and 94.81 minutes. Line
balancing is done to reduce the balance delay that occurs in seat cover production
line. By using the position rank weight method obtained the number of stations more
optimal than the initial conditions of 5 stations to 3 stations. Line efficiency achieved
at line balancing condition is 67.66%. The same is done to reduce the balance delay
that occurs on the carpet production line. By using the position rank weight method
obtained the number of stations more optimal than the initial conditions of 5 stations
to 3 stations. Line efficiency achieved at line balancing condition is 64.56%. In this
study the simulation is done because the value of balance delay and there is idle time
in line balancing method is still relatively large. The simulation has been done with
three conditions such as initial condition, improvement scenario 1, and improvement
scenario 2. From the simulation result of each conditions, the 2nd improvement
scenario has the most optimal result because the number of incoming orders can be
completely fulfilled.
Key word: Line Balancing, Rank Position Weight (RPW), Arena Simulation
(This page is intentionally blank)
xv
DAFTAR ISI
KATA PENGANTAR ........................................................................................ ix
ABSTRAK............................................................................................................xi
ABSTRACT………………….. ............................................................................. xiii
DAFTAR ISI ....................................................................................................... xv
DAFTAR GAMBAR ....................................................................................... xvii
DAFTAR TABEL ............................................................................................. xix
BAB I PENDAHULUAN ..................................................................................... 1
1.1 Latar Belakang ......................................................................................... 1
1.2 Rumusan Masalah .................................................................................... 2
1.3 Tujuan Penelitian ...................................................................................... 3
1.4 Manfaat Penelitian .................................................................................... 3
1.5 Ruang Lingkup Penelitian ........................................................................ 3
1.6 Sistematika Penulisan ............................................................................... 4
BAB II TINJAUAN PUSTAKA ........................................................................... 5
2.1 Proses Produksi ........................................................................................ 5
2.1.1 Jenis Proses Produksi ........................................................................ 5
2.2 Pengukuran Kerja ................................................................................... 10
2.2.1 Tujuan dan Manfaat Pengukuran Kerja .......................................... 10
2.2.2 Teknik Pengukuran Waktu ............................................................. 11
2.3 Line Balancing ....................................................................................... 20
2.3.1 Terminologi dalam Line Balancing ................................................ 21
2.3.2 Metode Helgeson-Birnie (Ranked Position Weight) ...................... 22
2.4 Simulasi .................................................................................................. 23
2.4.1 Klasifikasi Model Simulasi ............................................................. 24
2.4.2 Kelebihan dan Kelemahan Dari Simulasi ....................................... 25
2.4.3 Simulasi Sistem Diskrit .................................................................. 25
2.4.4 Pola Distribusi Masukan ................................................................. 26
2.4.5 Simulasi Arena ............................................................................... 34
2.5 Penelitian Terdahulu .............................................................................. 36
BAB III METODOLOGI PENELITIAN ........................................................... 39
3.1 Jenis Penelitian ...................................................................................... 39
3.2 Teknik Pengumpulan Data .................................................................... 39
3.3 Teknik Pengolahan Data ........................................................................ 41
3.4 Analisis Data .......................................................................................... 43
3.5 Tempat dan Waktu Penelitian ................................................................ 43
3.6 Diagram Alir Penelitian ......................................................................... 44
BAB IV PENGUMPULAN, PENGOLAHAN, DAN ANALISIS DATA ........ 47
4.1 Pengumpulan Data ................................................................................. 47
4.1.1 Data Urutan Proses dan Elemen Kerja. .......................................... 47
4.1.2 Data Pengamatan Faktor Penyesuaian (Rating Factor). ................ 49
4.1.3 Allowance Time .............................................................................. 54
4.2 Pengolahan Data .................................................................................... 56
4.2.1 Uji Kecukupan Data ....................................................................... 56
4.2.2 Uji Keseragaman data .................................................................... 57
4.2.3 Perhitungan Waktu Baku ............................................................... 58
4.2.4 Analisis Line Balancing dengan Metode Ranked Position Weight 61
4.2.5 Simulasi Lini Produksi ................................................................... 69
4.2.6 Analisis Biaya ................................................................................ 80
BAB V PENUTUP ............................................................................................. 85
5.1 Kesimpulan ............................................................................................ 85
DAFTAR PUSTAKA ......................................................................................... 87
xvii
DAFTAR GAMBAR
Gambar 2. 1 Contoh Peta Kontrol untuk Uji Keseragaman Data.............................. 14
Gambar 2. 2 Presedence Diagram ............................................................................ 23
Gambar 2. 3 Histogram Data Yang Akan Diuji Pola Distribusinya.......................... 28
Gambar 2. 4 Kurva Fungsi Normal ........................................................................... 28
Gambar 2. 5 Kurva Fungsi Normal ........................................................................... 29
Gambar 2. 6 Histogram Proporsi Pengamatan dan Harapan ..................................... 30
Gambar 3. 1 Peta Kontrol .......................................................................................... 42
Gambar 3. 2 Diagram Alir Penelitian ........................................................................ 45
Gambar 4. 1 OPC Pembuatan Seat Cover ................................................................. 48
Gambar 4. 2 Peta Kontrol Uji Keseragaman Data Operator A1 ............................... 58
Gambar 4. 3 Stasiun Kerja pada Kondisi Aktual Produksi Seat Cover..................... 62
Gambar 4. 4 Precedence Diagram Produksi Seat Cover .......................................... 62
Gambar 4. 5 Stasiun Kerja yang Terbentuk dari Hasil Perhitungan ......................... 64
Gambar 4. 6 Stasiun Kerja pada Kondisi Aktual Produksi Karpet ........................... 66
Gambar 4. 7 Precedence Diagram Produksi Seat Cover .......................................... 66
Gambar 4. 8 Stasiun Kerja yang Terbentuk dari Hasil Perhitungan ......................... 68
Gambar 4. 9 Model Konseptual Aliran Proses Produksi Seat Cover ........................ 71
Gambar 4. 10 Activity Cycle Diagram Produksi Seat Cover..................................... 71
Gambar 4. 11 Model Konseptual Aliran Proses Produksi Karpet ............................. 71
Gambar 4. 12 Activity Cycle Diagram Produksi Karpet ........................................... 72
Gambar 4. 13 Model Simulasi Produksi Seat Cover dan Karpet Kondisi Awal ....... 73
Gambar 4. 14 Model Simulasi Skenario Perbaikan 1 ............................................... 77
Gambar 4. 15 Model Simulasi Skenario Perbaikan 2 ............................................... 79
Gambar 4. 16 Grafik utilitas operator hasil running simulasi kondisi awal, skenario 1,
dan skenario 2. ................................................................................... 80
(Halaman ini sengaja dikosongkan)
xix
DAFTAR TABEL
Tabel 1. 1 Data Penumpukan Bahan Baku Pada Lini Produksi .................................. 2
Tabel 2. 1 Kriteria untuk Faktor Skill ........................................................................ 14
Tabel 2. 2 Kriteria untuk Kelas Pada Faktor Effort ................................................... 16
Tabel 2. 3 Tabel Performance Ratings dengan sistem Westinghouse ....................... 19
Tabel 2. 4 Penelitian Terdahulu ................................................................................ 36
Tabel 3. 1 Lembar Pengamatan Pengukuran Waktu Kerja ....................................... 40
Tabel 3. 2 Lembar Penilaian Rating Performance .................................................... 40
Tabel 3. 3 Lembar pengamatan Allowance Time ...................................................... 41
Tabel 4. 1 Elemen Kerja dan Jumlah Operator pada Produksi Seat Cover ............... 47
Tabel 4. 2 Urutan Proses dan Jumlah Operator pada Produksi Karpet ..................... 48
Tabel 4. 3 Faktor- Faktor Penyesuaian Operator ...................................................... 49
Tabel 4. 4 Data Pengamatan Allowance Time Setiap Operator Produksi (dalam
menit:detik) ............................................................................................. 55
Tabel 4. 5 Data Waktu Lama Proses Penggambaran Pola oleh Operator A1. .......... 56
Tabel 4. 6 Hasil Perhitungan Waktu Normal Proses Produksi Seat Cover ............... 59
Tabel 4. 7 Hasil Perhitungan Waktu Normal Proses Produksi Karpet ...................... 60
Tabel 4. 8 Hasil Perhitungan Waktu Baku Tiap Proses pada Produksi Seat Cover .. 61
Tabel 4. 9 Hasil Perhitungan Waktu Baku Tiap Proses pada Produksi Karpet ......... 61
Tabel 4. 10 Perhitungan Bobot Tiap Elemen Kerja .................................................. 62
Tabel 4. 11 Hasil Alokasi Elemen Kerja dengan Metode Ranked Weight Position .. 63
Tabel 4. 12 Perhitungan Bobot Tiap Elemen Kerja Produksi Karpet ....................... 66
Tabel 4. 13 Hasil Alokasi Elemen Kerja dengan Metode Ranked Weight Position
(dalam menit) .......................................................................................... 67
Tabel 4. 14 Jumlah Resources pada Produksi Seat Cover dan Karpet ...................... 70
Tabel 4. 15 Hasil Distribution Fitting dari Lama Proses Produksi Seat Cover ........ 72
Tabel 4. 16 Hasil Distribution Fitting dari Lama Proses Produksi Karpet ............... 73
Tabel 4. 17 Output dari Replikasi Kondisi Awal dan Aktual (dalam set) ................. 74
Tabel 4. 18 Rekapitulasi Hasil Simulasi Kondisi Awal ............................................ 76
Tabel 4. 19 Rekapitulasi Hasil Simulasi Skenario Perbaikan 1 ................................ 78
Tabel 4. 20 Rekapitulasi Hasil Simulasi Skenario Perbaikan 2 ................................ 79
Tabel 4. 21 Data Hasil Simulasi 10 Replikasi Lini Produksi Kondisi Awal (dalam set)
................................................................................................................. 80
Tabel 4. 22 Data Hasil Simulasi 10 Replikasi Lini Produksi Skenario 1 .................. 81
Tabel 4. 23 Data Hasil Simulasi 10 Replikasi Lini Produksi Skenario 2 .................. 82