HASIL PENGUJIAN RELAI ARUS LEBIH BAY : LINE 1 BATUBESAR - NONGSA ARUS KERJA MATA UJI FASA YANG DI UJI FASA R FASA S FASA T FASA N Arus setelan (I 1 1 1 0.2 Arus Kerja 1.2 1.2 1.2 0.23 Arus Reset ( 1 1 1 0.2 Ir/Ipu 0.8333 0.8333 0.8333 0.8696 WAKTU KERJA MATA UJI FASA ARUS INJEKSI 2XIs 3XIs 4XIs WAKTU KERJA R 12.12 7.6 6.02 S 12.12 7.6 6.02 T 12.12 7.6 6.02 N 12.12 7.62 6.04 ARUS FASA R LINE ARUS FASA R TRAFO 1 2 3 0.9 0.95 1 1.05 1.1 1.15 1.2 1.25 Column B 0.51 0.52

description

transmisi tenaga

Transcript of Uji Ocr Line

Sheet1HASIL PENGUJIAN RELAI ARUS LEBIHBAY : LINE 1 BATUBESAR - NONGSAARUS KERJAPENGUJIAN ARUS KERJA

MATA UJIFASA YANG DI UJIMATA UJIFASA YANG DI UJIWaktu kerja FASA RFASA RFASA S FASA TFASA NFASA RFASA S FASA TFASA NISIPIR2xIS3xIS4xISArus setelan (Is) A1110.2Arus setelan (Is) A0.50.50.50.211.2112.127.66.02Arus Kerja (Ipu) A1.21.21.20.23Arus Kerja (Ipu) A0.510.510.510.21Arus Reset (Ir) A1110.2Arus Reset (Ir) A0.480.480.480.18Ir/Ipu %0.83333333330.83333333330.83333333330.8695652174Ir/Ipu %0.94117647060.94117647060.94117647060.8571428571

WAKTU KERJAPENGUJIAN WAKTU KERJA

MATA UJIFASAARUS INJEKSIMATA UJIFASAARUS INJEKSI2XIs3XIs4XIs2XIs3XIs4XIsWAKTU KERJAR12.127.66.02WAKTU KERJAR8.675.414.27S12.127.66.02S8.675.414.27T12.127.66.02T8.675.414.27N12.127.626.04N6.444.023.17

ARUS FASA R LINEARUS FASA S LINEARUS FASA T LINEARUS FASA N LINEWAKTU KERJA FASA R LINEWAKTU KERJA FASA S LINEWAKTU KERJA FASA T LINEWAKTU KERJA FASA N LINEARUS FASA R TRAFOARUS FASA S TRAFOARUS FASA T TRAFOARUS FASA N TRAFOWAKTU KERJA FASA R TRAFOWAKTU KERJA FASA S TRAFOWAKTU KERJA FASA T TRAFOWAKTU KERJA FASA N TRAFOFASA RFASA SFASA TFASA NARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)3008.673008.673008.673006.444505.414505.414505.414504.026004.276004.276004.276003.17

Sheet2HASIL PENGUJIAN RELAI ARUS LEBIHBAY : LINE 1 BATUBESAR - NONGSA

PENGUJIAN ARUS KERJA LINE

MATA UJIFASA YANG DI UJIFASA RFASA SFASA TFASA NFasa N TransmisiFasa N TrafoFASA RFASA S FASA TFASA NARUS KERJA (A)WAKTU KERJA (S)ARUS KERJA (A)WAKTU KERJA (S)ARUS KERJA (A)WAKTU KERJA (S)ARUS KERJA (A)WAKTU KERJA (S)Arus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)Arus setelan (Is) A1110.2160012.12160012.12160012.12160012.12160016.153006.15Arus Kerja (Ipu) A1.21.21.20.2324007.624007.624007.624007.6224009.544503.63Arus Reset (Ir) A1110.232006.0232006.0232006.0232006.0432007.56002.85Ir/Ipu %0.83333333330.83333333330.83333333330.86956521749002.2212001.9PENGUJIAN WAKTU KERJA LINE15001.722501.45MATA UJIFASAARUS INJEKSI30001.312XIs3XIs4XIs33001.26WAKTU KERJAR12.127.66.02S12.127.66.02T12.127.66.02N12.127.626.04

HASIL PENGUJIAN RELAI ARUS LEBIHBAY : TRAFO 1 GI SAGULUNG

PENGUJIAN ARUS KERJA TRAFO

MATA UJIFASA YANG DI UJIFASA RFASA SFASA TFASA NFASA RFASA S FASA TFASA NARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)ARUS KERJA (A)WAKTU KERJA (s)Arus setelan (Is) A0.50.50.50.23008.673008.673008.673006.44Arus Kerja (Ipu) A0.510.510.510.214505.414505.414505.414504.02Arus Reset (Ir) A0.480.480.480.186004.276004.276004.276003.17NAMA GINAMA PEMBANGKITKAPASITAS PEMBANGKITNAMA GIPANJANG TRANSMISIIr/Ipu %0.94117647060.94117647060.94117647060.8571428571GI Panaran PLTG PANARAN ( 4 x 27,5 MW)GI PANARAN - GI MUKA KUNING2xDRAKE 402 mm2PLTMG ANGGREKO 1 ( 20 x 1,2 MW )376 MVA / 1,447 APENGUJIAN WAKTU KERJA TRAFOPLTMG TM 2500 (1 x 18 MW )L=7,06 kmr - 24 TowerMesin CC (1 x 22,9 MW )GI MUKA KUNING - GI TANJUNG KASAM2xDRAKE 402 mm2MATA UJIFASAARUS INJEKSIGI Sagulung PLTMG AGGREKO 2( 5 x 3,15 MW )376 MVA / 1,447 A2XIs3XIs4XIsGI Sei HarapanPLTD SEKUPANG 2 ( 4 x 4,5 MW )L=15,76 kmr - 40 TowerWAKTU KERJAR8.675.414.27GI Tanjung SengkuangPLTD BTA ATAS( 3 x 7,68 MW )GI TANJUNG KASAM - GI BATU BESAR2xDOVE 282 mm2S8.675.414.27PLTD BTA BARU( 2 x 10,5 MW )308 MVA / 1,185 AT8.675.414.27PLTD SENGKUANG( 4 x 5,2 MW )L=8,2 kmr - 29 TowerN6.444.023.17GI Sei BaloiPLTD SEI BALOI( 2 x 12,34 MW )GI BATU BESAR - GI SEI BALOI1xHAWK 241,7 mm2PLTD JEMBO 1( 3 x 9,36 MW )139 MVA / 535 APLTMG JEMBO 2(6 x 4 MW )L=9,671 kmr - 37 TowerGI Batu BesarPLTMG KABIL 2 ( 6 x 2,5 MW)GI BALOI - GI TANJUNG SENGKUANG2xZEBRA 428,8 mm2PLTMG KABIL 1 ( 3 x 6 MW)392 MVA / 1,509 AGI Tanjung KasamPLTU MESIN 1( 1 x 65 MW )L=8,32 kmr - 35 TowerPLTU MESIN 2 ( 1 x 65 MW )GI BALOI - GI SEI HARAPAN1xHAWK 241,7 mm2Fasa R TransmisiFasa R Trafo139 MVA / 535 AArus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)L=7,045 kmr - 22 Tower160016.153009.15GI SEI HARAPAN - GI SAGULUNG2xZEBRA 428,8 mm224009.544505.4392 MVA / 1,509 A32007.56004.25L=9,186 kmr - 33 Tower9003.3GI SAGULUNG - GI PANARAN2xZEBRA 428,8 mm212002.83392 MVA / 1,509 A15002.53L=21,87 kmr - 56 Tower22502.16TOTAL TRANSMISI157,83 kms - 253 tower - 16 jalur30001.9513 trafo daya 150/20 kV - 450 MVA33001.88150 cel kubikel 20 KV

Sheet3OCR FASA R TRANSMISIOCR FASA R TRANSFORMATORMata UjiFasa yang DiujiMata UjiFasa yang DiujiPengujian Arus Injeksi (A)waktu kerja (s)Pengujian Arus Injeksi (A)waktu kerja (s)Fasa RFasa SFasa TFasa NFasa RFasa SFasa TFasa N1216.15119.15Arus Setelan (Is) A1110.2Arus Setelan (Is) A0.50.50.50.2239.5421.55.4Arus Kerja (Ipu) A1.21.21.20.23Arus Kerja (Ipu) A0.510.510.510.21347.5324.25Arus Reset (Ir) A1110.2Arus Reset (Ir) A0.480.480.480.18465.83433.3Ir/Ipu %0.83%0.83%0.83%0.86%Ir/Ipu %0.94%0.94%0.94%0.85%585542.836104.46652.5377.52.16Mata UjiFasaArus InjeksiMata UjiFasaArus InjeksiGFR FASA N TRANSMISI8101.952xIs3xIs4xIs2xIs3xIs4xIs9112.53waktu kerja (s)R12.127.66.02waktu kerja (s)R8.675.414.27Pengujian Arus Injeksi (A)waktu kerja (s)S12.127.66.02S8.675.414.2710.416.15GFR FASA N TRANSFORMATORT12.127.66.02T8.675.414.2720.69.54N12.127.626.04N6.444.023.1730.87.5Pengujian Arus Injeksi (A)waktu kerja (s)41.25.8310.416.1551.6520.69.54624.4630.87.541.25.8351.65624.46731.45841.3194.41.26

Sheet4Fasa R TransmisiFasa R TrafoArus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)160012.123008.6724007.64505.4132006.026004.27

Fasa N TransmisiFasa N TrafoArus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)160012.123006.4424007.624504.0232006.046003.17

Sheet5Fasa R TransmisiFasa R TrafoFasa N TransmisiFasa N TrafoArus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)Arus Kerja (A)Waktu Kerja (S)160016.153009.15160016.153006.1524009.544505.424009.544503.6332007.56004.2532007.56002.859003.39002.2212002.8312001.915002.5315001.722502.1622501.4530001.9530001.3133001.8833001.26