AUDIT ENERGI
Tugas 2
Dosen: Rispiandi, ST, MT
Nama : Nurul Fathatun
NIM : 121424023
Kelas : 3A-TKPB
PROGRAM STUDI DIPLOMA IV TEKNIK KIMIA PRODUKSI BERSIH
JURUSAN TEKNIK KIMIA
POLITEKNIK NEGERI BANDUNG
2015
Tanggal Penugasan : 19 Maret 2015
Tanggal Pengumpulan : 24 Maret 2015
Boiler
F=10500 TF =30°C40°C50°C60°C70°C
S=10 ton/jam40 bar300°CHs= 2960,7
BD=5% x S=5% x 10000=500 kg/jam40 bar, cair jenuhHBD= 1087,31
No. 1
Bahan bakar : Solar, ɳsolar = 75%
Untuk T=30°CHF = 125,79 KJ/Kg
QBoiler = [ (S x Hs) + (BD x HBD ) ] – (F x HF)
= [ (10000 Kgjam
x 2960,7 KJKg
) + (500 Kgjam
x 1087,31 KJKg
) ] – (10500 K gjam
x 125,79
KJKg
)
= 30150655 KJjam
- 1320795 KJjam
= 28829860 KJjam
QSolar = QBoiler
MSolar x LHVSolar x ɳSolar = QBoiler
MSolar = QBoiler
LHV Solar x ɳSolar
= 28829860
KJjam
41032,6KJKg
x 0,75
= 936,81 Kgjam
VSolar = M Solar
ρSolar
= 936,81
Kgjam
0,88KgLiter
= 1064,55 Literjam
Cost = Rp. 6400/liter x 1064,55 Literjam
= Rp. 6.813.120,-/jam
Rp .tonsteam
= Rp .6.813 .120/ jam10ton / jam
= Rp .6 81.312 ,− ¿
ton steam¿
Untuk T= 40°C, 50°C, 60°C, 70°C ada dalam table berikut:
Suhu Umpan
(°C)
HF
(KJ/Kg)QBoiler
(KJ/jam)MSolar
(Kg/jam)VSolar
(Liter/jam)Cost (Rupiah/jam)
Rp./ton steam
30 125,79 28829860 936,81 1064,55 Rp. 6.813.120/jam Rp. 681.31240 167,57 28391170 922,55 1048,35 Rp. 6.709.440/jam Rp. 670.94450 209,33 27952690 908,31 1032,16 Rp. 6.605.824/jam Rp. 660.582,460 251,13 27511690 893,97 1015,88 Rp. 6.501.632/jam Rp. 650.163,270 292,98 27074365 879,76 999,73 Rp. 6.398.272/jam Rp. 639.827,2
25 30 35 40 45 50 55 60 65 70 75610000
620000
630000
640000
650000
660000
670000
680000
690000
681312
670944
660582.4
650163.2
639827.2
Grafik Pengaruh Suhu Umpan Terhadap Cost Per Ton Steam
Suhu Umpan (°C)
Rp./
ton
stea
m
Boiler
HF= 125,8 TF=30°CVariasi kualitas air (SiO2)=15 ppm25 ppm40 ppm55 ppm70 ppm
S=10 ton/jam40 bar300°CHs= 2960,7
BD?SiO2 = 250 ppm40 bar, cair jenuhHBD= 1087,31
No. 2
Bahan bakar : Solar, ɳsolar = 75%
Untuk kadar SiO2 = 15 ppm
F = BD + SF . XF = BD . XBD + S . Xs
F (15) = BD (250) + 10000 (0)
F = 25015
BD
F = 16,67 BD
F = BD + S16,67 BD= BD + 1000015,67 BD= 10000BD = 638,16 kg/jam
F = BD + S= 638,16 kg/jam + 10000 kg/jam= 10638,16 kg/jam
QBoiler = [ (S x Hs) + (BD x HBD ) ] – (F x HF)
= [ (10000 Kgjam
x 2960,7 KJKg
) + (638,16 Kgjam
x 1087,31 KJKg
) ] – (10638,16 Kgjam
x
125,8 KJKg
)
= 28962597,22 KJjam
QSolar = QBoiler
MSolar x LHVSolar x ɳSolar = QBoiler
MSolar = QBoiler
LHV Solar x ɳSolar
= 28962597,22
KJjam
41032,6KJKg
x 0,75
= 941,12 Kgjam
VSolar = M Solar
ρSolar=
941,12Kgjam
0,88KgLiter
= 1069,45 Literjam
Cost = Rp. 6400/liter x 1069,45 Literjam
= Rp. 6.844.480,-/jam
Rp .tonsteam
= Rp .6.844 .48 0 / jam10 ton/ jam
= Rp .6 84.448 ,− ¿tons team
¿
Untuk kadar SiO2 = 25 ppm, 40 ppm, 55 ppm, 70 ppm ada dalam table berikut:
kadar SiO2
(ppm)
Blow Down
(Kg/jam)
Feed (Kg/jam)
QBoiler
(KJ/jam)MSolar
(Kg/jam)VSolar
(Liter/jam)Cost (Rupiah/jam)
Rp./ton steam
15 638,16 10638,16 28962597,22 941,12 1069,45 Rp. 6.844.480/jam Rp. 684.44825 1111,11 11111,11 29417343,38 955,90 1086,25 Rp. 6.952.000/jam Rp. 695.20040 1904,76 11904,76 30180445,79 980,69 1114,42 Rp. 7.132.288/jam Rp. 713.228,855 2824,85 12824,85 31065121,52 1009,44 1147,09 Rp. 7.341.376/jam Rp. 734.137,670 3891,05 13891,05 32090283,49 1042,75 1184,95 Rp. 7.583.680/jam Rp. 758.368
10 20 30 40 50 60 70 80640000
660000
680000
700000
720000
740000
760000
780000
684448695200
713228.8
734137.6
758368
Grafik Pengaruh Konsentrasi SiO2 Terhadap Cost Per Ton Steam
Konsentrasi SiO2 (ppm)
Rp./
ton
stea
m
Boiler
HF= 125,8 TF=30°C
S=10 ton/jam40 bar300°CHs= 2960,7
BD=5% x S=5% x 10000=500 kg/jam40 bar, cair jenuhHBD= 1087,31
No. 3
Variasi bahan bakar:
Solar, LHVsolar=9800 kcal/kg = 41032,6 KJ/kg, ɳsolar=75%, ρsolar=0,88 kgliter
,
Harga=Rp.6400/liter Gas, ɳgas=80%, Harga= S 10/MMBtu, 1 MMBtu=1000000 Btu, S 1= Rp. 13.000,- Batu bara, LHVbatu bara=6000 kcal/kg = 25122 kJ/kg, ɳbatu bara=65%, Harga=Rp.1000/kg Bagasse, LHVBagasse=2000 kcal/kg = 8374 kJ/kg, ɳBagasse=60%, Harga=Rp.200 /kg
QBoiler = [ (S x Hs) + (BD x HBD ) ] – (F x HF)
= [ (10000 Kgjam
x 2960,7 KJKg
) + (500 Kgjam
x 1087,31 KJKg
) ] – (10500 Kgjam
x 125,8 KJKg
)
= 28829755 KJjam
Untuk Bahan Bakar SolarQSolar = QBoiler
MSolar x LHVSolar x ɳSolar = QBoiler
MSolar = QBoiler
LHV Solar x ɳSolar
= 28829755
KJjam
41032,6KJKg
x 0,75
= 936,80 Kgjam
VSolar = M Solar
ρSolar
= 936,80
Kgjam
0,88KgLiter
= 1064,55 Literjam
Cost = Rp. 6400/liter x 1064,55 Literjam
= Rp. 6.813.150,-/jam
Rp .tonsteam
= Rp .6.813 .150/ jam10ton / jam
= Rp .6 81.315 ,− ¿tons team
¿
Untuk Bahan Bakar GasQGas = QBoiler
QGas x ɳGas = QBoiler
QGas = QBoiler
ɳGas
= 28829755
KJjam
0,80
= 36037193,75 kJ/jam x |0,948Btu1kJ | x | 1 MMBtu
1000000Btu|= 34,16 MMBtu/jam
Cost = S 10/MMBtu x 34,16 MMBtujam
= S 341,6/jam= S 341,6/jam x Rp. 13.000= Rp. 4.440.800,-/jam
Rp .tonsteam
= Rp .4.440 .800 / jam10 ton/ jam
= Rp .444.080 ,− ¿
ton s team¿
Untuk Bahan Bakar Batu BaraQBatu bara = QBoiler
MBatu bara x LHVBatu bara x ɳBatu bara = QBoiler
MBatu bara = QBoiler
LHV Batubara xɳbatubara
= 28829755
KJjam
25122KJKg
x 0,6 5
= 1765,52 Kgjam
Cost = Rp. 1000/kg x 1765,52 Kgjam
= Rp. 1.765.520,-/jam
Rp .tonsteam
= Rp .1.765 .520/ jam10ton / jam
= Rp .176.552 ,− ¿ton s team
¿
Untuk Bahan Bakar Bagasse
QBagasse = QBoiler
MBagasse x LHVBagasse x ɳBagasse = QBoiler
MBagasse = QBoiler
LHV Bagasse x ɳBagasse
= 28829755
KJjam
8374KJKg
x 0,60
= 5737,94 Kgjam
Cost = Rp. 200/kg x 5737,94 Kgjam
= Rp. 1.147.588,-/jam
Rp .tonsteam
= Rp .1.147 .588/ jam10ton / jam
= Rp .1 14 .758 ,8 ,− ¿ton s team
¿
Untuk jenis bahan bakar lain ada dalam table berikut:
Jenis Bahan Bakar
MBahan bakar (Kg/jam)VSolar
(Liter/jam)Cost (Rupiah/jam)
Rp./ton steam
Solar 936,80 1064,55 Rp. 6.813.150/jam Rp. 681.315 Gas QGas = 34,16 MMBtu/jam - Rp. 4.440.800/jam Rp. 444.080
Batu Bara 1765,52 - Rp. 1.765.520/jam Rp. 176.552Bagasse 5737,94 - Rp. 1.147.588/jam Rp. 114.758,8
Solar Gas Batu Bara Bagasse0
100000200000300000400000500000600000700000800000
681315
444080
176552114758.8
Grafik Pengaruh Jenis Bahan Bakar Terhadap Cost Per Ton Steam
Jenis Bahan Bakar
Rp./
ton
stea
m