UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL / BAHAN
PROPINSI : BENGKULU KABUPATEN : KAUR
UPAH UPAHNO TENAGA KERJA KODE TENAGA KERJA NO TENAGA KERJA KODE TENAGA KERJA
( Rp/HARI) ( Rp/HARI)
1 Mandor Lapangan L.061 80,000.00 8 Pembantu Operator L.089 45,000.00
2 Mekanik L.071 75,000.00 9 Supir truk L.091 55,000.00
3 Mekanik Pembantu L.072 65,000.00 10 Supir personil L.092 45,000.00
4 Kepala Tukang L.073 80,000.00 11 Pembantu Supir L.099 45,000.00
5 Tukang L.079 70,000.00 12 Buruh Lapangan tak terlatih L.101 45,000.00
6 Operator terlatih L.081 80,000.00 13 Buruh Lapangan kurang terlatih L.103 50,000.00
7 Operator kurang terlatih L.082 60,000.00 14 Buruh Lapangan terlatih L.106 40,000.00
HARGA DI JARAK ONGKOS JUMLAH HARGA JUMLAH HARGANO MATERIAL UNIT KODE QUARRY/SUMBER ANGKUT ANGKUT (TANPA PAJAK) PAJAK (TERMASUK
(TANPA PAJAK) RATA-RATA PER UNIT PAJAK )( Rp ) ( Km ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
1 Batu gunung atau guarry m3 M.010 150,000 25 45,976 195,976 - 195,976
2 Kerikil dari galian bukit m3 M.011 150,000 -
3 Kerikil sungai m3 M.012 150,000 25 75,000 225,000 - 225,000
4 Batu kali m3 M.013 150,000 25 75,000 225,000 - 225,000
5 Kerikil sungai ayak tanpa pasir m3 M.014 150,000 25 75,000 225,000 - 225,000
6 Batu pecah 10 - 15 cm m3 M.020 220,000 25 75,000 295,000 - 295,000
7 Batu pecah 7 - 10 cm m3 M.021 220,000 25 75,000 295,000 - 295,000
8 Batu pecah 5 - 10 cm m3 M.022 220,000 25 75,000 295,000 - 295,000
9 Batu pecah 3 - 5 cm m3 M.023 247,500 25 75,000 322,500 - 322,500
10 Batu pecah 2 - 3 cm m3 M.024 264,000 25 75,000 339,000 - 339,000
11 Batu pecah 1 - 2 cm m3 M.025 330,000 25 75,000 405,000 - 405,000
12 Batu pecah 0,5 - 1 cm m3 M.026 385,000 25 75,000 460,000 - 460,000
13 Gorong2 beton diameter 60 cm m M.031 90,000 25 15,000 105,000 - 105,000
14 Gorong2 beton diameter 80 cm m M.033 110,000 25 15,000 125,000 - 125,000
15 Gorong2 beton diameter 100 cm m M.035 130,000 25 15,000 145,000 - 145,000
16 Pasir urug/Timbun m3 M.040 137,500 25 75,000 212,500 - 212,500
17 Pasir ayak untuk beton m3 M.041 143,000 25 75,000 218,000 - 218,000
18 Sirtu ( tak diayak ) m3 M.042 150,000 25 75,000 225,000 - 225,000
19 Bahan timbunan pilihan m3 M.050 70,000 25 75,000 145,000 - 145,000
20 Aspal Bitumen kg M.061 8,500 80 1,000 9,500 - 9,500
21 Aspal Buton Kg M.062 1,200,000 80 1,000 1,201,000 - 1,201,000
22 Minyak Flux lt M.063 2,400 25 1,000 3,400 - 3,400
23 Minyak tanah lt M.065 4,500 25 1,000 5,500 - 5,500
24 Kayu bakar m3 M.070 200,000 25 75,000 275,000 - 275,000
25 Semen Pc 50 kg M.080 57,000 25 5,000 62,000 - 62,000
26 Kapur bakar m3 M.091 25 500 500 - 500
27 Batu kapur m3 M.082 - -
28 Cat Jembatan kg M.090 30,000 25 500 30,500 - 30,500
29 Baja tralis kg M.161 10,000 500 10,500 - 10,500
30 Kawat beronjong kg M.162 17,000 25 1,000 18,000 - 18,000
31 Baut baja kg M.163 15,000 25 1,000 16,000 - 16,000
32 Besi galpanisir btg M.164 750,000 25 1,000 751,000 - 751,000
33 Baja konstruksi kg M.165 13,000 25 1,000 14,000 - 14,000
34 Paku jembatan kg M.166 15,000 25 500 15,500 - 15,500
35 Baja tulangan beton kg M.167 10,000 25 500 10,500 - 10,500
36 Alat - alat bantu set M.170 90,000 25 90,000 - 90,000
37 Kayu untuk perancah m3 M.180 700,000 25 75,000 775,000 - 775,000
38 Kayu untuk konstruksi Jembatan m3 M.181 1,900,000 25 75,000 1,975,000 - 1,975,000
39 Minyak Diesel/solar lt M.183 5,500 25 200 5,700 - 5,700
40 Bensin/premium lt M.184 4,500 25 200 4,700 - 4,700
41 minyak pelumas lt M.185 35,000 25 200 35,200 - 35,200
Tak bertulang : 1 Cangkul + 1 skop + 1 pikulan
M2M3 K.9
783,902 15,000
165,000
900,000
1,317,500 1,472,500
10.668 0.22194
850,000 112,014 2.66328
7885.014
85,344
M2M3
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.088DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : Stemper 4 HP ( 4 HP) TENAGA HPHARGA : Rp. 3000000 UMUR KER: 6 Tahun : 1,440 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.24668
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 3000000 x 0.24668 = Rp 555.03
1200.000
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 3000000 = Rp 82.501200
Sub Total = Rp 637.53
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 4 x 5,700 = Rp 3,648.00 Pelumas = 0.006 x 4 x 35,200 = Rp 844.80 Perbaikan & Spare Parts = 0.6 x 555.03 x = Rp 333.02 ( 60 % x Depresiasi ) = Sub Total = Rp 4,825.82
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 637.53 + Rp 4,825.82 = Rp 5,463.35 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.087DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : VIBRO ROLLER ( 7 HP) TENAGA HPHARGA : Rp. 19,000,000 UMUR KER: 6 Tahun : 8,640 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.24668
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 19,000,000 x 0.24668 = Rp 3,515.19
1200
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 19,000,000 = Rp 522.501200
Sub Total = Rp 4,037.69
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 4 x 5,700 = Rp 3,648.00 Pelumas = 0.006 x 4 x 35,200 = Rp 844.80 Perbaikan & Spare Parts = 0.6 x 3,515.19 x = Rp 2,109.11 ( 60 % x Depresiasi ) = Sub Total = Rp 6,601.91
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 4,037.69 + Rp 6,601.91 = Rp 10,639.60 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.341DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : POMPA AIR ( 8 HP) TENAGA HPHARGA : Rp. 15,000,000 UMUR KER: 7 Tahun : 10,080 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.22260
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 15,000,000 x 0.22260 = Rp 2,086.88
1440
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 15,000,000 = Rp 343.751440
Sub Total = Rp 2,430.63
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 8 x 5,700 = Rp 7,296.00 Pelumas = 0.006 x 8 x 35,200 = Rp 1,689.60 Perbaikan & Spare Parts = 0.6 x 2,086.88 x = Rp 1,252.13 ( 60 % x Depresiasi ) = Sub Total = Rp 10,237.73
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 2,430.63 + Rp 10,237.73 = Rp 12,668.35 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.052DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : WHEEL LOADER ( 80 HP) TENAGA HPHARGA : Rp. 115,000,000 UMUR KER: 7 Tahun : 12,600 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.22260
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 115,000,000 x 0.22260 = Rp 12,799.50
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 115,000,000 = Rp 2108.331800
Sub Total = Rp 14,907.83
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 115 x 5,700 = Rp 104,880.00 Pelumas = 0.006 x 115 x 35,200 = Rp 24,288.00 Perbaikan & Spare Parts = 0.6 x 12,799.50 x = Rp 7,679.70 ( 60 % x Depresiasi ) = Sub Total = Rp 136,847.70
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 14,907.83 + Rp 136,847.70 = Rp 151,755.53 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.212DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : DUMPT TRUCK ( 100 HP) TENAGA HPHARGA : Rp. 75,000,000.00 UMUR KER: 6 Tahun : 10,800 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.24668
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 75,000,000 x 0.24668 = Rp 9,250.50
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 75,000,000 = Rp 1375.001800
Sub Total = Rp 10,625.50
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 100 x 5,700 = Rp 91,200.00 Pelumas = 0.006 x 100 x 35,200 = Rp 21,120.00 Perbaikan & Spare Parts = 0.6 x 9,250.50 x = Rp 5,550.30 ( 60 % x Depresiasi ) = Sub Total = Rp 117,870.30
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 10,625.50 + Rp 117,870.30 = Rp 128,495.80 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.001DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : BULL DOZER ( 100 HP) TENAGA HPHARGA : Rp. 700,000,000 UMUR KER: 2 Tahun : 3,600 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.59559
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 700,000,000 x 0.59559 = Rp 208,456.50
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 700,000,000 = Rp 12833.331800
Sub Total = Rp 221,289.83
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 100 x 5,700 = Rp 91,200.00 Pelumas = 0.006 x 100 x 35,200 = Rp 21,120.00 Perbaikan & Spare Parts = 0.6 x 208,456.50 x = Rp 125,073.90 ( 60 % x Depresiasi ) = Sub Total = Rp 237,393.90
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 221,289.83 + Rp 237,393.90 = Rp 458,683.73 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.089DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : CONCRET VIBRORATOR ( 8 HP) TENAGA HPHARGA : Rp. 80,000,000 UMUR KER: 7 Tahun : 10,080 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.22260
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 80,000,000 x 0.22260 = Rp 11,130.00
1440
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 80,000,000 = Rp 1833.331440
Sub Total = Rp 12,963.33
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 8 x 5,700 = Rp 7,296.00 Pelumas = 0.006 x 8 x 35,200 = Rp 1,689.60 Perbaikan & Spare Parts = 0.6 x 11,130.00 x = Rp 6,678.00 ( 60 % x Depresiasi ) = Sub Total = Rp 15,663.60
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 12,963.33 + Rp 15,663.60 = Rp 28,626.93 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.221DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : DUMP TRUK (3,5 - 4T) ( 80 HP) TENAGA HPHARGA : Rp. 85,000,000 UMUR KER: 2 Tahun : 3,600.00 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.59559
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 85,000,000 x 0.59559 = Rp 25,312.57
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 85,000,000 = Rp 1558.331800
Sub Total = Rp 26,870.91
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 25,312.57 x = Rp 15,187.54 ( 60 % x Depresiasi ) = Sub Total = Rp 105,043.55
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 26,870.91 + Rp 105,043.55 = Rp 131,914.45 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.253DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : ALAT PENGADUK BETON O,5 M3/20 HP ( 4 HP) TENAGA HPHARGA : Rp. 5,000,000 UMUR KER: 5 Tahun : 3,600.00 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 2 Jam Kerja FAKTOR (CRF)
0.28085
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 5,000,000 x 0.28085 = Rp 1,755.31
720
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 5,000,000 = Rp 229.17720
Sub Total = Rp 1,984.48
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 4 x 5,700 = Rp 3,648.00 Pelumas = 0.006 x 4 x 35,200 = Rp 844.80 Perbaikan & Spare Parts = 0.6 x 1,755.31 x = Rp 1,053.19 ( 60 % x Depresiasi ) = Sub Total = Rp 5,545.99
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 1,984.48 + Rp 5,545.99 = Rp 7,530.47 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.080DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : THREE WHEELS ROLLER 8 - 10 T ( 51 HP) TENAGA HPHARGA : Rp. 110,000,000 UMUR KER: 2 Tahun : 3,600 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.59559
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 110,000,000 x 0.59559 = Rp 32,757.45
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 110,000,000 = Rp 2016.671800
Sub Total = Rp 34,774.12
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 51 x 5,700 = Rp 46,512.00 Pelumas = 0.006 x 51 x 35,200 = Rp 10,771.20 Perbaikan & Spare Parts = 0.6 x 32,757.45 x = Rp 19,654.47 ( 60 % x Depresiasi ) = Sub Total = Rp 76,937.67
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 34,774.12 + Rp 76,937.67 = Rp 111,711.79 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.010DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : MOTOR GRADER ( 100 HP) TENAGA HPHARGA : Rp. 250,000,000 UMUR KER: 1 Tahun : 1,800 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
1.12500
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 250,000,000 x 1.12500 = Rp 140,625.00
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 250,000,000 = Rp 4583.331800
Sub Total = Rp 145,208.33
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 110 x 5,700 = Rp 100,320.00 Pelumas = 0.006 x 110 x 35,200 = Rp 23,232.00 Perbaikan & Spare Parts = 0.6 x 140,625.00 x = Rp 84,375.00 ( 60 % x Depresiasi ) = Sub Total = Rp 207,927.00
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 145,208.33 + Rp 207,927.00 = Rp 353,135.33 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.031DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : CRUSHER 30 t/hr ( 140 HP) TENAGA HPHARGA : Rp. 550,000,000.00 UMUR KER: 1 Tahun : 1,800 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
1.12500
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 550,000,000 x 1.12500 = Rp 309,375.00
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 550,000,000 = Rp 10083.331800
Sub Total = Rp 319,458.33
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 140 x 5,700 = Rp 127,680.00 Pelumas = 0.006 x 140 x 35,200 = Rp 29,568.00 Perbaikan & Spare Parts = 0.6 x 309,375.00 x = Rp 185,625.00 ( 60 % x Depresiasi ) = Sub Total = Rp 342,873.00
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 319,458.33 + Rp 342,873.00 = Rp 662,331.33 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.252DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : CHONCRETE MIXER ( 10 HP) TENAGA HPHARGA : Rp. 89,000,000.00 UMUR KER: 7 Tahun : 10,080 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.22260
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 89,000,000 x 0.22260 = Rp 12,382.13
1440
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 89,000,000 = Rp 2039.581440
Sub Total = Rp 14,421.71
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 10 x 5,700 = Rp 9,120.00 Pelumas = 0.006 x 10 x 35,200 = Rp 2,112.00 Perbaikan & Spare Parts = 0.6 x 12,382.13 x = Rp 7,429.28 ( 60 % x Depresiasi ) = Sub Total = Rp 18,661.28
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 14,421.71 + Rp 18,661.28 = Rp 33,082.98 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.153DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : SPRAYER ASPAL ( 5 HP) TENAGA HPHARGA : Rp. 100,000,000.00 UMUR KER: 3 Tahun : 5,400 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.41993
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 100,000,000 x 0.41993 = Rp 20,996.50
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 100,000,000 = Rp 1833.331800
Sub Total = Rp 22,829.83
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 5 x 5,700 = Rp 4,560.00 Pelumas = 0.006 x 5 x 35,200 = Rp 1,056.00 Perbaikan & Spare Parts = 0.6 x 20,996.50 x = Rp 12,597.90 ( 60 % x Depresiasi ) = Sub Total = Rp 18,213.90
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 22,829.83 + Rp 18,213.90 = Rp 41,043.73 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.082DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : VIBRATOR ROLLER ( 35 HP) TENAGA HPHARGA : Rp. 120,000,000.00 UMUR KER: 1 Tahun : 1,800 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
1.12500
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 120,000,000 x 1.12500 = Rp 67,500.00
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 120,000,000 = Rp 2200.001800
Sub Total = Rp 69,700.00
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 35 x 5,700 = Rp 31,920.00 Pelumas = 0.006 x 35 x 35,200 = Rp 7,392.00 Perbaikan & Spare Parts = 0.6 x 67,500.00 x = Rp 40,500.00 ( 60 % x Depresiasi ) = Sub Total = Rp 79,812.00
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 69,700.00 + Rp 79,812.00 = Rp 149,512.00 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.152DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : SPRAYER ASPHALT ( 7 HP) TENAGA HPHARGA : Rp. 150,000,000.00 UMUR KER: 2 Tahun : 2,880 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 4 Jam Kerja FAKTOR (CRF)
0.59559
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 150,000,000 x 0.59559 = Rp 55,836.56
1440
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 150,000,000 = Rp 3437.501440
Sub Total = Rp 59,274.06
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 7 x 5,700 = Rp 6,384.00 Pelumas = 0.006 x 7 x 35,200 = Rp 1,478.40 Perbaikan & Spare Parts = 0.6 x 55,836.56 x = Rp 33,501.94 ( 60 % x Depresiasi ) = Sub Total = Rp 41,364.34
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 59,274.06 + Rp 41,364.34 = Rp 100,638.40 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.182DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : WATER TANK TRUCK ( 80 HP) TENAGA HPHARGA : Rp. 90,000,000.00 UMUR KER: 10 Tahun : 18,000 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.18062
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 90,000,000 x 0.18062 = Rp 8,127.90
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 90,000,000 = Rp 1650.001800
Sub Total = Rp 9,777.90
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 8,127.90 x = Rp 4,876.74 ( 60 % x Depresiasi ) = Sub Total = Rp 94,732.74
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 9,777.90 + Rp 94,732.74 = Rp 104,510.64 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.211DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : PLAT BED TRUCK ( 80 HP) TENAGA HPHARGA : Rp. 69,500,000.00 UMUR KER: 10 Tahun : 18,000 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.18062
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 69,500,000 x 0.18062 = Rp 6,276.55
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 69,500,000 = Rp 1274.171800
Sub Total = Rp 7,550.71
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 6,276.55 x = Rp 3,765.93 ( 60 % x Depresiasi ) = Sub Total = Rp 93,621.93
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 7,550.71 + Rp 93,621.93 = Rp 101,172.64 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.155DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : MESIN PENCAMPUR ASPAL ( 80 HP) TENAGA HPHARGA : Rp. 900,000,000.00 UMUR KER: 1 Tahun : 1,800 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
1.12500
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 900,000,000 x 1.12500 = Rp 506,250.00
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 900,000,000 = Rp 16500.001800
Sub Total = Rp 522,750.00
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 506,250.00 x = Rp 303,750.00 ( 60 % x Depresiasi ) = Sub Total = Rp 393,606.00
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 522,750.00 + Rp 393,606.00 = Rp 916,356.00 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.084DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : MESIN GILAS RODA KARET 8 -15 T ( 80 HP) TENAGA HPHARGA : Rp. 148,000,000.00 UMUR KER: 2 Tahun : 3,600 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.59559
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 148,000,000 x 0.59559 = Rp 44,073.66
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 148,000,000 = Rp 2713.331800
Sub Total = Rp 46,786.99
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 44,073.66 x = Rp 26,444.20 ( 60 % x Depresiasi ) = Sub Total = Rp 116,300.20
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 46,786.99 + Rp 116,300.20 = Rp 163,087.19 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.157DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : MESIN PENGHAMPAR ( 80 HP) TENAGA HPHARGA : Rp. 72,000,000.00 UMUR KER: 4 Tahun : 7,200 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.33271
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 72,000,000 x 0.33271 = Rp 11,977.56
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 72,000,000 = Rp 1320.001800
Sub Total = Rp 13,297.56
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 11,977.56 x = Rp 7,186.54 ( 60 % x Depresiasi ) = Sub Total = Rp 97,042.54
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 13,297.56 + Rp 97,042.54 = Rp 110,340.10 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.301DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : KOMRESOR ( 80 HP) TENAGA HPHARGA : Rp. 20,000,000.00 UMUR KER: 12 Tahun : 21,600 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.16519
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 20,000,000 x 0.16519 = Rp 1,651.90
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 20,000,000 = Rp 366.671800
Sub Total = Rp 2,018.57
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 80 x 5,700 = Rp 72,960.00 Pelumas = 0.006 x 80 x 35,200 = Rp 16,896.00 Perbaikan & Spare Parts = 0.6 x 1,651.90 x = Rp 991.14 ( 60 % x Depresiasi ) = Sub Total = Rp 90,847.14
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 2,018.57 + Rp 90,847.14 = Rp 92,865.71 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.040DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : MESIN PENYARING ( 140 HP) TENAGA HPHARGA : Rp. 120,000,000.00 UMUR KER: 8 Tahun : 14,400 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.18062
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 120,000,000 x 0.18062 = Rp 10,837.20
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 120,000,000 = Rp 2200.001800
Sub Total = Rp 13,037.20
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 140 x 5,700 = Rp 127,680.00 Pelumas = 0.006 x 140 x 35,200 = Rp 29,568.00 Perbaikan & Spare Parts = 0.6 x 10,837.20 x = Rp 6,502.32 ( 60 % x Depresiasi ) = Sub Total = Rp 163,750.32
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 13,037.20 + Rp 163,750.32 = Rp 176,787.52 JamAtau = Rp x Rp = Rp Hari
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODESUBDIT PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E.10DAN KABUPATEN
PROPINSI KODE KAUPATEN KODE DISIAPKAN DISIAPKAN BENGKULU TANGGAL
JENIS ALAT : EXAVATOR ( 140 HP) TENAGA HPHARGA : Rp. 230,000,000.00 UMUR KER: 4 Tahun : 7,200 Jam
( 1 Tahun ) : 360 Hari KerjaAtau 1 Hari 5 Jam Kerja FAKTOR (CRF)
0.33271
A. BIAYA PEMILIKAN ( OWNERSHIP COST ) : ( Rp./Jam )
1. Depresia: 90% x Harga Alat= 0.9 x 230,000,000 x 0.33271 = Rp 38,261.65
1800
2. Lain - lainAsuransi 3 % thn + PPN 10 % 3.3 % x
0.033 x 230,000,000 = Rp 4216.671800
Sub Total = Rp 42,478.32
B. BIAYA OPERASI (OPERATING COST ) : Rp./Jam)
Kebutuhan Bahan Bakar dan Pelumas tiap HP :Diesel = 0.160 Liter/HP/JamBensin = 0.170 Liter/HP/JamPelumas = 0.006 Liter/HP/Jam
Harga Solar /Minyak Diesel = Rp. 5,700 /LiterBensin = Rp. 4,700 /LiterPelumas = Rp. 35,200 /Liter
Bahan Bakar = 0.160 x 140 x 5,700 = Rp 127,680.00 Pelumas = 0.006 x 140 x 35,200 = Rp 29,568.00 Perbaikan & Spare Parts = 0.6 x 38,261.65 x = Rp 22,956.99 ( 60 % x Depresiasi ) = Sub Total = Rp 180,204.99
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp 42,478.32 + Rp 180,204.99 = Rp 222,683.31 JamAtau = Rp x Rp = Rp Hari
PERHITUNGAN BIAYA ANGKUT PER UNIT MATERIAL / BAHAN
I. Jarak angkut rata - rata dari Quarry ke lokasi = 25.00 Km ( a )Kapasitas Truck = 3.50 M3 ( b )Kecepatan Truck = 50.00 Km/Jam ( c )
II. PENGGUNAAN TRUCKTruck disewa @ / Jam = 131,914.45 Km
1 Orang Supir @ 55,000.00 / 5 Jam = 11,000.00 M32 Orang Kenek @ 90,000.00 / 5 Jam = 18,000.00 Km/Jam
160,914.45 Km/Jam ( d )
III. Waktu yang diperlukanMuat 15 Menit
25.00 Bongkar 10 Menit
IV. Perjalanan P/P2
25.00 Km60 60.0050.00 Km/Jam
Total 100.00 Menit (f)
Ongkos angkut /M3 1.00 jam x 160,914.45 45,976 3.50
Menit
x x Menit Menit
= =
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN MEMPRODUKSI CAMPURAN ASPAL BUTON AGREGATSUB DIT. PERENCANAAN JALAN LOKAL & MENGGUNAKAN ALATKABUPATEN
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Asbuton ukuran besar dipecah dgn 1. Menggunakan tenaga Manusia ( 30 ton/hari)
tenaga manusia 2. Matrial dikirim ke lokasi pencampuran oleh leveransir2. Masukan asbuton pilihan + minyak 3. Asbuton dipecah dengan tangan agar dapat melewati saringan 1 cm
flux kedalam alat pencampur, 4. Asbuton pilihan dicampur dengan minyak flux atau minyak aspal + 3 %3. Bahan campuran tersebut disimpan dari volume ( 20 l/ton ), waktu pencampuran ( satu kali pencampuran vol 0,35 m3 )
dan dilindungi adalah 10 menit4. Bahan campuran dimuat kedalam 5. Bahan campuran disimpan dan dilindungi selama 3 sampai 5 hari
truk dan dikirim ketempat pekerjaan 6. Pengisian ke truk dan pembongkaran dengan tenaga manusia pembongkaran sejauh 10 km
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator semi terlatih 2.0 1 L 082 2 60,000.00 120,000.00 ER Sopir 2.0 1 L 091 2 55,000.00 110,000.00 JA Buruh tak terlatih 25.0 1 L 101 25 45,000.00 1,125,000.00
Buruh semi terlatih 2.0 1 L 103 2 50,000.00 100,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir beton 8.0 m3 M041 218,000.00 1,744,000.00 AT Batu pecah 1-2 cm 6.0 m3 M025 405,000.00 2,430,000.00 ER Aspal 600.0 Kg M061 9,500.00 5,700,000.00 IA Asbuton 6.0 tonne M062 1,201,000.00 7,206,000.00 L
Minyak flux 600.0 Lt M063 3,400.00 2,040,000.00
Minyak bakar 300.0 Lt M065 5,500.00 1,650,000.00
Dump truk (3,5 T)/44 HP 1.0 set M170 90,000.00 90,000.00
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P Dump truk (3,5 T)/44 HP 2.0 1 E.221 10 131,914.453 1,319,144.53 ER Alat pengaduk beton 0,5 m3 /20 HP 2.0 1 E.253 5 7,530.467 37,652.33 ALATAN
TOTAL(Rp)
VOLUME/ : 30 SATUAN tonne HARGA SATUAN Rp. 791,726.56 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN MEMBUAT PARIT GALIAN TANAHSUB DIT. PERENCANAAN JALAN LOKAL & ( MENGGUNAKAN BURUH )KABUPATEN
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Galian parit 1. Menggunakan tenaga Manusia 100 m /hari2. Pembuangan hasil galian menggu 2. Dimensi saluran : Lebar bawah = 0,40 m
nakan truk Lebar atas = 0,6 mKedalaman = 0,6 m ( vol = 0,50 m3/m
3. 25% hasil galian dibuang setempat4. Hasil galian dibuang sejauh 2 Km5. Menggali dan dihitung : 1,5 m3 /hari -org6. Penggunaan alat bantu 1 bulan - orang
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Sopir 1.0 1 L 091 1 - E
R Buruh tak terlatih 36.0 1 L 101 36 45,000.00 1,620,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.5 set M.170 90,000.00 135,000.00 A
T
E
R
I
AL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P Dump truk 2.0 1 E.221 10 - E
R
A
LATAN
TOTAL(Rp)
VOLUME/ : 54 SATUAN M3 HARGA SATUAN Rp. 33,981.48 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN MEMBUAT PASANGAN BATU PADA PARIT GALIAN TANAHSUB DIT. PERENCANAAN JALAN LOKAL & ( MENGGUNAKAN BURUH )KABUPATEN
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Galian tambahan (0,55 m3/m) 1. Galian parit vol. 0,43 m3 /meter2. Pasangan parit berdekatan dengan 2. Ukuran parit bagian dalam : tebal 20 cm ; lebar bawah = 0,5 m ;
3. dinding penahan tanah bila diperlukan lebar atas 0,9 m ; kedalam = 0,6 m4. tebal pasangan 20 cm 3. 40 % Pembuangan hasil galian dengan truk biasa,sejauh 1 km
4. 60 % dibuang setempat
5. Bahan - bahan dikirim ke tempat pekerjaan oleh leveransir
6. Hasil produksi 60 m/hari
7. Lihat gambar D1 ; 1/4 tipe B
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 6 L 061 6 80,000.00 480,000.00 E
K Sopir 1.0 2 L 091 2 55,000.00 110,000.00 E
R Buruh tak terlatih 6.0 6 L 101 36 45,000.00 1,620,000.00 J
A Tukang batu/beton 2.0 6 L 079 12 70,000.00 840,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.5 set M.170 90,000.00 135,000.00 A
T Batu gunung 30.0 m3 M.010 195,975.56 5,879,266.74 E
R Pasir beton 7.5 m3 M.041 218,000.00 1,635,000.00 I
A Semen 114.0 40kg M.080 62,000.00 7,068,000.00 L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P Dump Truck 1.0 2 E.221 10 131,914.45 1,319,144.53 E
R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 60 SATUAN M' HARGA SATUAN Rp. 318,106.85 QUANTITY
Untuk ukuran : 80/40 T=50 HS = 0.845 x 318,106.85 = 268,800.29 Untuk ukuran : 60/40 T=50 HS = 0.645 x 318,106.85 = 205,178.92
M3
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PASANG PIPA BETON PRACETAK TIDAK BERTULANG O 600 mmKABUPATEN
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Menggali parit 1.3 m x 1.3 m 1. Menggunakan tenaga manusia (tidak termasuk kepala gorong - gorong)
2. Pipa dikirim kelokasi 2. Pipa beton gorong -gorong dibeli setempat (9 m ), 4 hari
3. Meletakan pipa didasar 3. Beton rabat untuk landasan dan pengisi, di dapatkan sampai
batas permukaan
4. Menimbun dan memadatkan
disekitar pipa
5. Membuat perkerasan
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 4 L 061 4 80,000.00 320,000.00 EK Buruh tak terlatih 7.0 4 L 101 28 45,000.00 1,260,000.00 ERJA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Adukan Beton K.125 4.5 m3 K.720 - AT Pipa beton Tanpa tulangan Dia 60 cm 8.0 m' M.O31 105,000.00 840,000.00 ER Alat bantu 1.12 set M.170 90,000.00 100,800.00 IAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 8 SATUAN M' HARGA SATUAN Rp. 315,100.00 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PASANG PIPA BETON PRACETAK TIDAK BERTULANG O 800 mmKABUPATEN
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Gali jalur gorong2 1,3 m x 1,3m di 1. Menggunakan tenaga manusia (tidak termasuk kepala gorong - gorong)
bawah permukaan tanah dasar
2. Pipa dikirim kelokasi 2. Pipa beton gorong -gorong dibeli setempat (9 m ), 4 hari
3. menempatkan pipa di tempat Gorong2
3. Beton rabat untuk landasan dan pengisi dasar pipa
4. Menimbun dan memadatkan
disekitar pipa sampai ke permukaan 4. Pengangkutan Pipa Beton sampai tempat Pekerjaan
tanah dasar
5. Jika tambahan/Penggantian Gorong2 5. Tidak termasuk penggalian dan pemadatan kembali
dibutukan pekerjaan exstra
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 4 L 061 4 80,000.00 320,000.00 E
K Buruh tak terlatih 6.0 4 L 101 24 45,000.00 1,080,000.00 E
R Buruh semi terlatih 2.0 4 L 103 8 - J
A Tukang batu 1.0 4 L 079 4 -
Buruh terlatih 1.0 4 L 106 4 -
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Gorong2 beton Dia 80 cm 9.0 m' M.O33 125,000.00 1,125,000.00 A
T Alat bantu 2.60 set M.170 90,000.00 234,000.00 E
R Kerikil kali di saring 6.80 m3 M.014 - I
A Pasir Beton 4.10 m3 M.041 - L -
Semen 51.50 40 Kg M.080 -
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Concrete mixer 1.0 1 E.252 4 - R
A Concrete Vibrator 1.0 1 E.089 4 - L
A Pompa Air 1.0 1 E.341 4 - T
A
N
TOTAL(Rp)
VOLUME/ : 9 SATUAN M' HARGA SATUAN Rp. 306,555.56
QUANTITY Dia 40 cm 153,277.78
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PEMBUATAN PIPA BETON BERTULANGKABUPATEN
60 CM X 1.0 M, ( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Membersikan tempat cetakan 1. Beton klas. K175 diaduk ditempat kerja
2. Tukang besi membuat tulangan 2. Kapasitas pengecoran 6,4 m3 /hari
melingkar 3. Diameter dalam pipa 60 cm, luas 76 cm,panjang 1.0 m
3. Psg Cetakan melingkari tulangan 4. Berat tulangan 16,9 kg per m pipa, hasil kerja 50 kg /hari org
4. Tuang adukan beton kedalam ceta 5. Buka dan bersikan cetakan kap 9 pasang dari 2 org
kan dan di geser 6. Pipa jadi berat 420 kg
5. Memuat pipa ke truk dengan wheel
loader
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Tukang batu 7.0 1 L 073 7 80,000.00 560,000.00 ER Operator terlatih 1.0 1 L 081 1 80,000.00 80,000.00 JA Buruh tak terlatih 20.0 1 L 101 8 45,000.00 360,000.00
Buruh semi terlatih 4.0 1 L 103 12 50,000.00 600,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Besi beton & kawat beton 608.4 kg M.167 10,500.00 6,388,200.00 AT Alat bantu 7.0 set M.170 90,000.00 ER Pasir beton 3.0 m3 M.041 218,000.00 IA Semen 48.0 40kg M.080 62,000.00 L
Kerikil pecah tersaring 4.6 m3 A.110
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Wheel Loader 80 HP 1.0 1 E.052 5 270,244.800 1351224.00RA Alat penggetar beton 4 HP 1.0 1 E.089 5LA Concrete mixer 125 L/6 HP 1.0 1 E.251 5TA Pompa air ( 5 cm ) 30 m3 /jam 1.0 1 E.341 5N
TOTAL(Rp)
VOLUME/ : 36 SATUAN M' HARGA SATUAN Rp. 224,116.67 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PEMBUATAN PIPA BETON BERTULANGKABUPATEN
80 CM X 1.0 M, ( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Membersikan tempat cetakan 1. Beton klas. K175 diaduk ditempat kerja
2. Tukang besi membuat tulangan 2. Kapasitas pengecoran 6,4 m3 /hari
melingkar 3. Diameter dalam pipa 80 cm, luas 100 cm,panjang 1.0 m
3. Psg Cetakan melingkari tulangan 4. Berat tulangan 26,9 kg per m pipa, hasil kerja 50 kg /hari org
4. Tuang adukan beton kedalam ceta 5. Buka dan bersikan cetakan ; 6 m/pasang/ hari ; 4 pasang dari 3 org
kan dan di geser 6. Pipa jadi berat 625 kg
5. Memuat pipa ke truk dengan wheel 7. Pipa diangkut ketempat pekerjaan,jarak 5 km, 5 rit per hari
loader
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 1 L 061 2 47,500.00 95,000.00 EK Tukang batu 1.0 1 L 073 1 55,000.00 55,000.00 ER Operator terlatih 1.0 1 L 081 1 25,000.00 25,000.00 JA Buruh tak terlatih 24.0 1 L 101 24 25,000.00 600,000.00
Buruh semi terlatih 15.0 1 L 103 15 25,000.00 375,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Besi beton & kawat beton 645.6 kg M.167 55,000.00 35,508,000.00 AT Alat bantu 9.0 set M.170ER Pasir beton 3.0 m3 M.041IA Semen 48.0 40kg M.080L
Kerikil pecah tersaring 4.6 m3 A.110
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Wheel Loader 80 HP 1.0 1 E.052 5 270,244.800 1351224.00RA Alat penggetar beton 4 HP 1.0 1 E.089 5LA Concrete mixer 125 L/6 HP 1.0 1 E.251 5TA Pompa air ( 5 cm ) 30 m3 /jam 1.0 1 E.341 5N
TOTAL(Rp)
VOLUME/ : 24 SATUAN M' HARGA SATUAN Rp. 1,486,791.67 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & DINDING SAYAP GORONG-GORONG PASANGAN BATUKABUPATEN
( SATU PASANG ) ( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Gali tanah untuk dinding dan dasar 1. Tebal rata-rata dinding 45 cm
kaki kedua sisi ( 13 m3 ) 2. Volume seluruhnya 8 m3
2. Ikat dua dinding kepala pasang batu 3. Bahan dikirim sampai ketempat pekerjaan
3. Timbun kembali dengan bahan urug 4. Dinding berdiri pada plat pasangan batu tebal 25 cm
kan yang baik (3 m3) 5. Lihat gambar standar D 1/2
4. Buang hasil galian yang tidak terpakai
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 6 L 061 12 80,000.00 960,000.00 EK Buruh tak terlatih 25.0 6 L 101 150 45,000.00 6,750,000.00 ER Buruh terlatih 1.0 6 L 106 6 40,000.00 240,000.00 JA Tukang Batu 2.0 6 L 079 12 70,000.00 840,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 3.0 set M.170 90,000.00 270,000.00 AT Timbunan kontruksi 3.0 m3 K225 350,775.57 1,052,326.70 ER Batu belah 10-15 8.0 m3 M.020 295,000.00 2,360,000.00 IA Pasir beton 2.0 m3 M.041 218,000.00 436,000.00 L
Semen 30.4 40kg M.080 62,000.00 1,884,800.00
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Pompa air ( 5 cm ) 30 m3 /jam 1.0 1 E.341 2 - RALATAN
TOTAL(Rp)
VOLUME/ : 8 SATUAN M3 HARGA SATUAN Rp. 1,849,140.84 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PENIMBUNAN DAN PEMADATANKABUPATEN
(UNTUK JEMBATAN & GORONG-GORONG ) ( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Struktur di bersihkan dari bahan 1. Bahan timbun dikirim kelapangan oleh leveransir
organik 2. Timbun dipadatkan berlapis tebal 10 cm
2. Timbun kembali bagian belakang
struktur
3. Padatkan dengan Stemper dan mesin
gilas bergetar (stemper)
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Buruh tak terlatih 10.0 1 L 101 10 45,000.00 450,000.00 ER Buruh semi terlatih 3.0 1 L 103 3 50,000.00 150,000.00 JA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Sirtu 20.0 m3 M.042 225,000.00 4,500,000.00 AT Alat bantu 0.3 set M.170 90,000.00 27,000.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Stemper 4 HP 1.0 2 E.088 10 5,463.35 54,633.48 RALATAN
TOTAL(Rp)
VOLUME/ : 15 SATUAN M3 HARGA SATUAN Rp. 350,775.57 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJAKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Buldozer mengupas dan membuang 1. Menggunakan alat berat
semak - semak dari jalan 2. Tidak ada pohon besar dalam damija dan semak - semak
DMJ (Daerah milik jalan) 3. Lebar damija 12 m
4. Pembersihan damija 200 m per - hari
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Buruh tak terlatih 2.0 1 L 101 2 45,000.00 90,000.00 ER Operator terlatih 1.0 1 L 081 1 80,000.00 80,000.00 JA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.0 set M.170 90,000.00 90,000.00 ATERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Bulldozer 110 hp 1.0 1 E.001 5 458,683.73 2,293,418.67 RALATAN
TOTAL(Rp)
VOLUME/ : 2400 SATUAN M2 HARGA SATUAN Rp. 1,097.26 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & MENGANGKUT MATERIAL UNTUK MENGURUG GALIAN DIPADATKANKABUPATEN
( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Penggalian dan pemuatan ketruk 1. Menggunakan alat berat (120 m3/hari)
dengan tenaga manusia 2. Dipakai material dari penggalian didaerah jalan atau tempat lain yang diperbolehkan
2. Pengiriman ketempat pekerjaan dg 3. Jarak angkut pp < 4 Km ( 1 trip/jam/truk)
truk 4. Perataan dengan tenaga manusia, tebal pelapis 10 cm
3. Membongkar dan meratakan dengan 5. Pemadatan menggunakan mesin gilas tandem
tenaga manusia 6. Tidak termasuk pekerjaan persiapan dilokasi pengambilan
4. Pemadatan lapisan -lapisan. 7. Hasil pemadatan 60 m3
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Buruh terlatih 4.0 1 L 081 4 40,000.00 160,000.00 ER Sopir 6.0 1 L 091 6 55,000.00 330,000.00 JA Buruh tak terlatih 10.0 1 L 101 10 45,000.00 450,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 0.4 set M.170 90,000.00 36,000.00 ATERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Buldozer 110 hp 1.0 1 E.001 5 458,683.733 2,293,418.67 RA Greder 110 hp 1.0 1 E.010 5 - LA Wheel loader 80 HP 1.0 1 E.052 5 - TA Mesin Gilas bergetar 1 tonne 1.0 1 E.082 5 149,512.00 747,560.00 N
truck tangki air 68 HP 1.0 1 E.182 5 -
Dump truk (5 T) - 68 HP 5.0 1 E.212 25 -
TOTAL(Rp)
VOLUME/ : 120 SATUAN M3 HARGA SATUAN Rp. 34,141.49 QUANTITYUntuk Pasangan Beronjong Menggunakan E.212 -
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & GALIAN TANAH UNTUK KONTRUKSIKABUPATEN
( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Penggalian tanah dengan tenaga 1. Menggunakan tenaga manusia
manusia (50 m3/hari) 2. Kapasitas kerja kelompok 50 m3 / hari2. Tanah galian disingkirkan sejauh 3. Kedalaman rata - rata galian s/d 3 m
minimal 30 m dari lubang galian 4. Untuk jenis tanah berbatu, harga satuan pekerjaan K.225 dikalikan dengan faktor 1,5
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Buruh terlatih 2.0 1 L106 2 40,000.00 80,000.00 E
R Buruh tak terlatih 30.0 1 L 101 30 45,000.00 1,350,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 10.0 set M.170 90,000.00 900,000.00 A
T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 50 SATUAN M3 HARGA SATUAN Rp. 48,200.00 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & TIMBUNAN DAN PEMADATANKABUPATEN
( UNTUK JEMBATAN & GORONG-GORONG)( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Struktur di bersihkan dari bahan-bahan 1. Bahan timbunan dikirim kelapangan oleh leveransir
organik 2. Timbunan dipadatkan berlapis tebal 10 cm
2. Timbun kembali bagian belakang
struktur
Padatkan dengan stamper dan mesin
gilas bergetar (stamper)
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Buruh tak terlatih 10.0 1 L 101 10 45,000.00 450,000.00 ER Buruh semi terlatih 3.0 1 L 103 3 50,000.00 150,000.00 JA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Sirtu 20.0 m3 M.042 225,000.00 4,500,000.00 AT Alat bantu 0.3 set M.170 90,000.00 27,000.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 15 SATUAN M3 HARGA SATUAN Rp. 347,133.33 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & MEMBENTUK BADAN JALAN/SUBGRADE DENGAN TIMBUNANKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Matrial dihampar (maksimum setiap 1. Menggunakan peralatan berat (120 m3/hari)
Lapis 20 cm ) 2. Harga matrial galian berdasarkan harga dilokasi pekerjaan
2. Setiap Lapis (20 cm ) dipadatkan
semaksimal 4 kali lintasan dengan
Roller 8 ton
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 ER Sopir 1.0 1 L 091 1 55,000.00 55,000.00 JA Buruh tak terlatih 10.0 1 L 101 10 45,000.00 450,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir urug 160.0 m3 M.040 212,500.00 34,000,000.00 AT Alat bantu 1.0 set M.170 90,000.00 90,000.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Grader 110 HP 1.0 1 E.010 5 353,135.333 1,765,676.67 RA Mesin gilas roda karet 8 - 15 t 1.0 1 E.084 5 163,087.19 815,435.95 L - A Truck tangki air 68 HP 1.0 1 E.182 5 104,510.64 522,553.20 TAN
TOTAL(Rp)
VOLUME/ : 120 SATUAN M3 HARGA SATUAN Rp. 316,155.55 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & MEMBENTUK BADAN JALAN/SUBGRADE DIDAERAH GALIAN TANAHKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Penggalian dengan Bulldozer 1. Menggunakan peralatan berat (200 m3/hari)
2. Hasil galian dibuang dengan truck 2. 20 % terbuang di tempat
sejauh 1 km 3. 80 % diangkut dan dibuang dengan truck
3. Permukaan tanah dibentuk dan di 4. 2.5 rit pp /jam/truk
rapihkan dengan grader 5. Jarak 1 rit pp < 2 km
6. Tidak termasuk pekerjaan pemadatan tanah dasar
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 ER Sopir 4.0 1 L 091 4 55,000.00 220,000.00 JA Buruh tak terlatih 5.0 1 L 101 5 45,000.00 225,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 0.2 set M.170 90,000.00 18,000.00 ATERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Bulldozer 110 hp 1.0 1 E.001 5 458,683.733 2,293,418.67 RA Exavator 1.0 1 E.10 5 222,683.31 1,113,416.53 L - A weel Loader 80 HP 1.0 1 E.052 5T - A Dump truck ( 5 T ) - 68 HP 4.0 1 E.212 20 128,495.80 2,569,916.00 N
TOTAL(Rp)
VOLUME/ : 200 SATUAN M3 HARGA SATUAN Rp. 33,398.76 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PEMADATAN TANAH DASARKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Pembentukan dasar jalan dengan 1. Menggunakan alat berat ( 8 m x 500 m/hari)
Grader 2. Damija di bersikan dari semak
2. Dipadatkan dengan mesin gilas 3. Lebar dasar jalan 8 m
4. Hasil kerja menyiapkan dasar jalan 500 m/hari
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 ER Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00 JA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.0 set M.170 90,000.00 90,000.00 ATERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Grader 110 HP 1.0 1 E.010 6 353,135.33 2,118,812.00 RA Mesin gilas 3 roda 8 - 10 T 1.0 1 E.080 6 111,711.79 670,270.72 LATAN
TOTAL(Rp)
VOLUME/ : 4000 SATUAN M2 HARGA SATUAN Rp. 824.77 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI BAWAH (LPB) KELAS AKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Membentuk meratakan kembali per- 1. Menggunakan peralatan berat ( 150 m3/hari)
mukaan jalan lama dengan Grader 2. Dimulai dengan pekerjaan memperbaiki penurunan
2. Agregat ditempatkan disepanjang 3. Grader melakukan 2 kali lintasan untuk mencampur dan 3 kali lintasan untuk menghampar dan meratakan
jalan
3. Menghampar Agregat dengan Grader
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 ER Sopir 1.0 1 L 091 1 55,000.00 55,000.00 JA Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Batu pecah 3-5 cm 45.0 m3 M.023 322,500.00 14,512,500.00 A Batu pecah 2-3 cm 23.0 m3 M.024 339,000.00 7,797,000.00 T Batu pecah 1-2 cm 13.0 m3 M.025 405,000.00 5,265,000.00 E Batu pecah 0,5-1 cm 27.0 m3 M.026 460,000.00 12,420,000.00 R Pasir urug 72.0 m3 M.040 212,500.00 15,300,000.00 I Alat bantu 1.0 set M.170 90,000.00 90,000.00 AL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Grader 110 HP 1.0 1 E.010 5 353,135.33 1,765,676.67 RA Mesin gilas 3 roda 8 - 10 T 1.0 1 E.080 5 111,711.79 558,558.93 LA Truck tangki air 68 HP 1.0 1 E.182 4 104,510.64 418,042.56 TAN
TOTAL(Rp)
VOLUME/ : 150 SATUAN M3 HARGA SATUAN Rp. 390,678.52 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI BAWAH (LPB) KELAS BKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Agregat ditempatkan disepanjang 1. Menggunakan peralatan berat
jalan oleh leveransir 2. Agregat ditimbun oleh leveransir ditempat pekerjaan
2. Menghampar Agregat dengan Grader 3. Menghampar dan memadatkan lapisan-lapisan tiap 15 cm
A Pemadatan dilakukan dengan mesin 4. Dipilih memakai 120 m3 batu pecah tersaring dengan 75 m3 binder atau
gilas bergetar 10 t dengan truk air 125 m3 batu pecah tersaring dengan 65 m3 binder
5. Tambahan binder ( pasir urug /untuk mengisi rongga-rongga)
6. Produksi LPB padat 1000 m2 /hari
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 ER Sopir 1.0 1 L 091 1 55,000.00 55,000.00 JA Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir urug 65.0 m3 M.040 212,500.00 13,812,500.00 A Alat bantu 0.2 set M.170 90,000 18,000.00 T Kerikil pecah tersaring 125.0 m3 K.017 390,225.38 48,778,172.50 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Grader 110 HP 1.0 1 E.010 5 353,135.33 1,765,676.67 R - A Mesin gilas bergetar 1 tonne 1.0 1 E.082 5 149,512.00 747,560.00 L - A Truck tangki air 68 HP 1.0 1 E.182 5 104,510.64 522,553.20 TAN
TOTAL(Rp)
VOLUME/ : 150 SATUAN M3 HARGA SATUAN Rp. 440,796.42 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI BAWAH (LPB) KELAS CKABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Kerikil di timbun sepanjang jalan 1. Menggunakan alat berat
oleh leveransir 2. Krikil ditimbun sepanjang jalan oleh leveransir2. Grader menghampar kerikil dan 3. Material kerikil kali tanpa disaring dikirimkan leveransir sampai tempat pekerjaan
ukuran yang besar dipisah 4. 6 % kerikil dengan ukuran lebih (oversize),yang tersingkir saat penghamparan dengan grader3. Pemadatan menggunakan mesin gilas 5. Dihampar setebal 15 cm di padatkan menjadi 10 cm padat
dan truk air 6. Hasil kerja 1200 m2 perhari (ma x 300 meter )
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 E
R Buruh tak terlatih 6.0 1 L 101 6 45,000.00 270,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Kerikil sungai tidak tersaring 160.0 m3 K.012 278,089.65 44,494,344.60 A Alat bantu 0.2 set M.170 90,000.00 18,000.00 T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Grader 1.0 1 E.010 5 353,135.33 1,765,676.67 R
A Mesin gilas bergetar 1.0 1 E.082 5 149,512.00 747,560.00 L
A Truck tangki air 1.0 1 E.182 5 104,510.64 522,553.20 T
A
N
TOTAL(Rp)
VOLUME/ : 120 SATUAN M3 HARGA SATUAN Rp. 400,484.45 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PENYEDIAAN KERIKIL SUNGAI (TAK DISARING)KABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Bulldozer membuat timbunan kerikil 1. Menggunakan alat berat ( 160 m3/hari )
ditepi sungai 2. Wheel Loader mengisi 3 truk / jam ( 6 jam kerja)2. Weel Loader mengisi truk dari 3. Pengangkutan jarak 10 km dari sumber
timbunan 4. Pengambilan material dengan dipungut pembayaran ganti,rugi royalti yang berlaku3. Dump truk mengangkut kerikil sungai 5. Volume yang di ukur berdasarkan 5 tonne/truk (lepas) BJ = 1,5
tidak disaring kelokasi penimbunan 6. 1,0 trip/jam/tratau pekerjaan 7. Penggunaan alat bantu rata-rata 1 set untuk 1 orang perbulan
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator terlatih 2.0 1 L 081 2 80,000.00 160,000.00 E
R Sopir 8.0 1 L 091 8 55,000.00 440,000.00 J
A Buruh tak terlatih 1.0 1 L 101 1 45,000.00 45,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Ganti rugi kerikil sungai - royalti 160.0 m3 MR.42 225,000.00 36,000,000.00 A
T Alat bantu 0.4 set M.170 90,000.00 36,000.00 E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Bulldozer 1.0 1 E.001 4 458,683.73 1,834,734.93 R
A Wheel Loader 1.0 1 E.052 5 151,755.53 758,777.67 L
A Dump truk 8.0 1 E.212 40 128,495.80 5,139,832.00 T
A
N
TOTAL(Rp)
VOLUME/ : 160 SATUAN M3 HARGA SATUAN Rp. 278,089.65 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & LAPIS PENETRASI MAKADAM 5 CM (LAPEN)KABUPATEN
( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Menyemprotkan aspal tack coat 8L/m3 1. Menggunakan tenaga buruh 2. Hamparkan Agregat pokok 3-5 2. Harga material ( agregat pokok,agregat pengunci, agregat penutup, aspal) adalah harga di lokasi proyek
3 m2/m3 3. Volume Aspal cair untuk tack coat /prime coat 0,8 Ltr/m23. Semprotkan Aspal (2,5 kg/m2) 4. Tebal lapisan penetrasi : 5 cm3. Hamparkan Agregat pengunci 5. Agregat dikirim sampai tempat pekerjaan oleh leveransir
split 90 m2 /m3 dan padatkan Semprotkan Aspal 1,5 kg/m & gilas taburkan pasir rata-rata 400 m2/m3
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 3 L 061 6 80,000.00 480,000.00 E
K Operator terlatih 2.0 3 L 081 6 80,000.00 480,000.00 E
R Sopir 1.0 3 L 091 3 55,000.00 165,000.00 J
A Buruh tak terlatih 66.0 3 L 101 198 45,000.00 8,910,000.00
Buruh terlatih 2.0 3 L 106 6 40,000.00 240,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Batu pecah 3-5 cm 56.0 m3 M.023 322,500.00 18,060,000.00 A Batu pecah 2-3 cm 31.0 m3 M.024 339,000.00 10,509,000.00 T Batu pecah 1-2 cm 15.5 m3 M.025 405,000.00 6,277,500.00 E Pasir beton 3.5 m3 M.041 218,000.00 763,000.00 R Aspal 6270.0 Kg M.061 9,500.00 59,565,000.00 I Minyak bakar 450.0 ltr M.065 5,500.00 2,475,000.00 A Alat bantu 8.1 set M.170 90,000.00 729,000.00 L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Mesin gilas 3 roda 1.0 3 E.080 15 111,711.79 1,675,676.80 R
A Sprayer aspal 1.0 3 E.153 15 41,043.73 615,656.00 L
A Dump truk 4 T 1.0 3 E.221 15 131,914.45 1,978,716.80 T
A
N
TOTAL(Rp)
VOLUME/ : 1400 SATUAN M2 HARGA SATUAN Rp. 80,659.68 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PRODUKSI KERIKIL PACAH TERSARING (Alat)KABUPATEN
( MENGGUNAKAN KERIKIL SUNGAI (Menggunakan Alat )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Buldozer membuat timbunan 1. Menggunakan Alat berat (60 M3/hari), material diolah dua kali
dipinggir sungai 2. Batu diambil dari sungai dan diangkut ketempat pemecahan batu
2. Wheel Loader memuat ke truck yang 3. 33,3 % batu lolos saringan padamesin dengan produksi 15 tonne/jam
membongkar batu ditempat 4. 70,0 % batu yang sudah dipecah dicampur kembali dengan batu dari sungai yang lolos saringan
penyaringan. 5. Volume yang diukur berdasarkan 5 tone/Truck (lepas), 1,0 trip/Tr, BJ=1,5
3. Batu Oversize dipecah mesin 6. Jarah angkut dari tempat sumber ketempat pekerjaan 10 Km
4. Hasil pecahan batu dicampur 7. Rata-rata umur alat bantu 1 bulan orang perset
kembali dengan batu dari sungai
yang lolos saringan
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 3.0 1 L 081 3 80,000.00 240,000.00 ER Operator semi terlatih 2.0 1 L 082 2 60,000.00 120,000.00 JA Sopir 1.0 1 L 091 1 55,000.00 55,000.00
Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Kerikil sungai - dipungut Royalty 80.0 m3 MR.12 150,000.00 12,000,000.00 AT Alat bantu 0.2 set M.170 90,000.00 18,000.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Buldozer 110 HP 1.0 1 E.001 6 458,683.73 2,752,102.40 R Mesin pecah batu 140 HP 1.0 1 E.031 6 662,331.33 3,973,988.00 A Wheel loader 80 HP 1.0 1 E.052 6 151,755.53 910,533.20 L Dump truk ( 3,5 T ) /44 HP 1.0 1 E.212 24 128,495.80 3,083,899.20 ATAN
TOTAL(Rp)
VOLUME/ : 60 SATUAN M3 HARGA SATUAN Rp. 390,225.38 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A N
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR / RABATSUB DIT. PERENCANAAN JALAN LOKAL & KLAS.K.125KABUPATEN
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Material dikirim oleh leveransir 1. Bahan-bahan dikirim ketempat pekerjaan oleh leveransir2. Pencampuran beton ditempat 2. Dipakai agregat pecah dan tersaring
pekerjaan 3. Hasil kerja 6,0 M3/hari-6 jam (9 campuran per jam)4. Campuran 1 PC : 3 PC : 5 Kr (atau 1 = 8)5. Dalam 1 M2 beton dibutuhkan 6,25 Zak (40 Kg/Zak) PC (250 Kg/M3)6. Setiap pencampuran memerlukan + 30 Kg semen7. Dbutuhkan untuk alas pondasi beton
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Tukang Batu 1.0 1 L 073 1 70,000.00 70,000.00 ER Buruh tak terlatih 12.0 1 L 101 12 45,000.00 540,000.00 JA Buruh semi terlatih 2.0 1 L 103 2 50,000.00 100,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir beton 3.0 M3 M041 218,000.00 654,000.00 AT Semen 40.0 40 Kg M080 62,000.00 2,480,000.00 ER Kayu Bekisting 0.2 M3 M180 775,000.00 155,000.00 IA Alat Bantu 0.6 set M170 90,000.00 54,000.00 L
Penyediaan kerikil 5.0 M3 K.012 278,089.65 1,390,448.27
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Alat penggetar beton 1.0 1 E089 5 28,626.93 143,134.67 RA Concret Mixer 1.0 1 E252 5 33,082.98 165,414.92 LA Pompa air (Dia 5 cm ) 30 M3/Jam 1.0 1 E341 5 12,668.35 63,341.75 TAN
TOTAL(Rp)
VOLUME/ : 6 SATUAN : HARGA SATUAN Rp. 982,556.60 QUANTITY
M3
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A N
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR / UNTUK KONSTRUKSISUB DIT. PERENCANAAN JALAN LOKAL & MENGGUNAKAN ALATKABUPATEN KLAS.K.175
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 47,500.00 47,500.00 EK Buruh tak terlatih 12.0 1 L 101 12 25,000.00 300,000.00 ER Buruh semi terlatih 2.0 1 L 103 2 27,500.00 55,000.00 JA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir 3.0 M3 M041 218,000.00 654,000.00 AT Semen 48.0 Kg M080 62,000.00 2,976,000.00 ER Alat Bantu 0.6 set M170 90,000.00 54,000.00 IA Kerikil pecah tersaring 4.6 M3 K017 390,225.38 1,795,036.75 L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Conret Vibrator 1.0 1 E089 5 28,626.933 143134.67RA Conret Mixer 125 L/ HP 1.0 1 E252 5 33,082.983 165414.92LA Pompa air (Dia 5 cm ) 30 M3/Jam 1.0 1 E341 5 12,668.350 63341.75TAN
TOTAL(Rp)
VOLUME/ : 6 SATUAN : HARGA SATUAN Rp. 1,042,238.01 QUANTITY
M3
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN PENULANGAN BETON (MEMOTONG, MEMBENGKOK DAN MEMASANG BESI SUB DIT. PERENCANAAN JALAN LOKAL & TULANGAN MENGGUNAKAN BURUHKABUPATEN
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Tukang Batu 1.0 1 L 073 1 80,000.00 80,000.00 ER Buruh tak terlatih 2.0 1 L 101 2 45,000.00 90,000.00 JA Buruh semi terlatih 2.0 1 L 103 2 50,000.00 100,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Besi Beton 225.0 Kg M167 16,000.00 3,600,000.00 AT Alat Bantu 0.2 set M170 90,000.00 18,000.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 200 SATUAN : Kg HARGA SATUAN Rp. 19,840.00 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PEMBERSIHAN RUMPUT & TANAMAN DIBAHU JALAN KABUPATEN
( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Potong Semak Belukar yang tumbuh 1. Menggunakan tenaga manusia ( 2x 1,5 m x 5000 m/hari)
pada bahu jalan 2. Dengan lebar 1,5 m dari tepi jalan rata-rata luas yang di bersihkan 1000 m2/km satu sisi2. Bersihkan rumput /semak dari bahu 3. Hasil kerja 60 m2/hari-orang
jalan dan aspalan 4. Sampah/reruntuhan dibuang sejauh 1 km5. Penggunaan alat bantu 1 bln-org
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Buruh tak terlatih 25.0 1 L 101 25 45,000.00 1,125,000.00 E
R - J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.0 set M.170 90,000.00 90,000.00 A
T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 1500 SATUAN M2 HARGA SATUAN Rp. 863.33 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PEMBERSIHAN PARIT SAMPING KABUPATEN
( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Bersihkan saluran samping dan gorong 1. Menggunakan tenaga manusia
gorong dari kotoran sampah dan tum 2. Membersihkan sampah,kotoran yg menyumbat,tumbuh - tumbuhan dari gorong-gorongbuh -tumbuhan 3. Sampah/reruntuhan dibuang sejauh 1 km
2. Buang sampah kotoran dengan meng 4. Penggunaan alat bantu 1 bln-orggunakan truck di muat oleh tenaga 5. Kapasitas 1 rit pp / jam/truckmanusia
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Supir 2.0 1 L 091 2 55,000.00 110,000.00 E
R Buruh tak terlatih 36.0 1 L 101 36 45,000.00 1,620,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 1.2 set M.170 90,000.00 108,000.00 A
T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Dump Truck 2.0 1 E221 10 131,914.45 1,319,144.53 R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 500 SATUAN M' HARGA SATUAN Rp. 6,474.29 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI PASANGAN BATUKABUPATEN
( MENGGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Matrial disiapkan dilokasi oleh leveran 1. Dilakukan untuk pekerjaan gorong2, Jembatan, Dinding Penahan,Tanah dan Struktur lainnya yang menggunakan
sir Dilakukan untuk pekerjaan gorong2, Jembatan, Kontruksi Pasangan batu2. Pekerja membawah batu pecah ke 2. Bahan dikirim sampai ketempat pekerjaan
tempat tukang batu bekerja 3. Tidak termasuk galian/timbunan 3. tukang batu memasang batu pecah 4. Bagian M170 di perbolekan pakai bambu
dengan adukan pasir semen
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00 E
R Tukang Batu 12.0 1 L 079 12 70,000.00 840,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat bantu 0.7 set M.170 90,000.00 63,000.00 A
T Batu gunung 5.0 m3 M.010 195,975.56 979,877.79 E
R Pasir beton 1.2 m3 M.041 218,000.00 261,600.00 I
A Semen 19.0 40kg M.080 62,000.00 1,178,000.00 L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Pompa air 1.0 1 E.341 4 12,668.35 50,673.40 R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 5 SATUAN M3 HARGA SATUAN Rp. 726,630.24 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & MENGHAMPAR LAPIS PONDASI ATAS ASPAL BETONKABUPATEN
( LASTON ATAS ) ( MENGGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. 1.
2. 2.3.
3. 4.
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator terlatih 4.0 1 L 081 4 80,000.00 320,000.00 E
R Buruh tak terlatih 12.0 1 L 101 12 45,000.00 540,000.00 J
A Buruh terlatih 8.0 1 L 106 8 40,000.00 320,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir beton 0.6 m3 M.041 218,000.00 130,800.00 A
T Aspal 135.0 kg M.061 9,500.00 1,282,500.00 E
R Minyak Bakar 90.0 Lt M.065 5,500.00 495,000.00 I
A Alat bantu 0.5 set M.170 90,000.00 45,000.00 L
Campuran Laston Atas 100.0 tonne K.026 852,269.93 85,226,993.07
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Mesin gilas 3 Roda 8-10 T 1.0 1 E.080 5 111,711.79 558,558.93 R
A Mesin gilas roda karet 8-15 T 1.0 1 E.084 5 163,087.19 815,435.95 L
A Mesin Penyemprot aspal 1000 L 1.0 1 E.153 3 41,043.73 123,131.20 T
A Mesin penghampar 1,82 m 1.0 1 E.157 5 110,340.10 551,700.48 N
Compresor 120 m3/jam 1.0 1 E.301 4 92,865.71 371,462.83
TOTAL(Rp)
VOLUME/ : 45 SATUAN M3 HARGA SATUAN Rp. 2,019,124.05 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & MEMPRODUKSI CAMPURAN ASPAL BETON UNTUK LAPIS PONDASIKABUPATEN
ATAS ( LASTON ATAS ) ( MENGGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. 1.
2. 2.3.
3. 4.
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 1 L 061 2 80,000.00 160,000.00 E
K Mekanik ; terlatih 1.0 1 L 071 1 75,000.00 75,000.00 E
R Operator ; terlatih 4.0 1 L 081 4 80,000.00 320,000.00 J
A Operator ; semi terlatih 3.0 1 L 082 3 60,000.00 180,000.00
Sopir 6.0 1 L 091 6 55,000.00 330,000.00
Buruh tak terlatih 7.0 1 L 101 7 45,000.00 315,000.00
Buruh semi terlatih 7.0 1 L 103 7 50,000.00 350,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir beton 25.0 m3 M.041 218,000.00 5,450,000.00 A
T Aspal 5900.0 kg M.061 9,500.00 56,050,000.00 E
R Dump truk ( 3,5 T)/44 HP 0.2 set M.170 90,000.00 18,000.00 I
A Pemecah batu 200 HP 47.0 m3 MR.12 150,000.00 7,050,000.00 L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Wheel loader 80 HP 2.0 1 E.052 9 151,755.53 1,365,799.80 R
A Mesin pencampur aspal 1.0 1 E.155 5 916,356.00 4,581,780.00 L
A Dump truk (5 T) - 68 HP 7.0 1 E.212 35 128,495.80 4,497,353.00 T
A Bulldozer 110 hp 1.0 1 E.001 4 458,683.73 1,834,734.93 N
Pemecah batu 200 HP 1.0 1 E.031 4 662,331.33 2,649,325.33
TOTAL(Rp)
VOLUME/ : 100 SATUAN tonne HARGA SATUAN Rp. 852,269.93
QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PENGUPASAN TANAH SEMAK PADA DAMIJAKABUPATEN
ATAS ( LASTON ATAS ) ( MENGGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Buldozer mengupas dan membuang 1. Menggunakan Alat Berat
semak - semak dari damija 2. Tidak ada pohon besar dalam damija ( hanya semak - semak)(Daerah Milik jalan ) 3. Lebar Dmija 12 m
4. pembersihan Damija 200 m per- hari
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator ; terlatih 1.0 1 L 081 1 80,000.00 80,000.00 E
R Buruh tak terlatih 2.0 1 L 101 2 45,000.00 90,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Alat Bantu 1.0 set M.170 90,000.00 90,000.00 A
T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Bulldozer 110 hp 1.0 1 E.001 4 458,683.73 1,834,734.93 R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 2400 SATUAN M2 HARGA SATUAN Rp. 906.14
QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI ATAS ( LPA) KELAS . AKABUPATEN
( MENGGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Agregate ditempatkan disepanjang jalan oleh 1. Menggunakan peralatan Berat
leveransir 2. Matrial dikirim dan ditimbun oleh levarensir2. Menghampar agregate dengan greder 3. Penghamparan dan pemadatan sampai tebal 10 cm3. Pemadatan dengan mesin gilas bergetar, 4. Menggunakan :135 m3 batu, pecah mesin dengan binder 24 m3 atau 141 m3
disertai dengan truck air Kerikil pecah mesin dengan binder 15 m35. Tambahkan binder untuk mengisi rongga6. Dicampur dan dipadatkan 1200 m2 per hari
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator ; terlatih 2.0 1 L 081 2 80,000.00 160,000.00 E
R Sopir 1.0 1 L 091 1 55,000.00 55,000.00 J
A Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Pasir Urug 15.0 M3 M.040 212,500.00 3,187,500.00 A
T Alat Bantu 0.2 set M.170 90,000.00 18,000.00 E
R Kerikil Pecah tersaring 150.0 M3 K.017 390,225.38 58,533,807.00 I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Greder 110 HP 1.0 1 E.010 5 353,135.33 1,765,676.67 R
A Mesin Gilas bergetar 1 tonne 1.0 1 E.082 5 149,512.00 747,560.00 L
A Truck tangki Air 68 HP 1.0 1 E.182 5 104,510.64 522,553.20 T
A
N
TOTAL(Rp)
VOLUME/ : 120 SATUAN M3 HARGA SATUAN Rp. 543,750.81
QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI ATAS ( LPA) KELAS . BKABUPATEN
( MENGGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Kerikil disuplei dan ditimbun di sepanjang 1. Menggunakan peralatan Berat
jalan oleh leverensir 2. Kerikil ditimbun disepanjang jalan oleh leverensir 2. Menghampar dengan Greder 3. dihampar dan dipadatkan hingga padat tebal padat 10 cm3. Pemadatan dengan mesin gilas bergetar, 4. Hasil kerja menghampar dan dipadatkan 1500 m2/hari ( 4 m x 375 m )
dengan tangki air dan mesin gilas roda baja
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 E
K Operator ; terlatih 2.0 1 L 081 2 80,000.00 160,000.00 E
R Sopir 1.0 1 L 091 1 55,000.00 55,000.00 J
A Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M
A
T Alat Bantu 0.2 set M.170 90,000.00 18,000.00 E
R Kerikil Pecah tersaring 200.0 M3 K.016 349,258.89 69,851,777.11 I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Greder 110 HP 1.0 1 E.010 5 353,135.33 1,765,676.67 R
A Mesin Gilas bergetar 1 tonne 1.0 1 E.082 5 149,512.00 747,560.00 L
A Truck tangki Air 68 HP 1.0 1 E.182 5 104,510.64 522,553.20 T
A
N
TOTAL(Rp)
VOLUME/ : 150 SATUAN M3 HARGA SATUAN Rp. 489,203.78
QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PRODUKSI KERIKIL SUNGSI (TERSARING)KABUPATEN
( MENGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Buldozer membuat timbunan 1. Menggunakan Alat berat (60 M3/hari),
dipinggir sungai 2. Wheel Loader mengisi 6 truck /jam ( 6 jam kerja)
2. Wheel Loader memuat ke truck yang 3. Pengangkutan pada jarak 10 km dari sumber
3. Kerikil disaring diinstalasi penyaring 4. Pengambilan matrial dipungut pembayaran ganti rugi yang berlaku
an sesuai ukuran yang dikehendaki 5. Volume yang diukur berdasarkan 5 tonne /truck (lepas) BJ = 1.5
4. Dump truck mengangkut kerikil su- 6. 1.0 trip /jam/tr
ngai yang disaring kelokasi penimbu 7. Penggunaan alat bantu rata-rata 1 set untuk 1 orang perbulan
nan atau pekerjaan 8. Kapasitas screning rata-rata 18 ton /jam dengan ditambah bagian halus 20 % dan terjadi oversize 30 %
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 1 L 061 1 80,000.00 80,000.00 EK Operator terlatih 3.0 1 L 081 3 80,000.00 240,000.00 ER Operator semi terlatih 1.0 1 L 082 1 60,000.00 60,000.00 JA Sopir 4.0 1 L 091 4 55,000.00 220,000.00
Buruh tak terlatih 4.0 1 L 101 4 45,000.00 180,000.00
Buruh semi terlatih 4.0 1 L 103 4 50,000.00 200,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Kerikil sungai - dipungut Royalty 67.5 m3 MR.12 150,000.00 10,125,000.00 AT Ganti rugi kerikil sungai - royalti 12.5 m3 M.42 225,000.00 2,812,500.00 ER Alat bantu 0.2 set M.170 90,000.00 18,000.00 IAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Buldozer 110 HP 1.0 1 E.001 5 458,683.73 2,293,418.67 R Mesin penyaring 8 HP 1.0 1 E.040 5 176,787.52 883,937.60 A Wheel loader 80 HP 1.0 1 E.052 5 151,755.53 758,777.67 L Dump truk ( 5 T ) /68 HP 4.0 1 E.212 24 128,495.80 3,083,899.20 ATAN
TOTAL(Rp)
VOLUME/ : 60 SATUAN M3 HARGA SATUAN Rp. 349,258.89 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & LAPIS RESAP PENGIKATKABUPATEN
( MENGUNAKAN ALAT )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Aspal dan minyak flux dicampur dan 1. Menggunakan Alat berat (cara mekanik),
dipanaskan sehingga menjadi cam 2. Lokasi Pekerjaan sepanjang Jalan
puran aspal cair 3. Jarak rata - rata Base Camp kelokasi pekerjaan
2. Permukaan yang akan dilapis dibersih 4. Jam kerja efektif per - hari
kan dari debu dan kotoran dengan air 5. Faktor kehilangan bahan
compresor 6. Komposisi campuran Aspal AC-10 atau Ac.20 dan minyak flux / pencair
3. Campuran Aspal cair disemprotkan 7. Bahan dasar (Aspal & minyak pencair ) semuanya diterima dilokasi pekerjaan
dengan aspalt Sprayer keatas permu
kaan yang akan dilapis
4. Angkut aspal & Minyak Flux Menggu
nakan Dump Truck
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 1 L 061 2 80,000.00 160,000.00 EK Buruh tak terlatih 10.0 1 L 101 10 45,000.00 450,000.00 ERJA
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Aspal 2014.08 kg M.061 9,500.00 19,133,760.00 AT Kerosene 1564.48 ltr M.063 3,400.00 5,319,232.00 ERIAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PE Aspal Sprayer 1.0 1 E.153 7 41,043.73 287,306.13 R Compressor 1.0 1 E.301 7 92,865.71 650,059.95 A Dump truk 1.0 1 E.221 7 131,914.45 923,401.17 LATAN
TOTAL(Rp)
VOLUME/ : 3200 SATUAN LITER HARGA SATUAN Rp. 8,413.67 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & BERONJONG PENAHANKABUPATEN
( MENGUNAKAN BURUH )
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Gali muka tanah untuk tempat 1. Batu dikirim kelapangan oleh leverensir
beronjong 2. Anyaman beronjong dikirim kelapangan oleh leverensir
2. Rangkai dan bentuk anyaman beron 3. selesai dalam 2 hari
2. jong
3. isi anyaman kawat dengan batu
4. Anyaman dibuat kokoh dengan ikatan
kawat
5. Timbunan Kembali hingga mantap
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 1.0 2 L 061 2 80,000.00 160,000.00 EK Buruh tak terlatih 35.0 2 L 101 70 45,000.00 3,150,000.00 ER Buruh semi terlatih 5.0 2 L 103 10 50,000.00 500,000.00 JA Buruh terlatih 2.0 2 L 106 4 40,000.00 160,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Batu Gunung 25.00 m3 M.010 195,975.56 4,899,388.95 AT Kawat untuk pengikat 200.00 kg M.162 18,000.00 3,600,000.00 ER alat bantu 3.30 set M.170 90,000.00 297,000.00 IAL
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
PERALATAN
TOTAL(Rp)
VOLUME/ : 25 SATUAN M3 HARGA SATUAN Rp. 510,655.56 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & LANTAI DAN SPORT PLAT JEMBATAN TEBAL 4 CMKABUPATEN
( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Menggunakan Buruh2. Matrial dikirim Leverensir kelokasi pekerjaan3. Menggunakan Papan Tebal 4 cm4. Menggunakan kayu Klas. II
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 0.010 1 L 061 0.01 80,000.00 800.00 E
K Kepala tukang 0.050 1 L 073 0.05 80,000.00 4,000.00 E
R Tukang 0.500 1 L 079 0.5 70,000.00 35,000.00 J
A Buruh tak terlatih 0.200 1 L101 0.2 45,000.00 9,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Papan klas. II 1.0 m3 M.181 1,975,000.00 1,975,000.00 A Besi paku 0.750 kg M.166 15,500.00 11,625.00 T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E
R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 33 SATUAN M2 HARGA SATUAN Rp. 61,679.55 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & KONTRUKSI LAPIS PONDASI BAWAH (LPB) KELAS CKABUPATEN
( MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Kerikil di timbun sepanjang jalan 1. Menggunakan alat berat
oleh leveransir 2. Krikil ditimbun sepanjang jalan oleh leveransir2. Grader menghampar kerikil dan 3. Material kerikil kali tanpa disaring dikirimkan leveransir sampai tempat pekerjaan
ukuran yang besar dipisah 4. 6 % kerikil dengan ukuran lebih (oversize),yang tersingkir saat penghamparan dengan grader3. Pemadatan menggunakan mesin gilas 5. Dihampar setebal 15 cm di padatkan menjadi 10 cm padat
dan truk air 6. Hasil kerja 1200 m2 perhari (ma x 300 meter )
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 3.0 1 L 061 3 80,000.00 240,000.00 E
K Operator terlatih 1.0 1 L 081 1 80,000.00 80,000.00 E
R Buruh tak terlatih 60.0 1 L 101 60 45,000.00 2,700,000.00 J
A Sopir 1.0 1 L 091 1 55,000.00 55,000.00
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Kerikil sungai tidak tersaring 75.0 m3 K.013 361,065.34 27,079,900.40 A Alat bantu 2.5 set M.170 90,000.00 225,000.00 T
E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E
R
A Mesin gilas bergetar 1.0 1 E.080 5 111,711.79 558,558.93 L
A Truck tangki air 1.0 1 E182 5 104,510.64 522,553.20 T
A
N
TOTAL(Rp)
VOLUME/ : 60 SATUAN M3 HARGA SATUAN Rp. 524,350.21 QUANTITY
DIREKTORAT JENDRAL BINA MARGA A N A L I S A B I A Y A P E K E R J A A NDIREKTORAT BINA PROGRAM JALAN
SUB DIT. PERENCANAAN JALAN LOKAL & PENYEDIAAN KERIKIL SUNGAI (TAK DISARING)KABUPATEN
( MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL:
URAIAN : ANGGAPAN / ASUMSI :1. Bulldozer membuat timbunan kerikil 1. Menggunakan alat berat ( 160 m3/hari )
ditepi sungai 2. Wheel Loader mengisi 3 truk / jam ( 6 jam kerja)2. Weel Loader mengisi truk dari 3. Pengangkutan jarak 10 km dari sumber
timbunan 4. Pengambilan material dengan dipungut pembayaran ganti,rugi royalti yang berlaku3. Dump truk mengangkut kerikil sungai 5. Volume yang di ukur berdasarkan 5 tonne/truk (lepas) BJ = 1,5
tidak disaring kelokasi penimbunan 6. 1,0 trip/jam/tratau pekerjaan 7. Penggunaan alat bantu rata-rata 1 set untuk 1 orang perbulan
P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y AORANG HARI/ORANG (Rp./org?hari) (Rp)
P Mandor 2.0 1 L 061 2 80,000.00 160,000.00 E
K Sopir 6.0 1 L 091 6 55,000.00 330,000.00 E
R Buruh tak terlatih 60.0 1 L 101 60 45,000.00 2,700,000.00 J
A
M A T R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y ASATUAN (Rp) (Rp)
M Ganti rugi kerikil sungai - royalti 60.0 m3 MR.42 225,000.00 13,500,000.00 A
T Alat bantu 2.5 set M.170 90,000.00 225,000.00 E
R
I
A
L
P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y AALAT KERJA KERJA (Rp./ jam) (Rp)
P
E Dump truk 6.0 1 E.221 36 131,914.45 4,748,920.32 R
A
L
A
T
A
N
TOTAL(Rp)
VOLUME/ : 60 SATUAN M3 HARGA SATUAN Rp. 361,065.34 QUANTITY
K O D E
K.030
TANGGAL:
SUB TOTAL(Rp)
1,535,000.00
SUB TOTAL(Rp)
20,860,000.00
SUB TOTAL(Rp)
1,356,796.87 23,751,796.87
per tone
K O D E
K.110
TANGGAL:
SUB TOTAL(Rp)
1,700,000.00
SUB TOTAL(Rp)
135,000.00
SUB TOTAL(Rp)
- 1,835,000.00
per M3
K O D E
K.112
TANGGAL:
SUB TOTAL(Rp)
3,050,000.00
SUB TOTAL(Rp)
14,717,266.74
SUB TOTAL(Rp)
1,319,144.53 19,086,411.28
per M'
M3
K O D E
K.121
TANGGAL:
SUB TOTAL(Rp)
1,580,000.00
SUB TOTAL(Rp)
940,800.00
SUB TOTAL(Rp)
2,520,800.00
per M'
K O D E
K.123
TANGGAL:
SUB TOTAL(Rp)
1,400,000.00
SUB TOTAL(Rp)
1,359,000.00
SUB TOTAL(Rp)
- 2,759,000.00
per M'
K O D E
K.115
TANGGAL:
SUB TOTAL(Rp)
1,680,000.00
SUB TOTAL(Rp)
6,388,200.00
SUB TOTAL(Rp)
0.00 8,068,200.00
per M'
K O D E
K.116
TANGGAL:
SUB TOTAL(Rp)
175,000.00
SUB TOTAL(Rp)
35,508,000.00
SUB TOTAL(Rp)
0.00 35,683,000.00
per M'
K O D E
K.139
TANGGAL:
SUB TOTAL(Rp)
8,790,000.00
SUB TOTAL(Rp)
6,003,126.70
SUB TOTAL(Rp)
- 14,793,126.70
per M3
K O D E
K.225
TANGGAL:
SUB TOTAL(Rp)
680,000.00
SUB TOTAL(Rp)
4,527,000.00
SUB TOTAL(Rp)
54,633.48 5,261,633.48
per M3
K O D E
K.211
TANGGAL:
SUB TOTAL(Rp)
250,000.00
SUB TOTAL(Rp)
90,000.00
SUB TOTAL(Rp)
2293418.67 2,633,418.67
per M2
K O D E
K.221
TANGGAL:
SUB TOTAL(Rp)
1,020,000.00
SUB TOTAL(Rp)
36,000.00
SUB TOTAL(Rp)
3040978.67 4,096,978.67
per M3
K O D E
K.224
TANGGAL:
SUB TOTAL(Rp)
1,510,000.00
SUB TOTAL(Rp)
900,000.00
SUB TOTAL(Rp)
2,410,000.00
per M3
K O D E
K.225
TANGGAL:
SUB TOTAL(Rp)
680,000.00
SUB TOTAL(Rp)
4,527,000.00
SUB TOTAL(Rp)
0.00 5,207,000.00
per M3
K O D E
K.311
TANGGAL:
SUB TOTAL(Rp)
745,000.00
SUB TOTAL(Rp)
34,090,000.00
SUB TOTAL(Rp)
3,103,665.81 37,938,665.81
per M3
K O D E
K.321
TANGGAL:
SUB TOTAL(Rp)
685,000.00
SUB TOTAL(Rp)
18,000.00
SUB TOTAL(Rp)
5976751.20 6,679,751.20
per M3
K O D E
K.342
TANGGAL:
SUB TOTAL(Rp)
420,000.00
SUB TOTAL(Rp)
90,000.00
SUB TOTAL(Rp)
2,789,082.72 3,299,082.72
per M2
K O D E
K.510
TANGGAL:
SUB TOTAL(Rp)
475,000.00
SUB TOTAL(Rp)
55,384,500.00
SUB TOTAL(Rp)
2742278.16 58,601,778.16
per M3
K O D E
K.512
TANGGAL:
SUB TOTAL(Rp)
475,000.00
SUB TOTAL(Rp)
62,608,672.50
SUB TOTAL(Rp)
3035789.87 66,119,462.37
per M3
K O D E
K.514
TANGGAL:
SUB TOTAL(Rp)
510,000.00
SUB TOTAL(Rp)
44,512,344.60
SUB TOTAL(Rp)
3,035,789.87 48,058,134.47
per M3
K O D E
K.012
TANGGAL:
SUB TOTAL(Rp)
725,000.00
SUB TOTAL(Rp)
36,036,000.00
SUB TOTAL(Rp)
7,733,344.60 44,494,344.60
per M3
K O D E
K.618
TANGGAL:
SUB TOTAL(Rp)
10,275,000.00
SUB TOTAL(Rp)
98,378,500.00
SUB TOTAL(Rp)
4,270,049.60 112,923,549.60
per M2
K O D E
K.017
TANGGAL:
SUB TOTAL(Rp)
675,000.00
SUB TOTAL(Rp)
12,018,000.00
SUB TOTAL(Rp)
10,720,522.80 23,413,522.80
per M3
K O D E
K.720
TANGGAL:
SUB TOTAL(Rp)
790,000.00
SUB TOTAL(Rp)
4,733,448.27
SUB TOTAL(Rp)
371,891.33 5,895,339.60
per M3
K O D E
K725
TANGGAL:
SUB TOTAL(Rp)
402,500.00
SUB TOTAL(Rp)
5,479,036.75
SUB TOTAL(Rp)
371,891.33 6,253,428.08
per M3
K O D E
K715
TANGGAL:
SUB TOTAL(Rp)
350,000.00
SUB TOTAL(Rp)
3,618,000.00
SUB TOTAL(Rp)
- 3,968,000.00
per Kg
K O D E
K.422
TANGGAL:
SUB TOTAL(Rp)
1,205,000.00
SUB TOTAL(Rp)
90,000.00
SUB TOTAL(Rp)
1,295,000.00
per M2
K O D E
K.424
TANGGAL:
SUB TOTAL(Rp)
1,810,000.00
SUB TOTAL(Rp)
108,000.00
SUB TOTAL(Rp)
1,319,144.53 3,237,144.53
per M'
K O D E
K.810
TANGGAL:
SUB TOTAL(Rp)
1,100,000.00
SUB TOTAL(Rp)
2,482,477.79
SUB TOTAL(Rp)
50,673.40 3,633,151.19
per M3
K O D E
K.528
TANGGAL:
SUB TOTAL(Rp)
1,260,000.00
SUB TOTAL(Rp)
87,180,293.07
SUB TOTAL(Rp)
2,420,289.39 90,860,582.45
per M3
K O D E
K.026
TANGGAL:
SUB TOTAL(Rp)
1,730,000.00
SUB TOTAL(Rp)
68,568,000.00
SUB TOTAL(Rp)
14,928,993.07 85,226,993.07
per tonne
K O D E
K.211
TANGGAL:
SUB TOTAL(Rp)
250,000.00
SUB TOTAL(Rp)
90,000.00
SUB TOTAL(Rp)
1,834,734.93 2,174,734.93
per M2
K O D E
K.520
TANGGAL:
SUB TOTAL(Rp)
475,000.00
SUB TOTAL(Rp)
61,739,307.00
SUB TOTAL(Rp)
3,035,789.87 65,250,096.87
per M3
K O D E
K.522
TANGGAL:
SUB TOTAL(Rp)
475,000.00
SUB TOTAL(Rp)
69,869,777.11
SUB TOTAL(Rp)
3,035,789.87 73,380,566.98
per M3
K O D E
K.016
TANGGAL:
SUB TOTAL(Rp)
980,000.00
SUB TOTAL(Rp)
12,955,500.00
SUB TOTAL(Rp)
7,020,033.13 20,955,533.13
per M3
K O D E
K.611
TANGGAL:
SUB TOTAL(Rp)
610,000.00
SUB TOTAL(Rp)
24,452,992.00
SUB TOTAL(Rp)
1,860,767.25 26,923,759.25
per LITER
K O D E
K.815
TANGGAL:
SUB TOTAL(Rp)
3,970,000.00
SUB TOTAL(Rp)
8,796,388.95
SUB TOTAL(Rp)
- 12,766,388.95
per M3
K O D E
F. 8
TANGGAL:
SUB TOTAL(Rp)
48,800.00
SUB TOTAL(Rp)
1,986,625.00
SUB TOTAL(Rp)
- 2,035,425.00
per M2
K O D E
K.515
TANGGAL:
SUB TOTAL(Rp)
3,075,000.00
SUB TOTAL(Rp)
27,304,900.40
SUB TOTAL(Rp)
1,081,112.13 31,461,012.53
per M3
K O D E
K.013
TANGGAL:
SUB TOTAL(Rp)
3,190,000.00
SUB TOTAL(Rp)
13,725,000.00
SUB TOTAL(Rp)
4,748,920.32 21,663,920.32
per M3
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATANPEKERJAAN : TMDD KABUPATENLOKASI : KEC. MUARA SAHUNG SUMBER DANAVOLUME : 23,6 KM
NO URAIAN PEKERJAAN ANALISA SATUAN VOLUME HARGA SATUAN
I. PEKERJAAN PERSIAPAN1. Pengukuran kembali M 23,600.00 500.00 2. Mobilisasi /Demobilisasi Ls 4.00 10,000,000.00 3. Barak kerja dan Peralatan Unit 1.00 10,000,000.00
II. PEKERJAAN TANAH1 Pengupasan dan Pembentukan B.Jalan K.211 M2 236,000.00 1,097.26 2 Galian Tanah biasa K 321 M3 94,400.00 32,000.00 3 Timbunan Tanah K.221 M3 23,600.00 34,141.49 4 Siring Galian Tanah K.110 M3 30,680.00 33,981.48
III. PEKERJAAN PERKERASAN1 Lapis Pondasi Bawah Klas.C K.514 Unit 14,160.00 400,484.45
IV. PEKERJAAN JEMBATAN1 Gorong - gorong Dia 60 Cm K.121 M1 - 315,100.00 4 Plat Duiker 2 x 2 x 15 Ls Unit - 75,000,000.00 5 Plat Duiker 1 x 1 x 15 Ls Unit - 45,000,000.00 6 Jembatan Bentang = 30 m Ls Unit 2.00 4,500,000,000.00 7 Jembatan Bentang = 20 m Ls Unit 3.00 3,000,000,000.00 8 Jembatan Bentang = 15 m Ls Unit 4.00 2,250,000,000.00 9 Jembatan Bentang = 10 m Ls Unit 4.00 850,000,000.00
10 Bronjong K.815 M3 - 510,655.56 11 Pasangan Batu K.810 M3 - 726,630.24
V. PEKERJAAN LAIN-LAIN1. Dokumentasi Proyek - Ls 1.00 2,500,000.00 2. Administrasi & Pelaporan Proyek - Ls 1.00 15,000,000.00 3. P3K & Obat-obatan dan Keamanan - Ls 1.00 2,000,000.00
VI. BIAYA PERENCANAAN1. Biaya Perencanaan Fisik - Paket 1.00
REKAPITULASI :I. PEKERJAAN PERSIAPAN Rp.
II. PEKERJAAN TANAH Rp.III. PEKERJAAN PERKERASAN Rp.IV. PEKERJAAN JEMBATAN Rp.V. PEKERJAAN LAIN-LAIN Rp.
VI. BIAYA PERENCANAAN Rp.JUMLAH Rp.PPN 10 % Rp.TOTAL Rp.PEMBULATAN Rp.
Terbilang :
Bintuhan, ................ 2011DIPERIKSA OLEH : DIBUAT OLEH :
KEPALA BIDANG BINA MARGA KASI PEMBANGUNANDINAS PEKERJAAN UMUM JALAN DAN JEMBATAN
KABUPATEN KAUR
M. E D I A N. ST J U M D I. ST.M.SiNIP. 19700706 200312 1 009 NIP.19690115 2006041005
RENCANA ANGGARAN BIAYA
: KAUR:
401280
JUMLAH HARGA 8024
300536
11,800,000.00 40,000,000.00 10,000,000.00 180 61,800,000.00
258,952,835.56 3,020,800,000.00 805,739,137.78 1,042,551,851.85 0.5 5,128,043,825.19 57,618,469.95 0.3
5,670,859,867.07 5,670,859,867.07
2,880,923,497.30 0.65 0.5 - - - - 41,666,667 9,000,000,000.00 500,000,000 9,000,000,000.00 9,000,000,000.00 3,400,000,000.00 - -
30,400,000,000.00 36,142,570,355.37 11,136,248,984.13 #REF!
#REF! 2,115,887,306.99 1,795,818,306.84 #REF! 2,500,000.00 13,252,136,291.12 #REF! 15,000,000.00 2,000,000.00 19,500,000.00 1,500,000
233,900,000.00 58,475,000,000.00 #REF! 233,900,000.00
61,800,000.00 81,300,000.00 5,128,043,825.19 5,670,859,867.07 30,400,000,000.00 4,232,710,369.23 19,500,000.00 233,900,000.00 41,514,103,692.25 4,151,410,369.23 45,665,514,061.48 45,665,514,000.00
Bintuhan, ................ 2011
KASI PEMBANGUNAN KOMANDAN KODIM 0408JALAN DAN JEMBATAN BENGKULU SELATAN
NIP.19690115 2006041005 SAFRUDIN
LETKOL. INF. NRP. 1910024430568
1,600,000,000 40
600,000,000 12
9,400,000,000 160
9,400,000,000 24
600,000,000 300
600,000,000 536
4,000,000,0004,000,000,0002,800,000,000
3,142,570,355.37 36,142,570,355.37 36,142,570,355.37
#REF!
#REF! 3,911,705,613.83 #REF!