CONSTRUCTION COST ESTIMATES
CIKAMPEK - PALIMANAN TOLL ROAD
TENDER PRICE - PACKAGE 6A
ITEM DESCRIPTION Package - 6A (Volume hasilPerhitungan Bersama)
1 General 11,227,995,000
2 Site Clearing -
3 Demolition 203,882,500
4 Road Eartworks 81,818,991,530
5 Structure Excavation 817,639,619
6 Drainage 10,802,377,864
7 Subgrade 7,969,389,245
8 Subbase and Base Course 21,332,156,948
9 Pavements 124,240,646,639
10 Concrete Structures 130,577,961,830
11 Structural Steel Works -12 Miscellaneous 24,460,369,902
13 Utilities -
14 Toll Gates and Facilities -
15 Diversion and Protection of Existing UtL. -
16 Toll Plaza Facilities -
17 Branch Office and Supporting Buildings -
A. Sub Total 413,451,411,077
B. Tax (PPN) - 10% of Sub Total (A x 0.1) 41,345,141,108
C. TOTAL (A + B) 454,796,552,185
ROUNDED 454,796,550,000
Jakarta, 27 Agustus 2013
PT. HUTAMA KARYA (Persero)
Ir. SUROTO, MM
General Manager
-
8/10/2019 time schedule kerja praktik
2/2
TIME SCHEDULE (S - CURVE)CIKAMPEK - PALIMANAN TOLL ROAD PROJECT, SECTION 6A (Sta 193+300 - Sta 200+950)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 3
27 - 04 05 - 11 12 - 18 19 - 25 26 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 -
1 GENERAL
1.19 Maintenance and Protection of Traffic (Temporary Road and Bridge) ls 0.242 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.00
1.20 (9) Remaining Mobilization Work not Covered by 1.20 (1) to 1.20 (8), above ls 2.096 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161
1.51 (1) Performance Bond ls 0.245 0.061 0.061 0.061 0.061
1.51 (2) Progress Report ls 0.121 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.00
1.51 (3) Insurance Premium ls 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
Sub Total 1 2.716 0.229 0.229 0.229 0.229 0.168 0.168 0.168 0.168 0.168 0.167 0.167 0.167 0.167 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.00
2 SITE CLEARING
Sub Total 2
3 DEMOLITION
3.01 (1) Removal of Masonry or Concrete Structures cu.m 0.028 0.007 0.007 0.007 0.007
3.01 (2) Removal of Hedge or Fences m 0.004 0.001 0.001 0.001 0.001
3.01 (3) Removal of Existing Curbs m 0.001 0.001
3.01 (4) Removal of Old Pavements sq.m 0.016 0.003 0.003 0.003 0.003 0.003
3.01 (5) Removal of Traffic Signs each 0.000 0.000
Sub Total 3 0.049 0.008 0.008 0.008 0.009 0.003 0.003 0.003 0.003 0.003
4 ROAD EARTHWORK
4.02 (1) CPT Test each 0.005 0.002 0.002
4.03 (1) Common Excavation of Suitable Materials re-measure cu.m 0.732 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
4.03 (2) Common Excavation of Unsuitable Materials re-measure cu.m 0.146 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
4.05 Borrow Material re-measure cu.m 16.365 0.491 0.491 0.491 0.491 0.491 0.245 0.245 0.245 0.245 0.213 0.213 0.213 0.213 0.213 0.245 0.245 0.245 0.245 0.409 0.409 0.409 0.409 0.540 0.540 0.540 0.540 0.655 0.655 0.655 0.65
4.06 (1) Settlement Plate each 0.040 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.00
4.06 (3) Piezometer each 0.052 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.00
4.07 Free Draining Material cu.m 0.127 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.00
4.08 Granular Backfill cu.m 2.284 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.12
4.9 Permeable Material cu.m 0.037
4.11 (2) Geotextile Sheet sq.m
Sub Total 4 19.789 0.033 0.033 0.033 0.036 0.533 0.531 0.531 0.531 0.531 0.285 0.285 0.285 0.285 0.269 0.269 0.269 0.269 0.269 0.301 0.301 0.301 0.301 0.416 0.416 0.536 0.536 0.667 0.667 0.667 0.667 0.781 0.781 0.781 0.78
5 STRUCTURE EXCAVATION5.01 (1) Structure Excavation to a depth not exceeding 2 m cu.m 0.061 0.010 0.010 0.010 0.010 0.010 0.010
5.01 (2) Structure Excavation to a depth greater than 2 m, but not exceeding 4 m cu.m 0.043 0.007 0.007 0.007 0.007 0.007 0.007
5.01 (3) Structure Excavation to a depth greater than 4 m cu.m 0.002 0.001 0.001
5.01 (7) Blinding Stone cu.m 0.092 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Sub Total 5 0.198 0.017 0.017 0.017 0.017 0.017 0.017 0.014 0.014 0.014 0.014 0.014 0.014 0.007 0.007
6 DRAINAGE
6.05 (3) R.C. Pipe, D = 60 cm, Type A m 0.023 0.011 0.011
6.05 (4) R.C. Pipe, D = 60 cm, Type B m 0.061 0.020 0.020 0.020
6.05 (7) R.C. Pipe, D = 100 cm, Type A m 0.107 0.027 0.027 0.027 0.027
6.05 (8) R.C. Pipe, D = 100 cm, Type B m 0.049 0.049
6.05 (9) R.C. Pipe, D = 120 cm, Type A m 0.441 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044
6.05 (10) R.C. Pipe, D = 120 cm, Type B m 0.508 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063
6.06 (4) U Ditch, DS-4 m 0.242 0.016.06 (5) U Ditch, DS-5 m 0.012
6.06 (6) U Ditch, DS-6 m 0.141 0.007 0.00
6.06 (7) U Ditch, DS-7 m 0.249 0.012 0.01
6.06 (8) U Ditch, DS-8 m 0.107 0.005 0.00
6.06 (11) U Ditch, DS-11 m 0.194 0.010 0.01
6.06 (13) U Ditch, DS-14 m 0.051
6.06 (15) Catchbasin DC-1 each 0.013
6.06 (23) Catchbasin DC-14 each 0.003
6.07 (1) Porous Drainage of Filter Material cu.m 0.089 0.004 0.00
6.07 (2) Plastic Filter Fabric sq.m 0.144 0.007 0.00
6.07 (3) Perforated Pipe for Sub surface Drainage Works m 0.107 0.005 0.00
6.07(4) Drain Inlet (DI - 3 & DO -3 ) each 0.060
6.07.(6) Mortared Rubble Chute DV - 5 cu.m 0.008
6.07.(7) Concrete klass D Chute DV - 5 cu.m 0.003
Sub Total 6 2.613 - 0.011 0.011 0.020 0.020 0.020 0.027 0.027 0.027 0.027 0.049 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.044 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.115 0.06
7 SUBGRADE
7.01 Subgrade Preparation sq.m 0.154 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.00
7.03 (1) Stabilization by Lime Stone cu.m 1.773 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118
Sub Total 7 1.928 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.125 0.125 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.00
8 SUBBASE AND ROAD BASE
8.01 Sub Base cu.m 0.302 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.01
8.02 (1) Aggregate Base Class A cu.m 4.858 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.18
Sub Total 8 5.160 0.012 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.19
9 PAVEMENTS
9.04 (1) Bituminous Prime Coat (Grade MC-70 or RC-250) kg 0.212
9.04 (2) Bituminous Tack Coat (Grade RC-250) kg 0.089
9.07 (1) Asphalt Treated Base Course ton 1.849
9.07 (2) Asphalt Concrete Binder Course ton
9.07 (3) Asphalt Concrete Surface Course ton 0.179
9.07 (4) Asphalt Cement ton 2.034
9.08 (1) Concrete Pavement (t=30 cm) sq.m 21.478 0.614 0.614 0.614 0.614 0.614 0.614 0.614 0.614 0.614 0.614 0.614 0.61
9.08 (3)a Concrete Pavement with steel mesh (t=30 cm) single sq.m 0.188
9.08 (3)b Concrete Pavement with steel mesh (t=30 cm) double sq.m 0.284
9.09 Wet lean concrete (t=10 cm) sq.m 3.735 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.120 0.12
Sub Total 9 30.050 0.120 0.120 0.120 0.120 0.734 0.734 0.734 0.734 0.734 0.734 0.734 0.734 0.734 0.734 0.734 0.73
10 CONCRETE STRUCTURE10.01 (1) Structural Concrete Class B-1 (Cross beams and diaprgam of prestressed concrete) cu.m 0.192 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.00
10.01 (4) Structural Concrete Class B-4 (reinforced concrete for bridge deck slab) cu.m 0.364 0.012 0.012 0.012 0.012 0.012 0.012 0.01
10.01 (5) Structural Concrete Class B-5 (reinforced concrete for pier columns) cu.m 0.290 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.01
10.01 (6) Structural Concrete Class C-1 (stairs of pedestrian bridge) cu.m 0.022
10.01 (7) Structural Concrete Class C-2 (reinforced and precast plate for slabs) cu.m 0.957 0.096 0.09
10.01 (8) Structural Concrete Class C-3 (footing for pedestrian bridge) cu.m 0.055
10.01 (9) Structural Concrete Class C-4 (Abutments, piers, approach slabs for bituminous pavement, retainin cu.m 3.869 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.138 0.13
10.01 (10) Structural Concrete Class C-5 (box culvert and encasement of pipe culverts) cu.m 3.117 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.10
10.01 (11) Structural Concrete Class D (gravity type retaining walls, concrete backfill, concrete in masonry str cu.m 0.037 0.01
10.01 (12) Structural Concrete Class E (levelling concrete, backfill concrete in masonry structures and as spec cu.m 0.182 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
10.02 Reinforcing Steel Bars kg 9.908 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.19
10.03 (1)a PC U1-14 Girder each 0.257 0.129 0.129
10.03 (2)a PC U1-21 Girder each 0.303 0.151 0.151
10.03 (2)b PC U1-25 Girder each 0.090 0.090
10.03 (3)a PC U2-14 Girder each 0.575 0.144 0.144 0.144 0.14410.03 (4)a PC U2-21 Girder each 0.839 0.21
10.03 (4)c PC U3-14 Girder each 0.177
10.03 (5)b PC U3-21 Girder each 0.794
10.03 (9) PC T30 Edge Beam each 0.477
10.03 (10) PC T30 Inner Beam each 1.162
10.03 (17) Deck Connection (tie bolts at movement joints) kg 0.003
10.03 (20) PC I 25 Edge Beam each 0.799
10.05 (1) Furnish PretensionedS un Concrete Pile outside diameter 50 cm re-measure m 1.485 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099 0.099
10.05 (2) Driving Pretensioned Spun Concrete Pile, outside diameter 50 cm (re-measure) m 0.283 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
10.05 (3) Furnish and Drive Pretensioned Spun Concrete Pile, test pile, outside diameter 50 cm m 0.125 0.062 0.062
10.05 (7)a Loading Test on PretensionedSpun Concrete Pile, outside diameter 50 cm (MLT) each 0.051 0.051
10.05 (12) Pile Testing (PDA) each 0.048 0.008 0.008 0.008 0.008 0.008 0.008
10.07 (1) Cast-in-place Concrete Pile, 100 cm in diameter m 4.002 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222
10.07 (2) Loading Test (MLT) for Cast-in-place Concrete Pile, 100 cm in diameter each 0.048 0.048
10.08 Test Drilling m 0.000 0.000
10.09 (1) Bridge Railling m 0.180
10.09 (2) Stair Handrail m 0.058
10.09 (3) Chainlink Fence m 0.180
10.10 (1) Expansion Joint, Type A m 0.194
10.11 (1) Elastromeric Bearings, Type A each 0.010 0.005 0.005
10.11 (2) Elastromeric Bearings, Type B each 0.169 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.01
10.11 (3) Elastromeric Bearings, Type C each 0.057
10.11 (4) Elastromeric Bearings, Type D each 0.090
10.11 (7) Elastromeric Bearings, Type G each 0.069
10.12 (1) Drain Pipe diameter 20 cm with Fitting and Supports m 0.010
10.12 (2) Drain Pipe diameter 15 cm with Fitting and Supports m 0.029
10.12 (3) Deck Drain Gullies complete with Fittings each 0.024
Sub Total 10 31.582 0.322 0.329 0.693 0.693 0.788 0.788 0.796 0.788 0.788 0.796 0.788 0.788 0.796 0.788 0.796 0.703 0.711 0.759 0.534 0.484 0.605 0.611 0.634 0.646 0.584 0.638 0.631 0.631 0.727 0.80
11 STRUCTURAL STEEL WORK
Sub Total 11
12 MISCELLANEOUS
12.01 (1) Solid Sodding sq.m 0.153
12.01 (2) Strip Sodding sq.m 0.156
12.02 (1) Stone Masonry cu.m 1.039
12.03 (2) Concrete BlocK Slope Protection SP-A sq.m 0.077
12.05 Mortared Rubble sq.m 0.252
12.06 (1) Vehicle Guardrail, Type-A m 1.599
12.06 (12) Removable Barrier Post each 0.000
12.07 (1) Regulatory and Warning Signs Type - A1 each 0.028
12.07 (2) Regulatory and Warning Signs Type - A2 each 0.02112.07 (3) Regulatory and Warning Signs Type - B1 each 0.010
12.07 (4) Regulatory and Warning Signs Type - B2 each 0.002
12.07 (5) Regulatory and Warning Signs Type - C each 0.025
12.08 (7) Guide Sign Type E1 (Attachment on Roof, for Barrier Gate) each 0.119
12.08 (8) Guide Sign Type E2 (Attachment on Roof, for Interchange Toll Gate) each 0.123
12.09 (2) Road Marking, Type-A General Application sq.m 0.214
12.09 (3) Road Marking, Type-A Special Application sq.m 0.002
12.09 (6) Rumble Strip configuration t = 10 mm sq.m 0.057
12.12(1) Concrete Curb Type A m 0.023
12.19 (2) Wire-mesh Mattress, Furnished and Stone Filled cu.m 0.262
12.20 (1) Kilometer Posts (1 km) each 0.001
12.20 (2) Kilometer Posts (200 m) each 0.003
12.20 (4) Guide Post Type A each 0.022
12.20 (5) Guide Post Type B each 0.179
12.21 (1) Right-of-way Fence, Type-A m 0.21012.21 (2) Right-of-way Fence, Type-B m 1.104
12.21 (3) Right-of-way Fence, Type-C m 0.232
12.21 (4) Right-of-way Fence Gate, Type-A each 0.001
12.21 (5) Right-of-way Fence Gate, Type-B each 0.001
Sub Total 12 5.916
SUMMARY PROGRESS (%) 100.000 0.271 0.389 0.389 0.392 1.161 1.177 1.541 1.550 1.645 1.395 1.406 1.398 1.398 1.229 1.249 1.244 1.140 1.318 1.472 1.380 1.388 1.435 1.938 1.888 2.129 2.155 2.309 2.321 2.259 2.313 2.421 2.421 2.568 2.59
SUMMARY MONTHLY PROGRESS (%) 1.440 7.075 5.598 6.180 5.675 8.111 9.202
ACCUMULATIVE SUMMARY PROGRESS (%) 0.000 0.271 0.659 1.048 1.440 2.601 3.778 5.320 6.870 8.515 9.910 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### 27.906 29.795 31.924 34.079 36.388 38.709 40.968 43.281 45.701 48.122 50.690 53.2
ITEM NO.UNIT
QTY
(%)DESCRIPTION
Oktober 2013 November 2013 Desember 2013 Januar 2014 Frebruar 2014 Maret 2014 Apr l 2014 Me 2014