THE POWER OF OEE
-
Upload
anang-tristianto -
Category
Education
-
view
307 -
download
2
description
Transcript of THE POWER OF OEE
OEE PT. Santos Jaya Abadi Instant Coffee
Plant
Created By Anang
Raya Panjunan Km 3
1. Apa Kepanjangan Dari OEE ?2. Jelaskan Pengertian / Definisi Tentang
OEE ?3. Factor apa yang Mempengaruhi OEE ?4. Jelaskan Tentang AVAILABILITY ?5. Jelaskan Tentang PERFORMANCE ?6. Jelaskan Tentang QUALITY ?7. Jelaskan Tentang Downtime ?
Pre Test
Garis Besar :PengenaIan OEEOEE ManufacturingResep rahasia: I x F x AStudi kasus: OEE Improvement
The Power of OEE
1. PENGENALAN OEE
Created By Anang
OEE (Overall Equipment Effectiveness) adalah cara "best practice" untuk memonitor dan mengimprove effectiveness dari manufacturing processes (i.e. machines, manufacturing cells, assembly lines).
• OEE adalah metriks terpadu yang mengukur tingkat yang dihasilkan dari suatu proses
Definisi OEE
Masurement adalah dasar dari improvement"
Zero Losses Zero Breakdowns Zero Defects Zero Accidents
Continuous Improvement Berkesinambungan Berdasarkan Team Work Activity Tidak Tergantung Orang-2 Tertentu
World Class Manufacturing company
Tujuan OEE / Goals
Production Engineering / Maintenance Quality Control / Assurance Human Resources Development Management And all related parties who can contribute
Siapa Yang Akan Melakukan OEE ?
Body Mass Index Kategori
> 30 OBESITAS
25,0 - 29,9 OVERWEIGHT
18,5 - 24,9 NORMAL
< 18,5 UNDERWEIGHT
Measurement create Crisis
mass(kg)BMI =
(height(m))2
You can’t improve if you don’t control You can’t control if you don’t measure You can’t measure if you don’t check You can’t check if you don’t understand You can’t understand if you don’t learn You can’t learn if you don’t know You won’t know if you aren’t willing
You can’t improve if you aren’t willing
Major Losses
Losses Due To Machine
Breakdown
Losses Due To Set Up, Change Over
Losses Due To Deffect
Losses Due To Rework
Speed Loss Minor Stopage
“Berapa Resources Yang Terbuang”
Input : Machine Man
Power Material Energy
Knowing your Losses is very valuable!
Losses adalah pemakaian resource yang tidak dirasakan oleh end customer tapi hanya menambah biaya produk
Time Diagram
Manned time Unused
time
Change overtime
- No Order No Activity
- Idle time
- “Extra” cleaning, training, meetings
- Speeds less than nominal capacity
- Minor stops (< 15 minutes)
- Cleaning
- Trial
- Start-up / Shut down mesin
- Set-up and
equipment adjustment
- Breakdowns mechanical (> 15 minutes)
- All quality defects
including products on hold
Theoretical Prod. Time =
good product / nom.capacity
- Shift system
- Nights & Weekends
unmanned
- Holidays
Effi
cie
ncy
Pre
para
tion
Qu
ality
Perfo
rman
ce
Availa
bility
Good product orTheoretical
Production time
Reject &rework
Speed losses &
minor stopsProduction time
Planneddowntime
YearlyMaint.
Team
main
t.ra
tio.
NONAEffective working time
Lab
ou
r.P
lan
.Eff
.
- shut down / overhole
OP
I
OP
I NO
NA
Eff
ecti
vit
y
Externalstops
no electricity, no steam, no compressed air, no water
Total time
Actual production time
Breakdowntime
Operating time
Available production time
OEE COMPOSITION
Company OEE
Awal Untuk OEE Umum 30% - 50%
World Class OEE 85% - 95%
World Class OEE
OEE = Availability x Performance x Quality
OEE Formula
OEE
Availability
Performance Quality
Breakdown Losses Minor Stoppage Scrap/Rework
Setup & Adjustment Speed Losses Start Up
Six Big Losses
Created By Anang
2. OEE Manufacturing
OEE & Lean ManufacturingBusiness Result
Return Of Stageholder EquityOperating Margin, Cash Flow
Operating Excellence
Continous Improvement
OEE – Operational Stability5R Stadndart Work, Maintenant Management
PeopleLean
Processes
Six Big Losses
Model OEE OEE = Availability x Performance x Quality
Perusahaan ManufacturingRunning Time = 8 JamBeakdown Mesin = 60 menitSetup Adjustment = 30 menit
Availability = (Actual Running Time / Planed Running Time) x 100%
= (8 Jam – (60+30 Menit) / (8 Jam)) x 100%
= 81 %
Contoh : Availability Calculation
Avaiability Time = 8 Jam – 1,5 Jam = 6,5 JamTheoritical Speed = 120 Pcs / Jam Actual Output = 580 Pcs (Good+Reject)
Performance = (Actual Output/Theoritical OutPut) x 100%
= (580 Pcs/(120 Pcs/Jam x 6,5 Jam)) x 100%
= 74%
Contoh : Performance Calculation
Actual Output = 580 Pcs (Good+Reject)Good = 500 PcsReject/Rework = 80 Pcs
Quality = (Actual Good / Actual Output) x 100%
= (500 Pcs/580 Pcs) x 100%
= 86%
Contoh : Quality Calculation
Availability = 81%Performance = 74%Quality = 86%
OEE = Availability x Performance x Quality
= 81% x 745 x 86%
= 52%
Contoh : OEE Calculation
3. Latihan Menghitung OEE
Latihan Menghitung OEE
Diketahui :
Total Time = 7 Jam Breakdown Mesin = 45 Menit Setup Adjustment = 45 Menit Theoritical Speed =2.000 Botol/Jam Actual Output = 6.300 Botol (Good & Reject) Good Product = 5.900 Botol; Reject = 400 Botol
Hitung : Availability, Performance, Quality dan OEE ?
Hitung OEE Manufacturing
Availability : (7 x 60) – (45 x 2) / (7 x 60) : 330 / 420 : 78,57 %
Performance : 6.300 / ((330/60) x 2.000): 6.300 / 11.000: 57,27 %
Quality : 5.900 / 6.300: 93,65 %
OEE : 78,57 % x 57,27 % x 93,65 % : 42,14 %
Jawaban Soal :1
Diketahui :
Running Time = 7 Jam Breakdown Mesin = 45 Menit Setup Adjustment = 45 Menit Cleaning Mesin = 20 Menit Theoritical Speed =2.000 Botol/Jam Idle menunggu Kemasan = 15 Menit Actual Output = 6.300 Botol (Good & Reject) Good Product = 5.900 Botol; Reject = 400 Botol Jumlah Yang Bisa di Rework = 200 Botol
Hitung : Availability, Performance, Quality dan OEE ?
Hitung OEE Manufacturing
How To Improve OEE
Information x Focus x Action
Improve OEE
Result = I x F x A Terlalu Banyak Data, Tetapi Tidak Banyak Informasi
Tidak ada Informasi Dapat Berarti Keputusan dibuat Berdasarkan Insting.
Ketiadaan Informasi menyebabkan tidak ada focus di perusahaan
Tidak ada Fokus utama untuk Improvment.effisiensi hanya menjadi sakah satu performance Indikator, tetapi belum menjadi sasaran satu perusahaan.
Tidak ada nya fokus menjadi penyebab tidak adanya alasan nyata untuk aksi.
Tidak ada aksi untuk mencapai sasaran bersama.
Semua menjalankan bisnis as ussual (seperti biasanya)
Accurate Data As Close to real time as you can get it Focusing On what caused you to be off track Review regularly and act !!!
Informasi Yang Tepat
Collect Data pada banyak mesin, masalah produkstivitas,Tidak ada waktu - terlalu sibuk
Data tidak akurat :Tidak merekan minor StopMembulatkan angkaBudget Time
Karena data idak akurat, maka data tidak dipakai, sehingga operator tidak mengisi dengan benar.
Hasilnya : Tidak ada improvement
Issue menggunakan manual data collection
Keuntungan Automated Data Collection
Manual System - Reaktif Automated System - Proaktif
Slow Reaktion Rapid Reaction
Historical Information Real Time
Snap Shot Audit Continous Visualization
Inaccurate data Accurate Data
Perceived Losses On Critical Machine Real Losses on Critical Machine
OEE Score Board (OEE DashBoard)
Terima kasih
1. Apa Kepanjangan Dari OEE ?2. Jelaskan Pengertian / Definisi Tentang
OEE ?3. Factor apa yang Mempengaruhi OEE ?4. Jelaskan Tentang AVAILABILITY ?5. Jelaskan Tentang PERFORMANCE ?6. Jelaskan Tentang QUALITY ?7. Jelaskan Tentang Downtime ?
Post Test